CN114289467A - Waste material separation equipment for civil engineering construction and separation method thereof - Google Patents

Waste material separation equipment for civil engineering construction and separation method thereof Download PDF

Info

Publication number
CN114289467A
CN114289467A CN202111632614.8A CN202111632614A CN114289467A CN 114289467 A CN114289467 A CN 114289467A CN 202111632614 A CN202111632614 A CN 202111632614A CN 114289467 A CN114289467 A CN 114289467A
Authority
CN
China
Prior art keywords
crusher body
waste
civil engineering
rubbing crusher
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202111632614.8A
Other languages
Chinese (zh)
Inventor
郑馥静
杨志
杨清
杨柳
张勤勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Liqin Photoelectric Technology Co ltd
Original Assignee
Wuhu Liqin Photoelectric Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Liqin Photoelectric Technology Co ltd filed Critical Wuhu Liqin Photoelectric Technology Co ltd
Priority to CN202111632614.8A priority Critical patent/CN114289467A/en
Publication of CN114289467A publication Critical patent/CN114289467A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses waste separation equipment for civil engineering construction and a separation method thereof, and relates to the technical field of waste separation. The waste material separating device for the civil engineering and the separating method thereof comprise a crusher body, wherein a first sliding groove is formed in the front side of the crusher body, a collecting box is connected to the inside of the first sliding groove in a sliding mode, a supporting plate is fixedly connected to the left side of the crusher body, and a purifying box is fixedly connected to the top of the supporting plate. This waste material splitter for civil engineering building and separation method thereof extracts the dust that produces to rubbing crusher body inside through the air exhauster to reduce rubbing crusher body to a certain extent and at the in-process of carrying out work, the dust of production flies into the external environment, makes the external environment receive the pollution, and makes the staff inhale the dust, makes the healthy condition that receives the threat of staff appear, thereby makes the staff can be more convenient use device smash the separation to the waste material.

Description

Waste material separation equipment for civil engineering construction and separation method thereof
Technical Field
The invention relates to the technical field of waste separation, in particular to waste separation equipment for civil engineering construction and a separation method thereof.
Background
Solid waste refers to solid, semi-solid and gaseous products disposed in containers that are produced during manufacturing, life and other activities and are discarded or discarded without losing their value, the products or substances being subject to waste management by material, law and administrative regulations. Liquid waste which cannot be discharged into a water body and gaseous substances which cannot be discharged into the atmosphere and are placed in a container usually generate a large amount of construction gravel or cement block solid waste on a construction site, and the waste usually contains a large amount of metal building material leftover materials which are not convenient to recycle;
the collection of metal in some present wastes materials is simultaneously through the crushing and screening of waste material, and to the metal separation of going through the screening, but because some crushing apparatus at present are directly exposed to smash the waste material in external environment, but carry out kibbling in-process at the waste material and easily produce the dust, and the dust that produces flies into external environment, makes external environment receive the pollution to make the staff inhale the dust, make staff's healthy condition that receives the threat appear.
Disclosure of Invention
The invention aims to solve at least one technical problem in the prior art, and provides waste separating equipment for civil engineering and construction and a separating method thereof, which can solve the problem that dust is easy to generate in the process of crushing waste.
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides a waste separation equipment for civil engineering building, including rubbing crusher body, first spout has been opened to rubbing crusher body's front side, the inside sliding connection of first spout has the collection box, rubbing crusher body's left side fixedly connected with backup pad, the top fixedly connected with purifying box of backup pad, the inside of purifying box is hollow structure, the purifying box top is provided with the air exhauster, the output of air exhauster passes through the inside intercommunication of pipeline with the purifying box, the input fixedly connected with connecting pipe of air exhauster, the one end that the air exhauster was kept away from to the connecting pipe runs through rubbing crusher body's left side and extends to rubbing crusher body's inside, the mounting groove has been seted up in the left side of purifying box, the inside of mounting groove is provided with purifies installation device.
Preferably, the front side of rubbing crusher body is opened and is equipped with the second spout with the inside intercommunication of rubbing crusher body, and the inside sliding connection of second spout has the baffle, the rear side fixedly connected with fixed block of baffle.
Preferably, the inside of fixed block is provided with magnet, and the cross-section of fixed block is triangle-shaped.
Preferably, the right surface inside the pulverizer body is rotatably connected with a filter plate, the filter plate is provided with meshes, and the right side of the pulverizer body is provided with a discharge port communicated with the inside of the pulverizer body.
Preferably, the left side fixedly connected with motor of rubbing crusher body, the output of motor rotate run through the left side of rubbing crusher body and extend to the inside of rubbing crusher body, the output fixedly connected with cam of motor, the cam is located the bottom of filter.
Preferably, a partition plate is fixedly connected to the left surface inside the pulverizer body, and the partition plate is obliquely arranged on the inner wall of the pulverizer body.
Preferably, purify installation device includes the mounting panel, the surface of mounting panel and the inside sliding connection of mounting groove, the mounting panel passes through the bolt fastening in the inside of mounting groove, the sliding tray with the inside intercommunication of purifying box is seted up to the inside of mounting groove, the inside sliding connection of sliding tray has the mounting bracket, the front side of mounting bracket is opened and is equipped with two shifting chutes with the inside intercommunication of mounting bracket, the inside of two shifting chutes is sliding connection respectively has first installing frame and second installing frame, first installing frame is provided with filter screen and activated carbon layer respectively with the inside of second installing frame.
Preferably, the bottom of the collecting box is provided with a rolling ball.
A separation method of a waste material separation apparatus for civil engineering construction, the first step of: the waste materials are placed into the crusher body through the feed inlet by workers, the cross section of the fixing block is triangular, so that the waste materials can smoothly fall through the inclined plane at the top of the fixing block and are crushed, and meanwhile, the fixing block can absorb some iron materials in the waste materials through the magnet in the fixing block, so that the primary separation of the waste materials is realized;
the second step is that: the cam is driven by the motor to rotate, so that the cam drives the left side of the filter plate to move up and down, the waste is screened, the screening speed of the waste is increased to a certain extent, the waste is reduced from being accumulated in one place, the meshes of the filter plate are blocked, and the uncrushed metal can be discharged from the inside of the discharge hole by moving up and down on the left side of the filter plate;
the third step: the exhaust fan can extract dust generated in the crusher body through the connecting pipe, so that the situation that the generated dust flies into the external environment and the external environment is polluted in the working process of the crusher body is reduced to a certain extent;
the fourth step: get into the inside waste gas of purifying box, can filter and purify waste gas through filter screen and activated carbon layer to make waste gas discharge to the external environment after purifying, and reduce the pollution of waste gas to the environment, make the environment of staff's work obtain the guarantee.
Compared with the prior art, the invention has the beneficial effects that:
(1) this waste material splitter for civil engineering building and separation method thereof extracts the dust that produces to rubbing crusher body inside through the air exhauster to reduce rubbing crusher body to a certain extent and at the in-process of carrying out work, the dust of production flies into the external environment, makes the external environment receive the pollution, and makes the staff inhale the dust, makes the healthy condition that receives the threat of staff appear, thereby makes the staff can be more convenient use device smash the separation to the waste material.
(2) According to the waste material separation equipment for civil engineering and construction and the separation method thereof, waste gas can be filtered and purified through the filter screen and the activated carbon layer, so that the waste gas is discharged to the external environment after being purified, the pollution of the waste gas to the environment is reduced, and the working environment of workers is guaranteed.
(3) This waste material splitter for civil engineering building and separation method thereof, the cross-section through the fixed block is triangle-shaped, makes the waste material can be more smooth fall through the inclined plane at fixed block top to smash, simultaneously through the inside magnet of fixed block, makes the fixed block can absorb some iron material in the waste material, thereby realizes the initial gross separation of waste material, makes that the staff can be more convenient separates the waste material.
(4) This waste material splitter for civil engineering building and separation method thereof, drive the cam through the motor and rotate, can make the cam drive the left side of filter and reciprocate, thereby realize the screening to the waste material, and accelerate the speed that the waste material was sieved to a certain extent, it piles up in a place to reduce the waste material, the condition of jam appears in the mesh of messenger's filter, and reciprocate through the filter is left, make not by the inside discharge of discharge gate, thereby make the operative employee can more convenient operative installations.
(5) The waste material separating equipment for the civil engineering building and the separating method thereof are obliquely arranged on the inner wall of the crusher body through the partition plate, so that the crushed waste material can more smoothly fall on the filter plate for screening, the moving position of the filter plate is limited, and the condition that the filter plate is blocked is reduced, so that the filter plate can more smoothly move, and the working personnel can more conveniently use the device.
Drawings
The invention is further illustrated with reference to the following figures and examples:
FIG. 1 is a schematic view of the construction of a waste separation apparatus according to the present invention;
FIG. 2 is a schematic front plan view of the pulverizer body of the present invention;
FIG. 3 is a schematic left side plan view of a shredder body according to the present invention;
FIG. 4 is a schematic view of a purge bin of the present invention;
FIG. 5 is an enlarged view of A in FIG. 4 according to the present invention;
FIG. 6 is a schematic view of a mount of the present invention;
FIG. 7 is a schematic view of a ball according to the present invention.
Reference numerals: 1 rubbing crusher body, 2 first spout, 3 collection boxes, 4 second spouts, 5 baffles, 6 backup pads, 7 mounting grooves, 8 motors, 9 purifying box, 10 mounting panels, 11 air blowers, 12 connecting pipes, 13 discharge gates, 14 filter, 15 cams, 16 baffles, 17 fixed blocks, 18 mounting brackets, 19 sliding chutes, 20 shifting chutes, 21 first installing frames, 22 second installing frames, 23 spin.
Detailed Description
Referring to fig. 1-3, the present invention provides a technical solution: a waste separation device for civil engineering construction comprises a pulverizer body 1, a first chute 2 is arranged at the front side of the pulverizer body 1, a collection box 3 is slidably connected inside the first chute 2, the collection box 3 can collect waste residues, the interior of the pulverizer body 1 is of a hollow structure, a pulverizing device is arranged inside the pulverizer body 1, the pulverizing device is of an existing structure and is not described herein, the pulverizing device can pulverize waste residues, the collection box 3 is located below the pulverizing device, a support plate 6 is fixedly connected to the left side of the pulverizer body 1, a purification box 9 is fixedly connected to the top of the support plate 6, the interior of the purification box 9 is of a hollow structure, an exhaust fan 11 is arranged at the top of the purification box 9, the output end of the exhaust fan 11 is communicated with the interior of the purification box 9 through a pipeline, a connecting pipe 12 is fixedly connected to the input end of the exhaust fan 11, one end, far away from the exhaust fan 12, penetrates through the left side of the pulverizer body 1 and extends to the interior of the pulverizer body 1, air exhauster 11 can extract the dust of 1 inside production of rubbing crusher body through connecting pipe 12, thereby reduce rubbing crusher body 1 to a certain extent and at the in-process of carrying out work, the dust of production flies into the external environment, make the external environment receive the pollution, and make the staff inhale the dust, the condition that makes staff's healthy receive the threat appears, thereby make the operative installations that the staff can be more convenient smash the separation to the waste material, mounting groove 7 has been seted up in the left side of purifying box 9, the inside of mounting groove 7 is provided with the clean-up installation device.
Further, rubbing crusher body 1's front side is opened and is equipped with second spout 4 with the inside intercommunication of rubbing crusher body 1, the inside sliding connection of second spout 4 has baffle 5, the rear side fixedly connected with fixed block 17 of baffle 5, the inside of fixed block 17 is provided with magnet, the cross-section of fixed block 17 is triangle-shaped, fixed block 17 is located reducing mechanism's top, the cross-section through fixed block 17 is triangle-shaped, the inclined plane through fixed block 17 top that makes the waste material can be more smooth falls down, and smash, simultaneously through the inside magnet of fixed block 17, make fixed block 17 can absorb some iron materials in the waste material, thereby realize the initial segregation of waste material, make the staff can be more convenient separate the waste material.
Further, the filter 14 is connected with in the rotation of the inside right side surface of rubbing crusher body 1, and the filter 14 is located the below of reducing mechanism, has seted up the mesh on the filter 14 to make the filter 14 can separate kibbling waste residue and not by kibbling metal, the discharge gate 13 with the inside intercommunication of rubbing crusher body 1 is seted up on rubbing crusher body 1's right side, and the inside discharge of discharge gate 13 can be followed to the metal through the screening, and collect.
Further, the left side fixedly connected with motor 8 of rubbing crusher body 1, motor 8 is current structure, do not do too much to describe here, motor 8's output rotates the left side that runs through rubbing crusher body 1 and extends to rubbing crusher body 1's inside, motor 8's output fixedly connected with cam 15, cam 15 is located the bottom of filter 14, it rotates to drive cam 15 through motor 8, can make the left side that cam 15 drove filter 14 reciprocate, thereby realize the screening to the waste material, and accelerate the speed of waste material screening to a certain extent, it piles up in a place to reduce the waste material, the condition that the jam appears in the mesh of filter 14, and reciprocate through the filter 14 is left, make the inside discharge that discharge gate 13 can be followed to the metal that is not smashed, thereby make the operative installations that the staff can be more convenient.
Further, the inside left fixed surface of rubbing crusher body 1 is connected with baffle 16, baffle 16 is the slope form and sets up on rubbing crusher body 1's inner wall, can make the waste material after smashing more smoothly drop on filter 14 through baffle 16 and sieve, make the shift position of filter 14 receive the restriction simultaneously, reduce the dead condition of card in filter 14 appearance, thereby make the removal that filter 14 can be more smooth, and make the operative installations that the staff can be more convenient.
Referring to fig. 4-6, the purification installation apparatus includes an installation plate 10, the surface of the installation plate 10 is slidably connected to the inside of the installation groove 7, the installation plate 10 is fixed inside the installation groove 7 by bolts, a sliding groove 19 communicated with the inside of the purification box 9 is formed inside the installation groove 7, an installation frame 18 is slidably connected inside the sliding groove 19, two moving grooves 20 communicated with the inside of the installation frame 18 are formed at the front side of the installation frame 18, a first installation frame 21 and a second installation frame 22 are slidably connected inside the two moving grooves 20, a filter screen and an activated carbon layer are respectively arranged inside the first installation frame 21 and the second installation frame 22, and the exhaust gas can be filtered and purified by the filter screen and the activated carbon layer, therefore, the waste gas is discharged to the external environment after being purified, the pollution of the waste gas to the environment is reduced, and the working environment of workers is guaranteed.
Referring to fig. 7, further, the bottom of the collecting box 3 is provided with a rolling ball 23, and the collecting box 3 can be moved more conveniently by rolling the rolling ball 23 on the bottom of the collecting box 3.
The separation method of the waste material separation equipment for the civil engineering and construction comprises the following specific steps:
the first step is as follows: the waste materials are placed into the pulverizer body 1 through the feed inlet by workers, the cross section of the fixing block 17 is triangular, so that the waste materials can smoothly fall through the inclined plane at the top of the fixing block 17 and are pulverized, and meanwhile, the fixing block 17 can absorb some iron materials in the waste materials through the magnet in the fixing block 17, so that the primary separation of the waste materials is realized;
the second step is that: the motor 8 drives the cam 15 to rotate, so that the cam 15 drives the left side of the filter plate 14 to move up and down, the waste is screened, the screening speed of the waste is increased to a certain extent, the waste accumulated in one place is reduced, the mesh of the filter plate 14 is blocked, and the uncrushed metal can be discharged from the inside of the discharge hole 13 by moving up and down on the left side of the filter plate 14;
the third step: the exhaust fan 11 can extract the dust generated in the crusher body 1 through the connecting pipe 12, so that the situation that the generated dust flies into the external environment and the external environment is polluted in the working process of the crusher body 1 is reduced to a certain extent;
the fourth step: get into the inside waste gas of purifying box 9, can filter and purify waste gas through filter screen and activated carbon layer to make waste gas discharge to the external environment after purifying, and reduce the pollution of waste gas to the environment, make the environment of staff's work obtain the guarantee.
The working principle is as follows: this waste material splitter for civil engineering building and separation method thereof, the cross-section through fixed block 17 is triangle-shaped when using, make the waste material can be more smooth fall through the inclined plane at fixed block 17 top, and smash, it rotates to drive cam 15 through motor 8, can make cam 15 drive the left side of filter 14 reciprocate, thereby realize the screening to the waste material, and accelerate the speed of waste material screening to a certain extent, it piles up in a place to reduce the waste material, the condition of jam appears in the mesh that makes filter 14, simultaneously air exhauster 11 can extract the dust of 1 inside production of rubbing crusher body through connecting pipe 12, get into the inside waste gas of purifying box 9, can carry out filtration purification to waste gas through filter screen and active carbon layer.

Claims (9)

1. The utility model provides a waste material splitter for civil engineering building, includes rubbing crusher body (1), its characterized in that: the utility model discloses a crushing machine, including rubbing crusher body (1), the front side of rubbing crusher body (1) is seted up first spout (2), the inside sliding connection of first spout (2) has collection box (3), left side fixedly connected with backup pad (6) of rubbing crusher body (1), the top fixedly connected with purifying box (9) of backup pad (6), the inside of purifying box (9) is hollow structure, purifying box (9) top is provided with air exhauster (11), the output of air exhauster (11) passes through the inside intercommunication of pipeline with purifying box (9), the input fixedly connected with connecting pipe (12) of air exhauster (11), the one end that air exhauster (11) were kept away from in connecting pipe (12) runs through the left side of rubbing crusher body (1) and extends to the inside of rubbing crusher body (1), mounting groove (7) have been seted up in the left side of purifying box (9), the inside of mounting groove (7) is provided with the purification installation device.
2. The waste separation apparatus for civil engineering construction according to claim 1, wherein: the front side of rubbing crusher body (1) is opened and is equipped with second spout (4) with rubbing crusher body (1) inside intercommunication, and the inside sliding connection of second spout (4) has baffle (5), and the rear side fixedly connected with fixed block (17) of baffle (5).
3. The waste separation apparatus for civil engineering construction according to claim 2, wherein: magnets are arranged inside the fixing blocks (17), and the cross sections of the fixing blocks (17) are triangular.
4. The waste separation apparatus for civil engineering construction according to claim 1, wherein: the right surface inside the crusher body (1) is rotatably connected with a filter plate (14), meshes are formed in the filter plate (14), and a discharge hole (13) communicated with the inside of the crusher body (1) is formed in the right side of the crusher body (1).
5. The waste separation apparatus for civil engineering construction according to claim 1, wherein: the left side fixedly connected with motor (8) of rubbing crusher body (1), the output of motor (8) is rotated the left side that runs through rubbing crusher body (1) and is extended to the inside of rubbing crusher body (1), the output fixedly connected with cam (15) of motor (8), and cam (15) are located the bottom of filter (14).
6. The waste separation apparatus for civil engineering construction according to claim 1, wherein: the left surface of the interior of the crusher body (1) is fixedly connected with a partition plate (16), and the partition plate (16) is obliquely arranged on the inner wall of the crusher body (1).
7. The waste separation apparatus for civil engineering construction according to claim 1, wherein: purify installation device includes mounting panel (10), the inside sliding connection of the surface of mounting panel (10) and mounting groove (7), mounting panel (10) are passed through the bolt fastening in the inside of mounting groove (7), sliding tray (19) with the inside intercommunication of purifying box (9) are seted up to the inside of mounting groove (7), the inside sliding connection of sliding tray (19) has mounting bracket (18), the front side of mounting bracket (18) is seted up two shifting chutes (20) with the inside intercommunication of mounting bracket (18), the inside of two shifting chutes (20) is sliding connection respectively has first installing frame (21) and second installing frame (22), the inside of first installing frame (21) and second installing frame (22) is provided with filter screen and active carbon layer respectively.
8. The waste separation apparatus for civil engineering construction according to claim 1, wherein: the bottom of the collecting box (3) is provided with a rolling ball (23).
9. A separation method of waste separation equipment for civil engineering construction is characterized in that: the first step is as follows: the waste materials are placed into the crusher body (1) through the feeding hole by workers, the cross section of the fixing block (17) is triangular, so that the waste materials can smoothly fall down through the inclined plane at the top of the fixing block (17) and are crushed, and meanwhile, the fixing block (17) can absorb some iron materials in the waste materials through the magnet in the fixing block (17), so that the primary separation of the waste materials is realized;
the second step is that: the motor (8) drives the cam (15) to rotate, so that the cam (15) can drive the left side of the filter plate (14) to move up and down, the waste is screened, the screening speed of the waste is accelerated to a certain extent, the waste is reduced from being accumulated in one place, the meshes of the filter plate (14) are blocked, and the uncrushed metal can be discharged from the inside of the discharge hole (13) by moving up and down on the left side of the filter plate (14);
the third step: the exhaust fan (11) can extract dust generated in the crusher body (1) through the connecting pipe (12), so that the situation that the generated dust flies into the external environment and the external environment is polluted in the working process of the crusher body (1) is reduced to a certain extent;
the fourth step: get into the inside waste gas of purifying box (9), can filter and purify waste gas through filter screen and activated carbon layer to make waste gas discharge to the external environment after purifying, and reduce the pollution of waste gas to the environment, make the environment of staff's work obtain the guarantee.
CN202111632614.8A 2021-12-29 2021-12-29 Waste material separation equipment for civil engineering construction and separation method thereof Withdrawn CN114289467A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111632614.8A CN114289467A (en) 2021-12-29 2021-12-29 Waste material separation equipment for civil engineering construction and separation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111632614.8A CN114289467A (en) 2021-12-29 2021-12-29 Waste material separation equipment for civil engineering construction and separation method thereof

Publications (1)

Publication Number Publication Date
CN114289467A true CN114289467A (en) 2022-04-08

Family

ID=80972532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111632614.8A Withdrawn CN114289467A (en) 2021-12-29 2021-12-29 Waste material separation equipment for civil engineering construction and separation method thereof

Country Status (1)

Country Link
CN (1) CN114289467A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118751379A (en) * 2024-08-20 2024-10-11 山东创新金属科技有限公司 A raw material conveying device for recycled aluminum production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118751379A (en) * 2024-08-20 2024-10-11 山东创新金属科技有限公司 A raw material conveying device for recycled aluminum production

Similar Documents

Publication Publication Date Title
CN206444710U (en) Environment-friendly type building decoration refuse disposal installation
CN106733098B (en) A kind of environment-friendly type building decoration refuse disposal installation
CN208177648U (en) A kind of building waste separation recoverer with environment-friendly function
CN112916134B (en) Building concrete crushing and recycling equipment
CN111589511B (en) Construction waste efficient crushing and recycling system
CN110038687A (en) A kind of building rubbish treatment device
CN111185384B (en) Screening machine for construction waste
CN109731632A (en) A kind of concrete waste recycling device for civil engineering
CN111905861B (en) Green type building rubbish integrated processing device
CN218834740U (en) Concrete waste crushing and recycling equipment
CN112275390A (en) Be used for building rubbish environmental protection processing apparatus
CN209238024U (en) A construction waste screening device with crushing function
CN215901854U (en) System is smashed to building rubbish for recycled concrete
CN213376877U (en) Engineering waste recycling divides sieve device
CN111841715B (en) Building rubbish classification device
CN211801159U (en) A construction waste recycling device
CN109894186B (en) Construction waste recycling and crushing treatment equipment and use method
CN106694157A (en) Novel construction waste disposal device
CN115430683A (en) Municipal concrete solid waste recycling device
CN215234872U (en) Construction waste screening device
CN215963777U (en) Garbage crushing device for building construction
CN212493142U (en) Magnetic separation treatment device for recycling construction waste
CN116441170A (en) Grit sorting and cleaning integrated machine for civil engineering
CN114985088A (en) Building waste recovery device for building capable of improving crushing efficiency of building waste metal
CN115254280A (en) A kind of coal gangue waste recycling and processing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20220408