Improved back-pull type pull-press composite anchor rod and construction method thereof
Technical Field
The invention relates to an improved back-pull type pull-press composite anchor rod and a construction method thereof, which are used for anchoring and reinforcing of foundation pits, side slopes, tunnels and underground engineering, and are particularly suitable for the anchoring engineering that an anchor rod anchoring section passes through a hard soil layer and a soft soil layer simultaneously.
Background
ZL201420450678.5 discloses a draw-press compound stock, is provided with the bearing plate according to predetermineeing the position in the body of rod of its stock anchor section, makes the single anchor section of traditional stock break down into pressure-bearing anchor section and tension anchor section, has reduced the stress concentration phenomenon at anchor section and ground body interface greatly, makes anchor section and ground body's bonding strength obtain full play, when the same anchor section length, draws the compound stock of pressure and is showing and improve than the resistance to plucking bearing capacity of traditional pulling force formula stock and traditional pressure formula stock.
However, due to layering of the rock-soil body, the soil body in practical engineering is composed of different soil layers, and when the anchoring section of the anchor rod passes through the hard soil layer and then passes through the soft soil layer. The conventional tension type anchor rod for the stratum has the following problems that (1) an anchoring section positioned on a hard soil layer is stressed firstly and has serious stress concentration phenomenon, (2) the anchoring section positioned on a soft soil layer is stressed later and can bear little load even no load because the hard soil layer bears more load firstly, and (3) the anchoring section positioned on the hard soil layer and the soft soil layer bear load in a non-cooperative manner, so that the anchoring section of the soft soil layer is seriously wasted. The conventional pressure anchor rod for the stratum has the following problems that (1) an anchor section positioned on a soft soil layer is stressed firstly, the interface friction between the anchor section and the soft soil layer is very low, the bearing load is relatively small, and the material saving is not facilitated, and (2) the soft soil layer is relatively weak in constraint of the anchor section on grouting body, when the anchor rod body deviates from the center, the anchor section is in a biased compression state, and the grouting body is easy to break.
The tension-compression composite anchor rod disclosed in the patent ZL201420450678.5 can bear force through the pressure-bearing anchoring section and the tension anchoring section simultaneously, and the bearing capacity is improved compared with that of the traditional tension-type anchor rod and the traditional pressure-type anchor rod. However, as the bearing anchoring section is positioned on the front hard soil layer and the tension anchoring section is positioned on the rear soft soil layer, the rigidity and the bearing capacity of the bearing anchoring section and the tension anchoring section are greatly different. Based on deformation coordination of the bearing plate, the bearing anchoring section and the tension anchoring section are stressed simultaneously, and as the bonding strength of the soft soil layer interface is low and the bonding strength of the hard soil layer interface is high, when the bearing capacity of the tension anchoring section in the soft soil layer reaches the limit, the bearing capacity of the bearing anchoring section in the hard soil layer is far from the limit, the tension anchoring section in the soft soil layer is damaged firstly, the load born by the bearing anchoring section is transferred to the bearing anchoring section in the hard soil layer, the bearing anchoring section is further damaged, and the anchor rod is disabled.
Therefore, when the tension-compression composite anchor rod disclosed by ZL201420450678.5 is applied to a hard and soft staggered soil layer, the bearing capacity of a pressure-bearing anchoring section in the hard soil layer cannot be fully and cooperatively exerted, and the pulling-resistant bearing capacity of the anchor rod is low, so that an improvement and optimization space is provided.
Disclosure of Invention
In view of the above, the present invention aims to provide an improved pull-back type tension-compression composite anchor rod with high pullback resistance and bearing capacity, which can fully exert the bearing capacity of a bearing anchoring section in a hard soil layer.
In order to achieve the aim, the improved back-pulling type tension-compression composite anchor rod comprises an anchor rod body, wherein the anchor rod body is provided with a pressure-bearing anchoring section, a slow-pulling section and a tension-pulling anchoring section, a pressure-bearing plate is arranged at the junction of the pressure-bearing anchoring section and the slow-pulling section and is fixed on the anchor rod body, an outer sleeve is arranged on the anchor rod body in the range of the pressure-bearing anchoring section, a heat shrinkage tube is arranged on the anchor rod body in the range of the slow-pulling section, the pressure-bearing anchoring section is arranged corresponding to a hard soil layer at the upper part, the tension-pulling anchoring section is arranged corresponding to a soft soil layer at the lower part, and the slow-pulling section is simultaneously arranged corresponding to the hard soil layer and the soft soil layer.
As a preferable mode of the invention, the anchor rod body is ribbed steel bar, steel strand, finish rolled deformed steel bar or hollow deformed steel bar.
As a preferable mode of the invention, the anchor rod body is a ribbed steel bar, and the bearing plate is symmetrically and propped against the ribbed steel bar through the upper bar steel bar for welding and fixing on the ribbed steel bar.
As a preferable mode of the invention, the anchor rod body is a steel strand, and the bearing plate is fixed on the steel strand through the extrusion sleeve.
In a preferred mode of the invention, the anchor rod body is finish rolled deformed steel bar or hollow deformed steel bar, and the bearing plate is fixed on the finish rolled deformed steel bar or hollow deformed steel bar through a nut.
As a preferable mode of the invention, the heat-shrinkable tube is a heat-shrinkable PE tube.
The invention also provides an improved construction method of the back-pull type pull-press composite anchor rod, which comprises the following steps:
The method comprises the steps of A, fixing a bearing plate, namely, when a ribbed steel bar is adopted by an anchor rod body, symmetrically propping and welding the bearing plate on the ribbed steel bar through a side bar steel bar, when a steel strand is adopted by the anchor rod body, fixing the bearing plate on the steel strand through an extrusion sleeve, and when finish rolling threaded steel or hollow threaded steel bar is adopted by the anchor rod body, fixing the bearing plate on the finish rolling threaded steel or hollow threaded steel bar through a nut;
step C, packaging the heat-shrinkable PE pipe by the anchor rod body at the slow-pulling section position, namely sheathing the heat-shrinkable PE pipe into the slow-pulling section according to the designed length, heating the heat-shrinkable PE pipe by a heater, and stopping heating when the heat-shrinkable PE pipe is just contracted and attached to the anchor rod body;
And D, drilling holes in the soil layer, centering the anchor rod body into the drilled holes, enabling the bearing anchoring section to be located in the hard soil layer on the upper portion, enabling the tension anchoring section to be located in the soft soil layer on the lower portion, enabling the slow-pull section to be located in the hard soil layer and the soft soil layer at the same time, and injecting cement into the drilled holes to finish construction.
As a preferred mode of the present invention, the bearing plate is spaced 1-3m from the soft soil layer.
As a preferable mode of the invention, the heat shrinkage tube of the slow-pulling section stretches into the soft soil layer for 1-2m.
After the structure is adopted, the improved back-pulling type tension-compression composite anchor rod has the advantages that (1) when the anchor rod is acted by load, the pressure-bearing anchoring section is stressed firstly due to high strength of a hard soil layer, the tension anchoring section is stretched and stressed by the transition of the slow-pulling section and the elasticity of the anchor rod body in the slow-pulling section range, and (2) after the slow-pulling section is arranged at the junction of the hard soil layer and the soft soil layer, the deformation of the bottom of the pressure-bearing anchoring section is larger than the deformation of the top of the tension anchoring section, the initial deformation difference occurs when the tension anchoring section and the pressure-bearing anchoring section bear load, the pressure-bearing anchoring section and the tension anchoring section tend to reach the bearing capacity limit at the same time, and the pulling-resistant bearing capacity of the anchor rod is greatly improved.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
Fig. 2 is a schematic diagram of a load displacement curve of the pull-press composite anchor disclosed in ZL 201420450678.5;
Fig. 3 is a schematic representation of the load displacement curve of the improved bolt of the present invention.
In the figure, 1, an anchor rod body, 2, a pressure-bearing anchoring section, 3, an outer sleeve, 4, a grouting body, 5, a heat-shrinkable PE pipe, 6, drilling, A, a pressure-bearing anchoring section, B, a slow-pull section, C, a tension anchoring section, D, a hard soil layer, E, a soft soil layer, y=f (x), a stress-deformation curve diagram of the pressure-bearing anchoring section in the hard soil layer, y=g (x), a stress-deformation curve diagram of the tension anchoring section in the soft soil layer, Q1., a deformation amount corresponding to the ultimate bearing capacity of the tension anchoring section in the soft soil layer, Q2, a deformation corresponding to the ultimate bearing capacity of the pressure-bearing anchoring section in the hard soil layer, S, an initial deformation difference of the pressure-bearing load of the tension anchoring section in the hard soil layer and the tension anchoring in the soft soil layer.
Detailed Description
In order to further explain the technical scheme of the invention, the invention is explained in detail by specific examples.
The improved back-pulling type tension-compression composite anchor rod is shown in the figures 1-3, and is provided with a pressure-bearing anchoring section A, a slow-pulling section B and a tension anchoring section C, wherein the slow-pulling section B is positioned between the pressure-bearing anchoring section A and the tension anchoring section C, a pressure-bearing plate 2 is arranged at the juncture of the pressure-bearing anchoring section A and the slow-pulling section B (the pressure-bearing plate 2 adopts an assembled pressure-bearing plate), an outer sleeve 3 is arranged on an anchor rod body 1 in the range of the pressure-bearing anchoring section A, a heat shrink tube 5 (specifically a heat shrink PE tube) is arranged on the anchor rod body 1 in the range of the slow-pulling section B, the anchor rod body 1 in the tension anchoring section C is free of the outer sleeve and the heat shrink PE tube, the pressure-bearing anchoring section A is arranged on a hard soil layer D at the upper part, the tension anchoring section C is arranged on a soft soil layer E at the lower part, and the slow-pulling section B simultaneously penetrates through the hard soil layer D and the soft soil layer E.
The invention also provides an improved construction method of the back-pull type pull-press composite anchor rod, which comprises the following steps:
The method comprises the steps of A, fixing a bearing plate, namely symmetrically propping and welding the bearing plate on ribbed steel bars through the ribbed steel bars when the anchor rod body 1 adopts the ribbed steel bars, fixing the bearing plate on the steel twisted wires through an extrusion sleeve when the anchor rod body 1 adopts the steel twisted wires, fixing the bearing plate on the finish rolling threaded steel or the hollow threaded steel bars through nuts when the anchor rod body 1 adopts the finish rolling threaded steel or the hollow threaded steel bars, and packaging an outer sleeve 3 by the anchor rod body 1 at the position of a bearing anchoring section A, namely sleeving the outer sleeve 3 into the anchor rod body 1 from the anchor head end of the anchor rod body 1, and sealing openings at two ends of the outer sleeve 3;
Step C, packaging the heat-shrinkable PE pipe by the anchor rod body 1 at the position of the slow-pulling section B, namely sleeving the heat-shrinkable PE pipe 5 into the slow-pulling section B according to the design length, heating the heat-shrinkable PE pipe 5 by a heater, and stopping heating when the heat-shrinkable PE pipe 5 is just contracted and attached to the anchor rod body 1;
And D, drilling holes in the soil layer to form drilling holes 6, centering the anchor rod body 1 into the drilling holes 6, enabling the bearing anchoring section A to be located in the hard soil layer on the upper portion, enabling the tension anchoring section to be located in the soft soil layer on the lower portion, enabling the slow-pulling section B to be located in the hard soil layer D and the soft soil layer E at the same time, and injecting cement paste into the drilling holes 6 to form grouting bodies 4, so that construction is completed.
As a preferred mode of the present invention, the bearing plate is spaced 1-3m from the soft soil layer.
As a preferable mode of the invention, the heat shrinkage pipe of the slow-pulling section B stretches into the soft soil layer for 1-2m.
The following combines the comparison ZL201420450678.5, the improved back-pull type pull-press composite anchor rod of the invention has the action principle and the advantages:
As shown in fig. 2, ZL201420450678.5 discloses a pull-compression composite anchor rod, when the anchor rod is stressed, the anchor head directly transmits force to the node of the bearing plate, and simultaneously the bearing anchoring section on the bearing plate starts to be compressed to provide resistance and the tension anchoring section under the bearing plate starts to be tensioned to provide resistance, when the bearing plate is displaced upwards to S1, the bearing capacity of the tension anchoring section in the soft soil layer reaches a limit value, and at this time, the bearing capacity of the bearing anchoring section in the hard soil layer does not reach a limit value because the upward displacement of the bearing plate does not reach S2. When the stress of the anchor rod is continuously increased, the tension anchoring section in the soft soil layer fails firstly because the displacement of the bearing plate exceeds S1 and the bearing load exceeds the limit bearing capacity, and after the tension anchoring section in the soft soil layer fails, the residual bearing capacity of the tension anchoring section is rapidly reduced, so that the bearing load shared by the bearing anchoring section in the hard soil layer is greatly increased and then is rapidly destroyed. The ultimate bearing capacity of the anchor is therefore less than (q1+q2).
As shown in fig. 3, in this embodiment, since the slow-pull section B is disposed between the pressure-bearing anchoring section a and the tension-anchoring section C, the slow-pull section B passes through the hard soil layer D and the soft soil layer E at the same time, and the outer sleeve 3 is disposed on the anchor body 1 in the range of the slow-pull section B, after the anchor is loaded, the pressure-bearing anchoring section a is pressed by the assembled pressure-bearing plate 2 first, so that the pressure-bearing anchoring section a is stressed first, and then the assembled pressure-bearing plate 2 moves upward, and since the lower portion of the assembled pressure-bearing plate 2 is connected with the slow-pull section B provided with the heat-shrink PE pipe 5, the anchor body 1 stretching the slow-pull section B first causes elastic tensile deformation when the assembled pressure-bearing plate 2 moves upward, and then the tension-bearing section C at the lower portion lags behind the load, so that the initial deformation difference S of the bearing load generated by the pressure-bearing anchoring section a in the hard soil layer D and the tension-bearing anchoring section C in the soft soil layer E can delay the tension-bearing section C in the soft soil layer E, so that the pressure-bearing anchoring section a in the hard soil layer D reaches the ultimate bearing capacity Q2 when the anchor is deformed S2, and the ultimate bearing capacity Q1 in the soft soil layer E reaches the ultimate bearing capacity Q1 when the anchor is synchronously stressed when the anchor section C1 reaches the ultimate bearing capacity q+q.
The improved back-pulling type tension-compression composite anchor rod is simple in structure, the defect that the bearing capacity of the tension-compression composite anchor rod in a hard and soft staggered soil layer cannot be fully and cooperatively exerted is successfully solved, and the pulling-resistant bearing capacity of the anchor rod is greatly improved.