CN114198802B - Heating system and method of low-pressure cylinder zero-output coupling absorption heat pump - Google Patents

Heating system and method of low-pressure cylinder zero-output coupling absorption heat pump Download PDF

Info

Publication number
CN114198802B
CN114198802B CN202111520268.4A CN202111520268A CN114198802B CN 114198802 B CN114198802 B CN 114198802B CN 202111520268 A CN202111520268 A CN 202111520268A CN 114198802 B CN114198802 B CN 114198802B
Authority
CN
China
Prior art keywords
steam turbine
low
heat
heater
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111520268.4A
Other languages
Chinese (zh)
Other versions
CN114198802A (en
Inventor
马汀山
吕凯
王妍
居文平
程东涛
许朋江
石慧
张建元
薛朝囡
邓佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Thermal Power Research Institute Co Ltd
Xian Xire Energy Saving Technology Co Ltd
Original Assignee
Xian Thermal Power Research Institute Co Ltd
Xian Xire Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Thermal Power Research Institute Co Ltd, Xian Xire Energy Saving Technology Co Ltd filed Critical Xian Thermal Power Research Institute Co Ltd
Priority to CN202111520268.4A priority Critical patent/CN114198802B/en
Publication of CN114198802A publication Critical patent/CN114198802A/en
Application granted granted Critical
Publication of CN114198802B publication Critical patent/CN114198802B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D15/00Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
    • F01D15/10Adaptations for driving, or combinations with, electric generators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D1/00Feed-water heaters, i.e. economisers or like preheaters
    • F22D1/50Feed-water heaters, i.e. economisers or like preheaters incorporating thermal de-aeration of feed-water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D11/00Feed-water supply not provided for in other main groups
    • F22D11/02Arrangements of feed-water pumps
    • F22D11/06Arrangements of feed-water pumps for returning condensate to boiler
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B30/00Heat pumps
    • F25B30/04Heat pumps of the sorption type
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/14Combined heat and power generation [CHP]

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The invention discloses a heating system and a heating method of a low-pressure cylinder zero-output coupling absorption heat pump.A return water of a heat supply network and a water supply of the heat supply network are firstly preliminarily heated in the absorption heat pump and then divided into two parts, one part of the return water of the heat supply network and the water supply of the heat supply network are heated by a steam exhaust heater of a small steam turbine, the other part of the return water of the heat supply network and the water supply of the heat supply network are heated by a heat supply network heater and then converged to supply heat to the outside; a condensation water tank is arranged in front of a deaerator of the extraction condensing unit, condensation water is provided for the extraction condensing unit and the low-pressure cylinder zero-output unit, and the condensation water of the extraction condensing unit and the low-pressure cylinder zero-output unit is heated by a low-pressure heater of the extraction condensing unit. The invention utilizes the low-pressure heater of the extraction condensing unit to heat the condensed water of the low-pressure cylinder zero-output unit, solves the heating problem of the condensed water of the low-pressure cylinder zero-output unit, reasonably utilizes the waste heat of the system by reasonably distributing heating heat sources in different stages through a heat supply network, has higher energy utilization rate of the unit, meets the water supply temperature of the heat supply network required in different heat supply periods by adjusting the heat load of the absorption heat pump and the steam extraction quantity of the heat supply network heater, and has operation flexibility.

Description

一种低压缸零出力耦合吸收式热泵的供热系统及方法A heating system and method for a low-pressure cylinder zero-output coupled absorption heat pump

技术领域technical field

本发明属于热电联产领域,涉及一种低压缸零出力耦合吸收式热泵的供热系统及方法。The invention belongs to the field of cogeneration of heat and power, and relates to a heat supply system and method for a low-pressure cylinder zero-output coupled absorption heat pump.

背景技术Background technique

目前热电联产机组多采用抽凝式汽轮机、背压式汽轮机或者使凝器式汽轮机在供热工况下提高背压运行,抽汽供热机组与高背压供热机组的电热负荷运行域的特点具有一般普适性,其他机组的电热负荷运行域也会有类似特点,某300MW抽凝式机组与某300MW高背压机组热电负荷特性如图1所示。高背压机组的电负荷调节范围非常小,而抽凝机组在热负荷较高时,电负荷调节范围也逐渐降低;低压缸零出力机组电热特性如图2所示,低压缸零出力改造后,机组的热负荷调节范围增加,电负荷调节范围也随之增加,可以满足机组的灵活调峰需求;为了满足机组供热的同时兼具灵活调峰能力,也解决低压缸零出力机组凝结水加热问题,提出一种低压缸零出力耦合吸收式热泵的供热系统及方法。At present, cogeneration units mostly use extraction condensing turbines, backpressure turbines, or condenser turbines to increase backpressure operation under heating conditions. The characteristics are generally applicable, and the electrothermal load operating domain of other units will also have similar characteristics. The thermal and electrical load characteristics of a 300MW extraction condensing unit and a 300MW high back pressure unit are shown in Figure 1. The electrical load adjustment range of the high back pressure unit is very small, and the electrical load adjustment range of the extraction condensing unit is gradually reduced when the heat load is high; Finally, the thermal load adjustment range of the unit increases, and the electrical load adjustment range also increases accordingly, which can meet the flexible peak regulation requirements of the unit; in order to meet the heat supply of the unit and have flexible peak regulation capabilities, it also solves the problem of low-pressure cylinder zero output unit condensation To solve the problem of water heating, a heating system and method for low-pressure cylinder zero output coupling absorption heat pump are proposed.

发明内容Contents of the invention

本发明的目的在于解决现有技术中的问题,提供一种低压缸零出力耦合吸收式热泵的供热系统及方法。The purpose of the present invention is to solve the problems in the prior art, and provide a heat supply system and method for a low-pressure cylinder zero output coupling absorption heat pump.

为达到上述目的,本发明采用以下技术方案予以实现:In order to achieve the above object, the present invention adopts the following technical solutions to achieve:

一种低压缸零出力耦合吸收式热泵的供热系统,包括:A low-pressure cylinder zero output coupled absorption heat pump heating system, comprising:

第一热电联产机组,所述第一热电联产机组包括第一锅炉以及第一汽轮机组;第一汽轮机组包括依次与第一锅炉相连的第一高压汽轮机、第一中压汽轮机和第一低压汽轮机;The first heat and power cogeneration unit, the first heat and power cogeneration unit includes a first boiler and a first steam turbine unit; the first steam turbine unit includes a first high-pressure steam turbine, a first medium-pressure steam turbine and a first steam turbine connected to the first boiler in sequence low pressure steam turbine;

第一中压汽轮机的排汽端分别与第一低压汽轮机的入口和第一除氧器的第一入口相连;The exhaust end of the first medium-pressure steam turbine is respectively connected with the inlet of the first low-pressure steam turbine and the first inlet of the first deaerator;

第一低压汽轮机的排汽端与第一凝汽器的热侧工质入口相连,第一凝汽器的热侧工质出口经第一低压加热器连接至凝结水箱的第一入口,凝结水箱的第一出口连接第一除氧器的第二入口;第一除氧器的出口通过第一高压加热器与第一锅炉相连;The exhaust end of the first low-pressure steam turbine is connected to the hot-side working medium inlet of the first condenser, and the hot-side working medium outlet of the first condenser is connected to the first inlet of the condensate tank through the first low-pressure heater, and the condensate tank The first outlet of the first deaerator is connected to the second inlet of the first deaerator; the outlet of the first deaerator is connected to the first boiler through the first high-pressure heater;

第二热电联产机组,所述第二热电联产机组包括第二锅炉以及第二汽轮机组;第二汽轮机组包括依次与第二锅炉相连的第二高压汽轮机、第二中压汽轮机和第二低压汽轮机;The second heat and power cogeneration unit, the second heat and power cogeneration unit includes a second boiler and a second steam turbine unit; the second steam turbine unit includes a second high-pressure steam turbine, a second medium-pressure steam turbine and a second steam turbine connected to the second boiler in sequence low pressure steam turbine;

第二中压汽轮机的排汽端分别与第二低压汽轮机的入口、第二除氧器的第一入口、吸收式热泵的热源工质入口、热网循环水泵小汽机的入口以及热网加热器的热侧工质入口相连;The exhaust end of the second medium-pressure steam turbine is connected to the inlet of the second low-pressure steam turbine, the first inlet of the second deaerator, the heat source working medium inlet of the absorption heat pump, the inlet of the small steam turbine of the heat network circulating water pump, and the heat network heater The working fluid inlet on the hot side is connected;

第二低压汽轮机的排汽端与第二凝汽器的热侧工质入口相连,第二凝汽器的热侧工质出口与第一凝汽器的热井相连;第二除氧器的第二入口与凝结水箱的第二出口相连;第二除氧器的出口通过第二高压加热器与第二锅炉相连;The exhaust end of the second low-pressure steam turbine is connected with the hot-side working medium inlet of the second condenser, and the hot-side working medium outlet of the second condenser is connected with the hot well of the first condenser; the second deaerator The second inlet is connected with the second outlet of the condensate tank; the outlet of the second deaerator is connected with the second boiler through the second high pressure heater;

吸收式热泵,所述吸收式热泵的热源工质出口与凝结水箱的第二入口相连;所述吸收式热泵的被加热工质入口输入热网回水和热网补水,被加热工质出口一路与小汽机乏汽加热器冷侧工质入口相连,另一路与热网加热器冷侧工质入口相连;Absorption heat pump, the heat source working medium outlet of the absorption heat pump is connected to the second inlet of the condensate tank; the heated working medium inlet of the absorption heat pump is input into the heat network return water and the heat network replenishment water, and the heated working medium outlet is all the way It is connected to the cold side working medium inlet of the exhaust steam heater of the small steam turbine, and the other is connected to the cold side working medium inlet of the heat network heater;

热网加热器和小汽机乏汽加热器的热侧工质出口均连接至第一凝汽器的热井,冷侧工质出口均输出热网供水;The hot-side working medium outlets of the heating network heater and the exhaust steam heater of the small steam turbine are connected to the hot well of the first condenser, and the cold-side working medium outlets output the heating network water supply;

热网循环水泵小汽机热侧工质出口与小汽机乏汽加热器热侧工质入口相连。The hot side working medium outlet of the small steam turbine of the heat network circulating water pump is connected with the hot side working medium inlet of the exhaust steam heater of the small steam turbine.

本发明进一步的改进在于:The further improvement of the present invention is:

所述第一锅炉包括第一锅炉加热器和第一锅炉再热器,第一锅炉加热器的出口连接第一高压汽轮机的入口,第一高压汽轮机的出口连接第一锅炉再热器的入口,第一锅炉再热器的出口连接第一中压汽轮机的入口。The first boiler includes a first boiler heater and a first boiler reheater, the outlet of the first boiler heater is connected to the inlet of the first high-pressure steam turbine, and the outlet of the first high-pressure steam turbine is connected to the inlet of the first boiler reheater, The outlet of the first boiler reheater is connected to the inlet of the first intermediate pressure steam turbine.

所述第一高压汽轮机的抽汽端与第一高压加热器的热侧工质入口相连;第一低压汽轮机的抽汽端与第一低压加热器的热侧工质入口相连。The steam extraction end of the first high-pressure steam turbine is connected with the hot-side working medium inlet of the first high-pressure heater; the steam extraction end of the first low-pressure steam turbine is connected with the hot-side working medium inlet of the first low-pressure heater.

所述第一凝汽器和第一低压加热器之间设置有第一凝结水泵;第一除氧器和第一高压加热器之间设置有第一给水泵。A first condensate pump is arranged between the first condenser and the first low-pressure heater; a first feedwater pump is arranged between the first deaerator and the first high-pressure heater.

所述第二锅炉包括第二锅炉加热器和第二锅炉再热器,第二锅炉加热器的出口连接第二高压汽轮机的入口,第二高压汽轮机的出口连接第二锅炉再热器的入口,第二锅炉再热器的出口连接第二中压汽轮机的入口。The second boiler includes a second boiler heater and a second boiler reheater, the outlet of the second boiler heater is connected to the inlet of the second high-pressure steam turbine, and the outlet of the second high-pressure steam turbine is connected to the inlet of the second boiler reheater, The outlet of the second boiler reheater is connected to the inlet of the second intermediate pressure steam turbine.

所述第二高压汽轮机的抽汽端与第二高压加热器的热侧工质入口相连。The steam extraction end of the second high-pressure steam turbine is connected to the hot-side working fluid inlet of the second high-pressure heater.

所述第二凝汽器和板式换热器之间设置有第二凝结水泵;第二除氧器和第二高压加热器之间设置有第二给水泵。A second condensate pump is arranged between the second condenser and the plate heat exchanger; a second feedwater pump is arranged between the second deaerator and the second high-pressure heater.

热网回水与热网补水汇输入至热网循环水泵的入口,热网循环水泵连接吸收式热泵的被加热工质入口;热网循环水泵小汽机驱动热网循环水泵为热网水加压。The heating network return water and heating network make-up water sink are input to the inlet of the heating network circulating water pump, and the heating network circulating water pump is connected to the heated working medium inlet of the absorption heat pump; the small steam turbine of the heating network circulating water pump drives the heating network circulating water pump to pressurize the heating network water .

所述第一高压汽轮机、第一中压汽轮机和第一低压汽轮机共同带动第一发电机转动,对外输出电能;第二高压汽轮机、第二中压汽轮机和第二低压汽轮机共同带动第二发电机转动,对外输出电能。The first high-pressure steam turbine, the first medium-pressure steam turbine and the first low-pressure steam turbine jointly drive the first generator to rotate and output electric energy to the outside; the second high-pressure steam turbine, the second medium-pressure steam turbine and the second low-pressure steam turbine jointly drive the second generator Rotate to output electric energy to the outside.

一种低压缸零出力耦合吸收式热泵的供热方法,包括以下步骤:A heat supply method for a low-pressure cylinder zero-output coupled absorption heat pump, comprising the following steps:

将第二中压汽轮机出口工质分流,第一路工质入第二低压汽轮机,用于防止第二低压汽轮机叶片过热,进入第二低压汽轮机的工质质量流量占锅炉最大出力工况下工质质量流量的1-3%,经过第二低压汽轮机后进入第二凝汽器;The working fluid at the outlet of the second medium-pressure steam turbine is divided, and the first channel of working fluid enters the second low-pressure steam turbine to prevent the blades of the second low-pressure steam turbine from overheating. 1-3% of the mass flow rate enters the second condenser after passing through the second low-pressure steam turbine;

第二路工质作为驱动蒸汽进入热网循环水泵小汽机,由热网循环水泵小汽机驱动热网循环水泵为热网水加压,热网循环水泵小汽机的乏汽进入小汽机乏汽加热器继续放热,最后汇入第一凝汽器;The second working medium is used as driving steam to enter the small steam turbine of the heating network circulating water pump, and the heating network circulating water pump is driven by the small steam turbine of the heating network circulating water pump to pressurize the heating network water, and the exhaust steam of the small steam turbine of the heating network circulating water pump enters the exhaust steam heating of the small steam turbine The condenser continues to release heat, and finally enters the first condenser;

第三路工质进入吸收式热泵的热侧工质入口,作为吸收式热泵的驱动热源,驱动吸收式热泵回收冷源损失,用于初步加热热网回水和热网补水;The third working medium enters the hot side working medium inlet of the absorption heat pump, and serves as the driving heat source of the absorption heat pump, drives the absorption heat pump to recover the loss of the cold source, and is used for preliminary heating of the return water of the heating network and replenishment of the heating network;

第四路工质进入热网加热器,用于加热热网循环水,放热之后汇集至第一凝汽器的热井;The fourth working medium enters the heating network heater, which is used to heat the circulating water of the heating network, and after releasing heat, it is collected into the hot well of the first condenser;

热网加热器的热侧工质和小汽机乏汽加热器的热侧工质放热之后均汇至第一凝汽器的热井与第一凝汽器产生的凝结水汇合,并由第一低压汽轮机的抽汽进行加热,在凝结水箱中根据需求分流进入第一除氧器和第二除氧器中。The working medium on the hot side of the heat network heater and the working medium on the hot side of the exhaust steam heater of the small steam turbine will both flow to the hot well of the first condenser after exothermic heat, join with the condensed water produced by the first condenser, and be fed by the second The extraction steam of a low-pressure steam turbine is heated, and in the condensed water tank, it is divided into the first deaerator and the second deaerator according to demand.

与现有技术相比,本发明具有以下有益效果:Compared with the prior art, the present invention has the following beneficial effects:

本发明第一热电联产机组为抽凝机组,第二热电联产机组为低压缸零出力机组,利用低压缸零出力机组的中排抽汽驱动吸收式热泵及热网循环水泵小汽机,符合能量梯级利用原则,而且低压缸零出力机组电热负荷调节范围广,可以满足灵活调峰需求;本发明采用吸收式热泵回收纯凝机组的冷端余热,能量利用率高,热网水加热分为两个过程,符合温度匹配,能级匹配,利用较低温度的热量满足供热需求,显著降低机组的能耗;低压缸零出力机组凝结水及热网加热器热侧工质出口以及小汽机乏汽加热器热侧工质出口与抽凝机组凝汽器热井相连通,利用抽凝机组低压加热器加热低压缸零出力机组凝结水,解决了低压缸零出力机组凝结水加热问题。The first combined heat and power unit of the present invention is a condensing extraction unit, and the second combined heat and power unit is a low-pressure cylinder zero-output unit, which uses the middle exhaust steam extraction of the low-pressure cylinder zero-output unit to drive the absorption heat pump and the heat network circulating water pump. The principle of energy cascade utilization, and the low-pressure cylinder zero-output unit has a wide range of electric heating load adjustment, which can meet the needs of flexible peak regulation; the invention adopts the absorption heat pump to recover the waste heat at the cold end of the pure condensing unit, and the energy utilization rate is high. The water heating of the heating network is divided into The two processes conform to temperature matching and energy level matching, using heat at a lower temperature to meet the heating demand and significantly reducing the energy consumption of the unit; the condensate water of the low-pressure cylinder zero-output unit and the outlet of the working medium on the hot side of the heating network heater and the small steam turbine The working medium outlet on the hot side of the exhaust steam heater is connected to the hot well of the condenser of the extraction condensing unit, and the low-pressure heater of the extraction condensing unit is used to heat the condensate of the zero-output unit of the low-pressure cylinder, which solves the problem of heating the condensate of the zero-output unit of the low-pressure cylinder.

本发明耦合低压缸零出力机组和吸收式热泵,同时为用户提供热、电两种能源。通过抽凝机组冷端-低压缸零出力机组-吸收式热泵过程的耦合优化,本发明可大幅度提高燃煤机组的能量利用率。本发明将热网回水加热过程分为2个阶段:先在吸收式热泵中进行初步加热,之后分流为两部分,一部分进入小汽机乏汽加热器利用热网循环水泵小汽机乏汽进行加热,另一部分进入热网加热器利用低压缸零出力机组的中排抽汽进行加热,之后再汇合对外进行供热,满足热网供热需求;在抽凝机组除氧器之前设置凝结水箱,为抽凝机组和低压缸零出力机组提供凝结水,低压缸零出力机组凝结水汇合至抽凝机组凝汽器热井,利用抽凝机组低压加热器进行加热,之后再汇入凝结水箱。低压缸零出力机组电负荷调节能力强,可以满足灵活调峰需求,系统利用抽凝机组低压加热器加热低压缸零出力机组的凝结水,解决了低压缸零出力机组凝结水加热问题,利用吸收式热泵回收抽凝机组冷端余热并初步加热热网水,通过合理热网水分配不同阶段加热热源,合理利用系统余热,机组的能量利用率较高,通过调整吸收式热泵热负荷以及热网加热器抽汽量,满足不同供热期所需热网供水温度,具有运行灵活性。The invention couples the low-pressure cylinder zero-output unit and the absorption heat pump, and simultaneously provides users with two energy sources of heat and electricity. Through the coupling optimization of the cold end of the condensing unit-the low-pressure cylinder zero-output unit-absorption heat pump process, the invention can greatly improve the energy utilization rate of the coal-fired unit. The invention divides the heating process of the heating network return water into two stages: firstly, it conducts preliminary heating in the absorption heat pump, and then divides the flow into two parts, and one part enters the exhaust steam of the small steam turbine. , the other part enters the heat network heater and uses the mid-row exhaust steam of the low-pressure cylinder zero-output unit for heating, and then converges to supply heat to the outside to meet the heating demand of the heat network; set up a condensate tank before the deaerator of the condensing unit to The condensing unit and low-pressure cylinder zero-output unit provide condensed water, and the condensed water of the low-pressure cylinder zero-output unit merges into the hot well of the condenser of the condensing unit, is heated by the low-pressure heater of the condensing unit, and then flows into the condensate tank. The low-pressure cylinder zero-output unit has a strong electrical load adjustment capability, which can meet the needs of flexible peak regulation. The system uses the low-pressure heater of the condensing unit to heat the condensate of the low-pressure cylinder zero-output unit, which solves the problem of heating the condensate of the low-pressure cylinder zero-output unit. The heat pump recovers the waste heat at the cold end of the condensing unit and initially heats the water in the heating network. By distributing the water in the heating network reasonably in different stages to heat the heat source, the waste heat in the system is rationally utilized, and the energy utilization rate of the unit is high. By adjusting the heat load of the absorption heat pump and the heating network The steam extraction capacity of the heater can meet the water supply temperature of the heating network required in different heating periods, and it has operational flexibility.

附图说明Description of drawings

为了更清楚的说明本发明实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本发明的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present invention, and thus It should be regarded as a limitation on the scope, and those skilled in the art can also obtain other related drawings based on these drawings without creative work.

图1为常规抽凝机组与高背压机组电热负荷特性对比图,其中(a)为某300MW抽凝机组电热负荷特性图,(b)为某300MW高背压机组电热负荷特性图。Figure 1 is a comparison diagram of the electrothermal load characteristics of a conventional condensing unit and a high back pressure unit, in which (a) is a characteristic diagram of the electrothermal load of a 300MW condensing unit, and (b) is a characteristic diagram of the electrothermal load of a 300MW high backpressure unit.

图2为低压缸零出力机组热电负荷特性图。Figure 2 is the thermoelectric load characteristic diagram of the low-pressure cylinder zero output unit.

图3为本发明低压缸零出力耦合吸收式热泵的供热系统的示意图。Fig. 3 is a schematic diagram of a heat supply system of a low-pressure cylinder coupled with an absorption heat pump according to the present invention.

其中:1为第一锅炉,1-1为第一锅炉加热器,1-2为第一锅炉再热器,2为第一高压汽轮机,3为第一中压汽轮机,4为第一低压汽轮机,5为第一凝汽器,6为第一凝结水泵,7为第一低压加热器,8为第一除氧器,9为第一给水泵,10为第一高压加热器,11为第一发电机,12为第二锅炉,12-1为第二锅炉加热器,12-2为第二锅炉再热器,13为第二高压汽轮机,14为第二中压汽轮机,15为第二低压汽轮机,16为第二凝汽器,17为第二凝结水泵,18为第二除氧器,19为第二给水泵,20为第二高压加热器,21为第二发电机,22为热网加热器,23为凝结水箱,24为吸收式热泵,25为热网循环水泵小汽机,26为热网循环水泵,27为小汽机乏汽加热器。Among them: 1 is the first boiler, 1-1 is the first boiler heater, 1-2 is the first boiler reheater, 2 is the first high-pressure steam turbine, 3 is the first medium-pressure steam turbine, 4 is the first low-pressure steam turbine , 5 is the first condenser, 6 is the first condensate pump, 7 is the first low pressure heater, 8 is the first deaerator, 9 is the first feed water pump, 10 is the first high pressure heater, 11 is the first A generator, 12 is the second boiler, 12-1 is the second boiler heater, 12-2 is the second boiler reheater, 13 is the second high pressure steam turbine, 14 is the second medium pressure steam turbine, 15 is the second 16 is the second condenser, 17 is the second condensate pump, 18 is the second deaerator, 19 is the second feed water pump, 20 is the second high pressure heater, 21 is the second generator, 22 is Heat network heater, 23 is condensed water tank, 24 is absorption heat pump, 25 is heat network circulation water pump small steam turbine, 26 is heat network circulation water pump, 27 is exhaust steam heater of small steam turbine.

具体实施方式detailed description

为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本发明实施例的组件可以以各种不同的配置来布置和设计。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations.

因此,以下对在附图中提供的本发明的实施例的详细描述并非旨在限制要求保护的本发明的范围,而是仅仅表示本发明的选定实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。Accordingly, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.

在本发明实施例的描述中,需要说明的是,若出现术语“上”、“下”、“水平”、“内”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该发明产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of the embodiments of the present invention, it should be noted that the orientation or positional relationship indicated by the terms "upper", "lower", "horizontal", "inside" etc. is based on the orientation or positional relationship shown in the drawings , or the orientation or positional relationship that the product of the invention is usually placed in use is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation or be constructed in a specific orientation and operation, and therefore should not be construed as limiting the invention. In addition, the terms "first", "second", etc. are only used for distinguishing descriptions, and should not be construed as indicating or implying relative importance.

此外,若出现术语“水平”,并不表示要求部件绝对水平,而是可以稍微倾斜。如“水平”仅仅是指其方向相对“竖直”而言更加水平,并不是表示该结构一定要完全水平,而是可以稍微倾斜。In addition, when the term "horizontal" appears, it does not mean that the part is required to be absolutely horizontal, but may be slightly inclined. For example, "horizontal" only means that its direction is more horizontal than "vertical", and it does not mean that the structure must be completely horizontal, but can be slightly inclined.

在本发明实施例的描述中,还需要说明的是,除非另有明确的规定和限定,若出现术语“设置”、“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In the description of the embodiments of the present invention, it should also be noted that, unless otherwise specified and limited, the terms "setting", "installation", "connection" and "connection" should be interpreted in a broad sense, for example, It can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention according to specific situations.

下面结合附图对本发明做进一步详细描述:The present invention is described in further detail below in conjunction with accompanying drawing:

参见图3,本发明实施例公开了一种低压缸零出力耦合吸收式热泵的供热系统,包括第一热电联产机组和第二热电联产机组;Referring to Fig. 3, the embodiment of the present invention discloses a low-pressure cylinder zero output coupled absorption heat pump heating system, including a first combined heat and power unit and a second combined heat and power unit;

第一热电联产机组包括依次相连的凝结水箱23、第一除氧器8、第一给水泵9、第一高压加热器10、第一锅炉加热器1-1、第一高压汽轮机2、第一锅炉再热器1-2、第一中压汽轮机3、第一低压汽轮机4;第一凝汽器5、第一凝结水泵6和第一低压加热器7;第一高压汽轮机2、第一中压汽轮机3和第一低压汽轮机4共同带动第一发电机11转动,对外输出电能。The first combined heat and power unit includes a condensed water tank 23, a first deaerator 8, a first feed water pump 9, a first high-pressure heater 10, a first boiler heater 1-1, a first high-pressure steam turbine 2, a first A boiler reheater 1-2, the first medium-pressure steam turbine 3, the first low-pressure steam turbine 4; the first condenser 5, the first condensate pump 6 and the first low-pressure heater 7; the first high-pressure steam turbine 2, the first The medium-pressure steam turbine 3 and the first low-pressure steam turbine 4 jointly drive the first generator 11 to rotate and output electric energy to the outside.

第一高压汽轮机2入口与第一锅炉加热器1-1出口相连通,第一高压汽轮机2出口与第一锅炉再热器1-2入口相连通,第一高压汽轮机2抽汽与第一高压加热器10热侧工质入口相连通;第一中压汽轮机3入口与第一锅炉再热器1-2出口相连通,第一中压汽轮机3出口与第一低压汽轮机4入口和第一除氧器8入口相连通;第一低压汽轮机4出口与第一凝汽器5热侧工质入口相连通,第一低压汽轮机4抽汽与第一低压加热器7热侧工质入口相连通。The inlet of the first high-pressure steam turbine 2 is connected with the outlet of the first boiler heater 1-1, the outlet of the first high-pressure steam turbine 2 is connected with the inlet of the first boiler reheater 1-2, and the steam extraction of the first high-pressure steam turbine 2 is connected with the first high-pressure The hot side working medium inlet of the heater 10 is connected; the inlet of the first medium-pressure steam turbine 3 is connected with the outlet of the first boiler reheater 1-2, the outlet of the first medium-pressure steam turbine 3 is connected with the inlet of the first low-pressure steam turbine 4 and the first dehumidifier The inlet of the oxygenator 8 is connected; the outlet of the first low-pressure steam turbine 4 is connected with the hot-side working medium inlet of the first condenser 5 , and the steam extraction of the first low-pressure steam turbine 4 is connected with the hot-side working medium inlet of the first low-pressure heater 7 .

第一凝汽器5冷侧工质入口与吸收式热泵24冷源工质出口相连通,第一凝汽器5冷侧工质出口与吸收式热泵24冷源工质入口相连通,第一凝汽器5热井与第一低压加热器7热侧工质出口、第一凝汽器5热侧工质出口、第一凝结水泵6入口、第二凝结水泵17出口、小汽机乏汽加热器27热侧工质出口和热网加热器22热侧工质出口相连通;The cold side working medium inlet of the first condenser 5 is connected with the cold source working medium outlet of the absorption heat pump 24, the cold side working medium outlet of the first condenser 5 is connected with the absorption heat pump 24 cold source working medium inlet, and the first Condenser 5 hot well and first low-pressure heater 7 hot-side working medium outlet, first condenser 5 hot-side working medium outlet, first condensate pump 6 inlet, second condensate pump 17 outlet, small turbine exhaust steam heating The working medium outlet on the hot side of the device 27 is connected with the working medium outlet on the hot side of the heating network heater 22;

第一低压加热器7冷侧工质入口与第一凝结水泵6出口相连通,第一低压加热器7冷侧工质出口与凝结水箱23相连通;第一除氧器入口8与凝结水箱23相连通;第一给水泵9入口与第一除氧器8出口相连通,第一给水泵9出口与第一高压加热器10冷侧工质入口相连通;第一高压加热器10热侧工质出口与第一除氧器8入口相连通,第一高压加热器10冷侧工质出口与第一锅炉加热器1-1入口相连通;The working medium inlet on the cold side of the first low-pressure heater 7 is connected with the outlet of the first condensate pump 6, and the working medium outlet on the cold side of the first low-pressure heater 7 is connected with the condensate tank 23; the first deaerator inlet 8 is connected with the condensate tank 23 connected; the inlet of the first feedwater pump 9 is connected with the outlet of the first deaerator 8, and the outlet of the first feedwater pump 9 is connected with the inlet of the working medium on the cold side of the first high pressure heater 10; the hot side of the first high pressure heater 10 is connected The gas outlet is connected to the inlet of the first deaerator 8, and the outlet of the working fluid on the cold side of the first high pressure heater 10 is connected to the inlet of the first boiler heater 1-1;

第二热电联产机组包括依次相连通的第二除氧器18、第二给水泵19、第二高压加热器20、第二锅炉加热器12-1、第二高压汽轮机13、第二锅炉再热器12-2、第二中压汽轮机14和第二低压汽轮机15、第二凝汽器16、第二凝结水泵17,还包括热网加热器22、第一发电机11、第二发电机21、吸收式热泵24、热网循环水泵小汽机25、热网循环水泵26和小汽机乏汽加热器27;第二热电联产机组为纯凝机组进行低压缸零出力改造的机组,第二高压汽轮机13和第二中压汽轮机14共同带动第一发电机21转动,对外输出电能;The second cogeneration unit includes a second deaerator 18, a second feed water pump 19, a second high-pressure heater 20, a second boiler heater 12-1, a second high-pressure steam turbine 13, and a second boiler that are connected in sequence. Heater 12-2, second medium-pressure steam turbine 14 and second low-pressure steam turbine 15, second condenser 16, second condensed water pump 17, heat network heater 22, first generator 11, second generator 21. Absorption heat pump 24, heating network circulating water pump and small steam turbine 25, heating network circulating water pump 26 and small steam turbine exhaust steam heater 27; The high-pressure steam turbine 13 and the second medium-pressure steam turbine 14 jointly drive the first generator 21 to rotate and output electric energy to the outside;

热网回水与热网补水汇集之后首先经过热网循环水泵26进行加压,之后经过吸收式热泵24进行初步加热,然后分流为两股,一部分进入小汽机乏汽加热器27利用热网循环水泵小汽机25乏汽进行加热,另一部分进入热网加热器22利用第二中压汽轮机14排汽进行加热,之后汇合对外供热,满足供热需求;After the return water of the heating network and the supplementary water of the heating network are collected, it is firstly pressurized by the heating network circulating water pump 26, and then initially heated by the absorption heat pump 24, and then divided into two streams, and one part enters the exhaust steam heater 27 of the small steam turbine to utilize the heating network circulation The water pump small steam turbine 25 exhausts steam for heating, and the other part enters the heat network heater 22 to use the exhaust steam of the second medium-pressure steam turbine 14 for heating, and then converges for external heating to meet the heating demand;

第二高压汽轮机13入口与第二锅炉加热器12-1出口相连通,第二高压汽轮机13出口与第二锅炉再热器12-2入口相连通,第二高压汽轮机13抽汽与第二高压加热器20热侧工质入口相连通;第二中压汽轮机14入口与第二锅炉再热器12-2出口相连通,第二中压汽轮机14出口与第二低压汽轮机15入口、第二除氧器18入口、吸收式热泵24热源工质入口、热网循环水泵小汽机25入口和热网加热器22热侧工质入口相连通;第二低压汽轮机15出口与第二凝汽器16热侧工质入口相连通;The inlet of the second high-pressure steam turbine 13 is connected with the outlet of the second boiler heater 12-1, the outlet of the second high-pressure steam turbine 13 is connected with the inlet of the second boiler reheater 12-2, and the steam extraction of the second high-pressure steam turbine 13 is connected with the second high-pressure The hot side working medium inlet of the heater 20 is connected; the inlet of the second medium-pressure steam turbine 14 is connected with the outlet of the second boiler reheater 12-2, the outlet of the second medium-pressure steam turbine 14 is connected with the inlet of the second low-pressure steam turbine 15, the second Oxygenator 18 inlet, absorption heat pump 24 heat source working medium inlet, heat network circulating water pump small steam turbine 25 inlet and heat network heater 22 heat side working medium inlet are connected; second low-pressure steam turbine 15 outlet and second condenser 16 heat The side working medium inlet is connected;

第二凝汽器16热井与第二凝汽器16热侧工质出口和第二凝结水泵17入口相连通;第二除氧器18入口与凝结水箱23、第二中压汽轮机14出口以及第二高压加热器20热侧工质出口相连通;第二给水泵19入口与第二除氧器18出口相连通,第二给水泵19出口与第二高压加热器20冷侧工质入口相连通;第二高压加热器20冷侧工质出口与第二锅炉加热器12-1入口相连通;The hot well of the second condenser 16 communicates with the outlet of the hot side working medium of the second condenser 16 and the inlet of the second condensed water pump 17; the inlet of the second deaerator 18 is connected with the outlet of the condensed water tank 23, the second medium-pressure steam turbine 14, and The outlet of the working medium on the hot side of the second high pressure heater 20 is connected; the inlet of the second feedwater pump 19 is connected to the outlet of the second deaerator 18, and the outlet of the second feedwater pump 19 is connected to the inlet of the working medium on the cold side of the second high pressure heater 20 Pass; the cold side working medium outlet of the second high pressure heater 20 is connected with the inlet of the second boiler heater 12-1;

吸收式热泵24热源工质出口汇集至凝结水箱24,吸收式热泵24被加热工质入口与热网循环水泵26出口相连通,吸收式热泵24被加热工质出口与小汽机乏汽加热器27冷侧工质入口和热网加热器22冷侧工质入口相连通;The heat source working medium outlet of the absorption heat pump 24 is collected to the condensate tank 24, the heated working medium inlet of the absorption heat pump 24 is connected with the heat network circulating water pump 26 outlet, and the heated working medium outlet of the absorption heat pump 24 is connected with the small turbine exhaust steam heater 27 The cold-side working medium inlet is connected to the cold-side working medium inlet of the heating network heater 22;

热网循环泵小汽机25热侧工质出口与小汽机乏汽加热器27热侧工质入口相连通,热网循环水泵小汽机25驱动热网循环水泵26为热网水加压,热网循环水泵26入口与供热回水和供热补水相连通,热网循环水泵26出口与吸收式热泵24被加热工质入口相连通;The hot side working medium outlet of the small steam turbine 25 of the heat network circulation pump is connected with the hot side working medium inlet of the small steam turbine exhaust heater 27, and the small steam turbine 25 of the heat network circulation pump drives the heat network circulation water pump 26 to pressurize the heat network water, and the heat network The inlet of the circulating water pump 26 is connected with the heating return water and the heating supplementary water, and the outlet of the heating network circulating water pump 26 is connected with the inlet of the heated working medium of the absorption heat pump 24;

热网加热器22热侧工质出口与第一凝汽器5热井和小汽机乏汽加热器27热侧工质出口相连通,热网加热器22冷侧工质出口与小汽机乏汽加热器27冷侧工质出口和热网供水相连通;The working medium outlet on the hot side of the heating network heater 22 is connected with the hot well of the first condenser 5 and the hot side working medium outlet of the exhaust steam heater 27 of the small turbine, and the working medium outlet on the cold side of the heating network heater 22 is connected with the exhaust steam of the small turbine The outlet of the working medium on the cold side of the heater 27 is connected to the water supply of the heating network;

本发明实施例公开了一种低压缸零出力耦合吸收式热泵的供热方法,包括以下步骤:The embodiment of the present invention discloses a heat supply method of a low-pressure cylinder zero output coupled absorption heat pump, which includes the following steps:

第一为纯凝机组,第二为纯凝机组进行低压缸零出力改造的机组,第二中压汽轮机14出口工质分流为四部分,The first is a pure condensing unit, the second is a pure condensing unit that undergoes low-pressure cylinder zero-output transformation, and the second medium-pressure steam turbine 14 outlet working fluid is divided into four parts,

第一部分进入第二低压汽轮机15,防止第二低压汽轮机15叶片过热,此部分工质质量流量占锅炉最大出力工况下工质质量流量的1-3%,经过第二低压汽轮机15后进入第二凝汽器16;The first part enters the second low-pressure steam turbine 15 to prevent the blades of the second low-pressure steam turbine 15 from overheating. The mass flow rate of this part of the working medium accounts for 1-3% of the mass flow rate of the working medium under the maximum output working condition of the boiler. After passing through the second low-pressure steam turbine 15, it enters the first part Second condenser 16;

第二部分作为驱动蒸汽进入热网循环水泵小汽机25,由热网循环水泵小汽机25驱动热网循环水泵26为热网水加压,热网循环水泵小汽机25乏汽进入小汽机乏汽加热器27继续放热,最后汇入第一凝汽器5;The second part is used as driving steam to enter the small turbine 25 of the heating network circulating water pump, and the heating network circulating water pump 25 drives the heating network circulating water pump 26 to pressurize the heating network water, and the exhausted steam of the heating network circulating water pump small turbine 25 enters the exhausted steam of the small turbine The heater 27 continues to release heat, and finally flows into the first condenser 5;

第三部分进入吸收式热泵24热侧工质入口,作为吸收式热泵24驱动热源,驱动吸收式热泵24回收第一冷源损失,用于初步加热热网回水和热网补水;The third part enters the inlet of the working medium on the hot side of the absorption heat pump 24, and serves as the driving heat source of the absorption heat pump 24, drives the absorption heat pump 24 to recover the loss of the first cold source, and is used for preliminary heating of the return water of the heating network and replenishment of the heating network;

第四部分工质进入热网加热器22加热热网循环水,放热之后汇集至第一凝汽器5热井;The fourth part of the working medium enters the heating network heater 22 to heat the circulating water of the heating network, and collects it into the first condenser 5 hot well after releasing heat;

热网加热器22热侧工质和小汽机乏汽加热器27热侧工质放热之后均汇至第一凝汽器5热井与第一凝结水汇合,并由第一低压汽轮机4抽汽进行加热,并在凝结水箱23中根据需求分流进入第一除氧器8和第二除氧器18中,实现能量的梯级利用,降低了第一的冷源损失,也解决了第二进行低压缸零出力改造后凝结水加热问题,降低了机组的能耗。The working medium on the hot side of the heating network heater 22 and the exhaust steam heater 27 of the small steam turbine are all discharged to the first condenser 5 after the hot side working fluid is discharged, and the hot well is merged with the first condensed water, and is pumped by the first low-pressure steam turbine 4 The steam is heated and diverted into the first deaerator 8 and the second deaerator 18 in the condensed water tank 23 according to the demand, so as to realize cascade utilization of energy, reduce the loss of the first cold source, and solve the problem of the second process. The problem of condensate heating after zero-efficiency transformation of the low-pressure cylinder reduces the energy consumption of the unit.

以上仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (10)

1.一种低压缸零出力耦合吸收式热泵的供热系统,其特征在于,包括:1. A low-pressure cylinder zero output coupled absorption heat pump heating system, characterized in that it comprises: 第一热电联产机组,所述第一热电联产机组包括第一锅炉(1)以及第一汽轮机组;第一汽轮机组包括依次与第一锅炉(1)相连的第一高压汽轮机(2)、第一中压汽轮机(3)和第一低压汽轮机(4);A first heat and power cogeneration unit, the first heat and power cogeneration unit includes a first boiler (1) and a first steam turbine unit; the first steam turbine unit includes a first high-pressure steam turbine (2) sequentially connected to the first boiler (1) , the first medium-pressure steam turbine (3) and the first low-pressure steam turbine (4); 第一中压汽轮机(3)的排汽端分别与第一低压汽轮机(4)的入口和第一除氧器(8)的第一入口相连;The exhaust end of the first medium-pressure steam turbine (3) is respectively connected with the inlet of the first low-pressure steam turbine (4) and the first inlet of the first deaerator (8); 第一低压汽轮机(4)的排汽端与第一凝汽器(5)的热侧工质入口相连,第一凝汽器(5)的热侧工质出口经第一低压加热器(7)连接至凝结水箱(23)的第一入口,凝结水箱(23)的第一出口连接第一除氧器(8)的第二入口;第一除氧器(8)的出口通过第一高压加热器(10)与第一锅炉(1)相连;The exhaust end of the first low-pressure steam turbine (4) is connected to the hot-side working medium inlet of the first condenser (5), and the hot-side working medium outlet of the first condenser (5) passes through the first low-pressure heater (7) ) is connected to the first inlet of the condensed water tank (23), and the first outlet of the condensed water tank (23) is connected to the second inlet of the first deaerator (8); the outlet of the first deaerator (8) passes through the first high pressure The heater (10) is connected to the first boiler (1); 第二热电联产机组,所述第二热电联产机组包括第二锅炉(12)以及第二汽轮机组;第二汽轮机组包括依次与第二锅炉(12)相连的第二高压汽轮机(13)、第二中压汽轮机(14)和第二低压汽轮机(15);The second heat and power cogeneration unit, the second heat and power cogeneration unit includes a second boiler (12) and a second steam turbine unit; the second steam turbine unit includes a second high-pressure steam turbine (13) connected to the second boiler (12) in sequence , the second medium-pressure steam turbine (14) and the second low-pressure steam turbine (15); 第二中压汽轮机(14)的排汽端分别与第二低压汽轮机(15)的入口、第二除氧器(18)的第一入口、吸收式热泵(24)的热源工质入口、热网循环水泵小汽机(25)的入口以及热网加热器(22)的热侧工质入口相连;The exhaust end of the second medium-pressure steam turbine (14) is respectively connected with the inlet of the second low-pressure steam turbine (15), the first inlet of the second deaerator (18), the heat source working fluid inlet of the absorption heat pump (24), the heat The inlet of the small turbine (25) of the network circulating water pump is connected with the hot side working medium inlet of the heating network heater (22); 第二低压汽轮机(15)的排汽端与第二凝汽器(16)的热侧工质入口相连,第二凝汽器(16)的热侧工质出口与第一凝汽器(5)的热井相连;第二除氧器(18)的第二入口与凝结水箱(23)的第二出口相连;第二除氧器(18)的出口通过第二高压加热器(20)与第二锅炉(12)相连;The exhaust end of the second low-pressure steam turbine (15) is connected to the hot side working medium inlet of the second condenser (16), and the hot side working medium outlet of the second condenser (16) is connected to the first condenser (5 ) of the hot well; the second inlet of the second deaerator (18) is connected with the second outlet of the condensate tank (23); the outlet of the second deaerator (18) is connected with the second high pressure heater (20) The second boiler (12) is connected; 吸收式热泵(24),所述吸收式热泵(24)的热源工质出口与凝结水箱(23)的第二入口相连;所述吸收式热泵(24)的被加热工质入口输入热网回水和热网补水,被加热工质出口一路与小汽机乏汽加热器(27)冷侧工质入口相连,另一路与热网加热器(22)冷侧工质入口相连;Absorption heat pump (24), the heat source working fluid outlet of the absorption heat pump (24) is connected to the second inlet of the condensate tank (23); the heated working fluid inlet of the absorption heat pump (24) is input into the heat network back Water and heating network replenishment, the outlet of the heated working medium is connected to the cold side working medium inlet of the exhaust steam heater (27) of the small steam turbine, and the other is connected to the cold side working medium inlet of the heating network heater (22); 热网加热器(22)和小汽机乏汽加热器(27)的热侧工质出口均连接至第一凝汽器(5)的热井,冷侧工质出口均输出热网供水;The hot-side working medium outlets of the heating network heater (22) and the exhaust steam heater (27) of the small steam turbine are connected to the hot well of the first condenser (5), and the cold-side working medium outlets output the heating network water supply; 热网循环水泵小汽机(25)热侧工质出口与小汽机乏汽加热器(27)热侧工质入口相连。The hot side working medium outlet of the small steam turbine (25) of the heat network circulating water pump is connected with the hot side working medium inlet of the exhaust steam heater (27) of the small steam turbine. 2.根据权利要求1所述的低压缸零出力耦合吸收式热泵的供热系统,其特征在于,所述第一锅炉(1)包括第一锅炉加热器(1-1)和第一锅炉再热器(1-2),第一锅炉加热器(1-1)的出口连接第一高压汽轮机(2)的入口,第一高压汽轮机(2)的出口连接第一锅炉再热器(1-2)的入口,第一锅炉再热器(1-2)的出口连接第一中压汽轮机(3)的入口。2. The heat supply system of low-pressure cylinder zero output coupling absorption heat pump according to claim 1, characterized in that, the first boiler (1) includes a first boiler heater (1-1) and a first boiler reheating system Heater (1-2), the outlet of the first boiler heater (1-1) is connected to the inlet of the first high-pressure steam turbine (2), and the outlet of the first high-pressure steam turbine (2) is connected to the first boiler reheater (1- 2), the outlet of the first boiler reheater (1-2) is connected to the inlet of the first medium-pressure steam turbine (3). 3.根据权利要求2所述的低压缸零出力耦合吸收式热泵的供热系统,其特征在于,所述第一高压汽轮机(2)的抽汽端与第一高压加热器(10)的热侧工质入口相连;第一低压汽轮机(4)的抽汽端与第一低压加热器(7)的热侧工质入口相连。3. The heat supply system of low-pressure cylinder zero-output coupled absorption heat pump according to claim 2, characterized in that the heat between the extraction end of the first high-pressure steam turbine (2) and the first high-pressure heater (10) The side working medium inlet is connected; the steam extraction end of the first low-pressure steam turbine (4) is connected with the hot side working medium inlet of the first low-pressure heater (7). 4.根据权利要求1或2或3所述的低压缸零出力耦合吸收式热泵的供热系统,其特征在于,所述第一凝汽器(5)和第一低压加热器(7)之间设置有第一凝结水泵(6);第一除氧器(8)和第一高压加热器(10)之间设置有第一给水泵(9)。4. The heat supply system of the low-pressure cylinder zero output coupling absorption heat pump according to claim 1 or 2 or 3, characterized in that, the first condenser (5) and the first low-pressure heater (7) A first condensate pump (6) is arranged between them; a first feedwater pump (9) is arranged between the first deaerator (8) and the first high-pressure heater (10). 5.根据权利要求1所述的低压缸零出力耦合吸收式热泵的供热系统,其特征在于,所述第二锅炉(12)包括第二锅炉加热器(12-1)和第二锅炉再热器(12-2),第二锅炉加热器(12-1)的出口连接第二高压汽轮机(13)的入口,第二高压汽轮机(13)的出口连接第二锅炉再热器(12-2)的入口,第二锅炉再热器(12-2)的出口连接第二中压汽轮机(14)的入口。5. The heat supply system of low-pressure cylinder zero output coupling absorption heat pump according to claim 1, characterized in that, the second boiler (12) comprises a second boiler heater (12-1) and a second boiler reheating system Heater (12-2), the outlet of the second boiler heater (12-1) is connected to the inlet of the second high-pressure steam turbine (13), and the outlet of the second high-pressure steam turbine (13) is connected to the second boiler reheater (12- 2), the outlet of the second boiler reheater (12-2) is connected to the inlet of the second medium-pressure steam turbine (14). 6.根据权利要求5所述的低压缸零出力耦合吸收式热泵的供热系统,其特征在于,所述第二高压汽轮机(13)的抽汽端与第二高压加热器(20)的热侧工质入口相连。6. The heat supply system of low-pressure cylinder zero-output coupling absorption heat pump according to claim 5, characterized in that, the heat between the extraction end of the second high-pressure steam turbine (13) and the second high-pressure heater (20) The side working medium inlet is connected. 7.根据权利要求1或5或6所述的低压缸零出力耦合吸收式热泵的供热系统,其特征在于,所述第二凝汽器(16)和板式换热器(24)之间设置有第二凝结水泵(17);第二除氧器(18)和第二高压加热器(20)之间设置有第二给水泵(19)。7. The heat supply system of low-pressure cylinder zero output coupled absorption heat pump according to claim 1 or 5 or 6, characterized in that, between the second condenser (16) and the plate heat exchanger (24) A second condensate pump (17) is provided; a second feedwater pump (19) is provided between the second deaerator (18) and the second high-pressure heater (20). 8.根据权利要求7所述的低压缸零出力耦合吸收式热泵的供热系统,其特征在于,热网回水与热网补水汇输入至热网循环水泵(26)的入口,热网循环水泵(26)连接吸收式热泵(24)的被加热工质入口;热网循环水泵小汽机(25)驱动热网循环水泵(26)为热网水加压。8. The heat supply system of low-pressure cylinder zero output coupling absorption heat pump according to claim 7, characterized in that the return water of the heating network and the replenishment water of the heating network are input to the inlet of the circulating water pump (26) of the heating network, and the heating network circulates The water pump (26) is connected to the heated working medium inlet of the absorption heat pump (24); the heat network circulating water pump small turbine (25) drives the heat network circulating water pump (26) to pressurize the heat network water. 9.根据权利要求1所述的低压缸零出力耦合吸收式热泵的供热系统,其特征在于,所述第一高压汽轮机(2)、第一中压汽轮机(3)和第一低压汽轮机(4)共同带动第一发电机(11)转动,对外输出电能;第二高压汽轮机(13)、第二中压汽轮机(14)和第二低压汽轮机(15)共同带动第二发电机(21)转动,对外输出电能。9. The heat supply system of low-pressure cylinder zero output coupling absorption heat pump according to claim 1, characterized in that, the first high-pressure steam turbine (2), the first medium-pressure steam turbine (3) and the first low-pressure steam turbine ( 4) jointly drive the first generator (11) to rotate, and output electric energy to the outside; the second high-pressure steam turbine (13), the second medium-pressure steam turbine (14) and the second low-pressure steam turbine (15) jointly drive the second generator (21) Rotate to output electric energy to the outside. 10.一种采用权利要求1-9任一项所述系统的低压缸零出力耦合吸收式热泵的供热方法,其特征在于,包括以下步骤:10. A heat supply method using the low-pressure cylinder zero output coupled absorption heat pump of the system according to any one of claims 1-9, characterized in that it comprises the following steps: 将第二中压汽轮机(14)出口工质分流,第一路工质入第二低压汽轮机(15),用于防止第二低压汽轮机(15)叶片过热,进入第二低压汽轮机(15)的工质质量流量占锅炉最大出力工况下工质质量流量的1-3%,经过第二低压汽轮机(15)后进入第二凝汽器(16);The working fluid at the outlet of the second medium-pressure steam turbine (14) is divided, and the first-way working fluid enters the second low-pressure steam turbine (15) to prevent the blades of the second low-pressure steam turbine (15) from overheating and enter the second low-pressure steam turbine (15). The mass flow rate of the working medium accounts for 1-3% of the mass flow rate of the working medium under the maximum output condition of the boiler, and enters the second condenser (16) after passing through the second low-pressure steam turbine (15); 第二路工质作为驱动蒸汽进入热网循环水泵小汽机(25),由热网循环水泵小汽机(25)驱动热网循环水泵(26)为热网水加压,热网循环水泵小汽机(25)的乏汽进入小汽机乏汽加热器(27)继续放热,最后汇入第一凝汽器(5);The second working medium enters the small steam turbine (25) of the heating network circulating water pump as driving steam, and the heating network circulating water pump (26) is driven by the small steam turbine (25) of the heating network circulating water pump to pressurize the heating network water, and the small steam turbine of the heating network circulating water pump The exhausted steam of (25) enters the exhausted steam heater (27) of the small turbine to continue releasing heat, and finally imports into the first condenser (5); 第三路工质进入吸收式热泵(24)的热侧工质入口,作为吸收式热泵(24)的驱动热源,驱动吸收式热泵(24)回收冷源损失,用于初步加热热网回水和热网补水;The third working medium enters the hot side working medium inlet of the absorption heat pump (24), and serves as the driving heat source of the absorption heat pump (24), drives the absorption heat pump (24) to recover the loss of the cold source, and is used to initially heat the return water of the heating network and heating network replenishment; 第四路工质进入热网加热器(22),用于加热热网循环水,放热之后汇集至第一凝汽器(5)的热井;The fourth working medium enters the heating network heater (22) for heating the circulating water of the heating network, and collects it into the hot well of the first condenser (5) after releasing heat; 热网加热器(22)的热侧工质和小汽机乏汽加热器(27)的热侧工质放热之后均汇至第一凝汽器(5)的热井与第一凝汽器(5)产生的凝结水汇合,并由第一低压汽轮机(4)的抽汽进行加热,在凝结水箱(23)中根据需求分流进入第一除氧器(8)和第二除氧器(18)中。The working fluid on the hot side of the heat network heater (22) and the working fluid on the hot side of the exhaust steam heater (27) of the small steam turbine are both released to the hot well of the first condenser (5) and the first condenser (5) The condensed water produced merges, and is heated by the steam extraction of the first low-pressure steam turbine (4), and enters the first deaerator (8) and the second deaerator ( 18).
CN202111520268.4A 2021-12-13 2021-12-13 Heating system and method of low-pressure cylinder zero-output coupling absorption heat pump Active CN114198802B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111520268.4A CN114198802B (en) 2021-12-13 2021-12-13 Heating system and method of low-pressure cylinder zero-output coupling absorption heat pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111520268.4A CN114198802B (en) 2021-12-13 2021-12-13 Heating system and method of low-pressure cylinder zero-output coupling absorption heat pump

Publications (2)

Publication Number Publication Date
CN114198802A CN114198802A (en) 2022-03-18
CN114198802B true CN114198802B (en) 2022-12-27

Family

ID=80653197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111520268.4A Active CN114198802B (en) 2021-12-13 2021-12-13 Heating system and method of low-pressure cylinder zero-output coupling absorption heat pump

Country Status (1)

Country Link
CN (1) CN114198802B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114754395B (en) * 2022-04-11 2022-11-01 峰和轻碳(北京)设计研究院有限公司 Heating system based on four-stage back pressure cascade heating and adjusting method
CN116244548B (en) * 2022-12-06 2025-07-08 华电电力科学研究院有限公司 Zero-output optimal operation method for low-pressure cylinder of extraction condensing unit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4660511A (en) * 1986-04-01 1987-04-28 Anderson J Hilbert Flue gas heat recovery system
DE10206636A1 (en) * 2001-02-15 2002-11-07 Vaillant Gmbh Adsorption heat pump, has a closed-circuit heat medium supply with two heat-pump modules and a reverse-flow valve
CN105222203A (en) * 2015-11-04 2016-01-06 清华大学 A kind of novel gas cogeneration of heat and power central heating device
CN108625911A (en) * 2018-03-29 2018-10-09 东北电力大学 A kind of therrmodynamic system promoting thermal power plant unit electricity output regulating power
CN110219707A (en) * 2019-06-27 2019-09-10 东方电气集团东方汽轮机有限公司 A kind of control and guard method that double low pressure (LP) cylinder turbine low pressure cylinders zero are contributed
CN113048456A (en) * 2021-03-23 2021-06-29 国网陕西省电力公司电力科学研究院 Energy storage power generation and heat supply system and method for deep peak shaving

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4660511A (en) * 1986-04-01 1987-04-28 Anderson J Hilbert Flue gas heat recovery system
DE10206636A1 (en) * 2001-02-15 2002-11-07 Vaillant Gmbh Adsorption heat pump, has a closed-circuit heat medium supply with two heat-pump modules and a reverse-flow valve
CN105222203A (en) * 2015-11-04 2016-01-06 清华大学 A kind of novel gas cogeneration of heat and power central heating device
CN108625911A (en) * 2018-03-29 2018-10-09 东北电力大学 A kind of therrmodynamic system promoting thermal power plant unit electricity output regulating power
CN110219707A (en) * 2019-06-27 2019-09-10 东方电气集团东方汽轮机有限公司 A kind of control and guard method that double low pressure (LP) cylinder turbine low pressure cylinders zero are contributed
CN113048456A (en) * 2021-03-23 2021-06-29 国网陕西省电力公司电力科学研究院 Energy storage power generation and heat supply system and method for deep peak shaving

Also Published As

Publication number Publication date
CN114198802A (en) 2022-03-18

Similar Documents

Publication Publication Date Title
CN114592934B (en) System and method for thermal power unit transformation based on high and low parameter combination molten salt
CN114198800B (en) A heat supply system and method for a dual-unit coupled absorption heat pump
CN109681943B (en) Heating system
CN109869205A (en) It is a kind of for the heat accumulation of cogeneration units, power generation and heating system
CN112856544B (en) Method and system for improving flexibility of thermoelectric unit by combining exhaust gas waste heat recovery and heat storage
CN108678819B (en) A system that uses bypass to achieve thermoelectric decoupling and rapid peak shaving
CN114234264B (en) Thermoelectric cooperative system coupled with steam ejector and operation method
CN114198802B (en) Heating system and method of low-pressure cylinder zero-output coupling absorption heat pump
CN109595045B (en) Energy storage system for efficient and flexible heat supply of ultra-supercritical secondary reheating unit
CN210801355U (en) A thermo-decoupling system based on multi-stage ejector gas distribution and heat pump exhaust steam recovery
CN114413311B (en) Cold end waste heat supply system of coal-fired unit of coupling oblique temperature layer heat storage tank and operation method
CN111457450A (en) Thermoelectric decoupling system and working method
CN114856948A (en) Supercritical carbon dioxide Brayton combined cycle solar power generation system
CN101806448A (en) Application of second type absorption type heat pump in heat exchange cycle system of power plant
CN117905542A (en) Thermal electric coupling system for thermal power generating unit coupling ejector and heat storage and operation method
CN212408812U (en) Thermoelectric decoupling system
CN111828115A (en) Thermo-decoupling method and system of high and low pressure cutting cylinder based on built-in group injection of exhausted steam
CN207317055U (en) Supercritical carbon dioxide system for realizing thermoelectric decoupling
CN114198801B (en) Low-pressure cylinder zero-output heat supply system and method
CN211575203U (en) Low-level energy step heating and heating system using ejector
CN219433368U (en) A gas-steam combined cycle exhaust steam heating system
CN218883946U (en) Solar coal-fired coupling auxiliary industrial steam supply cogeneration system
CN217057668U (en) A Flexible Thermo-Electrocouple Heating System
CN107606676A (en) Supercritical carbon dioxide system for realizing thermoelectric decoupling
CN111121130B (en) A low potential energy step heating system using ejectors

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant