CN114033147B - 一种井道内悬挑脚手架工字钢拆改施工方法 - Google Patents
一种井道内悬挑脚手架工字钢拆改施工方法 Download PDFInfo
- Publication number
- CN114033147B CN114033147B CN202111308675.9A CN202111308675A CN114033147B CN 114033147 B CN114033147 B CN 114033147B CN 202111308675 A CN202111308675 A CN 202111308675A CN 114033147 B CN114033147 B CN 114033147B
- Authority
- CN
- China
- Prior art keywords
- steel
- cantilevered
- overhanging
- bracket
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
- E04G3/246—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the inside contour of a building
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202111308675.9A CN114033147B (zh) | 2021-11-05 | 2021-11-05 | 一种井道内悬挑脚手架工字钢拆改施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202111308675.9A CN114033147B (zh) | 2021-11-05 | 2021-11-05 | 一种井道内悬挑脚手架工字钢拆改施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN114033147A CN114033147A (zh) | 2022-02-11 |
| CN114033147B true CN114033147B (zh) | 2023-05-05 |
Family
ID=80136474
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202111308675.9A Active CN114033147B (zh) | 2021-11-05 | 2021-11-05 | 一种井道内悬挑脚手架工字钢拆改施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN114033147B (zh) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116607746B (zh) * | 2023-05-16 | 2023-11-21 | 广东省构建工程建设有限公司 | 一种大悬挑钢结构顶撑换撑拆除施工工艺 |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101736893B (zh) * | 2009-12-16 | 2011-06-22 | 通广建工集团有限公司 | 悬挑式脚手架支撑系统 |
| CN105256992A (zh) * | 2015-09-24 | 2016-01-20 | 河南省第一建设集团第七建筑工程有限公司 | 型钢斜拉钢丝绳周转式锚固装置 |
| CN205296802U (zh) * | 2015-10-16 | 2016-06-08 | 北京博大经开建设有限公司 | 一种井道钢平台 |
| CN107190975B (zh) * | 2017-07-14 | 2018-11-23 | 四川华西集团有限公司 | 超高层建筑施工综合模架系统 |
| CN208380049U (zh) * | 2018-02-27 | 2019-01-15 | 广西建工集团建筑工程总承包有限公司 | 悬挑外脚手架可拆装式三角形组合型钢悬挑支撑 |
| CN209585576U (zh) * | 2018-12-27 | 2019-11-05 | 上海建工二建集团有限公司 | 一种悬挑脚手架 |
-
2021
- 2021-11-05 CN CN202111308675.9A patent/CN114033147B/zh active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN114033147A (zh) | 2022-02-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105926916B (zh) | 基于智能监控斜拉悬挑复合式支撑体系及施工方法 | |
| CN104032678B (zh) | H型塔柱内力可调的临时横撑结构及其施工方法 | |
| CN102661054B (zh) | 平面钢桁架整体提升中的侧向加固结构及整体提升方法 | |
| CN103452126B (zh) | 一种底板钢材可回收的轻型组合吊箱及其施工工艺 | |
| CN206328678U (zh) | 钢箱梁挑臂及钢护栏安装两用型移动操作平台 | |
| CN115369748A (zh) | 桥墩及系梁一体化浇筑的模板系统施工方法 | |
| CN109184756B (zh) | 用于盾构暗挖通道内拆除负环管片的装置及方法 | |
| CN209780193U (zh) | 一种悬吊式脚手架 | |
| CN106437188B (zh) | 一种钢筋混凝土结构主梁增设钢结构箱型梁的加固方法 | |
| CN110306774B (zh) | 一种承插式悬挑脚手架的安装方法及装置 | |
| CN103452311A (zh) | 一种型钢悬挑结构支撑架的搭设方法 | |
| CN109594479A (zh) | 一种双幅并行高架桥中央防撞护栏同时施工模架及方法 | |
| CN116411520A (zh) | 索塔塔柱线形施工控制方法 | |
| CN116732887A (zh) | 一种特大桥主塔超高横梁底模排架施工方法 | |
| CN105926925A (zh) | 一种悬挂式脚手架的工字钢悬挑梁及施工方法 | |
| CN210439705U (zh) | 一种预制混凝土叠合板吊装装置 | |
| CN110374006B (zh) | 一种拆除空间异性大吨位钢梁托架的施工方法 | |
| CN107142954A (zh) | 一种整体吊装的钢吊箱吊装系统及其吊装方法 | |
| CN111827648A (zh) | 下撑式悬挑脚手架施工装置及方法 | |
| CN204282803U (zh) | 悬挑支模平台安装结构 | |
| CN115163077A (zh) | 一种用于竖井支护的可调型钢支撑结构及悬吊拼装方法 | |
| CN114033147A (zh) | 一种井道内悬挑脚手架工字钢拆改施工方法 | |
| CN106758855B (zh) | 圆弧形墩帽施工用拱形支架组件及圆弧形墩帽施工方法 | |
| CN100549346C (zh) | 一种电梯井筒工具式脚手架 | |
| CN204370797U (zh) | 一种混凝土楼板施工用模板装置及其支撑组件 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A construction method for dismantling and renovating I-beams of suspended scaffolding in a shaft Effective date of registration: 20231128 Granted publication date: 20230505 Pledgee: China Construction Bank Co.,Ltd. Hefei Chengdong sub branch Pledgor: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau Registration number: Y2023980067840 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20230505 Pledgee: China Construction Bank Co.,Ltd. Hefei Chengdong sub branch Pledgor: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau Registration number: Y2023980067840 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right |