CN114263122A - Integral hoisting construction method for bridge bent cap framework and template - Google Patents

Integral hoisting construction method for bridge bent cap framework and template Download PDF

Info

Publication number
CN114263122A
CN114263122A CN202210049851.XA CN202210049851A CN114263122A CN 114263122 A CN114263122 A CN 114263122A CN 202210049851 A CN202210049851 A CN 202210049851A CN 114263122 A CN114263122 A CN 114263122A
Authority
CN
China
Prior art keywords
bent cap
framework
hoisting
mould
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210049851.XA
Other languages
Chinese (zh)
Inventor
鲁满库
甘贺德
蔡军
刘帅军
李建军
韩晓霞
王志发
李玉祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN202210049851.XA priority Critical patent/CN114263122A/en
Publication of CN114263122A publication Critical patent/CN114263122A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A construction method for integrally hoisting a bridge capping beam framework and a template relates to the technical field of bridge construction and comprises the following steps: weaving a bent cap framework; assembling and fixing the bent cap mould; putting the bent cap framework into a bent cap mould; building a supporting device on the bridge pier stud; cleaning corners at the upper ends of the piers; integrally fixing the bent cap framework and the die for hoisting; after the hoisting is finished, fixing the die on the supporting device, and binding and fixing the bent cap framework; checking the fixation of the whole die and the framework, and pouring the cover beam; and (4) demoulding the whole mould without dismounting, and hoisting the whole mould by using a hoisting tool to dismount the mould on the ground. The invention has the beneficial effects that: the construction method is simple, the integral hoisting and dismounting can save the construction time of the bent cap, the risk caused by high-position assembling and disassembling can be effectively avoided, the construction of the bent cap is facilitated, the workload of constructors is reduced, and the construction difficulty is reduced.

Description

Integral hoisting construction method for bridge bent cap framework and template
Technical Field
The invention relates to the technical field of bridge construction, in particular to a construction method for integrally hoisting a bridge capping beam framework and a template.
Background
At present, the bridge bent cap construction is generally built on the pier stud of being good and is carried out the support system earlier and is built, lay the bent cap die block again, it is fixed in the bent cap mould to hoist the skeleton hoist and mount well woven again, it is fixed to hoist all the other moulds one by one again, pour at last, current bent cap construction step is loaded down with trivial details, mould hoist and mount one by one is fixed and is built, waste time and energy, it has certain risk to carry out the mould equipment on the pier stud, dismantle the mould one by one again after pouring the completion, if not fixed well there is certain risk of falling during the dismantlement, not only damage the mould, still probably produce injury or destruction to constructor or object on every side.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a bridge bent cap framework and a construction method for integrally hoisting a template, and aims to solve the problems of complex installation and disassembly of the framework and the template and potential safety hazards in bent cap construction.
The invention provides a construction method for integrally hoisting a bridge capping beam framework and a template, which comprises the following steps:
the first step is as follows: weaving a bent cap framework;
the second step is that: assembling and fixing the bent cap mould;
the third step: putting the bent cap framework into a bent cap mould;
the fourth step: building a supporting device on the bridge pier stud;
the fifth step: cleaning corners at the upper ends of the piers;
and a sixth step: integrally fixing the bent cap framework and the die for hoisting;
the seventh step: after the hoisting is finished, fixing the die on the supporting device, and binding and fixing the bent cap framework;
eighth step: checking the fixation of the whole die and the framework, and pouring the cover beam;
the ninth step: and (4) demoulding the whole mould without dismounting, and hoisting the whole mould by using a hoisting tool to dismount the mould on the ground.
The supporting device is supported by a hoop supporting system.
The supporting device border of telling is provided with construction platform, conveniently pours the construction.
The invention has the beneficial effects that: the construction method is simple, the integral hoisting and dismounting can save the construction time of the bent cap, the risk caused by high-position assembling and disassembling can be effectively avoided, the construction of the bent cap is facilitated, the workload of constructors is reduced, and the construction difficulty is reduced.
Detailed Description
Example 1
The invention provides a construction method for integrally hoisting a bridge capping beam framework and a template, which comprises the following steps:
the first step is as follows: compiling a bent cap framework according to the size of the bent cap;
the second step is that: assembling and fixing the bent cap mould;
the third step: the bent cap framework is arranged in a bent cap mould for fixing;
the fourth step: building a supporting device on the bridge pier stud, and building a supporting frame through hoop support;
the fifth step: cleaning uneven corners of the upper end of the pier stud after pouring;
and a sixth step: integrally fixing the bent cap framework and the die for hoisting;
the seventh step: after the hoisting is finished, fixing the die on the supporting device, and binding and fixing the bent cap framework;
eighth step: checking the fixation of the whole die and the framework, and pouring the cover beam;
the ninth step: and (4) demoulding the whole mould without dismounting, and hoisting the whole mould by using a hoisting tool to dismount the mould on the ground.
The supporting device border of telling is provided with construction platform, conveniently pours the construction.
Example 2
The invention provides a construction method for integrally hoisting a bridge capping beam framework and a template, which comprises the following steps:
the first step is as follows: compiling a bent cap framework according to the size of the bent cap;
the second step is that: assembling and fixing the bent cap mould;
the third step: the bent cap framework is arranged in a bent cap mould for fixing;
the fourth step: building a supporting device on a bridge pier stud, building a supporting frame through a building frame support, and reserving a construction platform space at the edge;
the fifth step: cleaning uneven corners of the upper end of the pier stud after pouring;
and a sixth step: integrally fixing the bent cap framework and the die for hoisting;
the seventh step: after the hoisting is finished, fixing the die on the supporting device, and binding and fixing the bent cap framework;
eighth step: checking the fixation of the whole die and the framework, and pouring the cover beam;
the ninth step: and (4) demoulding the whole mould without dismounting, and hoisting the whole mould by using a hoisting tool to dismount the mould on the ground.
The construction safety platform is built at the edge of the supporting device, and pouring construction is facilitated.

Claims (3)

1. A construction method for integrally hoisting a bridge bent cap framework and a template is characterized by comprising the following steps: the method comprises the following steps:
the first step is as follows: weaving a bent cap framework;
the second step is that: assembling and fixing the bent cap mould;
the third step: putting the bent cap framework into a bent cap mould;
the fourth step: building a supporting device on the bridge pier stud;
the fifth step: cleaning corners at the upper ends of the piers;
and a sixth step: integrally fixing the bent cap framework and the die for hoisting;
the seventh step: after the hoisting is finished, fixing the die on the supporting device, and binding and fixing the bent cap framework;
eighth step: checking the fixation of the whole die and the framework, and pouring the cover beam;
the ninth step: and (4) demoulding the whole mould without dismounting, and hoisting the whole mould by using a hoisting tool to dismount the mould on the ground.
2. The integral hoisting construction method for the bridge capping beam framework and the template according to claim 1, characterized in that: the supporting device is supported by a hoop supporting system.
3. The integral hoisting construction method for the bridge capping beam framework and the template according to claim 1 or 2, which is characterized in that: the supporting device is provided with a construction platform at the edge.
CN202210049851.XA 2022-01-17 2022-01-17 Integral hoisting construction method for bridge bent cap framework and template Pending CN114263122A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210049851.XA CN114263122A (en) 2022-01-17 2022-01-17 Integral hoisting construction method for bridge bent cap framework and template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210049851.XA CN114263122A (en) 2022-01-17 2022-01-17 Integral hoisting construction method for bridge bent cap framework and template

Publications (1)

Publication Number Publication Date
CN114263122A true CN114263122A (en) 2022-04-01

Family

ID=80833218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210049851.XA Pending CN114263122A (en) 2022-01-17 2022-01-17 Integral hoisting construction method for bridge bent cap framework and template

Country Status (1)

Country Link
CN (1) CN114263122A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922143A (en) * 2010-07-02 2010-12-22 上海市第二市政工程有限公司 Construction method of bent cap
CN106120562A (en) * 2016-07-08 2016-11-16 杭州市市政工程集团有限公司 Overpass rod iron bracket bent cap support for shuttering integral hoisting construction method
CN108505448A (en) * 2018-04-30 2018-09-07 安徽省公路桥梁工程有限公司 Pier cap beam anchor ear girder steel template system and its construction method
CN110847044A (en) * 2019-11-15 2020-02-28 中交第二航务工程局有限公司 Semi-prefabricated assembled bent cap construction method
CN212128878U (en) * 2020-03-28 2020-12-11 中交路桥建设有限公司 Cylindrical pier capping beam construction bracket based on pin rod method
WO2021031354A1 (en) * 2019-08-20 2021-02-25 山东省路桥集团有限公司 Method for movable formwork passing through hole, and device for movable formwork passing through hole

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922143A (en) * 2010-07-02 2010-12-22 上海市第二市政工程有限公司 Construction method of bent cap
CN106120562A (en) * 2016-07-08 2016-11-16 杭州市市政工程集团有限公司 Overpass rod iron bracket bent cap support for shuttering integral hoisting construction method
CN108505448A (en) * 2018-04-30 2018-09-07 安徽省公路桥梁工程有限公司 Pier cap beam anchor ear girder steel template system and its construction method
WO2021031354A1 (en) * 2019-08-20 2021-02-25 山东省路桥集团有限公司 Method for movable formwork passing through hole, and device for movable formwork passing through hole
CN110847044A (en) * 2019-11-15 2020-02-28 中交第二航务工程局有限公司 Semi-prefabricated assembled bent cap construction method
CN212128878U (en) * 2020-03-28 2020-12-11 中交路桥建设有限公司 Cylindrical pier capping beam construction bracket based on pin rod method

Similar Documents

Publication Publication Date Title
CN106193588B (en) A kind of method pouring building post-cast strip and pour mould
CN202766972U (en) Circular pier column hoop
CN204298742U (en) For the supporting and protection structure of Bridge High-pier construction
JP2010037725A (en) Method for constructing column capital section of pc bridge
CN106013784A (en) Angle iron frame template and construction method
CN114263122A (en) Integral hoisting construction method for bridge bent cap framework and template
CN111910521A (en) Supporting and dismantling method for bent cap formwork support
CN102817322A (en) Shrinkable internal model without draw bar
JPH05280012A (en) Movable formwork process and device used therefor
CN205976472U (en) Pour mould of building post -cast strip
CN208858150U (en) A kind of close rib building roof mold
CN113512944A (en) Rigid frame bridge side span construction method using bracket and hanging basket
CN112095780A (en) Upper cover structure system applied to track operation line and implementation method thereof
CN108979133A (en) A kind of close rib building roof mold and application method
CN105839541B (en) Construction method and structure of No. 0 section non-welding bracket of rigid frame bridge
CN212077628U (en) Installation device for steel truss girder large-tonnage support in limited space
CN218712226U (en) Segment box girder prestress tensioning platform
CN218138750U (en) Hydraulic prefabricated cover beam bottom die with firstly-disassembled blocks
CN214939360U (en) Moving formwork for improving appearance quality of concrete box girder
CN219909302U (en) Post-cast strip supporting system
CN220079790U (en) Assembled railway overhauls platform concrete baffle
CN2175807Y (en) Shuttering early-removing chapiter
CN208965832U (en) A kind of floor construction of recyclable split heads
JP3831499B2 (en) Construction method of column head of PC cantilever bridge
CN206023512U (en) Stator inspection platform is supported and movable supporting legs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220401

RJ01 Rejection of invention patent application after publication