CN114232970B - Method for installing super high-rise self-elevating attached overhanging type interlayer material transfer platform - Google Patents
Method for installing super high-rise self-elevating attached overhanging type interlayer material transfer platform Download PDFInfo
- Publication number
- CN114232970B CN114232970B CN202111645737.5A CN202111645737A CN114232970B CN 114232970 B CN114232970 B CN 114232970B CN 202111645737 A CN202111645737 A CN 202111645737A CN 114232970 B CN114232970 B CN 114232970B
- Authority
- CN
- China
- Prior art keywords
- platform
- guide rail
- super high
- rise
- transfer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000463 material Substances 0.000 title claims abstract description 67
- 239000011229 interlayer Substances 0.000 title claims abstract description 51
- 238000000034 method Methods 0.000 title claims abstract description 46
- 230000009194 climbing Effects 0.000 claims abstract description 54
- 230000009471 action Effects 0.000 claims abstract description 4
- 230000005540 biological transmission Effects 0.000 claims description 62
- 229910000831 Steel Inorganic materials 0.000 claims description 32
- 239000010959 steel Substances 0.000 claims description 32
- 230000001012 protector Effects 0.000 claims description 12
- 230000007704 transition Effects 0.000 claims description 10
- 230000003028 elevating effect Effects 0.000 claims description 7
- 238000009434 installation Methods 0.000 abstract description 11
- 238000010586 diagram Methods 0.000 description 8
- 230000008569 process Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000009435 building construction Methods 0.000 description 2
- 239000004566 building material Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/003—Devices for storing material on the scaffold
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G2005/008—Hoisting devices specially adapted as part of a scaffold system
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Types And Forms Of Lifts (AREA)
Abstract
The invention provides a mounting method of a super high-rise self-elevating attached overhanging type interlayer material transfer platform, which is characterized in that a pair of vertically arranged brackets are arranged on the outer side of a super high-rise wall body; the first section and the second section of standard guide rail sections are sequentially installed and calibrated on the support; the platform frame is installed and is fixedly connected with the middle parts of the first section of standard guide rail sections of the two guide rails respectively; hoisting a platform plate, and installing the platform plate on the platform frame to form a lifting platform; installing the rest standard guide rail sections; a plurality of wall-attached systems are arranged at intervals on one side of the guide rail; the bracket is dismantled, and the whole body consisting of the guide rail, the lifting platform and the wall attaching system is hoisted, so that the wall attaching system is fixedly connected with the super high-rise wall; the lifting platform is provided with the driving climbing system and is operated and debugged, so that the lifting platform can move along the guide rail under the action of the driving climbing system, and the rapid and efficient installation of the super-high-rise self-lifting attached overhanging type interlayer material transfer platform is realized.
Description
Technical Field
The invention belongs to the technical field of building construction, and particularly relates to an installation method of a super high-rise self-elevating attached overhanging type interlayer material transfer platform.
Background
Currently, in the field of super high-rise building construction, 2 existing material transferring modes are generally available.
One is to use a gate material hoist between low floors to hoist building material for transfer between floors. The transportation platform of the elevator usually adopts a material lifting platform similar to that used in engineering construction, the lifting platform is powered by an oil cylinder and is transported up and down along a column guide rail, the lifting platform is formed by four columns serving as a vertical supporting structure, the bottom of each column is fixedly connected or bolted with the ground, and in addition, heavy weights are required to be distributed at the bottom of each column, so that the structural stability is maintained. The main problem of this kind of lift platform is that the steel consumption is big, and is with high costs, owing to receive door material lifting machine height restriction, can only transport building material between the low floor, and the suitability is low, and in addition, this kind of lift platform adopts the hydro-cylinder as actuating system, and the hydro-cylinder purchase cost is high, and whole lift platform cost is expensive.
The other is a traditional super high-rise material transfer platform, the material transfer work needs the cooperation of the tower crane to move up and down, and the tower crane can collide with a peripheral protection structure or has the safety problems of material scattering and the like in the frequent material transfer process; secondly, the tower crane is transferred the material and needs artifical fixed ligature and fixed buckle, inefficiency, and the construction site tower crane uses the coordination difficulty moreover.
Disclosure of Invention
The invention aims to invent a mounting method of a super high-rise self-elevating attached overhanging type interlayer material transfer platform, which can realize the rapid mounting of the super high-rise self-elevating attached overhanging type interlayer material transfer platform, and the steel consumption is saved and the cost is reduced by attaching a guide rail to a super high-rise wall; the motor driving system is adopted to drive the lifting platform to operate along the guide rail, so that the cost is low, the transportation efficiency is high, the operation is simple, and the safety is high.
In order to solve the technical problems, the invention provides the following technical scheme:
the method for installing the super high-rise self-elevating attached overhanging type interlayer material transfer platform comprises the following steps of:
step 1, arranging a pair of vertically arranged brackets on the outer side of an ultra-high-rise wall body;
step 2, respectively installing first sections of standard guide rail sections for forming the guide rail on corresponding brackets, and correcting the verticality of the guide rail, wherein each section of standard guide rail section comprises a stand column and a rack arranged on the stand column and extending along the axial direction of the stand column;
step 3, respectively installing second sections of standard guide rail sections for forming the guide rail on corresponding brackets, correcting the verticality of the guide rail, and connecting the second sections of standard guide rail sections to the upper ends of the first sections of standard guide rail sections;
step 4, installing a platform frame of the lifting platform, wherein the platform frame is of a rectangular structure formed by connecting four platform steel beams, and the platform frame is fixedly connected with the middle parts of the first section of standard guide rail sections of the two guide rails respectively;
step 5, hoisting a platform plate, namely installing the platform plate on the platform frame to form a lifting platform, wherein the platform plate is formed by assembling modularized steel plates in advance on the ground before hoisting and is additionally provided with guardrails;
step 6, repeating the steps 2 and 3, and installing the rest standard guide rail sections;
step 7, arranging a plurality of wall-attached systems at intervals along the axial direction of the guide rail on one side of the guide rail;
step 8, dismantling the bracket, hoisting the whole body composed of the guide rail, the lifting platform and the wall attaching system, and enabling the wall attaching system to be fixedly connected with the super high-rise wall;
and 9, installing a driving climbing system on the lifting platform, and operating and debugging to enable the lifting platform to move along the guide rail under the action of the driving climbing system.
Preferably, in the method for installing the super high-rise self-elevating attached overhanging type interlayer material transferring platform, the upright column is H-shaped steel, the driving climbing system comprises a motor driving box, a driving connecting rod, a front wheel and a back wheel, the front wheel is arranged on the elevating platform and props against the outer side of the flange, far away from the super high-rise wall, of the upright column, the back wheel is arranged on the motor driving box and props against the inner side of the flange, far away from the super high-rise wall, of the upright column, two ends of the driving connecting rod are respectively connected with the motor driving box and the elevating platform, the motor driving box comprises a driving box body, a motor and a first climbing gear, the motor and the first climbing gear are respectively arranged on the driving box body, and the first climbing gear is meshed with the rack.
Preferably, in the method for installing the super high-rise self-elevating attached overhanging type interlayer material transferring platform, a preformed hole is formed in the super high-rise wall corresponding to each floor, and the climbing system is driven to drive the elevating platform to move up and down along the guide rail, so that material transferring among all floors is achieved.
Preferably, in the method for installing the super high-rise self-elevating attaching overhanging type interlayer material transferring platform, the wall attaching systems are arranged at intervals along the height direction of the upright posts, the intervals between the wall attaching systems are kept consistent with the intervals between the floor plates, and the upright posts are fixed at the end parts of all floor plates of the super high-rise wall body through a plurality of wall attaching systems.
Preferably, in the method for installing the super high-rise self-elevating attached overhanging type interlayer material transfer platform, the wall attaching system comprises I-steel and a connecting end plate, one surface of the I-steel is welded with the upright post, the other surface of the I-steel is welded with the connecting end plate, and the connecting end plate is connected with the floor plate.
Preferably, in the method for installing the super high-rise self-elevating attached overhanging type interlayer material transfer platform, the elevating platform is connected with the driving climbing system through a plurality of pull rods, and a bottom support is arranged at the bottom of the platform frame.
Preferably, in the method for installing the superhigh-rise self-lifting attachment overhanging type interlayer material transfer platform, the motor driving box further comprises a transfer box, a plurality of first transmission shafts and a plurality of first transfer gears, the transfer box is arranged in the driving box body and is located in the middle of the driving box body, the number of the motors is more than two, the motors respectively transfer kinetic energy to the first transmission shafts on two sides through the transfer box, the first transmission shafts are respectively provided with the first transfer gears at the ends, far away from the transfer box, of the first transmission shafts, the first transmission shafts drive the first transfer gears to operate, the first transfer gears are meshed with the corresponding first climbing gears, the motors are arranged on the transfer box at equal intervals along the vertical direction, and the first transfer gears are arranged on the racks at equal intervals along the vertical direction.
Preferably, in the method for installing the superhigh-rise self-elevating attached overhanging type interlayer material transfer platform, the motor driving box further comprises a plurality of transition gears, an anti-falling device, two second transmission shafts, a second transmission gear and a second climbing gear, the anti-falling device is connected with the transfer case, the transfer case transmits kinetic energy of the anti-falling device to the second transmission shafts on two sides respectively, the second transmission gears are fixedly arranged at the ends, far away from the transfer case, of the second transmission shafts respectively, the second transmission gears are meshed with the second climbing gear, the transition gears are respectively arranged between the adjacent first transmission gears and the adjacent second transmission gears, and the second transmission gears are identical to the first transmission gears in size and shape and are arranged at equal intervals along the vertical direction.
Preferably, in the method for installing the super high-rise self-elevating attached overhanging type interlayer material transfer platform, the falling protector can be started when the descending speed exceeds the limit, so that the second transmission shafts at two sides of the transfer case are locked, thereby driving the second transmission gears to be locked, simultaneously, the second transmission gears lock the first climbing gear through the transition gear,
preferably, in the method for installing the superhigh-rise self-elevating attached overhanging type interlayer material transfer platform, the falling protector comprises a falling protector motor, a hall sensor for detecting falling speed and an intelligent control chip, when the hall sensor detects that the falling speed exceeds the limit, the intelligent control chip starts the falling protector motor, so that second transmission shafts on two sides of the distribution box are locked, and the second transmission gears are locked.
Compared with the prior art, the technical scheme disclosed by the invention has the following beneficial effects:
the invention provides a mounting method of a super high-rise self-elevating attached overhanging type interlayer material transfer platform, which is characterized in that a pair of vertically arranged brackets are arranged on the outer side of a super high-rise wall body; respectively installing a first section of standard guide rail section for forming the guide rail on a corresponding bracket, and correcting the verticality of the guide rail, wherein each section of standard guide rail section comprises a stand column and a rack arranged on the stand column and extending along the axial direction of the stand column; respectively installing second section standard guide rail sections for forming guide rails on corresponding brackets, correcting the verticality of the guide rails, and connecting the second section standard guide rail sections to the upper ends of the first section standard guide rail sections; the platform frame is a rectangular structure formed by connecting four platform steel beams, and is fixedly connected with the middle parts of the first section of standard guide rail sections of the two guide rails respectively; hoisting a platform plate, and installing the platform plate on the platform frame to form a lifting platform, wherein the platform plate is formed by assembling modularized steel plates on the ground in advance; the rest standard guide rail sections are installed; a plurality of wall attaching systems are arranged at one side of the guide rail along the axial direction of the guide rail at intervals; the bracket is dismantled, and the whole formed by the guide rail, the lifting platform and the wall attaching system is hoisted, so that the wall attaching system is fixedly connected with the super high-rise wall; the lifting platform is connected with the driving climbing system and operates and debugs, so that the rapid and efficient installation of the super-high-rise self-lifting attached overhanging type interlayer material transfer platform is realized; according to the super high-rise self-elevating attached overhanging type interlayer material transfer platform, two guide rails attached to a large super high-rise wall body are adopted as a guide device and a vertical support device, a counterweight is not required to be added at the bottom, the steel consumption is greatly reduced, and the cost is effectively saved; the lifting platform drives the climbing system to lift along the racks on the guide rails through the motor, and conveys materials to the designated positions, so that the cargo transportation function is realized.
In addition, the motor and the gear rack are used for driving the climbing system and the guide rail, so that the climbing system and the guide rail are low in price, real-time stopping in the lifting process can be realized, and the climbing system and the guide rail reach any height in the range of the guide rail, and have higher applicability; the platform plate of the lifting platform is formed by assembling modularized steel, the lifting platform is connected with a driving climbing system through a plurality of pull rods, lifting operation is achieved, the front wheel is arranged on the lifting platform and abuts against the outer side of a flange of a stand column far away from the super high-rise wall body, the back wheel is arranged on the motor driving box and abuts against the inner side of the flange of the stand column far away from the super high-rise wall body, one end of the lifting platform is tightly abutted against two sides of the flange of the stand column of the guide rail through the front wheel and the back wheel, the anti-overturning effect is achieved, and in addition, the front wheel is overhanging, steel consumption can be greatly saved, and the lifting platform has the characteristics of being rapid and efficient.
Drawings
Fig. 1 is a schematic structural diagram of a super high-rise self-elevating attachment overhanging type interlayer material transferring platform in the step 1 of the installation method.
Fig. 2 is a schematic structural diagram of the super high-rise self-elevating attachment overhanging type interlayer material transferring platform in the step 2 of the installation method.
Fig. 3 is a schematic structural diagram of the super high-rise self-elevating attachment overhanging type interlayer material transferring platform in the step 3 of the installation method.
Fig. 4 is a schematic structural diagram of the super high-rise self-elevating attachment overhanging type interlayer material transferring platform in the step 4 of the installation method.
Fig. 5 is a schematic structural diagram of the super high-rise self-elevating attachment overhanging type interlayer material transferring platform in the step 5 of the method.
Fig. 6 is a schematic structural diagram of the super high-rise self-elevating attachment overhanging type interlayer material transferring platform in the step 7 of the method.
Fig. 7 is a schematic structural diagram of the super high-rise self-elevating attachment overhanging type interlayer material transferring platform in the step 8 of the method.
Fig. 8 is a schematic structural diagram of the super high-rise self-elevating attachment overhanging type interlayer material transferring platform in the step 9 of the method.
Fig. 9 is a schematic structural view of a super high-rise self-elevating attached overhanging type interlayer material transferring platform.
Fig. 10 is a schematic view of the assembly of the rail and the drive climbing system.
Fig. 11 is a schematic structural view of the motor drive case.
Fig. 12 is a side view schematic of fig. 11.
Fig. 13 is a schematic top view of fig. 11.
Fig. 14 is a schematic perspective view of a super high-rise self-elevating attached overhanging type interlayer material transfer platform.
In the figure: 1-guide rail, 11-standard guide rail section, 111-stand, 112-rack, 2-wall attachment system, 21-I-steel, 22-connection end plate, 3-lifting platform, 31-guardrail, 32-pull rod, 33-bottom support, 4-drive climbing system, 41-motor drive box, 411-drive box body, 412-motor, 413-climbing gear, 414-transfer case, 415-first transmission shaft, 416-first transmission gear, 417-transition gear, 418-fall arrester, 419-second transmission shaft, 420-second transmission gear, 421-second climbing gear, 42-drive connecting rod, 43-front wheel, 44-back wheel, 5-super high-rise wall, 6-floor plate, 7-bracket, 8-transverse support.
Detailed Description
The invention is described in further detail below with reference to the drawings and the specific examples. The technical contents and features of the present invention will be described in detail below with reference to the attached drawings by way of the illustrated embodiments. It should be further noted that the drawings are in a very simplified form and are all to a non-precise scale, merely for convenience and clarity in aiding in the description of embodiments of the invention. For convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the drawings, but this should not be construed as a limitation of the technical scheme of the present invention.
Referring to fig. 1 to 14, the embodiment discloses a method for installing a super high-rise self-elevating attached overhanging type interlayer material transfer platform, which comprises the following steps:
step 1, arranging a pair of vertically arranged brackets 7 on the outer side of an ultra-high-rise wall body 5;
step 2, respectively installing first standard guide rail sections 11 for forming the guide rail 1 on corresponding brackets 7, and correcting the verticality of the guide rail 1, wherein each standard guide rail section 11 comprises a stand column 111 and a rack 112 which is arranged on the stand column 111 and extends along the axial direction of the stand column 111;
step 3, respectively installing second sections of standard guide rail sections 11 for forming the guide rail 1 on the corresponding brackets 7, correcting the verticality of the guide rail 1, and connecting the second sections of standard guide rail sections to the upper ends of the first sections of standard guide rail sections;
step 4, installing a platform frame, wherein the platform frame is of a rectangular structure formed by connecting four platform steel beams, and the platform frame is fixedly connected with the middle parts of the first section of standard guide rail sections of the two guide rails 1 respectively;
step 5, hoisting a platform plate, and mounting the platform plate on the platform frame to form a lifting platform 3, wherein the platform plate is formed by assembling modularized steel plates on the ground in advance;
step 6, repeating the steps 2 and 3, and installing the rest standard guide rail sections;
step 7, arranging a plurality of wall-attached systems 2 at intervals along the axial direction of the guide rail 1 on one side of the guide rail 1;
step 8, dismantling the bracket 7, hoisting the whole body composed of the guide rail 1, the lifting platform 3 and the wall-attached system 2, and enabling the wall-attached system 2 to be fixedly connected with the super high-rise wall 5;
and 9, installing a driving climbing system on the lifting platform, and operating and debugging to enable the lifting platform to move along the guide rail under the action of the driving climbing system 4.
The invention provides an installation method of a super high-rise self-elevating attached overhanging type interlayer material transfer platform, which is characterized in that a pair of vertically arranged brackets 7 are arranged on the outer side of a super high-rise wall body 5; the first section of standard guide rail sections for forming the guide rail 1 are respectively arranged on the corresponding brackets 7, the verticality of the guide rail 1 is corrected, and each section of standard guide rail sections comprises a stand column and a rack which is arranged on the stand column and extends along the axial direction of the stand column; respectively installing second sections of standard guide rail sections for forming the guide rails on corresponding brackets 7, correcting the verticality of the guide rail 1, and connecting the second sections of standard guide rail sections to the upper ends of the first sections of standard guide rail sections; the platform frame is a rectangular structure formed by connecting four platform steel beams, and is fixedly connected with the middle parts of the first section of standard guide rail sections of the two guide rails respectively; hoisting a platform plate, and installing the platform plate on the platform frame to form a lifting platform, wherein the platform plate is formed by assembling modularized steel plates on the ground in advance; the rest standard guide rail sections are installed; a plurality of wall attaching systems are arranged at one side of the guide rail along the axial direction of the guide rail at intervals; the bracket 7 is dismantled, and the whole body consisting of the guide rail, the platform frame, the lifting platform and the wall attaching system is hoisted, so that the wall attaching system is fixedly connected with the super high-rise wall; the lifting platform is connected with the driving climbing system and operates and debugs, so that the rapid and efficient installation of the super-high-rise self-lifting attached overhanging type interlayer material transfer platform is realized; according to the super high-rise self-elevating attached overhanging type interlayer material transfer platform, two guide rails attached to a large super high-rise wall body are adopted as a guide device and a vertical support device, a counterweight is not required to be added at the bottom, the steel consumption is greatly reduced, and the cost is effectively saved; the lifting platform drives the climbing system to lift along the racks on the guide rails through the motor, and conveys materials to the designated positions, so that the cargo transportation function is realized.
The invention provides a method for installing a super high-rise self-elevating attached overhanging type interlayer material transfer platform, which adopts a guide rail fixed on the outer side of a super high-rise wall body through a plurality of wall-attached systems as a guide device and a vertical supporting device of an elevating platform 3; the lifting platform 3 lifts and operates along the racks 112 on the attachment guide rail 11 by driving the climbing system 4 to convey materials to a designated position, so that a cargo transportation function is realized. The guide rail 11 of the guide rail is attached to the super high-rise wall body 5 without adding a counterweight at the bottom, so that the steel consumption is greatly reduced, and the cost is effectively saved; the climbing gear 413 is driven by the motor 412 to climb along the rack 112, so that the material is convenient to obtain, the price is low, the real-time stop in the lifting process can be realized, the lifting platform 3 can accurately reach any height within the range of the guide rail 11, and the applicability is high. The lifting platform 3 is connected with the driving climbing system 4 to realize lifting operation, one end of the lifting platform 3 is tightly propped against two sides of the flange of the upright 111 of the guide rail 11 through the front wheel 43 and the back wheel 44 to achieve the anti-overturning effect, and the other end of the lifting platform is overhanging, so that the steel consumption can be greatly reduced, the cost is reduced, and the lifting platform has the characteristics of quick installation, simplicity in operation and high-efficiency lifting.
Preferably, in the method for installing the super high-rise self-elevating attached overhanging type interlayer material transferring platform, the upright column 111 of the guide rail 11 is composed of H-shaped steel standard sections, the rack 112 is formed by assembling rack 112 standard sections, the guide rail 11 is formed by assembling H-shaped steel standard sections and rack 112 standard sections, and the arrangement of the guide rail 11 with any required height can be realized
Preferably, in the above-mentioned method for installing a super high-rise self-elevating attached overhanging type interlayer material transferring platform, the wall-attached systems 2 are arranged at intervals along the height direction of the upright posts 111, the spacing between the wall-attached systems 2 is consistent with the spacing between the floor boards 6, and the upright posts 111 are fixed at the end parts of each floor board 6 of the super high-rise wall 5 through a plurality of wall-attached systems 2. By keeping the spacing of the wall attachment systems 2 consistent with the spacing between the floor boards 6, efficient and stable connection with the floor boards 6 is facilitated.
Preferably, in the method for installing the super high-rise self-elevating attached overhanging type interlayer material transferring platform, the two guide rails 1 can be connected through a plurality of transverse supports 8, so that the overall stability of the super high-rise self-elevating attached overhanging type interlayer material transferring platform is enhanced.
Preferably, in the above-mentioned method for installing a super high-rise self-elevating attaching overhanging type interlayer material transferring platform, the wall attaching system 2 includes a i-beam 21 and a connecting end plate 22, one surface of the i-beam 21 is welded with the upright 111, the other surface is welded with the connecting end plate 22, and the connecting end plate 22 is connected with the floor board 6, so as to achieve the purpose of stably attaching the guide rail 11 to the super high-rise wall 5.
Preferably, in the method for installing the super high-rise self-lifting attachment overhanging type interlayer material transferring platform, the lifting platform 4 is connected with the driving climbing system through the plurality of pull rods 32, so that the lifting platform 3 can be driven to lift by the driving climbing system 4, and the lifting platform 3 can be prevented from overturning in a static state. The bottom of the lifting platform is provided with a bottom support 33. The bottom support 33 is disposed at the bottom of the lifting platform 3, and is used for supporting the lifting platform 3 when the lifting platform 3 is lowered to the ground, so as to maintain the stability of the whole system.
Preferably, in the above method for installing a super high-rise self-lifting attachment overhanging type interlayer material transferring platform, the motor driving box 41 further includes a transfer box 414, a plurality of first transmission shafts 415, and a plurality of first transfer gears 416, the transfer box 414 is disposed in the driving box 411 and is located in the middle of the driving box 411, the number of the motors 412 is more than two, kinetic energy is respectively transferred to the first transmission shafts 415 on two sides by the transfer box 414, the first transfer gears 416 are respectively disposed on the ends, far away from the transfer box 414, of the first transmission shafts 415, the first transmission shafts 415 drive the first transfer gears 416 to operate, and the first transfer gears 416 are meshed with the corresponding first climbing gears 413, so that the first climbing gears 413 climb along the racks 112.
In order to enable the motor driving box 41 to stably climb along the rack 112 and enable the rack 112 to be stressed uniformly, preferably, in the above-mentioned installation method of the super high-rise self-elevating attached overhanging type interlayer material transferring platform, the motors 412 are arranged on the transfer box 414 at equal intervals along the vertical direction, and the first transfer gears 416 are arranged on the rack 112 at equal intervals along the vertical direction.
Preferably, in the above-mentioned method for installing a super high-rise self-lifting and attaching overhanging type interlayer material transferring platform, the motor driving box 41 further includes a plurality of transition gears 417, a fall arrester 418, two second transmission shafts 419, a second transmission gear 420 and a second climbing gear 421, the fall arrester 418 is connected with the transfer case 414, the transfer case 414 transfers kinetic energy of the fall arrester 418 to the second transmission shafts 419 on two sides, the second transmission gears 420 are respectively fixed at ends of the second transmission shafts 419 far away from the transfer case 414, the second transmission gears 420 are meshed with the second climbing gear 421, the transition gears 417 are respectively arranged between the adjacent first transmission gears 416 and the second transmission gears 420, and the second transmission gears 420 are identical in size and shape with the first transmission gears 416 and are arranged at equal intervals along the vertical direction.
Preferably, in the above-mentioned method for installing a super high-rise self-lifting attachment overhanging type interlayer material transferring platform, the falling protector 418 may be started when the descending speed exceeds the limit, so that the second transmission shafts 419 on two sides of the transfer case 414 are locked, and thus the second transmission gears 420 are driven to be locked, and meanwhile, the second transmission gears 420 lock the first climbing gears 413 through the transition gears 417, so as to realize the falling protection function of the lifting platform 3. That is, when the lifting platform 3 falls out of control, the fall arrester 418 starts to work, and the transfer case 414 transfers kinetic energy to the second transfer gears 420 on both sides to lock the transfer case to stop rotating, so as to drive the transition gear 417 and the first climbing gear 413 on the upper part to stop rotating, thereby achieving the purpose of braking the lifting platform 3.
Preferably, in the above-mentioned method for installing a super high-rise self-elevating attached overhanging type interlayer material transferring platform, the falling protector 418 comprises a falling protector motor 412 (not shown), a hall sensor (not shown) for detecting a falling speed, and an intelligent control chip (not shown), when the hall sensor detects that the falling speed exceeds a limit, the signal is transmitted to the intelligent control chip, and the intelligent control chip starts the falling protector motor 412, so that the second transmission shafts 419 at two sides of the distribution box 414 are locked, and the second transmission gear 420 is locked.
The invention provides a method for installing an ultrahigh self-elevating attached overhanging type interlayer material transfer platform, which adopts two guide rails attached to a large-scale ultrahigh wall body as a guide device and a vertical support device; the lifting platform drives the climbing system to lift along the gear rack attached to the guide rail through the motor, the material is conveyed to the designated position, the cargo transportation function is realized, and the rack is also based on the modularized design and is formed by assembling standard sections. The two guide rails are attached to the super high-rise wall body, so that the counterweight is not required to be added at the bottom, the steel consumption is greatly reduced, and the cost is effectively saved; the motor and the gear rack are used for driving the climbing system and the guide rail, so that the climbing system and the guide rail are low in price, real-time stopping in the lifting process can be realized, any height in the range of the guide rail can be reached, and the climbing system and the guide rail have higher applicability; the platform plate of the lifting platform is formed by assembling modularized steel, the lifting platform is connected with a driving climbing system through a plurality of pull rods, lifting operation is achieved, the front wheel is arranged on the lifting platform and abuts against the outer side of a flange of a stand column far away from the super high-rise wall body, the back wheel is arranged on the motor driving box and abuts against the inner side of the flange of the stand column far away from the super high-rise wall body, one end of the lifting platform is tightly abutted against two sides of the flange of the stand column of the guide rail through the front wheel and the back wheel, the anti-overturning effect is achieved, and in addition, the front wheel is overhanging, steel consumption can be greatly saved, and the lifting platform has the characteristics of being rapid and efficient.
The above description is only illustrative of the preferred embodiments of the present invention and is not intended to limit the scope of the present invention, and any alterations and modifications made by those skilled in the art based on the above disclosure shall fall within the scope of the appended claims.
Claims (4)
1. The method for installing the super high-rise self-elevating attached overhanging type interlayer material transfer platform is characterized by comprising the following steps of:
step 1, arranging a pair of vertically arranged brackets on the outer side of an ultra-high-rise wall body;
step 2, respectively installing first sections of standard guide rail sections for forming the guide rail on corresponding brackets, and correcting the verticality of the guide rail, wherein each section of standard guide rail section comprises a stand column and a rack arranged on the stand column and extending along the axial direction of the stand column;
step 3, respectively installing second sections of standard guide rail sections for forming the guide rail on corresponding brackets, correcting the verticality of the guide rail, and connecting the second sections of standard guide rail sections to the upper ends of the first sections of standard guide rail sections;
step 4, installing a platform frame, wherein the platform frame is of a rectangular structure formed by connecting four platform steel beams, and the platform frame is fixedly connected with the middle parts of the first section of standard guide rail sections of the two guide rails respectively;
step 5, hoisting a platform plate, and mounting the platform plate on the platform frame to form a lifting platform, wherein the platform plate is formed by assembling modularized steel plates on the ground in advance;
step 6, repeating the steps 2 and 3, and installing the rest standard guide rail sections;
step 7, arranging a plurality of wall-attached systems at intervals along the axial direction of the guide rail on one side of the guide rail;
step 8, dismantling the bracket, hoisting the whole body composed of the guide rail, the lifting platform and the wall attaching system, and enabling the wall attaching system to be fixedly connected with the super high-rise wall;
step 9, a driving climbing system is installed on a lifting platform and operated and debugged, so that the lifting platform can move along a guide rail under the action of the driving climbing system, the upright column is H-shaped steel, the driving climbing system comprises a motor driving box, a driving connecting rod, a front wheel and a back wheel, the front wheel is arranged on the lifting platform and is propped against the outer side of a flange, far away from a super high-rise wall, of the upright column, the back wheel is arranged on the motor driving box and is propped against the inner side of the flange, far away from the super high-rise wall, of the upright column, two ends of the driving connecting rod are respectively connected with the motor driving box and the lifting platform, the motor driving box comprises a driving box body, a motor and a first climbing gear, and the motor and the first climbing gear are respectively arranged on the driving box body and meshed with the rack;
the motor driving box further comprises a transfer case, a plurality of first transmission shafts and a plurality of first transfer gears, wherein the transfer case is arranged in the driving box body and is positioned in the middle of the driving box body, the number of the motors is more than two, the motors respectively transfer kinetic energy to the first transmission shafts on the two sides through the transfer case, the first transfer gears are respectively arranged at the ends, far away from the transfer case, of the first transmission shafts, the first transmission shafts drive the first transfer gears to operate, the first transfer gears are meshed with the corresponding first climbing gears, the motors are arranged on the transfer case at equal intervals along the vertical direction, and the first transfer gears are arranged on racks at equal intervals along the vertical direction;
the motor driving box further comprises a plurality of transition gears, an anti-falling device, two second transmission shafts, a second transmission gear and a second climbing gear, wherein the anti-falling device is connected with the transfer box, the transfer box transmits kinetic energy of the anti-falling device to the second transmission shafts on two sides respectively, the second transmission gears are fixedly arranged at the ends, far away from the transfer box, of the second transmission shafts respectively, the second transmission gears are meshed with the second climbing gear, the transition gears are respectively arranged between adjacent first transmission gears and second transmission gears, and the second transmission gears are identical to the first transmission gears in size and shape and are arranged at equal intervals along the vertical direction;
the falling protector can be started when the falling speed exceeds the limit, so that the second transmission shafts on two sides of the transfer case are locked, the second transmission gear is driven to be locked, and meanwhile, the second transmission gear locks the first climbing gear through the transition gear;
the wall attaching systems are arranged at intervals along the height direction of the stand columns, the distance between the wall attaching systems and the distance between the floor plates are kept consistent, the stand columns are fixed at the end parts of all floor plates of the super high-rise wall body through a plurality of wall attaching systems, each wall attaching system comprises I-steel and a connecting end plate, one face of each I-steel is welded with the stand column, the other face of each I-steel is welded with the connecting end plate, and the connecting end plates are connected with the floor plates.
2. The method for installing the super high-rise self-elevating attached overhanging type interlayer material transferring platform according to claim 1, wherein a reserved hole is arranged on the super high-rise wall body corresponding to each floor, and the climbing system is driven to drive the elevating platform to move up and down along the guide rail, so that material transferring between the floors is realized.
3. The method for installing the super high-rise self-elevating attached overhanging type interlayer material transferring platform as claimed in claim 1, wherein the elevating platform is connected with the driving climbing system through a plurality of pull rods, and a bottom support is arranged at the bottom of the platform frame.
4. The method for installing the super high-rise self-elevating attached overhanging type interlayer material transfer platform according to claim 1, wherein the falling protector comprises a falling protector motor, a Hall sensor for detecting falling speed and an intelligent control chip, and when the Hall sensor detects that the falling speed exceeds the limit, the intelligent control chip starts the falling protector motor to lock a second transmission shaft on two sides of the gearbox, so that a second transmission gear is locked.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202111645737.5A CN114232970B (en) | 2021-12-30 | 2021-12-30 | Method for installing super high-rise self-elevating attached overhanging type interlayer material transfer platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202111645737.5A CN114232970B (en) | 2021-12-30 | 2021-12-30 | Method for installing super high-rise self-elevating attached overhanging type interlayer material transfer platform |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN114232970A CN114232970A (en) | 2022-03-25 |
| CN114232970B true CN114232970B (en) | 2023-10-24 |
Family
ID=80744466
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202111645737.5A Active CN114232970B (en) | 2021-12-30 | 2021-12-30 | Method for installing super high-rise self-elevating attached overhanging type interlayer material transfer platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN114232970B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114291705B (en) * | 2021-12-30 | 2024-04-02 | 上海建工集团股份有限公司 | Super high-rise self-elevating attached overhanging type interlayer material transfer platform |
| CN116005938A (en) * | 2022-12-12 | 2023-04-25 | 中国水利水电第十二工程局有限公司 | Core wall construction device for hydraulic engineering |
| CN118390822A (en) * | 2024-03-13 | 2024-07-26 | 中建中新建设工程有限公司 | Electric early warning self-climbing unloading platform |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104060812A (en) * | 2014-07-03 | 2014-09-24 | 武汉天蝎建筑装备有限公司 | Conveyance type automatically climbing material platform |
| CN205558308U (en) * | 2016-03-30 | 2016-09-07 | 中建二局第二建筑工程有限公司 | Integrated form platform of unloading |
| CN107327149A (en) * | 2017-08-10 | 2017-11-07 | 广西建工集团建筑机械制造有限责任公司 | A kind of Liftable type discharging platform |
| CN211817864U (en) * | 2020-03-19 | 2020-10-30 | 中国建筑第二工程局有限公司 | Attached lifting scaffold |
| CN212743427U (en) * | 2020-06-03 | 2021-03-19 | 中建一局集团第五建筑有限公司 | A climbing unloading platform |
| CN112942790A (en) * | 2021-04-08 | 2021-06-11 | 中国华西企业有限公司 | Cantilever climbing device and construction method of cantilever structure |
| WO2021196927A1 (en) * | 2020-03-31 | 2021-10-07 | 中建三局集团有限公司 | Rail and frame integrated supporting and jacking system for integrated platform and jacking method therefor |
-
2021
- 2021-12-30 CN CN202111645737.5A patent/CN114232970B/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104060812A (en) * | 2014-07-03 | 2014-09-24 | 武汉天蝎建筑装备有限公司 | Conveyance type automatically climbing material platform |
| CN205558308U (en) * | 2016-03-30 | 2016-09-07 | 中建二局第二建筑工程有限公司 | Integrated form platform of unloading |
| CN107327149A (en) * | 2017-08-10 | 2017-11-07 | 广西建工集团建筑机械制造有限责任公司 | A kind of Liftable type discharging platform |
| CN211817864U (en) * | 2020-03-19 | 2020-10-30 | 中国建筑第二工程局有限公司 | Attached lifting scaffold |
| WO2021196927A1 (en) * | 2020-03-31 | 2021-10-07 | 中建三局集团有限公司 | Rail and frame integrated supporting and jacking system for integrated platform and jacking method therefor |
| CN212743427U (en) * | 2020-06-03 | 2021-03-19 | 中建一局集团第五建筑有限公司 | A climbing unloading platform |
| CN112942790A (en) * | 2021-04-08 | 2021-06-11 | 中国华西企业有限公司 | Cantilever climbing device and construction method of cantilever structure |
Also Published As
| Publication number | Publication date |
|---|---|
| CN114232970A (en) | 2022-03-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110606437B (en) | Walking type small electric hoist suitable for transferring materials between floors of reverse construction method | |
| CN201679222U (en) | Double mast climbing work platform | |
| CN211524016U (en) | Double-working-surface guide frame climbing type working platform and system | |
| CN114232970A (en) | Installation method of super high-rise self-lifting attached overhanging type interlayer material transfer platform | |
| CN108190757A (en) | A kind of bylinder brace type steel platform and tower crane integral jacking device and its jacking method | |
| CN114291705B (en) | Super high-rise self-elevating attached overhanging type interlayer material transfer platform | |
| CN104847098A (en) | Multi-guide-rail attachment type electric ascending and descending scaffold | |
| CN113494127A (en) | Construction method for layered lifting of large-span open-web corridor steel platform | |
| US3726053A (en) | Method and apparatus for erecting modular high-rise building | |
| CN220203366U (en) | Rail electric hanging basket device | |
| CN112523520B (en) | Construction method of lifting protection platform for prefabricated building | |
| CN114436100B (en) | Super high-rise self-lifting attached overhanging type interlayer material transferring method | |
| CN219196727U (en) | Simple assembling bracket for high formwork | |
| CN210764005U (en) | Walking type small electric elevator suitable for transferring materials between floors by reverse construction method | |
| CN113668401B (en) | Hoisting process based on installation and transportation platform on long-span bridge pier | |
| CN223018199U (en) | A detachable transport device and feeding system | |
| CN219031629U (en) | Lifting equipment for indoor plate installation | |
| JPH08333898A (en) | Stand for vertical and horizontal transportation of building blocks, etc. | |
| CN210366717U (en) | Be applied to console mode and from climbing formula whole construction work platform | |
| CN220565730U (en) | Guide rail type discharging device | |
| CN223577531U (en) | Low-gravity-center screw type intelligent lifting working platform | |
| CN216641362U (en) | Self-lifting scaffold construction platform | |
| CN207392766U (en) | A kind of hoistway module assembling system | |
| CN219448895U (en) | Emergency rescue device for rapid personnel lifting in ultra-deep vertical shaft | |
| CN202787931U (en) | Driving structure of van-type protected automatic lifting construction platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |