CN114278131B - Warehouse-frame integrated building with primary and secondary structures and construction method - Google Patents

Warehouse-frame integrated building with primary and secondary structures and construction method Download PDF

Info

Publication number
CN114278131B
CN114278131B CN202111580755.XA CN202111580755A CN114278131B CN 114278131 B CN114278131 B CN 114278131B CN 202111580755 A CN202111580755 A CN 202111580755A CN 114278131 B CN114278131 B CN 114278131B
Authority
CN
China
Prior art keywords
steel
concrete
column
warehouse
hollow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111580755.XA
Other languages
Chinese (zh)
Other versions
CN114278131A (en
Inventor
任重
戴柳丝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shanghai for Science and Technology
Original Assignee
University of Shanghai for Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shanghai for Science and Technology filed Critical University of Shanghai for Science and Technology
Priority to CN202111580755.XA priority Critical patent/CN114278131B/en
Publication of CN114278131A publication Critical patent/CN114278131A/en
Application granted granted Critical
Publication of CN114278131B publication Critical patent/CN114278131B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

本发明提供了一种具有主次结构的库架合一建筑及构建方法,其技术方案为:包括基础库架、屋顶桁架、仓库墙面和仓库屋顶,基础库架与仓库墙面上的仓库屋顶连接,仓库屋顶前后端底部固定连接仓库墙面,仓库屋顶内顶部固定连接屋顶桁架,屋顶桁架前后端底部均匀安装有主结构,主结构之间连接有次结构;其构建方法为:步骤一、建筑场地处理;步骤二、主结构的构建;步骤三、屋顶桁架的构建;步骤四、次结构的构建;步骤五、立柱间的连接。本发明有益效果是:本发明的主结构由钢管和混凝土组成,主结构不仅使得仓库整体的稳定性以及抗震性能有了很大的提升,并且使得耐火性能也有了改善。

Figure 202111580755

The present invention provides a warehouse-rack integration building and construction method with primary and secondary structures. The roof is connected, the front and rear ends of the warehouse roof are fixedly connected to the warehouse wall, the inner top of the warehouse roof is fixedly connected to the roof truss, the front and rear ends of the roof trusses are evenly installed at the bottom of the main structure, and the main structure is connected with a secondary structure; the construction method is as follows: Step 1 , construction site treatment; step 2, construction of the main structure; step 3, the construction of the roof truss; step 4, the construction of the secondary structure; step 5, the connection between the columns. The beneficial effects of the present invention are: the main structure of the present invention is composed of steel pipes and concrete, and the main structure not only greatly improves the overall stability and seismic performance of the warehouse, but also improves the fire resistance performance.

Figure 202111580755

Description

一种具有主次结构的库架合一建筑及构建方法A library-shelf-integrated building with primary and secondary structure and construction method

技术领域technical field

本发明涉及土木工程中库架合一技术领域,特别涉及一种具有主次结构的库架合一建筑及构建方法。The invention relates to the technical field of storage-shelf integration in civil engineering, in particular to a storage-frame integration building and construction method with primary and secondary structures.

背景技术Background technique

仓储是通过仓库对商品与物品的储存与保管。“仓”即仓库,为存放、保管、储存物品的建筑物和场地的总称,可以是房屋建筑、洞穴、大型容器或特定的场地等,具有存放和保护物品的功能。“储”即储存、储备,表示收存以备使用,具有收存、保管、交付使用的意思。Warehousing is the storage and custody of goods and items through warehouses. "Warehouse" is a warehouse, which is a general term for buildings and sites that store, keep, and store items. "Storage" means storage, reserve, which means to store for use, and means to store, keep, and deliver for use.

库架合一仓库也被称为整体式仓库、库架一体式仓库等,它是相对于库架分离式仓库而言的,目前在国内还没有统一的定义。顾名思义,“库”指的是仓库,“架”指的是货架。综合专业人士的分析,库架合一仓库是仓库+货架形成的整体结构,一般由高层货架、抗风结构、屋顶、围护结构等组成的建筑结构体系,以及排水、消防、电气照明、物料搬运设备及其控制和管理系统等部分组成。The combined warehouse and rack warehouse is also known as the integrated warehouse, the integrated warehouse and rack warehouse, etc. It is relative to the warehouse rack separated warehouse, and there is no unified definition in China at present. As the names suggest, "library" refers to a warehouse, and "shelf" refers to a shelf. Based on the analysis of professionals, the combined warehouse and rack is the overall structure formed by the warehouse and the shelf. It consists of handling equipment and its control and management systems.

货架作为库架合一仓库的主体与核心设备,具有两种属性:货架既是整个库房建筑的主支撑结构,支撑屋顶和墙面围护结构,并承受风压、雪压、地震力等荷载,即要保证安全性;同时,货架是货物存储设备,要满足自动化设备的运行要求,与其他物流设备配合,实现仓储、搬运等物流作业。As the main body and core equipment of a warehouse with a combination of warehouse and shelf, the shelf has two properties: the shelf is not only the main support structure of the entire warehouse building, but also supports the roof and wall envelope structure, and bears loads such as wind pressure, snow pressure, and earthquake force. That is to ensure safety; at the same time, shelves are goods storage equipment, which must meet the operation requirements of automation equipment, and cooperate with other logistics equipment to realize logistics operations such as warehousing and handling.

但是,这种全钢式库架合一自动化仓储,通过全钢进行固定连接,后期维护、改造困难,使用年限短。However, this kind of all-steel storage and rack-integrated automatic storage is fixedly connected by all-steel, which is difficult to maintain and transform in the later period, and has a short service life.

基于此,本发明提供了一种具有主次结构的库架合一建筑及构建方法,以解决上述技术问题。Based on this, the present invention provides a library-shelf-integrated building and construction method with primary and secondary structures to solve the above-mentioned technical problems.

发明内容SUMMARY OF THE INVENTION

为了解决上述技术问题,本发明提供了一种具有主次结构的库架合一建筑及构建方法,本发明的主结构由型钢混凝土立柱、型钢混凝土横梁和型钢混凝土侧向支撑梁组成,主结构不仅使得仓库整体的稳定性以及抗震性能有了很大的提升,并且使得耐火性能也有了改善。In order to solve the above-mentioned technical problems, the present invention provides a building and construction method with a primary and secondary structure in one storehouse and frame. It not only greatly improves the overall stability and seismic performance of the warehouse, but also improves the fire resistance.

本发明是通过以下措施实现的:一种具有主次结构的库架合一建筑,包括基础库架、屋顶桁架、仓库墙面和仓库屋顶,所述基础库架与仓库墙面上的仓库屋顶连接,所述仓库屋顶前后端底部固定连接仓库墙面,所述仓库屋顶内顶部固定连接屋顶桁架,所述屋顶桁架前后端底部均匀安装有主结构,所述主结构之间连接有次结构。The present invention is realized by the following measures: a warehouse-rack-integrated building with primary and secondary structures, including a basic warehouse, a roof truss, a warehouse wall and a warehouse roof, the basic warehouse and the warehouse roof on the warehouse wall The front and rear bottoms of the warehouse roof are fixedly connected to the warehouse walls, the inner top of the warehouse roof is fixedly connected to the roof truss, the front and rear bottoms of the roof trusses are evenly installed with main structures, and secondary structures are connected between the main structures.

所述主结构包括型钢混凝土立柱、型钢混凝土横梁和型钢混凝土侧向支撑梁,左右相邻所述的型钢混凝土立柱之间等间距连接若干个所述型钢混凝土侧向支撑梁,所述型钢混凝土侧向支撑梁倾斜设置,前后相邻所述的型钢混凝土立柱之间通过型钢混凝土横梁连接。The main structure includes a profiled steel concrete column, a profiled steel concrete beam and a profiled steel concrete lateral support beam. The left and right adjacent profiled steel concrete columns are connected with a plurality of the profiled steel concrete lateral support beams at equal intervals. It is inclined to the support beam, and the front and rear adjacent shaped steel concrete columns are connected by shaped steel concrete beams.

进一步地,所述型钢混凝土立柱、型钢混凝土横梁和型钢混凝土侧向支撑梁内部结构相同,所述型钢混凝土立柱包括立柱方钢管和套接在所述立柱方钢管外侧的立柱混凝土,所述立柱方钢管由方钢管和连接在方钢管一端的两相对的连接钢板组成,两所述连接钢板上均匀设置若干个固定螺栓,所述立柱方钢管的连接钢板通过固定螺栓与型钢混凝土横梁的横梁方钢管、型钢混凝土侧向支撑梁的侧向支撑方钢管连接。Further, the internal structures of the section steel concrete column, section steel concrete beam and section steel concrete lateral support beam are the same, and the section steel concrete column includes a column square steel pipe and a column concrete sleeved on the outside of the column square steel pipe. The steel pipe is composed of a square steel pipe and two opposite connecting steel plates connected at one end of the square steel pipe. Several fixing bolts are evenly arranged on the two connecting steel plates. , The lateral support square steel pipe connection of the profiled steel concrete lateral support beam.

进一步地,所述型钢混凝土立柱顶部的立柱方钢管与屋顶桁架端部固定连接。Further, the column square steel pipe at the top of the shaped steel concrete column is fixedly connected to the end of the roof truss.

进一步地,所述次结构包括钢货架立柱、横梁方钢管和侧向支撑C型钢,所述横梁方钢管两端分别与钢货架立柱连接。Further, the secondary structure includes a steel shelf column, a beam square steel pipe and a lateral support C-shaped steel, and both ends of the beam square steel pipe are respectively connected with the steel shelf column.

进一步地,所述型钢混凝土立柱和钢货架立柱底部均固设有钢板。Further, steel plates are fixed at the bottoms of the shaped steel concrete columns and the steel rack columns.

进一步地,最前和最后所述的钢货架立柱均与型钢混凝土立柱贴合接触,所述钢货架立柱和型钢混凝土立柱之间连接有用于型钢混凝土立柱和钢货架立柱加固的套箍结构。Further, the first and last steel racking columns are in contact with the profiled steel concrete columns, and a hoop structure for reinforcing the profiled steel concrete columns and the steel racking columns is connected between the steel racking columns and the profiled steel concrete columns.

进一步地,所述套箍结构包括第一中空C形钢、加固螺栓柱、加固螺帽和插块,所述第一中空C形钢和第二中空C形钢结构相同,所述第一中空C形钢和第二中空C形钢一端固定连接有插块,所述第一中空C形钢连接的插块与第二中空C形钢插接,所述第二中空C形钢连接的插块与第一中空C形钢插接,所述第一中空C形钢端部、第二中空C形钢端部和插块通过滑孔与加固螺栓柱插接,所述加固螺栓柱外端螺纹有加固螺帽。Further, the ferrule structure includes a first hollow C-shaped steel, a reinforcing bolt column, a reinforcing nut and an insert block, the first hollow C-shaped steel and the second hollow C-shaped steel have the same structure, and the first hollow One end of the C-shaped steel and the second hollow C-shaped steel is fixedly connected with a plug, the plug connected with the first hollow C-shaped steel is plugged with the second hollow C-shaped steel, and the plug connected with the second hollow C-shaped steel is plugged. The block is inserted into the first hollow C-shaped steel, the end of the first hollow C-shaped steel, the second hollow C-shaped steel end and the insert block are inserted into the reinforcement bolt column through the sliding hole, and the outer end of the reinforcement bolt column is inserted The threads have reinforced nuts.

为了更好地实现上述发明目的,本发明还提供了一种具有主次结构的库架合一建筑的构建方法,具体包括以下步骤:In order to better realize the above-mentioned purpose of the invention, the present invention also provides a method for constructing a library-shelf-integrated building with a primary and secondary structure, which specifically includes the following steps:

步骤一、建筑场地处理,在构建具有主次结构的库架合一建筑之前,对建筑场地进行场地平整、确定立柱位置;Step 1. Construction site treatment. Before constructing a library-frame-integrated building with a primary and secondary structure, the construction site is leveled and the position of the column is determined;

步骤二、主结构的构建,主结构的构建主要包括型钢混凝土立柱、型钢混凝土横梁和型钢混凝土侧向支撑梁的构建;其中,型钢混凝土立柱、型钢混凝土横梁和型钢混凝土侧向支撑梁都是先加工制作一个80*80*5mm的方形钢管,在方钢管的四周分别做好直径为20mm的孔洞,型钢柱螺栓竖向间距为100mm,柱底第一道对拉螺栓距地面200mm。随后在方钢管的周围支起160*160的模板,在模板内预织直径为16mm的钢筋网,然后浇筑强度等级为C的混凝土,养护28天;Step 2, the construction of the main structure, the construction of the main structure mainly includes the construction of the section steel concrete column, the section steel concrete beam and the section steel concrete lateral support beam; A square steel pipe of 80*80*5mm is processed and made, holes with a diameter of 20mm are made around the square steel pipe, the vertical spacing of the steel stud bolts is 100mm, and the first pair of tie bolts at the bottom of the column are 200mm from the ground. Then, a 160*160 formwork is supported around the square steel pipe, and a steel mesh with a diameter of 16mm is pre-woven in the formwork, and then concrete with a strength grade of C is poured and cured for 28 days;

步骤三、屋顶桁架的构建,完成主结构的构建后,进行屋顶桁架与主结构的固定连接;Step 3: Construction of the roof truss. After the construction of the main structure is completed, the fixed connection between the roof truss and the main structure is carried out;

步骤四、立柱间的连接,在完成次结构的构建后,对首端和末端的钢货架立柱均与钢混凝土立柱通过套箍结构进行贴合接触。Step 4: The connection between the columns, after completing the construction of the secondary structure, the steel shelf columns at the head end and the end are in contact with the steel concrete column through the hoop structure.

与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:

1.本发明主结构由钢管和混凝土组成,主结构不仅使得仓库整体的稳定性以及抗震性能有了很大的提升,并且使得防火性能也有了改善。1. The main structure of the present invention is composed of steel pipes and concrete. The main structure not only greatly improves the overall stability and seismic performance of the warehouse, but also improves the fire resistance.

2.本发明套箍结构方便组装,便于对钢混凝土立柱和钢货架立柱进行加固连接,和传统的连接方式相比,一旦发生了火灾,套箍结构方便快速打开,使得钢混凝土立柱和钢货架立柱分离,以保证仓库的稳定安全。2. The ferrule structure of the present invention is easy to assemble, and facilitates the reinforcement and connection of the steel concrete column and the steel shelf column. Compared with the traditional connection method, once a fire occurs, the ferrule structure is convenient and quick to open, so that the steel concrete column and the steel shelf can be easily and quickly opened. The columns are separated to ensure the stability and safety of the warehouse.

3.本发明每排钢货架立柱中相邻钢货架立柱之间的跨度根据货位的模数进行确定,相邻两堆垛单元之间的跨距根据巷道堆垛机的走形空间进行确定,使得自动化仓库的设计更方便货物的存取,保证仓库结构的适配性。3. The span between adjacent steel rack columns in each row of steel rack columns of the present invention is determined according to the modulus of the cargo space, and the span between two adjacent stacking units is determined according to the shape space of the roadway stacker. , making the design of the automated warehouse more convenient for the access of goods and ensuring the adaptability of the warehouse structure.

附图说明Description of drawings

附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the specification, and are used to explain the present invention together with the embodiments of the present invention, and do not constitute a limitation to the present invention.

图1为本发明的库架合一建筑整体示意图。FIG. 1 is an overall schematic diagram of a warehouse-rack-integrated building of the present invention.

图2为本发明的主结构和次结构连接结构示意图。FIG. 2 is a schematic diagram of the connection structure of the primary structure and the secondary structure of the present invention.

图3为本发明的型钢混凝土立柱中的立柱方钢管结构示意图。FIG. 3 is a schematic structural diagram of a column square steel tube in the profiled steel concrete column of the present invention.

图4为本发明中型钢混凝土立柱和型钢混凝土横梁之间位置关系结构示意图。FIG. 4 is a schematic structural diagram of the positional relationship between the medium-shaped steel concrete column and the shaped steel concrete beam according to the present invention.

图5为本发明中型钢混凝土立柱与型钢混凝土侧向支撑梁之间位置关系结构示意图。FIG. 5 is a schematic structural diagram of the positional relationship between the medium-shaped steel-concrete column and the steel-concrete lateral support beam of the present invention.

图6为本发明中型钢混凝土立柱结构示意图。FIG. 6 is a schematic structural diagram of a medium-sized steel-concrete column of the present invention.

图7为本发明的套箍结构、型钢混凝土立柱和钢货架立柱连接示意图。FIG. 7 is a schematic diagram of the connection between the hoop structure, the profiled steel concrete column and the steel shelf column of the present invention.

图8为本发明的套箍结构、型钢混凝土立柱和钢货架立柱连接剖视图。FIG. 8 is a sectional view of the connection between the hoop structure, the profiled steel concrete column and the steel shelf column according to the present invention.

其中,附图标记为:Among them, the reference numerals are:

1、基础库架;2、主结构;3、次结构;31、钢货架立柱;32、横梁方钢管;33、侧向支撑C型钢;4、屋顶桁架;5、仓库墙面;5、仓库屋顶;21、型钢混凝土立柱;22、型钢混凝土横梁;23、型钢混凝土侧向支撑梁;211、立柱方钢管;212、立柱混凝土;2110、方钢管;2111、连接钢板;8、套箍结构;81、第一中空C形钢;82、加固螺栓柱;83、加固螺帽;84、第二中空C形钢;85、插块。1. Basic warehouse rack; 2. Main structure; 3. Secondary structure; 31. Steel shelf column; 32. Beam square steel pipe; 33. Lateral support C-shaped steel; 4. Roof truss; 5. Warehouse wall; 5. Warehouse Roof; 21. Profiled steel concrete column; 22. Profiled steel concrete beam; 23. Profiled steel concrete lateral support beam; 211. Column square steel pipe; 212. Column concrete; 2110, square steel pipe; 2111, connecting steel plate; 81. First hollow C-shaped steel; 82. Reinforced bolt column; 83. Reinforced nut; 84. Second hollow C-shaped steel; 85. Insert block.

具体实施方式Detailed ways

为了使本发明的目的、技术方案及优点更加清楚明白,以下实施例是对本发明进行进一步详细说明。当然,此处所描述的具体实施例仅用以解释本发明,并不用于限定本发明。In order to make the objectives, technical solutions and advantages of the present invention clearer, the following embodiments are used to further describe the present invention in detail. Of course, the specific embodiments described herein are only used to explain the present invention, but not to limit the present invention.

实施例1Example 1

参见图1至8所示,一种具有主次结构的库架合一建筑,包括基础库架1、屋顶桁架4、仓库墙面5和仓库屋顶6,基础库架1与仓库墙面5上的仓库屋顶6连接,仓库屋顶6前后端底部固定连接仓库墙面5,仓库屋顶6内顶部固定连接屋顶桁架4,屋顶桁架4前后端底部均匀安装有主结构2,主结构2之间连接有次结构3。Referring to Figures 1 to 8, a warehouse-rack-integrated building with a primary and secondary structure includes a basic warehouse 1, a roof truss 4, a warehouse wall 5 and a warehouse roof 6, and the basic warehouse 1 and the warehouse wall 5 are on the The warehouse roof 6 is connected to the warehouse roof 6, the front and rear ends of the warehouse roof 6 are fixedly connected to the warehouse wall 5, the inner top of the warehouse roof 6 is fixedly connected to the roof truss 4, the front and rear ends of the roof truss 4 are evenly installed with the main structure 2, and the main structure 2 is connected with a Substructure 3.

优选地,主结构2包括型钢混凝土立柱21、型钢混凝土横梁22和型钢混凝土侧向支撑梁23,左右相邻的型钢混凝土立柱21之间等间距连接若干个型钢混凝土侧向支撑梁23,型钢混凝土侧向支撑梁23倾斜设置,前后相邻的型钢混凝土立柱21之间通过型钢混凝土横梁22连接。Preferably, the main structure 2 includes shaped steel concrete columns 21, shaped steel concrete beams 22 and shaped steel concrete lateral support beams 23, and the left and right adjacent shaped steel concrete columns 21 are connected with a number of shaped steel concrete lateral support beams 23 at equal intervals. The lateral support beams 23 are arranged obliquely, and the front and rear adjacent shaped steel concrete columns 21 are connected by shaped steel concrete beams 22 .

优选地,型钢混凝土立柱21、型钢混凝土横梁22和型钢混凝土侧向支撑梁23内部结构相同,型钢混凝土立柱21包括立柱方钢管211和套接在立柱方钢管211外侧的立柱混凝土212,立柱方钢管211由方钢管2110和连接在方钢管一端的两相对的连接钢板2111组成,两连接钢板211上均匀设置若干个固定螺栓,立柱方钢管211的连接钢板2111通过固定螺栓与型钢混凝土横梁22的横梁方钢管、型钢混凝土侧向支撑梁23的侧向支撑方钢管连接。Preferably, the profiled steel concrete column 21, the profiled steel concrete beam 22 and the profiled steel concrete lateral support beam 23 have the same internal structure, and the profiled steel concrete column 21 includes a column square steel pipe 211 and a column concrete 212 sleeved on the outside of the column square steel pipe 211. The column square steel pipe 211 is composed of a square steel pipe 2110 and two opposite connecting steel plates 2111 connected at one end of the square steel pipe. Several fixing bolts are evenly arranged on the two connecting steel plates 211. The square steel pipe and the lateral support square steel pipe of the profiled steel concrete lateral support beam 23 are connected.

优选地,型钢混凝土立柱21顶部的立柱方钢管211与屋顶桁架4端部固定连接。Preferably, the column square steel pipe 211 at the top of the shaped steel concrete column 21 is fixedly connected to the end of the roof truss 4 .

优选地,次结构3包括钢货架立柱31、横梁方钢管32和侧向支撑C型钢33,横梁方钢管32两端分别与钢货架立柱31连接。Preferably, the secondary structure 3 includes steel rack uprights 31 , beam square steel pipes 32 and lateral support C-shaped steels 33 , and both ends of the beam square steel pipes 32 are respectively connected to the steel rack uprights 31 .

优选地,型钢混凝土立柱21和钢货架立柱31底部均固设有钢板7。Preferably, steel plates 7 are fixed at the bottoms of the shaped steel concrete uprights 21 and the steel rack uprights 31 .

优选地,最前和最后的钢货架立柱31均与型钢混凝土立柱21贴合接触,钢货架立柱31和型钢混凝土立柱21之间连接有用于型钢混凝土立柱21和钢货架立柱31加固的套箍结构8。Preferably, the foremost and the last steel rack uprights 31 are in contact with the profiled steel concrete uprights 21 , and a hoop structure 8 for reinforcing the profiled steel concrete uprights 21 and the steel racked uprights 31 is connected between the steel rack uprights 31 and the profiled steel concrete uprights 21 .

优选地,套箍结构8包括第一中空C形钢81、加固螺栓柱82、加固螺帽83和插块85,第一中空C形钢81和第二中空C形钢84结构相同,第一中空C形钢81和第二中空C形钢84一端固定连接有插块85,第一中空C形钢81连接的插块85与第二中空C形钢84插接,第二中空C形钢84连接的插块85与第一中空C形钢81插接,第一中空C形钢81端部、第二中空C形钢84端部和插块85通过滑孔与加固螺栓柱82插接,加固螺栓柱82外端螺纹有加固螺帽83。Preferably, the ferrule structure 8 includes a first hollow C-shaped steel 81, a reinforcing bolt column 82, a reinforcing nut 83 and an insert block 85. The first hollow C-shaped steel 81 and the second hollow C-shaped steel 84 have the same structure. One end of the hollow C-shaped steel 81 and the second hollow C-shaped steel 84 is fixedly connected with an insert block 85, the insert block 85 connected with the first hollow C-shaped steel 81 is inserted into the second hollow C-shaped steel 84, and the second hollow C-shaped steel 84 is inserted. The plug 85 connected by 84 is plugged with the first hollow C-shaped steel 81, and the end of the first hollow C-shaped steel 81, the end of the second hollow C-shaped steel 84 and the plug 85 are plugged with the reinforcement bolt column 82 through the sliding hole. , the outer end thread of the reinforcement bolt column 82 is provided with a reinforcement nut 83 .

为了更好地实现上述发明目的,本发明还提供了一种具有主次结构的库架合一建筑的构建方法,具体包括以下步骤:In order to better realize the above-mentioned purpose of the invention, the present invention also provides a method for constructing a library-shelf-integrated building with a primary and secondary structure, which specifically includes the following steps:

步骤一、建筑场地处理,在构建具有主次结构的库架合一建筑之前,对建筑场地进行场地平整、确定立柱位置;Step 1. Construction site treatment. Before constructing a library-frame-integrated building with a primary and secondary structure, the construction site is leveled and the position of the column is determined;

步骤二、主结构2的构建,主结构2的构建主要包括型钢混凝土立柱21、型钢混凝土横梁22和型钢混凝土侧向支撑梁23的构建;其中,型钢混凝土立柱21、型钢混凝土横梁22和型钢混凝土侧向支撑梁23都是先加工制作一个80*80*5mm的方形钢管,在方钢管的四周分别做好直径为30mm的孔洞,型钢柱螺栓竖向间距为100mm,柱底第一道对拉螺栓距地面200mm,随后在方钢管的周围支起160*160的模板,在模板内预织直径为16mm的钢筋网,然后浇筑强度等级为C30的混凝土,养护28天;Step 2, the construction of the main structure 2, the construction of the main structure 2 mainly includes the construction of the section steel concrete column 21, the section steel concrete beam 22 and the section steel concrete lateral support beam 23; The lateral support beam 23 is first processed to make a square steel pipe of 80*80*5mm, and holes with a diameter of 30mm are made around the square steel pipe. The vertical spacing of the steel stud bolts is 100mm. The bolts are 200mm away from the ground, and then a 160*160 formwork is supported around the square steel pipe, and a steel mesh with a diameter of 16mm is pre-woven in the formwork, and then concrete with a strength grade of C30 is poured and cured for 28 days;

步骤三、屋顶桁架4的构建,完成主结构2的构建后,进行屋顶桁架4与主结构2的固定连接;步骤四、立柱间的连接,在完成次结构3的构建后,对首端和末端的钢货架立柱31均与钢混凝土立柱21通过套箍结构8进行贴合接触。Step 3, the construction of the roof truss 4, after the completion of the construction of the main structure 2, the fixed connection of the roof truss 4 and the main structure 2; Step 4, the connection between the columns, after the completion of the construction of the secondary structure 3, the head end and the main structure 2 are connected. The steel rack uprights 31 at the ends are in contact with the steel concrete uprights 21 through the hoop structure 8 .

以上仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention. Inside.

Claims (5)

1.一种具有主次结构的库架合一建筑,包括基础库架(1)、屋顶桁架(4)、仓库墙面(5)和仓库屋顶(6),其特征在于,所述基础库架(1)与仓库墙面(5)上的仓库屋顶(6)连接,所述仓库屋顶(6)前后端底部固定连接仓库墙面(5),所述仓库屋顶(6)内顶部固定连接屋顶桁架(4),所述屋顶桁架(4)前后端底部均匀安装有主结构(2),所述主结构(2)之间连接有次结构(3);1. A warehouse-rack-integrated building with primary and secondary structures, comprising a basic warehouse (1), a roof truss (4), a warehouse wall (5) and a warehouse roof (6), characterized in that the basic warehouse The rack (1) is connected to the warehouse roof (6) on the warehouse wall (5), the front and rear bottoms of the warehouse roof (6) are fixedly connected to the warehouse wall (5), and the inner top of the warehouse roof (6) is fixedly connected a roof truss (4), a main structure (2) is evenly installed at the bottom of the front and rear ends of the roof truss (4), and a secondary structure (3) is connected between the main structures (2); 所述主结构(2)包括型钢混凝土立柱(21)、型钢混凝土横梁(22)和型钢混凝土侧向支撑梁(23),左右相邻所述型钢混凝土立柱(21)之间等间距连接若干个所述型钢混凝土侧向支撑梁(23),所述型钢混凝土侧向支撑梁(23)倾斜设置,前后相邻所述型钢混凝土立柱(21)之间通过型钢混凝土横梁(22)连接;The main structure (2) comprises a steel-concrete column (21), a steel-concrete beam (22) and a steel-concrete lateral support beam (23), and a plurality of left and right adjacent shaped-steel-concrete columns (21) are connected at equal intervals. The profiled steel concrete lateral support beam (23), the profiled steel concrete lateral support beam (23) is inclined and arranged, and the front and rear adjacent profiled steel concrete columns (21) are connected by a profiled steel concrete beam (22); 所述型钢混凝土立柱(21)和钢货架立柱(31)底部均固设有钢板(7);A steel plate (7) is fixed at the bottom of the shaped steel concrete column (21) and the steel shelf column (31); 最前和最后所述的钢货架立柱(31)均与型钢混凝土立柱(21)贴合接触,所述钢货架立柱(31)和型钢混凝土立柱(21)之间连接有用于型钢混凝土立柱(21)和钢货架立柱(31)加固的套箍结构(8);The steel racking uprights (31) described at the front and the end are in contact with the profiled steel concrete uprights (21), and a profiled steel concrete upright (21) is connected between the steel racking uprights (31) and the profiled steel concrete uprights (21). The hoop structure (8) reinforced with the steel shelf column (31); 所述套箍结构(8)包括第一中空C形钢(81)、加固螺栓柱(82)、加固螺帽(83)和插块(85),所述第一中空C形钢(81)和第二中空C形钢(84)结构相同,所述第一中空C形钢(81)和第二中空C形钢(84)一端固定连接有插块(85),所述第一中空C形钢(81)连接的插块(85)与第二中空C形钢(84)插接,所述第二中空C形钢(84)连接的插块(85)与第一中空C形钢(81)插接,所述第一中空C形钢(81)端部、第二中空C形钢(84)端部和插块(85)通过滑孔与加固螺栓柱(82)插接,所述加固螺栓柱(82)外端螺纹有加固螺帽(83)。The ferrule structure (8) includes a first hollow C-shaped steel (81), a reinforcement bolt column (82), a reinforcement nut (83) and an insert block (85). The first hollow C-shaped steel (81) The structure is the same as that of the second hollow C-shaped steel (84). One end of the first hollow C-shaped steel (81) and the second hollow C-shaped steel (84) is fixedly connected with an insert block (85). The plug (85) connected with the shaped steel (81) is plugged with the second hollow C-shaped steel (84), and the plug (85) connected with the second hollow C-shaped steel (84) is connected with the first hollow C-shaped steel (81) Plug connection, the end of the first hollow C-shaped steel (81), the end of the second hollow C-shaped steel (84) and the plug (85) are plugged with the reinforcement bolt column (82) through the sliding hole, A reinforcing nut (83) is threaded on the outer end of the reinforcing bolt column (82). 2.根据权利要求1所述的一种具有主次结构的库架合一建筑,其特征在于,所述型钢混凝土立柱(21)、型钢混凝土横梁(22)和型钢混凝土侧向支撑梁(23)内部结构相同,所述型钢混凝土立柱(21)包括立柱方钢管(211)和套接在所述立柱方钢管(211)外侧的立柱混凝土(212),所述立柱方钢管(211)由方钢管(2110)和连接在方钢管一端的两相对的连接钢板(2111)组成,两所述连接钢板(2111)上均匀设置若干个固定螺栓,所述立柱方钢管(211)的连接钢板(2111)通过固定螺栓与型钢混凝土横梁(22)的横梁方钢管、型钢混凝土侧向支撑梁(23)的侧向支撑方钢管连接。2. A building with a primary and secondary structure in one building according to claim 1, characterized in that the profiled steel concrete column (21), the profiled steel concrete beam (22) and the profiled steel concrete lateral support beam (23) ) has the same internal structure, the shaped steel concrete column (21) includes a column square steel pipe (211) and a column concrete (212) sleeved on the outside of the column square steel pipe (211). The steel pipe (2110) is composed of two opposite connecting steel plates (2111) connected to one end of the square steel pipe. Several fixing bolts are evenly arranged on the two connecting steel plates (2111). ) is connected with the beam square steel pipe of the section steel concrete beam (22) and the lateral support square steel pipe of the section steel concrete lateral support beam (23) through fixing bolts. 3.根据权利要求2所述的一种具有主次结构的库架合一建筑,其特征在于,所述型钢混凝土立柱(21)顶部的立柱方钢管(211)与屋顶桁架(4)端部固定连接。3. A storage-frame-integrated building with a primary and secondary structure according to claim 2, characterized in that the square steel pipe (211) on the top of the shaped steel concrete column (21) and the end of the roof truss (4) Fixed connection. 4.根据权利要求3所述的一种具有主次结构的库架合一建筑,其特征在于,所述次结构(3)包括钢货架立柱(31)、横梁方钢管(32)和侧向支撑C型钢(33),所述横梁方钢管(32)两端分别与钢货架立柱(31)连接。4. A storage-rack-integrated building with a primary and secondary structure according to claim 3, characterized in that the secondary structure (3) comprises a steel rack column (31), a beam square steel pipe (32) and a lateral A C-shaped steel (33) is supported, and both ends of the beam square steel pipe (32) are respectively connected with the steel rack uprights (31). 5.一种如权利要求4所述的一种具有主次结构的库架合一建筑的构建方法,其特征在于,包括以下步骤:5. a kind of construction method with the library-shelf integration building of primary and secondary structure as claimed in claim 4, is characterized in that, comprises the following steps: 步骤一、建筑场地处理,在构建具有主次结构的库架合一建筑之前,对建筑场地进行场地平整、确定立柱位置;Step 1. Construction site treatment. Before constructing a library-frame-integrated building with a primary and secondary structure, the construction site is leveled and the position of the column is determined; 步骤二、主结构(2)的构建,主结构(2)的构建主要包括型钢混凝土立柱(21)、型钢混凝土横梁(22)和型钢混凝土侧向支撑梁(23)的构建;其中,型钢混凝土立柱(21)、型钢混凝土横梁(22)和型钢混凝土侧向支撑梁(23)都是先加工制作一个80*80*5mm的方形钢管,在方钢管的四周分别做好直径为30mm的孔洞,型钢柱螺栓竖向间距为100mm,柱底第一道对拉螺栓距地面200mm,随后在方钢管的周围支起160*160的模板,在模板内预织直径为16mm的钢筋网,然后浇筑强度等级为C30的混凝土,养护28天;Step 2, the construction of the main structure (2), the construction of the main structure (2) mainly includes the construction of the section steel concrete column (21), the section steel concrete beam (22) and the section steel concrete lateral support beam (23); The upright column (21), the section steel concrete beam (22) and the section steel concrete lateral support beam (23) are first processed to make a square steel pipe of 80*80*5mm, and holes with a diameter of 30mm are made around the square steel pipe respectively. The vertical spacing of the steel stud bolts is 100mm, and the first tie bolt at the bottom of the column is 200mm from the ground. Then a 160*160 formwork is supported around the square steel pipe, and a steel mesh with a diameter of 16mm is pre-woven in the formwork, and then the strength is poured. Concrete of grade C30, curing for 28 days; 步骤三、屋顶桁架(4)的构建,完成主结构(2)的构建后,进行屋顶桁架(4)与主结构(2)的固定连接;Step 3: Construction of the roof truss (4), after the construction of the main structure (2) is completed, the fixed connection between the roof truss (4) and the main structure (2) is carried out; 步骤四、立柱间的连接,在完成次结构(3)的构建后,对首端和末端的钢货架立柱(31)均与型钢混凝土立柱(21)通过套箍结构(8)进行贴合接触。Step 4: The connection between the columns, after the construction of the secondary structure (3) is completed, the steel shelf columns (31) at the head end and the end are in contact with the shaped steel concrete column (21) through the hoop structure (8). .
CN202111580755.XA 2021-12-22 2021-12-22 Warehouse-frame integrated building with primary and secondary structures and construction method Active CN114278131B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111580755.XA CN114278131B (en) 2021-12-22 2021-12-22 Warehouse-frame integrated building with primary and secondary structures and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111580755.XA CN114278131B (en) 2021-12-22 2021-12-22 Warehouse-frame integrated building with primary and secondary structures and construction method

Publications (2)

Publication Number Publication Date
CN114278131A CN114278131A (en) 2022-04-05
CN114278131B true CN114278131B (en) 2022-09-09

Family

ID=80873745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111580755.XA Active CN114278131B (en) 2021-12-22 2021-12-22 Warehouse-frame integrated building with primary and secondary structures and construction method

Country Status (1)

Country Link
CN (1) CN114278131B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116892306A (en) * 2023-07-10 2023-10-17 亚太建设科技信息研究院有限公司 A three-dimensional warehouse and construction method of a giant frame-support structure system
CN116934179B (en) * 2023-09-15 2023-12-01 菏泽建工建筑设计研究院 Building engineering quality detection data analysis management system based on big data
CN119915469B (en) * 2025-04-03 2025-06-20 上海大学 Four-way car track impact force testing arrangement

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006274617A (en) * 2005-03-29 2006-10-12 Nippon Steel Corp Factory building with overhead crane
CN104358318A (en) * 2014-10-28 2015-02-18 四川华铁钢结构有限公司 Building house adopting concrete steel structure uprights
CN204492265U (en) * 2015-02-16 2015-07-22 徐州力泰钢结构有限公司 A kind of steel-structure factory building of I shape steel reinforced concrete
CN105113717A (en) * 2015-08-24 2015-12-02 河海大学 Inner truss type steel tube concrete L-shaped column and construction method thereof
CN105133789A (en) * 2015-08-24 2015-12-09 河海大学 Inner truss type steel pipe concrete T-shaped column and construction method thereof
CN108533014A (en) * 2018-05-22 2018-09-14 中铁第四勘察设计院集团有限公司 A kind of three-dimensional freezer of library frame unification
CN212358607U (en) * 2020-03-27 2021-01-15 浙江省天正设计工程有限公司 Multi-layer warehouse hybrid frame structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006274617A (en) * 2005-03-29 2006-10-12 Nippon Steel Corp Factory building with overhead crane
CN104358318A (en) * 2014-10-28 2015-02-18 四川华铁钢结构有限公司 Building house adopting concrete steel structure uprights
CN204492265U (en) * 2015-02-16 2015-07-22 徐州力泰钢结构有限公司 A kind of steel-structure factory building of I shape steel reinforced concrete
CN105113717A (en) * 2015-08-24 2015-12-02 河海大学 Inner truss type steel tube concrete L-shaped column and construction method thereof
CN105133789A (en) * 2015-08-24 2015-12-09 河海大学 Inner truss type steel pipe concrete T-shaped column and construction method thereof
CN108533014A (en) * 2018-05-22 2018-09-14 中铁第四勘察设计院集团有限公司 A kind of three-dimensional freezer of library frame unification
CN212358607U (en) * 2020-03-27 2021-01-15 浙江省天正设计工程有限公司 Multi-layer warehouse hybrid frame structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钢货架结构研究现状与关键技术;赵宪忠等;《工程力学》;20190830;第1-11页 *

Also Published As

Publication number Publication date
CN114278131A (en) 2022-04-05

Similar Documents

Publication Publication Date Title
KR101767677B1 (en) Compisite column structure for steel and concrete
CN114278131A (en) Warehouse-frame integrated building with primary and secondary structures and construction method
CN205653923U (en) Novel big board shear wall structure is secretly supported in prefabricated assembled area of connecting from top to bottom
CN108532760B (en) Semi-through combined column-through double steel beam connection structure and construction method thereof
CN105544801A (en) Bolted connection technique for prefabricated large plate shear wall provided with concealed bracing and construction method
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN105064529A (en) Prefabricated and assembled large-board shear wall structure with concealed bracings
CN105133793A (en) Space constraint multi-cavity pipe-in-pipe steel bar concrete huge column and construction method
CN110439104A (en) Low system of multi-floor steel structure residential building and its method of construction
CN213061736U (en) A cast-in-place assembled composite support frame for concrete box girder
CN115680116A (en) Assembled frame beam column connecting node and construction method thereof
CN108104264A (en) A kind of concrete frame-light gauge cold-formed steel shape mixed structure housing building system
CN210887559U (en) Low multi-storey steel structure residential system
CN106088334B (en) Assembled giant steel pipe column special-shaped combined node and installation method
CN105569222A (en) Vertical connection technology for precast assembled large panel shear walls with concealed supports
CN108442728A (en) Construction elevator basement roof local stiffening structures and methods
CN118241751A (en) Core tube structure based on double steel plate shear wall and its construction method
CN115182452A (en) Outer wrapping type column base structure of reinforced concrete column
CN206360399U (en) The existing reinforced concrete coupling beam bracing means of one species " doubly-linked beam "
CN115217269A (en) A composite structure of concrete-filled steel tubular composite columns and reinforced concrete beams
CN109372109B (en) Assembled beam column connected node
CN108086535A (en) A kind of assembled square steel tube steel plate concrete combined shear wall
CN216948714U (en) Warehouse and frame integrated reinforced concrete combined structure
CN120906246A (en) I-shaped column-full-dry type connection RC beam column joint and connection method
CN206529892U (en) Building structure system applied to high-rise structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant