CN113982240A - Construction work platform is built in room - Google Patents

Construction work platform is built in room Download PDF

Info

Publication number
CN113982240A
CN113982240A CN202111311805.4A CN202111311805A CN113982240A CN 113982240 A CN113982240 A CN 113982240A CN 202111311805 A CN202111311805 A CN 202111311805A CN 113982240 A CN113982240 A CN 113982240A
Authority
CN
China
Prior art keywords
hanging basket
basket
wire rope
steel wire
work platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111311805.4A
Other languages
Chinese (zh)
Inventor
王海龙
项琛恺
左亚斌
杨洋
董建强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Road And Bridge Hongsheng House Building Installation Co ltd
Original Assignee
Gansu Road And Bridge Hongsheng House Building Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Road And Bridge Hongsheng House Building Installation Co ltd filed Critical Gansu Road And Bridge Hongsheng House Building Installation Co ltd
Publication of CN113982240A publication Critical patent/CN113982240A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/283Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a house construction operation platform, belongs to the technical field of house construction, and aims to solve the problems that the operation platform in the prior art is low in use stability and cannot realize transverse movement of a hanging basket. The device comprises a winch, a steel wire rope and a hanging basket, wherein one end of the steel wire rope is connected with the winch, and the other end of the steel wire rope penetrates through a pulley and is connected with the hanging basket. Still including the ball screw that matches mutually vice and ball nut pair, ball nut is vice to be equipped with the slider for a set of and top at least, and a set of slider top is equipped with the support body, and hoist engine and pulley are all established on the support body, and the support body tip still is equipped with movable loop bar, and movable loop bar end-to-end connection is on the hanging flower basket. Through the practical improvement of the two aspects, the hanging basket operation platform is more suitable for the related operation of the outer wall, the safety and the convenience are greatly improved no matter curtain wall installation, outer wall heat insulation operation or wall cleaning, the operation cost can be saved, and the construction efficiency can be improved.

Description

Construction work platform is built in room
Technical Field
The invention belongs to the technical field of house construction, and particularly relates to a house construction operation platform.
Background
The hanging basket is a basic building tool for building construction operation, and is used for various external wall operations, such as curtain wall installation, external wall heat insulation operation, wall cleaning and the like. Generally, the cantilever mechanism is erected on a roof or a higher floor according to the specification, the lifting mechanism is used for driving the suspension platform, the suspension platform runs up and down along the vertical face of the building through a steel wire rope to serve as an operation platform for operators, and related materials can be hoisted.
In the construction process, a hanging basket is generally arranged in one unit, and after the up-and-down operation is finished, the hanging basket installation position is moved for operation again. The hanging flower basket is arranged on the roof side by side when the construction period is tight, so that multiple groups of personnel can operate synchronously, the construction efficiency of various external wall operations can be effectively improved, the installation and use quantity of the hanging flower baskets is greatly increased, the electric wire arrangement quantity and the electric energy consumption quantity are synchronously increased, and the construction cost is also obviously improved.
If the basket is provided with a transverse moving function and a transverse moving space, the use amount of the basket can be reduced, and the consumption of electric wires and electric quantity can be reduced, which is absent in the prior art. Meanwhile, when the existing hanging basket is used, the hanging basket is in a suspension state, the stability of the hanging basket is greatly impacted in a sudden windy weather, the hanging basket can shake along with a steel wire rope, the operation wall surface is damaged slightly, and the safety of operating personnel and surrounding pedestrians can be threatened seriously. And the reason that the frequency of the hanging basket is high is to take materials to the bottom layer.
Based on the problems in the background art, the operating personnel provide a building construction operating platform.
Disclosure of Invention
The invention aims to provide a house building construction work platform, which solves the problems that the work platform in the prior art is low in use stability and cannot realize transverse movement of a hanging basket.
In order to solve the problems, the technical scheme of the invention is as follows:
a building construction work platform comprises a winch, a steel wire rope and a hanging basket, wherein one end of the steel wire rope is connected with the winch, and the other end of the steel wire rope penetrates through a pulley and is connected with the hanging basket. Still including the ball screw that matches mutually vice and ball nut pair, ball nut is vice to be equipped with the slider for a set of and top at least, and a set of slider top is equipped with the support body, and hoist engine and pulley are all established on the support body, and the support body tip still is equipped with movable loop bar, and movable loop bar end-to-end connection is on the hanging flower basket.
Furthermore, a bearing seat is arranged between the sliding block and the frame body, and a balancing weight is arranged at one end, far away from the hanging basket, of the bearing seat.
Furthermore, a motor is arranged at the end part of the ball screw pair.
Furthermore, the bottom of the hanging basket is connected with a carrying basket through a connecting arm.
Furthermore, a group of supporting blocks are arranged at the positions of the ball nut pairs below the bearing seat.
Furthermore, the ball nut pair is arranged on the track plate.
The invention has the following beneficial effects:
(1) the invention utilizes the motor to drive the ball screw pair to act, realizes the transverse movement of the frame body driven by the slide block by driving the ball nut pair to move, and enlarges the operation range of the operation platform on the original hanging basket; the setting of activity loop bar for except wire rope between hanging flower basket and the support body, still rigid connection reduces rocking of hanging flower basket in the operation, under unexpected weather conditions, can avoid on the hanging flower basket rocking by a wide margin of operation platform in short term, transfers or promotes the hanging flower basket fast, strives for to take out evacuation time for operation platform's on the hanging flower basket operation personnel, guarantees operation personnel's security. And because the transverse moving space is increased, the installation amount of the hanging basket on the roof can be reduced on the premise of meeting the construction efficiency, and the cost is saved.
(2) The balancing weight and the supporting block ensure the stability of the frame body; the ball screw pair is driven by the motor, so that the speed and the efficiency are high. The carrying basket at the bottom of the hanging basket can prevent operation materials, reduce the up-down frequency of the hanging basket and save the operation cost.
(3) Through the practical improvement of the two aspects, the hanging basket operation platform is more suitable for the related operation of the outer wall, the safety and the convenience are greatly improved no matter curtain wall installation, outer wall heat insulation operation or wall cleaning, the operation cost can be saved, and the construction efficiency can be improved.
Drawings
FIG. 1 is a schematic structural diagram of a building construction work platform;
FIG. 2 is a schematic view of the installation positions of a winch and a ball screw pair in a room construction work platform;
fig. 3 is a top view of a ball screw assembly in a building construction work platform.
The reference numbers are as follows: 1-a winch; 11-a steel wire rope; 12-a movable loop bar; 13-a bearing seat; 14-a counterweight block; 15-frame body; 16-a support block; 17-a pulley; 2-hanging baskets; 21-linking arm; 22-carrying basket; 3-a ball screw pair; 31-a motor; 32-a track slab; 33-a slide block; 34-ball nut pair.
DETAILED DESCRIPTION OF EMBODIMENT (S) OF INVENTION
As shown in fig. 1-3, a building construction work platform comprises a winch 1, a steel wire rope 11 and a hanging basket 2, wherein one end of the steel wire rope 11 is connected with the winch 1, the other end of the steel wire rope 11 penetrates through a pulley 17 to be connected with the hanging basket 2, and the bottom of the hanging basket 2 is connected with a carrying basket 22 through a connecting arm 21.
The device also comprises a ball screw pair 3 and a ball nut pair 34 which are matched with each other, wherein the end part of the ball screw pair 3 is provided with a motor 31; at least one group of ball nut pairs 34 are arranged on the track plate 32, and the top of each ball nut pair is provided with a sliding block 33; the top of the group of sliding blocks 33 is provided with a frame body 15 through a bearing seat 13, one end of the bearing seat 13 far away from the hanging basket 2 is provided with a balancing weight 14, and a group of supporting blocks 16 are arranged below the bearing seat 13 and positioned at the ball nut pair 34; the winch 1 and the pulley 17 are arranged on the frame body 15, the end part of the frame body 15 is also provided with a movable loop bar 12, and the tail end of the movable loop bar 12 is connected to the hanging basket 2.
Before operation, the invention is firstly installed, an adaptive supporting block 16 is found and supported below the bearing seat 13, then the frame body 15 is installed or welded on the bearing seat 13, and the hoisting balancing weight 14 is pressed on one side of the bearing seat 13, so that the frame body 15 is prevented from overturning in the operation.
During the operation, start hoist engine 1, transfer wire rope 11, hanging flower basket 2 descends to ground with carrying thing basket 22, carries thing basket 22 and carries the thing, and hanging flower basket 2 carries the operation personnel, and reverse hoist engine 1 promotes wire rope 11, drives hanging flower basket 2 and carries out the outer wall relevant operation to the operation point, when needing to supply the operation material, can follow and carry thing basket 22 and draw, makes things convenient for the operation. After one area is operated, the ball screw pair 3 is rotated by the starting motor 31, the ball nut pair 34 translates on the ball screw pair to drive the sliding block and the frame body 15 to translate, the swinging amplitude of the hanging basket 2 is small under the protection of the movable sleeve rod 12, the hanging basket 2 translates to the next operation area within a safety range, the motor 31 is stopped, and the operation is carried out in the next operation area.
After the operation is finished, the winch 1 is lifted to perform the operation of the previous area, the similar translational frame body 15 moves the operation area with the same height, and the operation is circulated until the operation is finished.
Under the condition of sudden weather, under the protection of the movable loop bar 12, the swinging amplitude of the hanging basket 2 is not large, the hanging basket 2 is quickly lowered or lifted, the evacuation time is taken for the operators of the operation platform on the hanging basket 2, and the safety of the operators is ensured.

Claims (6)

1. A building construction work platform comprises a winch (1), a steel wire rope (11) and a hanging basket (2), wherein one end of the steel wire rope (11) is connected with the winch (1), and the other end of the steel wire rope (11) penetrates through a pulley (17) to be connected with the hanging basket (2); the method is characterized in that: the hoisting device is characterized by further comprising a ball screw pair (3) and a ball nut pair (34) which are matched with each other, wherein the ball nut pair (34) is at least one group, a sliding block (33) is arranged at the top of the ball nut pair (34), a frame body (15) is arranged at the top of the sliding block (33), the hoisting machine (1) and the pulley (17) are arranged on the frame body (15), a movable sleeve rod (12) is further arranged at the end part of the frame body (15), and the tail end of the movable sleeve rod (12) is connected to the hanging basket (2).
2. The building construction work platform of claim 1, wherein: be equipped with bearing (13) between slider (33) and support body (15), the one end that bearing (13) kept away from hanging flower basket (2) is equipped with balancing weight (14).
3. A building construction work platform according to claim 1 or 2, characterized in that: and a motor (31) is arranged at the end part of the ball screw pair (3).
4. The building construction work platform of claim 3, wherein: the bottom of the hanging basket (2) is connected with a carrying basket (22) through a connecting arm (21).
5. The building construction work platform of claim 2, wherein: and a group of supporting blocks (16) are arranged below the bearing seat (13) and positioned at the ball nut pair (34).
6. The building construction work platform of claim 2, wherein: the ball nut pair (34) is arranged on the track plate (32).
CN202111311805.4A 2021-05-18 2021-11-08 Construction work platform is built in room Pending CN113982240A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2021105381029 2021-05-18
CN202110538102.9A CN113266138A (en) 2021-05-18 2021-05-18 Construction work platform is built in room

Publications (1)

Publication Number Publication Date
CN113982240A true CN113982240A (en) 2022-01-28

Family

ID=77231429

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202110538102.9A Withdrawn CN113266138A (en) 2021-05-18 2021-05-18 Construction work platform is built in room
CN202111311805.4A Pending CN113982240A (en) 2021-05-18 2021-11-08 Construction work platform is built in room

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202110538102.9A Withdrawn CN113266138A (en) 2021-05-18 2021-05-18 Construction work platform is built in room

Country Status (1)

Country Link
CN (2) CN113266138A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114291746B (en) * 2021-12-28 2026-01-02 甘肃路桥宏盛房屋建筑安装工程有限公司 A fixed-point hoisting and conveying device for masonry engineering

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090063536A (en) * 2007-12-14 2009-06-18 삼지석재공업주식회사 Temporary system for building exterior construction and building exterior construction method using the same
CN210395103U (en) * 2019-03-19 2020-04-24 江苏森淼工程质量检测有限公司 A kind of high stability pulley type hanging basket for bridge construction
CN112160580A (en) * 2020-09-23 2021-01-01 西安外事学院 Construction work platform for building external wall

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090063536A (en) * 2007-12-14 2009-06-18 삼지석재공업주식회사 Temporary system for building exterior construction and building exterior construction method using the same
CN210395103U (en) * 2019-03-19 2020-04-24 江苏森淼工程质量检测有限公司 A kind of high stability pulley type hanging basket for bridge construction
CN112160580A (en) * 2020-09-23 2021-01-01 西安外事学院 Construction work platform for building external wall

Also Published As

Publication number Publication date
CN113266138A (en) 2021-08-17

Similar Documents

Publication Publication Date Title
CN201295709Y (en) A sleeve loading and unloading apparatus
CN213979852U (en) Suspension type track hanging flower basket structure
CN113982240A (en) Construction work platform is built in room
CN208150864U (en) A kind of construction material lifting apparatus
CN113845024B (en) Hydraulic lifting portal frame for subway construction
CN114033151B (en) A high-altitude work hanging basket system suitable for various wall conditions
CN111502294B (en) Automatic installation method of movable precast concrete wallboard
CN213387572U (en) Hoist engine for road and bridge engineering
CN117533938B (en) A prefabricated wall panel component lifting device
CN111561139B (en) Method for constructing roof of fabricated building
CN217942432U (en) Integral standard festival shaping frock of tower machine fishplate
CN217627069U (en) Steel construction lifting device for assembly type building construction
CN219156359U (en) Self-climbing construction crane for elevator steel structure well
CN214692916U (en) A mobile shield machine lifting hanger
CN218465409U (en) Lifting device for bricklaying equipment
CN212639769U (en) Crane for maintenance of ships in floating dock
CN210366715U (en) Bridge-building portal crane
CN210763956U (en) Automatic change equipment crane
CN210505314U (en) Hoisting device for civil air defense equipment installation
CN208603626U (en) A kind of assembled architecture concrete prefabricated element truck-loading facilities
CN209442543U (en) Hanging device is used in a kind of construction of assembled architecture
CN222099412U (en) A movable lifting device
CN217780466U (en) Scaffold-free mounting structure for elevator
CN114382012A (en) Bridge construction lifts by crane better hanging flower basket of wind-resistance for equipment
CN215886185U (en) Construction elevator for intermediate frequency goods

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220128

RJ01 Rejection of invention patent application after publication