CN114481857A CN202210265273.3A CN202210265273A CN114481857A CN 114481857 A CN114481857 A CN 114481857A CN 202210265273 A CN202210265273 A CN 202210265273A CN 114481857 A CN114481857 A CN 114481857A
Authority
CN
China
Prior art keywords
highway
hanging
template
post
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210265273.3A
Other languages
Chinese (zh)
Inventor
王瑞
李奔琦
杨忠勇
吴小俊
阮梦飞
朱文
田永强
杭正雨
沈伟
王成穆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
2nd Engineering Co Ltd of MBEC
Original Assignee
2nd Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 2nd Engineering Co Ltd of MBEC filed Critical 2nd Engineering Co Ltd of MBEC
Priority to CN202210265273.3A priority Critical patent/CN114481857A/en
Publication of CN114481857A publication Critical patent/CN114481857A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a post-cast section hanging template system for a middle flange of a highway and railway dual-purpose bridge, which comprises: a support beam; the supporting beam extends from one side of the poured flange plate to the other side of the poured flange plate; the supporting seat is arranged at the bottom of the supporting beam; the hanging piece is detachably connected with the supporting beam; the hanging piece penetrates through a designed seam of the beam body; the template longitudinal beam is arranged at the bottom of the hanging piece; the template cross beam is arranged on the template longitudinal beam; and the panel is arranged on the template cross beam. The invention has the characteristics of saving construction period and cost, wide application range and the like.

Description

Post-cast section hanging template system for middle flange of highway and railway dual-purpose bridge and highway beam
Technical Field
The invention relates to the technical field of highway and railway dual-purpose bridges, in particular to a hanging template system for a post-pouring section of a middle flange of a highway beam of a highway and railway dual-purpose bridge.
Background
The highway-railway dual-purpose bridge has the characteristic of multiple purposes, one bridge can meet the traffic requirements of two ways of highways and railways, and the bridge type is more and more applied to modern bridge design along with the rapid development of high-speed railways.
When the highway and railway dual-purpose bridge is designed, a common railway is arranged at the lower layer, and a highway is arranged at the upper layer. Because the requirement for railway running is high, in order to avoid the influence of objects falling above the upper layer on the railway running safety, the middle of the left and right width of the upper layer highway beam is usually designed to be a closed structure, namely, the flange plates in the middle of the left and right width highway beams are widened, and the clear distance is only about 2 cm. When the main body of the highway beam is constructed, the middle widening section is usually not constructed temporarily, and pouring construction is carried out after the main body is constructed. When the post-cast section between the left and right road beams is constructed, a full framing support is erected to form a template supporting system, or a hanging rod hole is arranged on the post-cast section, and the hanging template is used for construction. The method has the advantages of large workload of installing and detaching the bracket, high safety risk, long time consumption, more required materials and higher cost.
Disclosure of Invention
Aiming at the prior art, the invention provides a post-cast section hanging template system for a middle flange of a highway and railway dual-purpose bridge and highway beam, which has the characteristics of construction period and cost saving, wide application range and the like.
The invention provides a post-cast section hanging template system for a middle flange of a highway and railway dual-purpose bridge, which comprises:
a support beam; the supporting beam extends from one side of the poured flange plate to the other side of the poured flange plate;
the supporting seat is arranged at the bottom of the supporting beam;
the hanging piece is detachably connected with the supporting beam; the hanging piece penetrates through a designed seam of the beam body;
the template longitudinal beam is arranged at the bottom of the hanging piece;
the template cross beam is arranged on the template longitudinal beam;
and the panel is arranged on the template cross beam.
Preferably, the supporting seat is assembled by a plurality of I-shaped beams.
Preferably, the supporting seat comprises two bottom I-shaped beams, and the upper ends of the two bottom I-shaped beams are provided with a top I-shaped beam.
Preferably, the hanging piece comprises a first hanging rod and a second hanging rod, the second hanging rod penetrates through a design seam of the beam body, and a fixing frame is arranged at the top of the second hanging rod; the first suspender passes a supporting beam extremely the inboard of fixed frame, just the first suspender with a supporting beam passes through first bolted connection, with fixed frame passes through second bolted connection.
Preferably, the number of the first bolts is two, the first bolts are arranged in a stacked mode, and a cushion block is arranged between the first bolts and the supporting beam.
Preferably, the number of the second bolts is two, and the two second bolts are respectively arranged on the inner side and the outer side of the fixing frame.
Preferably, the first hanger rod, the second hanger rod and the fixed frame are all made of steel materials.
Compared with the prior art, the invention has the beneficial effects that: the invention has simple structure, definite stress, safety and reliability; the required material is less, and the cost is saved; the construction only needs to be assembled and disassembled once, the die can be moved forwards in the process, repeated assembly and disassembly are not needed, the working procedure is simple, and the construction period and the cost are saved; the template system is installed and dismantled on the beam end pier top, so that the safety risk is controllable; is not influenced by ground environment and has wide application range.
Drawings
FIG. 1 is a front view of an embodiment of the present invention.
Fig. 2 is a side view of an embodiment of the present invention.
Wherein, 1, a support beam; 2. pouring a flange plate; 3. a bottom I-beam; 4. jacking the I-beam; 5. a first boom; 6. a second boom; 7. a fixing frame; 8. a first bolt; 9. a second bolt; 10. cushion blocks; 11. template longitudinal beams; 12. a template beam; 13. a panel; 14. and (5) post-pouring.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further explained below by combining the specific drawings.
Examples
As shown in fig. 1 and 2, a post-cast section hanging template system for a middle flange of a highway and railway dual-purpose bridge and highway beam comprises: a support beam 1 and a hanger.
Supporting beam 1 extends to the flange board 2 of pouring of opposite side from the flange board 2 of pouring of one side, and supporting seat all is equipped with to supporting beam 1's both sides bottom, the supporting seat includes two end I-beams 3, and a top I-beam 4 is laid to two end I-beams 3's upper end.
The hanging piece comprises a first hanging rod 5 and a second hanging rod 6, the second hanging rod 6 penetrates through the design seams of the left side beam body and the right side beam body, and a fixing frame 7 is arranged at the top of the second hanging rod 6; first jib 5 passes a supporting beam 1 to the inboard of fixed frame 7, and first jib 5 is connected through first bolt 8 with a supporting beam 1, passes through second bolt 9 with fixed frame 7 and is connected, and first bolt 8 sets up two, stacks and arranges, and is equipped with cushion 10 between first bolt 8 and a supporting beam 1, and second bolt 9 sets up two, arranges the inside and outside of fixed frame 7 in respectively, and the second bolt 9 in the outside tightly touches with a supporting beam 1. The bottom of the second suspension rod 6 is positioned at the lower side of the post-pouring section 14, a template longitudinal beam 11 is arranged on the template longitudinal beam, a template cross beam 12 is arranged on the template longitudinal beam, and a panel 13 is laid on the template cross beam. The first hanger bar 5, the second hanger bar 6 and the fixed frame 7 are all made of steel materials.
In the embodiment, a support seat and a support beam 1 are arranged on a poured beam body, a hanging piece is arranged in the middle, a hanging strip penetrates through a designed seam of the beam body, the top of the hanging piece is connected with the support beam 1, the bottom of the hanging piece is connected with a template longitudinal beam 11, and a template transverse beam 12 and a panel 13 are laid on the top of the template longitudinal beam 11 to form a hanging template system. The hanging template system can be designed in a segmented mode, is installed on the pier top of one end of the box girder, and after the front block section is poured, the second suspender 6 is placed under the template, so that the template system can be integrally moved forwards, next block section construction is carried out, and the template does not need to be dismantled and installed again. And after the middle post-pouring section is completely poured, removing the template system at the pier top.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all equivalent structures made by using the contents of the present specification and the drawings can be directly or indirectly applied to other related technical fields, and are within the scope of the present invention.

Claims (7)

1. The utility model provides a template system is hung to post-cast section of flange in middle of dual-purpose bridge highway roof beam of highway and railway, its characterized in that includes:
a support beam; the supporting beam extends from one side of the poured flange plate to the other side of the poured flange plate;
the supporting seat is arranged at the bottom of the supporting beam;
the hanging piece is detachably connected with the supporting beam; the hanging piece penetrates through a designed seam of the beam body;
the template longitudinal beam is arranged at the bottom of the hanging piece;
the template cross beam is arranged on the template longitudinal beam;
and the panel is arranged on the template cross beam.
2. The post-cast section hanging formwork system for road and railway dual-purpose bridge and road beam middle flange as claimed in claim 1, wherein the supporting seat is assembled by a plurality of I-beams.
3. The post-cast section hanging formwork system for road and railway bridges and highway beams intermediate flanges as claimed in claim 2, wherein the supporting base comprises two bottom I-beams, and a top I-beam is arranged at the upper ends of the two bottom I-beams.
4. The post-cast section hanging template system for the middle flange of the highway and railway dual-purpose bridge and highway beam as claimed in claim 1, wherein the hanging piece comprises a first hanging rod and a second hanging rod, the second hanging rod penetrates through the designed seam of the beam body, and a fixing frame is arranged at the top of the second hanging rod; first jib passes it extremely to prop up supporting beam the inboard of fixed frame, just first jib with it passes through first bolted connection to prop up supporting beam, with fixed frame passes through second bolted connection.
5. The post-cast section hanging template system for the road flange of the highway beam of the highway-railway dual-purpose bridge as claimed in claim 4, wherein two first bolts are arranged in a stacked mode, and a cushion block is arranged between each first bolt and the corresponding supporting beam.
6. The post-cast section hanging template system for the road and railway dual-purpose bridge and road beam middle flange as claimed in claim 4, wherein two second bolts are arranged and are respectively arranged on the inner side and the outer side of the fixing frame.
7. The highway beam middle flange post-cast section hanging formwork system according to claim 4, wherein the first hanger rod, the second hanger rod and the fixed frame are made of steel materials.
CN202210265273.3A 2022-03-17 2022-03-17 Post-cast section hanging template system for middle flange of highway and railway dual-purpose bridge and highway beam Pending CN114481857A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210265273.3A CN114481857A (en) 2022-03-17 2022-03-17 Post-cast section hanging template system for middle flange of highway and railway dual-purpose bridge and highway beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210265273.3A CN114481857A (en) 2022-03-17 2022-03-17 Post-cast section hanging template system for middle flange of highway and railway dual-purpose bridge and highway beam

Publications (1)

Publication Number Publication Date
CN114481857A true CN114481857A (en) 2022-05-13

Family

ID=81485465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210265273.3A Pending CN114481857A (en) 2022-03-17 2022-03-17 Post-cast section hanging template system for middle flange of highway and railway dual-purpose bridge and highway beam

Country Status (1)

Country Link
CN (1) CN114481857A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB946548A (en) * 1959-05-23 1964-01-15 Strabag Bau Ag Methods of constructing concrete bridges and like structures
JPH08199510A (en) * 1995-01-20 1996-08-06 P S Co Ltd Execution method of cast-in-place floor slab section of precast concrete girder and form thereof
JP2009057685A (en) * 2007-08-29 2009-03-19 Sumitomo Mitsui Construction Co Ltd Movable suspension support
CN108951424A (en) * 2018-07-09 2018-12-07 中国五冶集团有限公司 The formwork support structure and construction method that bridge suspension type pours
CN113481852A (en) * 2021-06-16 2021-10-08 五冶集团上海有限公司 Bridge wet joint formwork system capable of being continuously constructed

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB946548A (en) * 1959-05-23 1964-01-15 Strabag Bau Ag Methods of constructing concrete bridges and like structures
JPH08199510A (en) * 1995-01-20 1996-08-06 P S Co Ltd Execution method of cast-in-place floor slab section of precast concrete girder and form thereof
JP2009057685A (en) * 2007-08-29 2009-03-19 Sumitomo Mitsui Construction Co Ltd Movable suspension support
CN108951424A (en) * 2018-07-09 2018-12-07 中国五冶集团有限公司 The formwork support structure and construction method that bridge suspension type pours
CN113481852A (en) * 2021-06-16 2021-10-08 五冶集团上海有限公司 Bridge wet joint formwork system capable of being continuously constructed

Similar Documents

Publication Publication Date Title
CN108505405B (en) Combined construction structure of suspension type monorail and highway bridge
CN101603288A (en) A kind of three-truss main girder structure of highway and railway bi-purpose cable-stayed bridge and mounting method thereof
CN110409318B (en) Assembling and erecting method for large-span simply-supported steel-concrete composite beam
CN108149577B (en) A kind of steel bracket system and its installation method
CN210066504U (en) Large-span cantilever truss type bent cap support system
CN215925691U (en) Bearing support for casting No. 0 block of bridge
CN216238129U (en) Continuous rigid frame bridge side span cast-in-place section and closure section integral construction hanging bracket
CN211596455U (en) Basket is hung in quick construction of double-deck edge of a wing concrete box girder bridge
CN211420881U (en) Movable formwork for concrete construction of overhanging wing plate of steel-concrete composite beam
CN208472473U (en) A kind of suspension type monorail and highway bridge build structure jointly
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN208328660U (en) The U-shaped girder construction of the Two bors d's oeuveres of combined bridge
CN110700112A (en) Movable formwork for concrete construction of overhanging wing plate of steel-concrete composite beam and construction method
CN114481857A (en) Post-cast section hanging template system for middle flange of highway and railway dual-purpose bridge and highway beam
CN210395127U (en) Assembled Bailey beam hanging basket upper walking system
CN109356088B (en) High pile wharf cast-in-situ beam template suspension supporting device and supporting system
CN106917345B (en) A kind of novel railway overhead device
CN112482241A (en) Walking type hanging bracket for post-pouring section of box girder flange plate and construction method thereof
CN108316119B (en) Steel construction overpass convenient to installation
CN207538205U (en) A kind of tower intelligent stereo garage main body module assembly connection structure
CN205576746U (en) A new support for U type flange board is cast -in -place
CN216474535U (en) Movable construction platform for bridge inter-span construction
CN213389733U (en) Suspension type operation platform of overline bridge steel case roof beam construction and installation
CN109252455A (en) A kind of free cantilever erection construction method of more main truss Steel truss structures
CN213389745U (en) Cantilever bridge side span formwork system

Legal Events