CN113982629B - 隧道支护结构 - Google Patents
隧道支护结构 Download PDFInfo
- Publication number
- CN113982629B CN113982629B CN202111276036.9A CN202111276036A CN113982629B CN 113982629 B CN113982629 B CN 113982629B CN 202111276036 A CN202111276036 A CN 202111276036A CN 113982629 B CN113982629 B CN 113982629B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- chamber
- supporting
- sub
- supporting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000002093 peripheral effect Effects 0.000 claims abstract description 19
- 238000010276 construction Methods 0.000 claims abstract description 7
- 238000005192 partition Methods 0.000 claims description 39
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 239000011435 rock Substances 0.000 abstract description 46
- 238000000034 method Methods 0.000 description 3
- 230000003111 delayed effect Effects 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/006—Lining anchored in the rock
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
- E21D11/20—Special cross- sections, e.g. corrugated
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明涉及隧道支护技术领域,具体而言,涉及一种隧道支护结构。该隧道支护结构包括多个支护箱,多个支护箱绕隧道的轴线及沿隧道的轴线依次设置,每个支护箱的外周面均与隧道的内周面抵接;每个支护箱内均设置有第一隔板,第一隔板绕隧道的轴线延伸,且将支护箱分隔为第一腔室及第二腔室;其中,沿隧道的径向方向,第一腔室位于支护箱靠近隧道的内周面的一侧,第二腔室的部分填充有混凝土。该隧道支护结构能够释放围岩形变压力,减小初期支护结构的结构内力,从而保证初期支护结构的稳定性,还可以用于滞后岩爆隧道支护,保证支护结构的可控变形但不至于损坏;同时,可以吸收飞溅岩块的冲击力,避免支护结构的损坏,保证施工作业人员的安全。
Description
技术领域
本发明涉及隧道支护技术领域,具体而言,涉及一种隧道支护结构。
背景技术
传统的“强支硬顶”支护理念,是通过不断增加初期支护结构的厚度和刚度来增加支护抗力,减小围岩变形,进而保证初期支护结构的稳定性。
然而,当遇到软岩大变形隧道或者滞后岩爆隧道时,围岩的形变压力或者岩块炸飞的冲击力将远远超过初期支护结构的支护抗力。当软岩大变形隧道的围岩形变压力大于初期支护结构的峰值强度时,初期支护结构就会发生屈服、压溃,甚至整体溃塌,进而导致严重的安全事故和经济损失。同样的,当滞后岩爆隧道发生岩爆时,飞溅岩块的强大冲击力也会造成初期支护结构的局部损坏、甚至人员伤亡。更换损坏和溃塌的初期支护结构,还会造成大量的支护材料和施工成本的重复投入,延误工期。
发明内容
本发明的目的包括,例如,提供了一种隧道支护结构,其能够释放围岩形变压力,减小初期支护结构的结构内力,从而保证初期支护结构的稳定性,还可以吸收飞溅岩块的冲击力,避免支护结构的损坏,保证施工作业人员的安全。
本发明的实施例可以这样实现:
本发明提供一种隧道支护结构,其包括多个支护箱,多个支护箱绕隧道的轴线及沿隧道的轴线依次设置,每个支护箱的外周面均与隧道的内周面抵接;
每个支护箱内均设置有第一隔板,第一隔板绕隧道的轴线延伸,且将支护箱分隔为第一腔室及第二腔室;
其中,沿隧道的径向方向,第一腔室位于支护箱靠近隧道的内周面的一侧,第二腔室的部分填充有混凝土。
在可选的实施方式中,支护箱开设有第一导气孔及第二导气孔;
第一导气孔与第一腔室连通,第二导气孔与第二腔室中除填充有混凝土外的部分连通。
在可选的实施方式中,每个支护箱内均设置有两个第二隔板,绕隧道的轴线方向,两个第二隔板间隔的设置于第二腔室内,且两个第二隔板用于将第二腔室分隔为第一子腔室、第二子腔室及第三子腔室,第二子腔室位于两个第二隔板之间;
第一子腔室、第二子腔室或第三子腔室中的一个或多个内填充有混凝土。
在可选的实施方式中,第一子腔室及第三子腔室相对于第二子腔室对称设置。
在可选的实施方式中,第一子腔室及第三子腔室内填充有混凝土,第二导气孔与第二子腔室连通。
在可选的实施方式中,每个支护箱内均设置有第二隔板,第二隔板位于第二腔室内,且第二隔板用于将第二腔室分隔为第四子腔室及第五子腔室;
第四子腔室内填充有混凝土,第五子腔室与第二导气孔连通。
在可选的实施方式中,每个支护箱内均设置有多个第三隔板,多个第三隔板绕隧道的轴线方式依次间隔的设置于第一腔室内。
在可选的实施方式中,支护箱开设有与第二腔室连通的注浆口。
在可选的实施方式中,注浆口位于支护箱背离隧道的内周面的一侧。
在可选的实施方式中,支护箱的箱体、第一隔板及第二隔板均由钢板制成。
本发明实施例的有益效果包括:
该隧道支护结构包括多个支护箱,多个支护箱绕隧道的轴线及沿隧道的轴线依次设置,每个支护箱的外周面均与隧道的内周面抵接;每个支护箱内均设置有第一隔板,第一隔板绕隧道的轴线延伸,且将支护箱分隔为第一腔室及第二腔室;其中,沿隧道的径向方向,第一腔室位于支护箱靠近隧道的内周面的一侧,第二腔室的部分填充有混凝土。
这样的结构设置,使得填充有混凝土的支护箱的部分能够提供刚性支护,而支护箱的其余部分则能够提供柔性支护。
故,该隧道支护结构能够在对围岩进行支护的过程中,通过支护箱的提供柔性支护的部分吸收围岩的形变压力,从而能够通过释放围岩的变形压力的方式,维持围岩的稳定性,并且支护箱的提供柔性支护的部分吸收围岩的变形压力后的残余强度不小于围岩压力,而且在支护箱的提供刚性支护的部分的作用下,能够保证支护结构不发生侵限或溃塌等情况。
由此,该隧道支护结构能够释放围岩形变压力,减小初期支护结构的结构内力,从而保证初期支护结构的稳定性,还可以用于滞后岩爆隧道支护,保证支护结构的可控变形但不至于损坏;同时,可以吸收飞溅岩块的冲击力,避免支护结构的损坏,保证施工作业人员的安全。
附图说明
为了更清楚地说明本发明实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本发明的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。
图1为本发明实施例中隧道支护结构的安装示意图;
图2为本发明实施例中隧道支护结构的结构示意图;
图3为本发明实施例中支护箱的结构示意图;
图4为本发明实施例中支护箱中填充混凝土后的结构示意图;
图5为本发明实施例中支护箱的立体图。
图标:100-围岩;200-隧道支护结构;210-支护箱;211-第一隔板;212-第一腔室;213-第二腔室;214-第二隔板;215-第一子腔室;216-第二子腔室;217-第三子腔室;218-第一导气孔;219-第二导气孔;221-第一撑板;222-第二撑板。
具体实施方式
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本发明实施例的组件可以以各种不同的配置来布置和设计。
因此,以下对在附图中提供的本发明的实施例的详细描述并非旨在限制要求保护的本发明的范围,而是仅仅表示本发明的选定实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。
在本发明的描述中,需要说明的是,若出现术语“上”、“下”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该发明产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。
此外,若出现术语“第一”、“第二”等仅用于区分描述,而不能理解为指示或暗示相对重要性。
需要说明的是,在不冲突的情况下,本发明的实施例中的特征可以相互结合。
请参考图1-图4,图1及图2示出了本发明实施例中隧道支护结构200的结构,图3-图5示出了本发明实施例中支护箱210的结构;
本实施例提供了一种隧道支护结构200,其包括多个支护箱210,多个支护箱210绕隧道的轴线及沿隧道的轴线依次设置,每个支护箱210的外周面均与隧道的内周面抵接;
每个支护箱210内均设置有第一隔板211,第一隔板211绕隧道的轴线延伸,且将支护箱210分隔为第一腔室212及第二腔室213;
其中,沿隧道的径向方向,第一腔室212位于支护箱210靠近隧道的内周面的一侧,第二腔室213的部分填充有混凝土。
该隧道支护结构200的工作原理是:
请参考图1-图5,该隧道支护结构200包括多个支护箱210,多个支护箱210绕隧道的轴线及沿隧道的轴线依次设置,每个支护箱210的外周面均与隧道的内周面抵接;每个支护箱210内均设置有第一隔板211,第一隔板211绕隧道的轴线延伸,且将支护箱210分隔为第一腔室212及第二腔室213;其中,沿隧道的径向方向,第一腔室212位于支护箱210靠近隧道的内周面的一侧,第二腔室213的部分填充有混凝土。
这样的结构设置,使得填充有混凝土的支护箱210的部分能够提供刚性支护,而支护箱210的其余部分则能够提供柔性支护。
故,该隧道支护结构200能够在对围岩100进行支护的过程中,通过支护箱210的提供柔性支护的部分吸收围岩100的形变压力,从而能够通过释放围岩100的变形压力的方式,维持围岩100的稳定性,并且支护箱210的提供柔性支护的部分吸收围岩100的变形压力后的残余强度不小于围岩100压力,而且在支护箱210的提供刚性支护的部分的作用下,能够保证支护结构不发生侵限或溃塌等情况。
由此,该隧道支护结构200能够释放围岩100形变压力,减小初期支护结构的结构内力,从而保证初期支护结构的稳定性,还可以用于滞后岩爆隧道支护,保证支护结构的可控变形但不至于损坏;同时,可以吸收飞溅岩块的冲击力,避免支护结构的损坏,保证施工作业人员的安全。
进一步地,请参考图1-图5,在本实施例中,在设置支护箱210时,为能够在支护箱210的提供柔性支护的部分吸收围岩100的形变压力而变形时,释放其内部的气体,故,支护箱210开设有第一导气孔218及第二导气孔219;第一导气孔218与第一腔室212连通,第二导气孔219与第二腔室213中除填充有混凝土外的部分连通。
在设置隔板时,隔板的作用在于将支护箱210分隔为第一腔室212及第二腔室213,其沿隧道的径向方向,第一腔室212位于支护箱210靠近隧道的内周面的一侧,且第二腔室213内填充有混凝土。由此,在该隧道支护结构200在对围岩100进行支护的过程中,是通过第一腔室212的形变吸收围岩100的形变压力,从而能够通过释放围岩100的变形压力的方式,维持围岩100的稳定性,并且第一腔室212吸收围岩100的变形压力后的残余强度不小于围岩100压力,而支护箱210的第二腔室213则能够提供刚性支护;进而通过这样的方式,对围岩100起到刚性支护的作用,并能够保证支护结构不发生侵限或溃塌等情况。
进一步地,请参考图1-图4,为提高支护箱210的支护性能,故在本实施例中,每个支护箱210内均设置有两个第二隔板214,绕隧道的轴线方向,两个第二隔板214间隔的设置于第二腔室213内,且两个第二隔板214用于将第二腔室213分隔为第一子腔室215、第二子腔室216及第三子腔室217,第二子腔室216位于两个第二隔板214之间;且,第一子腔室215及第三子腔室217相对于第二子腔室216对称设置;第一子腔室215、第二子腔室216或第三子腔室217中的一个或多个内填充有混凝土。具体的,在本实施例中,采用的是第一子腔室215及第三子腔室217内填充有混凝土的方式,并且第二导气孔219与第二子腔室216连通。
由此,这样的设置方式,使得每个第二腔室213的第一子腔室215及第三子腔室217均能够用于对围岩100起到刚性支护的作用,并且每个第二腔室213的第一子腔室215与第三子腔室217之间均具备提供柔性支护的第二子腔室216;进而能够通过这样的方式,能够在第一腔室212提供柔性支护的同时,使得第二腔室213同样能够提供柔性支护,进而能够提高该隧道支护结构200的支护性能。需要说明的是,在支护的过程中,当第二子腔室216因吸收围岩100的形变压力而发生变形后,其变形后的残余强度不小于围岩100压力。
而在本发明的其他实施例中,每个支护箱210内均设置有第二隔板214,第二隔板214位于第二腔室213内,且第二隔板214用于将第二腔室213分隔为第四子腔室及第五子腔室;第四子腔室内填充有混凝土,第五子腔室与第二导气孔219连通。这样的设置方式,其目的是通过第二腔室213中的第四子腔室或第五子腔室同样能够提供柔性支护,需要注意的是,在本实施例中,当第四子腔室或第五子腔室提供柔性支护时,其吸收围岩100的形变压力而发生变形后,其变形后的残余强度不小于围岩100压力。
进一步地,在本实施例中,为提高该支护箱210的第一腔室212的强度,故,每个支护箱210内均设置有多个第三隔板,多个第三隔板绕隧道的轴线方式依次间隔的设置于第一腔室212内,进而通过这样的方式,能够提高第一腔室212的结构强度,从而能够通过这样的方式提高该隧道支护结构200的支护性能。
进一步地,在本实施例中,在向第二腔室213或第四子腔室中灌注混凝土浆液时,为简化灌注混凝土浆液的操作难度,故,支护箱210开设有与第二腔室213或第四子腔室连通的注浆口,且,注浆口位于支护箱210背离隧道的内周面的一侧。
需要说明的是,在本实施例中,在制作支护箱210时,支护箱210的箱体、第一隔板211及第二隔板214均由钢板制成;并且,钢板与钢板之间可以采用焊接的连接方式,而且相邻的支护箱210也可以采用焊接的方式进行连接。
请参照图3-图5,而且还可以在第一腔室212及第二腔室213内分别设置第一撑板221及第二撑板222,通过第一撑板221及第二撑板222能够在该隧道支护结构100的变形阶段,实现恒定阻力的变形。其中,第一腔室212中的第一撑板221为多个,且依次间隔布置,第二腔室213中的第二撑板222则位于第二子腔室216中。
以上,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应以权利要求的保护范围为准。
Claims (7)
1.一种隧道支护结构,其特征在于:
所述隧道支护结构(200)包括多个支护箱(210), 多个所述支护箱(210)绕隧道的轴线及沿所述隧道的轴线依次设置,每个所述支护箱(210)的外周面均与所述隧道的内周面抵接;
每个所述支护箱(210)内均设置有第一隔板(211),所述第一隔板(211)绕所述隧道的轴线延伸,且将所述支护箱(210)分隔为第一腔室(212)及第二腔室(213);
其中,沿所述隧道的径向方向,所述第一腔室(212)位于所述支护箱(210)靠近所述隧道的内周面的一侧,所述第二腔室(213)的部分填充有混凝土;
所述支护箱(210)开设有第一导气孔(218)及第二导气孔(219);
所述第一导气孔(218)与所述第一腔室(212)连通,所述第二导气孔(219)与所述第二腔室(213)中除填充有混凝土外的部分连通;
每个所述支护箱(210)内均设置有两个第二隔板(214),绕所述隧道的轴线方向,两个所述第二隔板(214)间隔的设置于所述第二腔室(213)内,且两个所述第二隔板(214)用于将所述第二腔室(213)分隔为第一子腔室(215)、第二子腔室(216)及第三子腔室(217),所述第二子腔室(216)位于两个所述第二隔板(214)之间;所述第一子腔室(215)、所述第二子腔室(216)或所述第三子腔室(217)中的一个或多个内填充有混凝土;或,每个所述支护箱(210)内均设置有第二隔板(214),所述第二隔板(214)位于所述第二腔室(213)内,且所述第二隔板(214)用于将所述第二腔室(213)分隔为第四子腔室及第五子腔室;所述第四子腔室内填充有混凝土,所述第五子腔室与所述第二导气孔(219)连通。
2.根据权利要求1所述的隧道支护结构,其特征在于:
所述第一子腔室(215)及所述第三子腔室(217)相对于所述第二子腔室(216)对称设置。
3.根据权利要求2所述的隧道支护结构,其特征在于:
所述第一子腔室(215)及所述第三子腔室(217)内填充有混凝土,所述第二导气孔(219)与所述第二子腔室(216)连通。
4.根据权利要求1所述的隧道支护结构,其特征在于:
每个所述支护箱(210)内均设置有多个第三隔板,多个所述第三隔板绕所述隧道的轴线方式依次间隔的设置于所述第一腔室(212)内。
5.根据权利要求1-4中任意一项所述的隧道支护结构,其特征在于:
所述支护箱(210)开设有与所述第二腔室(213)连通的注浆口。
6.根据权利要求5所述的隧道支护结构,其特征在于:
所述注浆口位于所述支护箱(210)背离所述隧道的内周面的一侧。
7.根据权利要求1-4中任意一项所述的隧道支护结构,其特征在于:
所述支护箱(210)的箱体、所述第一隔板(211)及第二隔板(214)均由钢板制成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111276036.9A CN113982629B (zh) | 2021-10-29 | 2021-10-29 | 隧道支护结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111276036.9A CN113982629B (zh) | 2021-10-29 | 2021-10-29 | 隧道支护结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113982629A CN113982629A (zh) | 2022-01-28 |
CN113982629B true CN113982629B (zh) | 2024-04-05 |
Family
ID=79744778
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111276036.9A Active CN113982629B (zh) | 2021-10-29 | 2021-10-29 | 隧道支护结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113982629B (zh) |
Citations (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4072018A (en) * | 1975-04-30 | 1978-02-07 | Alvarez Calderon Alberto | Tunnel support structure and method |
CN86103897A (zh) * | 1985-05-28 | 1987-03-11 | 法兰西企业公司 | 衬砌模板 |
CH686198A5 (de) * | 1992-04-29 | 1996-01-31 | Marti Holding Ag Bern | Verfahren zur Erstellung eines tragenden Tunnelausbaus mit integrierter Isolation. |
JPH09195687A (ja) * | 1996-01-17 | 1997-07-29 | Ishikawajima Constr Materials Co Ltd | セグメント |
JPH1088986A (ja) * | 1996-09-12 | 1998-04-07 | Ohbayashi Corp | トンネル覆工用型枠及びトンネルの覆工方法 |
JPH1161861A (ja) * | 1997-08-07 | 1999-03-05 | Kato Kensetsu:Kk | 沈設体用セグメントピース |
JPH11159293A (ja) * | 1997-11-26 | 1999-06-15 | Atsushi Koizumi | 合成セグメント |
JP2000073695A (ja) * | 1998-08-28 | 2000-03-07 | Daiho Constr Co Ltd | 大断面シールドトンネルの覆工方法およびトンネル覆工体構築用のコンクリート型枠構成部材 |
CN2731106Y (zh) * | 2004-09-09 | 2005-10-05 | 李金奎 | 锚壳喷支护体系 |
JP2008144512A (ja) * | 2006-12-12 | 2008-06-26 | Kajima Corp | 拡幅セグメント |
JP2009074291A (ja) * | 2007-09-20 | 2009-04-09 | Nippon Steel Corp | 簡易合成セグメント |
JP2010242397A (ja) * | 2009-04-07 | 2010-10-28 | Nippon Steel Corp | 内空側に表面板を有する合成セグメントおよびトンネル |
CN101963060A (zh) * | 2010-10-15 | 2011-02-02 | 西南交通大学 | 基于钢管拱肋支护结构的隧道施工方法 |
JP2012057403A (ja) * | 2010-09-10 | 2012-03-22 | Kumagai Gumi Co Ltd | 内型枠のレール装置 |
WO2013056306A1 (en) * | 2011-10-19 | 2013-04-25 | Quickway Constructions Pty Ltd | Shoring box system and method |
CN103089273A (zh) * | 2013-01-14 | 2013-05-08 | 西南交通大学 | 一种纵向开孔大跨大体积混凝土隧道衬砌结构的建造方法 |
CN103748321A (zh) * | 2011-06-21 | 2014-04-23 | 斯坦博纳有限责任公司 | 用于构建隧道路线的方法以及该方法使用的结构元件 |
EP2918772A2 (de) * | 2014-03-14 | 2015-09-16 | Bochumer Eisenhütte Heintzmann GmbH&Co. Kg | Ausbausystem für untertägige Tunnel oder Strecken |
CN204677221U (zh) * | 2015-06-02 | 2015-09-30 | 北京首尔工程技术有限公司 | 一种隧道移动支护结构 |
CN105401963A (zh) * | 2015-12-08 | 2016-03-16 | 安徽理工大学 | 矿山隔热三维钢筋混凝土衬砌 |
CN205117365U (zh) * | 2015-10-26 | 2016-03-30 | 中铁二十局集团有限公司 | 高地应力软弱围岩隧道格栅钢架与套拱联合支护体系 |
CN105781574A (zh) * | 2016-04-19 | 2016-07-20 | 长安大学 | 一种隧道装配式支护体系及其施工方法 |
CN105927251A (zh) * | 2016-06-30 | 2016-09-07 | 吴镇 | 浅埋型球铁框架-钢筋混凝土组合隧道壁板 |
CN106050261A (zh) * | 2016-06-12 | 2016-10-26 | 中铁二院工程集团有限责任公司 | 一种内设箱形钢架的隧道初期支护构造 |
CN206071600U (zh) * | 2016-08-29 | 2017-04-05 | 中南大学 | 一种膨胀围岩隧道的刚柔结合支护体系 |
CN106812538A (zh) * | 2015-11-29 | 2017-06-09 | 吴镇 | 预埋式球铁框架-钢筋混凝土组合隧道壁板 |
CN107218061A (zh) * | 2017-07-04 | 2017-09-29 | 山东大学 | 一种刚柔耦合的隧道监测支护综合体系与方法 |
CN107524457A (zh) * | 2017-10-24 | 2017-12-29 | 仇文革 | 利用材料峰后性能的大行程组合型阻尼器 |
CN107795326A (zh) * | 2017-10-24 | 2018-03-13 | 仇文革 | 阻尼器及隧道支护结构的施工方法 |
JP2018109329A (ja) * | 2017-01-05 | 2018-07-12 | 株式会社大林組 | トンネル躯体 |
JP2018109280A (ja) * | 2016-12-28 | 2018-07-12 | ジオスター株式会社 | トンネル内構造およびトンネル内構造の築造方法 |
CN108506015A (zh) * | 2018-06-07 | 2018-09-07 | 北京住总集团有限责任公司 | 一种大管径分仓开挖人工顶管及应用顶管开挖的施工方法 |
CN108915727A (zh) * | 2018-06-27 | 2018-11-30 | 昆明理工大学 | 一种以钢管混凝土为骨架的隧道衬砌结构及滑模施工方法 |
EP3521556A1 (de) * | 2018-01-31 | 2019-08-07 | ICW Ingenieur Consult Würzburg Peter Hofstetter | Multifunktionsrahmen im tunnelbau |
CN209838431U (zh) * | 2018-12-29 | 2019-12-24 | 中煤建工集团有限公司 | 一种隧道用支撑装置 |
CN210264755U (zh) * | 2019-06-17 | 2020-04-07 | 中交第三公路工程局有限公司 | 矿山法隧道初期支护结构 |
CN111188630A (zh) * | 2020-01-14 | 2020-05-22 | 西南交通大学 | 一种取热吸能让压隧道结构 |
CN111577339A (zh) * | 2020-04-21 | 2020-08-25 | 中国建筑股份有限公司 | 高地应力软岩隧道支护结构体系及其施工方法 |
CN213063599U (zh) * | 2020-09-03 | 2021-04-27 | 许晓峰 | 一种煤矿掘进支护装置 |
-
2021
- 2021-10-29 CN CN202111276036.9A patent/CN113982629B/zh active Active
Patent Citations (40)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4072018A (en) * | 1975-04-30 | 1978-02-07 | Alvarez Calderon Alberto | Tunnel support structure and method |
CN86103897A (zh) * | 1985-05-28 | 1987-03-11 | 法兰西企业公司 | 衬砌模板 |
CH686198A5 (de) * | 1992-04-29 | 1996-01-31 | Marti Holding Ag Bern | Verfahren zur Erstellung eines tragenden Tunnelausbaus mit integrierter Isolation. |
JPH09195687A (ja) * | 1996-01-17 | 1997-07-29 | Ishikawajima Constr Materials Co Ltd | セグメント |
JPH1088986A (ja) * | 1996-09-12 | 1998-04-07 | Ohbayashi Corp | トンネル覆工用型枠及びトンネルの覆工方法 |
JPH1161861A (ja) * | 1997-08-07 | 1999-03-05 | Kato Kensetsu:Kk | 沈設体用セグメントピース |
JPH11159293A (ja) * | 1997-11-26 | 1999-06-15 | Atsushi Koizumi | 合成セグメント |
JP2000073695A (ja) * | 1998-08-28 | 2000-03-07 | Daiho Constr Co Ltd | 大断面シールドトンネルの覆工方法およびトンネル覆工体構築用のコンクリート型枠構成部材 |
CN2731106Y (zh) * | 2004-09-09 | 2005-10-05 | 李金奎 | 锚壳喷支护体系 |
JP2008144512A (ja) * | 2006-12-12 | 2008-06-26 | Kajima Corp | 拡幅セグメント |
JP2009074291A (ja) * | 2007-09-20 | 2009-04-09 | Nippon Steel Corp | 簡易合成セグメント |
JP2010242397A (ja) * | 2009-04-07 | 2010-10-28 | Nippon Steel Corp | 内空側に表面板を有する合成セグメントおよびトンネル |
JP2012057403A (ja) * | 2010-09-10 | 2012-03-22 | Kumagai Gumi Co Ltd | 内型枠のレール装置 |
CN101963060A (zh) * | 2010-10-15 | 2011-02-02 | 西南交通大学 | 基于钢管拱肋支护结构的隧道施工方法 |
CN103748321A (zh) * | 2011-06-21 | 2014-04-23 | 斯坦博纳有限责任公司 | 用于构建隧道路线的方法以及该方法使用的结构元件 |
WO2013056306A1 (en) * | 2011-10-19 | 2013-04-25 | Quickway Constructions Pty Ltd | Shoring box system and method |
CN103089273A (zh) * | 2013-01-14 | 2013-05-08 | 西南交通大学 | 一种纵向开孔大跨大体积混凝土隧道衬砌结构的建造方法 |
EP2918772A2 (de) * | 2014-03-14 | 2015-09-16 | Bochumer Eisenhütte Heintzmann GmbH&Co. Kg | Ausbausystem für untertägige Tunnel oder Strecken |
DE102014103477A1 (de) * | 2014-03-14 | 2015-09-17 | Bochumer Eisenhütte Heintzmann GmbH & Co. KG | Ausbausystem für untertägige Tunnel oder Strecken, Ausbaueinheit sowie Bogensegment |
CN204677221U (zh) * | 2015-06-02 | 2015-09-30 | 北京首尔工程技术有限公司 | 一种隧道移动支护结构 |
CN205117365U (zh) * | 2015-10-26 | 2016-03-30 | 中铁二十局集团有限公司 | 高地应力软弱围岩隧道格栅钢架与套拱联合支护体系 |
CN106812538A (zh) * | 2015-11-29 | 2017-06-09 | 吴镇 | 预埋式球铁框架-钢筋混凝土组合隧道壁板 |
CN105401963A (zh) * | 2015-12-08 | 2016-03-16 | 安徽理工大学 | 矿山隔热三维钢筋混凝土衬砌 |
CN105781574A (zh) * | 2016-04-19 | 2016-07-20 | 长安大学 | 一种隧道装配式支护体系及其施工方法 |
CN106050261A (zh) * | 2016-06-12 | 2016-10-26 | 中铁二院工程集团有限责任公司 | 一种内设箱形钢架的隧道初期支护构造 |
CN105927251A (zh) * | 2016-06-30 | 2016-09-07 | 吴镇 | 浅埋型球铁框架-钢筋混凝土组合隧道壁板 |
CN206071600U (zh) * | 2016-08-29 | 2017-04-05 | 中南大学 | 一种膨胀围岩隧道的刚柔结合支护体系 |
JP2018109280A (ja) * | 2016-12-28 | 2018-07-12 | ジオスター株式会社 | トンネル内構造およびトンネル内構造の築造方法 |
JP2018109329A (ja) * | 2017-01-05 | 2018-07-12 | 株式会社大林組 | トンネル躯体 |
CN107218061A (zh) * | 2017-07-04 | 2017-09-29 | 山东大学 | 一种刚柔耦合的隧道监测支护综合体系与方法 |
CN107795326A (zh) * | 2017-10-24 | 2018-03-13 | 仇文革 | 阻尼器及隧道支护结构的施工方法 |
CN107524457A (zh) * | 2017-10-24 | 2017-12-29 | 仇文革 | 利用材料峰后性能的大行程组合型阻尼器 |
EP3521556A1 (de) * | 2018-01-31 | 2019-08-07 | ICW Ingenieur Consult Würzburg Peter Hofstetter | Multifunktionsrahmen im tunnelbau |
CN108506015A (zh) * | 2018-06-07 | 2018-09-07 | 北京住总集团有限责任公司 | 一种大管径分仓开挖人工顶管及应用顶管开挖的施工方法 |
CN108915727A (zh) * | 2018-06-27 | 2018-11-30 | 昆明理工大学 | 一种以钢管混凝土为骨架的隧道衬砌结构及滑模施工方法 |
CN209838431U (zh) * | 2018-12-29 | 2019-12-24 | 中煤建工集团有限公司 | 一种隧道用支撑装置 |
CN210264755U (zh) * | 2019-06-17 | 2020-04-07 | 中交第三公路工程局有限公司 | 矿山法隧道初期支护结构 |
CN111188630A (zh) * | 2020-01-14 | 2020-05-22 | 西南交通大学 | 一种取热吸能让压隧道结构 |
CN111577339A (zh) * | 2020-04-21 | 2020-08-25 | 中国建筑股份有限公司 | 高地应力软岩隧道支护结构体系及其施工方法 |
CN213063599U (zh) * | 2020-09-03 | 2021-04-27 | 许晓峰 | 一种煤矿掘进支护装置 |
Non-Patent Citations (3)
Title |
---|
Experimental and numerical investigation on overbreak control considering the influence of initial support in tunnels;Chen, Jihui et al.;《TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY》;第1-10页 * |
城市市政道路混凝土双孔箱涵施工技术浅析;刘强等;《科学技术创新》;第96-97页 * |
深埋硬岩隧道初期支护劣化过程衬砌力学特性试验研究;仇文革等;《岩石力学与工程学报》;第72-77页 * |
Also Published As
Publication number | Publication date |
---|---|
CN113982629A (zh) | 2022-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113982629B (zh) | 隧道支护结构 | |
EP2698558A1 (en) | Impact absorption member | |
CN110395084A (zh) | 安装结构及设备 | |
CN207450019U (zh) | 一种衬套的连接装置、电池包及车辆 | |
JP6191521B2 (ja) | 車両の衝撃吸収構造 | |
CN111424839A (zh) | 一种蒸压加气的混凝土泄爆板及其制作方法 | |
CN104006345A (zh) | 一种汽车前大灯结构 | |
CN208873803U (zh) | 一种电池箱体及动力电池 | |
EP3412515B1 (en) | Airbag housing and airbag assembly | |
CN112670647B (zh) | 电池托盘、电池包和电动汽车 | |
CN207684065U (zh) | 一种机械设备放置用外箱盒 | |
CN101806330A (zh) | 缓冲器 | |
CN205784906U (zh) | 一种低冲击线型爆炸解锁装置 | |
CN105650149A (zh) | 一种散热型刹车片 | |
CN111649116A (zh) | 一种车辆分动箱抗冲击保护装置 | |
CN215922959U (zh) | 一种可重复利用的桩基钢筋笼存放台座 | |
CN210554634U (zh) | 一种汽车安全防撞底盘 | |
CN214267484U (zh) | 一种用于雷达车通讯采集设备的防护装置 | |
CN221259671U (zh) | 一种抗爆容器用泄压底座 | |
CN214144836U (zh) | 一种建筑结构加固连接装置 | |
CN113982631B (zh) | 隧道支护结构和隧道支护方法 | |
CN221235108U (zh) | 一种半圆形筒体的翻转工装 | |
CN218177481U (zh) | 一种水泵支架 | |
CN213686027U (zh) | 一种冰晶石脱水离心机安装用缓震平台 | |
CN210117797U (zh) | 一种具有斜撑的强外框高层建筑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |