CN114104698B - Automatic upper plate wire connecting equipment processing automated production system - Google Patents

Automatic upper plate wire connecting equipment processing automated production system Download PDF

Info

Publication number
CN114104698B
CN114104698B CN202111363857.6A CN202111363857A CN114104698B CN 114104698 B CN114104698 B CN 114104698B CN 202111363857 A CN202111363857 A CN 202111363857A CN 114104698 B CN114104698 B CN 114104698B
Authority
CN
China
Prior art keywords
piece
push rod
pushing
conveyor belt
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111363857.6A
Other languages
Chinese (zh)
Other versions
CN114104698A (en
Inventor
马乾强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Xingju Home Furnishings Co ltd
Original Assignee
Hangzhou Gujia Custom Home Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Gujia Custom Home Co ltd filed Critical Hangzhou Gujia Custom Home Co ltd
Priority to CN202111363857.6A priority Critical patent/CN114104698B/en
Publication of CN114104698A publication Critical patent/CN114104698A/en
Application granted granted Critical
Publication of CN114104698B publication Critical patent/CN114104698B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/74Feeding, transfer, or discharging devices of particular kinds or types
    • B65G47/82Rotary or reciprocating members for direct action on articles or materials, e.g. pushers, rakes, shovels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27CPLANING, DRILLING, MILLING, TURNING OR UNIVERSAL MACHINES FOR WOOD OR SIMILAR MATERIAL
    • B27C3/00Drilling machines or drilling devices; Equipment therefor
    • B27C3/02Stationary drilling machines with a single working spindle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G13/00Roller-ways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G15/00Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration
    • B65G15/30Belts or like endless load-carriers
    • B65G15/32Belts or like endless load-carriers made of rubber or plastics
    • B65G15/42Belts or like endless load-carriers made of rubber or plastics having ribs, ridges, or other surface projections
    • B65G15/44Belts or like endless load-carriers made of rubber or plastics having ribs, ridges, or other surface projections for impelling the loads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G43/00Control devices, e.g. for safety, warning or fault-correcting
    • B65G43/08Control devices operated by article or material being fed, conveyed or discharged
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G57/00Stacking of articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G59/00De-stacking of articles
    • B65G59/06De-stacking from the bottom of the stack
    • B65G59/067De-stacking from the bottom of the stack articles being separated substantially perpendicularly to the axis of the stack
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/02Articles
    • B65G2201/0282Wooden articles, e.g. logs, trunks or planks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2203/00Indexing code relating to control or detection of the articles or the load carriers during conveying
    • B65G2203/04Detection means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Forests & Forestry (AREA)
  • De-Stacking Of Articles (AREA)

Abstract

The application relates to the field of plate processing equipment, in particular to an automatic production system for processing automatic upper plate connecting equipment, which comprises a machine body with a feeding end and a discharging end, wherein the feeding end of the machine body is provided with a conveyor belt, the conveyor belt is provided with a storage mechanism, the storage mechanism comprises a storage rack and a receiving table arranged below the storage rack, the conveyor belt is provided with a stop block which moves along the conveying direction along with the conveyor belt, the receiving table comprises two butt plates which are arranged at intervals, and the movement track of the stop block passes between the two butt plates; the discharge end of the machine body is also provided with a detection mechanism, the detection mechanism comprises a detector for detecting the wood board penetrating out of the discharge end of the machine body and a controller for receiving detection signals sent by the detector, and the controller controls the feeding of the conveyor belt according to the detection signals. The automatic feeding device can realize automatic feeding of the hole arrangement equipment, and has the effects of reducing the influence on the productivity of the hole arrangement equipment and reducing the operation intensity of staff.

Description

一种自动上板连线设备加工自动化生产系统An automatic production system for automatic board connection equipment processing

技术领域technical field

本申请涉及板材加工设备的领域,尤其是涉及一种自动上板连线设备加工自动化生产系统。The present application relates to the field of plate processing equipment, in particular to an automatic production system for automatic plate loading and connection equipment processing.

背景技术Background technique

六面钻是目前高端板式家具生产连线主要的排孔设备,机器内部采用双夹钳进料,可根据板材规格自动调节夹持位置,通过选配钻包和主轴的搭配,可以一次完成加工板材的正反面和四个侧孔所有孔位的加工,双面同时开槽、倒角异形加工等功能。The six-sided drill is currently the main hole arrangement equipment for the production line of high-end panel furniture. The machine uses double clamps to feed the material, and the clamping position can be automatically adjusted according to the plate specifications. By matching the matching drill bag and the spindle, the processing can be completed at one time. The front and back of the plate and all the four side holes are processed, double-sided simultaneous slotting, chamfering and special-shaped processing and other functions.

目前,主要是人工将木板放到设备的进料端口,夹钳加持住木板后再送入设备内加工,人工放板的操作和节拍容易影响设备的生产效率,进而降低设备的产能,因此需要改进。At present, it is mainly to manually put the wooden boards into the feeding port of the equipment. The clamps hold the wooden boards and then send them into the equipment for processing. The manual operation and rhythm of placing the boards will easily affect the production efficiency of the equipment, thereby reducing the production capacity of the equipment, so it needs to be improved. .

发明内容Contents of the invention

为了提升上料效率,减少对排孔设备产能的影响,本申请提供一种自动上板连线设备加工自动化生产系统。In order to improve the feeding efficiency and reduce the impact on the production capacity of the hole row equipment, the application provides an automatic production system for automatic board loading and wiring equipment processing.

本申请提供的一种自动上板连线设备加工自动化生产系统采用如下的技术方案:An automatic production system for automatic board-loading and wiring equipment processing provided by this application adopts the following technical solutions:

一种自动上板连线设备加工自动化生产系统,包括具有进料端和出料端的机体,机体进料端设有传送带,传送带上设有储料机构,储料机构包括用于竖向堆叠木板的储料架和设在储料架下方用于承接木板的承接台,承接台固定设置在传送带上,传送带上设有跟随传送带沿传输方向移动的挡块,承接台包括沿垂直于传送带的传输方向间隔排布的两块搭板,挡块的运动轨迹经过两块搭板之间;机体的出料端还设有检测机构,检测机构包括用于检测木板从机体出料端穿出的检测器和用于接收检测器所发出检测信号的控制器,控制器根据检测信号控制传送带进料。An automatic production system for automatic loading and connecting equipment processing, including a machine body with a feed end and a discharge end, the feed end of the machine body is provided with a conveyor belt, and a material storage mechanism is provided on the conveyor belt. The storage rack and the receiving platform for receiving wooden boards are arranged under the storage rack. The receiving platform is fixed on the conveyor belt. There are two boards arranged at intervals in the direction, and the movement track of the stopper passes between the two boards; the discharge end of the machine body is also equipped with a detection mechanism, which includes a detection mechanism for detecting the passage of wooden boards from the discharge end of the machine body. A detector and a controller for receiving the detection signal sent by the detector, and the controller controls the feeding of the conveyor belt according to the detection signal.

通过采用上述技术方案,传送带带动挡块移动从两块搭板之间穿过,挡块将搭板上的一块木板推至传送带上,储料架内的木板再下落一块木板到承接台上。挡块将木板从进料端送入机体内,木板在机体内钻孔加工结束后从出料端穿出,检测器检测到加工完的木板后,通过控制器使传送带再次运行,将下一块在承接台上的木板送入机体内加工,如此循环,从而实现了自动上料,可以减少对设备产能的影响,同时还可降低工作人员的作业强度。By adopting the above technical scheme, the conveyor belt drives the block to move and pass between the two boards, the block pushes a board on the board to the conveyor belt, and the board in the storage rack drops another board onto the receiving platform. The stopper sends the wooden board into the body from the feeding end, and the wooden board passes through the output end after the drilling process in the machine body. After the detector detects the processed wooden board, the conveyor belt runs again through the controller, and the next piece The wooden boards on the receiving table are sent into the machine body for processing, and this cycle realizes automatic feeding, which can reduce the impact on equipment production capacity and reduce the working intensity of the staff.

优选的,所述储料架包括用于放置木板的承载件,承载件位于承接台远离机体的一侧,并且承载件顶面的位置高于搭板顶面的位置;承载件远离承接台的一侧设有推料组件,推料组件包括推动件和设在推动件上的第一推杆,控制器控制推动件驱使第一推杆将承载件上的木板推至承接台上;承载件靠近承接台的一侧及与该侧相邻的一侧均设有第一挡板,两块第一挡板相连且同步竖向滑动设置在承载件上,承载件上还设有驱使第一挡板上移的顶升件,当推动件推动木板移动前,顶升件抬升第一挡板,第一挡板底面与承载件顶面之间的距离大于一块木板的厚度且小于两块木板的厚度。Preferably, the storage rack includes a carrier for placing wooden boards, the carrier is located on the side of the receiving platform away from the machine body, and the top surface of the carrier is higher than the top surface of the board; the carrier is far away from the receiving platform. One side is provided with a pusher assembly, the pusher assembly includes a pusher and a first push rod arranged on the pusher, the controller controls the pusher to drive the first pusher to push the wooden board on the carrier to the receiving platform; the carrier The side close to the receiving platform and the side adjacent to this side are provided with a first baffle, and the two first baffles are connected and synchronously vertically slid and arranged on the carrier, and the carrier is also provided with a driving first baffle. The lifting part that moves up the baffle, when the pushing part pushes the wooden board to move, the lifting part lifts the first baffle, and the distance between the bottom surface of the first baffle and the top surface of the bearing part is greater than the thickness of one wooden board and smaller than two wooden boards thickness of.

通过采用上述技术方案,控制器控制传送带运行以将承接台上的一块木板带下的同时,控制推动件将承载件上的一块木板推至承接台上,位于储料架最底层的木板在被推出时所受的阻力由推动件承担,而传送带推动承接台上的木板相对更加容易,传送带的传输便可更加顺利。By adopting the above technical solution, the controller controls the operation of the conveyor belt to bring down a wooden board on the receiving platform, and at the same time controls the pusher to push a wooden board on the carrier to the receiving platform, and the wooden board at the bottom of the storage rack The resistance suffered when pushing out is borne by the pusher, and it is relatively easier for the conveyor belt to push the planks on the receiving platform, so the transmission of the conveyor belt can be smoother.

其次,第一推杆将一块木板从承载件上推下时,上方的木板下落一定距离改由第一推杆支撑,当第一推杆从该木板与承载件之间抽出时,该木板再下落一段距离落在承载件上,可以减缓堆叠木板的下落速度,木板落在承载件上的冲击力及产生的噪音均可降低。Secondly, when the first push rod pushes a plank down from the carrier, the upper plank falls a certain distance and is supported by the first push rod. When the first push rod is pulled out from between the plank and the carrier, the plank will Dropping a certain distance on the carrier can slow down the falling speed of the stacked planks, and the impact force and noise generated by the planks falling on the carrier can be reduced.

两块第一挡板的设置,使得在向承载件上堆叠木板时,从最底层的一块木板开始起便可整齐地堆叠码放,木板最终掉落在传送带上的位置可被预期和控制,以使木板进入机体内后可被顺利被夹钳夹持。在推动木板从承载件上落下时,通过顶升件将第一挡板抬升一定的距离,仅使一块木板可被推动,而其上层的木板则被处于承载件靠近承接台一侧的第一挡板阻挡在储料架内。The arrangement of the two first baffles makes it possible to stack the planks neatly starting from the bottommost plank when stacking the planks on the carrier, and the position where the planks will eventually fall on the conveyor belt can be predicted and controlled, so as to After the wooden board enters the body, it can be smoothly clamped by the clamps. When the wooden board is pushed to fall from the supporting part, the first baffle plate is lifted by a certain distance through the jacking part, so that only one wooden board can be pushed, and the wooden board on the upper layer is placed on the first side of the supporting part near the receiving platform. The baffle is blocked in the material storage rack.

优选的,所述承载件上竖立有限位杆,限位杆上滑动套设有套筒,两块第一挡板均连接在套筒上,限位杆的顶端螺纹套设有限位块,当套筒与限位块抵接时,木板可从第一挡板与承载件之间穿过;顶升件包括滑动设置在承载件上的推动块,推动块的滑移方向与推动组件推动木板移动的方向平行,推动块与套筒之间设有倾斜的牵引杆,牵引杆的高端与套筒转动连接,牵引杆的低端与推动块铰接;推动件上还设有用于推动推动块移动的第二推杆,第二推杆与推动件之间设有弹性件,弹性件用于驱使第二推杆远离推动件,第二推杆在第一推杆推动木板之前先与推动块抵接。Preferably, a limit rod is erected on the carrier, a sleeve is provided on the sliding sleeve on the limit rod, the two first baffles are connected to the sleeve, and a limit block is provided on the threaded sleeve at the top of the limit rod. When the sleeve abuts against the limit block, the wooden board can pass between the first baffle plate and the carrier; the jacking member includes a push block slidably arranged on the carrier, and the sliding direction of the push block is the same as that of the push assembly to push the wooden board The direction of movement is parallel, and there is an inclined draw bar between the push block and the sleeve. The high end of the draw bar is rotatably connected with the sleeve, and the low end of the draw bar is hinged with the push block; The second push rod is provided with an elastic member between the second push rod and the push member, and the elastic member is used to drive the second push rod away from the push member, and the second push rod is against the push block before the first push rod pushes the plank catch.

通过采用上述技术方案,推动件驱使第一推杆推动木板时,第二推杆同步移动,并提前与推动块抵接,随后推动推动块移动,推动块移动而带动牵引杆转动,牵引杆的便将套筒连带两块第一挡板顶起,直至套筒与限位块抵接,第一挡板与承载件之间露出间隔位置仅供一块木板被推下。By adopting the above technical solution, when the pusher drives the first push rod to push the plank, the second push rod moves synchronously and contacts the push block in advance, and then pushes the push block to move, and the push block moves to drive the draw bar to rotate. Then the sleeve is lifted together with the two first baffles until the sleeve abuts against the limit block, and the space between the first baffle and the bearing part is exposed for only one wooden board to be pushed down.

由于第一挡板被顶起的高度即相近于木板的厚度,小于第一推杆将木板从承载件上推下的距离,故而通过弹性件的设置,在套筒抵住限位块后,第二推杆便停止移动,而推动件可以继续驱使第一推杆推动木板移动,此时弹性件的作用力持续使第二推杆抵住推动块,直至第二推杆回缩与推动块脱离时第一挡板再落下。Since the raised height of the first baffle is close to the thickness of the wooden board, which is smaller than the distance that the first push rod pushes the wooden board down from the bearing part, through the setting of the elastic part, after the sleeve touches the limit block, The second push rod stops moving, and the pusher can continue to drive the first push rod to push the plank to move. At this time, the active force of the elastic member continues to make the second push rod resist the push block until the second push rod retracts and pushes the block. When leaving, the first baffle plate falls again.

通过旋转限位块可以改变限位块在限位杆上的位置,从而调整第一挡板升起的高度,使储料架可适配堆叠不同厚度的木板,提升装置的实用性和灵活性。The position of the limit block on the limit rod can be changed by rotating the limit block, thereby adjusting the raised height of the first baffle, so that the storage rack can be adapted to stack wood boards of different thicknesses, and the practicality and flexibility of the lifting device .

优选的,所述承载件包括底板和转动连接在底板上的多根第二辊轮,多根第二辊轮沿推动件推动木板移动的方向间隔排布。Preferably, the carrier includes a bottom plate and a plurality of second rollers rotatably connected to the bottom plate, and the plurality of second rollers are arranged at intervals along the direction in which the pusher pushes the wooden board to move.

通过采用上述技术方案,第二辊轮的设置可以减小木板在被推动时与底板之间的摩擦力,从而降低推动件推动木板的阻力,使推动件可更加顺利地将木板逐一从承载件上推下。By adopting the above-mentioned technical solution, the setting of the second roller can reduce the friction between the wooden board and the bottom plate when being pushed, thereby reducing the resistance of the pushing member to push the wooden board, so that the pushing member can move the wooden boards one by one from the supporting member more smoothly. Push up and down.

优选的,所述第一推杆底侧的位置高度与第二辊轮顶侧的位置高度相同。Preferably, the height of the bottom side of the first push rod is the same as the height of the top side of the second roller.

通过采用上述技术方案,第一推杆将一块木板从承载件上推下而支撑上方的多层木板时,第一推杆所受到的竖向荷载可传递给第二辊轮,而第一推杆与推动件之间的弯矩作用便可减少,降低第一推杆发生弯曲的概率,使第一推杆可以顺利伸入到第二辊轮上并推动木板移动。By adopting the above-mentioned technical solution, when the first push rod pushes down a wooden board from the carrier to support the upper multi-layer wooden board, the vertical load received by the first push rod can be transmitted to the second roller, and the first push rod The bending moment action between the rod and the pusher can be reduced, reducing the probability of bending of the first push rod, so that the first push rod can smoothly extend into the second roller and push the plank to move.

优选的,所述储料机构还包括设在传送带上的安装件,底板的底部设有转轴,转轴与安装件可拆卸连接且转动设置,安装件上设置有用于限制转轴旋转的限位件。Preferably, the storage mechanism further includes a mounting part provided on the conveyor belt, a rotating shaft is provided at the bottom of the base plate, the rotating shaft is detachably connected to the mounting part and rotated, and the mounting part is provided with a limiting part for restricting the rotation of the rotating shaft.

通过采用上述技术方案,储料架通过底板的转轴与安装件插接实现可拆卸连接,使得储料架可从传送带取下堆叠好木板后,再通过叉车或者吊装设备装回,相比直接在传送带上堆叠木板更加方便。在将储料架安装在安装件上时,转轴转动的设置,使得工作人员可无需注意储料架在转运时的位置朝向,储料架的转运过程可以更加便捷。将储料架安装在安装件上后,再转动储料架调整其朝向即可,并用限位件限制储料架在工作的过程中发生转动而偏位。By adopting the above technical solution, the storage rack can be detachably connected by plugging the rotating shaft of the bottom plate with the mounting part, so that the storage rack can be removed from the conveyor belt and stacked with wooden boards, and then put back by a forklift or hoisting equipment. It is more convenient to stack planks on the conveyor belt. When the material storage rack is installed on the mounting part, the rotation of the rotating shaft is arranged so that the staff does not need to pay attention to the orientation of the material storage rack during transfer, and the transfer process of the material storage rack can be more convenient. After the storage rack is installed on the mounting piece, just turn the storage rack to adjust its orientation, and use the limiter to limit the rotation of the storage rack during the working process.

优选的,所述底板上设有两块第二挡板,两块第二挡板分别与一块第一挡板相对且间隔设置。Preferably, two second baffles are provided on the bottom plate, and the two second baffles are respectively opposite to one first baffle and arranged at intervals.

通过采用上述技术方案,两块第二挡板和两块第一挡板可以共同将堆叠的木板围挡住,避免在转运储料架的过程中木板堆发生倾斜倒塌。By adopting the above technical solution, the two second baffles and the two first baffles can jointly block the stacked wooden boards, so as to avoid the pile of wooden boards from tilting and collapsing during the process of transferring the storage rack.

优选的,两块所述第二挡板分别沿与各自相对的第一挡板的排布方向滑动设置,其中一块第二挡板上转动连接有第一螺杆和第二螺杆,底板上设有与第一螺杆螺纹连接的固定块,该块第二挡板上设有螺纹套设在第二螺杆上的滑块,另一块第二挡板与滑块连接。Preferably, the two second baffles are slidably arranged along the arrangement direction of the first baffles opposite to each other, one of the second baffles is rotatably connected with a first screw and a second screw, and the bottom plate is provided with The fixing block is threadedly connected with the first screw rod, the second baffle plate of the block is provided with a slide block threaded on the second screw rod, and another second baffle plate is connected with the slide block.

通过采用上述技术方案,通过旋转第一螺杆或第二螺杆,可以实现对应的第二挡板滑移,进而改变每块第二挡板与相对的一块第一挡板之间的距离,使储料架可以放置侧边长度不同的木板,且在没第二挡板停止移动后其位置可以固定。此外,在向储料架上堆叠木板时,使每块第二挡板与对应的第一挡板之间相较于木板尺寸有较大的距离,工作人员堆叠木板时可以更加方便。By adopting the above technical solution, by rotating the first screw or the second screw, the corresponding second baffle can be realized to slide, and then the distance between each second baffle and the opposite first baffle can be changed, so that the storage The material rack can place planks with different side lengths, and its position can be fixed after the second baffle plate stops moving. In addition, when stacking the wooden boards on the stocker, there is a larger distance between each second baffle and the corresponding first baffle than the size of the wooden boards, so that it is more convenient for the staff to stack the wooden boards.

优选的,所述第一推杆水平滑动设置在推动件上,并且第一推杆的滑移方向与推动件推动木板的方向垂直,推动件上设有用于锁定第一推杆位置的锁定件。Preferably, the first push rod is horizontally slidably arranged on the push member, and the sliding direction of the first push rod is perpendicular to the direction in which the push member pushes the plank, and the push member is provided with a locking member for locking the position of the first push rod .

通过采用上述技术方案,当木板与第一推杆抵接的一侧边长度改变后,滑动第一推杆改变其在推动件上的位置,使第一推杆继续正对木板的中部,木板在被第一推杆推动时所受力可以保持均匀,不容易被第一推杆推动偏位。第一推杆位置调整结束后再通过锁定件锁定其位置。By adopting the above-mentioned technical solution, when the length of the side of the plank abutting against the first push rod changes, slide the first push rod to change its position on the pusher, so that the first push rod continues to face the middle of the plank, and the plank When being pushed by the first push rod, the applied force can be kept uniform, and it is not easy to be pushed and shifted by the first push rod. After the position adjustment of the first push rod is completed, its position is locked by the locking piece.

综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:

通过传送带、储料架和承接台的设置,传送带将承接台上的一块木板送入机体内,储料架上的木板再下落一块木板至承接台上,形成自动上料;Through the setting of the conveyor belt, the storage rack and the receiving platform, the conveyor belt sends a wooden board on the receiving platform into the body, and the wooden board on the storage rack drops another wooden board to the receiving platform to form automatic feeding;

通过储料架的承载件和推动组件的设置,使传送带的传输更加顺利,同时可以减缓堆叠木板的下落速度,木板落在承载件上的冲击力及产生的噪音均可降低;Through the setting of the load-bearing parts and push components of the storage rack, the transmission of the conveyor belt is smoother, and at the same time, the falling speed of the stacked planks can be slowed down, and the impact force and noise generated by the planks falling on the support parts can be reduced;

通过两块第一挡板及其竖向滑动的设置,起到控制推动组件单次可被推下木板数量的作用的同时,还可为木板堆叠码放整齐提供参照;Through the setting of the two first baffles and their vertical sliding, while controlling the number of wooden boards that can be pushed down by the pushing component at a time, it can also provide a reference for the neat stacking of wooden boards;

通过两块第二挡板及其在承载件上水平移动的设置,可以避免在转运储料架的过程中木板堆发生倾斜倒塌,同时储料架可以装载不同大小的木板。Through the arrangement of the two second baffles and their horizontal movement on the carrier, it is possible to avoid tilting and collapsing of the pile of wooden boards during the process of transferring the storage rack, and meanwhile, the storage rack can be loaded with boards of different sizes.

附图说明Description of drawings

图1是本申请实施例中自动上板连线设备加工自动化生产系统的整体结构示意图;FIG. 1 is a schematic diagram of the overall structure of the automatic production system for automatic board-loading and wiring equipment processing in the embodiment of the present application;

图2是表示传送带和储料机构的结构示意图;Fig. 2 is a structural representation of a conveyer belt and a storage mechanism;

图3是检测机构的控制流程图;Fig. 3 is the control flowchart of detection mechanism;

图4是图2视角下主要表示推动组件的结构示意图;Fig. 4 is a schematic structural diagram mainly showing the push assembly from the perspective of Fig. 2;

图5是图4中A部分的放大示意图;Fig. 5 is an enlarged schematic view of part A in Fig. 4;

图6是图2视角下主要表示储料架的结构示意图;Fig. 6 is a schematic structural view mainly showing the storage rack from the perspective of Fig. 2;

图7是表示承载件的结构示意图;Fig. 7 is a schematic view showing the structure of the carrier;

图8是表示承载件底部的结构示意图;Fig. 8 is a schematic view showing the structure of the bottom of the carrier;

图9是主要表示安装件的结构示意图;Fig. 9 is a schematic view mainly showing the structure of the mounting part;

图10是表示储料架相对于图2的另一侧视角的结构示意图;Fig. 10 is a structural schematic view showing the perspective of the other side of the storage rack relative to Fig. 2;

图11是主要表示储料架中第二挡板的位置及结构示意图。Fig. 11 is a schematic diagram mainly showing the position and structure of the second baffle in the stocker.

附图标记说明:1、机体;11、进料端;12、出料端;2、传送带;21、机架;22、第一辊轮;23、皮带;24、电机;25、挡块;3、储料机构;31、推动组件;311、推动件;3111、气缸;3112、连接杆;3113、弹簧;3114、连接块;3115、第二螺栓;312、第一推杆;313、第二推杆;32、储料架;321、承载件;3211、底板;32111、嵌槽;3212、第二辊轮;3213、转轴;32121、限位孔;322、第一挡板;3221、限位杆;3222、套筒;3223、限位块;323、第二挡板;3231、第一螺杆;3232、第二螺杆;3233、固定块;3234、滑块;324、顶升件;3241、推动块;3242、牵引杆;325、安装件;3251、横梁;3252、安装板;3253、第一螺栓;33、承接台;331、搭板;4、检测机构;41、检测器;42、控制器;5、木板。Explanation of reference signs: 1, body; 11, feed end; 12, discharge end; 2, conveyor belt; 21, frame; 22, first roller; 23, belt; 24, motor; 25, block; 3, storage mechanism; 31, push assembly; 311, push member; 3111, cylinder; 3112, connecting rod; 3113, spring; 3114, connecting block; 3115, second bolt; 312, first push rod; Two push rods; 32, storage rack; 321, bearing member; 3211, bottom plate; 32111, embedding groove; 3212, second roller; 3213, rotating shaft; Limit rod; 3222, sleeve; 3223, limit block; 323, second baffle plate; 3231, first screw rod; 3232, second screw rod; 3233, fixed block; 3234, slide block; 324, jacking piece; 3241, push block; 3242, drawbar; 325, mounting piece; 3251, beam; 3252, mounting plate; 3253, first bolt; 42. Controller; 5. Wooden board.

具体实施方式Detailed ways

以下结合附图1-11对本申请作进一步详细说明。The present application will be described in further detail below in conjunction with accompanying drawings 1-11.

本申请实施例公开一种自动上板连线设备加工自动化生产系统。参照图1,生产系统包括用于对木板5钻孔的机体1,机体1具有进料端11和出料端12两个端口,机体1的进料端11设置有传送带2,传送带2上设置有用于放置多块木板5的储料机构3,机体1的出料端12设有检测机构4,检测机构4检测到一块木板5从机体1的出料端12穿出,便控制传送带2运行,将储料机构3的一块木板5从进料端11传送入机体1内,如此循环。The embodiment of the present application discloses an automatic production system for automatic board-loading and wiring equipment processing. Referring to Fig. 1, the production system includes a machine body 1 for drilling a plank 5, the machine body 1 has two ports of a feed end 11 and a discharge end 12, the feed end 11 of the machine body 1 is provided with a conveyor belt 2, and the conveyor belt 2 is provided with There is a material storage mechanism 3 for placing a plurality of wooden boards 5. The discharge end 12 of the body 1 is provided with a detection mechanism 4. The detection mechanism 4 detects that a wooden board 5 passes through the discharge end 12 of the body 1, and then controls the operation of the conveyor belt 2. , a plank 5 of the material storage mechanism 3 is conveyed into the body 1 from the feed end 11, and the circulation is like this.

参照图1和图2,传送带2包括机架21和设置在机架21两端的两个第一辊轮22,两个第一辊轮22之间套设有皮带23,机架21上安装有驱使其中一个第一辊轮22的电机24。皮带23上固定有挡块25,本实施例挡块25设置为两块,且沿皮带23的传输方向均匀间隔排布。每个挡块25跟随皮带23移动经过储料机构3时,便带动一块木板5朝向机体1移动。Referring to Fig. 1 and Fig. 2, conveyer belt 2 comprises frame 21 and is arranged on two first rollers 22 of frame 21 two ends, is provided with belt 23 between two first rollers 22, is installed on frame 21 A motor 24 that drives one of the first rollers 22 . A stopper 25 is fixed on the belt 23 . In this embodiment, two stoppers 25 are arranged at regular intervals along the transmission direction of the belt 23 . When each block 25 follows the belt 23 and moves through the storage mechanism 3 , it drives a wooden board 5 to move toward the body 1 .

参照图1、图2和图3,检测机构4包括安装在机体1上的检测器41和控制器42,其中检测器41位于机体1的出料端12,本实施例中检测器41为红外检测器41,控制器42为单片机。检测器41检测到有木板5从机体1出料端12穿出后,将检测信号传递给控制器42,控制器42根据检测信号控制电机24的转动,使传送带2以预设速度运行预设时间,一个挡块25完成将储料机构3的一块木板5推入机体1内的行程后,另一个挡块25移动至储料机构3远离机体1一侧的位置。Referring to Fig. 1, Fig. 2 and Fig. 3, detection mechanism 4 comprises detector 41 and controller 42 installed on body 1, wherein detector 41 is positioned at the discharge end 12 of body 1, and detector 41 is infrared in the present embodiment The detector 41 and the controller 42 are single-chip microcomputers. After the detector 41 detects that the board 5 passes through the discharge end 12 of the machine body 1, the detection signal is transmitted to the controller 42, and the controller 42 controls the rotation of the motor 24 according to the detection signal, so that the conveyor belt 2 runs at a preset speed. Time, after a stopper 25 completes the stroke of pushing a plank 5 of the material storage mechanism 3 into the body 1, the other stopper 25 moves to a position where the storage mechanism 3 is away from the body 1 side.

参照图2,储料机构3包括沿传送带2传输方向依次水平排布的推动组件31、储料架32及承接台33,储料架32用于竖向堆叠木板5,推动组件31用于将储料架32最底层的一块木板5推到承接台33上,皮带23上的挡块25再将承接台33上的木板5推至皮带23上。Referring to Fig. 2, material storage mechanism 3 comprises push assembly 31, material storage rack 32 and accepting platform 33 that are arranged horizontally successively along conveyor belt 2 transmission direction, and material storage rack 32 is used for stacking planks 5 vertically, and push assembly 31 is used for A piece of plank 5 on the bottom of the material storage rack 32 is pushed onto the receiving platform 33 , and the block 25 on the belt 23 pushes the plank 5 on the receiving platform 33 onto the belt 23 again.

参照图2,承接台33包括水平间隔设置的两块搭板331,两块搭板331的排布方向与传送带2的传输方向垂直。两块搭板331均悬空于皮带23的上方,挡块25跟随皮带23移动的运动轨迹从两块搭板331之间穿过,两块搭板331相互远离的一侧分别固定在传送带2的机架21上,两块搭板331相对一侧之间的距离大于相同方向上的挡块25的宽度。搭板331顶面的位置高度低于挡块25的顶面位置高度,如此挡块25从两块搭板331之间穿过时,便可将搭板331上的木板5推至皮带23上。Referring to FIG. 2 , the receiving platform 33 includes two boards 331 horizontally spaced apart, and the arrangement direction of the two boards 331 is perpendicular to the conveying direction of the conveyor belt 2 . The two straps 331 are all suspended above the belt 23, and the block 25 follows the moving track of the belt 23 and passes between the two straps 331. The sides of the two straps 331 that are far away from each other are respectively fixed on the sides of the conveyor belt 2. On the frame 21 , the distance between the opposite sides of the two boards 331 is greater than the width of the stopper 25 in the same direction. The position height of the top surface of the board 331 is lower than the height of the top surface of the block 25, so when the block 25 passes between the two boards 331, the plank 5 on the board 331 can be pushed onto the belt 23.

参照图2和图4,推动组件31包括推动件311和安装在推动件311上的第一推杆312,推动件311包括气缸3111,气缸3111安装在机架21上,气缸3111的活塞杆平行于传送带2的传输方向,气缸3111的活塞杆端部固定连接有一根水平连接杆3112,并且连接杆3112与气缸3111的活塞杆垂直,第一推杆312通过连接杆3112与气缸3111连接,第一推杆312与气缸3111的活塞杆平行,气缸3111通过第一推杆312推动储料架32上的木板5移动。With reference to Fig. 2 and Fig. 4, push assembly 31 comprises push piece 311 and the first push rod 312 that is installed on push piece 311, push piece 311 comprises cylinder 3111, and cylinder 3111 is installed on the frame 21, and the piston rod of cylinder 3111 is parallel In the transmission direction of the conveyor belt 2, a horizontal connecting rod 3112 is fixedly connected to the end of the piston rod of the cylinder 3111, and the connecting rod 3112 is perpendicular to the piston rod of the cylinder 3111, the first push rod 312 is connected to the cylinder 3111 through the connecting rod 3112, the second A push rod 312 is parallel to the piston rod of the cylinder 3111, and the cylinder 3111 pushes the plank 5 on the storage rack 32 through the first push rod 312 to move.

参照图2和图3,控制器42控制传送带2的电机24转动的同时,同样控制气缸3111活塞杆的往复运动,使气缸3111带动第一推杆312移动预设距离。当挡块25开始推动承接台33上的木板5同时,第一推杆312开始推动储料架32上的木板5,当承接台33上的木板5脱离承接台33到皮带23上时,储料架32上的一块木板5被推动落至承接台33上。2 and 3, the controller 42 controls the rotation of the motor 24 of the conveyor belt 2, and also controls the reciprocating movement of the piston rod of the cylinder 3111, so that the cylinder 3111 drives the first push rod 312 to move a preset distance. When the block 25 starts to push the wooden board 5 on the receiving platform 33, the first push rod 312 starts to promote the wooden board 5 on the storage rack 32, and when the wooden board 5 on the receiving platform 33 breaks away from the receiving platform 33 to the belt 23, the storage A plank 5 on the material rack 32 is pushed and falls onto the receiving platform 33 .

参照图6和图7,储料架32包括设置在传送带2上用于放置木板5的承载件321,承载件321包括底板3211和设置在底板3211顶面的多根第二辊轮3212,本实施例以矩形的底板3211为例,底板3211的长边延伸方向与传送带2的传输方向平行,第二辊轮3212的轴线方向与底板3211的宽边延伸方向平行,多根第二辊轮3212沿平行于底板3211长边的延伸方向均匀间隔排布。6 and 7, the storage rack 32 includes a carrier 321 arranged on the conveyor belt 2 for placing planks 5, the carrier 321 includes a bottom plate 3211 and a plurality of second rollers 3212 arranged on the top surface of the bottom plate 3211, this The embodiment takes a rectangular bottom plate 3211 as an example, the long side extension direction of the bottom plate 3211 is parallel to the transmission direction of the conveyor belt 2, the axis direction of the second roller 3212 is parallel to the wide side extension direction of the bottom plate 3211, and multiple second rollers 3212 They are evenly spaced along the extending direction parallel to the long side of the bottom plate 3211 .

参照图7,底板3211的顶面开设有嵌槽32111,多根第二辊轮3212均处于嵌槽32111内,第二辊轮3212的两端分别与相邻的一侧嵌槽32111内壁转动连接。第二辊轮3212顶侧的位置高度高于底板3211顶面的位置高度,放置在承载件321上的木板5由第二辊轮3212承载,可以减少气缸3111通过第一推杆312推动木板5移动时的阻力。同时,承载件321由多根第二辊轮3212顶侧所确定的平面位置高于搭板331顶面的位置,在承载件321上的木板5能够顺利被推到承接台33上。Referring to Fig. 7, the top surface of the bottom plate 3211 is provided with a slot 32111, a plurality of second rollers 3212 are located in the slot 32111, and the two ends of the second roller 3212 are respectively connected to the inner wall of the adjacent side slot 32111 for rotation. . The position height of the top side of the second roller 3212 is higher than the position height of the top surface of the bottom plate 3211, and the wooden board 5 placed on the carrier 321 is carried by the second roller 3212, which can reduce the cylinder 3111 pushing the wooden board 5 through the first push rod 312 Resistance when moving. At the same time, the plane position of the carrier 321 determined by the top sides of the plurality of second rollers 3212 is higher than the position of the top surface of the board 331 , and the plank 5 on the carrier 321 can be pushed onto the receiving platform 33 smoothly.

参照图6,承载件321上还设置有第一挡板322,本实施例中第一挡板322设置为两块。其中一块第一挡板322竖立在底板3211靠近承接台33的一侧宽边,该块第一挡板322的底边与底板3211的宽边延伸方向平行。另一块第一挡板322竖立在底板3211相邻一侧的长边,两块第一挡板322底边所对应的延伸方向相互垂直并且相互连接。两块第一挡板322的底面齐平,并且均与底板3211的顶面抵接,在承载件321上堆叠木板5时,参照两块第一挡板322的位置,可使木板5堆叠码放的更加整齐。Referring to FIG. 6 , a first baffle 322 is also provided on the carrier 321 , and in this embodiment, there are two first baffles 322 . One of the first baffles 322 is erected on the wide side of the bottom plate 3211 close to the receiving platform 33 , and the bottom of the first baffle 322 is parallel to the extending direction of the wide side of the bottom plate 3211 . Another first baffle 322 is erected on the long side of the adjacent side of the bottom plate 3211 , and the extension directions corresponding to the bottom sides of the two first baffles 322 are perpendicular to each other and connected to each other. The bottom surfaces of the two first baffles 322 are flush and both abut against the top surface of the bottom plate 3211. When the wooden boards 5 are stacked on the carrier 321, the positions of the two first baffles 322 can be referred to so that the wooden boards 5 can be stacked and stacked. more tidy.

参照图6,底板3211靠近两块第一挡板322连接处的角部竖立有一根限位杆3221,限位杆3221上滑动套设由一个套筒3222,两块第一挡板322均固定连接在套筒3222上,两块第一挡板322通过套筒3222和限位杆3221实现竖向滑动连接在底板3211上。限位杆3221的横截面为正方形,套筒3222为与限位杆3221配合的方环形套筒3222,用以限制两块第一挡板322绕限位杆3221转动。限位杆3221的顶端螺纹套设有一块限位块3223,用于限制套筒3222上移的高度。Referring to Fig. 6, a limit rod 3221 is erected at the corner of the bottom plate 3211 close to the junction of the two first baffle plates 322, and a sleeve 3222 is slidingly sleeved on the limit rod 3221, and the two first baffle plates 322 are fixed. Connected to the sleeve 3222 , the two first baffles 322 are vertically slidably connected to the bottom plate 3211 through the sleeve 3222 and the limit rod 3221 . The cross section of the limiting rod 3221 is square, and the sleeve 3222 is a square annular sleeve 3222 matched with the limiting rod 3221 to limit the rotation of the two first baffles 322 around the limiting rod 3221 . A limit block 3223 is threaded on the top of the limit rod 3221 to limit the height of the sleeve 3222 moving up.

当气缸3111通过第一推杆312推动木板5之前,两块第一挡板322向上移动直至套筒3222顶端与限位块3223抵接,第一挡板322上移到最高的位置,此时第一挡板322底面与承载件321顶面,即第二辊轮3212顶侧所处的水平面之间的距离大于一块木板5的厚度,且小于两块木板5的厚度。当第一推杆312开始推动木板5移动时,处于底板3211靠近承接台33一侧的第一挡板322便可允许一块木板5通过,且能够将上一层的一块木板5阻挡在储料架32上。通过旋转限位块3223可以改变限位块3223的位置高度,进而使储料架32能够装载不同厚度的木板5。Before the cylinder 3111 pushes the plank 5 through the first push rod 312, the two first baffles 322 move upward until the top of the sleeve 3222 abuts against the stopper 3223, and the first baffle 322 moves up to the highest position. The distance between the bottom surface of the first baffle 322 and the top surface of the carrier 321 , that is, the horizontal plane where the top side of the second roller 3212 is greater than the thickness of one wooden board 5 , and smaller than the thickness of two wooden boards 5 . When the first push rod 312 began to push the wooden board 5 to move, the first baffle plate 322 on the side of the bottom plate 3211 close to the receiving platform 33 could allow a wooden board 5 to pass through, and could block a wooden board 5 on the upper floor in the storage. Rack 32. The position height of the limit block 3223 can be changed by rotating the limit block 3223, so that the stocker 32 can be loaded with wood boards 5 of different thicknesses.

值得说明的是,第一推杆312将一块木板5从底板3211上推下时,上层堆叠的木板5则改由第一推杆312支撑,为使第一推杆312与连接杆3112连接处不容易弯曲变形,第一推杆312底侧的位置高度与第二辊轮3212顶侧的位置高度相同,如此第一推杆312所受到的竖向荷载可传递给第二辊轮3212,能够降低第一推杆312发生弯曲的概率。It is worth noting that when the first push rod 312 pushes down a plank 5 from the bottom plate 3211, the upper stacked plank 5 is then supported by the first push rod 312, in order to make the connection between the first push rod 312 and the connecting rod 3112 It is not easy to bend and deform, and the height of the bottom side of the first push rod 312 is the same as that of the top side of the second roller 3212, so that the vertical load on the first push rod 312 can be transmitted to the second roller 3212, which can The probability of bending of the first push rod 312 is reduced.

参照图6,底板3211上还设有一组顶升件324,当第一推杆312推动木板5之前,顶升件324作用以将套筒3222连带两块第一挡板322顶起。当第一推杆312开始推动木板5移动的时分,套筒3222上移到与限位块3223抵接的位置。Referring to FIG. 6 , there is also a set of jacking parts 324 on the bottom plate 3211 , before the first push rod 312 pushes the wooden board 5 , the jacking parts 324 function to lift the sleeve 3222 together with the two first baffles 322 . When the first push rod 312 starts to push the wooden board 5 to move, the sleeve 3222 moves up to a position where it abuts against the limit block 3223 .

参照图6,顶升件324包括滑动连接在底板3211上的推动块3241,本实施例中推动块3241处于底板3211设置有第一挡板322的一侧长边,推动块3241沿底板3211该侧长边的延伸方向滑移,推动块3241位于该第一挡板322远离底板3211中心的一侧,且位于限位杆3221靠近第一推杆312的一侧。Referring to Fig. 6, the jacking member 324 includes a push block 3241 slidably connected to the bottom plate 3211. In this embodiment, the push block 3241 is located on the long side of the bottom plate 3211 provided with the first baffle plate 322, and the push block 3241 is along the bottom plate 3211. The extension direction of the side long side slides, and the pushing block 3241 is located on the side of the first baffle plate 322 away from the center of the bottom plate 3211 , and is located on the side of the limiting rod 3221 close to the first push rod 312 .

参照图6,推动块3241与套筒3222之间连接有一根倾斜的牵引杆3242,牵引杆3242的高端与套筒3222转动连接,牵引杆3242的低端与推动块3241的顶面铰接,牵引杆3242低端的转动轴线水平设置且与推动块3241的滑移方向垂直,牵引杆3242两端的转动轴线相互平行。当推动块3241朝向套筒3222移动时,牵引杆3242的趋向于竖直状态,套筒3222便会被牵引杆3242顶起,反之套筒3222便会下移。Referring to Fig. 6, an inclined draw bar 3242 is connected between the push block 3241 and the sleeve 3222, the high end of the draw bar 3242 is rotationally connected with the sleeve 3222, the low end of the draw bar 3242 is hinged with the top surface of the push block 3241, and the traction The rotation axis of the lower end of the rod 3242 is arranged horizontally and perpendicular to the sliding direction of the pushing block 3241, and the rotation axes of the two ends of the draw rod 3242 are parallel to each other. When the push block 3241 moves towards the sleeve 3222, the draw bar 3242 tends to be in a vertical state, and the sleeve 3222 will be lifted up by the draw bar 3242, otherwise the sleeve 3222 will move down.

参照图4和图6,推动件311上还设有用于推动推动块3241移动的第二推杆313,第二推杆313的轴线与推动块3241的滑移方向平行,第二推杆313一端设置在连接杆3112上,第二推杆313远离连接杆3112的一端用于与推动块3241抵接。气缸3111作为动力源,通过连接杆3112推动第一推杆312和第二推杆313同步移动。第二推杆313滑动穿设于连接杆3112上,第二推杆313与连接杆3112之间设有弹性件,本实施例中弹性件为弹簧3113,弹簧3113套设在第二推杆313上,弹簧3113一端与连接杆3112抵接,另一端固定在第二推杆313上,弹簧3113始终处于压缩状态,用于驱使第二推杆313用于抵接推动块3241的一端远离连接杆3112。4 and 6, the pusher 311 is also provided with a second push rod 313 for pushing the push block 3241 to move, the axis of the second push rod 313 is parallel to the sliding direction of the push block 3241, and one end of the second push rod 313 It is arranged on the connecting rod 3112 , and the end of the second push rod 313 away from the connecting rod 3112 is used to abut against the pushing block 3241 . The cylinder 3111 is used as a power source, and pushes the first push rod 312 and the second push rod 313 to move synchronously through the connecting rod 3112 . The second push rod 313 slides through the connecting rod 3112, and an elastic member is provided between the second push rod 313 and the connecting rod 3112. In this embodiment, the elastic member is a spring 3113, and the spring 3113 is sleeved on the second push rod 313. One end of the spring 3113 abuts against the connecting rod 3112, and the other end is fixed on the second push rod 313. The spring 3113 is always in a compressed state, and is used to drive the end of the second push rod 313 used to abut against the push block 3241 away from the connecting rod 3112.

参照图4和图6,在气缸3111活塞杆处于缩回行程的终点位置时,第一推杆312与所将推动木板5之间的距离,大于第二推杆313与推动块3241之间的距离,当气缸3111的活塞杆伸出时,第二推杆313将在第一推杆312推动木板5之前先与推动块3241抵接,当在第一推杆312开始推动木板5移动时,第一挡板322与底板3211之间能够露出间隔位置以供一块木板5滑出。在套筒3222抵住限位块3223后,第二推杆313便停止移动,而气缸3111活塞杆继续驱使第一推杆312推动木板5移动,此时弹簧3113被进一步压缩,弹簧3113的弹力使第二推杆313持续抵住推动块3241,直至气缸3111活塞杆回缩第二推杆313与推动块3241脱离时,第一挡板322再落下。4 and 6, when the piston rod of the cylinder 3111 is at the terminal position of the retraction stroke, the distance between the first push rod 312 and the plank 5 to be pushed is greater than the distance between the second push rod 313 and the push block 3241 distance, when the piston rod of the cylinder 3111 stretched out, the second push rod 313 would first abut against the push block 3241 before the first push rod 312 pushed the plank 5, and when the first push rod 312 began to push the plank 5 to move, A gap position can be exposed between the first baffle plate 322 and the bottom plate 3211 for a wooden board 5 to slide out. After the sleeve 3222 pressed against the stopper 3223, the second push rod 313 stopped moving, and the piston rod of the cylinder 3111 continued to drive the first push rod 312 to push the plank 5 to move. At this time, the spring 3113 was further compressed, and the elastic force of the spring 3113 Make the second push rod 313 keep against the push block 3241 until the piston rod of the cylinder 3111 retracts and when the second push rod 313 disengages from the push block 3241, the first baffle plate 322 falls again.

参照图6和图9,储料架32与传送带2之间设置有安装件325,储料架32通过安装件325安装在传送带2上。安装件325包括沿传送带2传输方向间隔排布的两根横梁3251,横梁3251的两端分别固定在传送带2的机架21上。两根横梁3251之间固定连接有一块安装板3252,储料架32的底板3211转动连接在安装板3252上。Referring to FIG. 6 and FIG. 9 , a mounting piece 325 is provided between the storage rack 32 and the conveyor belt 2 , and the storage rack 32 is mounted on the conveyor belt 2 through the mounting piece 325 . The mounting part 325 includes two beams 3251 arranged at intervals along the conveying direction of the conveyor belt 2 , and the two ends of the beams 3251 are respectively fixed on the frame 21 of the conveyor belt 2 . A mounting plate 3252 is fixedly connected between the two beams 3251 , and the bottom plate 3211 of the storage rack 32 is rotatably connected to the mounting plate 3252 .

参照图8,底板3211的底面固定连接有一根转轴3213,转轴3213穿设于安装板3252上且转动设置。转轴3213可从安装板3252上拔出,使得储料架32可从传送带2取下堆叠好木板5后,再通过叉车或者吊装设备装回,相比直接在传送带2上堆叠木板5更加方便。Referring to FIG. 8 , a rotating shaft 3213 is fixedly connected to the bottom surface of the bottom plate 3211 , and the rotating shaft 3213 passes through the mounting plate 3252 and is rotatably arranged. The rotating shaft 3213 can be pulled out from the mounting plate 3252, so that the storage rack 32 can be removed from the conveyor belt 2 to stack the planks 5, and then reinstalled by a forklift or lifting equipment, which is more convenient than directly stacking the planks 5 on the conveyor belt 2.

参照图9,安装板3252上设有用于限制转轴3213旋转的限位件,本实例中限位件为螺纹连接在安装板3252上的第一螺栓3253,转轴3213上开设有供第一螺栓3253插入的限位孔32121。在将储料架32安装回安装板3252上时,无需注意储料架32在转运时的位置朝向,储料架32装在安装板3252上后,再转动储料架32调整其朝向,使推动块3241处于可被第二推杆313推动的位置。此时转轴3213上的限位孔32121正对第一螺栓3253,工作人员旋转第一螺栓3253将其插入限位孔32121内,限制储料架32在工作的过程中发生转动而偏位。Referring to Fig. 9, the mounting plate 3252 is provided with a limiting member for restricting the rotation of the rotating shaft 3213. In this example, the limiting member is a first bolt 3253 threaded on the mounting plate 3252, and the rotating shaft 3213 is provided with a first bolt 3253. Insert the limit hole 32121. When the material storage rack 32 is installed back on the mounting plate 3252, it is not necessary to pay attention to the position of the material storage rack 32 during transfer. After the material storage rack 32 is installed on the mounting plate 3252, turn the material storage rack 32 to adjust its orientation so that The push block 3241 is at a position that can be pushed by the second push rod 313 . Now the limit hole 32121 on the rotating shaft 3213 is facing the first bolt 3253, and the worker rotates the first bolt 3253 to insert it in the limit hole 32121, so as to limit the rotation of the storage rack 32 during the work and to shift.

参照图10,承载件321上还设置有两块第二挡板323,两块第二挡板323分别与一块第一挡板322相对,每对第一挡板322和第二挡板323均分别位于底板3211相对的两侧边,每块第二挡板323均与相对的第一挡板322平行。两块第二挡板323和两块第一挡板322可以共同将堆叠的木板5围挡住,避免在转运储料架32的过程中木板5堆发生倾斜倒塌。Referring to Fig. 10, two second baffles 323 are also arranged on the carrier 321, and the two second baffles 323 are respectively opposite to a first baffle 322, and each pair of the first baffle 322 and the second baffle 323 are Located on opposite sides of the bottom plate 3211 , each second baffle 323 is parallel to the opposite first baffle 322 . The two second baffles 323 and the two first baffles 322 can jointly block the stacked wooden planks 5 to prevent the stack of wooden planks 5 from tilting and collapsing during the process of transferring the storage rack 32 .

参照图10和图11,处于底板3211长边的第二挡板323沿与相对的第一挡板322的排布方向即底板3211的宽度方向滑移,并且该第二挡板323的底面与第二辊轮3212顶侧抵接。底板3211上固定有一个固定块3233,固定块3233螺纹穿设有一根第一螺杆3231,第一螺杆3231的长度方向与底板3211的宽边方向平行,第一螺杆3231与该第一挡板322转动连接,旋转第一螺杆3231后,第一螺杆3231将会带动所连的第二挡板323移动。10 and 11, the second baffle plate 323 on the long side of the bottom plate 3211 slides along the arrangement direction of the opposite first baffle plate 322, that is, the width direction of the bottom plate 3211, and the bottom surface of the second baffle plate 323 is in line with the The top side of the second roller 3212 abuts. A fixed block 3233 is fixed on the bottom plate 3211, and a first screw rod 3231 is threaded through the fixed block 3233. The length direction of the first screw rod 3231 is parallel to the width direction of the bottom plate 3211. The first screw rod 3231 and the first baffle plate 322 Rotate the connection, after the first screw 3231 is rotated, the first screw 3231 will drive the connected second baffle 323 to move.

参照图11,处于底板3211宽边的第二挡板323沿与相对的第一挡板322的排布方向即底板3211的长度方向滑移,该第二挡板323滑动连接在另一块第二挡板323上。另一块第二挡板323上转动连接有一根第二螺杆3232,第二螺杆3232水平设置且与第一螺杆3231垂直,第二螺杆3232上螺纹套设有一个滑块3234,滑块3234与处于底板3211宽边的第二挡板323连接,旋转第二螺杆3232后,滑块3234与所连接的第二挡板323便会开始移动。当储料架32所装载的木板5边长发生变化后,滑移对应的第二挡板323,调整与之相对的第一挡板322之间的距离,使第二挡板323可以继续发挥支挡木板5的作用。Referring to Fig. 11, the second baffle plate 323 on the wide side of the bottom plate 3211 slides along the arrangement direction of the opposite first baffle plate 322, that is, the length direction of the bottom plate 3211, and the second baffle plate 323 is slidingly connected to another second baffle plate 323. On the baffle 323. Another piece of second baffle plate 323 is rotatably connected with a second screw rod 3232, the second screw rod 3232 is horizontally arranged and perpendicular to the first screw rod 3231, and a slider 3234 is threaded on the second screw rod 3232, and the slider 3234 is in contact with the first screw rod 3231. The second baffle 323 on the wide side of the bottom plate 3211 is connected, and after the second screw 3232 is rotated, the slider 3234 and the connected second baffle 323 will start to move. When the side length of the board 5 loaded by the storage rack 32 changes, slide the corresponding second baffle plate 323, and adjust the distance between the first baffle plate 322 opposite to it, so that the second baffle plate 323 can continue to play its role. Support the effect of blocking plank 5.

参照图4和图5,第一推杆312靠近连接杆3112的一端固定有一个连接块3114,连接块3114套设在连接杆3112上且沿连接杆3112的长度方向滑移,连接杆3112的横截面为矩形,用以限制连接块3114的转动。连接块3114上设有锁定件,本实施例中锁定件为第二螺栓3115,第二螺栓3115螺纹连接在连接块3114上并与连接杆3112抵紧。当储料架32上转载的木板5朝向第一推杆312的一侧边长改变后,对应地滑动第一推杆312,改变第一推杆312所正对储料架32的位置,使第一推杆312继续正对木板5的中部,木板5在被第一推杆312推动时所受力可以保持均匀,不容易被第一推杆312推动偏位。第一推杆312的位置调整结束后,再旋紧第二螺栓3115来锁定连接块3114的位置。4 and 5, a connecting block 3114 is fixed on the end of the first push rod 312 close to the connecting rod 3112. The connecting block 3114 is sleeved on the connecting rod 3112 and slides along the length direction of the connecting rod 3112. The connecting rod 3112 The cross section is rectangular, used to limit the rotation of the connection block 3114 . The connecting block 3114 is provided with a locking piece, in this embodiment the locking piece is a second bolt 3115 , and the second bolt 3115 is threaded on the connecting block 3114 and pressed against the connecting rod 3112 . After the length of the side of the side of the first push rod 312 of the plank 5 reproduced on the storage rack 32 changes, the first push rod 312 is correspondingly slid, and the position of the first push rod 312 facing the storage rack 32 is changed, so that The first push rod 312 continues to face the middle part of the plank 5, and the force on the plank 5 when pushed by the first push rod 312 can be kept uniform, and it is not easy to be displaced by the first push rod 312. After the position adjustment of the first push rod 312 is completed, the second bolt 3115 is tightened to lock the position of the connecting block 3114 .

本申请实施例的实施原理为:工作人员先在储料架32上堆放一定数量的木板5,参照两块第一挡板322的位置将木板5堆叠整齐,然后将储料架32放置在安装板3252上。The implementation principle of the embodiment of the present application is: the staff first stacks a certain amount of planks 5 on the storage rack 32, stacks the planks 5 neatly with reference to the positions of the two first baffle plates 322, and then places the storage rack 32 on the installation Board 3252.

启动气缸3111同步推动第一推杆312和第二推杆313移动,第二推杆313的移动通过顶升件324先将两块第一挡板322顶起,第一挡板322与底板3211之间露出仅允许一块木板5通过的间距,随后第一推杆312抵底板3211上最底层的一块木板5,并将其从底板3211上推下落至承接台33上。启动传送带2带动挡块25移动,挡块25从承接台33的两块搭板331之间穿过时,将可把其上的木板5推至传送带2上,随即被送入机体1内进行加工。随后再通过气缸3111推动一块木板5到承接台33上进行备料。The starting cylinder 3111 synchronously pushes the first push rod 312 and the second push rod 313 to move, and the movement of the second push rod 313 first lifts up the two first baffles 322 through the jacking member 324, and the first baffle 322 and the bottom plate 3211 There is a gap that allows only one plank 5 to pass through, and then the first push rod 312 touches the bottommost plank 5 on the bottom plate 3211 , and pushes it down from the bottom plate 3211 to the receiving platform 33 . Start the conveyor belt 2 to drive the stopper 25 to move. When the stopper 25 passes between the two boards 331 of the receiving platform 33, the wooden board 5 on it will be pushed onto the conveyor belt 2, and then it will be sent into the body 1 for processing. . Then promote a plank 5 to the receiving platform 33 by the cylinder 3111 and prepare materials.

加工完毕的木板5从机体1的出料端12穿出,并被检测器41检测到,检测器41通过控制器42控制气缸3111和传送带2的电机24运行,传送带2通过挡块25先带动承接台33上的木板5移动,同时气缸3111推动储料架32上的一块木板5移动,当承接台33上的木板5被推至传送带2上时,储料架32上的一块木板5被推至承接台33上,如此循环进行上料。The processed wooden board 5 passes through the discharge end 12 of the machine body 1 and is detected by the detector 41. The detector 41 controls the operation of the cylinder 3111 and the motor 24 of the conveyor belt 2 through the controller 42, and the conveyor belt 2 is first driven by the stopper 25. The plank 5 on the receiving platform 33 moves, and the cylinder 3111 promotes a plank 5 on the storage rack 32 to move. Push it onto the receiving platform 33, and carry out feeding in such a cycle.

当所加工的木板5厚度发生变化后,工作人员旋转限位块3223,可以控制第一挡板322能够升起的最大距离。当储料架32所装载的木板5边长发生变化后,工作人员滑移第二挡板323,调整对应一对第一挡板322和第二挡板323之间的距离,使第一挡板322和第二挡板323支挡堆叠后的木板5堆,防止其倾斜倒塌。When the thickness of the processed wooden board 5 changes, the worker rotates the limit block 3223 to control the maximum distance that the first baffle 322 can rise. When the side length of the plank 5 loaded on the storage rack 32 changes, the staff slides the second baffle 323, and adjusts the distance between the corresponding pair of first baffle 322 and the second baffle 323, so that the first baffle The board 322 and the second baffle plate 323 support the stacked planks 5 to prevent them from tilting and collapsing.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。All of the above are preferred embodiments of the application, and are not intended to limit the protection scope of the application. Therefore, all equivalent changes made according to the structure, shape, and principle of the application should be covered by the protection scope of the application. Inside.

Claims (7)

1. Automatic board line equipment processing automated production system that goes up, including organism (1) that has feed end (11) and discharge end (12), its characterized in that: the conveyor belt (2) is arranged at the feeding end (11) of the machine body (1), the conveyor belt (2) is provided with a storage mechanism (3), the storage mechanism (3) comprises a storage rack (32) for vertically stacking the wood boards (5) and a carrying table (33) arranged below the storage rack (32) and used for carrying the wood boards (5), the carrying table (33) is fixedly arranged on the conveyor belt (2), the conveyor belt (2) is provided with a stop block (25) which moves along the conveying direction along with the conveyor belt (2), the carrying table (33) comprises two butt straps (331) which are arranged at intervals along the conveying direction perpendicular to the conveyor belt (2), and the movement track of the stop block (25) passes between the two butt straps (331); the discharging end (12) of the machine body (1) is also provided with a detection mechanism (4), the detection mechanism (4) comprises a detector (41) used for detecting the wood board (5) penetrating out of the discharging end (12) of the machine body (1) and a controller (42) used for receiving a detection signal sent by the detector (41), and the controller (42) controls the feeding of the conveyor belt (2) according to the detection signal;
the storage rack (32) comprises a bearing piece (321) for placing the wood board (5), the bearing piece (321) is positioned on one side of the bearing table (33) away from the machine body (1), and the top surface of the bearing piece (321) is higher than the top surface of the butt strap (331); a pushing assembly is arranged on one side, far away from the bearing piece (321), of the bearing table (33), and comprises a pushing piece (311) and a first push rod (312) arranged on the pushing piece (311), and the controller (42) controls the pushing piece (311) to drive the first push rod (312) to push the wood board (5) on the bearing piece (321) to the bearing table (33); the bearing piece (321) is provided with a first baffle plate (322) on one side, close to the bearing table (33), and on the side adjacent to the bearing table, the two first baffle plates (322) are connected and vertically and synchronously arranged on the bearing piece (321) in a sliding manner, the bearing piece (321) is also provided with a jacking piece (324) for driving the first baffle plate (322) to move upwards, when the pushing piece (311) pushes the wood plate (5) to move, the jacking piece (324) lifts the first baffle plate (322), and the distance between the bottom surface of the first baffle plate (322) and the top surface of the bearing piece (321) is larger than the thickness of one wood plate (5) and smaller than the thickness of two wood plates (5);
a limiting rod (3221) is vertically arranged on the bearing piece (321), a sleeve (3222) is sleeved on the limiting rod (3221) in a sliding mode, two first baffles (322) are connected to the sleeve (3222), a limiting block (3223) is sleeved on the top end of the limiting rod (3221) in a threaded mode, and when the sleeve (3222) is abutted to the limiting block (3223), the wood board (5) can penetrate through the space between the first baffles (322) and the bearing piece (321); the jacking piece (324) comprises a pushing block (3241) which is arranged on the bearing piece (321) in a sliding manner, the sliding direction of the pushing block (3241) is parallel to the moving direction of the pushing assembly (31) for pushing the wood board (5), an inclined traction rod (3242) is arranged between the pushing block (3241) and the sleeve (3222), the high end of the traction rod (3242) is rotationally connected with the sleeve (3222), and the low end of the traction rod (3242) is hinged with the pushing block (3241); the pushing piece (311) is also provided with a second push rod (313) for pushing the pushing block (3241) to move, an elastic piece is arranged between the second push rod (313) and the pushing piece (311), the elastic piece is used for driving the second push rod (313) to be far away from the pushing piece (311), and the second push rod (313) is abutted with the pushing block (3241) before the first push rod (312) pushes the wood board (5).
2. An automated manufacturing system for machining an upper plate wiring device according to claim 1, wherein: the bearing piece (321) comprises a bottom plate (3211) and a plurality of second rollers (3212) rotatably connected to the bottom plate (3211), and the second rollers (3212) are distributed at intervals along the direction in which the pushing piece (311) pushes the wood board (5) to move.
3. An automated manufacturing system for machining an upper plate wiring device according to claim 2, wherein: the position height of the bottom side of the first push rod (312) is the same as the position height of the top side of the second roller (3212).
4. An automated manufacturing system for machining an upper plate wiring device according to claim 2, wherein: the storage mechanism (3) further comprises a mounting piece (325) arranged on the conveyor belt (2), a rotating shaft (3213) is arranged at the bottom of the bottom plate (3211), the rotating shaft (3213) is detachably connected with the mounting piece (325) and is rotatably arranged, and a limiting piece used for limiting the rotation of the rotating shaft (3213) is arranged on the mounting piece (325).
5. The automated production system for machining an automatic upper plate connecting device according to claim 4, wherein: two second baffle plates (323) are arranged on the bottom plate (3211), and the two second baffle plates (323) are respectively opposite to and spaced from one first baffle plate (322).
6. An automated manufacturing system for automated board-handling equipment as defined in claim 5, wherein: the two second baffles (323) are respectively arranged in a sliding manner along the arrangement direction of the first baffles (322) opposite to each other, a first screw (3231) and a second screw (3232) are rotationally connected to one second baffle (323), a fixed block (3233) in threaded connection with the first screw (3231) is arranged on the bottom plate (3211), a sliding block (3234) in threaded sleeve connection with the second screw (3232) is arranged on the second baffle (323), and the other second baffle (323) is connected with the sliding block (3234).
7. The automated production system for machining an automatic upper plate connecting device according to claim 6, wherein: the first push rod (312) is horizontally arranged on the pushing piece (311) in a sliding mode, the sliding direction of the first push rod (312) is perpendicular to the direction of the pushing piece (311) pushing the wood board (5), and a locking piece used for locking the position of the first push rod (312) is arranged on the pushing piece (311).
CN202111363857.6A 2021-11-17 2021-11-17 Automatic upper plate wire connecting equipment processing automated production system Active CN114104698B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111363857.6A CN114104698B (en) 2021-11-17 2021-11-17 Automatic upper plate wire connecting equipment processing automated production system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111363857.6A CN114104698B (en) 2021-11-17 2021-11-17 Automatic upper plate wire connecting equipment processing automated production system

Publications (2)

Publication Number Publication Date
CN114104698A CN114104698A (en) 2022-03-01
CN114104698B true CN114104698B (en) 2023-09-01

Family

ID=80396287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111363857.6A Active CN114104698B (en) 2021-11-17 2021-11-17 Automatic upper plate wire connecting equipment processing automated production system

Country Status (1)

Country Link
CN (1) CN114104698B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114535652B (en) * 2022-03-22 2023-05-12 邯郸市占江预应力锚具有限公司 Drilling device for anchor rod upper base plate
CN114789887B (en) * 2022-06-23 2022-08-26 诸城市圣阳机械有限公司 Automatic conveying device for machining
CN118637371B (en) * 2024-07-26 2024-11-19 阿玛特(江苏)电气有限公司 An automatic veneer pad device for the production of carbon zinc-manganese batteries
CN118595728B (en) * 2024-08-08 2024-10-01 贵州汇通申发钢结构有限公司 An assembled steel frame structure welding positioning mechanism
CN119873288B (en) * 2025-01-16 2025-08-05 苏州圣达生机电设备有限公司 A material dispensing machine and its use method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06156735A (en) * 1992-11-20 1994-06-03 Seirei Ind Co Ltd Seedling box automatic feeder
JPH11249238A (en) * 1998-03-04 1999-09-17 Minolta Co Ltd Slide feeder
CN103029966A (en) * 2012-12-18 2013-04-10 石狮市文峰机械有限公司 Pallet trolley continuous plate feeding conveying device and control system and continuous conveying method
KR101305415B1 (en) * 2012-04-24 2013-09-06 주식회사 한샘 Supplying apparatus for furniture panel
CN107010423A (en) * 2017-06-07 2017-08-04 广州市健力食品机械有限公司 The batch continuous feeding device of bearing surface disk
CN109397453A (en) * 2018-12-18 2019-03-01 青岛美嘉隆包装机械有限公司 It is a kind of for producing the automatic production line of plancon
CN210214010U (en) * 2019-07-26 2020-03-31 横琴信诺电子设备有限公司 Automatic feeding device is used in processing of PCB board
CN213670149U (en) * 2020-07-21 2021-07-13 杭州中粮美特容器有限公司 Coating machine for producing upper cover of electric oven
CN214732793U (en) * 2021-05-08 2021-11-16 湖北工业大学 Plank material feeding unit

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06156735A (en) * 1992-11-20 1994-06-03 Seirei Ind Co Ltd Seedling box automatic feeder
JPH11249238A (en) * 1998-03-04 1999-09-17 Minolta Co Ltd Slide feeder
KR101305415B1 (en) * 2012-04-24 2013-09-06 주식회사 한샘 Supplying apparatus for furniture panel
CN103029966A (en) * 2012-12-18 2013-04-10 石狮市文峰机械有限公司 Pallet trolley continuous plate feeding conveying device and control system and continuous conveying method
CN107010423A (en) * 2017-06-07 2017-08-04 广州市健力食品机械有限公司 The batch continuous feeding device of bearing surface disk
CN109397453A (en) * 2018-12-18 2019-03-01 青岛美嘉隆包装机械有限公司 It is a kind of for producing the automatic production line of plancon
CN210214010U (en) * 2019-07-26 2020-03-31 横琴信诺电子设备有限公司 Automatic feeding device is used in processing of PCB board
CN213670149U (en) * 2020-07-21 2021-07-13 杭州中粮美特容器有限公司 Coating machine for producing upper cover of electric oven
CN214732793U (en) * 2021-05-08 2021-11-16 湖北工业大学 Plank material feeding unit

Also Published As

Publication number Publication date
CN114104698A (en) 2022-03-01

Similar Documents

Publication Publication Date Title
CN114104698B (en) Automatic upper plate wire connecting equipment processing automated production system
CN108582266B (en) Wood floor palletizer
WO2014008821A1 (en) Apparatus for feeding bar stocks
CN105947620B (en) A production line for automatically unloading and collecting pendants
CN111422627B (en) Feeding equipment
CN211733113U (en) Wood board feeding device for floor gluing line
CN113879823B (en) Plate conveying device for automatic drilling machine for furniture plates
CN111776765A (en) A kind of super long bolt row feeding equipment
CN209796914U (en) Loading equipment
CN219030626U (en) High-precision positioning double-layer conveying circulation line
CN118809323A (en) Grinding machine and material feeding control method, medium and computer equipment thereof
KR101068221B1 (en) High speed transfer raw material supply system
JP5493214B2 (en) Parallel material clamp transfer equipment
CN108840112A (en) Position correcting mechanism and stacking device with same
CN218875636U (en) A feeding processing device and circuit board processing equipment
CN115780918B (en) Full-automatic processing equipment for racks
CN216784825U (en) Automatic discharging and feeding system
CN114535475B (en) Loading and unloading device for thread rolling machine
CN102139811B (en) Automatic separation system for external fiber cement wall plates
CN115863232A (en) Multi-material automatic feeding equipment
CN212449944U (en) Aluminum substrate layered storage system
CN219525396U (en) Plate unloading system for hot press
JPH1159903A (en) Method and device for accumulation of plate
CN219823148U (en) Corrugated paper unloading conveying equipment
CN113086658B (en) Shaft bin type full-automatic feeding machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250310

Address after: Building 5, No. 2828 Weiwu Road, Linjiang Street, Qiantang District, Hangzhou City, Zhejiang Province 310020

Patentee after: Hangzhou Xingju Home Furnishings Co.,Ltd.

Country or region after: China

Address before: 310026 floor 2, plant 4, No. 189, Sanfeng Road, Qianjin Street, dajiangdong industrial agglomeration zone, Hangzhou, Zhejiang

Patentee before: HANGZHOU GUJIA CUSTOM HOME Co.,Ltd.

Country or region before: China