CN114407734B - Flexible traction power supply system and protection method - Google Patents
Flexible traction power supply system and protection method Download PDFInfo
- Publication number
- CN114407734B CN114407734B CN202111575296.6A CN202111575296A CN114407734B CN 114407734 B CN114407734 B CN 114407734B CN 202111575296 A CN202111575296 A CN 202111575296A CN 114407734 B CN114407734 B CN 114407734B
- Authority
- CN
- China
- Prior art keywords
- breaker
- circuit breaker
- traction transformer
- flexible traction
- fault
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000005191 phase separation Methods 0.000 claims description 17
- 238000012544 monitoring process Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 21
- 230000001681 protective effect Effects 0.000 description 6
- 230000003137 locomotive effect Effects 0.000 description 4
- 238000004891 communication Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 230000009191 jumping Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000001568 sexual effect Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60M—POWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
- B60M3/00—Feeding power to supply lines in contact with collector on vehicles; Arrangements for consuming regenerative power
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/50—Arrangements for eliminating or reducing asymmetry in polyphase networks
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
技术领域technical field
本发明属于牵引供电技术领域,具体涉及一种柔性牵引供电系统及保护方法。The invention belongs to the technical field of traction power supply, and in particular relates to a flexible traction power supply system and a protection method.
背景技术Background technique
目前,世界上对于电气化铁路牵引供电系统基本上都是采取的三相-两相供电模式,变电所经牵引变压器从三相电网取电降压后分两供电臂输出,从而为牵引网供电,由于供电臂电压相位、幅值和频率难以完全一致,因此各供电臂间需设置电分相,但这种牵引供电系统存在电能质量较低、供电能力较差的问题。At present, the traction power supply system for electrified railways in the world basically adopts the three-phase-two-phase power supply mode. The substation takes the power from the three-phase power grid through the traction transformer and then divides it into two power supply arms to output power, so as to supply power to the traction network. , because the voltage phase, amplitude and frequency of the power supply arms are difficult to be completely consistent, electrical phase separation needs to be set between each power supply arm, but this traction power supply system has the problems of low power quality and poor power supply capability.
因此,如何减少乃至取消传统铁路牵引供电系统中的电分相装置并解决其存在的电能质量较低和供电能力较差的问题,同时如何提高柔性牵引供电系统供电可靠性并为其提供合适的综合保护方法,是本领域技术人员有待解决的技术问题。Therefore, how to reduce or even cancel the electrical phase separation device in the traditional railway traction power supply system and solve the problems of low power quality and poor power supply capacity, and how to improve the power supply reliability of the flexible traction power supply system and provide suitable The comprehensive protection method is a technical problem to be solved by those skilled in the art.
发明内容SUMMARY OF THE INVENTION
本发明的目的是为了减少乃至取消传统铁路牵引供电系统中的电分相装置,并提高电能质量和供电能力,提出了一种柔性牵引供电系统及保护方法。The purpose of the present invention is to reduce or even cancel the electrical phase separation device in the traditional railway traction power supply system, and improve the power quality and power supply capability, and propose a flexible traction power supply system and a protection method.
本发明的技术方案为:一种柔性牵引供电系统,其特征在于,所述系统包括:The technical scheme of the present invention is: a flexible traction power supply system, characterized in that the system includes:
第一柔性牵引变压器,所述第一柔性牵引变压器包括依次连接的断路器QF6、第一节能型牵引变压器、断路器QF8、第一匹配变压器、第一三相-单相变流器和断路器QF10,其中,所述第一节能型牵引变压器的原边三相通过所述断路器QF6与三相电网连接,所述第一节能型牵引变压器的副边三相通过断路器QF8与第一匹配变压器的原边三相连接,所述第一匹配变压器的副边与所述第一三相-单相变流器的输入端连接,所述第一三相-单相变流器的输出端通过所述断路器QF10与母线A连接;A first flexible traction transformer, which includes a circuit breaker QF6, a first energy-saving traction transformer, a circuit breaker QF8, a first matching transformer, a first three-phase-single-phase converter, and a circuit breaker connected in sequence QF10, wherein the primary three-phase of the first energy-saving traction transformer is connected to the three-phase power grid through the circuit breaker QF6, and the secondary three-phase of the first energy-saving traction transformer is matched with the first energy-saving traction transformer through the circuit breaker QF8 The primary side of the transformer is three-phase connected, the secondary side of the first matching transformer is connected to the input end of the first three-phase-single-phase converter, and the output end of the first three-phase-single-phase converter Connect to bus A through the circuit breaker QF10;
第一既有牵引变压器,所述第一既有牵引变压器的输入端通过断路器QF1与三相电网连接,所述第一既有牵引变压器的第一输出端通过断路器QF2与母线A连接,所述第一既有牵引变压器的第二输出端通过断路器QF3与母线B连接;The first existing traction transformer, the input end of the first existing traction transformer is connected to the three-phase power grid through the circuit breaker QF1, the first output end of the first existing traction transformer is connected to the bus A through the circuit breaker QF2, The second output end of the first existing traction transformer is connected to the busbar B through the circuit breaker QF3;
第二柔性牵引变压器,所述第二柔性牵引变压器包括依次连接的断路器QF6′、第二节能型牵引变压器、断路器QF8′、第二匹配变压器、第二三相-单相变流器和断路器QF10′,其中,所述第二节能型牵引变压器的原边三相通过所述断路器QF6′与三相电网连接,所述第二节能型牵引变压器的副边三相通过断路器QF8′与第二匹配变压器的原边三相连接,所述第二匹配变压器的副边与所述第二三相-单相变流器的输入端连接,所述第二三相-单相变流器的输出端通过所述断路器QF10′与母线A′连接;The second flexible traction transformer includes a circuit breaker QF6', a second energy-saving traction transformer, a circuit breaker QF8', a second matching transformer, a second three-phase-single-phase converter and Circuit breaker QF10', wherein the primary three-phase of the second energy-saving traction transformer is connected to the three-phase power grid through the circuit breaker QF6', and the secondary three-phase of the second energy-saving traction transformer is connected to the three-phase grid through the circuit breaker QF8 ' is connected with the primary three-phase of the second matching transformer, the secondary side of the second matching transformer is connected with the input end of the second three-phase-single-phase converter, and the second three-phase-single-phase transformer The output end of the current transformer is connected to the busbar A' through the circuit breaker QF10';
第二既有牵引变压器,所述第二既有牵引变压器的输入端通过断路器QF1′与三相电网连接,所述第二既有牵引变压器的第一输出端通过断路器QF2′与母线A′连接,所述第二既有牵引变压器的第二输出端通过断路器QF3′与母线B′连接;The second existing traction transformer, the input end of the second existing traction transformer is connected to the three-phase grid through the circuit breaker QF1', and the first output end of the second existing traction transformer is connected to the bus A through the circuit breaker QF2' ' connection, the second output end of the second existing traction transformer is connected to the busbar B' through the circuit breaker QF3';
其中,所述第一既有牵引变压器、第一柔性牵引变压器、第二柔性牵引变压器、第二既有牵引变压器为依次排列连接在母线上;Wherein, the first existing traction transformer, the first flexible traction transformer, the second flexible traction transformer, and the second existing traction transformer are arranged and connected to the busbar in sequence;
所述系统还包括有断路器QF4、断路器QF5、断路器QF5′、断路器QF4′,所述断路器QF4和断路器QF5分别位于电分相a的两侧,所述断路器QF5和断路器QF5′分别位于电分相b的两侧,所述断路器QF5′和QF4′分别位于电分相c的两侧,其中,所述电分相a、电分相c分别为柔性牵引变电所1与柔性牵引变电所2所内电分相,所述电分相b为柔性牵引变电所1与柔性牵引变电所2所间电分相,所述电分相a并联断路器QF11,电分相b处并联断路器QF12。The system also includes a circuit breaker QF4, a circuit breaker QF5, a circuit breaker QF5', and a circuit breaker QF4'. The circuit breakers QF5' are located on both sides of the electrical split-phase b respectively, and the circuit breakers QF5' and QF4' are respectively located on both sides of the electrical split-phase c, wherein the electrical split-phase a and the electrical split-phase c are respectively flexible traction transformers.
进一步地,所述第一节能型牵引变压器还通过断路器QF7与母线A、母线B连接,所述第二节能型牵引变压器还通过QF7′与母线A′、母线B′连接。Further, the first energy-saving traction transformer is also connected to bus A and bus B through circuit breaker QF7, and the second energy-saving traction transformer is also connected to bus A' and bus B' through QF7'.
本发明还提出一种柔性牵引供电系统的保护方法,应用于上述的柔性牵引供电系统中,所述方法包括以下步骤:The present invention also provides a protection method for a flexible traction power supply system, which is applied to the above-mentioned flexible traction power supply system, and the method includes the following steps:
S1、实时监测系统环流、系统各处电气量、各断路器的工作状态及保护动作信号,所述工作状态包括跳闸和闭合,所述系统各处电气量包括各断路器处的电压电流量,所述保护动作信号包括保护动作和保护不动作;S1. Real-time monitoring of system circulation, electrical quantities at various places in the system, working state of each circuit breaker and protection action signal, the working state includes tripping and closing, and the electrical quantities at various places in the system include the voltage and current at each circuit breaker, The protection action signal includes protection action and protection inaction;
S2、基于系统环流、系统各处电气量、各断路器的工作状态及保护动作信号,确定出故障设备;S2. Determine the faulty equipment based on the circulating current of the system, the electrical quantities in all parts of the system, the working state of each circuit breaker and the protection action signal;
S3、根据所述故障设备控制各断路器。S3. Control each circuit breaker according to the faulty device.
进一步地,所述步骤S2中基于系统环流、系统各处电气量、各断路器的工作状态及保护动作信号,确定出故障设备,具体包括为:Further, in the step S2, the faulty equipment is determined based on the circulating current of the system, the electrical quantities of various parts of the system, the working state of each circuit breaker and the protection action signal, which specifically includes:
若所述系统环流大于预设最大限值,则为系统并网失败;If the system circulating current is greater than the preset maximum limit, the system fails to be connected to the grid;
若所述系统有保护动作,断路器QF10与断路器QF8,或断路器QF6与断路器QF8跳闸,且断路器QF10′、QF6′、断路器QF5′、断路器QF5和断路器QF8′均闭合时,则为第一柔性牵引变压器故障;If the system has a protective action, the circuit breaker QF10 and the circuit breaker QF8, or the circuit breaker QF6 and the circuit breaker QF8 are tripped, and the circuit breaker QF10', QF6', circuit breaker QF5', circuit breaker QF5 and circuit breaker QF8' are all closed , the first flexible traction transformer is faulty;
若所述系统有保护动作,所述断路器QF10′与断路器QF8′,或断路器QF6′与断路器QF8′跳闸,且断路器QF5′、断路器QF5、断路器QF6、断路器QF8和断路器QF10均闭合时,则为第二柔性牵引变压器故障;If the system has a protective action, the circuit breaker QF10' and the circuit breaker QF8', or the circuit breaker QF6' and the circuit breaker QF8' are tripped, and the circuit breaker QF5', the circuit breaker QF5, the circuit breaker QF6, the circuit breaker QF8 and the circuit breaker QF8' are tripped. When the circuit breakers QF10 are all closed, the second flexible traction transformer is faulty;
若所述系统有保护动作,所述断路器QF10与断路器QF5跳闸,且所述断路器QF5′、断路器QF10′、断路器QF6′、断路器QF8′、断路器QF8和断路器QF6均闭合时,则为第一柔性牵引变压器处母线故障;If the system has a protection action, the circuit breaker QF10 and the circuit breaker QF5 are tripped, and the circuit breaker QF5', the circuit breaker QF10', the circuit breaker QF6', the circuit breaker QF8', the circuit breaker QF8 and the circuit breaker QF6 are all tripped. When closed, the busbar fault at the first flexible traction transformer;
若所述系统有保护动作,所述断路器QF10′与断路器QF5′跳闸,且所述断路器QF5、断路器QF10、断路器QF6、断路器QF8、断路器QF8′和断路器QF6′均闭合时,则为第二柔性牵引变压器处母线故障;If the system has a protection action, the circuit breaker QF10' and the circuit breaker QF5' are tripped, and the circuit breaker QF5, the circuit breaker QF10, the circuit breaker QF6, the circuit breaker QF8, the circuit breaker QF8' and the circuit breaker QF6' are all tripped. When closed, the busbar fault at the second flexible traction transformer;
若所述系统有保护动作,所述断路器QF10、断路器QF8、断路器QF10′与断路器QF8′跳闸且断路器QF5和断路器QF5′闭合时,或,所述系统有保护动作,断路器QF6′、断路器QF8′、断路器QF6与断路器QF8跳闸且断路器QF5和断路器QF5′闭合时,或,所述系统有保护动作,断路器QF6′、断路器QF8′、断路器QF8与断路器QF10跳闸且断路器QF5和断路器QF5′闭合时,或,所述系统有保护动作,断路器QF8′、断路器QF10′、断路器QF6与断路器QF8跳闸且断路器QF5和断路器QF5′闭合时,则为第一柔性牵引变压器和第二柔性牵引变压器均故障;If the system has a protection action, when the circuit breaker QF10, the circuit breaker QF8, the circuit breaker QF10' and the circuit breaker QF8' are tripped and the circuit breaker QF5 and the circuit breaker QF5' are closed, or, the system has a protection action, the circuit is opened When circuit breaker QF6', circuit breaker QF8', circuit breaker QF6 and circuit breaker QF8 are tripped and circuit breaker QF5 and circuit breaker QF5' are closed, or, the system has a protection action, circuit breaker QF6', circuit breaker QF8', circuit breaker QF8', circuit breaker QF5' is closed When QF8 and circuit breaker QF10 are tripped and circuit breaker QF5 and circuit breaker QF5' are closed, or, the system has a protective action, circuit breaker QF8', circuit breaker QF10', circuit breaker QF6 and circuit breaker QF8 are tripped and circuit breakers QF5 and When the circuit breaker QF5' is closed, both the first flexible traction transformer and the second flexible traction transformer are faulty;
若所述系统有保护动作,所述断路器QF10与断路器QF5跳闸且断路器QF5′、断路器QF6、断路器QF8闭合,同时,断路器QF10′与断路器QF8′跳闸,或,所述系统有保护动作,断路器QF6′与断路器QF8′跳闸时,则为第一柔性牵引变压器处母线故障且第二柔性牵引变压器故障;If the system has a protection action, the circuit breaker QF10 and the circuit breaker QF5 are tripped and the circuit breaker QF5', the circuit breaker QF6 and the circuit breaker QF8 are closed, and at the same time, the circuit breaker QF10' and the circuit breaker QF8' are tripped, or, the When the system has a protection action, when the circuit breaker QF6' and the circuit breaker QF8' are tripped, the bus at the first flexible traction transformer is faulty and the second flexible traction transformer is faulty;
若所述系统有保护动作,所述断路器QF10′与断路器QF5′跳闸且断路器QF5、断路器QF6′、断路器QF8′闭合,同时,断路器QF10与断路器QF8跳闸,或断路器QF6与断路器QF8跳闸时,则为第一柔性牵引变压器故障且第二柔性牵引变压器处母线故障;If the system has a protection action, the circuit breaker QF10' and the circuit breaker QF5' are tripped and the circuit breaker QF5, the circuit breaker QF6', and the circuit breaker QF8' are closed, and at the same time, the circuit breaker QF10 and the circuit breaker QF8 are tripped, or the circuit breaker QF10 and the circuit breaker QF8 are tripped. When QF6 and circuit breaker QF8 trip, the first flexible traction transformer is faulty and the bus at the second flexible traction transformer is faulty;
若所述系统有保护动作,所述断路器QF10、断路器QF5、断路器QF5′和断路器QF10′均跳闸且断路器QF6、断路器QF6′、断路器QF8、断路器QF8′闭合时,则所述第一柔性牵引变压器处母线故障且第二柔性牵引变压器处母线故障;If the system has a protection action, when the circuit breaker QF10, circuit breaker QF5, circuit breaker QF5' and circuit breaker QF10' are all tripped and circuit breaker QF6, circuit breaker QF6', circuit breaker QF8, and circuit breaker QF8' are closed, Then the busbar at the first flexible traction transformer is faulty and the busbar at the second flexible traction transformer is faulty;
若所述断路器QF5或断路器QF5′处电气量达到设定的保护动作值且满足故障方向条件,同时断路器QF10、断路器QF10′、断路器QF6、断路器QF6′、断路器QF8和断路器QF8′均闭合且无保护动作信号发出时,则为接触网故障。If the electrical quantity at the circuit breaker QF5 or circuit breaker QF5' reaches the set protection action value and meets the fault direction condition, the circuit breaker QF10, circuit breaker QF10', circuit breaker QF6, circuit breaker QF6', circuit breaker QF8 and When the circuit breakers QF8' are all closed and no protection action signal is sent, it is a catenary fault.
进一步地,所述步骤S3具体如下:Further, the step S3 is as follows:
若所述故障为系统并网失败,则将断路器QF12断开,使第一柔性牵引变压器为电分相a与电分相b之间及电分相a左侧供电臂供电,使第二柔性牵引变压器为电分相b右侧供电臂供电;If the fault is the failure of the system to be connected to the grid, the circuit breaker QF12 will be disconnected, so that the first flexible traction transformer can supply power between the electrical split-phase a and electrical split-phase b and the power supply arm on the left side of electrical split-phase a, so that the second flexible traction transformer can supply power The flexible traction transformer supplies power to the power supply arm on the right side of the electrical split phase b;
若所述故障为第一柔性牵引变压器故障,则将断路器QF1和断路器QF2闭合;If the fault is the fault of the first flexible traction transformer, closing the circuit breaker QF1 and the circuit breaker QF2;
若所述故障为第二柔性牵引变压器故障,则将断路器QF2′闭合;If the fault is the fault of the second flexible traction transformer, closing the circuit breaker QF2';
若所述故障为第一柔性牵引变压器处母线故障,则控制所述第二柔性牵引变压器为系统贯通供电区段进行供电;If the fault is a busbar fault at the first flexible traction transformer, controlling the second flexible traction transformer to supply power to the power supply section of the system;
若所述故障为第二柔性牵引变压器处母线故障,则控制所述第一柔性牵引变压器为系统贯通供电区段进行供电;If the fault is a busbar fault at the second flexible traction transformer, controlling the first flexible traction transformer to supply power to the power supply section of the system;
若所述故障为第一柔性牵引变压器和第二柔性牵引变压器均故障,则将断路器QF11和断路器QF12均断开,以使系统退回到既有牵引供电状态;If the fault is that both the first flexible traction transformer and the second flexible traction transformer are faulty, the circuit breaker QF11 and the circuit breaker QF12 are both disconnected, so that the system returns to the existing traction power supply state;
若所述故障为第一柔性牵引变压器处母线故障且第二柔性牵引变压器故障,则将断路器QF2′闭合,以使第二既有牵引变压器为贯通供电区段进行供电;If the fault is the fault of the busbar at the first flexible traction transformer and the fault of the second flexible traction transformer, the circuit breaker QF2' is closed, so that the second existing traction transformer supplies power to the through power supply section;
若所述故障为第一柔性牵引变压器故障且第二柔性牵引变压器处母线故障,则将断路器QF1、断路器QF2、断路器QF3和断路器QF4闭合,将断路器QF11断开,以使第一既有牵引变压器为牵引网进行供电;If the fault is the fault of the first flexible traction transformer and the fault of the bus at the second flexible traction transformer, the circuit breaker QF1, the circuit breaker QF2, the circuit breaker QF3 and the circuit breaker QF4 are closed, and the circuit breaker QF11 is opened, so that the first 1. The existing traction transformer supplies power to the traction network;
若所述故障为第一柔性牵引变压器处母线故障且第二柔性牵引变压器处母线故障,则将所述系统停止运行;If the fault is a bus failure at the first flexible traction transformer and a bus failure at the second flexible traction transformer, stopping the system;
若所述故障为接触网故障,则根据接触网故障位置控制对应的断路器进行闭合或断开。If the fault is a catenary fault, control the corresponding circuit breaker to close or open according to the position of the catenary fault.
进一步地,所述若所述故障为接触网故障,则根据接触网故障位置控制对应的断路器进行闭合或断开,具体如下:Further, if the fault is a catenary fault, control the corresponding circuit breaker to close or open according to the catenary fault position, as follows:
判断故障位置;Determine the fault location;
若所述接触网故障位于电分相a的左侧,则将断路器QF11断开;If the catenary fault is located on the left side of the electrical split phase a, disconnect the circuit breaker QF11;
若所述接触网故障位于电分相a和电分相b之间,则将断路器QF11、断路器QF12和断路器QF5断开,将断路器QF1、断路器QF3和断路器QF4闭合,以使电分相a左侧由第一既有牵引变压器进行供电,电分相b和电分相c之间由第二柔性牵引变压器进行供电;If the catenary fault is located between the electrical sub-phase a and the electrical sub-phase b, the circuit breaker QF11, the circuit breaker QF12 and the circuit breaker QF5 are opened, and the circuit breaker QF1, the circuit breaker QF3 and the circuit breaker QF4 are closed, so as to The left side of the electrical split phase a is powered by the first existing traction transformer, and the second flexible traction transformer is powered between the electrical split phase b and the electrical split phase c;
若所述接触网故障位于电分相b和电分相c之间,则将断路器QF12和断路器QF5′断开,以使电分相b左侧供电臂由第一柔性牵引变压器进行供电。If the catenary fault is located between the electrical split phase b and the electrical split phase c, the circuit breaker QF12 and the circuit breaker QF5' are disconnected, so that the power supply arm on the left side of the electrical split phase b is powered by the first flexible traction transformer .
与现有技术相比,本发明具备以下有益效果:Compared with the prior art, the present invention has the following beneficial effects:
(1)本发明提出的一种柔性牵引供电系统,包括第一柔性牵引变压器、第一既有牵引变压器、第二柔性牵引变压器和第二既有牵引变压器,其中,所述第一既有牵引变压器、第一柔性牵引变压器、第二柔性牵引变压器、第二既有牵引变压器为依次排列并通过对应的断路器连接在母线上,所述系统还包括有断路器QF4、断路器QF5、断路器QF5′、断路器QF4′、断路器QF11和断路器QF12,所述断路器QF4和断路器QF5分别位于电分相a的两侧,所述断路器QF5和断路器QF5′分别位于电分相b的两侧,所述断路器QF5′和QF4′分别位于电分相c的两侧,所述断路器QF11、断路器QF12分别并联在电分相a与电分相b两端,可取消贯通供电区段内的所内所间电分相,实现电分相两侧供电臂贯通供电,解决既有牵引供电系统中存在的无功、负序和谐波等电能质量问题,以及提高供电能力。(1) A flexible traction power supply system proposed by the present invention includes a first flexible traction transformer, a first existing traction transformer, a second flexible traction transformer and a second existing traction transformer, wherein the first existing traction transformer The transformer, the first flexible traction transformer, the second flexible traction transformer, and the second existing traction transformer are arranged in sequence and connected to the busbar through corresponding circuit breakers. The system further includes circuit breakers QF4, circuit breakers QF5, circuit breakers QF5', circuit breaker QF4', circuit breaker QF11 and circuit breaker QF12, the circuit breaker QF4 and circuit breaker QF5 are respectively located on both sides of the electrical split phase a, and the circuit breaker QF5 and the circuit breaker QF5' are respectively located on the electrical split phase On both sides of b, the circuit breakers QF5' and QF4' are respectively located on the two sides of the electrical split phase c, and the circuit breakers QF11 and QF12 are connected in parallel at both ends of the electrical split phase a and the electrical split phase b respectively, which can be eliminated. Connect the electrical phase between the stations in the power supply section, realize the power supply arm on both sides of the electrical phase separation, solve the power quality problems such as reactive power, negative sequence and harmonics existing in the existing traction power supply system, and improve the power supply capacity .
(2)本发明提出的一种柔性牵引供电系统的保护方法,可实现柔性牵引供电系统在单个或多个柔性牵引变电所多种故障的情况下的自愈重构,保证系统在多种故障状态下对故障隔离和切除后的稳定供电,提高了柔性牵引供电系统供电可靠性,避免因柔性牵引供电系统中的电力电子器件故障率较高,从而导致柔性牵引供电系统故障无法可靠供电的技术问题。(2) The protection method of the flexible traction power supply system proposed by the present invention can realize the self-healing and reconstruction of the flexible traction power supply system in the case of various faults of a single or multiple flexible traction substations, and ensure that the system can be operated in a variety of ways. The stable power supply after fault isolation and removal in the fault state improves the power supply reliability of the flexible traction power supply system, and avoids the failure rate of the power electronic devices in the flexible traction power supply system. technical problem.
附图说明Description of drawings
图1所示为本发明实施例提供的一种柔性牵引供电系统的结构示意图;FIG. 1 is a schematic structural diagram of a flexible traction power supply system provided by an embodiment of the present invention;
图2所示为本发明实施例提供的一种柔性牵引供电系统保护方法的流程示意图;FIG. 2 is a schematic flowchart of a protection method for a flexible traction power supply system provided by an embodiment of the present invention;
图3所示为本发明实施例中柔性牵引供电系统正常运行状态示意图;FIG. 3 is a schematic diagram showing a normal operation state of a flexible traction power supply system in an embodiment of the present invention;
图4所示为本发明实施例中第一柔性牵引变压器故障的运行状态示意图;FIG. 4 is a schematic diagram showing the operation state of the first flexible traction transformer fault in the embodiment of the present invention;
图5所示为本发明实施例中第一柔性牵引变压器处母线故障时为例的运行状态示意图;FIG. 5 is a schematic diagram showing the operation state of the first flexible traction transformer when the busbar is faulty as an example in the embodiment of the present invention;
图6所示为本发明实施例中第一柔性牵引变压器和第二柔性牵引变压器均故障时运行状态示意图;FIG. 6 is a schematic diagram showing the operating state when both the first flexible traction transformer and the second flexible traction transformer are faulty in the embodiment of the present invention;
图7所示为本发明实施例中第一柔性牵引变压器处母线故障且第二柔性牵引变压器故障时系统运行示意图;FIG. 7 is a schematic diagram showing the operation of the system when the bus at the first flexible traction transformer is faulty and the second flexible traction transformer is faulty in the embodiment of the present invention;
图8所示为本发明实施例中第一柔性牵引变压器故障且第二柔性牵引变压器处母线故障时系统运行示意图;FIG. 8 is a schematic diagram of system operation when the first flexible traction transformer is faulty and the bus at the second flexible traction transformer is faulty according to the embodiment of the present invention;
图9所示为本发明实施例中第一柔性牵引变压器处母线故障且第二柔性牵引变压器处母线故障时系统示意图;9 is a schematic diagram of a system when the busbar at the first flexible traction transformer is faulty and the busbar at the second flexible traction transformer is faulty in an embodiment of the present invention;
图10所示为本发明实施例中柔性牵引供电系统接触网ab段故障时为例的系统运行状态示意图;FIG. 10 is a schematic diagram of the system operation state when the catenary ab segment of the flexible traction power supply system is faulty as an example in the embodiment of the present invention;
图11所示为本发明实施例中柔性牵引供电系统解网运行状态示意图。FIG. 11 is a schematic diagram showing the disconnected operation state of the flexible traction power supply system in the embodiment of the present invention.
具体实施方式Detailed ways
下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, but not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present application.
本申请提出了一种柔性牵引供电系统,如图1所示为本申请实施例提出的一种柔性牵引供电系统的结构示意图,包括:The application proposes a flexible traction power supply system, as shown in FIG. 1 , a schematic structural diagram of a flexible traction power supply system proposed in an embodiment of the application, including:
第一柔性牵引变压器,所述第一柔性牵引变压器包括依次连接的断路器QF6、第一节能型牵引变压器、断路器QF8、第一匹配变压器、第一三相-单相变流器和断路器QF10,其中,所述第一节能型牵引变压器的原边三相通过所述断路器QF6与三相电网连接,所述第一节能型牵引变压器的副边三相通过断路器QF8与第一匹配变压器的原边三相连接,所述第一匹配变压器的副边与所述第一三相-单相变流器的输入端连接,所述第一三相-单相变流器的输出端通过所述断路器QF10与母线A连接;A first flexible traction transformer, which includes a circuit breaker QF6, a first energy-saving traction transformer, a circuit breaker QF8, a first matching transformer, a first three-phase-single-phase converter, and a circuit breaker connected in sequence QF10, wherein the primary three-phase of the first energy-saving traction transformer is connected to the three-phase power grid through the circuit breaker QF6, and the secondary three-phase of the first energy-saving traction transformer is matched with the first energy-saving traction transformer through the circuit breaker QF8 The primary side of the transformer is three-phase connected, the secondary side of the first matching transformer is connected to the input end of the first three-phase-single-phase converter, and the output end of the first three-phase-single-phase converter Connect to bus A through the circuit breaker QF10;
第一既有牵引变压器,所述第一既有牵引变压器的输入端通过断路器QF1与三相电网连接,所述第一既有牵引变压器的第一输出端通过断路器QF2与母线A连接,所述第一既有牵引变压器的第二输出端通过断路器QF3与母线B连接;The first existing traction transformer, the input end of the first existing traction transformer is connected to the three-phase power grid through the circuit breaker QF1, the first output end of the first existing traction transformer is connected to the bus A through the circuit breaker QF2, The second output end of the first existing traction transformer is connected to the busbar B through the circuit breaker QF3;
第二柔性牵引变压器,所述第二柔性牵引变压器包括依次连接的断路器QF6′、第二节能型牵引变压器、断路器QF8′、第二匹配变压器、第二三相-单相变流器和断路器QF10′,其中,所述第二节能型牵引变压器的原边三相通过所述断路器QF6′与三相电网连接,所述第二节能型牵引变压器的副边三相通过断路器QF8′与第二匹配变压器的原边三相连接,所述第二匹配变压器的副边与所述第二三相-单相变流器的输入端连接,所述第二三相-单相变流器的输出端通过所述断路器QF10′与母线A′连接;The second flexible traction transformer includes a circuit breaker QF6', a second energy-saving traction transformer, a circuit breaker QF8', a second matching transformer, a second three-phase-single-phase converter and Circuit breaker QF10', wherein the primary three-phase of the second energy-saving traction transformer is connected to the three-phase power grid through the circuit breaker QF6', and the secondary three-phase of the second energy-saving traction transformer is connected to the three-phase grid through the circuit breaker QF8 ' is connected with the primary three-phase of the second matching transformer, the secondary side of the second matching transformer is connected with the input end of the second three-phase-single-phase converter, and the second three-phase-single-phase transformer The output end of the current transformer is connected to the busbar A' through the circuit breaker QF10';
第二既有牵引变压器,所述第二既有牵引变压器的输入端通过断路器QF1′与三相电网连接,所述第二既有牵引变压器的第一输出端通过断路器QF2′与母线A′连接,所述第二既有牵引变压器的第二输出端通过断路器QF3′与母线B′连接;The second existing traction transformer, the input end of the second existing traction transformer is connected to the three-phase grid through the circuit breaker QF1', and the first output end of the second existing traction transformer is connected to the bus A through the circuit breaker QF2' ' connection, the second output end of the second existing traction transformer is connected to the busbar B' through the circuit breaker QF3';
其中,所述第一既有牵引变压器、第一柔性牵引变压器、第二柔性牵引变压器、第二既有牵引变压器为依次排列连接在母线上;Wherein, the first existing traction transformer, the first flexible traction transformer, the second flexible traction transformer, and the second existing traction transformer are arranged and connected to the busbar in sequence;
所述系统还包括有断路器QF4、断路器QF5、断路器QF5′、断路器QF4′,所述断路器QF4和断路器QF5分别位于电分相a的两侧,所述断路器QF5和断路器QF5′分别位于电分相b的两侧,所述断路器QF5′和QF4′分别位于电分相c的两侧,其中,所述电分相a、电分相c分别为柔性牵引变电所1与柔性牵引变电所2所内电分相,所述电分相b为柔性牵引变电所1与柔性牵引变电所2所间电分相,所述电分相a并联断路器QF11,电分相b处并联断路器QF12。The system also includes a circuit breaker QF4, a circuit breaker QF5, a circuit breaker QF5', and a circuit breaker QF4'. The circuit breakers QF5' are located on both sides of the electrical split-phase b respectively, and the circuit breakers QF5' and QF4' are respectively located on both sides of the electrical split-phase c, wherein the electrical split-phase a and the electrical split-phase c are respectively flexible traction transformers.
在本申请实施例中,所述第一节能型牵引变压器还通过断路器QF7与母线A、母线B连接,所述第二节能型牵引变压器还通过QF7′与母线A′、母线B′连接。In the embodiment of the present application, the first energy-saving traction transformer is also connected to bus A and bus B through circuit breaker QF7, and the second energy-saving traction transformer is also connected to bus A' and bus B' through QF7'.
其中,第一柔性牵引变压器及其所在处的母线、第一既有牵引变压器及其所在处的母线、断路器QF4和断路器QF5组成为柔性牵引变电所1,第二柔性牵引变压器及其所在处的母线、第二既有牵引变压器及其所在处的母线、断路器QF4′和断路器QF5′组成为柔性牵引变电所2,本系统中所述的第二既有牵引变压器在系统正常工作的时候QF3′侧的供电臂一直在为c处电分相右侧供电。Among them, the first flexible traction transformer and its busbar, the first existing traction transformer and its busbar, circuit breaker QF4 and circuit breaker QF5 are composed of
本申请还提出一种柔性牵引系统的保护方法,如图2所示,其应用于如上述的柔性牵引供电系统中,所述方法包括以下步骤:The present application also proposes a protection method for a flexible traction system, as shown in FIG. 2 , which is applied to the above-mentioned flexible traction power supply system, and the method includes the following steps:
步骤S1、实时监测系统环流、系统各处电气量、各断路器的工作状态及保护动作信号,所述工作状态包括跳闸和闭合,所述系统各处电气量包括各断路器处的电压电流量,所述保护动作信号包括保护动作和保护不动作。Step S1, real-time monitoring of system circulation, electrical quantities at various places in the system, the working state of each circuit breaker and protection action signals, the working state includes tripping and closing, and the electrical quantities at various places in the system include the voltage and current at each circuit breaker. , the protection action signal includes protection action and protection inaction.
具体的,在柔性牵引变电所1所内及柔性牵引变电所1与柔性牵引变电所2所间电分相两端并联断路器,且在馈线断路器及电分相断路器处设置相应的电压电流互感器、光缆通信通道及功率方向元件,监测牵引网电分相处电气量信息,经通信通道可实现电气量信息的相互交流,实现变电所所内、所间断路器的联跳,从而实现系统工作状态切换。Specifically, circuit breakers are connected in parallel at both ends of the electrical split in the
如图1所示为柔性牵引供电系统结构示意图,以图中柔性牵引变电所1为例,在节能型牵引变压器故障时保护动作于QF6、QF8跳闸;在匹配变压器故障或三相-单相变流器系统故障时保护动作于QF8、QF10跳闸;在柔性牵引变电所母线故障时,保护动作于QF10、QF5跳闸;在牵引网故障时保护动作于QF5、QF11、QF12跳闸。Figure 1 is a schematic diagram of the structure of the flexible traction power supply system. Taking the
通过柔性牵引供电系统各处保护动作信息及断路器动作跳闸情况,可以判定系统设备运行情况,为系统运行状态提供依据,从而保证系统的安全稳定供电。Through the protection action information of each part of the flexible traction power supply system and the action and tripping of the circuit breaker, the operation of the system equipment can be determined, and the basis for the system operation state can be provided, thereby ensuring the safe and stable power supply of the system.
如图3所示,为柔性牵引供电系统正常运行状态示意图,检测系统各处电气量及保护动作状态,在系统正常工作时,变电所断路器QF6、断路器QF8、断路器QF10、断路器QF5、断路器QF11、断路器QF12、断路器QF6′、断路器QF8′、断路器QF10′、断路器QF5′、断路器QF1′、断路器QF3′、断路器QF4′闭合,其余断路器断开,柔性牵引供电系统实现长距离贯通供电。As shown in Figure 3, it is a schematic diagram of the normal operation state of the flexible traction power supply system, which detects the electrical quantity and protection action status of the system. Circuit breaker QF5, circuit breaker QF11, circuit breaker QF12, circuit breaker QF6', circuit breaker QF8', circuit breaker QF10', circuit breaker QF5', circuit breaker QF1', circuit breaker QF3', circuit breaker QF4' are closed, and the rest of the circuit breakers are closed open, the flexible traction power supply system realizes long-distance power supply.
步骤S2、基于系统环流、系统各处电气量、各断路器的工作状态及保护动作信号,确定出故障设备。Step S2: Determine the faulty equipment based on the circulating current of the system, the electrical quantities of various parts of the system, the working state of each circuit breaker, and the protection action signal.
在本申请实施例中,所述步骤S2中基于系统环流、系统各处电气量、各断路器的工作状态及保护动作信号,确定出故障设备,具体包括为:In the embodiment of the present application, in the step S2, the faulty equipment is determined based on the circulating current of the system, the electrical quantities in various parts of the system, the working state of each circuit breaker, and the protection action signal, which specifically includes:
(1)若所述系统环流大于预设最大限值,则为系统并网失败;(1) If the system circulating current is greater than the preset maximum limit, the system fails to connect to the grid;
(2)若所述系统有保护动作,断路器QF10与断路器QF8,或断路器QF6与断路器QF8跳闸,且断路器QF10′、QF6′、断路器QF5′、断路器QF5和断路器QF8′均闭合时,则为第一柔性牵引变压器故障;(2) If the system has a protective action, the circuit breaker QF10 and the circuit breaker QF8, or the circuit breaker QF6 and the circuit breaker QF8 are tripped, and the circuit breaker QF10', QF6', circuit breaker QF5', circuit breaker QF5 and circuit breaker QF8 are tripped When both are closed, the first flexible traction transformer is faulty;
(3)若所述系统有保护动作,所述断路器QF10′与断路器QF8′,或断路器QF6′与断路器QF8′跳闸,且断路器QF5′、断路器QF5、断路器QF6、断路器QF8和断路器QF10均闭合时,则为第二柔性牵引变压器故障;(3) If the system has a protection action, the circuit breaker QF10' and the circuit breaker QF8', or the circuit breaker QF6' and the circuit breaker QF8' are tripped, and the circuit breaker QF5', the circuit breaker QF5, the circuit breaker QF6, the circuit breaker When both the circuit breaker QF8 and the circuit breaker QF10 are closed, the second flexible traction transformer is faulty;
(4)若所述系统有保护动作,所述断路器QF10与断路器QF5跳闸,且所述断路器QF5′、断路器QF10′、断路器QF6′、断路器QF8′、断路器QF8和断路器QF6均闭合时,则为第一柔性牵引变压器处母线故障;(4) If the system has a protection action, the circuit breaker QF10 and the circuit breaker QF5 are tripped, and the circuit breaker QF5', the circuit breaker QF10', the circuit breaker QF6', the circuit breaker QF8', the circuit breaker QF8 and the circuit breaker When both QF6 and QF6 are closed, it is the busbar fault at the first flexible traction transformer;
(5)若所述系统有保护动作,所述断路器QF10′与断路器QF5′跳闸,且所述断路器QF5、断路器QF10、断路器QF6、断路器QF8、断路器QF8′和断路器QF6′均闭合时,则为第二柔性牵引变压器处母线故障;(5) If the system has a protection action, the circuit breaker QF10' and the circuit breaker QF5' are tripped, and the circuit breaker QF5, the circuit breaker QF10, the circuit breaker QF6, the circuit breaker QF8, the circuit breaker QF8' and the circuit breaker When both QF6' are closed, the busbar fault at the second flexible traction transformer;
(6)若所述系统有保护动作,所述断路器QF10、断路器QF8、断路器QF10′与断路器QF8′跳闸且断路器QF5和断路器QF5′闭合时,或,所述系统有保护动作,断路器QF6′、断路器QF8′、断路器QF6与断路器QF8跳闸且断路器QF5和断路器QF5′闭合时,或,所述系统有保护动作,断路器QF6′、断路器QF8′、断路器QF8与断路器QF10跳闸且断路器QF5和断路器QF5′闭合时,或,所述系统有保护动作,断路器QF8′、断路器QF10′、断路器QF6与断路器QF8跳闸且断路器QF5和断路器QF5′闭合时,则为第一柔性牵引变压器和第二柔性牵引变压器均故障;(6) If the system has a protection action, when the circuit breaker QF10, the circuit breaker QF8, the circuit breaker QF10' and the circuit breaker QF8' are tripped and the circuit breaker QF5 and the circuit breaker QF5' are closed, or, the system is protected When circuit breaker QF6', circuit breaker QF8', circuit breaker QF6 and circuit breaker QF8 are tripped and circuit breaker QF5 and circuit breaker QF5' are closed, or, the system has protective action, circuit breaker QF6', circuit breaker QF8' When the circuit breaker QF8 and the circuit breaker QF10 are tripped and the circuit breaker QF5 and the circuit breaker QF5' are closed, or, the system has a protective action, the circuit breaker QF8', the circuit breaker QF10', the circuit breaker QF6 and the circuit breaker QF8 are tripped and open circuit When the circuit breaker QF5 and the circuit breaker QF5' are closed, both the first flexible traction transformer and the second flexible traction transformer are faulty;
(7)若所述系统有保护动作,所述断路器QF10与断路器QF5跳闸且断路器QF5′、断路器QF6、断路器QF8闭合,同时,断路器QF10′与断路器QF8′跳闸,或,所述系统有保护动作,断路器QF6′与断路器QF8′跳闸时,则为第一柔性牵引变压器处母线故障且第二柔性牵引变压器故障;(7) If the system has a protection action, the circuit breaker QF10 and circuit breaker QF5 are tripped and circuit breaker QF5', circuit breaker QF6, and circuit breaker QF8 are closed, and at the same time, circuit breaker QF10' and circuit breaker QF8' are tripped, or , the system has a protection action, when the circuit breaker QF6' and the circuit breaker QF8' are tripped, the busbar at the first flexible traction transformer is faulty and the second flexible traction transformer is faulty;
(8)若所述系统有保护动作,所述断路器QF10′与断路器QF5′跳闸且断路器QF5、断路器QF6′、断路器QF8′闭合,同时,断路器QF10与断路器QF8跳闸,或断路器QF6与断路器QF8跳闸时,则为第一柔性牵引变压器故障且第二柔性牵引变压器处母线故障;(8) If the system has a protection action, the circuit breaker QF10' and the circuit breaker QF5' are tripped and the circuit breaker QF5, the circuit breaker QF6', and the circuit breaker QF8' are closed, and at the same time, the circuit breaker QF10 and the circuit breaker QF8 are tripped, Or when the circuit breaker QF6 and the circuit breaker QF8 are tripped, the first flexible traction transformer is faulty and the busbar at the second flexible traction transformer is faulty;
(9)若所述系统有保护动作,所述断路器QF10、断路器QF5、断路器QF5′和断路器QF10′均跳闸且断路器QF6、断路器QF6′、断路器QF8、断路器QF8′闭合时,则所述第一柔性牵引变压器处母线故障且第二柔性牵引变压器处母线故障;(9) If the system has a protection action, the circuit breaker QF10, circuit breaker QF5, circuit breaker QF5' and circuit breaker QF10' are all tripped and circuit breaker QF6, circuit breaker QF6', circuit breaker QF8, circuit breaker QF8' are all tripped When closed, the busbar at the first flexible traction transformer is faulty and the busbar at the second flexible traction transformer is faulty;
(10)若所述断路器QF5或断路器QF5′处电气量达到设定的保护动作值且满足故障方向条件,同时断路器QF10、断路器QF10′、断路器QF6、断路器QF6′、断路器QF8和断路器QF8′均闭合且无保护动作信号发出时,则为接触网故障。(10) If the electrical quantity at the circuit breaker QF5 or the circuit breaker QF5' reaches the set protection action value and meets the fault direction condition, the circuit breaker QF10, the circuit breaker QF10', the circuit breaker QF6, the circuit breaker QF6', the circuit breaker QF10', the circuit breaker QF6', the circuit breaker When both the circuit breaker QF8 and the circuit breaker QF8' are closed and no protection action signal is sent, it is a catenary fault.
步骤S3、根据所述故障设备控制各断路器。Step S3: Control each circuit breaker according to the faulty device.
在本申请实施例中,所述步骤S3具体如下:In the embodiment of the present application, the step S3 is specifically as follows:
若所述故障为系统并网失败,则将断路器QF12断开,使第一柔性牵引变压器为电分相a与电分相b之间及电分相a左侧供电臂供电,使第二柔性牵引变压器为电分相b右侧供电臂供电;If the fault is the failure of the system to be connected to the grid, the circuit breaker QF12 will be disconnected, so that the first flexible traction transformer can supply power between the electrical split-phase a and electrical split-phase b and the power supply arm on the left side of electrical split-phase a, so that the second flexible traction transformer can supply power The flexible traction transformer supplies power to the power supply arm on the right side of the electrical split phase b;
具体的,在系统正常工作之前或工作时,还需要监测系统环流是否超过预设限值,若是,则说明两个柔性牵引变压器并网失败,系统进入解网工作状态,若所述故障为系统并网失败,则将断路器QF12断开,使第一柔性牵引变压器为电分相a与电分相b之间及电分相a左侧供电臂供电,使第二牵引变压器为电分相b右侧供电臂供电,也即断路器QF12断开,b处电分相重新投入运行,各供电臂由相应的柔性牵引变压器分别供电。其中,电分相b左侧供电臂由柔性牵引变电所1柔性牵引变压器供电,bc供电臂由柔性牵引变电所2柔性牵引变压器供电,如图11所示为柔性牵引供电系统解网运行状态示意图。Specifically, before or during the normal operation of the system, it is also necessary to monitor whether the circulating current of the system exceeds the preset limit value. If so, it means that the two flexible traction transformers have failed to connect to the grid, and the system enters the disconnected working state. If the fault is the system If the grid connection fails, the circuit breaker QF12 is disconnected, so that the first flexible traction transformer supplies power between the electrical split phase a and the electrical split phase b and the power supply arm on the left side of the electrical split phase a, so that the second traction transformer is the electrical split phase The power supply arm on the right side of b is powered, that is, the circuit breaker QF12 is disconnected, the electrical phase at b is put into operation again, and each power supply arm is powered by the corresponding flexible traction transformer. Among them, the power supply arm on the left side of the electrical split phase b is powered by the flexible traction transformer of
若所述故障为第一柔性牵引变压器故障,则将断路器QF1和断路器QF2闭合;If the fault is the fault of the first flexible traction transformer, closing the circuit breaker QF1 and the circuit breaker QF2;
若所述故障为第二柔性牵引变压器故障,则将断路器QF2′闭合;If the fault is the fault of the second flexible traction transformer, closing the circuit breaker QF2';
具体的,如图4所示为第一柔性牵引变压器故障的运行状态示意图,实现在单个柔性牵引变压器故障情况下系统的重构运行(柔性牵引变电所2中柔性牵引变压器故障时同理),保证机车正常运行。Specifically, Fig. 4 is a schematic diagram of the operation state of the first flexible traction transformer fault, which realizes the reconfiguration operation of the system in the case of a single flexible traction transformer fault (the same is true when the flexible traction transformer in the flexible traction substation 2 fails) , to ensure the normal operation of the locomotive.
在系统保护动作,断路器QF10与断路器QF8或断路器QF6与断路器QF8跳闸且断路器QF10′、断路器QF6′、断路器QF5′、断路器QF5、断路器QF8'闭合时,判断仅为柔性牵引变电所1中柔性牵引变压器故障,也即第一柔性牵引变压器,柔性牵引变电所1断路器QF1、断路器QF2闭合,柔性牵引变电所2柔性牵引变压器也即第二柔性牵引变压器与柔性牵引变电所1既有牵引变压器也即第二既有牵引变压器一个供电臂并网共同向牵引网供电,实现在单个柔性牵引变压器故障时柔性牵引供电系统重构后的正常运行;在系统保护动作,断路器QF10′与断路器QF8′或断路器QF6′与断路器QF8′跳闸且断路器QF5′、断路器QF5、断路器QF6、断路器QF8、断路器QF10闭合时,柔性牵引变电所2柔性牵引变压器故障,柔性牵引变电所2断路器QF2′闭合,柔性牵引变电所2的既有牵引变压器与性牵引变电所1的柔性牵引变压器并网共同向牵引网供电,实现在单个柔性牵引变压器故障时柔性牵引供电系统重构后的正常运行。When the system protection operates, the circuit breaker QF10 and the circuit breaker QF8 or the circuit breaker QF6 and the circuit breaker QF8 are tripped and the circuit breaker QF10′, circuit breaker QF6′, circuit breaker QF5′, circuit breaker QF5 and circuit breaker QF8′ are closed, the judgment is only It is the fault of the flexible traction transformer in
若所述故障为第一柔性牵引变压器处母线故障,则控制所述第二柔性牵引变压器为系统贯通供电区段进行供电;If the fault is a busbar fault at the first flexible traction transformer, controlling the second flexible traction transformer to supply power to the power supply section of the system;
若所述故障为第二柔性牵引变压器处母线故障,则控制所述第一柔性牵引变压器为系统贯通供电区段进行供电;If the fault is a busbar fault at the second flexible traction transformer, controlling the first flexible traction transformer to supply power to the power supply section of the system;
具体的,如图5所示,为以柔性牵引变电所1母线故障也即第一柔性牵引变压器处母线故障时为例的运行状态示意图,实现在单个柔性牵引变电所母线故障时的系统重构,可使机车降功率通过。Specifically, as shown in FIG. 5 , it is a schematic diagram of the operation state when the bus of the
在系统保护动作,断路器QF10与QF5均跳闸且QF5'、QF10'、QF6'、QF8'、QF8、QF6闭合时,判断为柔性牵引变电所1母线故障,此时,仅靠柔性牵引变电所2中的柔性牵引变压器为系统贯通供电区段供电;在系统保护动作,断路器QF10'与QF5'均跳闸且QF5、QF10、QF6、QF8、QF8'、QF6'闭合时,判断为柔性牵引变电所2母线故障,此时,仅靠柔性牵引变电所1中的柔性牵引变压器为系统贯通供电区段供电。When the system protection acts, the circuit breakers QF10 and QF5 are both tripped and QF5', QF10', QF6', QF8', QF8, QF6 are closed, it is judged that the
若所述故障为第一柔性牵引变压器和第二柔性牵引变压器均故障,则将断路器QF11和断路器QF12均断开,以使系统退回到既有牵引供电状态;If the fault is that both the first flexible traction transformer and the second flexible traction transformer are faulty, the circuit breaker QF11 and the circuit breaker QF12 are both disconnected, so that the system returns to the existing traction power supply state;
具体的,如图6所示为第一柔性牵引变压器和第二柔性牵引变压器均故障时运行状态示意图,检测系统各处电气量及保护动作状态,在系统保护动作,断路器QF10′与断路器QF8′或断路器QF6′与断路器QF8′跳闸且断路器QF10与断路器QF8或断路器QF6与断路器QF8跳闸且断路器QF5、断路器QF5′闭合时,所有柔性牵引变压器全部故障,断开断路器QF11、断路器QF12,所有电分相重新投入使用,系统退回既有牵引供电系统状态。若断路器断路器QF6闭合,判断节能型牵引变压器无故障,则利用节能型牵引变压器实现既有牵引供电方式供电,若断路器断路器QF6断开,判断节能型牵引变压器故障,则利用变电所既有牵引变压器实现既有牵引供电方式供电,其具体情况如下:Specifically, as shown in FIG. 6 , it is a schematic diagram of the operating state when both the first flexible traction transformer and the second flexible traction transformer are faulty. The electrical quantities and protection action states of various parts of the system are detected. During the protection action of the system, the circuit breaker QF10 ′ and the circuit breaker When QF8′ or circuit breaker QF6′ and circuit breaker QF8′ are tripped and circuit breaker QF10 and circuit breaker QF8 or circuit breaker QF6 and circuit breaker QF8 are tripped and circuit breaker QF5 and circuit breaker QF5′ are closed, all flexible traction transformers are faulty The circuit breaker QF11 and the circuit breaker QF12 are opened, and all electrical phases are put into use again, and the system returns to the state of the existing traction power supply system. If the circuit breaker QF6 of the circuit breaker is closed, it is judged that the energy-saving traction transformer is not faulty, and the energy-saving traction transformer is used to realize the existing traction power supply. All existing traction transformers realize power supply by existing traction power supply, and the specific conditions are as follows:
对于柔性牵引变电所1,若断路器断路器QF6处于闭合状态,判断节能型牵引变压器正常,闭合断路器QF7利用柔性牵引变电所1节能型牵引变压器实现既有牵引供电方式供电;若断路器断路器QF6处于断开状态,判断节能型牵引变压器故障,闭合断路器QF1、断路器QF2、断路器QF3、断路器QF4,利用既有牵引变压器实现既有牵引供电方式对牵引网供电;对于柔性牵引变电所2,若断路器断路器QF6′处于闭合状态,判断节能型牵引变压器正常,闭合断路器QF7′,断开断路器QF1′、断路器QF3′,柔性牵引变电所2节能型牵引变压器实现既有牵引供电方式供电;若断路器QF6′处于断开状态,判断节能型牵引变压器故障,闭合断路器QF2′,利用既有牵引变压器实现既有牵引供电方式对牵引网供电。For
若所述故障为第一柔性牵引变压器处母线故障且第二柔性牵引变压器故障,则将断路器QF2′闭合,以使第二既有牵引变压器为贯通供电区段进行供电;If the fault is the fault of the busbar at the first flexible traction transformer and the fault of the second flexible traction transformer, the circuit breaker QF2' is closed, so that the second existing traction transformer supplies power to the through power supply section;
具体的,如图7所示为第一柔性牵引变压器处母线故障且第二柔性牵引变压器故障时系统运行示意图,在系统保护动作,断路器QF10与断路器QF5均跳闸且断路器QF5′、断路器QF6、断路器QF8闭合,断路器QF10′与断路器QF8′或断路器QF6′与断路器QF8′跳闸时,判断为柔性牵引变电所1母线故障且柔性牵引变电所2柔性牵引变压器故障,此时,断路器QF2′闭合,由柔性牵引变电所2既有牵引变压器为长距离贯通供电区间供电,机车降功率运行。Specifically, Fig. 7 is a schematic diagram of the system operation when the busbar at the first flexible traction transformer is faulty and the second flexible traction transformer is faulty. During the system protection action, the circuit breaker QF10 and the circuit breaker QF5 are both tripped and the circuit breaker QF5' and the circuit breaker are open. When circuit breaker QF6 and circuit breaker QF8 are closed, and circuit breaker QF10' and circuit breaker QF8' or circuit breaker QF6' and circuit breaker QF8' are tripped, it is judged that the
若所述故障为第一柔性牵引变压器故障且第二柔性牵引变压器处母线故障,则将断路器QF1、断路器QF2、断路器QF3和断路器QF4闭合,将断路器QF11断开,以使第一既有牵引变压器为牵引网进行供电;If the fault is the fault of the first flexible traction transformer and the fault of the bus at the second flexible traction transformer, the circuit breaker QF1, the circuit breaker QF2, the circuit breaker QF3 and the circuit breaker QF4 are closed, and the circuit breaker QF11 is opened, so that the first 1. The existing traction transformer supplies power to the traction network;
具体的,如图8所示为第一柔性牵引变压器故障且第二柔性牵引变压器处母线故障时系统运行示意图,在系统保护动作,断路器QF10′与断路器QF5′均跳闸且断路器QF5、断路器QF6′、断路器QF8′闭合,断路器QF10与断路器QF8或断路器QF6与断路器QF8跳闸时,判断为柔性牵引变电所2母线故障且柔性牵引变电所1柔性牵引变压器故障,此时,断路器QF1、断路器QF2、断路器QF3、断路器QF4闭合,断路器QF11断开,由柔性牵引变电所1既有牵引变压器供电,机车降功率运行。Specifically, Fig. 8 is a schematic diagram of the system operation when the first flexible traction transformer is faulty and the busbar at the second flexible traction transformer is faulty. During the system protection action, the circuit breaker QF10' and the circuit breaker QF5' are both tripped and the circuit breakers QF5, When the circuit breaker QF6' and the circuit breaker QF8' are closed, and the circuit breaker QF10 and the circuit breaker QF8 or the circuit breaker QF6 and the circuit breaker QF8 are tripped, it is judged that the flexible traction substation 2 busbar is faulty and the
若所述故障为第一柔性牵引变压器处母线故障且第二柔性牵引变压器处母线故障,则将所述系统停止运行;If the fault is a bus failure at the first flexible traction transformer and a bus failure at the second flexible traction transformer, stopping the system;
具体的,如图9所示为第一柔性牵引变压器处母线故障且第二柔性牵引变压器处母线故障时系统示意图,在系统保护动作,断路器QF10与断路器QF5均断开且断路器QF5′、断路器QF10′断开时,两个柔性牵引变电所母线处均故障,柔性牵引供电系统故障,系统停止运行。Specifically, Fig. 9 is a schematic diagram of the system when the busbar at the first flexible traction transformer is faulty and the busbar at the second flexible traction transformer is faulty. During the system protection action, the circuit breaker QF10 and the circuit breaker QF5 are both disconnected and the circuit breaker QF5' . When the circuit breaker QF10' is disconnected, both the busbars of the two flexible traction substations are faulty, the flexible traction power supply system is faulty, and the system stops running.
若所述故障为接触网故障,则根据接触网故障位置控制对应的断路器进行闭合或断开。If the fault is a catenary fault, control the corresponding circuit breaker to close or open according to the position of the catenary fault.
在本申请实施例中,所述若所述故障为接触网故障,则根据接触网故障位置控制对应的断路器进行闭合或断开,具体如下:In the embodiment of the present application, if the fault is a catenary fault, the corresponding circuit breaker is controlled to be closed or opened according to the position of the catenary fault, as follows:
判断故障位置;Determine the fault location;
若所述接触网故障位于电分相a的左侧,则将断路器QF11断开;If the catenary fault is located on the left side of the electrical split phase a, disconnect the circuit breaker QF11;
若所述接触网故障位于电分相a和电分相b之间,则将断路器QF11、断路器QF12和断路器QF5断开,将断路器QF1、断路器QF3和断路器QF4闭合,以使电分相a左侧由第一既有牵引变压器进行供电,电分相b和电分相c之间由第二柔性牵引变压器进行供电;If the catenary fault is located between the electrical sub-phase a and the electrical sub-phase b, the circuit breaker QF11, the circuit breaker QF12 and the circuit breaker QF5 are opened, and the circuit breaker QF1, the circuit breaker QF3 and the circuit breaker QF4 are closed, so as to The left side of the electrical split phase a is powered by the first existing traction transformer, and the second flexible traction transformer is powered between the electrical split phase b and the electrical split phase c;
若所述接触网故障位于电分相b和电分相c之间,则将断路器QF12和断路器QF5′断开,以使电分相b左侧供电臂由第一柔性牵引变压器进行供电。If the catenary fault is located between the electrical split phase b and the electrical split phase c, the circuit breaker QF12 and the circuit breaker QF5' are disconnected, so that the power supply arm on the left side of the electrical split phase b is powered by the first flexible traction transformer .
具体的,如图10所示,为柔性牵引供电系统接触网ab段故障时为例的系统运行状态示意图,在系统保护动作,若所述断路器QF5或断路器QF5′处测量的电气量达到设定的保护动作值且满足故障方向条件,同时断路器QF10、断路器QF10′、断路器QF6、断路器QF6′、断路器QF8、断路器QF8′均闭合时,判断为接触网故障,通过断路器QF5、断路器QF5′、断路器QF11、断路器QF12处方向元件检测故障发生方向,并动作于相应的断路器使得故障被隔离在故障段,减小故障对系统运行的影响,其具体情况如下:Specifically, as shown in FIG. 10, it is a schematic diagram of the system operation state when the catenary ab segment of the flexible traction power supply system is faulty as an example. During the system protection action, if the electrical quantity measured at the circuit breaker QF5 or the circuit breaker QF5' reaches When the set protection action value and the fault direction condition are met, and the circuit breaker QF10, circuit breaker QF10′, circuit breaker QF6, circuit breaker QF6′, circuit breaker QF8, circuit breaker QF8′ are all closed at the same time, it is judged as a catenary fault. The directional elements at circuit breaker QF5, circuit breaker QF5', circuit breaker QF11, and circuit breaker QF12 detect the direction of the fault, and act on the corresponding circuit breaker to isolate the fault in the fault section and reduce the impact of the fault on the system operation. details as following:
故障发生在电分相a左侧时,断路器QF11断开,故障被隔离在电分相a左侧供电臂,电分相a右侧供电臂由柔性牵引变电所1和柔性牵引变电所2柔性牵引变压器正常供电;故障发生在ab段时,断路器QF11、断路器QF12、断路器QF5断开,故障隔离在ab供电臂,断路器QF1、断路器QF3、断路器QF4闭合,电分相a左侧供电臂由柔性牵引变电所1既有牵引变压器正常供电,bc供电臂由柔性牵引变电所2柔性牵引变压器正常供电;故障发生在bc段时,断路器QF12、断路器QF5′断开,故障隔离在bc段,电分相b左侧供电臂由柔性牵引变电所1变压器正常供电。When the fault occurs on the left side of the electrical split phase a, the circuit breaker QF11 is disconnected, and the fault is isolated on the left power supply arm of the electrical split phase a, and the right power supply arm of the electrical split phase a is connected by the
本领域的普通技术人员将会意识到,这里所述的实施例是为了帮助读者理解本发明的原理,应被理解为本发明的保护范围并不局限于这样的特别陈述和实施例。本领域的普通技术人员可以根据本发明公开的这些技术启示做出各种不脱离本发明实质的其它各种具体变形和组合,这些变形和组合仍然在本发明的保护范围内。Those of ordinary skill in the art will appreciate that the embodiments described herein are intended to assist readers in understanding the principles of the present invention, and it should be understood that the scope of protection of the present invention is not limited to such specific statements and embodiments. Those skilled in the art can make various other specific modifications and combinations without departing from the essence of the present invention according to the technical teaching disclosed in the present invention, and these modifications and combinations still fall within the protection scope of the present invention.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111575296.6A CN114407734B (en) | 2021-12-21 | 2021-12-21 | Flexible traction power supply system and protection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111575296.6A CN114407734B (en) | 2021-12-21 | 2021-12-21 | Flexible traction power supply system and protection method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114407734A CN114407734A (en) | 2022-04-29 |
CN114407734B true CN114407734B (en) | 2022-08-23 |
Family
ID=81267374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111575296.6A Active CN114407734B (en) | 2021-12-21 | 2021-12-21 | Flexible traction power supply system and protection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114407734B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116890709B (en) * | 2023-05-30 | 2024-03-12 | 西南交通大学 | Control method for transition transformation structure of flexible traction substation |
CN116937625B (en) * | 2023-05-30 | 2024-07-05 | 洛阳理工学院 | Transition transformation structure of flexible traction substation and control method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001097079A (en) * | 1999-09-29 | 2001-04-10 | East Japan Railway Co | Construction method of reference electrode for determining ground fault and reference electrode for determining ground fault |
CN102310785A (en) * | 2011-05-30 | 2012-01-11 | 李子晗 | Electric railway damping automatic passing neutral section system |
CN107294115A (en) * | 2017-07-24 | 2017-10-24 | 西南交通大学 | A kind of four phase five-wire system low voltage distribution transformers |
JP2018186602A (en) * | 2017-04-24 | 2018-11-22 | 株式会社キューヘン | Electric power conversion system and reactive power conversion apparatus using the same |
CN110416977A (en) * | 2019-06-14 | 2019-11-05 | 国网河南省电力公司灵宝市供电公司 | The bus protection module of ground signalling locking |
WO2020143190A1 (en) * | 2019-01-09 | 2020-07-16 | 西南交通大学 | Four-rail power supply control system for short-stator magnetic levitation train |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2631080Y (en) * | 2003-05-08 | 2004-08-04 | 沈阳工业学院 | Intelligent transformer and distribution device |
GB2423424B (en) * | 2005-02-22 | 2009-10-28 | Areva T & D Uk Ltd | A method and an apparatus for supervising the operation of current transformers |
JP2012105407A (en) * | 2010-11-08 | 2012-05-31 | Toshiba Corp | Power storage system |
CN202260610U (en) * | 2011-08-31 | 2012-05-30 | 云南电网公司曲靖供电局 | Dual-power automatic switching device of direct current system |
CN104057842B (en) * | 2014-06-17 | 2017-01-11 | 西南交通大学 | Coaxial cable power supply system of electrified railway |
CN204012678U (en) * | 2014-07-01 | 2014-12-10 | 广东电网公司佛山供电局 | A kind of power distribution network multimode ground protection system |
US10079493B2 (en) * | 2014-09-30 | 2018-09-18 | The Boeing Company | Parallel modular converter architecture |
CN108859872A (en) * | 2017-05-15 | 2018-11-23 | 中车株洲电力机车研究所有限公司 | A kind of virtual perforation alternating current traction power supply system |
CN208369216U (en) * | 2018-06-16 | 2019-01-11 | 国网江西省电力有限公司电力科学研究院 | A kind of integration active compensation distribution change platform complexes |
CN208691006U (en) * | 2018-06-21 | 2019-04-02 | 天津凯发电气股份有限公司 | A through-type same-phase power supply equipment control system |
CN110040039B (en) * | 2019-05-21 | 2023-06-09 | 西南交通大学 | An AC traction power supply system and method for photovoltaic energy storage distributed power generation |
CN209921113U (en) * | 2019-05-21 | 2020-01-10 | 西南交通大学 | Alternating current traction power supply system for photovoltaic energy storage distributed power generation |
CN110224377A (en) * | 2019-06-20 | 2019-09-10 | 西南交通大学 | Bus bar protecting method is drawn at a kind of perforation cophase supply electric substation and segmentation |
US11500407B2 (en) * | 2020-02-13 | 2022-11-15 | Schweitzer Engineering Laboratories, Inc. | Boundary separation scheme for faults in power systems |
CN212366830U (en) * | 2020-02-17 | 2021-01-15 | 中电普瑞科技有限公司 | A flexible control device for power quality |
CN111361463B (en) * | 2020-03-02 | 2022-09-23 | 株洲中车时代电气股份有限公司 | Flexible bilateral power supply power flow control system of alternating current traction network |
CN112977181A (en) * | 2021-03-18 | 2021-06-18 | 清华大学 | Flexible alternating-current traction power supply system for realizing through same phase and operation method thereof |
CN113224762B (en) * | 2021-05-28 | 2022-05-10 | 西南交通大学 | A long-distance through flexible traction power supply system and its optimal control method |
-
2021
- 2021-12-21 CN CN202111575296.6A patent/CN114407734B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001097079A (en) * | 1999-09-29 | 2001-04-10 | East Japan Railway Co | Construction method of reference electrode for determining ground fault and reference electrode for determining ground fault |
CN102310785A (en) * | 2011-05-30 | 2012-01-11 | 李子晗 | Electric railway damping automatic passing neutral section system |
JP2018186602A (en) * | 2017-04-24 | 2018-11-22 | 株式会社キューヘン | Electric power conversion system and reactive power conversion apparatus using the same |
CN107294115A (en) * | 2017-07-24 | 2017-10-24 | 西南交通大学 | A kind of four phase five-wire system low voltage distribution transformers |
WO2020143190A1 (en) * | 2019-01-09 | 2020-07-16 | 西南交通大学 | Four-rail power supply control system for short-stator magnetic levitation train |
CN110416977A (en) * | 2019-06-14 | 2019-11-05 | 国网河南省电力公司灵宝市供电公司 | The bus protection module of ground signalling locking |
Also Published As
Publication number | Publication date |
---|---|
CN114407734A (en) | 2022-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114407734B (en) | Flexible traction power supply system and protection method | |
CN112977181A (en) | Flexible alternating-current traction power supply system for realizing through same phase and operation method thereof | |
CN204928156U (en) | A distribution network frame wiring structure | |
WO2023000585A1 (en) | Low-voltage transformer area load non-power-cut switching system and working method thereof | |
CN104979894A (en) | RMU uninterrupted power supply load transfer method | |
CN109995015A (en) | 220KV two electricity two charging DC system | |
CN114447972A (en) | Through flexible traction substation based on existing traction transformer and protection configuration method thereof | |
CN102868227B (en) | Medium voltage distribution-network looped-network switching operation method | |
CN118539425A (en) | Fault protection method for power distribution ring network with UPFC | |
CN112510706A (en) | A close ring circuit with mother for 10kV distribution network | |
CN207853185U (en) | Substation master and side system structure | |
WO2024148712A1 (en) | Offshore wind power circuit breaker short-circuit current rapid zero-crossing system and method | |
CN203481822U (en) | Closed loop power supply model of medium voltage 10 kilovolt power distribution network | |
CN109842204A (en) | Stand-by heat line electricity source based on optical-fibre channel controls in-put of spare power supply method | |
CN113183832B (en) | Power balance cooperative flexible neutral section passing device for electrified railway and control method | |
CN113346462B (en) | Petal type power distribution network contact line protection method based on predicted voltage amplitude | |
CN109861225B (en) | Hot standby circuit standby power supply switching method based on optical fiber channel | |
CN113098009A (en) | Uninterrupted loop closing and power reversing method for 30-degree angle difference system of power distribution network | |
CN114221326A (en) | Segmented switching strategy under insufficient switching power of centralized self-healing function | |
CN205992744U (en) | A kind of 220 kilovolts of booster stations systems | |
CN217882818U (en) | A circuit breaker control interlocking circuit for double busbar wiring of primary equipment in a substation | |
CN114604141B (en) | A kind of bilateral penetrating in-phase power supply system and control method | |
CN218829127U (en) | A flexible ring closing controller installation structure | |
CN219611356U (en) | A flexible loop-closing controller for distribution network | |
CN116826674B (en) | A method for inter-pole fault protection of a photovoltaic storage and charging DC microgrid with adaptive control mode switching |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |