CN113833246B - Scaffold for engineering - Google Patents

Scaffold for engineering Download PDF

Info

Publication number
CN113833246B
CN113833246B CN202111150271.1A CN202111150271A CN113833246B CN 113833246 B CN113833246 B CN 113833246B CN 202111150271 A CN202111150271 A CN 202111150271A CN 113833246 B CN113833246 B CN 113833246B
Authority
CN
China
Prior art keywords
support
positioning
adjustment
block
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111150271.1A
Other languages
Chinese (zh)
Other versions
CN113833246A (en
Inventor
褚天云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Jiangbei Electric Power Engineering Co ltd
Original Assignee
Jiaxing Tiankun Construction Engineering Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Tiankun Construction Engineering Design Co ltd filed Critical Jiaxing Tiankun Construction Engineering Design Co ltd
Priority to CN202111150271.1A priority Critical patent/CN113833246B/en
Publication of CN113833246A publication Critical patent/CN113833246A/en
Application granted granted Critical
Publication of CN113833246B publication Critical patent/CN113833246B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/22Scaffolds having a platform on an extensible substructure, e.g. of telescopic type or with lazy-tongs mechanism
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

本发明涉及一种工程用脚手架,包括底座与平台单元,底座上设置有平台单元。本发明可以解决目前存在的问题:现有的脚手架在使用时是通过各个零部件相互组装而成,在工程施工的过程中需要施工的效率更高,使用到脚手架的地方很多,因此需要对脚手架进行搬来搬去,而需要现场进行组装的脚手架会导致施工效率的降低,不利于工程施工过程中的使用,脚手架在使用时需要将工作人员升起至指定高度以便于施工正常进行,而现有的脚手架没有设计相应的防护措施,施工过程中会存在建筑垃圾、工具以及工作人员坠落的风险,没有相应的防护措施,不仅会对脚手架上的工作人员带来安全问题,还会对处于脚手架周围的工作人员带来安全问题。

Figure 202111150271

The invention relates to a scaffold for engineering, which comprises a base and a platform unit, and the base is provided with a platform unit. The present invention can solve the problems existing at present: the existing scaffolding is assembled by various parts when in use, the construction efficiency needs to be higher in the process of engineering construction, and there are many places where the scaffolding is used, so it is necessary to adjust the scaffolding Moving around, and the scaffolding that needs to be assembled on site will reduce the construction efficiency, which is not conducive to the use in the construction process. When the scaffolding is in use, the staff need to be raised to the specified height to facilitate the normal construction. Now Some scaffolds are not designed with corresponding protective measures. During the construction process, there will be risks of construction waste, tools and staff falling. Without corresponding protective measures, it will not only bring safety problems to the staff on the scaffolding, but also cause serious damage to the workers on the scaffolding. The surrounding staff pose a safety issue.

Figure 202111150271

Description

一种工程用脚手架scaffolding for engineering

技术领域technical field

本发明涉及脚手架设计领域,具体的说是一种工程用脚手架。The invention relates to the field of scaffold design, in particular to an engineering scaffold.

背景技术Background technique

脚手架是施工现场为工人操作并解决垂直和水平运输而搭设的一种临时性的建筑工具,其主要用在外墙、内部装修或层高较高无法直接施工的地方。主要为了施工人员上下作业或外围安全网围护及高空安装构件等,在广告业、市政、交通路桥、矿山等部门也广泛被使用。Scaffolding is a temporary construction tool set up on the construction site for workers to operate and solve vertical and horizontal transportation. It is mainly used in places where exterior walls, interior decoration or high floors cannot be directly constructed. It is mainly used for construction personnel to work up and down or for peripheral safety net enclosure and high-altitude installation components, etc. It is also widely used in advertising industry, municipal administration, transportation, roads and bridges, mines and other departments.

目前对工程用脚手架进行设计时,存在以下问题:①现有的脚手架在使用时是通过各个零部件相互组装而成,在工程施工的过程中需要施工的效率更高,使用到脚手架的地方很多,因此需要对脚手架进行搬来搬去,而需要现场进行组装的脚手架会导致施工效率的降低,不利于工程施工过程中的使用。At present, when designing scaffolding for engineering, there are the following problems: ①The existing scaffolding is assembled from various parts when it is used. In the process of engineering construction, the construction efficiency needs to be higher, and there are many places where scaffolding is used. , Therefore, it is necessary to move the scaffolding around, and the scaffolding that needs to be assembled on site will lead to a reduction in construction efficiency, which is not conducive to the use in the construction process.

②脚手架在使用时需要将工作人员升起至指定高度以便于施工正常进行,而现有的脚手架没有设计相应的防护措施,施工过程中会存在建筑垃圾、工具以及工作人员坠落的风险,没有相应的防护措施,不仅会对脚手架上的工作人员带来安全问题,还会对处于脚手架周围的工作人员带来安全问题。② Scaffolding needs to raise the staff to a specified height to facilitate the normal construction, but the existing scaffolding is not designed with corresponding protective measures, there will be construction waste, tools and the risk of staff falling during the construction process, without corresponding The protective measures will not only bring safety problems to the staff on the scaffold, but also bring safety problems to the staff around the scaffold.

发明内容Contents of the invention

本发明的目的在于提供一种工程用脚手架,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide a scaffold for engineering to solve the problems raised in the above background technology.

为实现上述目的,本发明提供如下技术方案:一种工程用脚手架,包括底座与平台单元,底座上设置有平台单元。To achieve the above object, the present invention provides the following technical solutions: a scaffold for engineering, including a base and a platform unit, and the base is provided with a platform unit.

所述底座为矩形平板结构,底座下表面的四个拐角处均设置有万向滚轮,且底座的四个拐角处均设置有定位组件。The base is a rectangular plate structure, the four corners of the lower surface of the base are provided with universal rollers, and the four corners of the base are provided with positioning components.

所述平台单元包括支撑柱、支撑杆、支撑滑轨、支撑块、支撑板、调节支杆、调节滑道、调节滑块与调节连杆,底座上表面四个拐角处均设置有支撑柱,支撑柱上端设置有支撑杆,支撑柱与支撑杆上均设置有支撑滑轨,且支撑柱与支撑杆的上支撑滑轨均上下一一对应,支撑滑轨上滑动设置有支撑块,四个支撑块之间共同通过螺栓安装有支撑板,左右相对位置的支撑柱之间和左右相对位置的支撑块之间均安装有调节支杆,上下相对位置的两个调节支杆的相对面上均开设有调节滑道,调节滑道两端对称滑动设置有调节滑块,且上下相对位置的两对调节滑块之间共同铰接有调节连杆,所述调节连杆呈剪叉式伸缩结构。The platform unit includes a support column, a support rod, a support slide rail, a support block, a support plate, an adjustment pole, an adjustment slideway, an adjustment slider, and an adjustment connecting rod. There are support columns at the four corners of the upper surface of the base, The upper end of the support column is provided with a support rod, and the support column and the support rod are provided with a support slide rail, and the upper support slide rails of the support column and the support rod are in a one-to-one correspondence, and the support slide rails are slidingly provided with support blocks, four The support blocks are jointly installed with support plates through bolts, and adjustment struts are installed between the support columns at the left and right relative positions and between the support blocks at the left and right relative positions. An adjustment slideway is provided, and adjustment sliders are arranged to slide symmetrically at both ends of the adjustment slideway, and two pairs of adjustment sliders at upper and lower relative positions are jointly hinged with an adjustment link, and the adjustment link is a scissors-type telescopic structure.

位于下方的所述调节滑道内转动设置有调节丝杠,位于下方的调节滑道内的调节滑块与调节丝杠通过螺纹连接,且两个调节滑块与调节丝杠之间的螺纹旋转方向相反,底座上表面左端前后对称设置有调节电机,调节丝杠与调节电机输出端连接。An adjustment lead screw is provided for rotation in the adjustment slideway located below, and the adjustment slide block in the adjustment slideway below is connected to the adjustment lead screw through threads, and the thread rotation directions between the two adjustment slide blocks and the adjustment lead screw are opposite , the left end of the upper surface of the base is symmetrically arranged with an adjusting motor front and back, and the adjusting lead screw is connected with the output end of the adjusting motor.

作为本发明进一步的方案:所述定位组件包括定位滑杆、定位压块、一号弹簧、定位块、定位支杆、液压缸与定位压杆,底座的四个拐角处均以上下滑动的方式设置有定位滑杆,定位滑杆上端安装有定位压块,底座上表面与定位压块下表面之间连接有一号弹簧,定位滑杆下端安装有定位块,底座上表面的拐角处与定位滑杆之间的位置安装有定位支杆,定位滑杆远离定位支杆的一侧设置有液压缸,底座上表面与液压缸固定连接,定位支杆上端与液压缸输出端之间共同铰接有定位压杆,定位压块与定位压杆之间接触。As a further solution of the present invention: the positioning assembly includes a positioning slide bar, a positioning pressing block, a No. 1 spring, a positioning block, a positioning support rod, a hydraulic cylinder and a positioning pressing rod, and the four corners of the base all slide up and down. A positioning slide bar is provided, and a positioning pressing block is installed on the upper end of the positioning sliding bar. A No. 1 spring is connected between the upper surface of the base and the lower surface of the positioning pressing block. Positioning struts are installed between the rods, and a hydraulic cylinder is provided on the side of the positioning slide bar far away from the positioning struts. Depressing rod, the contact between the positioning pressing block and the positioning pressing rod.

作为本发明进一步的方案:所述定位块由两个等腰直角三角板的直角边相互垂直焊接组成,且前后相对位置的三角板和左右相对位置的三角板均呈八字形结构排布。As a further solution of the present invention: the positioning block is composed of two isosceles right-angled triangular plates whose right-angled sides are welded perpendicular to each other, and the triangular plates at the front and rear relative positions and the triangular plates at the left and right relative positions are arranged in a figure-eight structure.

作为本发明进一步的方案:所述支撑柱上端与支撑杆下端通过铰链连接,且支撑柱上端面开设有圆弧形的锁紧道,支撑杆下端面设置有圆弧形锁紧插杆,锁紧道与锁紧插杆配合插接,支撑柱侧面滑动插接有锁紧销,锁紧插杆与锁紧销通过螺纹连接。As a further solution of the present invention: the upper end of the support column and the lower end of the support rod are connected by a hinge, and the upper end surface of the support column is provided with an arc-shaped locking channel, and the lower end surface of the support rod is provided with an arc-shaped locking insertion rod. The tight channel is mated with the locking plunger, the side of the support column is slidably inserted with a locking pin, and the locking plunger and the locking pin are connected by threads.

作为本发明进一步的方案:所述支撑杆上开设有防护滑道,防护滑道内滑动设置有防护滑块,防护滑块上转动设置有两个防护支杆,且两个防护支杆之间夹角为°,防护滑块与防护支杆连接处设置有一号扭簧,四个支撑杆上的前后相对位置的防护支杆之间和左右相对位置的防护支杆之间均连接有弹性的防护网,防护支杆上设置有一号齿条,所述一号齿条呈圆弧型结构,支撑块上设置有二号齿条,一号齿条与二号齿条相互啮合,防护滑块上安装有二号弹簧,支撑块与二号弹簧接触。As a further solution of the present invention: a protective slideway is provided on the support rod, a protective slider is slidably arranged in the protective slideway, and two protective poles are rotated on the protective slider, and the two protective poles are clamped The angle is °, the connection between the protective slider and the protective pole is provided with a No. 1 torsion spring, and the protective poles at the front and rear relative positions on the four support poles are connected with elastic protective poles. The No. 1 rack is arranged on the protective pole, and the No. 1 rack is in an arc-shaped structure. The No. 2 rack is arranged on the support block. The No. 1 rack and the No. 2 rack are meshed with each other. A No. 2 spring is installed, and the supporting block is in contact with the No. 2 spring.

作为本发明进一步的方案:所述支撑板上均匀开设有若干个漏渣孔,且相邻位置的四个漏渣孔之间设置有防滑凸块,所述防滑凸块截面呈菱形结构。As a further solution of the present invention: several slag leakage holes are evenly opened on the support plate, and anti-slip bumps are arranged between the four adjacent slag leakage holes, and the cross-section of the anti-slip bumps has a diamond-shaped structure.

作为本发明进一步的方案:所述支撑板上通过铰链设置有门板,调节连杆上设置有梯子,门板与梯子上端对应。As a further solution of the present invention: a door panel is provided on the support plate through a hinge, a ladder is provided on the adjusting link, and the door panel corresponds to the upper end of the ladder.

此外,还提供了一种使用上述工程用脚手架的方法,包括以下步骤:S1、在初始状态时,平台单元处于叠合状态,底座下表面的万向滚轮与地面接触,之后移动底座至施工现场。In addition, a method for using the above engineering scaffold is also provided, including the following steps: S1. In the initial state, the platform unit is in a stacked state, the universal rollers on the lower surface of the base are in contact with the ground, and then the base is moved to the construction site .

S2、在施工现场时,将支撑杆摆正到竖直状态,且使用锁紧销将支撑柱与支撑杆锁紧,接着通过调节电机带动调节丝杠转动,调节丝杠转动带动调节滑块相互靠近,调节滑块的相互靠近使得调节连杆逐渐将支撑板顶起,在支撑板上升的过程中,支撑块会对防护滑块上顶,使得防护网打开呈一定的倾斜角度,随着调节连杆的升起,梯子也逐渐呈倾斜状态,直到支撑板升至指定高度,便可以停止调节电机。S2. At the construction site, put the support rod in a vertical state, and use the locking pin to lock the support column and the support rod, and then drive the adjustment screw to rotate through the adjustment motor, and the rotation of the adjustment screw drives the adjustment slider to interact with each other. Close to each other, the adjustment sliders are close to each other so that the adjustment connecting rod gradually lifts the support plate. When the support plate rises, the support block will push up the protection slider, so that the protection net opens at a certain angle of inclination. With the adjustment When the connecting rod is raised, the ladder is gradually tilted until the support plate rises to the specified height, and then the motor can be stopped for adjustment.

S3、在施工时,工作人员可以从梯子上升到支撑板处并向上打开门板,工作人员便可以到达支撑板的上表面开始施工,施工过程中所需的工具、材料也可以从梯子经过门板送至支撑板上。S3. During construction, the staff can ascend to the support plate from the ladder and open the door panel upwards, and the staff can reach the upper surface of the support plate to start construction. The tools and materials required during the construction process can also be delivered from the ladder through the door panel. to the support plate.

S4、在施工结束后,工作人员从支撑板上经过门板、梯子回到地面,最后将平台单元折叠回初始状态即可。S4. After the construction is completed, the staff return to the ground from the support plate through the door panel and the ladder, and finally fold the platform unit back to the initial state.

与现有技术相比,本发明具有以下优点:1.本发明设计的平台单元可以不仅可以实现竖直方向的升降,还可以在需要移动至不同施工现场时进行折叠收纳,不仅方便移动,在使用时的展开速度也快,从而有效节省脚手架搭建所需的时间,以提高工程施工的效率。Compared with the prior art, the present invention has the following advantages: 1. The platform unit designed by the present invention can not only realize vertical lifting, but also can be folded and stored when it needs to be moved to different construction sites, which is not only convenient to move, but also The unfolding speed during use is also fast, which effectively saves the time required for scaffolding construction and improves the efficiency of engineering construction.

2.本发明设计的防护网可以对施工过程中掉落的建筑垃圾、工具进行拦截,防止建筑垃圾、工具砸伤地面上的工作人员,还可以防止脚手架上的工作人员坠落,从而保护工作人员的安全。2. The protective net designed by the present invention can intercept construction waste and tools falling during the construction process, prevent construction waste and tools from hurting workers on the ground, and can also prevent workers on scaffolding from falling, thereby protecting workers safety.

3.本发明设计的支撑板,支撑板表面有漏渣孔和防滑凸块,可以防止工作人员鞋底粘有砂粒造成滑倒问题的出现,从而保护工作人员的人身安全。3. The support plate designed by the present invention has slag leakage holes and anti-slip bumps on the surface of the support plate, which can prevent the occurrence of slipping problems caused by sand particles sticking to the soles of the staff, thereby protecting the personal safety of the staff.

4.本发明设计的支撑块由于其特殊的结构和相邻位置的支撑块配合,可以对脚手架起到更稳定的支撑。4. The support block designed by the present invention can provide more stable support for the scaffold due to its special structure and the cooperation of the adjacent support blocks.

附图说明Description of drawings

下面结合附图和实施例对本发明进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

图1是本发明的第一视角立体结构示意图。FIG. 1 is a schematic perspective view of the first perspective structure of the present invention.

图2是本发明的第二视角立体结构示意图。Fig. 2 is a schematic diagram of a perspective structure of a second viewing angle of the present invention.

图3是本发明图2的A处放大结构示意图。FIG. 3 is a schematic diagram of the enlarged structure at A in FIG. 2 of the present invention.

图4是本发明的支撑柱立体结构示意图。Fig. 4 is a schematic diagram of the three-dimensional structure of the support column of the present invention.

图5是本发明的支撑板立体结构示意图。Fig. 5 is a schematic diagram of the three-dimensional structure of the support plate of the present invention.

图6是本发明的防护滑块立体结构示意图。Fig. 6 is a schematic diagram of the three-dimensional structure of the protection slider of the present invention.

图7是本发明的支撑块立体结构示意图。Fig. 7 is a schematic diagram of the three-dimensional structure of the support block of the present invention.

图8是本发明的定位块立体结构示意图。Fig. 8 is a schematic diagram of the three-dimensional structure of the positioning block of the present invention.

图中:1、底座;10、万向滚轮;12、定位组件;120、定位滑杆;121、定位压块;122、一号弹簧;123、定位块;124、定位支杆;125、液压缸;126、定位压杆;127、三角板;2、平台单元;20、支撑柱;200、锁紧道;201、锁紧插杆;202、锁紧销;21、支撑杆;210、防护滑道;211、防护滑块;212、防护支杆;213、防护网;214、一号齿条;215、二号齿条;216、二号弹簧;22、支撑滑轨;23、支撑块;24、支撑板;240、漏渣孔;241、防滑凸块;242、门板;243、梯子;25、调节支杆;26、调节滑道;260、调节丝杠;261、调节电机;27、调节滑块;28、调节连杆。In the figure: 1, base; 10, universal roller; 12, positioning assembly; 120, positioning slide bar; 121, positioning pressing block; 122, No. 1 spring; 123, positioning block; Cylinder; 126, positioning pressure rod; 127, triangular plate; 2, platform unit; 20, support column; 200, locking road; 201, locking plunger; 202, locking pin; Road; 211, protective slider; 212, protective pole; 213, protective net; 214, No. 1 rack; 215, No. 2 rack; 216, No. 2 spring; 22, support slide rail; 23, support block; 24, support plate; 240, slag leakage hole; 241, anti-slip bump; 242, door panel; 243, ladder; 25, adjusting pole; 26, adjusting slideway; 260, adjusting screw; 261, adjusting motor; 27, Adjust the slider; 28, adjust the connecting rod.

具体实施方式detailed description

下面结合附图对本申请作进一步详细描述,有必要在此指出的是,以下具体实施方式只用于对本申请进行进一步的说明,不能理解为对本申请保护范围的限制,该领域的技术人员可以根据上述申请内容对本申请作出一些非本质的改进和调整。The application will be described in further detail below in conjunction with the accompanying drawings. It is necessary to point out that the following specific embodiments are only used to further illustrate the application, and cannot be interpreted as limiting the protection scope of the application. The above application content makes some non-essential improvements and adjustments to this application.

实施例1Example 1

参阅图1至图8,一种工程用脚手架,包括底座1与平台单元2,底座1上设置有平台单元2。Referring to FIG. 1 to FIG. 8 , an engineering scaffold includes a base 1 and a platform unit 2 , and the base 1 is provided with the platform unit 2 .

参阅图1和图2,所述平台单元2包括支撑柱20、支撑杆21、支撑滑轨22、支撑块23、支撑板24、调节支杆25、调节滑道26、调节滑块27与调节连杆28,底座1上表面四个拐角处均设置有支撑柱20,支撑柱20上端设置有支撑杆21,支撑柱20与支撑杆21上均设置有支撑滑轨22,且支撑柱20与支撑杆21的上支撑滑轨22均上下一一对应,支撑滑轨22上滑动设置有支撑块23,四个支撑块23之间共同通过螺栓安装有支撑板24,左右相对位置的支撑柱20之间和左右相对位置的支撑块23之间均安装有调节支杆25,上下相对位置的两个调节支杆25的相对面上均开设有调节滑道26,调节滑道26两端对称滑动设置有调节滑块27,且上下相对位置的两对调节滑块27之间共同铰接有调节连杆28,所述调节连杆28呈剪叉式伸缩结构,位于下方的所述调节滑道26内转动设置有调节丝杠260,位于下方的调节滑道26内的调节滑块27与调节丝杠260通过螺纹连接,且两个调节滑块27与调节丝杠260之间的螺纹旋转方向相反,底座1上表面左端前后对称设置有调节电机261,调节丝杠260与调节电机261输出端连接。1 and 2, the platform unit 2 includes a support column 20, a support rod 21, a support slide rail 22, a support block 23, a support plate 24, an adjustment pole 25, an adjustment slideway 26, an adjustment slider 27 and an adjustment Connecting rod 28, four corners on the upper surface of the base 1 are provided with supporting columns 20, the upper end of supporting columns 20 is provided with supporting rods 21, supporting slide rails 22 are arranged on supporting columns 20 and supporting rods 21, and supporting columns 20 and The upper support slide rail 22 of support bar 21 all corresponds up and down one by one, and support block 23 is slidably arranged on support slide rail 22, and support plate 24 is installed jointly by bolt between four support blocks 23, and the support column 20 of left and right relative position Adjusting struts 25 are installed between the support blocks 23 in relative positions on the left and right sides, and adjustment slides 26 are provided on the opposite surfaces of the two adjustment struts 25 in relative positions up and down, and the two ends of the adjustment slides 26 slide symmetrically. An adjustment slider 27 is provided, and an adjustment connecting rod 28 is jointly hinged between two pairs of adjustment sliders 27 at upper and lower relative positions. An adjustment lead screw 260 is provided for inner rotation, and the adjustment slider 27 in the adjustment slideway 26 below is threadedly connected to the adjustment lead screw 260, and the screw rotation directions between the two adjustment sliders 27 and the adjustment lead screw 260 are opposite , the left end of the upper surface of the base 1 is symmetrically provided with an adjusting motor 261 front and rear, and the adjusting screw 260 is connected to the output end of the adjusting motor 261 .

参阅图4,所述支撑柱20上端与支撑杆21下端通过铰链连接,且支撑柱20上端面开设有圆弧形的锁紧道200,支撑杆21下端面设置有圆弧形锁紧插杆201,锁紧道200与锁紧插杆201配合插接,支撑柱20侧面滑动插接有锁紧销202,锁紧插杆201与锁紧销202通过螺纹连接。Referring to Fig. 4, the upper end of the support column 20 is connected to the lower end of the support rod 21 through a hinge, and the upper end surface of the support column 20 is provided with an arc-shaped locking channel 200, and the lower end surface of the support rod 21 is provided with an arc-shaped locking insertion rod. 201, the locking channel 200 is mated with the locking insertion rod 201, and the side of the support column 20 is slidably inserted with the locking pin 202, and the locking insertion rod 201 and the locking pin 202 are connected by threads.

具体工作时,在初始状态时,左右相对位置的支撑杆21相对弯折与支撑柱20之间的夹角呈90°,且此时调节连杆28处于最低状态,支撑块23处于支撑柱20上的支撑滑轨22上,当需要使用支撑板24时,将支撑杆21摆正至竖直状态,且在摆正的过程中,锁紧插杆201逐渐插进锁紧道200内,等到支撑杆21完全处于竖直状态时,再使用锁紧销202将锁紧插杆201与锁紧道200彻底锁死,以保证支撑杆21的稳定性,接着调节电机261开始工作,调节电机261会带动调节丝杠260转动,调节丝杠260的转动会带动位于同一个调节滑道26内的两个调节滑块27相互靠近,如此调节连杆28逐渐展开升起,从而将处于支撑柱20上的支撑滑轨22上的支撑块23顶升至支撑杆21上的支撑滑轨22上,等到支撑板24升到指定高度后,便可以停止调节电机261的转动,在调节丝杠260的作用下,调节滑块27之间的距离锁死,从而保证支撑板24的稳定性,之后工作人员便可以上到支撑板24上开始施工作业。During specific work, in the initial state, the angle between the relative bending of the left and right support rods 21 and the support column 20 is 90°, and at this time, the adjustment link 28 is in the lowest state, and the support block 23 is in the support column 20. On the support slide rail 22 above, when the support plate 24 needs to be used, the support rod 21 is adjusted to a vertical state, and in the process of the adjustment, the locking insertion rod 201 is gradually inserted into the locking channel 200 until the When the support rod 21 is in the vertical state completely, then use the locking pin 202 to completely lock the locking insertion rod 201 and the locking road 200 to ensure the stability of the support rod 21, then the adjustment motor 261 starts to work, and the adjustment motor 261 It will drive the adjustment lead screw 260 to rotate, and the rotation of the adjustment lead screw 260 will drive the two adjustment sliders 27 located in the same adjustment slideway 26 to approach each other, so that the adjustment connecting rod 28 will gradually expand and rise, so that the adjustment rod 28 will be positioned at the support column 20. The support block 23 on the support slide rail 22 on the top is lifted to the support slide rail 22 on the support rod 21, after the support plate 24 rises to the specified height, the rotation of the adjustment motor 261 can be stopped, and the adjustment of the screw 260 Under the action, the distance between the adjustment sliders 27 is locked, thereby ensuring the stability of the support plate 24, and then the staff can go up to the support plate 24 to start construction work.

参阅图2、图6和图7,所述支撑杆21上开设有防护滑道210,防护滑道210内滑动设置有防护滑块211,防护滑块211上转动设置有两个防护支杆212,且两个防护支杆212之间夹角为90°,防护滑块211与防护支杆212连接处设置有一号扭簧,四个支撑杆21上的前后相对位置的防护支杆212之间和左右相对位置的防护支杆212之间均连接有弹性的防护网213,防护支杆212上设置有一号齿条214,所述一号齿条214呈圆弧型结构,支撑块23上设置有二号齿条215,一号齿条214与二号齿条215相互啮合,防护滑块211上安装有二号弹簧216,支撑块23与二号弹簧216接触。Referring to Fig. 2, Fig. 6 and Fig. 7, a protective slideway 210 is opened on the support rod 21, a protective slide block 211 is slidably arranged in the protective slideway 210, and two protective support rods 212 are arranged on the protective slide block 211 for rotation. , and the angle between the two protective poles 212 is 90°, the connection between the protective slider 211 and the protective pole 212 is provided with a No. 1 torsion spring, and the front and rear relative positions of the four support poles 21 A resilient protective net 213 is connected between the protective poles 212 at the left and right relative positions, and a No. 1 rack 214 is arranged on the protective pole 212. The No. 1 rack 214 is in an arc-shaped structure, and the supporting block 23 is provided with There is a No. 2 rack 215, a No. 1 rack 214 and a No. 2 rack 215 meshing with each other, a No. 2 spring 216 is installed on the protective slider 211, and the support block 23 contacts with the No. 2 spring 216.

具体工作时,在支撑块23从支撑柱20上移动至支撑杆21上时,支撑块23上的二号齿条215会先与防护滑块211上的一号齿条214接触,接着二号齿条215继续上移会通过与一号齿条214的啮合带动防护支杆212以与防护滑块211连接处为轴进行转动,且防护支杆212会逐渐从防护滑道210内移出与支撑杆21形成一定的角度,防护支杆212的展开会带动防护网213一同展开,直到支撑块23与二号弹簧216接触后,一号齿条214便不会与二号齿条215啮合,之后有建筑垃圾、工具或者工作人员坠落至防护网213上,这样在防护网213和二号弹簧216弹力的作用下对建筑垃圾、工具或者工作人员进行隔档。During specific work, when the support block 23 moves from the support column 20 to the support rod 21, the No. 2 rack 215 on the support block 23 will first contact the No. 1 rack 214 on the protection slider 211, and then the No. As the rack 215 continues to move up, it will drive the protective pole 212 to rotate around the connection with the protective slider 211 through the engagement with the No. The rod 21 forms a certain angle, and the expansion of the protective pole 212 will drive the protective net 213 to expand together. After the support block 23 contacts the No. 2 spring 216, the No. 1 rack 214 will not mesh with the No. 2 rack 215, and then Construction waste, tools or staff fall onto the protective net 213, so that construction waste, tools or staff are separated under the elastic force of the protective net 213 and No. 2 spring 216.

参阅图5,所述支撑板24上均匀开设有若干个漏渣孔240,且相邻位置的四个漏渣孔240之间设置有防滑凸块241,所述防滑凸块241截面呈菱形结构;具体工作时,漏渣孔240可以方便建筑垃圾碎料的掉落,防滑凸块241不仅可以防止工作人员鞋底打滑,还可以对工作人员的鞋底进行刮蹭,将鞋底粘有的砂砾刮去,从而防止工作人员的滑倒,以保护工作人员的人身安全。Referring to Fig. 5, several slag leakage holes 240 are evenly opened on the support plate 24, and anti-slip bumps 241 are arranged between the four slag leakage holes 240 at adjacent positions, and the cross-section of the anti-slip bumps 241 has a diamond-shaped structure ; During specific work, the slag leakage hole 240 can facilitate the falling of construction waste scraps, and the anti-slip bump 241 can not only prevent the soles of the staff from slipping, but also scrape the soles of the staff to scrape off the grit stuck on the soles , so as to prevent the staff from slipping and falling, so as to protect the personal safety of the staff.

参阅图2,所述支撑板24上通过铰链设置有门板242,调节连杆28上设置有梯子243,门板242与梯子243上端对应;具体工作时,门板242只能向上打开,配合梯子243的使用不仅方便工作人员上下支撑板24,也方便施工过程中所需物品上下支撑板24。Referring to Fig. 2, described support plate 24 is provided with door panel 242 by hinge, is provided with ladder 243 on the adjustment connecting rod 28, and door panel 242 corresponds to the upper end of ladder 243; Use is not only convenient for the staff to go up and down the support plate 24, but also facilitates the up and down support plate 24 of the required items in the construction process.

实施例2Example 2

在上述实施例1的基础上,参阅图1,所述底座1为矩形平板结构,底座1下表面的四个拐角处均设置有万向滚轮10,且底座1的四个拐角处均设置有定位组件12。On the basis of the above-mentioned embodiment 1, referring to Fig. 1, the base 1 is a rectangular plate structure, the four corners of the lower surface of the base 1 are provided with universal rollers 10, and the four corners of the base 1 are provided with Positioning assembly 12.

参阅图3和图8,所述定位组件12包括定位滑杆120、定位压块121、一号弹簧122、定位块123、定位支杆124、液压缸125与定位压杆126,底座1的四个拐角处均以上下滑动的方式设置有定位滑杆120,定位滑杆120上端安装有定位压块121,底座1上表面与定位压块121下表面之间连接有一号弹簧122,定位滑杆120下端安装有定位块123,底座1上表面的拐角处与定位滑杆120之间的位置安装有定位支杆124,定位滑杆120远离定位支杆124的一侧设置有液压缸125,底座1上表面与液压缸125固定连接,定位支杆124上端与液压缸125输出端之间共同铰接有定位压杆126,定位压块121与定位压杆126之间接触。3 and 8, the positioning assembly 12 includes a positioning slide bar 120, a positioning pressure block 121, a No. 1 spring 122, a positioning block 123, a positioning rod 124, a hydraulic cylinder 125 and a positioning pressure rod 126. All corners are provided with a positioning slide bar 120 in a manner of sliding up and down, and a positioning pressing block 121 is installed on the upper end of the positioning sliding bar 120, and a No. spring 122 is connected between the upper surface of the base 1 and the lower surface of the positioning pressing block 121, and the positioning sliding bar Positioning block 123 is installed at 120 lower ends, and the position between the corner of base 1 upper surface and positioning slide bar 120 is equipped with positioning strut 124, and the side of positioning slide bar 120 away from positioning strut 124 is provided with hydraulic cylinder 125, and base 1. The upper surface is fixedly connected to the hydraulic cylinder 125. A positioning pressure rod 126 is hinged between the upper end of the positioning rod 124 and the output end of the hydraulic cylinder 125. The positioning pressure block 121 contacts the positioning pressure rod 126.

参阅图8,所述定位块123由两个等腰直角三角板127的直角边相互垂直焊接组成,且前后相对位置的三角板127和左右相对位置的三角板127均呈八字形结构排布。Referring to FIG. 8 , the positioning block 123 is composed of two isosceles right-angled triangular plates 127 whose right-angled sides are welded perpendicular to each other, and the triangular plates 127 at the front and rear relative positions and the triangular plates 127 at the left and right relative positions are all arranged in a figure-eight structure.

具体工作时,当需要移动底座1到指定施工位置时,万向滚轮10可以起到辅助移动的作用,在底座1移动到指定位置后,起到液压缸125收缩,液压缸125收缩会拉动定位压杆126与之相连的一端下移,然后定位压杆126便会对定位压块121下压,使得定位滑杆120早底座1上下滑,一号弹簧122会被压缩,在定位滑杆120下移的过程中,定位块123逐渐与地面接触,随后四个定位块123的共同作用会将底座1反向顶起,使得万向滚轮10逐渐脱离地面,之后定位块123便会对底座1以及整个平台单元2进行支撑,由于定位块123的结构特征,可以使得底座1在各个方向上都可以得到很稳定的支撑,由此保证平台单元2的稳定。During specific work, when it is necessary to move the base 1 to the designated construction position, the universal roller 10 can play a role in assisting the movement. After the base 1 moves to the designated position, the hydraulic cylinder 125 will shrink, and the hydraulic cylinder 125 will pull the positioning The end of the pressure rod 126 connected to it moves down, and then the positioning pressure rod 126 will press down on the positioning pressing block 121, so that the positioning slide bar 120 slides up and down before the base 1, and the No. 1 spring 122 will be compressed, and the positioning slide bar 120 will In the process of moving down, the positioning blocks 123 gradually come into contact with the ground, and then the joint action of the four positioning blocks 123 will reversely lift the base 1, so that the universal roller 10 is gradually separated from the ground, and then the positioning blocks 123 will be on the base 1. And the entire platform unit 2 is supported, due to the structural characteristics of the positioning block 123, the base 1 can be supported stably in all directions, thereby ensuring the stability of the platform unit 2.

实施例3Example 3

在上述实施例1与实施例2的基础上,一种工程用脚手架的使用方法,如下:On the basis of above-mentioned embodiment 1 and embodiment 2, a kind of using method of engineering scaffolding is as follows:

在实际的工作时:步骤S1.在初始状态时,平台单元2处于叠合状态,当需要移动底座1到指定施工位置时,万向滚轮10可以起到辅助移动的作用,在底座1移动到指定位置后,起到液压缸125收缩,液压缸125收缩会拉动定位压杆126与之相连的一端下移,然后定位压杆126便会对定位压块121下压,使得定位滑杆120早底座1上下滑,一号弹簧122会被压缩,在定位滑杆120下移的过程中,定位块123逐渐与地面接触,随后四个定位块123的共同作用会将底座1反向顶起,使得万向滚轮10逐渐脱离地面,之后定位块123便会对底座1以及整个平台单元2进行支撑。In actual work: step S1. In the initial state, the platform unit 2 is in a stacked state. When the base 1 needs to be moved to the designated construction position, the universal roller 10 can play a role in assisting the movement. When the base 1 moves to After specifying the position, the hydraulic cylinder 125 contracts, and the contraction of the hydraulic cylinder 125 will pull the end of the positioning pressing rod 126 to move down, and then the positioning pressing rod 126 will press down on the positioning pressing block 121, so that the positioning slide bar 120 will move forward. When the base 1 slides up and down, the No. 1 spring 122 will be compressed. During the downward movement of the positioning slider 120, the positioning block 123 will gradually come into contact with the ground, and then the joint action of the four positioning blocks 123 will push the base 1 up in reverse. The universal roller 10 is gradually separated from the ground, and then the positioning block 123 will support the base 1 and the entire platform unit 2 .

步骤S2.在施工现场时,在初始状态时,左右相对位置的支撑杆21相对弯折与支撑柱20之间的夹角呈90°,且此时调节连杆28处于最低状态,支撑块23处于支撑柱20上的支撑滑轨22上,当需要使用支撑板24时,将支撑杆21摆正至竖直状态,且在摆正的过程中,锁紧插杆201逐渐插进锁紧道200内,等到支撑杆21完全处于竖直状态时,再使用锁紧销202将锁紧插杆201与锁紧道200彻底锁死,接着调节电机261开始工作,调节电机261会带动调节丝杠260转动,调节丝杠260的转动会带动位于同一个调节滑道26内的两个调节滑块27相互靠近,如此调节连杆28逐渐展开升起,从而将处于支撑柱20上的支撑滑轨22上的支撑块23顶升至支撑杆21上的支撑滑轨22上,等到支撑板24升到指定高度后,便可以停止调节电机261的转动。Step S2. At the construction site, in the initial state, the angle between the relative bending of the left and right support rods 21 and the support column 20 is 90°, and at this time, the adjustment link 28 is in the lowest state, and the support block 23 On the support slide rail 22 on the support column 20, when the support plate 24 needs to be used, the support rod 21 is placed in a vertical state, and in the process of setting, the locking insertion rod 201 is gradually inserted into the locking channel Within 200, when the support rod 21 is completely in the vertical state, use the locking pin 202 to completely lock the locking insertion rod 201 and the locking channel 200, and then the adjusting motor 261 starts to work, and the adjusting motor 261 will drive the adjusting screw 260 rotation, the rotation of the adjustment lead screw 260 will drive the two adjustment sliders 27 in the same adjustment slideway 26 to approach each other, so that the adjustment connecting rod 28 will gradually expand and rise, so that the support slide rail on the support column 20 will The support block 23 on the 22 is jacked up to the support slide rail 22 on the support bar 21, and after the support plate 24 rises to the specified height, the rotation of the adjustment motor 261 can be stopped.

步骤S3.在施工时,工作人员可以从梯子243上升到支撑板24处并向上打开门板242,工作人员便可以到达支撑板24的上表面开始施工,施工过程中所需的工具、材料也可以从梯子243经过门板242送至支撑板24上。Step S3. During construction, the staff can rise from the ladder 243 to the support plate 24 and open the door panel 242 upwards, and the staff can reach the upper surface of the support plate 24 to start construction. The tools and materials required in the construction process can also be From the ladder 243 to the support plate 24 through the door panel 242 .

步骤S4.在施工结束后,工作人员从支撑板24上经过门板242、梯子243回到地面,最后将平台单元2折叠回初始状态即可。Step S4. After the construction is completed, the staff return to the ground from the support plate 24 through the door panel 242 and the ladder 243, and finally fold the platform unit 2 back to the initial state.

本发明的描述中,需要理解的是,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In the description of the present invention, it should be understood that the terms "first" and "second" are used for description purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly indicating the quantity of indicated technical features. Thus, a feature defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present invention, "plurality" means two or more, unless otherwise specifically defined.

在本发明中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In the present invention, unless otherwise clearly specified and limited, terms such as "installation", "connection", "connection" and "fixation" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection , or integrated; it can be mechanically connected or electrically connected; it can be directly connected or indirectly connected through an intermediary, and it can be the internal communication of two components or the interaction relationship between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention according to specific situations.

在本发明中,除非另有明确的规定和限定,第一特征在第二特征“上”或“下”可以是第一和第二特征直接接触,或第一和第二特征通过中间媒介间接接触。而且,第一特征在第二特征“之上”、“上方”和“上面”可是第一特征在第二特征正上方或斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”可以是第一特征在第二特征正下方或斜下方,或仅仅表示第一特征水平高度小于第二特征。In the present invention, unless otherwise clearly specified and limited, the first feature may be in direct contact with the first feature or the first and second feature may be in direct contact with the second feature through an intermediary. touch. Moreover, "above", "above" and "above" the first feature on the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. "Below", "beneath" and "beneath" the first feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is less horizontally than the second feature.

在本说明书的描述中,参考术语“一个实施例”、“一些实施例”、“示例”、“具体示例”、或“一些示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不应理解为必须针对的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任一个或多个实施例或示例中以合适的方式结合。此外,在不相互矛盾的情况下,本领域的技术人员可以将本说明书中描述的不同实施例或示例以及不同实施例或示例的特征进行结合和组合。In the description of this specification, descriptions referring to the terms "one embodiment", "some embodiments", "example", "specific examples", or "some examples" mean that specific features described in connection with the embodiment or example , structure, material or feature is included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms should not be understood as necessarily referring to the same embodiment or example. Furthermore, the described specific features, structures, materials or characteristics may be combined in any suitable manner in any one or more embodiments or examples. In addition, those skilled in the art can combine and combine different embodiments or examples and features of different embodiments or examples described in this specification without conflicting with each other.

尽管上面已经示出和描述了本发明的实施例,可以理解的是,上述实施例是示例性的,不能理解为对本发明的限制,本领域的普通技术人员在本发明的范围内可以对上述实施例进行变化、修改、替换和变型。Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and those skilled in the art can make the above-mentioned The embodiments are subject to changes, modifications, substitutions and variations.

以上所述实施例仅表达了本发明的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。The above-mentioned embodiments only express several implementation modes of the present invention, and the description thereof is relatively specific and detailed, but should not be construed as limiting the patent scope of the present invention. It should be pointed out that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention, and these all belong to the protection scope of the present invention.

Claims (6)

1.一种工程用脚手架,包括底座(1)与平台单元(2),其特征在于:底座(1)上设置有平台单元(2);其中:1. A scaffolding for engineering, comprising a base (1) and a platform unit (2), characterized in that: the base (1) is provided with a platform unit (2); wherein: 所述底座(1)为矩形平板结构,底座(1)下表面的四个拐角处均设置有万向滚轮(10),且底座(1)的四个拐角处均设置有定位组件(12);The base (1) is a rectangular plate structure, the four corners of the lower surface of the base (1) are provided with universal rollers (10), and the four corners of the base (1) are provided with positioning components (12) ; 所述平台单元(2)包括支撑柱(20)、支撑杆(21)、支撑滑轨(22)、支撑块(23)、支撑板(24)、调节支杆(25)、调节滑道(26)、调节滑块(27)与调节连杆(28),底座(1)上表面四个拐角处均设置有支撑柱(20),支撑柱(20)上端设置有支撑杆(21),支撑柱(20)与支撑杆(21)上均设置有支撑滑轨(22),且支撑柱(20)与支撑杆(21)上的支撑滑轨(22)均上下一一对应,支撑滑轨(22)上滑动设置有支撑块(23),四个支撑块(23)之间共同通过螺栓安装有支撑板(24),左右相对位置的支撑柱(20)之间和左右相对位置的支撑块(23)之间均安装有调节支杆(25),上下相对位置的两个调节支杆(25)的相对面上均开设有调节滑道(26),调节滑道(26)两端对称滑动设置有调节滑块(27),且上下相对位置的两对调节滑块(27)之间共同铰接有调节连杆(28),所述调节连杆(28)呈剪叉式伸缩结构;Described platform unit (2) comprises support post (20), support bar (21), support slide rail (22), support block (23), support plate (24), adjustment strut (25), adjustment slideway ( 26), adjust the slider (27) and adjust the connecting rod (28), the four corners of the upper surface of the base (1) are provided with support columns (20), and the upper end of the support column (20) is provided with a support rod (21), The support column (20) and the support bar (21) are all provided with support slide rails (22), and the support slide rails (22) on the support column (20) and the support bar (21) are all corresponding up and down one by one, and the support slides A support block (23) is slidingly arranged on the rail (22), and a support plate (24) is installed through bolts between the four support blocks (23). Adjustment struts (25) are installed between the support blocks (23), and the opposite faces of the two adjustment struts (25) at the upper and lower relative positions are provided with adjustment slideways (26). An adjustment slider (27) is provided for end-symmetrical sliding, and an adjustment connecting rod (28) is jointly hinged between two pairs of adjustment sliders (27) at upper and lower relative positions, and the adjustment connecting rod (28) is scissor-like telescopic structure; 位于下方的所述调节滑道(26)内转动设置有调节丝杠(260),位于下方的调节滑道(26)内的调节滑块(27)与调节丝杠(260)通过螺纹连接,且两个调节滑块(27)与调节丝杠(260)之间的螺纹旋转方向相反,底座(1)上表面左端前后对称设置有调节电机(261),调节丝杠(260)与调节电机(261)输出端连接;An adjustment screw (260) is arranged to rotate in the adjustment slideway (26) below, and the adjustment slide block (27) and the adjustment screw (260) in the adjustment slideway (26) below are threaded. And the direction of rotation of the screw thread between the two adjustment sliders (27) and the adjustment leading screw (260) is opposite, and the left end of the upper surface of the base (1) is symmetrically provided with an adjustment motor (261) front and back, and the adjustment screw (260) and the adjustment motor (261) output terminal connection; 所述支撑杆(21)上开设有防护滑道(210),防护滑道(210)内滑动设置有防护滑块(211),防护滑块(211)上转动设置有两个防护支杆(212),且两个防护支杆(212)之间夹角为90°,防护滑块(211)与防护支杆(212)连接处设置有一号扭簧,四个支撑杆(21)上的前后相对位置的防护支杆(212)之间和左右相对位置的防护支杆(212)之间均连接有弹性的防护网(213),防护支杆(212)上设置有一号齿条(214),所述一号齿条(214)呈圆弧型结构,支撑块(23)上设置有二号齿条(215),一号齿条(214)与二号齿条(215)相互啮合,防护滑块(211)上安装有二号弹簧(216),支撑块(23)与二号弹簧(216)接触。A protective slideway (210) is provided on the support bar (21), a protective slide block (211) is slidably provided in the protective slideway (210), and two protective poles ( 212), and the angle between the two protective poles (212) is 90 °, the junction of the protective slide block (211) and the protective pole (212) is provided with a torsion spring, and the four support poles (21) Elastic protective nets (213) are connected between the protective poles (212) at the front and rear relative positions and between the protective poles (212) at the left and right relative positions, and a No. 1 rack (214) is arranged on the protective poles (212). ), the No. 1 rack (214) is an arc-shaped structure, the support block (23) is provided with a No. 2 rack (215), and the No. 1 rack (214) and the No. 2 rack (215) mesh with each other , No. 2 spring (216) is installed on the protective slide block (211), and support block (23) contacts with No. 2 spring (216). 2.根据权利要求1所述的一种工程用脚手架,其特征在于:所述定位组件(12)包括定位滑杆(120)、定位压块(121)、一号弹簧(122)、定位块(123)、定位支杆(124)、液压缸(125)与定位压杆(126),底座(1)的四个拐角处均以上下滑动的方式设置有定位滑杆(120),定位滑杆(120)上端安装有定位压块(121),底座(1)上表面与定位压块(121)下表面之间连接有一号弹簧(122),定位滑杆(120)下端安装有定位块(123),底座(1)上表面的拐角处与定位滑杆(120)之间的位置安装有定位支杆(124),定位滑杆(120)远离定位支杆(124)的一侧设置有液压缸(125),底座(1)上表面与液压缸(125)固定连接,定位支杆(124)上端与液压缸(125)输出端之间共同铰接有定位压杆(126),定位压块(121)与定位压杆(126)之间接触。2. An engineering scaffold according to claim 1, characterized in that: the positioning assembly (12) includes a positioning slide bar (120), a positioning pressing block (121), a No. 1 spring (122), a positioning block (123), positioning pole (124), hydraulic cylinder (125) and positioning pressure bar (126), the four corners of base (1) are all provided with positioning slide bar (120) in the mode of sliding up and down, and positioning slide The upper end of the bar (120) is equipped with a positioning briquetting block (121), a No. 1 spring (122) is connected between the upper surface of the base (1) and the lower surface of the locating briquetting block (121), and a positioning block is installed at the lower end of the positioning slide bar (120) (123), the position between the corner of the upper surface of the base (1) and the positioning slide bar (120) is equipped with a positioning pole (124), and the positioning pole (120) is set away from the side of the positioning pole (124) There is a hydraulic cylinder (125), the upper surface of the base (1) is fixedly connected with the hydraulic cylinder (125), and a positioning pressure rod (126) is jointly hinged between the upper end of the positioning support rod (124) and the output end of the hydraulic cylinder (125). Contact between the briquetting block (121) and the positioning pressure rod (126). 3.根据权利要求2所述的一种工程用脚手架,其特征在于:所述定位块(123)由两个等腰直角三角板(127)的直角边相互垂直焊接组成,两个三角板(127)呈八字形结构排布。3. A kind of scaffolding for engineering according to claim 2, characterized in that: the positioning block (123) is composed of two isosceles right-angled triangular plates (127) whose right-angled sides are welded perpendicularly to each other, and the two triangular plates (127) Arranged in a figure-of-eight structure. 4.根据权利要求1所述的一种工程用脚手架,其特征在于:所述支撑柱(20)上端与支撑杆(21)下端通过铰链连接,且支撑柱(20)上端面开设有圆弧形的锁紧道(200),支撑杆(21)下端面设置有圆弧形锁紧插杆(201),锁紧道(200)与锁紧插杆(201)配合插接,支撑柱(20)侧面滑动插接有锁紧销(202),锁紧插杆(201)与锁紧销(202)通过螺纹连接。4. A scaffold for engineering according to claim 1, characterized in that: the upper end of the support column (20) is connected to the lower end of the support rod (21) through a hinge, and the upper end surface of the support column (20) is provided with a circular arc shaped locking road (200), the lower end of the support rod (21) is provided with an arc-shaped locking insertion rod (201), the locking road (200) is mated with the locking insertion rod (201), and the support column ( 20) A locking pin (202) is slidably inserted on the side, and the locking insertion rod (201) is threadedly connected with the locking pin (202). 5.根据权利要求1所述的一种工程用脚手架,其特征在于:所述支撑板(24)上均匀开设有若干个漏渣孔(240),且相邻位置的四个漏渣孔(240)之间设置有防滑凸块(241),所述防滑凸块(241)截面呈菱形结构。5. A kind of scaffolding for engineering according to claim 1, is characterized in that: several slag leakage holes (240) are uniformly provided on the support plate (24), and four slag leakage holes (240) at adjacent positions ( 240) is provided with an anti-skid bump (241), and the cross-section of the anti-skid bump (241) has a diamond-shaped structure. 6.根据权利要求1所述的一种工程用脚手架,其特征在于:所述支撑板(24)上通过铰链设置有门板(242),调节连杆(28)上设置有梯子(243),门板(242)与梯子(243)上端对应。6. A kind of scaffolding for engineering according to claim 1, characterized in that: the support plate (24) is provided with a door panel (242) through a hinge, and a ladder (243) is provided on the adjusting link (28), The door panel (242) corresponds to the upper end of the ladder (243).
CN202111150271.1A 2021-09-29 2021-09-29 Scaffold for engineering Active CN113833246B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111150271.1A CN113833246B (en) 2021-09-29 2021-09-29 Scaffold for engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111150271.1A CN113833246B (en) 2021-09-29 2021-09-29 Scaffold for engineering

Publications (2)

Publication Number Publication Date
CN113833246A CN113833246A (en) 2021-12-24
CN113833246B true CN113833246B (en) 2022-12-20

Family

ID=78967654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111150271.1A Active CN113833246B (en) 2021-09-29 2021-09-29 Scaffold for engineering

Country Status (1)

Country Link
CN (1) CN113833246B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114314458A (en) * 2021-12-31 2022-04-12 山东圣匠机械制造有限公司 Rail type lifting operation platform
CN114622706A (en) * 2022-01-27 2022-06-14 陈桂谊 Scaffold with protection function
CN114541722B (en) * 2022-03-30 2023-09-22 河南省同宇建筑工程有限公司 Scaffold frame for building construction of adjustable height
CN115030468B (en) * 2022-06-14 2024-08-09 衡阳市星鸣建装装饰设计工程有限公司 Interior decoration building platform with adjustable
CN115977360B (en) * 2023-01-09 2023-10-20 江苏悦达绿色建筑科技有限公司 Assembled building safety construction platform
CN117967022B (en) * 2024-04-02 2024-07-09 唐帼(晋江)商贸有限公司 Safety protection equipment for construction
CN118273512A (en) * 2024-04-18 2024-07-02 中铁十一局集团有限公司 A safe type of movable sliding frame for skylight
CN119373295B (en) * 2024-12-23 2025-04-11 福建水利电力职业技术学院 Building construction strutting arrangement for building engineering

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU962530A1 (en) * 1981-02-23 1982-09-30 Трест "Днепростроймеханизация" Комбината "Днепрометаллургстрой" Минтяжстроя Усср Hoistable scaffold
CN212388949U (en) * 2020-01-23 2021-01-22 孔德奎 Portable scaffold frame for construction
CN111764614A (en) * 2020-06-15 2020-10-13 孔苏红 Mechanical lifting equipment with good protection performance
CN213418420U (en) * 2020-09-27 2021-06-11 欧阳世英 Scaffold convenient to install

Also Published As

Publication number Publication date
CN113833246A (en) 2021-12-24

Similar Documents

Publication Publication Date Title
CN113833246B (en) Scaffold for engineering
CN209703975U (en) A kind of municipal administration scaffold
CN118595726B (en) Welding platform for wind power tower cylinder door frame
CN219011860U (en) Scaffolding auxiliary building platform for building construction
CN214834581U (en) Portable construction device is used in building engineering construction
CN116335378A (en) Liftable scaffold and its construction method
CN115961995A (en) A protective structure for coal mine safety
CN211920814U (en) New lift
CN211419505U (en) A lifting device for interior decoration engineering
CN112196246B (en) A mobile ladder scaffold for building construction
CN220620972U (en) Building construction frame
CN210001549U (en) hydraulic movable lifting platform for building
CN217439486U (en) Scaffold for building construction for preventing slope collapse
CN218028843U (en) Construction support
CN207934797U (en) A kind of step ladder adapting to gradient slope
CN114671379A (en) Numerical control hydraulic lifting device for electromechanical installation
CN214031613U (en) Safety protection supporting platform for municipal engineering construction
CN213898050U (en) Protection device is pour with mixing earth to construction
CN209193502U (en) Lifting device for road and bridge construction
CN210917380U (en) Sliding adjustment formula concertina type loose joint
CN219509120U (en) A safe high-rise building climbing frame
CN219387109U (en) Climbing-assisting roof tool
CN220645101U (en) A portable building construction platform
CN219909868U (en) Adjustable scaffold for water conservancy construction
CN218862075U (en) A steel structure support frame for building construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250208

Address after: Room 313, No. 52, East Side of Yangcui Road, Dayanchang Town, Wuqing District, Tianjin City, 301706

Patentee after: Tianjin Qinyi Information Technology Co.,Ltd.

Country or region after: China

Address before: 314299 No. 8-2, building 13, Hangzhou bay new economic Park, port area, Jiaxing City, Zhejiang Province

Patentee before: Jiaxing Tiankun Construction Engineering Design Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20251015

Address after: 516000 Guangdong Province, Huizhou City, No. 3 Community, Jiangbei (No. 5 Juhua Road, Jiangbei District)

Patentee after: Huizhou Jiangbei Electric Power Engineering Co.,Ltd.

Country or region after: China

Address before: Room 313, No. 52, East Side of Yangcui Road, Dayanchang Town, Wuqing District, Tianjin City, 301706

Patentee before: Tianjin Qinyi Information Technology Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right