CN114109026B - Tool and construction method for plugging joints in masonry exterior wall - Google Patents
Tool and construction method for plugging joints in masonry exterior wall Download PDFInfo
- Publication number
- CN114109026B CN114109026B CN202111412424.5A CN202111412424A CN114109026B CN 114109026 B CN114109026 B CN 114109026B CN 202111412424 A CN202111412424 A CN 202111412424A CN 114109026 B CN114109026 B CN 114109026B
- Authority
- CN
- China
- Prior art keywords
- masonry
- traction rope
- square wood
- keel
- square
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/001—Corner fastening or connecting means for forming or stiffening elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/065—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
- E04G17/0655—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
- E04G17/0658—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts remaining completely or partially embedded in the cast material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种砌体外墙塞缝的工具及施工方法,包括结构梁、砌体墙、木胶板、方木次龙骨、方木主龙骨、螺纹钢、螺杆、PVC套管、固定螺母、方木龙骨、加固铁盘、加固螺母、铁环、牵引绳。本发明的有益效果是:将外侧模板与固定卡件与牵引绳结合,使用方便快捷的模板固定方法代替传统的外侧塞缝;并将传统的两侧塞缝方法,优化为内侧固定,一次施工成型,施工质量好;一名施工人员使用牵引绳与卡具即可完成整个工序的施工工作,方便快捷;另使用本发明,不用等待细石砼强度,可缩短该工序的施工时间一半以上。
The invention discloses a tool and a construction method for plugging joints in a masonry exterior wall, comprising structural beams, masonry walls, wood plywood, square wood secondary keels, square wood main keels, threaded steel, screw rods, PVC sleeves, fixing Nuts, square wooden keels, reinforced iron plates, reinforced nuts, iron rings, and traction ropes. The beneficial effects of the present invention are: the outer formwork is combined with the fixing clip and the traction rope, and the convenient and fast formwork fixing method is used to replace the traditional outer side plugging; Forming and good construction quality; one construction worker can complete the construction work of the whole process by using the traction rope and clamps, which is convenient and fast; in addition, the invention does not need to wait for the strength of fine stone concrete, which can shorten the construction time of this process by more than half.
Description
技术领域technical field
本发明涉及一种砌体外墙塞缝的施工工具,具体为一种砌体外墙塞缝的工具及施工方法,属于工程施工卡件技术领域。The invention relates to a construction tool for plugging joints of masonry external walls, in particular to a tool and a construction method for plugging joints of masonry external walls, belonging to the technical field of engineering construction clips.
背景技术Background technique
砌体顶部塞缝作为砌筑工程施工的一个必要的工序,其施工质量、密实度直接关系着外墙防水的效果。As a necessary process of masonry construction, the top plugging of masonry is directly related to the waterproof effect of the external wall in terms of its construction quality and compactness.
尤其在选用附着式提升脚手架的高层建筑施工中,目前施工现场无有效的措施工具进行砌体外墙顶部塞缝施工,普遍采用的方法为普遍采用微膨胀细石混凝土从两侧施工,封堵时先从一侧进行,待凝固后再行填塞另一侧。这种方法均存在施工复杂、工时较长、对外脚手架依赖性较强,容易产生误差及塞缝不密实的问题。Especially in the construction of high-rise buildings with attached lifting scaffolding, there are currently no effective measures and tools on the construction site for the construction of the top of the masonry exterior wall. When starting from one side, fill the other side after solidification. This method all has the problems of complex construction, long working hours, strong dependence on external scaffolding, prone to errors and incomplete plugging.
发明内容Contents of the invention
本发明的目的就在于为了解决问题而提供一种砌体外墙塞缝的工具及施工方法。The object of the present invention is just to provide a kind of tool and the construction method of masonry exterior wall plugging seam in order to solve the problem.
本发明通过以下技术方案来实现上述目的:一种砌体外墙塞缝的工具及施工方法,包括The present invention achieves the above object through the following technical solutions: a tool and a construction method for plugging joints in masonry exterior walls, including
外侧模板,其设置在结构梁与砌体墙的外侧,且其由紧贴在所述结构梁与砌体墙外侧壁上的木胶板、呈水平状贴合在所述木胶板外侧的方木次龙骨、呈竖直状贴合在所述方木次龙骨外侧的方木主龙骨构成;The outer formwork is arranged on the outside of the structural beam and the masonry wall, and it is composed of a wooden plywood that is closely attached to the outside wall of the structural beam and the masonry wall, and is horizontally attached to the outside of the wooden plywood. A square wood sub-keel, a square wood main keel fitted vertically on the outside of the square wood sub-keel;
内侧固定卡件,其设置在所述结构梁与砌体墙的内侧,且其由呈竖直状紧贴在所述结构梁与砌体墙内侧壁上的方木龙骨、贴合在所述方木龙骨外侧的加固铁盘构成;The inner fixing clip is arranged on the inner side of the structural beam and the masonry wall, and it is made of a square wooden keel that is vertically attached to the inner wall of the structural beam and the masonry wall, and is attached to the Reinforced iron plate on the outside of the square wooden keel;
拉结组件,其用于连接在外侧模板与内侧固定卡件之间,且其由穿过所述结构梁与砌体墙之间缝隙处的螺杆、与所述螺杆一端焊接并呈水平状贴合在所述方木主龙骨外侧的螺纹钢,与所述螺杆另一端螺纹咬合连接并位于所述加固铁盘外侧的加固螺母构成。The tie assembly is used to connect between the outer formwork and the inner fixing clip, and it is composed of a screw passing through the gap between the structural beam and the masonry wall, welded to one end of the screw and attached horizontally The threaded steel on the outside of the main keel of the square wood is screwed with the other end of the screw and is formed by a reinforcement nut located on the outside of the reinforcement iron plate.
作为本发明再进一步的方案:所述方木次龙骨分别贴合在螺杆所穿过缝隙处的上下侧,所述方木主龙骨分别设置在螺杆的两侧,且所述木胶板、方木次龙骨以及方木主龙骨之间通过钢钉固定为一个整体。As a further solution of the present invention: the square wood sub keels are attached to the upper and lower sides of the gap where the screw passes through, the square wood main keels are respectively arranged on both sides of the screw rod, and the wood plywood, square wood The wooden secondary keel and the square wooden main keel are fixed as a whole by steel nails.
作为本发明再进一步的方案:所述螺杆上螺纹套设有用于夹紧固定所述方木主龙骨的加固螺母。As a further solution of the present invention: the threaded sleeve on the screw rod is provided with a reinforcement nut for clamping and fixing the main keel of the square wood.
作为本发明再进一步的方案:所述螺杆穿过结构梁与砌体墙之间缝隙处的杆身上套设有PVC套管。As a further solution of the present invention: the screw rod passes through the gap between the structural beam and the masonry wall and is covered with a PVC sleeve.
作为本发明再进一步的方案:所述方木龙骨分别设置在螺杆的两侧。As a further solution of the present invention: the square wooden keels are respectively arranged on both sides of the screw rod.
作为本发明再进一步的方案:所述螺杆穿过内侧固定卡件的一端焊接固定有铁环。As a further solution of the present invention: one end of the screw passing through the inner fixing clip is welded and fixed with an iron ring.
一种砌体外墙塞缝的工具的施工方法,其施工方法包括以下步骤:A construction method of a tool for plugging joints of a masonry exterior wall, the construction method comprising the following steps:
步骤一、砌体墙施工完成14天后,由上一层板面用牵引绳将外侧整体模板从楼外侧放下,从下一层砌体墙顶部缝隙中用铁钩将牵引绳拉入楼内侧,收紧牵引绳将螺杆拉入楼内侧,利用内侧方木龙骨、加固铁盘以及加固螺母将模板加固牢固,松开牵引绳开始塞缝作业;Step 1: 14 days after the masonry wall construction is completed, the outer overall formwork is lowered from the outside of the building with a traction rope on the upper deck, and the traction rope is pulled into the inside of the building with an iron hook from the gap at the top of the masonry wall of the next floor. Tighten the traction rope to pull the screw into the inside of the building, use the inner square wooden keel, reinforced iron plate and reinforcement nuts to reinforce the formwork firmly, loosen the traction rope to start the caulking operation;
步骤二、塞缝作业完成后,拉紧牵引绳,松开内侧加固螺母以及卸下加固圆盘后将牵引绳利用预留PVC套管的内部孔道将外侧整体模板下方到下一层,在下一层砌体墙缝隙用铁钩将牵引绳拉入楼内侧,重复以上作业;
步骤三、PVC套管的内部PVC孔道后期用发泡胶填塞密实。
本发明的有益效果是:将外侧模板与固定卡件与牵引绳结合,使用方便快捷的模板固定方法代替传统的外侧塞缝;并将传统的两侧塞缝方法,优化为内侧固定,一次施工成型,施工质量好;一名施工人员使用牵引绳与卡具即可完成整个工序的施工工作,方便快捷;另使用本发明,不用等待细石砼强度,可缩短该工序的施工时间一半以上。The beneficial effects of the present invention are: the outer formwork is combined with the fixing clip and the traction rope, and the convenient and fast formwork fixing method is used to replace the traditional outer side plugging; Forming and good construction quality; one construction worker can complete the construction work of the whole process by using the traction rope and clamps, which is convenient and fast; in addition, the invention does not need to wait for the strength of the fine stone concrete, which can shorten the construction time of this process by more than half.
附图说明Description of drawings
图1为本发明剖面结构示意图;Fig. 1 is the cross-sectional structure schematic diagram of the present invention;
图2为本发明外侧模板平面结构示意图;Fig. 2 is a schematic diagram of the planar structure of the outer formwork of the present invention;
图3为本发明内侧固定卡件平面结构示意图。Fig. 3 is a schematic diagram of the planar structure of the inner fixing clip of the present invention.
图中:1、结构梁,2、砌体墙,3、木胶板,4、方木次龙骨,5、方木主龙骨,6、螺纹钢,7、螺杆,8、PVC套管,9、固定螺母,10、方木龙骨,11、加固铁盘,12、加固螺母,13、铁环,14、牵引绳。In the figure: 1. Structural beam, 2. Masonry wall, 3. Wood plywood, 4. Square wood secondary keel, 5. Square wood main keel, 6. Rebar, 7. Screw rod, 8. PVC casing, 9 , fixed nut, 10, square wooden keel, 11, reinforced iron plate, 12, reinforced nut, 13, iron ring, 14, traction rope.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
实施例一Embodiment one
请参阅图1~3,一种砌体外墙塞缝的工具,包括Please refer to Figures 1 to 3, a tool for plugging joints in masonry exterior walls, including
外侧模板,其设置在结构梁1与砌体墙2的外侧,且其由紧贴在所述结构梁1与砌体墙2外侧壁上的木胶板3、呈水平状贴合在所述木胶板3外侧的方木次龙骨4、呈竖直状贴合在所述方木次龙骨4外侧的方木主龙骨5构成;The outer formwork is arranged on the outer side of the
内侧固定卡件,其设置在所述结构梁1与砌体墙2的内侧,且其由呈竖直状紧贴在所述结构梁1与砌体墙2内侧壁上的方木龙骨10、贴合在所述方木龙骨10外侧的加固铁盘11构成;The inner fixed clip is arranged on the inner side of the
拉结组件,其用于连接在外侧模板与内侧固定卡件之间,且其由穿过所述结构梁1与砌体墙2之间缝隙处的螺杆7、与所述螺杆7一端焊接并呈水平状贴合在所述方木主龙骨5外侧的螺纹钢6,与所述螺杆7另一端螺纹咬合连接并位于所述加固铁盘11外侧的加固螺母12构成。The tie assembly is used to connect between the outer formwork and the inner fixing clip, and it is welded to one end of the screw rod 7 through the screw rod 7 passing through the gap between the
在本发明实施例中,所述方木次龙骨4分别贴合在螺杆7所穿过缝隙处的上下侧,所述方木主龙骨5分别设置在螺杆7的两侧,且所述木胶板3、方木次龙骨4以及方木主龙骨5之间通过钢钉固定为一个整体,以确保木胶板3能够紧固的贴合在结构梁1与砌体墙2外侧壁上。In the embodiment of the present invention, the square wood sub keels 4 are attached to the upper and lower sides of the gap where the screw rod 7 passes through, the square wood
在本发明实施例中,所述螺杆7上螺纹套设有用于夹紧固定所述方木主龙骨5的加固螺母12,使螺杆7与外侧模板组合固定在一起,进而便于施工人员通过铁钩进行整体的移动。In the embodiment of the present invention, the threaded sleeve on the screw rod 7 is provided with a
在本发明实施例中,所述螺杆7穿过结构梁1与砌体墙2之间缝隙处的杆身上套设有PVC套管8,进行填缝作业时,可避免将螺杆7埋入塞缝混凝土内,以确保可将螺杆7抽出进行二次使用。In the embodiment of the present invention, the screw rod 7 passes through the gap between the
实施例二Embodiment two
请参阅图1~3,一种砌体外墙塞缝的工具,包括Please refer to Figures 1 to 3, a tool for plugging joints in masonry exterior walls, including
外侧模板,其设置在结构梁1与砌体墙2的外侧,且其由紧贴在所述结构梁1与砌体墙2外侧壁上的木胶板3、呈水平状贴合在所述木胶板3外侧的方木次龙骨4、呈竖直状贴合在所述方木次龙骨4外侧的方木主龙骨5构成;The outer formwork is arranged on the outer side of the
内侧固定卡件,其设置在所述结构梁1与砌体墙2的内侧,且其由呈竖直状紧贴在所述结构梁1与砌体墙2内侧壁上的方木龙骨10、贴合在所述方木龙骨10外侧的加固铁盘11构成;The inner fixed clip is arranged on the inner side of the
拉结组件,其用于连接在外侧模板与内侧固定卡件之间,且其由穿过所述结构梁1与砌体墙2之间缝隙处的螺杆7、与所述螺杆7一端焊接并呈水平状贴合在所述方木主龙骨5外侧的螺纹钢6,与所述螺杆7另一端螺纹咬合连接并位于所述加固铁盘11外侧的加固螺母12构成。The tie assembly is used to connect between the outer formwork and the inner fixing clip, and it is welded to one end of the screw rod 7 through the screw rod 7 passing through the gap between the
在本发明实施例中,所述方木龙骨10分别设置在螺杆7的两侧,拧紧固定螺母9时,可使加固铁盘11油两侧的方木龙骨10进行支撑,确保受力平衡。In the embodiment of the present invention, the square
在本发明实施例中,所述螺杆7穿过内侧固定卡件的一端焊接固定有铁环13,且所述铁环13上连接有牵引绳14,可通过收紧牵引绳14将外侧模板定位到合适位置,然后固定内侧固定卡件收紧模板进行塞缝作业,作业完成后松开内部卡具,放松牵引绳14到下一层,利用铁钩将牵引绳14拉入下一层工作面后重复上述作业。In the embodiment of the present invention, an
实施例三Embodiment Three
一种砌体外墙塞缝的工具的施工方法,其施工方法包括以下步骤:A construction method of a tool for plugging joints of a masonry exterior wall, the construction method comprising the following steps:
步骤一、砌体墙2施工完成14天后,由上一层板面用牵引绳14将外侧整体模板从楼外侧放下,从下一层砌体墙2顶部缝隙中用铁钩将牵引绳14拉入楼内侧,收紧牵引绳14将螺杆7拉入楼内侧,利用内侧方木龙骨10、加固铁盘11以及加固螺母12将模板加固牢固,松开牵引绳14开始塞缝作业;Step 1: 14 days after the construction of the
步骤二、塞缝作业完成后,拉紧牵引绳14,松开内侧加固螺母12以及卸下加固圆盘11后将牵引绳14利用预留PVC套管11的内部孔道将外侧整体模板下方到下一层,在下一层砌体墙2缝隙用铁钩将牵引绳14拉入楼内侧,重复以上作业;
步骤三、PVC套管11的内部PVC孔道后期用发泡胶填塞密实。
工作原理:施工人员将外侧模板与卡具固定牢固,将牵引绳14与螺杆7连接,通过收紧牵引绳14将外侧模板定位到合适位置,然后固定内侧卡具收紧模板进行塞缝作业,作业完成后松开内部卡具,放松牵引绳14到下一层,利用铁钩将牵引绳14拉入下一层工作面后重复上述作业。Working principle: The construction personnel fix the outer formwork and the jig firmly, connect the
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the invention is not limited to the details of the above-described exemplary embodiments, but that the invention can be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Accordingly, the embodiments should be regarded in all points of view as exemplary and not restrictive, the scope of the invention being defined by the appended claims rather than the foregoing description, and it is therefore intended that the scope of the invention be defined by the appended claims rather than by the foregoing description. All changes within the meaning and range of equivalents of the elements are embraced in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only contains an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202111412424.5A CN114109026B (en) | 2021-11-25 | 2021-11-25 | Tool and construction method for plugging joints in masonry exterior wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202111412424.5A CN114109026B (en) | 2021-11-25 | 2021-11-25 | Tool and construction method for plugging joints in masonry exterior wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN114109026A CN114109026A (en) | 2022-03-01 |
| CN114109026B true CN114109026B (en) | 2023-04-14 |
Family
ID=80373047
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202111412424.5A Active CN114109026B (en) | 2021-11-25 | 2021-11-25 | Tool and construction method for plugging joints in masonry exterior wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN114109026B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114704080A (en) * | 2022-04-28 | 2022-07-05 | 北京中铁建建筑科技有限公司 | Aluminum template and PC (polycarbonate) component combined mold hanging system and construction method |
| CN117266383B (en) * | 2023-08-02 | 2025-12-19 | 中建新疆建工集团第一建筑工程有限公司 | Shear force wall screw hole shutoff instrument |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106812219A (en) * | 2017-03-14 | 2017-06-09 | 中国十七冶集团有限公司 | Filling wall top stuff up a crack construction method |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5154241B2 (en) * | 2008-01-24 | 2013-02-27 | シーアイ化成株式会社 | Water stop ring and water stop construction method for concrete structures |
| CN102635179A (en) * | 2012-05-02 | 2012-08-15 | 魏勇 | Device for preventing beam or beamless slab filler wall top from cracking and construction method |
| CN204983647U (en) * | 2015-09-01 | 2016-01-20 | 云南建工集团有限公司 | Design instrument formula aluminum alloy template |
| CN206539005U (en) * | 2016-08-01 | 2017-10-03 | 中国建筑第八工程局有限公司 | Formwork structure for narrow and small movement joint both sides shear wall construction |
| CN109653382A (en) * | 2018-11-27 | 2019-04-19 | 上海宝冶集团有限公司 | Gap construction technology at the top of masonry wall between main structure |
| CN110454479A (en) * | 2019-08-07 | 2019-11-15 | 郑素青 | A kind of bolt installation method of narrow space |
| CN110905219A (en) * | 2019-12-02 | 2020-03-24 | 淙创(上海)企业管理咨询中心 | Frame structure and filler wall interface combined anti-crack structure and construction method |
-
2021
- 2021-11-25 CN CN202111412424.5A patent/CN114109026B/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106812219A (en) * | 2017-03-14 | 2017-06-09 | 中国十七冶集团有限公司 | Filling wall top stuff up a crack construction method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN114109026A (en) | 2022-03-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104695703B (en) | Exempt from boring shear wall construction template system and shear wall construction method | |
| CN112854745A (en) | Construction process of assembled building aluminum alloy template | |
| CN114109026B (en) | Tool and construction method for plugging joints in masonry exterior wall | |
| CN108005387A (en) | A kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers | |
| CN110145124A (en) | A reinforcement tool and its construction method for controlling the quality of horizontal stubble of shear walls | |
| CN110630011A (en) | Template reinforcing system for double shear walls at deformation joint and construction method thereof | |
| CN106906841A (en) | One kind is used for lateral wall form bracing system construction | |
| CN112112265A (en) | A dry-connected prefabricated beam-column connection node and construction method | |
| CN203403670U (en) | unsupported formwork system | |
| CN111719856A (en) | Bare concrete construction formwork system and construction method thereof | |
| CN111364664B (en) | Construction technology of steel truss floor deck without demolition bottom formwork | |
| CN110512776B (en) | Construction method of assembled steel structure multi-cavity steel plate composite shear wall | |
| CN210976588U (en) | Template reinforcing system for double shear walls at deformation joint | |
| CN109457960B (en) | Adjustable universal mold for integrally assembling cast-in-situ stair steps | |
| CN110939216A (en) | Plaster-free wall based on gypsum hollow building blocks | |
| CN206158172U (en) | Entrance to a cave template | |
| CN201321720Y (en) | Ring-beam no-putlog-hole template erecting device in brick and concrete structure construction | |
| CN111335358A (en) | Immersed tube tunnel end mold, end mold supporting platform and construction method thereof | |
| CN217151210U (en) | Shear wall template reinforced structure | |
| AU2021105980A4 (en) | Construction method for impervious concrete for mbbr water treatment process structure | |
| CN118049049A (en) | General column hoop and construction method for cast-in-situ special-shaped frame column by using general column hoop | |
| CN104453235A (en) | Convertor station firewall construction technology | |
| CN211873413U (en) | Plaster-free wall based on gypsum hollow building blocks | |
| CN210288448U (en) | Slope formwork support system | |
| CN212336412U (en) | An assembled wall connection structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: No.88 Guangming Road, Huaqiao Town, Kunshan City, Suzhou City, Jiangsu Province Applicant after: China Railway Construction Group East China Engineering Co.,Ltd. Applicant after: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd. Address before: 215332 rooms 808 and 809, No. 2, xugongqiao Road, Huaqiao Town, Kunshan City, Suzhou City, Jiangsu Province Applicant before: China Railway Construction Group East China Engineering Co.,Ltd. Applicant before: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd. |
|
| CB02 | Change of applicant information | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |