CN114045829A - Spiral construction device and method for precast pile - Google Patents
Spiral construction device and method for precast pile Download PDFInfo
- Publication number
- CN114045829A CN114045829A CN202111354005.0A CN202111354005A CN114045829A CN 114045829 A CN114045829 A CN 114045829A CN 202111354005 A CN202111354005 A CN 202111354005A CN 114045829 A CN114045829 A CN 114045829A
- Authority
- CN
- China
- Prior art keywords
- pile
- transmission
- sleeve
- prefabricated pile
- spiral
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 60
- 238000000034 method Methods 0.000 title claims abstract description 8
- 230000005540 biological transmission Effects 0.000 claims abstract description 54
- 239000003638 chemical reducing agent Substances 0.000 claims abstract description 17
- 230000009351 contact transmission Effects 0.000 claims description 3
- 230000035939 shock Effects 0.000 claims description 2
- 238000013016 damping Methods 0.000 abstract description 7
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000009435 building construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000009933 burial Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 238000010009 beating Methods 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/22—Placing by screwing down
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The invention discloses a precast pile spiral construction device and a construction method, which comprises a customized precast pile, an external spiral blade, a spiral sleeve, a steering box, a speed reducer, a motor, a damping frame, a transmission platform, a hydraulic device, an expansion bracket, wheels, an operation carriage, a bearing platform, a precast pile, a transmission contact block and a conical pile head, and is characterized in that the bearing platform is connected and installed behind the operation carriage, the wheels are installed below the bearing platform, the hydraulic device and the expansion bracket are installed on the bearing platform, the transmission platform is installed at the top of the hydraulic device, the motor, the speed reducer and the steering box are sequentially installed on the transmission platform, the spiral sleeve is installed in the vertical direction of the steering box, the external spiral blade is processed outside the spiral sleeve, and the customized precast pile is placed inside the spiral sleeve, and the invention has the beneficial effects that: the prefabricated pile embedded depth control method is simple and convenient to operate, reduces loss of the prefabricated pile, improves utilization rate of the prefabricated pile, improves construction efficiency, shortens construction time, is not limited by site ground, and is deep in embedded depth.
Description
Technical Field
The invention relates to the technical field of building construction, in particular to a precast pile spiral construction device and a construction method.
Background
In building construction, the concrete precast pile can be precast in a factory or a construction site, and is widely applied to large-scale building construction production due to the characteristics of saving construction time and improving construction efficiency due to batch production.
At present, a pile driver is generally adopted for drilling holes in the ground, and then the precast pile is pressurized and beaten into the position of the pile hole which is drilled in advance by the pile driver, so that the precast pile is easy to crack, break and other precast pile loss accidents in the construction of the precast pile, the construction time is prolonged, the construction task is heavy, the efficiency of the construction site is low, and the like.
Disclosure of Invention
The invention provides a precast pile spiral construction device and a construction method, aiming at solving a series of technical problems brought by the traditional precast pile construction, the invention uses a spiral sleeve to be sleeved outside a specially-made precast pile, and uses the outer spiral blade of the spiral sleeve to rotate and press down to send the precast pile to a preset-positioned precast hole.
In order to achieve the purpose, the invention adopts the following technical scheme:
a precast pile spiral construction device and a construction method comprise a customized precast pile, an external spiral blade, a spiral sleeve, a steering box, a speed reducer, a motor, a damping frame, a transmission platform, a hydraulic device, an expansion bracket, wheels, an operation carriage, a bearing platform, a precast pile, a transmission contact block and a conical pile head, wherein the rear part of the operation carriage is connected with the bearing platform, the wheels are arranged below the bearing platform and the operation carriage, the hydraulic device is arranged at the positive center of the bearing platform, the transmission platform is arranged at the top of the hydraulic device, the liftable expansion bracket is arranged below the transmission platform, the motor, the speed reducer and the steering box are sequentially arranged on the transmission platform from left to right, the damping frame is arranged between the motor and the transmission platform, the spiral sleeve is arranged in the vertical direction of the steering box, the external spiral blade is processed outside the spiral sleeve, the customization precast pile is placed to spiral sleeve's inside, and spiral sleeve and customization precast pile pass through the cooperation of lower part transmission contact piece contact, the customization precast pile constitute by precast pile, transmission contact piece and toper pile head.
The steering box is provided with a pair of bevel gears to form a 90-degree transmission structure.
The radius of the bottom surface of the conical pile head is 50mm larger than that of the bottom surface of the precast pile, and a transmission contact block is processed on the conical bottom surface.
The concrete construction method of the precast pile spiral construction device and the construction method comprises the following steps:
and S1, constructing a pile driving hole with a certain depth at the position where pile driving is designed in advance through a pile driver, and driving the precast pile spiral construction device to the pile driving position.
And S2, hoisting the customized precast pile, enabling the conical pile head to extend into the pile driving hole, and vertically positioning the customized precast pile at the pile driving hole.
S3, the hydraulic device and the expansion bracket are controlled to lift the transmission platform by operating the carriage, the spiral sleeve is sleeved outside the customized precast pile, and the transmission contact block on the lower plane of the spiral sleeve is in close contact with two raised right-angle surfaces of the transmission contact block at the lower part of the customized precast pile.
And S4, starting a motor, wherein the motor transmits torque to a speed reducer, the speed reducer transmits torque to a steering box, the steering box transmits torque to a spiral sleeve in the direction of 90 degrees through a bevel gear, the spiral sleeve rotates, an outer spiral blade cuts the foundation on the outer wall of the piling hole, and a hydraulic device downward applies downward pressure to the spiral sleeve to enable the spiral sleeve to cut downward.
And S5, after the spiral sleeve is cut to the designed burial depth of the precast pile, the motor rotates in the opposite direction, the spiral sleeve rotates in the opposite direction, the hydraulic device is lifted again, the spiral sleeve is separated from the customized precast pile due to the fact that the spiral sleeve and the customized precast pile are in contact transmission, the spiral sleeve is pulled out of a pile driving hole, and the customized precast pile is left at the designed pile position.
And S6, pouring concrete into the pile driving hole expanded in the pile driving process of the spiral sleeve to fill the expanded pile driving hole.
Compared with the prior art, the invention has the beneficial effects that:
1) precast pile spiral construction device simple structure, the flexible operation, the noise is little, and area is little, and customization precast pile processing is convenient, and machining efficiency is high.
2) The precast pile spiral construction reduces the loss of the precast pile, improves the utilization rate of the precast pile, improves the construction efficiency and shortens the construction time.
3) The precast pile spiral construction is flexible, can be moved to any place where precast piles need to be constructed, is not limited by the ground of the place, and is deeper in embedded depth and embedded well.
4) The prefabricated pile driving aperture is enlarged through spiral cutting, concrete is poured on the periphery of the customized prefabricated pile, the strength of the pile is improved, and the mechanical property of the foundation is improved.
Drawings
Fig. 1 is a schematic structural diagram of a precast pile spiral construction device and a construction method according to the present invention.
Fig. 2 is a schematic axial view of a precast pile spiral construction device and a construction method according to the present invention.
Fig. 3 is a schematic structural diagram of a precast pile spiral construction device and a construction method of the construction device according to the present invention.
Fig. 4 is a schematic diagram of a precast pile structure customized by the precast pile spiral construction device and the construction method of the invention.
In the figure: 1. customized precast pile 2, external spiral blade 3, spiral sleeve 4, steering box 5, speed reducer 6, motor 7, damping frame 8, transmission platform 9, hydraulic device 10, expansion bracket 11, wheel 12, operation compartment 13, bearing table 14, precast pile 15, transmission contact block 16 and conical pile head
Detailed Description
The following further describes embodiments of the present invention with reference to the accompanying drawings:
as shown in fig. 1, 2, 3 and 4, a precast pile spiral construction device and a construction method thereof comprise customizing a precast pile 1, an external spiral blade 2, a spiral sleeve 3, a steering box 4, a speed reducer 5, a motor 6, a damping frame 7, a transmission platform 8, a hydraulic device 9, an expansion bracket 10, wheels 11, an operation carriage 12, a bearing platform 13, a precast pile 14, a transmission contact block 15 and a conical pile head 16, wherein the rear part of the operation carriage 12 is connected with and provided with the bearing platform 13, the wheels 11 are arranged below the bearing platform 13 and the operation carriage 12, the wheels 11 are flexible to move and can adapt to any ground condition, the hydraulic device 9 is arranged at the center of the bearing platform 13, the transmission platform 8 is arranged at the top of the hydraulic device 9, the liftable expansion bracket 10 is arranged below the transmission platform 8, the expansion bracket 10 supports the transmission platform 8, the hydraulic device 9 is responsible for lifting the transmission platform 8, the customized precast pile is characterized in that a motor 6, a speed reducer 5 and a steering box 4 are sequentially arranged on the transmission platform 8 from left to right, a damping frame 7 is arranged between the motor 6 and the transmission platform 8, a damping support 7 reduces vibration in the transmission process of the motor 6 and the speed reducer 5 so as to avoid influencing transmission of an inner circular bevel gear of the steering box 4, a spiral sleeve 3 is arranged in the vertical direction of the steering box 4, a conical gear is arranged in the steering box 4 for transmission, an input shaft and an output shaft are arranged at 90 degrees, a vertical output shaft is connected with the spiral sleeve 3, an outer spiral blade 2 is processed on the outer side of the spiral sleeve 3, the customized precast pile 1 is arranged in the spiral sleeve 3, the spiral sleeve 2 and the customized precast pile 1 are in contact fit through a lower transmission contact block 15, and the lower plane of the spiral sleeve 3 is in compression contact with the conical bottom surface of a conical pile head 16 of the customized precast pile 1 through gravity and the downward pressure of a hydraulic device, transmission contact piece 15 on the spiral sleeve 3 contacts the cooperation with 1 lower planar transmission contact piece 15 of customization precast pile, customization precast pile 1 constitute by precast pile 14, transmission contact piece 15 and toper pile head 16, spiral sleeve 3 outside processing external screw blade 2 enlarges the pile driving hole originally through the rotary cutting effect, exerts down force through hydraulic means 9, and the lower part toper pile head 16 of customization precast pile 1 is deepened downwards, and it is downthehole to change over into the pile driving with spiral sleeve 3 and customization precast pile 1, accomplishes the precast pile and puts into.
As shown in fig. 1 and 2, the steering box 4 has a pair of bevel gears forming a 90 ° transmission structure.
As shown in fig. 4, the radius of the bottom surface of the conical pile head 16 is 50mm larger than that of the precast pile 14, and a transmission contact block 15 is processed on the conical bottom surface.
The concrete construction method of the precast pile spiral construction device and the construction method comprises the following steps:
and S1, constructing a pile driving hole with a certain depth at the position where pile driving is designed in advance through a pile driver, and driving the precast pile spiral construction device to the pile driving position.
And S2, hoisting the customized precast pile 1, enabling the conical pile head 16 to extend into the pile driving hole, and vertically positioning the customized precast pile 1 at the pile driving hole.
S3, the hydraulic device 9 and the expansion bracket 10 are controlled by operating the carriage 12 to lift the transmission platform 8, the spiral sleeve 3 is sleeved outside the customized precast pile 1, and the transmission contact block 15 on the lower plane of the spiral sleeve 3 is in close contact with two protruding right-angle surfaces of the transmission contact block 15 at the lower part of the customized precast pile 1.
S4, starting a motor 6, wherein the motor 6 transmits torque to a speed reducer 5, the speed reducer 5 transmits torque to a steering box 4, the steering box 4 transmits torque to a spiral sleeve 3 in the 90-degree direction through a bevel gear, the spiral sleeve 3 rotates, an outer spiral blade 2 cuts the foundation of the outer wall of a piling hole, and a hydraulic device 9 downward applies downward pressure to the spiral sleeve 3 to enable the spiral sleeve 3 to cut downwards.
And S5, after the spiral sleeve 3 is cut to the designed burial depth of the precast pile, the motor 6 rotates in the reverse direction, the spiral sleeve 3 rotates in the reverse direction, the hydraulic device 9 is lifted again, the spiral sleeve 3 and the customized precast pile 1 are in contact transmission, the reverse lifting enables the spiral sleeve 3 to be separated from the customized precast pile 1, the spiral sleeve 3 is pulled out of a pile driving hole, and the customized precast pile 1 is left at the designed pile position.
And S6, pouring concrete into the pile driving hole expanded in the pile driving process of the spiral sleeve 3 to fill the expanded pile driving hole.
The following examples are carried out on the premise of the technical scheme of the invention, and detailed embodiments and specific operation processes are given, but the scope of the invention is not limited to the following examples. The methods used in the following examples are conventional methods unless otherwise specified.
[ examples ] A method for producing a compound
As shown in fig. 1 and 2, a spiral sleeve 3, a steering box 4, a speed reducer 5, a motor 6, a shock absorption frame 7, a transmission contact block 8, a hydraulic device 9, an expansion bracket 10, wheels 11, an operation compartment 12 and a bearing platform 13 are installed together according to design requirements, and an outer spiral blade 2 is machined outside the spiral sleeve 3.
As shown in fig. 4, the customized precast pile 1 is processed, and the conical pile head 16 and the transmission contact block 15 are processed.
As shown in fig. 1, the customized precast pile 1 is vertically inserted into the pile hole at the predetermined driving hole position, the driving platform 8 is lifted, and the spiral sleeve 3 is installed outside the customized precast pile 1.
Starting motor 6, spiral sleeve 3 is rotatory downwards, will customize precast pile 1 rotatory squeeze into the pile hole of beating, and motor 6 counter-rotation drives spiral sleeve 3 counter-rotation upwards, and spiral sleeve 3 breaks away from with customization precast pile 1, and spiral sleeve 3 leaves the pile hole, and customization precast pile 1 stays in the pile hole.
Concrete is poured into the pile driving hole enlarged by the spiral sleeve 3, the customized precast pile 1 which is well driven in the pile driving hole is reinforced by the concrete, and the strength of the customized precast pile 1 is increased.
And starting the precast pile spiral construction device, and transferring to other pile driving hole positions to complete the pile driving work of the precast pile.
When the prefabricated pile embedded type construction method is used, the operation is simple and convenient, the loss of the prefabricated pile is reduced, the utilization rate of the prefabricated pile is improved, the construction efficiency is improved, the construction time is shortened, the prefabricated pile is not limited by the ground of a site, the embedded depth of the prefabricated pile is deeper, and the prefabricated pile is embedded well.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111354005.0A CN114045829B (en) | 2021-11-12 | 2021-11-12 | Prefabricated pile spiral construction device and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111354005.0A CN114045829B (en) | 2021-11-12 | 2021-11-12 | Prefabricated pile spiral construction device and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114045829A true CN114045829A (en) | 2022-02-15 |
CN114045829B CN114045829B (en) | 2024-11-19 |
Family
ID=80209760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111354005.0A Active CN114045829B (en) | 2021-11-12 | 2021-11-12 | Prefabricated pile spiral construction device and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114045829B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006207161A (en) * | 2005-01-26 | 2006-08-10 | Jfe Steel Kk | Construction method of prefabricated pile |
CN102286977A (en) * | 2011-07-12 | 2011-12-21 | 周建 | Rotary drilling precast pile machine and construction method thereof |
CN105735248A (en) * | 2016-03-14 | 2016-07-06 | 中冶成都勘察研究总院有限公司 | Construction method for guaranteeing that pile end of prefabricated pile enters bearing layer and improving bearing force |
CN108086304A (en) * | 2017-11-30 | 2018-05-29 | 华南农业大学 | Excavator pile sinking mechanical interface and pile sinking process |
CN109695245A (en) * | 2019-01-17 | 2019-04-30 | 福建省大地管桩有限公司 | The bitubular is exempted to beat tubular pole and lower stake device |
CN217267457U (en) * | 2021-11-12 | 2022-08-23 | 中国三冶集团有限公司 | Precast pile spiral construction equipment |
-
2021
- 2021-11-12 CN CN202111354005.0A patent/CN114045829B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006207161A (en) * | 2005-01-26 | 2006-08-10 | Jfe Steel Kk | Construction method of prefabricated pile |
CN102286977A (en) * | 2011-07-12 | 2011-12-21 | 周建 | Rotary drilling precast pile machine and construction method thereof |
CN105735248A (en) * | 2016-03-14 | 2016-07-06 | 中冶成都勘察研究总院有限公司 | Construction method for guaranteeing that pile end of prefabricated pile enters bearing layer and improving bearing force |
CN108086304A (en) * | 2017-11-30 | 2018-05-29 | 华南农业大学 | Excavator pile sinking mechanical interface and pile sinking process |
CN109695245A (en) * | 2019-01-17 | 2019-04-30 | 福建省大地管桩有限公司 | The bitubular is exempted to beat tubular pole and lower stake device |
CN217267457U (en) * | 2021-11-12 | 2022-08-23 | 中国三冶集团有限公司 | Precast pile spiral construction equipment |
Also Published As
Publication number | Publication date |
---|---|
CN114045829B (en) | 2024-11-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106120785B (en) | A kind of pile cover former and Stake head handling and pile cover construction method | |
CN105507294A (en) | Equipment for combined work of piles shaped like Greek letter 'pi' and rectangular piles | |
CN111472688B (en) | Self-drilling tubular string support device and method thereof | |
CN210714465U (en) | Double dynamical screw thread bored pile rig | |
CN203685019U (en) | Long spiral drilling machine | |
CN105507271A (en) | Rectangular locking equipment with L-shaped piles and rectangular piles | |
CN201943066U (en) | A screw pile machine | |
CN217267457U (en) | Precast pile spiral construction equipment | |
CN114045829A (en) | Spiral construction device and method for precast pile | |
CN221299072U (en) | Pile driver with fracture prevention function for building | |
CN115324053A (en) | Cut-off hoop for integrally breaking pile head of cast-in-situ bored pile | |
CN221299058U (en) | Traffic engineering road drilling machine | |
CN213775284U (en) | Clear hole device of pile foundation construction | |
CN201031392Y (en) | Extorsion pipe inside spin pile-formation machine | |
CN113187401A (en) | Full-rotation full-casing drilling machine capable of improving working efficiency based on construction and construction process thereof | |
CN102155169A (en) | Extension bar and long spiral drilling machine using same | |
CN218346175U (en) | Civil engineering is with pile device | |
CN105507272A (en) | Rectangular inserting equipment with L-shaped piles and rectangular piles | |
CN205857270U (en) | A kind of roller groove wall-forming device | |
CN220977990U (en) | Water conservancy pile driver | |
CN217027045U (en) | Pile foundation construction auxiliary assembly | |
CN115434631B (en) | Deep stirring drilling tool with active telescopic function and use method | |
CN221118484U (en) | Static pressure pile planting machine with auxiliary assembly | |
CN214527781U (en) | A construction machinery material lift | |
CN212425316U (en) | A safety parking device for a building construction material hoist |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |