CN114413275A - Method for treating blockage of air preheater and reducing flue pressure - Google Patents
Method for treating blockage of air preheater and reducing flue pressure Download PDFInfo
- Publication number
- CN114413275A CN114413275A CN202111598454.XA CN202111598454A CN114413275A CN 114413275 A CN114413275 A CN 114413275A CN 202111598454 A CN202111598454 A CN 202111598454A CN 114413275 A CN114413275 A CN 114413275A
- Authority
- CN
- China
- Prior art keywords
- flue gas
- air
- outlet
- flue
- heat exchanger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23L—SUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
- F23L15/00—Heating of air supplied for combustion
- F23L15/04—Arrangements of recuperators
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J15/00—Arrangements of devices for treating smoke or fumes
- F23J15/02—Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material
- F23J15/022—Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material for removing solid particulate material from the gasflow
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J15/00—Arrangements of devices for treating smoke or fumes
- F23J15/06—Arrangements of devices for treating smoke or fumes of coolers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/34—Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Chimneys And Flues (AREA)
- Air Supply (AREA)
Abstract
Description
技术领域technical field
本发明涉及烟气输送技术领域,更具体的说是涉及一种处理空气预热器堵塞及降低烟道压力的方法。The invention relates to the technical field of flue gas conveying, and more particularly to a method for dealing with blockage of an air preheater and reducing flue pressure.
背景技术Background technique
目前燃煤锅炉风烟系统的送风系统为了使燃料在炉内能够正常燃烧,必须向炉膛内送入燃料燃烧所需要的空气,用送风机克服风道、空气预热器和燃烧器产生的流动阻力,并提供燃料燃烧所需的氧气。二次风流程为:空气经过滤网、消音器,垂直进入两台轴流送风机提压后,经过空预器入口二次风电动挡板进入空预器,再经二次风道进入两台容克式三分仓空气预热器的二次风仓中预热成热二次风,再经空预器出口热二次风电动挡板送至锅炉热二次风箱进入炉膛助燃。锅炉的烟气系统,炉膛尾部烟道的高温烟气经过脱硝反应器去除NOx后抽出,经空预器入口烟气电动挡板进入两台容克式三分仓空气预热器的烟气腔加热一次风和二次风,后进入电除尘装置除去烟气中的灰尘,经过引风机升压后进入脱硫装置去除烟气中的SO2,后经烟囱排向大气。In order to make the fuel burn normally in the furnace, the air supply system of the current coal-fired boiler fume system must supply the air required for fuel combustion into the furnace, and use the air supply fan to overcome the flow generated by the air duct, air preheater and burner. resistance and provide the oxygen needed for the fuel to burn. The secondary air process is as follows: the air passes through the filter screen and the muffler, vertically enters the two axial-flow blowers for pressure, then enters the air preheater through the secondary air electric baffle at the inlet of the air preheater, and then enters the two air preheaters through the secondary air duct. The hot secondary air is preheated in the secondary air silo of the Junker-type three-silo air preheater, and then sent to the boiler hot secondary air box through the electric baffle of the outlet of the air preheater to enter the furnace to support combustion. In the flue gas system of the boiler, the high temperature flue gas from the flue at the tail of the furnace is extracted after removing NOx through the denitrification reactor, and then enters the flue gas cavity of the two Junker-type three-silo air preheaters through the electric baffle of the flue gas at the inlet of the air preheater. The primary air and secondary air are heated, and then enter the electrostatic precipitator to remove the dust in the flue gas. After being boosted by the induced draft fan, it enters the desulfurization device to remove the SO 2 in the flue gas, and then is discharged to the atmosphere through the chimney.
燃煤锅炉排出的烟气需要全部经过脱硝、脱硫、除尘设备后才能排向大气,在锅炉烟气脱硝过程中由于氨逃逸过大造成空预器冷端大量堆积硫酸氢铵,容易造成空预器堵塞,空预器换热效率低,排烟温度高,炉膛负压波动大,送引风机电流大,存在风机失速和锅炉面临灭火的风险,锅炉效率低;另外,也会导致引风机入口处烟道压力在高负荷时超低限,引发锅炉烟道变形或者破裂,不得不降低锅炉负荷。The flue gas discharged from the coal-fired boiler needs to go through denitration, desulfurization and dust removal equipment before it can be discharged to the atmosphere. During the denitration process of the boiler flue gas, due to the excessive escape of ammonia, a large amount of ammonium hydrogen sulfate is accumulated at the cold end of the air preheater, which is easy to cause air preheater. The air preheater is blocked, the heat exchange efficiency of the air preheater is low, the exhaust gas temperature is high, the negative pressure of the furnace fluctuates greatly, the current of the induced draft fan is large, there is the risk of the fan stall and the boiler facing fire, and the boiler efficiency is low; in addition, it will also lead to the inlet of the induced draft fan. The flue pressure at high load exceeds the low limit, causing the boiler flue to deform or rupture, and the boiler load has to be reduced.
目前降低空预器差压主要通过以下方法进行:第一,加强蒸汽吹灰,即提高吹灰蒸汽压力、提高蒸汽吹灰频次,但空预器差压大的问题仍然得不到改善;第二,由于中大型燃煤锅炉风烟系统基本采用双列布置,平衡通风方式,因此采用提高单侧空预器出口温度到160℃以上熔化硫酸氢铵(硫酸氢铵熔点147℃)来降低空预器差压,具体以提高A空预器出口温度为例,提高A引风机出力,降低A送风机出力,使得大量的烟气加热少量的冷空气,以提高空预器出口的烟温,但是此方法在火电厂实际应用中存在弊端,即在调节锅炉A侧送风量和烟气量以提高A侧空预器出口温度熔化硫酸氢铵时,B侧空预器出口温度由于锅炉送风量偏大及烟气量偏小,导致了B空预器出口烟温降低到80℃以下,反而加剧了B侧空预器硫酸氢铵的堆积堵塞,进一步加大了空预器差压,因此采用此方法降低空预器差压效果不理想。第三,空预器在线进行高压水冲洗来清理空预器的堵塞物,高压水对空预器的换热元件造成损伤,冷冲击造成空预器转子变形产生磨损和卡顿,另外,喷入的水提高了烟气的露点。At present, reducing the differential pressure of the air preheater is mainly carried out by the following methods: first, strengthening steam soot blowing, that is, increasing the steam pressure of soot blowing and increasing the frequency of steam soot blowing, but the problem of large differential pressure of the air preheater still cannot be improved; Second, since the air and smoke system of medium and large coal-fired boilers basically adopts a double-column arrangement and a balanced ventilation method, the outlet temperature of the single-side air preheater is increased to above 160 ℃ to melt ammonium bisulfate (the melting point of ammonium bisulfate is 147 ℃) to reduce the air The differential pressure of the preheater, specifically taking the increase of the outlet temperature of the A air preheater as an example, increases the output of the A induced draft fan and reduces the output of the A blower, so that a large amount of flue gas heats a small amount of cold air to increase the flue gas temperature at the air preheater outlet, but This method has drawbacks in the practical application of thermal power plants, that is, when adjusting the supply air volume and flue gas volume of the boiler A side to increase the outlet temperature of the A side air preheater to melt ammonium hydrogen sulfate, the B side air preheater outlet temperature is due to the boiler supply air. The large amount and the small amount of flue gas caused the flue gas temperature at the outlet of the B air preheater to drop below 80 °C, which aggravated the accumulation and blockage of ammonium hydrogen sulfate in the air preheater on the B side, and further increased the differential pressure of the air preheater. Therefore, using this method to reduce the differential pressure of the air preheater is not ideal. Third, the air preheater is flushed with high-pressure water online to clear the blockage of the air preheater. The high-pressure water causes damage to the heat exchange elements of the air preheater, and the cold shock causes the rotor of the air preheater to deform and cause wear and jam. The incoming water raises the dew point of the flue gas.
发明内容SUMMARY OF THE INVENTION
本发明旨在解决空预器硫酸氢氨堵塞和烟道压力超限不能带额定负荷的问题。The invention aims to solve the problems that the air preheater is blocked by ammonium hydrogen sulfate and the flue gas pressure exceeds the limit and cannot carry the rated load.
本发明的一个目的是,提供了一种处理空气预热器堵塞及降低烟道压力的方法,通过增加烟气换热器来处理空气预热器堵塞及降低烟道压力,包括以下步骤:One object of the present invention is to provide a method for dealing with the blockage of the air preheater and reducing the pressure of the flue, by adding a flue gas heat exchanger to deal with the blockage of the air preheater and reducing the pressure of the flue, comprising the following steps:
(1)从锅炉尾部的脱硝反应器出口侧抽取高温烟气至烟气换热器的烟气腔,同时从送风机的出口电动挡板后抽取冷二次风至烟气换热器的空气腔;(1) Extract the high-temperature flue gas from the outlet side of the denitration reactor at the tail of the boiler to the flue gas cavity of the flue gas heat exchanger, and at the same time extract the cold secondary air from the electric baffle at the outlet of the blower to the air cavity of the flue gas heat exchanger ;
(2)高温烟气和冷二次风在烟气换热器中进行换热后分别得到低温烟气和热二次风,低温烟气输送至电除尘装置,同时热二次风输送至热二次风箱;(2) The high temperature flue gas and the cold secondary air are exchanged in the flue gas heat exchanger to obtain low temperature flue gas and hot secondary air respectively. The low temperature flue gas is sent to the electrostatic precipitator, and the hot secondary air is sent to the heat secondary air box;
通过调节送风机出口至烟气换热器空气腔的冷二次风风量以及高温烟气脱硝反应器出口至烟气换热器烟气腔的烟气量,以降低空气预热器的堵塞及降低烟道压力。By adjusting the volume of cold secondary air from the outlet of the blower to the air cavity of the flue gas heat exchanger and the volume of flue gas from the outlet of the high temperature flue gas denitrification reactor to the flue gas cavity of the flue gas heat exchanger, the blockage of the air preheater and the reduction of flue pressure.
优选的,送风机出口至烟气换热器空气腔的冷二次风风量通过二次风温调节挡板进行调整;Preferably, the air volume of the cold secondary air from the outlet of the blower to the air cavity of the flue gas heat exchanger is adjusted through the secondary air temperature adjusting baffle;
高温烟气脱硝反应器出口至烟气换热器烟气腔的烟气量通过烟道压力调节档板进行调整。The amount of flue gas from the outlet of the high temperature flue gas denitration reactor to the flue gas chamber of the flue gas heat exchanger is adjusted by the flue pressure regulating baffle.
优选的,处理空气预热器堵塞及降低烟道压力的方法具体包括以下步骤:Preferably, the method for dealing with the blockage of the air preheater and reducing the pressure of the flue specifically includes the following steps:
(1)锅炉尾部A、B侧烟道烟气分别经过两侧的脱硝反应器去除NOx,经过脱硝处理的烟气经过气动调节挡板抽取高温烟气,再经过烟道压力调节挡板送入烟气换热器的烟气腔进行换热,换热后的低温烟气经过气动调节挡板分别通入到两侧的电除尘装置;(1) The flue gas on the A and B sides of the boiler tail respectively removes NOx through the denitration reactors on both sides. The denitrified flue gas is extracted through the pneumatic adjustment baffle to extract the high temperature flue gas, and then sent to the flue pressure adjustment baffle. The flue gas cavity of the flue gas heat exchanger conducts heat exchange, and the low-temperature flue gas after heat exchange passes through the pneumatic adjustment baffles to the electrostatic precipitators on both sides respectively;
(2)从两侧送风机的出口电动挡板后抽取冷二次风,经过两侧的气动调节挡板后将冷二次风送入烟气换热器空气腔进行换热,被加热的二次风经过二次风温调节挡板和二次风气动调节挡板后回到热二次风箱。(2) Extract the cold secondary air from the electric baffles at the outlet of the blower on both sides, and send the cold secondary air into the air cavity of the flue gas heat exchanger after passing through the pneumatic adjustment baffles on both sides for heat exchange. The secondary air returns to the hot secondary air box after passing through the secondary air temperature adjustment baffle and the secondary air pneumatic adjustment baffle.
本发明的另一目的在于,提供了一种处理空气预热器堵塞及降低烟道压力的系统,包括:Another object of the present invention is to provide a system for dealing with blockage of an air preheater and reducing flue pressure, including:
烟气换热器,包括烟气腔和空气腔;Flue gas heat exchanger, including flue gas cavity and air cavity;
所述烟气换热器的烟气腔入口与脱硝反应器连通,出口连通至电除尘装置;所述烟气换热器的空气腔入口与送风机连通,出口连通至热二次风箱;The inlet of the flue gas cavity of the flue gas heat exchanger is communicated with the denitration reactor, and the outlet is communicated with the electrostatic precipitator; the inlet of the air cavity of the flue gas heat exchanger is communicated with the blower, and the outlet is communicated with the hot secondary air box;
所述脱硝反应器与所述烟气换热器的烟气腔之间设置有用于控制烟气流量的烟道压力调节档板;所述热二次风箱与所述烟气换热器的空气腔之间设置有用于控制风量的二次风温调节挡板。Between the denitration reactor and the flue gas cavity of the flue gas heat exchanger, a flue gas pressure regulating baffle plate for controlling the flow of flue gas is arranged; the air between the hot secondary air box and the flue gas heat exchanger A secondary air temperature adjustment baffle for controlling the air volume is arranged between the cavities.
优选的,所述送风机靠近出口处设置有电动挡板,且所述送风机的电动挡板与所述烟气换热器空气腔之间设置有气动调节挡板,用于调节所述烟气换热器空气腔的风量;Preferably, the blower is provided with an electric baffle near the outlet, and a pneumatic adjustment baffle is arranged between the electric baffle of the blower and the air cavity of the flue gas heat exchanger to adjust the flue gas exchange. The air volume of the heater air cavity;
所述电除尘装置的出口处设置有电动挡板,且所述电除尘装置与所述烟气换热器之间设置有气动调节挡板,用于调节锅炉尾部烟道出口烟气的流量。An electric baffle is arranged at the outlet of the electrostatic precipitator, and a pneumatic adjustment baffle is arranged between the electrostatic precipitator and the flue gas heat exchanger to adjust the flow rate of the flue gas at the outlet of the flue of the boiler.
优选的,所述烟气换热器为管壳式烟气换热器。Preferably, the flue gas heat exchanger is a shell and tube type flue gas heat exchanger.
优选的,所述脱硝反应器、所述电除尘装置、所述送风机均设置有至少两个,用于配合输送锅炉尾部多个烟道出口产生的烟气。Preferably, there are at least two of the denitration reactor, the electrostatic precipitator, and the blower, which are used for coordinating the transportation of flue gas generated by multiple flue outlets at the tail of the boiler.
优选的,所述脱硝反应器包括第一脱硝反应器和第二脱硝反应器;Preferably, the denitration reactor includes a first denitration reactor and a second denitration reactor;
所述第一脱硝反应器的入口与锅炉尾部A侧烟道出口连通,所述第二脱硝反应器的入口与锅炉尾部B侧烟道出口连通;The inlet of the first denitration reactor is communicated with the flue outlet on the A side of the boiler tail, and the inlet of the second denitration reactor is communicated with the flue outlet on the B side of the boiler tail;
所述第一脱硝反应器和所述第二脱硝反应器的出口管道汇集至同一管道后连通至所述烟气换热器的烟气腔。The outlet pipes of the first denitration reactor and the second denitration reactor are collected into the same pipe and then communicated to the flue gas cavity of the flue gas heat exchanger.
优选的,所述电除尘装置包括第一电除尘装置和第二电除尘装置;Preferably, the electrostatic precipitator includes a first electrostatic precipitator and a second electrostatic precipitator;
所述第一电除尘装置的入口与所述烟气换热器的烟气腔出口连通,用于输送锅炉尾部A侧烟道出口的烟气;所述第二电除尘装置的入口与所述烟气换热器的烟气腔出口连通,用于输送锅炉尾部B侧烟道出口的烟气。The inlet of the first electrostatic precipitator is communicated with the outlet of the flue gas cavity of the flue gas heat exchanger, and is used to transport the flue gas at the A-side flue outlet of the boiler tail; the inlet of the second electrostatic precipitator is connected to the The outlet of the flue gas chamber of the flue gas heat exchanger is communicated, and is used to transport the flue gas from the outlet of the flue on the B side of the boiler tail.
优选的,经过所述烟气换热器烟气腔的烟气由同一管道输出后通过不同的管道分流至所述第一电除尘装置和第二电除尘装置。Preferably, the flue gas passing through the flue gas cavity of the flue gas heat exchanger is output from the same pipeline and then divided into the first electrostatic precipitator and the second electrostatic precipitator through different pipelines.
优选的,所述送风机包括第一送风机和第二送风机;一般的,锅炉系统中送风机过来的空气称为二次风;Preferably, the blower includes a first blower and a second blower; generally, the air from the blower in the boiler system is called secondary air;
所述第一送风机和所述第二送风机的送风管道均汇集至同一管道后连通至所述烟气换热器的空气腔。The air supply ducts of the first blower and the second blower are all collected into the same duct and then communicated to the air cavity of the flue gas heat exchanger.
优选的,所述系统还包括:Preferably, the system further includes:
第一空预器,设置有二次风仓和烟气仓,所述第一空预器的烟气仓入口连通所述第一脱硝反应器、出口连通至所述第一电除尘装置,所述第一空预器的二次风仓入口连通所述第一送风机、出口连通至所述热二次风箱;The first air preheater is provided with a secondary air silo and a flue gas silo, the inlet of the flue gas silo of the first air preheater is connected to the first denitration reactor, and the outlet is connected to the first electrostatic precipitator, so The inlet of the secondary air silo of the first air preheater is connected to the first blower, and the outlet is connected to the hot secondary air box;
第二空预器,设置有二次风仓和烟气仓;所述第二空预器的烟气仓入口连通所述第二脱硝反应器、出口连通至所述第二电除尘装置,所述第二空预器的二次风仓入口连通所述第二送风机、出口连通至所述热二次风箱。The second air preheater is provided with a secondary air silo and a flue gas silo; the inlet of the flue gas silo of the second air preheater is connected to the second denitration reactor, and the outlet is connected to the second electrostatic precipitator, so The inlet of the secondary air silo of the second air preheater is connected to the second blower, and the outlet is connected to the hot secondary air box.
优选的,所述系统还包括:Preferably, the system further includes:
第一引风机,与所述第一电除尘装置的出口连通,用于输送锅炉尾部A侧烟道出口的烟气;a first induced draft fan, communicated with the outlet of the first electrostatic precipitator, and used for conveying the flue gas at the A-side flue outlet of the boiler tail;
第二引风机,与所述第二电除尘装置的出口连通,用于输送锅炉尾部B侧烟道出口的烟气。The second induced draft fan is communicated with the outlet of the second electrostatic precipitator, and is used for conveying the flue gas at the B-side flue outlet at the tail of the boiler.
优选的,所述第一送风机、所述第二送风机靠近出口处均设置有电动挡板;所述第一送风机的电动挡板与所述烟气换热器空气腔之间设置有气动调节挡板,用于调节所述第一送风机进入所述烟气换热器空气腔的风量;所述第二送风机的电动挡板与所述烟气换热器空气腔之间设置有气动调节挡板,用于调节所述第二送风机进入所述烟气换热器空气腔的风量。Preferably, the first blower and the second blower are provided with electric baffles near the outlet; and a pneumatic adjustment block is arranged between the electric baffle of the first blower and the air cavity of the flue gas heat exchanger a plate for adjusting the air volume of the first blower entering the air cavity of the flue gas heat exchanger; a pneumatic adjustment baffle is arranged between the electric baffle of the second blower and the air cavity of the flue gas heat exchanger is used to adjust the air volume of the second blower entering the air cavity of the flue gas heat exchanger.
优选的,所述第一电除尘装置、所述第二电除尘装置的出口处均设置有电动挡板;所述第一电除尘装置与所述烟气换热器之间设置有气动调节挡板,用于调节锅炉尾部A侧烟道出口烟气的流量;所述第二电除尘装置与所述烟气换热器之间设置有气动调节挡板,用于调节锅炉尾部B侧烟道出口烟气的流量。Preferably, an electric baffle is arranged at the outlet of the first electrostatic precipitator and the second electrostatic precipitator; a pneumatic adjustment baffle is arranged between the first electrostatic precipitator and the flue gas heat exchanger. The plate is used to adjust the flow rate of the flue gas at the A-side flue outlet at the boiler tail; a pneumatic adjustment baffle is arranged between the second electrostatic precipitator and the flue gas heat exchanger, which is used to adjust the B-side flue at the boiler tail The flow of flue gas at the outlet.
优选的,所述第一脱硝反应器、所述第二脱硝反应器与所述烟道压力调节挡板之间均设置有气动调节挡板,用于抽取高温烟气至所述烟气换热器中。Preferably, a pneumatic adjustment baffle is arranged between the first denitration reactor, the second denitration reactor and the flue pressure adjustment baffle for extracting high temperature flue gas to the flue gas for heat exchange in the device.
优选的,靠近所述第一电除尘装置的入口侧设置有压力表,用于测定锅炉尾部A侧烟道压力,靠近所述第二电除尘装置的入口侧设置有压力表,用于测定锅炉尾部B侧烟道压力。Preferably, a pressure gauge is provided near the inlet side of the first electrostatic precipitator for measuring the pressure of the flue on the A side of the boiler tail, and a pressure gauge is provided near the inlet side of the second electrostatic precipitator for measuring the boiler pressure Tail B side flue pressure.
优选的,靠近所述烟气换热器空气腔的出口侧设置有温度测量装置,用于测定所述烟气换热器出口的二次风温。Preferably, a temperature measuring device is provided near the outlet side of the air cavity of the flue gas heat exchanger for measuring the secondary air temperature at the outlet of the flue gas heat exchanger.
优选的,所述第一脱硝反应器与所述第一空预器的烟气仓之间设置有电动挡板,用于隔离锅炉尾部A侧烟道出口烟气进入所述第一空预器烟气仓;所述热二次风箱与所述第一空预器的二次风仓之间设置有电动挡板,用于隔绝热二次风倒流进入所述第一空预器二次风仓。Preferably, an electric baffle is provided between the first denitration reactor and the flue gas silo of the first air preheater, which is used to isolate the flue gas from the A-side flue outlet of the boiler tail from entering the first air preheater A flue gas silo; an electric baffle is arranged between the hot secondary air box and the secondary air silo of the first air preheater, which is used to isolate the hot secondary air from flowing backward into the secondary air of the first air preheater warehouse.
所述第二脱硝反应器与所述第二空预器的烟气仓之间设置有电动挡板,用于隔离锅炉尾部B侧烟道出口烟气进入所述第二空预器烟气仓;所述热二次风箱与所述第二空预器的二次风仓之间设置有电动挡板,用于隔绝热二次风倒流进入所述第二空预器二次风仓。An electric baffle is arranged between the second denitration reactor and the flue gas bin of the second air preheater, which is used to isolate the flue gas from the B side flue outlet of the boiler tail from entering the flue gas bin of the second air preheater. An electric baffle is arranged between the hot secondary air box and the secondary air silo of the second air preheater, which is used to isolate the hot secondary air from flowing backward into the secondary air silo of the second air preheater.
本发明提供了一种处理空气预热器堵塞及降低烟道压力的方法,与现有技术相比,其有益效果在于:The present invention provides a method for dealing with blockage of an air preheater and reducing flue pressure. Compared with the prior art, its beneficial effects are:
本发明解决了机组在线提高单侧空预器出口温度降低差压时另一侧空预器出口烟温过低的现象,以及能够减少流过空预器的烟气量来降低尾部烟道负力,解决机组由于空预器差压高或烟道积灰堵塞等原因导致烟道压力超限不能带额定负荷的问题;The invention solves the phenomenon that the flue gas temperature at the outlet of the air preheater on the other side is too low when the unit online increases the outlet temperature of the air preheater on one side and reduces the differential pressure, and can reduce the amount of flue gas flowing through the air preheater to reduce the negative pressure of the tail flue. to solve the problem that the unit cannot carry the rated load due to the high differential pressure of the air preheater or the blockage of the flue due to the accumulation of ash in the flue;
本发明的系统实现了锅炉双侧风道、烟道的联通,提高了锅炉单台风机运行时的带负荷能力,并且烟气换热器出口烟气温度容易控制,不会发生硫酸氢铵堵塞等问题,对于燃煤锅炉具有很好的应用前景。The system of the invention realizes the connection of the air ducts and flue ducts on both sides of the boiler, improves the load-bearing capacity of a single blower of the boiler during operation, and the flue gas temperature at the outlet of the flue gas heat exchanger is easy to control, and the blockage of ammonium hydrogen sulfate will not occur. It has a good application prospect for coal-fired boilers.
附图说明Description of drawings
图1是本发明系统的流程示意图。FIG. 1 is a schematic flow chart of the system of the present invention.
具体实施方式Detailed ways
下面将对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be described clearly and completely below. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
一种处理空气预热器堵塞及降低烟道压力的系统,包括:A system for dealing with clogging of an air preheater and reducing flue pressure, comprising:
烟气换热器,包括烟气腔和空气腔;Flue gas heat exchanger, including flue gas cavity and air cavity;
所述烟气换热器的烟气腔入口与脱硝反应器连通,出口连通至电除尘装置;所述烟气换热器的空气腔入口与送风机连通,出口连通至热二次风箱;The inlet of the flue gas cavity of the flue gas heat exchanger is communicated with the denitration reactor, and the outlet is communicated with the electrostatic precipitator; the inlet of the air cavity of the flue gas heat exchanger is communicated with the blower, and the outlet is communicated with the hot secondary air box;
所述脱硝反应器与所述烟气换热器的烟气腔之间设置有用于控制烟气流量的烟道压力调节档板;所述热二次风箱与所述烟气换热器的空气腔之间设置有用于控制风量的二次风温调节挡板。Between the denitration reactor and the flue gas cavity of the flue gas heat exchanger, a flue gas pressure regulating baffle plate for controlling the flow of flue gas is arranged; the air between the hot secondary air box and the flue gas heat exchanger A secondary air temperature adjustment baffle for controlling the air volume is arranged between the cavities.
优选的,所述送风机靠近出口处设置有电动挡板,且所述送风机的电动挡板与所述烟气换热器空气腔之间设置有气动调节挡板,用于调节所述烟气换热器空气腔的风量;Preferably, the blower is provided with an electric baffle near the outlet, and a pneumatic adjustment baffle is arranged between the electric baffle of the blower and the air cavity of the flue gas heat exchanger to adjust the flue gas exchange. The air volume of the heater air cavity;
所述电除尘装置的出口处设置有电动挡板,且所述电除尘装置与所述烟气换热器之间设置有气动调节挡板,用于调节锅炉尾部烟道出口烟气的流量。An electric baffle is arranged at the outlet of the electrostatic precipitator, and a pneumatic adjustment baffle is arranged between the electrostatic precipitator and the flue gas heat exchanger to adjust the flow rate of the flue gas at the outlet of the flue of the boiler.
为了进一步优化上述技术方案,所述烟气换热器为管壳式烟气换热器。In order to further optimize the above technical solution, the flue gas heat exchanger is a shell and tube type flue gas heat exchanger.
如图1所示,在本发明的一些实施例中,所述脱硝反应器、所述电除尘装置、所述送风机均设置有两个,用于配合输送锅炉尾部多个烟道出口产生的烟气。As shown in FIG. 1 , in some embodiments of the present invention, there are two denitration reactors, two electrostatic precipitators, and two blowers, which are used to convey the smoke generated by the multiple flue outlets at the tail of the boiler. gas.
其中,所述脱硝反应器包括第一脱硝反应器和第二脱硝反应器;Wherein, the denitration reactor includes a first denitration reactor and a second denitration reactor;
所述第一脱硝反应器的入口与锅炉尾部A侧烟道出口连通,所述第二脱硝反应器的入口与锅炉尾部B侧烟道出口连通;The inlet of the first denitration reactor is communicated with the flue outlet on the A side of the boiler tail, and the inlet of the second denitration reactor is communicated with the flue outlet on the B side of the boiler tail;
所述第一脱硝反应器和所述第二脱硝反应器的出口管道汇集至同一管道后连通至所述烟气换热器的烟气腔。The outlet pipes of the first denitration reactor and the second denitration reactor are collected into the same pipe and then communicated to the flue gas cavity of the flue gas heat exchanger.
在本发明的一些实施例中,所述电除尘装置包括第一电除尘装置和第二电除尘装置;In some embodiments of the present invention, the electrostatic precipitator includes a first electrostatic precipitator and a second electrostatic precipitator;
所述第一电除尘装置的入口与所述烟气换热器的烟气腔出口连通,用于输送锅炉尾部A侧烟道出口的烟气;所述第二电除尘装置的入口与所述烟气换热器的烟气腔出口连通,用于输送锅炉尾部B侧烟道出口的烟气。The inlet of the first electrostatic precipitator is communicated with the outlet of the flue gas cavity of the flue gas heat exchanger, and is used to transport the flue gas at the A-side flue outlet of the boiler tail; the inlet of the second electrostatic precipitator is connected to the The outlet of the flue gas chamber of the flue gas heat exchanger is communicated, and is used to transport the flue gas from the outlet of the flue on the B side of the boiler tail.
在本发明的一些实施例中,经过所述烟气换热器烟气腔的烟气由同一管道输出后通过不同的管道分流至所述第一电除尘装置和第二电除尘装置。In some embodiments of the present invention, the flue gas passing through the flue gas chamber of the flue gas heat exchanger is output from the same pipeline and then split to the first electrostatic precipitator and the second electrostatic precipitator through different pipelines.
在本发明的一些实施例中,所述送风机包括第一送风机和第二送风机;In some embodiments of the present invention, the blower includes a first blower and a second blower;
所述第一送风机和所述第二送风机的送风管道均汇集至同一管道后连通至所述烟气换热器的空气腔。The air supply ducts of the first blower and the second blower are all collected into the same duct and then communicated to the air cavity of the flue gas heat exchanger.
在本发明的一些实施例中,所述系统还包括:In some embodiments of the present invention, the system further includes:
第一空预器,设置有二次风仓和烟气仓,所述第一空预器的烟气仓入口连通所述第一脱硝反应器、出口连通至所述第一电除尘装置,所述第一空预器的二次风仓入口连通所述第一送风机、出口连通至所述热二次风箱;The first air preheater is provided with a secondary air silo and a flue gas silo, the inlet of the flue gas silo of the first air preheater is connected to the first denitration reactor, and the outlet is connected to the first electrostatic precipitator, so The inlet of the secondary air silo of the first air preheater is connected to the first blower, and the outlet is connected to the hot secondary air box;
第二空预器,设置有二次风仓和烟气仓;所述第二空预器的烟气仓入口连通所述第二脱硝反应器、出口连通至所述第二电除尘装置,所述第二空预器的二次风仓入口连通所述第二送风机、出口连通至所述热二次风箱。The second air preheater is provided with a secondary air silo and a flue gas silo; the inlet of the flue gas silo of the second air preheater is connected to the second denitration reactor, and the outlet is connected to the second electrostatic precipitator, so The inlet of the secondary air silo of the second air preheater is connected to the second blower, and the outlet is connected to the hot secondary air box.
在本发明的一些实施例中,所述系统还包括:In some embodiments of the present invention, the system further includes:
第一引风机,与所述第一电除尘装置的出口连通,用于输送锅炉尾部A侧烟道出口的烟气;a first induced draft fan, communicated with the outlet of the first electrostatic precipitator, and used for conveying the flue gas at the A-side flue outlet of the boiler tail;
第二引风机,与所述第二电除尘装置的出口连通,用于输送锅炉尾部B侧烟道出口的烟气。The second induced draft fan is communicated with the outlet of the second electrostatic precipitator, and is used for conveying the flue gas at the B-side flue outlet at the tail of the boiler.
在本发明的一些实施例中,所述第一送风机、所述第二送风机靠近出口处均设置有电动挡板1、3,用于隔离送风机;所述第一送风机的电动挡1与所述烟气换热器空气腔之间设置有气动调节挡板9,用于调节所述第一送风机进入所述烟气换热器空气腔的风量;所述第二送风机的电动挡板3与所述烟气换热器空气腔之间设置有气动调节挡板12,用于调节所述第二送风机进入所述烟气换热器空气腔的风量。In some embodiments of the present invention, the first blower and the second blower are provided with
在本发明的一些实施例中,所述第一电除尘装置、所述第二电除尘装置的出口处均设置有电动挡板6、8;所述第一电除尘装置与所述烟气换热器之间设置有气动调节挡板14,用于调节锅炉尾部A侧烟道出口烟气的流量;所述第二电除尘装置与所述烟气换热器之间设置有气动调节挡16,用于调节锅炉尾部B侧烟道出口烟气的流量。In some embodiments of the present invention,
在本发明的一些实施例中,所述第一脱硝反应器、所述第二脱硝反应器与所述烟道压力调节挡板17之间均设置有气动调节挡板13、15,用于抽取高温烟气至所述烟气换热器中。In some embodiments of the present invention, pneumatic adjustment baffles 13 and 15 are provided between the first denitration reactor, the second denitration reactor and the flue pressure adjustment baffle 17 for extraction High temperature flue gas into the flue gas heat exchanger.
在本发明的一些实施例中,靠近所述第一电除尘装置的入口侧设置有压力表,用于测定锅炉尾部A侧烟道压力,靠近所述第二电除尘装置的入口侧设置有压力表,用于测定锅炉尾部B侧烟道压力。In some embodiments of the present invention, a pressure gauge is provided near the inlet side of the first electrostatic precipitator, which is used to measure the flue pressure on the A side of the boiler tail, and a pressure gauge is provided near the inlet side of the second electrostatic precipitator. The table is used to measure the flue pressure on the B side of the boiler tail.
在本发明的一些实施例中,靠近所述烟气换热器空气腔的出口侧设置有温度测量装置,用于测定所述烟气换热器出口的二次风温。In some embodiments of the present invention, a temperature measuring device is provided near the outlet side of the air cavity of the flue gas heat exchanger, for measuring the temperature of the secondary air at the outlet of the flue gas heat exchanger.
在本发明的一些实施例中,所述第一脱硝反应器与所述第一空预器的烟气仓之间设置有电动挡板5,用于隔离锅炉尾部A侧烟道出口烟气进入所述第一空预器烟气仓;所述热二次风箱与所述第一空预器的二次风仓之间设置有电动挡板2,用于隔绝热二次风倒流进入所述第一空预器二次风仓。In some embodiments of the present invention, an electric baffle 5 is provided between the first denitration reactor and the flue gas bin of the first air preheater, which is used to isolate the entry of flue gas from the A-side flue outlet at the tail of the boiler. The first air preheater flue gas silo; an electric baffle 2 is arranged between the hot secondary air box and the secondary air silo of the first air preheater, which is used to isolate the hot secondary air from flowing back into the The first air preheater and the secondary air chamber.
所述第二脱硝反应器与所述第二空预器的烟气仓之间设置有电动挡板7,用于隔离锅炉尾部B侧烟道出口烟气进入所述第二空预器烟气仓;所述热二次风箱与所述第二空预器的二次风仓之间设置有电动挡板4,用于隔绝热二次风倒流进入所述第二空预器二次风仓。An electric baffle 7 is arranged between the second denitration reactor and the flue gas silo of the second air preheater, which is used to isolate the flue gas from the B side flue outlet of the boiler tail from entering the second air preheater flue gas There is an electric baffle 4 between the hot secondary air box and the secondary air chamber of the second air preheater, which is used to isolate the hot secondary air from backflow into the secondary air chamber of the second air preheater .
基于本发明上述实施例提供的处理空气预热器堵塞及降低烟道压力的系统,处理空气预热器堵塞及降低烟道压力的方法,包括以下步骤:Based on the system for treating the blockage of the air preheater and reducing the pressure of the flue provided by the above-mentioned embodiments of the present invention, the method for treating the blockage of the air preheater and reducing the pressure of the flue includes the following steps:
(1)锅炉尾部A、B侧烟道烟气分别经过两侧的脱硝反应器去除NOx,经过脱硝处理的烟气经过气动调节挡板抽取高温烟气,再经过烟道压力调节挡板送入烟气换热器的烟气腔进行换热,换热后的低温烟气经过气动调节挡板分别通入到两侧的电除尘装置;(1) The flue gas on the A and B sides of the boiler tail respectively removes NOx through the denitration reactors on both sides. The denitrified flue gas is extracted through the pneumatic adjustment baffle to extract the high temperature flue gas, and then sent to the flue pressure adjustment baffle. The flue gas cavity of the flue gas heat exchanger conducts heat exchange, and the low-temperature flue gas after heat exchange passes through the pneumatic adjustment baffles to the electrostatic precipitators on both sides respectively;
(2)从两侧送风机的出口电动挡板后抽取冷二次风,经过两侧的气动调节挡板后将冷二次风送入烟气换热器空气腔进行换热,被加热的二次风经过二次风温调节挡板和二次风气动调节挡板后回到热二次风箱。(2) Extract the cold secondary air from the electric baffles at the outlet of the blower on both sides, and send the cold secondary air into the air cavity of the flue gas heat exchanger after passing through the pneumatic adjustment baffles on both sides for heat exchange. The secondary air returns to the hot secondary air box after passing through the secondary air temperature adjustment baffle and the secondary air pneumatic adjustment baffle.
具体的,以下将结合具体操作工况对本发明处理空气预热器堵塞及降低烟道压力的系统的应用方式进行详细的说明。Specifically, the application mode of the system for dealing with the blockage of the air preheater and reducing the flue pressure of the present invention will be described in detail below in conjunction with the specific operating conditions.
第一、本发明解决了机组在线提高单侧空预器出口温度降低差压时另一侧空预器出口烟温过低的问题。First, the present invention solves the problem that the outlet temperature of the air preheater on the other side is too low when the unit online increases the outlet temperature of the air preheater on one side and reduces the differential pressure.
以单侧空预器升温熔化硫酸氢氨来降低第一空预器差压为例,适当降低第一送风机出力,提高第一引风机出力,提高第一空预器出口烟温,同时提高第二送风机出力,降低第二引风机出力,第二空预器出口烟温下降,调节过程中控制第二空预器出口烟温不低于烟气露点,此时开启第二脱硝反应器至烟气换热器烟气腔的气动调节挡板15及烟气换热器烟气腔到电除尘装置入口两侧的气动调节挡板14、16,再开启第一送风机出口与烟气换热器空气腔之间的气动调节挡板9及烟气换热器空气腔到热二次风箱的气动调节挡板10,调节烟道压力调节挡板17控制第二空预器出口烟温不低于烟气露点,调节二次风温调节挡板11继续提高第一空预器冷端温度,熔化后的硫酸氢氨被烟气冲刷携带到后面的烟道。Taking the temperature of the single-side air preheater to melt ammonium hydrogen sulfate to reduce the differential pressure of the first air preheater as an example, appropriately reduce the output of the first blower, increase the output of the first induced draft fan, increase the smoke temperature at the outlet of the first air preheater, and at the same time increase the output of the first air preheater. The output of the second air blower reduces the output of the second induced draft fan, and the flue gas temperature at the outlet of the second air preheater decreases. During the adjustment process, the flue gas temperature at the outlet of the second air preheater is controlled not to be lower than the dew point of the flue gas. At this time, the second denitration reactor is opened until the smoke The pneumatic adjustment baffle 15 of the flue gas cavity of the gas heat exchanger and the pneumatic adjustment baffles 14 and 16 on both sides of the flue gas cavity of the flue gas heat exchanger to the inlet of the electrostatic precipitator, and then open the outlet of the first blower and the flue gas heat exchanger The pneumatic adjustment baffle 9 between the air chambers and the pneumatic adjustment baffle 10 from the air chamber of the flue gas heat exchanger to the hot secondary air box, adjust the flue pressure adjustment baffle 17 to control the smoke temperature at the outlet of the second air preheater not lower than The dew point of the flue gas is adjusted, and the secondary air temperature adjustment baffle 11 continues to increase the temperature of the cold end of the first air preheater.
待第一空预器差压恢复正常后,调节两侧风机出力平衡,开启锅炉第一脱硝反应器至烟气换热器的气动调节挡板13及第二送风机出口到烟气换热器的气动调节挡板12,调节烟道压力调节挡板17和二次风温调节挡板11控制烟气换热器的出口烟温大于160℃熔化硫酸氢氨并被烟气带走,待烟气换热器差压正常后,关闭上述开启的阀门退出烟气换热器运行。After the differential pressure of the first air preheater returns to normal, adjust the output balance of the fans on both sides, and open the pneumatic adjustment baffle 13 from the first denitration reactor of the boiler to the flue gas heat exchanger and the outlet of the second blower to the flue gas heat exchanger. Pneumatically adjust the baffle 12, adjust the flue pressure adjustment baffle 17 and the secondary air temperature adjustment baffle 11 to control the outlet flue gas temperature of the flue gas heat exchanger to be greater than 160 ℃ to melt ammonium hydrogen sulfate and be taken away by the flue gas. After the differential pressure of the heat exchanger is normal, close the above-opened valve to exit the flue gas heat exchanger.
第二、本发明能够减少流过空预器的烟气量来降低尾部烟道负压,解决机组由于空预器差压高或烟道积灰堵塞等原因导致烟道压力超限不能带额定负荷的问题。Second, the invention can reduce the amount of flue gas flowing through the air preheater to reduce the negative pressure of the tail flue, so as to solve the problem that the flue pressure of the unit cannot be rated due to high differential pressure of the air preheater or clogging of the flue. load problem.
高负荷下烟道压力超低限时,开启第一脱硝反应器、第二脱硝反应器至烟气换热器烟气腔之间的气动调节挡板13、15及烟气换热器到电除尘装置入口两侧的气动调节挡板14、16,再开启第一送风机、第二送风机出口到烟气换热器空气腔之间的气动调节挡板9、12及烟气换热器到热二次风箱之间的气动调节挡板10,调节烟道压力调节挡板17和二次风温调节挡板11以控制烟气换热器出口烟温,利用烟气换热器烟气流通性能好的优势,减少第一空预器、第二空预器的烟气量,空预器阻力变小,引风机入口烟道负压得到改善,避免了烟道变形、撕裂,降低了一次风机、送风机和引风机的电耗,提高了锅炉效率,同时提高机组的带负荷能力。When the flue pressure exceeds the low limit under high load, open the pneumatic adjustment baffles 13 and 15 between the first denitration reactor, the second denitration reactor and the flue gas cavity of the flue gas heat exchanger and the flue gas heat exchanger to the electrostatic precipitator The pneumatic adjustment baffles 14 and 16 on both sides of the inlet of the device, and then turn on the pneumatic adjustment baffles 9 and 12 between the outlet of the first blower and the second blower and the air cavity of the flue gas heat exchanger and the flue gas heat exchanger to the second heat exchanger. The pneumatic adjustment baffle 10 between the secondary air boxes, the flue gas pressure adjustment baffle 17 and the secondary air temperature adjustment baffle 11 are adjusted to control the flue gas heat exchanger outlet flue gas temperature, and the flue gas heat exchanger has good flue gas flow performance The advantage of the air preheater is to reduce the flue gas volume of the first air preheater and the second air preheater, the resistance of the air preheater becomes smaller, the negative pressure of the flue at the inlet of the induced draft fan is improved, the deformation and tearing of the flue is avoided, and the primary fan is reduced. , the power consumption of the blower and the induced draft fan, improve the efficiency of the boiler, and at the same time improve the load capacity of the unit.
第三、本发明系统实现了锅炉双侧风道、烟道的联通,提高了机组单台风机故障时的带负荷能力。Third, the system of the present invention realizes the connection of the air ducts and flue ducts on both sides of the boiler, and improves the load capacity when a single fan of the unit fails.
假如第一引风机故障停运,第一引风机入口的烟气电动挡板6关闭,受到空预器差压的影响单侧风烟系统的带负荷能力低于50%,采用烟气换热器风烟管道可以实现风烟系统双侧运行。开启烟气换热器烟气腔到电除尘装置入口两侧的烟道气动调节挡板14、16,锅炉尾部A侧烟道的高温烟气经过第一空预器入口的烟气电动挡板5、第一空预器、电除尘装置入口两侧烟道的气动调节挡板14、16流到第二电除尘装置入口管道,由于烟气换热器出口烟道管径较小,第一送风机和A侧一次风机出力适当调小,锅炉风烟系统带负荷能力只受第二引风机的出力限制,由于第一空预器分流降低了第二空预器的烟气流通量,单台风机运行带负荷能力相应得到提高。If the first induced draft fan fails and shuts down, the flue gas electric baffle 6 at the inlet of the first induced draft fan is closed, and the load capacity of the one-sided wind and smoke system is lower than 50% due to the influence of the differential pressure of the air preheater, and the flue gas heat exchange is adopted. The air and smoke duct can realize the bilateral operation of the air and smoke system. Open the flue gas chamber of the flue gas heat exchanger to the flue pneumatic adjustment baffles 14 and 16 on both sides of the inlet of the electrostatic precipitator. 5. The pneumatic adjustment baffles 14 and 16 of the flue on both sides of the inlet of the first air preheater and the electrostatic precipitator flow to the inlet pipe of the second electrostatic precipitator. The output of the supply fan and the primary fan on the A side is appropriately adjusted to a small value, and the load capacity of the boiler air and smoke system is only limited by the output of the second induced draft fan. Since the diversion of the first air preheater reduces the flue gas flow of the second air preheater, a single unit The load capacity of the fan operation is correspondingly improved.
同理,第一送风机故障停运后,第二送风机出口的冷二次风经过气动调节挡板12、9经过第一空预器加热,同时加热A侧的冷一次风,风烟系统带负荷能力只受第二送风机的出力限制,锅炉的带负荷能力得到了提高。In the same way, after the failure of the first blower, the cold secondary air at the outlet of the second blower is heated by the first air preheater through the pneumatic adjustment baffles 12 and 9, and the cold primary air on the A side is heated at the same time, and the air and smoke system is loaded. The capacity is only limited by the output of the second blower, and the load-carrying capacity of the boiler is improved.
此外,如果第一送风机和第一引风机同时故障检修,因空预器差压的影响,风机带负荷能力得到限制。调节一次风机的运行方式,A侧一次风机供冷一次风,B侧一次风机供热一次风,第二送风机出口的冷二次风经过气动调节挡板12进入烟气换热器空气腔加热,再经过烟气换热器出口的二次风温调节挡板11及气动调节挡板10进入热二次风箱,同时开启第一脱硝反应器出口经过烟气气动调节挡板13抽取高温烟气,再经尾部烟道压力调节挡板17送入烟气换热器烟气腔,低温烟气经过气动调节挡板16通到第二电除尘装置入口烟道,投入烟气换热器运行,对B侧二次风进行分流,锅炉的带负荷能力得到提高,取决于第二送风机和第二引风机的出力,同时将锅炉尾部A侧烟道烟气流通起来,避免了第一引风机故障后烟道烟气无法流通积灰引发烟道垮塌事故。In addition, if the first blower and the first induced draft fan are repaired at the same time, the load capacity of the fan will be limited due to the influence of the differential pressure of the air preheater. Adjust the operation mode of the primary fan, the primary fan on the A side supplies the primary air for cooling, the primary fan on the B side supplies the primary air for heating, and the cold secondary air from the outlet of the second blower enters the air cavity of the flue gas heat exchanger through the pneumatic adjustment baffle 12 for heating. Then it enters the hot secondary air box through the secondary air temperature adjustment baffle 11 and the pneumatic adjustment baffle 10 at the outlet of the flue gas heat exchanger. At the same time, the outlet of the first denitration reactor is opened to extract the high temperature flue gas through the flue gas
本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。对于实施例公开的方案而言,由于其与实施例公开的方法相对应,所以描述的比较简单,相关之处参见方法部分说明即可。The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments, and the same and similar parts between the various embodiments can be referred to each other. As for the solutions disclosed in the examples, since they correspond to the methods disclosed in the examples, the descriptions are relatively simple, and the relevant parts can be referred to the description of the method section.
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments enables any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202111598454.XA CN114413275B (en) | 2021-12-24 | 2021-12-24 | Method for treating air preheater blockage and reducing flue pressure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202111598454.XA CN114413275B (en) | 2021-12-24 | 2021-12-24 | Method for treating air preheater blockage and reducing flue pressure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN114413275A true CN114413275A (en) | 2022-04-29 |
| CN114413275B CN114413275B (en) | 2024-11-01 |
Family
ID=81268763
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202111598454.XA Active CN114413275B (en) | 2021-12-24 | 2021-12-24 | Method for treating air preheater blockage and reducing flue pressure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN114413275B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116624882A (en) * | 2023-04-10 | 2023-08-22 | 浙江浙能长兴发电有限公司 | An optimization method for half-side isolation operation of tail flue of utility boiler |
| CN117490055A (en) * | 2023-11-01 | 2024-02-02 | 浙江西子联合工程有限公司 | Boiler air preheater online salt cleaning system and method |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101701717A (en) * | 2009-09-17 | 2010-05-05 | 西安热工研究院有限公司 | Heating process of low-temperature flue gas with wetting flue gas desulphurization |
| CN105020737A (en) * | 2015-07-22 | 2015-11-04 | 成信绿集成股份有限公司 | System for improving safety of air pre-heater by utilizing spiral-fin type heat exchanger |
| CN205717147U (en) * | 2016-04-26 | 2016-11-23 | 南京电力设备质量性能检验中心 | A kind of full load denitration utilizes and air preheater corrosion-and blocking-prevention coupled system with fume afterheat |
| CN205991507U (en) * | 2016-08-05 | 2017-03-01 | 京能(锡林郭勒)发电有限公司 | A kind of flue gas air heat-exchange system |
| WO2018014768A1 (en) * | 2016-07-21 | 2018-01-25 | 京能(锡林郭勒)发电有限公司 | Residual heat reuse system for turbine-boiler integrated heat energy circulation |
| CN207702507U (en) * | 2017-11-30 | 2018-08-07 | 中国大唐集团科学技术研究院有限公司西北分公司 | A kind of combination unit for delaying coal-burning boiler air preheater to block |
| CN109945227A (en) * | 2019-05-08 | 2019-06-28 | 北京国电龙源环保工程有限公司 | Reduce system and process that exhaust gas temperature inhibits air preheater low-temperature corrosion |
| CN209355296U (en) * | 2018-11-12 | 2019-09-06 | 南京博沃科技发展有限公司 | A kind of energy efficiency anti-blocking system based on air preheater bypass flue |
| CN111482086A (en) * | 2020-04-10 | 2020-08-04 | 马键 | Boiler flue gas cooperative treatment environmental protection equipment and treatment process |
| CN111981501A (en) * | 2020-07-30 | 2020-11-24 | 中国大唐集团科学技术研究院有限公司西北电力试验研究院 | Anti-blocking heat exchange device of air preheater of pulverized coal boiler |
| CN217082613U (en) * | 2021-12-24 | 2022-07-29 | 华能巢湖发电有限责任公司 | System for treating blockage of air preheater and reducing flue pressure |
-
2021
- 2021-12-24 CN CN202111598454.XA patent/CN114413275B/en active Active
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101701717A (en) * | 2009-09-17 | 2010-05-05 | 西安热工研究院有限公司 | Heating process of low-temperature flue gas with wetting flue gas desulphurization |
| CN105020737A (en) * | 2015-07-22 | 2015-11-04 | 成信绿集成股份有限公司 | System for improving safety of air pre-heater by utilizing spiral-fin type heat exchanger |
| CN205717147U (en) * | 2016-04-26 | 2016-11-23 | 南京电力设备质量性能检验中心 | A kind of full load denitration utilizes and air preheater corrosion-and blocking-prevention coupled system with fume afterheat |
| WO2018014768A1 (en) * | 2016-07-21 | 2018-01-25 | 京能(锡林郭勒)发电有限公司 | Residual heat reuse system for turbine-boiler integrated heat energy circulation |
| CN205991507U (en) * | 2016-08-05 | 2017-03-01 | 京能(锡林郭勒)发电有限公司 | A kind of flue gas air heat-exchange system |
| CN207702507U (en) * | 2017-11-30 | 2018-08-07 | 中国大唐集团科学技术研究院有限公司西北分公司 | A kind of combination unit for delaying coal-burning boiler air preheater to block |
| CN209355296U (en) * | 2018-11-12 | 2019-09-06 | 南京博沃科技发展有限公司 | A kind of energy efficiency anti-blocking system based on air preheater bypass flue |
| CN109945227A (en) * | 2019-05-08 | 2019-06-28 | 北京国电龙源环保工程有限公司 | Reduce system and process that exhaust gas temperature inhibits air preheater low-temperature corrosion |
| CN111482086A (en) * | 2020-04-10 | 2020-08-04 | 马键 | Boiler flue gas cooperative treatment environmental protection equipment and treatment process |
| CN111981501A (en) * | 2020-07-30 | 2020-11-24 | 中国大唐集团科学技术研究院有限公司西北电力试验研究院 | Anti-blocking heat exchange device of air preheater of pulverized coal boiler |
| CN217082613U (en) * | 2021-12-24 | 2022-07-29 | 华能巢湖发电有限责任公司 | System for treating blockage of air preheater and reducing flue pressure |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116624882A (en) * | 2023-04-10 | 2023-08-22 | 浙江浙能长兴发电有限公司 | An optimization method for half-side isolation operation of tail flue of utility boiler |
| CN117490055A (en) * | 2023-11-01 | 2024-02-02 | 浙江西子联合工程有限公司 | Boiler air preheater online salt cleaning system and method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN114413275B (en) | 2024-11-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102482578A (en) | Method and device for heat preservation of coke oven chamber in shutdown state of waste heat boiler | |
| CN104208995B (en) | A kind of thermal device improving boiler wet method desulfurization neat stress temperature and method | |
| CN111981473B (en) | A slag burnout system and method for a biomass boiler | |
| CN114413275B (en) | Method for treating air preheater blockage and reducing flue pressure | |
| CN107477564A (en) | A kind of biomass recirculating fluidized bed boiler flue gas waste heat recovery system and method | |
| CN218721644U (en) | Large coal-fired boiler air-smoke system | |
| CN219036665U (en) | Cooling air recovery device of dry slag discharging system of coal-fired boiler | |
| CN214370115U (en) | Waste heat cascade utilization system for coal-fired flue gas | |
| CN217082613U (en) | System for treating blockage of air preheater and reducing flue pressure | |
| CN209054577U (en) | Flue gas recirculation system based on bypass heat exchanger | |
| KR20100047410A (en) | A heat recovery system of reheating furnace and control method for waste gas and heat exchanger by using the heat recovery system | |
| CN207146439U (en) | A kind of air preheat structure of station boiler | |
| CN109813130A (en) | High-temperature flue gas system of heat recovery coke oven | |
| CN207187372U (en) | Sack cleaner anti-condensation automaton | |
| CN212178877U (en) | Primary wind system for waste incineration power generation | |
| CN209782692U (en) | A kind of biomass fuel split type baking equipment | |
| CN119802562A (en) | A CFB boiler using flue gas from the tail flue to heat molten salt | |
| CN219588933U (en) | Wide-load rapid peak regulating system of circulating fluidized bed boiler | |
| CN209138350U (en) | A kind of flue gas denitrification system for realizing grid-connected i.e. investment | |
| CN109084319B (en) | Flue gas recirculation system using two stages of heat exchange | |
| CN208735652U (en) | The eliminating white smoke system that a kind of heat exchanger and air preheater combine | |
| CN202166047U (en) | Energy-saving and environment-friendly biomass heating furnace | |
| CN104634070A (en) | Designing method of fire coal drying device and device | |
| CN211040943U (en) | A low-load flue gas cycle for power plant boilers to reduce pollution and improve efficiency and heat up combustion system | |
| CN116221698A (en) | Boiler Air Preheating System |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20220429 Assignee: YANTAI POWER PLANT, HUANENG SHANDONG GENERATING Co.,Ltd. Assignor: HUANENG CHAOHU POWER GENERATION Co.,Ltd. Contract record no.: X2025980011816 Denomination of invention: A method for dealing with air preheater blockage and reducing flue pressure Granted publication date: 20241101 License type: Common License Record date: 20250627 |
|
| EE01 | Entry into force of recordation of patent licensing contract |