CN114319470B - Engineering foundation pile detection fixing device for construction engineering detection - Google Patents
Engineering foundation pile detection fixing device for construction engineering detection Download PDFInfo
- Publication number
- CN114319470B CN114319470B CN202210074925.5A CN202210074925A CN114319470B CN 114319470 B CN114319470 B CN 114319470B CN 202210074925 A CN202210074925 A CN 202210074925A CN 114319470 B CN114319470 B CN 114319470B
- Authority
- CN
- China
- Prior art keywords
- rod
- fixing
- sliding
- arc
- sliding groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000001514 detection method Methods 0.000 title claims description 26
- 238000010276 construction Methods 0.000 title claims description 17
- 230000000694 effects Effects 0.000 description 12
- 238000009434 installation Methods 0.000 description 8
- 230000008093 supporting effect Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 230000000149 penetrating effect Effects 0.000 description 4
- 230000002093 peripheral effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to an engineering foundation pile detects fixing device for building engineering detects, which comprises a frame body, the orientation all around of framework is close to or keep away from the direction of framework center and all sliding connection has the body of rod, be provided with the first mounting that is used for fixing the body of rod to arbitrary back position of removing on the framework, all be provided with the stand on every body of rod, the tip that the stand kept away from the body of rod is provided with the connecting rod, be provided with a plurality of movable rods along the length direction sliding connection of connecting rod on the connecting rod, all be provided with the second mounting that is used for fixing the movable rod to the position after arbitrary removal on every movable rod, the tip that a plurality of movable rods kept away from the connecting rod is provided with elastic arc pole, arc pole sliding connection is provided with the third mounting that is used for fixing the arc pole to the position after arbitrary removal on the arc pole, form the fixed space that is used for supplying the foundation pile to move into between a plurality of arc poles; the fixing device has the advantage of improving applicability of the fixing device.
Description
Technical Field
The application relates to the field of foundation installation detection, in particular to an engineering foundation pile detection fixing device for construction engineering detection.
Background
Pile foundation detection is a test of single pile bearing capacity and pile body integrity in a pile foundation; the main methods include static load test, core drilling method, low strain method, high strain method, and acoustic wave transmission method.
The Chinese patent with the authorized bulletin number of CN213867961U discloses an engineering foundation pile detection fixing device for construction engineering detection, and relates to the field of construction engineering. This engineering foundation pile detects fixing device for building engineering detects, including the fixed column, the fixed column is equipped with two sets of, the equal fixedly connected with screw sleeve in bottom of two sets of fixed columns, the equal fixedly connected with ground plate in bottom of two sets of screw sleeve, the equal activity in center department of two sets of ground plates has cup jointed the earth-boring pole, two sets of earth-boring poles all bore into soil inside, the equal fixedly connected with fixed plate in top of two sets of fixed columns, the equal movably clamped connection of two sets of fixed plate opposite ends has the connecting plate, fixedly connected with spacing lantern ring between two sets of connecting plates, the inner wall fixedly connected with rubber ring of spacing lantern ring.
For the related art, the inventor considers that when the specification of the foundation is larger than the inner diameter of the limit collar, the limit collar needs to be specially customized and adapted, and the applicability of the same foundation pile detection fixing device is reduced.
Disclosure of Invention
In order to improve the applicability of the foundation installation detection fixing device, the application provides an engineering foundation pile detection fixing device for construction engineering detection.
The application provides an engineering foundation pile detects fixing device for building engineering detects adopts following technical scheme:
the utility model provides an engineering foundation pile detects fixing device for building engineering detects, includes the framework, the equal sliding connection of orientation all around of framework is close to or keeps away from the direction at framework center has the body of rod, be provided with on the framework and be used for fixing the body of rod to the first mounting of arbitrary back position that removes, every all be provided with the stand on the body of rod, the tip that the body of rod was kept away from to the stand is provided with the connecting rod, be provided with a plurality of movable rods along the length direction sliding connection of connecting rod on the connecting rod, every all be provided with on the movable rod and be used for fixing the movable rod to the second mounting of the position after arbitrary removal, a plurality of the movable rod is kept away from the tip of connecting rod and is provided with elastic arc pole, arc pole sliding connection is on a plurality of movable rods, be provided with on the arc pole and be used for fixing the third mounting of arbitrary back position that removes with the arc pole, a plurality of form between the arc pole and be used for supplying the foundation pile to move into.
Through adopting above-mentioned technical scheme, be located the framework through driving the body of rod and remove to adjust the interval between a plurality of arc poles, make a plurality of arc poles of different intervals can be fixed to the foundation pile of different specifications, be located the connecting rod through driving the movable rod and remove, and drive the arc pole and be located a plurality of movable rods and remove, thereby adjust the radian of arc pole, make the arc pole of different radians can further laminate to on the foundation pile outer wall of different specifications, further improved fixing device's suitability, and improved the fixed effect to the foundation pile of different specifications.
Optionally, a first sliding groove is formed in the frame body, a first sliding block which is clamped and connected in the first sliding groove in a sliding mode is fixedly arranged on the rod body, and the rod body is connected to the frame body in a sliding mode through the first sliding groove and the first sliding block.
Through adopting above-mentioned technical scheme, be located first sliding tray through the first sliding block that drives on the body of rod and remove to adjust the position that the body of rod is located the framework, make first mounting can be fixed the body of rod to the position after removing, be convenient for adjust the position of the body of rod.
Optionally, the second sliding tray has been seted up along the length direction of connecting rod on the connecting rod, fixed second sliding block that is provided with joint and sliding connection in the second sliding tray on the movable rod, the movable rod passes through second sliding tray and second sliding block sliding connection on the connecting rod, the connecting rod setting is run through at the both ends of second sliding tray, the second mounting is used for fixing the second sliding block to the optional position in the second sliding tray.
Through adopting above-mentioned technical scheme, be located the second sliding tray through driving the second sliding block and remove to be convenient for adjust the position of movable rod, the regulation pole of different positions can play different supporting effects to the arc pole, runs through the connecting rod with the second sliding tray, thereby is convenient for adjust the quantity of movable rod, adopts the movable rod of different quantity to have further improved supporting effect and the regulation effect to the arc pole.
Optionally, the third sliding tray has been seted up along the length direction of arc pole on the arc pole, fixed third sliding block that is provided with joint and sliding connection in the third sliding tray on the movable rod, the arc pole passes through third sliding tray and third sliding block sliding connection on a plurality of movable rods, the both ends in third sliding tray run through the arc pole setting, the third mounting is used for fixing the third sliding block to the optional position in the third sliding tray.
Through adopting above-mentioned technical scheme, be located the third sliding tray through driving the third sliding block and remove to be convenient for adjust the position that the movable rod is located the arc pole, the regulation pole of different positions can play different supporting effects to the arc pole, runs through the connecting rod with the third sliding tray, thereby be convenient for adjust the quantity of movable rod, adopt the movable rod of different quantity to have further improved supporting effect and the regulation effect to the arc pole.
Optionally, the movable rod is set to telescopic structure, and telescopic structure includes dead lever and grafting and sliding connection's grafting pole in the dead lever, the second sliding block sets up on the dead lever, the third sliding block sets up on the grafting pole, be provided with on the dead lever and be used for fixing the fourth mounting of arbitrary position in the dead lever with the grafting pole.
Through adopting above-mentioned technical scheme, be located the dead lever through driving the spliced pole and remove to be convenient for to the length adjustment of movable rod, through the length adjustment to movable rod, make the movable rod of different length can drive the arc pole and further adjust its radian, thereby further improved the regulation effect to the arc pole, make the arc pole of different radians can further be applicable to the foundation pile of different specifications.
Optionally, be provided with the regulation pole on the body of rod, it wholly is the arc setting to adjust the pole, and the notch of arc regulation pole sets up towards the position that the center of framework is located, the stand is along the length direction sliding connection of arc regulation pole on adjusting the pole, be provided with on the stand and be used for fixing the stand to the fifth mounting of arbitrary back position that removes.
By adopting the technical scheme, the adjusting rod is arranged in an arc shape, the positions of the rod body and the arc-shaped rod are conveniently adjusted along the circumferential position of the foundation pile, and the arc-shaped rods at different positions can play a further supporting effect on the foundation pile through the position adjustment of the arc-shaped rods, so that the fixing effect on foundation piles of different specifications is improved; the upright can be fixed to any moved position by a fifth fixing member.
Optionally, the fourth sliding tray has been seted up along the length direction of regulating lever on the regulation pole, be provided with joint and sliding connection fourth sliding block in the fourth sliding tray on the stand, the stand passes through fourth sliding tray and fourth sliding block sliding connection on the regulation pole, the both ends in fourth sliding tray run through the regulation pole setting, fifth mounting is used for fixing fourth sliding block to fourth sliding tray optional position.
Through adopting above-mentioned technical scheme, be located fourth sliding tray through the fourth sliding block that drives on the stand and remove to be convenient for adjust the position of stand, run through the regulation pole with the both ends of fourth sliding tray, thereby be convenient for adjust the quantity of stand, make the stand of different quantity drive the arc pole of different quantity and further fix the foundation pile of different specifications, thereby further improved fixing device's suitability and fixed effect.
Optionally, the adjusting rod is slidably connected to the rod body along the length direction of the rod body, and a driving mechanism for fixing the adjusting rod to any position after moving is arranged on the rod body.
Through adopting above-mentioned technical scheme, will adjust the pole and follow the length direction sliding connection of the body of rod on the body of rod to further adjust the interval between a plurality of arc poles, make the arc pole of different positions can further fix the foundation pile of different specifications, thereby further improved fixing device's suitability.
Optionally, the drive slot has been seted up along the length direction of the body of rod on the body of rod, fixedly provided with sliding connection is at the drive piece in the drive slot on the regulation pole, actuating mechanism includes the screw rod of setting up in the drive slot along the length direction rotation of drive slot, drive piece cover is established and threaded connection is on the screw rod, the fixed handle that is used for driving screw rod pivoted that is provided with of one end of the body of rod.
Through adopting above-mentioned technical scheme, drive the screw rod through the handle and rotate, because of drive piece sliding connection in the drive tank for the drive piece can not follow the rotation of screw rod and rotate, thereby make the drive piece be located the screw rod and remove, make the drive piece drive adjust its position of pole regulation, adopt the setting of screw rod can drive the pole of adjusting and fix to the position after the arbitrary removal, improved the drive effect to adjusting the pole.
Optionally, the framework includes four installation poles that mutually splice and form, adjacent be provided with between the installation pole be used for fixing the installation pole together the installed part.
Through adopting above-mentioned technical scheme, the setting of installed part can drive adjacent installation pole and dismantle the connection together to be convenient for with the foundation pile of high moving into between the framework.
In summary, the present application includes at least one of the following beneficial technical effects:
the rod body is driven to move on the frame body, so that the distance between the arc rods is adjusted, the arc rods with different distances can be fixed on foundation piles with different specifications, the moving rods are driven to move on the connecting rods, the arc rods are driven to move on the moving rods, the radian of the arc rods is adjusted, the arc rods with different radians can be further attached to the outer walls of foundation piles with different specifications, the applicability of the fixing device is further improved, and the fixing effect on foundation piles with different specifications is improved;
the adjusting rods are arranged in an arc shape, so that the positions of the rod body and the arc-shaped rods are conveniently adjusted along the circumferential positions of the foundation piles, and the arc-shaped rods at different positions can play a further supporting role on the foundation piles through the position adjustment of the arc-shaped rods, so that the fixing effect on the foundation piles with different specifications is improved; the upright can be fixed to any moved position by a fifth fixing member.
Drawings
FIG. 1 is a schematic overall structure of an embodiment of the present application;
FIG. 2 is a schematic view showing the structure of a mounting rod, a rod body, an adjusting rod and a connecting rod according to an embodiment of the present application;
fig. 3 is a schematic structural view for showing a fixing plate and a first fixing bolt according to an embodiment of the present application;
fig. 4 is a schematic view for showing the structure of the second sliding groove and the second sliding block according to the embodiment of the present application.
Reference numerals illustrate: 1. a frame; 11. a mounting rod; 111. a mounting plate; 112. installing a bolt; 113. installing a nut; 12. a rod body; 121. an adjusting rod; 122. a column; 123. a connecting rod; 124. a moving rod; 125. an arc-shaped rod; 126. a fixed space; 13. a first sliding groove; 131. a first slider; 132. a fixing plate; 133. a first fixing bolt; 14. a driving groove; 141. a driving block; 142. a screw; 143. a handle; 15. a fourth sliding groove; 151. a fourth slider; 152. a fifth fixing bolt; 16. a second sliding groove; 161. a second slider; 162. a second fixing bolt; 17. a third sliding groove; 171. a third slider; 172. a third fixing bolt; 18. a fixed rod; 181. inserting a connecting rod; 182. and a fourth fixing bolt.
Detailed Description
The present application is described in further detail below in conjunction with figures 1-4.
The embodiment of the application discloses a construction engineering detects with engineering foundation pile detects fixing device. Referring to fig. 1, an engineering foundation pile detection fixing device for construction engineering detection comprises a frame body 1, wherein the frame body 1 comprises four mutually spliced mounting rods 11, and mounting pieces for fixing the mounting rods 11 together are arranged between adjacent mounting rods 11; the mounting piece includes mounting panel 111, mounting bolt 112 and mounting nut 113, and the both ends of every installation pole 11 all are provided with mounting panel 111, and adjacent mounting panel 111 is mutual butt setting, and mounting bolt 112 wears to establish simultaneously on two adjacent mounting panels 111, and mounting bolt 112 cover is established and threaded connection is on mounting bolt 112 to fix adjacent installation pole 11 together.
Referring to fig. 1 and 2, the periphery of the frame 1 is slidably connected with a rod body 12 in a direction close to or far away from the center of the frame 1, an adjusting rod 121 is slidably arranged on the rod body 12 along the length direction of the rod body 12, the adjusting rod 121 is integrally in an arc shape, a notch of the arc-shaped adjusting rod 121 is arranged towards the center of the frame 1, a stand column 122 is slidably arranged on the adjusting rod 121 along the length direction of the adjusting rod 121, the stand column 122 is perpendicular to the plane of the frame 1, a connecting rod 123 is arranged at the end part of the stand column 122 far away from the rod body 12, the connecting rod 123 is parallel to the plane of the frame 1, a plurality of moving rods 124 are slidably connected on the connecting rod 123 along the length direction of the connecting rod 123, a plurality of moving rods 124 are parallel to the plane of the frame 1, an elastic arc-shaped rod 125 is arranged at the end part of the plurality of the moving rods 124 far away from the connecting rod 123, and the arc-shaped rod 125 is slidably connected on the plurality of moving rods 124, and a fixed space 126 for a foundation pile to move in is formed between the plurality of the arc-shaped rods 125.
Referring to fig. 2 and 3, a first sliding groove 13 is formed in the frame 1, a first sliding block 131 which is clamped and connected in the first sliding groove 13 in a sliding manner is fixedly arranged on the rod body 12, and the rod body 12 is connected to the frame 1 in a sliding manner through the first sliding groove 13 and the first sliding block 131; in this embodiment, the cross section of the first sliding groove 13 is set to be in a T shape, the first sliding block 131 is matched with the T-shaped first sliding groove 13, a first fixing piece for fixing the rod body 12 to an arbitrary moving rear position is arranged on the frame body 1, in this embodiment, the first fixing piece comprises a fixing plate 132 and first fixing bolts 133, the fixing plate 132 is fixedly arranged on the mounting rod 11 and located at two sides of the first sliding groove 13, the first fixing bolts 133 penetrate through the fixing plate 132 and are in threaded connection with the first sliding block 131 in a abutting mode, and the rod body 12 can be fixed to the rod body 12 by means of friction force between the first fixing bolts 133 and the first sliding blocks 131.
Referring to fig. 1 and 2, a driving groove 14 is formed in the rod body 12 along the length direction of the rod body 12, and a driving block 141 slidably connected in the driving groove 14 is fixedly arranged on the adjusting rod 121; in the present embodiment, the cross section of the driving groove 14 is provided with a T shape, the driving block 141 is matched with the T-shaped driving groove 14, and the rod body 12 is provided with a driving mechanism for fixing the adjusting rod 121 to an arbitrary moved position; the driving mechanism comprises a screw rod 142 which is rotatably arranged in the driving groove 14 along the length direction of the driving groove 14, a driving block 141 is sleeved on the screw rod 142 and is in threaded connection with the screw rod 142, and a handle 143 for driving the screw rod 142 to rotate is fixedly arranged at one end of the rod body 12; the screw rod 142 is driven to rotate by the handle 143, and the driving block 141 is slidably connected in the driving groove 14, so that the driving block 141 cannot rotate along with the rotation of the screw rod 142, and the driving block 141 moves on the screw rod 142, and the driving block 141 can drive the adjusting rod 121 to move.
Referring to fig. 1 and 2, a fourth sliding groove 15 is formed in the adjusting rod 121 along the length direction of the adjusting rod 121, two ends of the fourth sliding groove 15 penetrate through the adjusting rod 121, a fourth sliding block 151 which is clamped and connected in the fourth sliding groove 15 in a sliding manner is arranged on the upright post 122, the upright post 122 is connected to the adjusting rod 121 in a sliding manner through the fourth sliding groove 15 and the fourth sliding block 151, in this embodiment, the cross section of the fourth sliding groove 15 is in a T shape, the fourth sliding block 151 is matched with the fourth sliding groove 15 in the T shape, and in order to adjust the number of the upright posts 122, two ends of the fourth sliding groove 15 penetrate through the adjusting rod 121.
Referring to fig. 1 and 2, upright 122 is provided with a fifth fixing member for fixing upright 122 to an arbitrary post-movement position; the fifth fixing member is used for fixing the fourth sliding block 151 to an arbitrary position in the fourth sliding groove 15; in this embodiment, the fifth fixing member includes a fifth fixing bolt 152 penetrating through and screwed on the fourth sliding block 151, and the fifth fixing bolt 152 is driven to be screwed on the fourth sliding block 151, so that the rod portion of the fifth fixing bolt 152 abuts against the bottom wall of the fourth sliding groove 15, and the fourth sliding block 151 is fixed at any position in the fourth sliding groove 15.
Referring to fig. 2 and 4, a second sliding groove 16 is formed in the connecting rod 123 along the length direction of the connecting rod 123, a second sliding block 161 which is clamped and connected in the second sliding groove 16 in a sliding manner is fixedly arranged on the moving rod 124, the moving rod 124 is connected to the connecting rod 123 in a sliding manner through the second sliding groove 16 and the second sliding block 161, in this embodiment, the cross section of the second sliding groove 16 is set to be in a T shape, the second sliding block 161 is matched with the second sliding groove 16 in the T shape, and in order to adjust the number of the moving rods 124, two ends of the second sliding groove 16 penetrate through the connecting rod 123.
Referring to fig. 2 and 4, each of the moving rods 124 is provided with a second fixing member for fixing the moving rod 124 to an arbitrary moved position, the second fixing member being for fixing the second sliding block 161 to an arbitrary position within the second sliding groove 16; in the present embodiment, the second fixing member includes the second fixing bolt 162 penetrating and screwed on the second slide block 161, and the second fixing bolt 162 is screwed on the second slide block 161 so that the rod portion of the second fixing bolt 162 abuts on the bottom wall of the second slide groove 16, so that the second slide block 161 is fixed to an arbitrary position.
Referring to fig. 2 and 4, a third sliding groove 17 is formed in the arc rod 125 along the length direction of the arc rod 125, a third sliding block 171 which is clamped and connected in the third sliding groove 17 in a sliding manner is fixedly arranged on the moving rod 124, the arc rod 125 is connected to the plurality of moving rods 124 in a sliding manner through the third sliding groove 17 and the third sliding block 171, in this embodiment, the cross section of the third sliding groove 17 is set to be in a T shape, the third sliding block 171 is matched with the T-shaped third sliding groove 17, and in order to take down the moving rod 124 on the arc rod 125, two ends of the third sliding groove 17 penetrate through the arc rod 125.
Referring to fig. 2 and 4, a third fixing member for fixing the arc lever 125 to an arbitrary moved position is provided on the arc lever 125, and the third fixing member is used for fixing the third sliding block 171 to an arbitrary position within the third sliding groove 17; in the present embodiment, the third fixing member includes the third fixing bolt 172 penetrating and screwed on the third slider 171, and the third fixing bolt 172 is screwed on the third slider 171 so that the rod portion of the third fixing bolt 172 abuts on the bottom wall of the third slider 17, so that the third slider 171 is fixed to an arbitrary position.
Referring to fig. 2 and 4, in order to adjust the length of the moving rod 124, thereby facilitating the arc adjustment of the arc-shaped rod 125, the moving rod 124 is provided in a telescopic structure including a fixing rod 18 and a socket rod 181 inserted and slidably coupled in the fixing rod 18, a second sliding block 161 is provided on the fixing rod 18, a third sliding block 171 is provided on the socket rod 181, and a fourth fixing member for fixing the socket rod 181 to an arbitrary position in the fixing rod 18 is provided on the fixing rod 18; in this embodiment, the fourth fixing member includes a fourth fixing bolt 182 penetrating through and screwed onto the fixing rod 18, and the fourth fixing bolt 182 is driven to be screwed onto the fixing rod 18, so that the rod portion of the fourth fixing bolt 182 abuts against the plugging rod 181, so that the plugging rod 181 is fixed to any position in the fixing rod 18.
The implementation principle of the engineering foundation pile detection fixing device for the construction engineering detection is as follows: when the foundation pile needs to be fixed, the foundation pile is moved into the frame body 1, according to the peripheral specification of the foundation pile, the second sliding block 161 is driven to move in the second sliding groove 16, the third sliding block 171 is driven to move in the third sliding groove 17, the inserting connection rod 181 is driven to move in the fixing rod 18, accordingly, the radian of the arc-shaped rod 125 is adjusted, the arc-shaped rod 125 is adapted to foundation piles of different specifications, the fourth sliding block 151 is driven to move in the fourth sliding groove 15, the position of the arc-shaped rod 125 is adjusted along the peripheral position of the foundation pile, the first sliding block 131 is driven to move in the first sliding groove 13, the position of the adjusting rod 121 body 12 is driven to rotate through the handle 143, the driving block 141 drives the adjusting rod 121 to move, and the arc-shaped rod 125 is abutted to the outer wall of the foundation pile, and accordingly the arc-shaped rod 125 is applicable to foundation piles of different specifications, and the applicability of the fixing device and the fixing effect of the foundation pile are improved.
The foregoing are all preferred embodiments of the present application, and are not intended to limit the scope of the present application in any way, therefore: all equivalent changes in structure, shape and principle of this application should be covered in the protection scope of this application.
Claims (5)
1. The utility model provides a building engineering detects with engineering foundation pile detects fixing device which characterized in that: the pile foundation fixing device comprises a frame body (1), wherein the periphery of the frame body (1) is slidingly connected with a rod body (12) in a direction which is close to or far away from the center of the frame body (1), first fixing pieces for fixing the rod body (12) to any moving position are arranged on the frame body (1), each rod body (12) is provided with a stand column (122), the end part of the stand column (122) far away from the rod body (12) is provided with a connecting rod (123), a plurality of moving rods (124) are slidingly connected on the connecting rod (123) along the length direction of the connecting rod (123), second fixing pieces for fixing the moving rods (124) to any moving position are arranged on each moving rod (124), the end part of the moving rods (124) far away from the connecting rod (123) is provided with an elastic arc rod (125), the arc rod (125) is slidingly connected on the plurality of moving rods (124), the arc rod (125) is provided with third fixing pieces for fixing the arc rod (125) to any moving position, and a plurality of arc rods (125) are arranged between the arc rods (125) to form an arc pile foundation fixing space (126); the frame body (1) is provided with a first sliding groove (13), the rod body (12) is fixedly provided with a first sliding block (131) which is clamped and connected in the first sliding groove (13) in a sliding way, and the rod body (12) is connected to the frame body (1) in a sliding way through the first sliding groove (13) and the first sliding block (131); a second sliding groove (16) is formed in the connecting rod (123) along the length direction of the connecting rod (123), a second sliding block (161) which is clamped and connected in the second sliding groove (16) in a sliding manner is fixedly arranged on the moving rod (124), the moving rod (124) is connected on the connecting rod (123) in a sliding manner through the second sliding groove (16) and the second sliding block (161), two ends of the second sliding groove (16) penetrate through the connecting rod (123), and the second fixing piece is used for fixing the second sliding block (161) to any position in the second sliding groove (16); a third sliding groove (17) is formed in the arc-shaped rod (125) along the length direction of the arc-shaped rod (125), a third sliding block (171) which is clamped and connected in the third sliding groove (17) in a sliding manner is fixedly arranged on the moving rod (124), the arc-shaped rod (125) is connected to the plurality of moving rods (124) in a sliding manner through the third sliding groove (17) and the third sliding block (171), two ends of the third sliding groove (17) penetrate through the arc-shaped rod (125), and the third fixing piece is used for fixing the third sliding block (171) to any position in the third sliding groove (17); the movable rod (124) is arranged to be of a telescopic structure, the telescopic structure comprises a fixed rod (18) and a plugging rod (181) which is plugged in and connected in the fixed rod (18) in a sliding mode, the second sliding block (161) is arranged on the fixed rod (18), the third sliding block (171) is arranged on the plugging rod (181), and a fourth fixing piece used for fixing the plugging rod (181) to any position in the fixed rod (18) is arranged on the fixed rod (18); be provided with on the body of rod (12) and adjust pole (121), adjust pole (121) wholly and be the arc setting, the notch of adjusting pole (121) of arc sets up towards the position at the center place of framework (1), stand (122) are along the length direction sliding connection of adjusting pole (121) of arc on adjusting pole (121), be provided with on stand (122) and be used for fixing stand (122) to the fifth mounting of arbitrary back position that removes.
2. The construction foundation pile detection fixing device for construction engineering detection according to claim 1, wherein: the adjustable sliding block is characterized in that a fourth sliding groove (15) is formed in the adjusting rod (121) along the length direction of the adjusting rod (121), a fourth sliding block (151) which is clamped and connected in the fourth sliding groove (15) in a sliding mode is arranged on the upright post (122), the upright post (122) is connected onto the adjusting rod (121) in a sliding mode through the fourth sliding groove (15) and the fourth sliding block (151), two ends of the fourth sliding groove (15) penetrate through the adjusting rod (121) to be arranged, and a fifth fixing piece is used for fixing the fourth sliding block (151) to any position in the fourth sliding groove (15).
3. The construction foundation pile detection fixing device for construction engineering detection according to claim 2, wherein: the adjusting rod (121) is connected to the rod body (12) in a sliding manner along the length direction of the rod body (12), and a driving mechanism for fixing the adjusting rod (121) to an arbitrary moved position is arranged on the rod body (12).
4. A construction foundation pile detection fixing device for construction engineering detection according to claim 3, wherein: the novel structure is characterized in that a driving groove (14) is formed in the rod body (12) along the length direction of the rod body (12), a driving block (141) which is connected in the driving groove (14) in a sliding mode is fixedly arranged on the adjusting rod (121), the driving mechanism comprises a screw rod (142) which is arranged in the driving groove (14) in a rotating mode along the length direction of the driving groove (14), the driving block (141) is sleeved with the screw rod (142) in a threaded mode, and a handle (143) used for driving the screw rod (142) to rotate is fixedly arranged at one end of the rod body (12).
5. The construction foundation pile detection fixing device for construction engineering detection according to claim 4, wherein: the frame body (1) comprises four mutually spliced mounting rods (11), and mounting pieces used for fixing the mounting rods (11) together are arranged between the adjacent mounting rods (11).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210074925.5A CN114319470B (en) | 2022-01-22 | 2022-01-22 | Engineering foundation pile detection fixing device for construction engineering detection |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210074925.5A CN114319470B (en) | 2022-01-22 | 2022-01-22 | Engineering foundation pile detection fixing device for construction engineering detection |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN114319470A CN114319470A (en) | 2022-04-12 |
| CN114319470B true CN114319470B (en) | 2024-01-09 |
Family
ID=81029152
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210074925.5A Active CN114319470B (en) | 2022-01-22 | 2022-01-22 | Engineering foundation pile detection fixing device for construction engineering detection |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN114319470B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118498453B (en) * | 2024-07-12 | 2025-04-18 | 广州正和工程检测有限公司 | A foundation pile detection and fixing device for engineering detection |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008285918A (en) * | 2007-05-18 | 2008-11-27 | Japan Pile Corp | Pile dynamic horizontal loading test method and dynamic horizontal loading test device |
| CN209227637U (en) * | 2018-12-12 | 2019-08-09 | 王端峰 | Pile integration information construction monitoring positioning device |
| CN209723071U (en) * | 2019-03-27 | 2019-12-03 | 南京林业大学 | A road bridge pile foundation reinforcement device |
| CN111705852A (en) * | 2020-06-18 | 2020-09-25 | 深圳市蛇口招商港湾工程有限公司 | Static load detection method for rotary digging pile |
| CN211773825U (en) * | 2020-03-03 | 2020-10-27 | 廖姗姗 | Civil engineering construction is with high cushion cap foundation pile stabilising arrangement |
| CN211948426U (en) * | 2020-01-15 | 2020-11-17 | 云南山盾岩土工程有限公司 | Auxiliary pile foundation clamping device for house building engineering |
| CN112695817A (en) * | 2021-01-22 | 2021-04-23 | 穆元晖 | Building engineering detects and detects with engineering foundation pile detection fixing device |
| CN112922012A (en) * | 2021-03-25 | 2021-06-08 | 成都城投建筑工程有限公司 | Reinforcing structure after pile foundation excavation and reinforcing method thereof |
-
2022
- 2022-01-22 CN CN202210074925.5A patent/CN114319470B/en active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008285918A (en) * | 2007-05-18 | 2008-11-27 | Japan Pile Corp | Pile dynamic horizontal loading test method and dynamic horizontal loading test device |
| CN209227637U (en) * | 2018-12-12 | 2019-08-09 | 王端峰 | Pile integration information construction monitoring positioning device |
| CN209723071U (en) * | 2019-03-27 | 2019-12-03 | 南京林业大学 | A road bridge pile foundation reinforcement device |
| CN211948426U (en) * | 2020-01-15 | 2020-11-17 | 云南山盾岩土工程有限公司 | Auxiliary pile foundation clamping device for house building engineering |
| CN211773825U (en) * | 2020-03-03 | 2020-10-27 | 廖姗姗 | Civil engineering construction is with high cushion cap foundation pile stabilising arrangement |
| CN111705852A (en) * | 2020-06-18 | 2020-09-25 | 深圳市蛇口招商港湾工程有限公司 | Static load detection method for rotary digging pile |
| CN112695817A (en) * | 2021-01-22 | 2021-04-23 | 穆元晖 | Building engineering detects and detects with engineering foundation pile detection fixing device |
| CN112922012A (en) * | 2021-03-25 | 2021-06-08 | 成都城投建筑工程有限公司 | Reinforcing structure after pile foundation excavation and reinforcing method thereof |
Also Published As
| Publication number | Publication date |
|---|---|
| CN114319470A (en) | 2022-04-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN217500216U (en) | Anti-alignment offset mechanism for installing pile foundation engineering reinforcement cage for building | |
| CN114319470B (en) | Engineering foundation pile detection fixing device for construction engineering detection | |
| CN210569365U (en) | Underground pipe in ground source heat pump well | |
| CN114439486B (en) | Miniature push bench | |
| CN220726187U (en) | Jacking mechanism of miniature push bench | |
| CN214783978U (en) | Large-scale deep basal pit supporting construction | |
| CN213173756U (en) | Deep foundation pit slope supporting structure | |
| CN114775839A (en) | Fabricated shear wall building structure and construction method thereof | |
| CN220246985U (en) | Auxiliary embedded device of embedded part for open caisson construction | |
| CN214697667U (en) | Embedded formula cat ladder in well of environmental protection | |
| CN214850393U (en) | Support for cable trench | |
| CN217601456U (en) | Deep foundation pit supporting beam frame structure for geotechnical engineering | |
| CN218375747U (en) | Deep foundation pit enclosure structure | |
| CN217036710U (en) | Prefabricated cable trench for power distribution network engineering | |
| CN213143078U (en) | Support system of deep foundation pit | |
| CN210195664U (en) | Off tracking device is prevented with probing to engineering reconnaissance | |
| CN211006610U (en) | Real-time monitoring system for deep foundation pit | |
| CN114808963A (en) | A kind of prestressed anchor bolt supplementary tension structure of supporting structure pile-anchor system | |
| CN219654462U (en) | Sound insulation fence for municipal engineering | |
| CN218175860U (en) | A support structure for foundation pit of gymnasium | |
| CN113187319B (en) | Fixing device for municipal engineering isolation fence | |
| CN115306212B (en) | Guardrail structure for road and bridge excavation road section and using method | |
| CN220450834U (en) | Bored pile for engineering | |
| CN224081214U (en) | Geological exploration coring device for constructional engineering | |
| CN214061931U (en) | Personnel positioning device for pipeline dredging |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |