CN113699895A - 一种框构桥架空顶进多股道既有线的施工方法 - Google Patents
一种框构桥架空顶进多股道既有线的施工方法 Download PDFInfo
- Publication number
- CN113699895A CN113699895A CN202111153618.8A CN202111153618A CN113699895A CN 113699895 A CN113699895 A CN 113699895A CN 202111153618 A CN202111153618 A CN 202111153618A CN 113699895 A CN113699895 A CN 113699895A
- Authority
- CN
- China
- Prior art keywords
- overhead
- pipe joint
- jacking
- construction method
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 71
- 239000003673 groundwater Substances 0.000 claims abstract description 6
- 238000011065 in-situ storage Methods 0.000 claims abstract description 6
- 230000007704 transition Effects 0.000 claims abstract description 6
- 238000000034 method Methods 0.000 claims description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000005266 casting Methods 0.000 claims description 4
- 238000006243 chemical reaction Methods 0.000 claims description 3
- 241001669679 Eleotris Species 0.000 claims description 2
- 238000005192 partition Methods 0.000 claims description 2
- 238000001556 precipitation Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 3
- 230000000149 penetrating effect Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Hydrology & Water Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (10)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202111153618.8A CN113699895B (zh) | 2021-09-29 | 2021-09-29 | 一种框构桥架空顶进多股道既有线的施工方法 |
| US17/956,431 US20230102297A1 (en) | 2021-09-29 | 2022-09-29 | Construction method for overhead jacking of multi-track existing railway of frame bridge |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202111153618.8A CN113699895B (zh) | 2021-09-29 | 2021-09-29 | 一种框构桥架空顶进多股道既有线的施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN113699895A true CN113699895A (zh) | 2021-11-26 |
| CN113699895B CN113699895B (zh) | 2022-07-01 |
Family
ID=78662396
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202111153618.8A Active CN113699895B (zh) | 2021-09-29 | 2021-09-29 | 一种框构桥架空顶进多股道既有线的施工方法 |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US20230102297A1 (zh) |
| CN (1) | CN113699895B (zh) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113026541B (zh) * | 2021-04-16 | 2025-04-04 | 中铁第四勘察设计院集团有限公司 | 一种现浇、预制相结合的桥上接轨的组合结构及施工方法 |
| CN117026851A (zh) * | 2023-09-25 | 2023-11-10 | 中铁上海设计院集团有限公司 | 一种改建既有河道铁路桥梁的方法 |
| CN119243532B (zh) * | 2024-10-12 | 2025-10-03 | 郑州宙晖工程技术有限公司 | D型梁架空顶进方法 |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2101177A (en) * | 1981-06-25 | 1983-01-12 | Tung Hsing Long Construction C | Method of constructing underpass across railway and highway without affecting normal traffic thereof |
| CN101963061A (zh) * | 2010-10-19 | 2011-02-02 | 浙江省建工集团有限责任公司 | 一种铁路既有线地下箱涵的施工方法 |
| JP2012202055A (ja) * | 2011-03-24 | 2012-10-22 | Okumura Corp | 函体構造物の設置方法 |
| CN102979041A (zh) * | 2012-12-26 | 2013-03-20 | 中铁七局集团郑州工程有限公司 | 下穿铁路道岔群顶进卡跨度箱桥施工的软架空加固顶进法 |
| JP2015196990A (ja) * | 2014-04-01 | 2015-11-09 | 鹿島建設株式会社 | 地盤掘進方法 |
| CN106012878A (zh) * | 2016-08-03 | 2016-10-12 | 长沙楚泰建筑劳务有限公司 | 一种铁路箱涵顶进连续型施工便梁的施工方法及其装置 |
| CN106337373A (zh) * | 2015-07-13 | 2017-01-18 | 中铁第六勘察设计院集团有限公司 | 斜穿既有线架空顶进箱涵的施工方法及其应用的管节结构 |
| CN111676819A (zh) * | 2020-06-08 | 2020-09-18 | 中铁六局集团太原铁路建设有限公司 | 组合式工便梁连续加固线路大跨度框构桥顶进施工方法 |
| CN111926710A (zh) * | 2020-07-29 | 2020-11-13 | 中铁二十局集团第六工程有限公司 | 多股道铁路架空固定装置 |
| CN113235639A (zh) * | 2021-03-29 | 2021-08-10 | 中铁武汉勘察设计院有限公司 | 一种既有线下排桩围护结构及其施工方法 |
Family Cites Families (33)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3571835A (en) * | 1967-10-30 | 1971-03-23 | Dyckerhoff & Widmann Ag | Apparatus for concreting multiple section structures, particularly bridge supports of reinforced or prestressed concrete |
| US3706215A (en) * | 1971-02-19 | 1972-12-19 | Herbert D Horton | Rotary pipe straightener |
| US4282978A (en) * | 1980-01-28 | 1981-08-11 | Antonio Zambon | Bridge crane for the emplacement of elongate prefabricated members of structures spanning a multiplicity of spaced-apart supports |
| US4301565A (en) * | 1980-03-19 | 1981-11-24 | Irwin Weinbaum | Method and system for the removal and replacement of a bridge |
| US5771518A (en) * | 1989-06-16 | 1998-06-30 | Roberts; Michael Lee | Precast concrete bridge structure and associated rapid assembly methods |
| CA1311094C (en) * | 1989-07-12 | 1992-12-08 | Gamil S. Tadros | Bridge construction |
| US5566414A (en) * | 1993-10-20 | 1996-10-22 | Matsuo Engineering Co., Ltd. | Bridge raising/supporting method and bearing device for the method |
| US5511268A (en) * | 1994-08-08 | 1996-04-30 | The United States Of America As Represented By The Secretary Of Commerce | Construction of large structures by robotic crane placement of modular bridge sections |
| US5655243A (en) * | 1995-07-14 | 1997-08-12 | Kim; Sun Ja | Method for connecting precast concrete beams |
| US5960502A (en) * | 1997-07-18 | 1999-10-05 | Sherman; Yury | Method and mechanism for erection of prefabricated modular deck of viaducts, motorway flyovers and the like |
| US20030061672A1 (en) * | 1998-05-06 | 2003-04-03 | Eustace Nicholas J. | Bridge construction method and composite girder for use in same |
| FR2801328B1 (fr) * | 1999-11-19 | 2002-02-01 | Soc Civ D Brevets Matiere | Tablier de pont metallique et procede de construction d'un pont comportant un tel tablier |
| TW418272B (en) * | 2000-01-07 | 2001-01-11 | Jang Chi Guang | Advancing stationary shoring system and its construction method |
| US7013520B1 (en) * | 2002-05-24 | 2006-03-21 | Snead Edwin Desteiguer | Method for positioning a pile cap underneath an existing elevated bridge assembly |
| GB0507807D0 (en) * | 2005-04-18 | 2005-05-25 | England George L | A theral displacement compensation unit for integral bridges |
| US7546656B2 (en) * | 2005-08-16 | 2009-06-16 | Daewoo Engineering & Construction Co., Ltd | Method of installing prefabricated, segment concrete filled tube members |
| US7478450B2 (en) * | 2005-11-29 | 2009-01-20 | Charles Fong | Longitudinally offset bridge substructure support system |
| EP1966444B1 (en) * | 2005-12-20 | 2012-10-17 | Flatiron Constructors, Inc. | Method and apparatus for bridge construction |
| KR20080107085A (ko) * | 2007-06-05 | 2008-12-10 | 삼성물산 주식회사 | 교량의 거더 설치공법 및 이에 사용되는 거더 인양크레인,임시거더, 거더 운반용 차량, 거더 |
| EP2278094B1 (en) * | 2008-04-01 | 2014-05-07 | Beijing Shengtianyi Parking Management Co., Ltd. | Multi-purpose load lifting working platform or/and composite bridge structure |
| AU2009344385B2 (en) * | 2009-04-15 | 2015-11-26 | Vsl International Ag | Overhead form traveller and method |
| US8458839B2 (en) * | 2009-07-27 | 2013-06-11 | Encon Technologies, Llc | Apparatus and method for replacing a bridge using a pre-cast construction techniques |
| KR100950715B1 (ko) * | 2009-10-26 | 2010-03-31 | (주)대우건설 | 교량용 프리캐스트 코핑부의 시공 방법 |
| KR100958014B1 (ko) * | 2010-01-29 | 2010-05-17 | 변형균 | 강합성 거더교 시공방법 |
| US8522381B1 (en) * | 2010-09-07 | 2013-09-03 | OCCI, Inc. | System and method for bridge pier replacement |
| KR101203980B1 (ko) * | 2010-09-30 | 2012-11-22 | 주식회사 아앤시티 | 교량의 상부 구조물 |
| US8448279B2 (en) * | 2010-11-17 | 2013-05-28 | Terrace W. COOK | Ecologically-sound waterway culvert restoration |
| US8925282B2 (en) * | 2011-07-08 | 2015-01-06 | Contech Engineered Solutions LLC | Foundation system for bridges and other structures |
| US8621697B2 (en) * | 2012-03-19 | 2014-01-07 | Union Pacific Railroad Company | Bridge cap installation system and method |
| US8938836B2 (en) * | 2012-09-25 | 2015-01-27 | Pbc International Inc. | Abutment structures |
| US9695558B2 (en) * | 2012-12-13 | 2017-07-04 | Contech Engineered Solutions LLC | Foundation system for bridges and other structures |
| US8671490B1 (en) * | 2013-03-06 | 2014-03-18 | Mark Carney | Bridge span replacement system |
| US8956075B1 (en) * | 2013-11-04 | 2015-02-17 | Patrick Shawn Free | Tunnel mold, system and method for slip forming reinforced concrete structures with exposed rebars |
-
2021
- 2021-09-29 CN CN202111153618.8A patent/CN113699895B/zh active Active
-
2022
- 2022-09-29 US US17/956,431 patent/US20230102297A1/en active Pending
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2101177A (en) * | 1981-06-25 | 1983-01-12 | Tung Hsing Long Construction C | Method of constructing underpass across railway and highway without affecting normal traffic thereof |
| CN101963061A (zh) * | 2010-10-19 | 2011-02-02 | 浙江省建工集团有限责任公司 | 一种铁路既有线地下箱涵的施工方法 |
| JP2012202055A (ja) * | 2011-03-24 | 2012-10-22 | Okumura Corp | 函体構造物の設置方法 |
| CN102979041A (zh) * | 2012-12-26 | 2013-03-20 | 中铁七局集团郑州工程有限公司 | 下穿铁路道岔群顶进卡跨度箱桥施工的软架空加固顶进法 |
| JP2015196990A (ja) * | 2014-04-01 | 2015-11-09 | 鹿島建設株式会社 | 地盤掘進方法 |
| CN106337373A (zh) * | 2015-07-13 | 2017-01-18 | 中铁第六勘察设计院集团有限公司 | 斜穿既有线架空顶进箱涵的施工方法及其应用的管节结构 |
| CN106012878A (zh) * | 2016-08-03 | 2016-10-12 | 长沙楚泰建筑劳务有限公司 | 一种铁路箱涵顶进连续型施工便梁的施工方法及其装置 |
| CN111676819A (zh) * | 2020-06-08 | 2020-09-18 | 中铁六局集团太原铁路建设有限公司 | 组合式工便梁连续加固线路大跨度框构桥顶进施工方法 |
| CN111926710A (zh) * | 2020-07-29 | 2020-11-13 | 中铁二十局集团第六工程有限公司 | 多股道铁路架空固定装置 |
| CN113235639A (zh) * | 2021-03-29 | 2021-08-10 | 中铁武汉勘察设计院有限公司 | 一种既有线下排桩围护结构及其施工方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN113699895B (zh) | 2022-07-01 |
| US20230102297A1 (en) | 2023-03-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113699895A (zh) | 一种框构桥架空顶进多股道既有线的施工方法 | |
| CN108547641A (zh) | 富水软弱地层重载铁路隧道的基底加固体系及其施工方法 | |
| CN112983493B (zh) | 一种盾构近距离下穿大断面桥涵的加固结构及施工方法 | |
| CN114382011B (zh) | 一种桥隧协同建造结构的无梁施工方法 | |
| CN112681374A (zh) | 一种复杂条件下浅埋暗挖通道盖挖逆作法施工方法 | |
| CN215051679U (zh) | 路线交叉处既有路基改桥梁 | |
| CN112049011B (zh) | 一种大跨度预应力现浇桥梁逆作法施工方法 | |
| CN110184903A (zh) | 一种桁架式预制管柱拼装桥墩 | |
| CN104775368A (zh) | 一种设置钢刃角的预制装配式顶进箱涵 | |
| CN222227076U (zh) | 一种用于连续钢梁跨越既有铁路施工建造结构 | |
| CN220927477U (zh) | 一种装配式下穿桥小箱梁兼作支护桩对撑施工结构 | |
| CN110939139B (zh) | 基于桩后异型挡墙刚性接触的桩板墙结构及其构建方法 | |
| CN219653491U (zh) | 一种适用于钢栈桥的钢结构桥台 | |
| CN112878216A (zh) | 一种悬吊式铁路下穿箱涵顶进的轨道加固方法 | |
| CN217438963U (zh) | 一种用于临近地铁上方隧道基坑开挖的支护结构 | |
| CN217758292U (zh) | 冲沟地貌下隧道间的过渡桥 | |
| CN205502070U (zh) | 一桩二用地下廊道结构 | |
| CN214328328U (zh) | 分阶段实施路基改桥结构 | |
| CN113389218A (zh) | 一种地道桥出入口挡墙结构及其施工方法 | |
| CN213741181U (zh) | 一种用于地下建筑托换的桩基悬臂式结构 | |
| CN218911435U (zh) | 一种适用于非水平地形条件的半盖挖基坑盖板支承结构 | |
| CN220888347U (zh) | 一种新建盾构隧道下穿既有河道铁路桥梁改造结构 | |
| CN118814858B (zh) | 一种城市道路u型预应力敞口地下通道结构 | |
| CN222119958U (zh) | 一种新型d型便梁加固体系 | |
| CN219753302U (zh) | 既有过江隧道拓宽施工结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20230915 Address after: 710055 No. 13, middle section, Yanta Road, Shaanxi, Xi'an Patentee after: XIAN University OF ARCHITECTURE AND TECHNOLOG Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP OF THE FIFTH ENGINEERING Co.,Ltd. Patentee after: NO.6 ENGINEERING CO., LTD. OF CHINA RAILWAY 20TH BUREAU Group Address before: 710055 No. 13, Yanta Road, Shaanxi, Xi'an Patentee before: XIAN University OF ARCHITECTURE AND TECHNOLOG |