CN113699895A - 一种框构桥架空顶进多股道既有线的施工方法 - Google Patents

一种框构桥架空顶进多股道既有线的施工方法 Download PDF

Info

Publication number
CN113699895A
CN113699895A CN202111153618.8A CN202111153618A CN113699895A CN 113699895 A CN113699895 A CN 113699895A CN 202111153618 A CN202111153618 A CN 202111153618A CN 113699895 A CN113699895 A CN 113699895A
Authority
CN
China
Prior art keywords
overhead
pipe joint
jacking
construction method
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111153618.8A
Other languages
English (en)
Other versions
CN113699895B (zh
Inventor
张玉伟
宋战平
王剑
张峰
陈好春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Sixth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN202111153618.8A priority Critical patent/CN113699895B/zh
Publication of CN113699895A publication Critical patent/CN113699895A/zh
Application granted granted Critical
Publication of CN113699895B publication Critical patent/CN113699895B/zh
Priority to US17/956,431 priority patent/US20230102297A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

一种框构桥架空顶进多股道既有线的施工方法,通过过渡架空—降水施工—正式架空及两头对顶‑中间现浇的施工方式,直接规避了地下水位对挖孔成桩造成的风险;立交桥管节总体施工方案遵循分段施工、流水作业的原则,立交桥先施工顶进部分,顶进就位后,再现浇中间部分框架,既保证铁路运营安全,又保证工期质量,具有较好的经济效益与施工指导意义。

Description

一种框构桥架空顶进多股道既有线的施工方法
技术领域
本发明属于下穿工程施工技术领域,具体涉及一种框构桥架空顶进多股道既有线的施工方法。
背景技术
随着我国城镇化程度的提高,为连接和协调发展市内铁路两侧的区域,相当一部分市政规划道路需要跨越既有铁路线。虽然下穿既有铁路线立交施工技术已经逐渐成熟,但是随之而来的是对施工要求的提高,今后在处理条件复杂的下穿既有线立交问题时,现有施工技术将面临着严峻挑战。
在既有线架空加固施工中,路基结构及列车运营状况必将受到较大影响。经过长时间的工程实践,虽然下穿既有线架空加固技术得到了很大改进,但现场施工仍然会扰动周围结构物、土体,从而致使架空结构和路基等发生不同程度的位移变形。因此,在施工中必须最大限度地维护既有线的稳定性,降低既有线在架空施工中的安全风险。因此,如何减少周围环境及既有线路基在施工中受到的影响,怎样对架空顶进施工方案进行选取,才能同时满足铁路安全和效益最大化,就成为了架空顶进工程的关键问题。尤其是对于多股道既有运营线路,架空顶进施工更为复杂。因此,在既有线架空加固施工中,合理的架空顶进施工方案及其选型就具有了较深的现实意义。
发明内容
为了克服上述现有技术存在的问题,本发明的目的在于提供了一种框构桥架空顶进多股道既有线的施工方法,能够在框构桥立交施工过程中,使被下穿的既有线正常通车,不影响交通列车安全性,解决现有工程中存在的多股道既有线架空顶进过程中存在的无法大跨度架空施工的问题,施工安全性高,在施工完成后,纵梁、钢枕及横抬梁等钢构件可进行回收重复利用,施工成本低且安全性高。
为了实现上述目的,本发明采用的技术方案是:
一种框构桥架空顶进多股道既有线的施工方法,具体步骤如下:
一、在多股道既有线两侧开挖工作基坑10;
二、在工作基坑10内预制顶进管节1;
三、过渡架空;
四、拉槽降水;
五、正式架空桩6挖孔施工;
六、步骤五完成后,沿垂直于既有线方向,从多股道既有线两侧采用千斤顶将预制好的顶进管节1顶进架空体系;
七、采用边顶进、边破桩,进行架空转换,多股道既有线两侧的顶进管节1顶进就位后,顶进管节1代替架空桩作为支撑结构,通过架设横抬梁9形成中间现浇管节2的施工空间;然后在顶进管节1中间现浇管节2;
八、现浇管节2完成后,即框构桥下穿多股道既有线施工完成,拆除架空设备,恢复线路正常运营。
步骤一与步骤二所述工作基坑10的侧壁设置为模筑混凝土。
步骤三所述的过渡架空的具体方法为:根据荷载设计,在既有线下方下挖桩孔,挖孔深度在地下水平面上方,然后浇筑临时架空桩3,以临时架空桩3的桩顶为支点,架设上部架空构件。
所述上部架空构件包括纵梁7及钢枕8。
所述步骤四的具体方法为:完成步骤三过渡架空后,在既有线下方、每排临时架空桩3之间施做工作槽4,利用工作槽4内工作面施做基坑围护桩5和降水井12,然后降水,使地下水位达到设计水位。
步骤四所述降水井12分布在多股道既有线两侧和工作槽4内。
所述降水井12施工采用机械施工。
所述步骤五的具体方法为:根据荷载设计,在既有线下方紧贴临时架空桩3下挖桩孔,挖孔深度在地下水平面下方,然后浇筑正式架空桩6,以正式架空桩6的桩顶为支点,穿设横抬梁9,形成架空体系。
所述正式架空桩6采用人工挖孔法施工。
所述的顶进管节1和现浇管节2均包括管节顶板1-1、管节底板1-2、管节侧墙1-3与管节中隔墙1-4;所述管节顶板1-1与上部荷载接触,管节底板1-2与地面接触,管节侧墙1-3和管节中隔墙1-4与管节顶板1-1、管节底板1-2相连,管节中隔墙1-4位于管节侧墙1-3之间且平行于管节侧墙1-3。
所述顶进管节1的管节底板1-2一侧设置有三角补正块11,使顶进管节1与既有线路为斜交正顶施工。
相对于现有技术,本发明具有以下有益效果:
本发明提出了过渡架空—降水施工—正式架空的架空理念,及两头对顶-中间现浇的施工方式,能够在立交工程施工过程中,使得被下穿的多股道既有线正常运行通车,基本不影响交通车流;架空加固结构多为预制完成的钢结构,在施工完成后可进行回收,实现材料的重复利用,施工成本低;通过施工方案的优化设计,直接规避了地下水位对挖孔成桩的风险。立交桥管节总体施工方案遵循分段施工、流水作业的原则,立交桥先施工顶进部分,顶进就位后,再现浇中间部分框架,既保证铁路运营安全,又保证工期质量,具有较好的经济效益与施工指导意义。
附图说明
图1为本发明的平面结构示意图。
图2为本发明的横断面结构示意图。
图3为本发明的拉槽剖面示意图。
图4为本发明的纵断面结构示意图。
图5为本发明的框构桥管节顶进施工示意图。
图6为本发明的顶进管节1的实物图示例。
图中,1、顶进管节;2、现浇管节;3、临时架空桩;4、工作槽;5、基坑围护桩;6、正式架空桩;7、纵梁;8、钢枕;9、横抬梁;10、工作基坑;11、三角补正块;12、降水井;1-1、管节顶板;1-2、管节底板;1-3、管节侧墙;1-4、管节中隔墙。
具体实施方式
下面将结合附图,对本发明中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明的较佳实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。
参见图1至图6,一种框构桥架空顶进多股道既有线的施工方法,具体步骤如下:
一种框构桥架空顶进多股道既有线的施工方法,具体步骤如下:
一、在多股道既有线两侧开挖工作基坑10,工作基坑10的侧壁设置为模筑混凝土,既保证了基坑稳定性,又作为框构桥管节顶进的反力墙。
二、在工作基坑10内预制顶进管节1;
三、根据荷载设计,在既有线下方下挖桩孔,挖孔深度在地下水平面上方,然后浇筑临时架空桩3,以临时架空桩3的桩顶为支点,架设上部架空构件;
四、拉槽降水:完成步骤三过渡架空后,在既有线下方、每排临时架空桩3之间施做工作槽4,利用工作槽4内工作面施做基坑围护桩5和降水井12,然后降水,使地下水位达到设计水位;降水井12分布在多股道既有线两侧和工作槽4内,所述降水井12施工采用机械施工;
五、根据荷载设计,在既有线下方紧贴临时架空桩3下挖桩孔,采用人工挖孔法施工,挖孔深度在地下水平面下方,然后浇筑正式架空桩6,以正式架空桩6桩顶为支点,穿设横抬梁9,形成架空体系;
六、步骤五完成后,沿垂直于既有线方向,从多股道既有线两侧采用千斤顶将预制好的顶进管节1顶进架空体系;所述顶进管节1的管节底板1-2一侧设置有三角补正块11,使顶进管节1与既有线路为斜交正顶施工。
七、采用边顶进、边破桩,进行架空转换,多股道既有线两侧的顶进管节1顶进就位后,顶进管节1代替架空桩作为支撑结构,通过架设横抬梁9形成中间现浇管节2的施工空间;然后在顶进管节1中间现浇管节2;
八、现浇管节2完成后,即框构桥下穿多股道既有线施工完成,拆除架空设备,恢复线路正常运营。

Claims (10)

1.一种框构桥架空顶进多股道既有线的施工方法,其特征在于:具体步骤如下:
一、在多股道既有线两侧开挖工作基坑(10);
二、在工作基坑(10)内预制顶进管节(1);
三、过渡架空;
四、拉槽降水;
五、正式架空桩(6)挖孔施工;
六、步骤五完成后,沿垂直于既有线方向,从多股道既有线两侧采用千斤顶将预制好的顶进管节(1)顶进架空体系;
七、采用边顶进、边破桩,进行架空转换,多股道既有线两侧的顶进管节(1)顶进就位后,顶进管节(1)代替架空桩作为支撑结构,通过架设横抬梁(9)形成中间现浇管节(2)的施工空间;然后在顶进管节(1)中间现浇管节(2);
八、现浇管节(2)完成后,即框构桥下穿多股道既有线施工完成,拆除架空设备,恢复线路正常运营。
2.根据权利要求1所述的一种框构桥架空顶进多股道既有线的施工方法,其特征在于:步骤一与步骤二所述工作基坑(10)的侧壁设置为模筑混凝土。
3.根据权利要求1所述的一种框构桥架空顶进多股道既有线的施工方法,其特征在于:步骤三所述的过渡架空的具体方法为:根据荷载设计,在既有线下方下挖桩孔,挖孔深度在地下水平面上方,然后浇筑临时架空桩(3),以临时架空桩(3)的桩顶为支点,架设上部架空构件。
4.根据权利要求3所述的一种框构桥架空顶进多股道既有线的施工方法,其特征在于:所述上部架空构件包括纵梁(7)及钢枕(8)。
5.根据权利要求1所述的一种框构桥架空顶进多股道既有线的施工方法,其特征在于:所述步骤四的具体方法为:完成步骤三过渡架空后,在既有线下方、每排临时架空桩(3)之间施做工作槽(4),利用工作槽(4)内工作面施做基坑围护桩(5)和降水井(12),然后降水,使地下水位达到设计水位。
6.根据权利要求5所述的一种框构桥架空顶进多股道既有线的施工方法,其特征在于:步骤四所述降水井(12)分布在多股道既有线两侧和工作槽(4)内;所述降水井(12)施工采用机械施工。
7.根据权利要求1所述的一种框构桥架空顶进多股道既有线的施工方法,其特征在于:所述步骤五的具体方法为:根据荷载设计,在既有线下方紧贴临时架空桩(3)下挖桩孔,挖孔深度在地下水平面下方,然后浇筑正式架空桩(6),以正式架空桩(6)的桩顶为支点,穿设横抬梁(9),形成架空体系。
8.根据权利要求7所述的一种框构桥架空顶进多股道既有线的施工方法,其特征在于:所述正式架空桩(6)采用人工挖孔法施工。
9.根据权利要求1所述的一种框构桥架空顶进多股道既有线的施工方法,其特征在于:步骤七所述的顶进管节(1)和现浇管节(2)均包括管节顶板(1-1)、管节底板(1-2)、管节侧墙(1-3)与管节中隔墙(1-4);所述管节顶板(1-1)与上部荷载接触,管节底板(1-2)与地面接触,管节侧墙(1-3)和管节中隔墙(1-4)与管节顶板(1-1)、管节底板(1-2)相连,管节中隔墙(1-4)位于管节侧墙(1-3)之间且平行于管节侧墙(1-3)。
10.根据权利要求9所述的一种框构桥架空顶进多股道既有线的施工方法,其特征在于:所述顶进管节(1)的管节底板(1-2)一侧设置有三角补正块(11),使顶进管节(1)与既有线路为斜交正顶施工。
CN202111153618.8A 2021-09-29 2021-09-29 一种框构桥架空顶进多股道既有线的施工方法 Active CN113699895B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202111153618.8A CN113699895B (zh) 2021-09-29 2021-09-29 一种框构桥架空顶进多股道既有线的施工方法
US17/956,431 US20230102297A1 (en) 2021-09-29 2022-09-29 Construction method for overhead jacking of multi-track existing railway of frame bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111153618.8A CN113699895B (zh) 2021-09-29 2021-09-29 一种框构桥架空顶进多股道既有线的施工方法

Publications (2)

Publication Number Publication Date
CN113699895A true CN113699895A (zh) 2021-11-26
CN113699895B CN113699895B (zh) 2022-07-01

Family

ID=78662396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111153618.8A Active CN113699895B (zh) 2021-09-29 2021-09-29 一种框构桥架空顶进多股道既有线的施工方法

Country Status (2)

Country Link
US (1) US20230102297A1 (zh)
CN (1) CN113699895B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113026541B (zh) * 2021-04-16 2025-04-04 中铁第四勘察设计院集团有限公司 一种现浇、预制相结合的桥上接轨的组合结构及施工方法
CN117026851A (zh) * 2023-09-25 2023-11-10 中铁上海设计院集团有限公司 一种改建既有河道铁路桥梁的方法
CN119243532B (zh) * 2024-10-12 2025-10-03 郑州宙晖工程技术有限公司 D型梁架空顶进方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2101177A (en) * 1981-06-25 1983-01-12 Tung Hsing Long Construction C Method of constructing underpass across railway and highway without affecting normal traffic thereof
CN101963061A (zh) * 2010-10-19 2011-02-02 浙江省建工集团有限责任公司 一种铁路既有线地下箱涵的施工方法
JP2012202055A (ja) * 2011-03-24 2012-10-22 Okumura Corp 函体構造物の設置方法
CN102979041A (zh) * 2012-12-26 2013-03-20 中铁七局集团郑州工程有限公司 下穿铁路道岔群顶进卡跨度箱桥施工的软架空加固顶进法
JP2015196990A (ja) * 2014-04-01 2015-11-09 鹿島建設株式会社 地盤掘進方法
CN106012878A (zh) * 2016-08-03 2016-10-12 长沙楚泰建筑劳务有限公司 一种铁路箱涵顶进连续型施工便梁的施工方法及其装置
CN106337373A (zh) * 2015-07-13 2017-01-18 中铁第六勘察设计院集团有限公司 斜穿既有线架空顶进箱涵的施工方法及其应用的管节结构
CN111676819A (zh) * 2020-06-08 2020-09-18 中铁六局集团太原铁路建设有限公司 组合式工便梁连续加固线路大跨度框构桥顶进施工方法
CN111926710A (zh) * 2020-07-29 2020-11-13 中铁二十局集团第六工程有限公司 多股道铁路架空固定装置
CN113235639A (zh) * 2021-03-29 2021-08-10 中铁武汉勘察设计院有限公司 一种既有线下排桩围护结构及其施工方法

Family Cites Families (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3571835A (en) * 1967-10-30 1971-03-23 Dyckerhoff & Widmann Ag Apparatus for concreting multiple section structures, particularly bridge supports of reinforced or prestressed concrete
US3706215A (en) * 1971-02-19 1972-12-19 Herbert D Horton Rotary pipe straightener
US4282978A (en) * 1980-01-28 1981-08-11 Antonio Zambon Bridge crane for the emplacement of elongate prefabricated members of structures spanning a multiplicity of spaced-apart supports
US4301565A (en) * 1980-03-19 1981-11-24 Irwin Weinbaum Method and system for the removal and replacement of a bridge
US5771518A (en) * 1989-06-16 1998-06-30 Roberts; Michael Lee Precast concrete bridge structure and associated rapid assembly methods
CA1311094C (en) * 1989-07-12 1992-12-08 Gamil S. Tadros Bridge construction
US5566414A (en) * 1993-10-20 1996-10-22 Matsuo Engineering Co., Ltd. Bridge raising/supporting method and bearing device for the method
US5511268A (en) * 1994-08-08 1996-04-30 The United States Of America As Represented By The Secretary Of Commerce Construction of large structures by robotic crane placement of modular bridge sections
US5655243A (en) * 1995-07-14 1997-08-12 Kim; Sun Ja Method for connecting precast concrete beams
US5960502A (en) * 1997-07-18 1999-10-05 Sherman; Yury Method and mechanism for erection of prefabricated modular deck of viaducts, motorway flyovers and the like
US20030061672A1 (en) * 1998-05-06 2003-04-03 Eustace Nicholas J. Bridge construction method and composite girder for use in same
FR2801328B1 (fr) * 1999-11-19 2002-02-01 Soc Civ D Brevets Matiere Tablier de pont metallique et procede de construction d'un pont comportant un tel tablier
TW418272B (en) * 2000-01-07 2001-01-11 Jang Chi Guang Advancing stationary shoring system and its construction method
US7013520B1 (en) * 2002-05-24 2006-03-21 Snead Edwin Desteiguer Method for positioning a pile cap underneath an existing elevated bridge assembly
GB0507807D0 (en) * 2005-04-18 2005-05-25 England George L A theral displacement compensation unit for integral bridges
US7546656B2 (en) * 2005-08-16 2009-06-16 Daewoo Engineering & Construction Co., Ltd Method of installing prefabricated, segment concrete filled tube members
US7478450B2 (en) * 2005-11-29 2009-01-20 Charles Fong Longitudinally offset bridge substructure support system
EP1966444B1 (en) * 2005-12-20 2012-10-17 Flatiron Constructors, Inc. Method and apparatus for bridge construction
KR20080107085A (ko) * 2007-06-05 2008-12-10 삼성물산 주식회사 교량의 거더 설치공법 및 이에 사용되는 거더 인양크레인,임시거더, 거더 운반용 차량, 거더
EP2278094B1 (en) * 2008-04-01 2014-05-07 Beijing Shengtianyi Parking Management Co., Ltd. Multi-purpose load lifting working platform or/and composite bridge structure
AU2009344385B2 (en) * 2009-04-15 2015-11-26 Vsl International Ag Overhead form traveller and method
US8458839B2 (en) * 2009-07-27 2013-06-11 Encon Technologies, Llc Apparatus and method for replacing a bridge using a pre-cast construction techniques
KR100950715B1 (ko) * 2009-10-26 2010-03-31 (주)대우건설 교량용 프리캐스트 코핑부의 시공 방법
KR100958014B1 (ko) * 2010-01-29 2010-05-17 변형균 강합성 거더교 시공방법
US8522381B1 (en) * 2010-09-07 2013-09-03 OCCI, Inc. System and method for bridge pier replacement
KR101203980B1 (ko) * 2010-09-30 2012-11-22 주식회사 아앤시티 교량의 상부 구조물
US8448279B2 (en) * 2010-11-17 2013-05-28 Terrace W. COOK Ecologically-sound waterway culvert restoration
US8925282B2 (en) * 2011-07-08 2015-01-06 Contech Engineered Solutions LLC Foundation system for bridges and other structures
US8621697B2 (en) * 2012-03-19 2014-01-07 Union Pacific Railroad Company Bridge cap installation system and method
US8938836B2 (en) * 2012-09-25 2015-01-27 Pbc International Inc. Abutment structures
US9695558B2 (en) * 2012-12-13 2017-07-04 Contech Engineered Solutions LLC Foundation system for bridges and other structures
US8671490B1 (en) * 2013-03-06 2014-03-18 Mark Carney Bridge span replacement system
US8956075B1 (en) * 2013-11-04 2015-02-17 Patrick Shawn Free Tunnel mold, system and method for slip forming reinforced concrete structures with exposed rebars

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2101177A (en) * 1981-06-25 1983-01-12 Tung Hsing Long Construction C Method of constructing underpass across railway and highway without affecting normal traffic thereof
CN101963061A (zh) * 2010-10-19 2011-02-02 浙江省建工集团有限责任公司 一种铁路既有线地下箱涵的施工方法
JP2012202055A (ja) * 2011-03-24 2012-10-22 Okumura Corp 函体構造物の設置方法
CN102979041A (zh) * 2012-12-26 2013-03-20 中铁七局集团郑州工程有限公司 下穿铁路道岔群顶进卡跨度箱桥施工的软架空加固顶进法
JP2015196990A (ja) * 2014-04-01 2015-11-09 鹿島建設株式会社 地盤掘進方法
CN106337373A (zh) * 2015-07-13 2017-01-18 中铁第六勘察设计院集团有限公司 斜穿既有线架空顶进箱涵的施工方法及其应用的管节结构
CN106012878A (zh) * 2016-08-03 2016-10-12 长沙楚泰建筑劳务有限公司 一种铁路箱涵顶进连续型施工便梁的施工方法及其装置
CN111676819A (zh) * 2020-06-08 2020-09-18 中铁六局集团太原铁路建设有限公司 组合式工便梁连续加固线路大跨度框构桥顶进施工方法
CN111926710A (zh) * 2020-07-29 2020-11-13 中铁二十局集团第六工程有限公司 多股道铁路架空固定装置
CN113235639A (zh) * 2021-03-29 2021-08-10 中铁武汉勘察设计院有限公司 一种既有线下排桩围护结构及其施工方法

Also Published As

Publication number Publication date
CN113699895B (zh) 2022-07-01
US20230102297A1 (en) 2023-03-30

Similar Documents

Publication Publication Date Title
CN113699895A (zh) 一种框构桥架空顶进多股道既有线的施工方法
CN108547641A (zh) 富水软弱地层重载铁路隧道的基底加固体系及其施工方法
CN112983493B (zh) 一种盾构近距离下穿大断面桥涵的加固结构及施工方法
CN114382011B (zh) 一种桥隧协同建造结构的无梁施工方法
CN112681374A (zh) 一种复杂条件下浅埋暗挖通道盖挖逆作法施工方法
CN215051679U (zh) 路线交叉处既有路基改桥梁
CN112049011B (zh) 一种大跨度预应力现浇桥梁逆作法施工方法
CN110184903A (zh) 一种桁架式预制管柱拼装桥墩
CN104775368A (zh) 一种设置钢刃角的预制装配式顶进箱涵
CN222227076U (zh) 一种用于连续钢梁跨越既有铁路施工建造结构
CN220927477U (zh) 一种装配式下穿桥小箱梁兼作支护桩对撑施工结构
CN110939139B (zh) 基于桩后异型挡墙刚性接触的桩板墙结构及其构建方法
CN219653491U (zh) 一种适用于钢栈桥的钢结构桥台
CN112878216A (zh) 一种悬吊式铁路下穿箱涵顶进的轨道加固方法
CN217438963U (zh) 一种用于临近地铁上方隧道基坑开挖的支护结构
CN217758292U (zh) 冲沟地貌下隧道间的过渡桥
CN205502070U (zh) 一桩二用地下廊道结构
CN214328328U (zh) 分阶段实施路基改桥结构
CN113389218A (zh) 一种地道桥出入口挡墙结构及其施工方法
CN213741181U (zh) 一种用于地下建筑托换的桩基悬臂式结构
CN218911435U (zh) 一种适用于非水平地形条件的半盖挖基坑盖板支承结构
CN220888347U (zh) 一种新建盾构隧道下穿既有河道铁路桥梁改造结构
CN118814858B (zh) 一种城市道路u型预应力敞口地下通道结构
CN222119958U (zh) 一种新型d型便梁加固体系
CN219753302U (zh) 既有过江隧道拓宽施工结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230915

Address after: 710055 No. 13, middle section, Yanta Road, Shaanxi, Xi'an

Patentee after: XIAN University OF ARCHITECTURE AND TECHNOLOG

Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP OF THE FIFTH ENGINEERING Co.,Ltd.

Patentee after: NO.6 ENGINEERING CO., LTD. OF CHINA RAILWAY 20TH BUREAU Group

Address before: 710055 No. 13, Yanta Road, Shaanxi, Xi'an

Patentee before: XIAN University OF ARCHITECTURE AND TECHNOLOG