CN113692476A - 建造地下隧道的方法和系统 - Google Patents

建造地下隧道的方法和系统 Download PDF

Info

Publication number
CN113692476A
CN113692476A CN202080023310.9A CN202080023310A CN113692476A CN 113692476 A CN113692476 A CN 113692476A CN 202080023310 A CN202080023310 A CN 202080023310A CN 113692476 A CN113692476 A CN 113692476A
Authority
CN
China
Prior art keywords
tunnel
shield
hole
holes
predetermined path
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202080023310.9A
Other languages
English (en)
Chinese (zh)
Inventor
斯蒂芬·乔丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Super Tunnel Ip Co ltd
Original Assignee
Super Tunnel Ip Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Super Tunnel Ip Co ltd filed Critical Super Tunnel Ip Co ltd
Publication of CN113692476A publication Critical patent/CN113692476A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/025Rock drills, i.e. jumbo drills
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/03Driving non-circular tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0621Shield advancing devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Soil Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Sampling And Sample Adjustment (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Earth Drilling (AREA)
CN202080023310.9A 2019-03-22 2020-03-20 建造地下隧道的方法和系统 Pending CN113692476A (zh)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
GB1903979.1A GB2582376B (en) 2019-03-22 2019-03-22 Method and system of constructing an underground tunnel
GB1903979.1 2019-03-22
PCT/GB2020/050756 WO2020193960A1 (en) 2019-03-22 2020-03-20 Method and system of constructing an underground tunnel

Publications (1)

Publication Number Publication Date
CN113692476A true CN113692476A (zh) 2021-11-23

Family

ID=66381560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202080023310.9A Pending CN113692476A (zh) 2019-03-22 2020-03-20 建造地下隧道的方法和系统

Country Status (19)

Country Link
US (2) US11591908B2 (https=)
EP (2) EP4019737A1 (https=)
JP (2) JP2022524893A (https=)
CN (1) CN113692476A (https=)
AU (2) AU2020249771B2 (https=)
BR (1) BR112021018735A2 (https=)
CA (2) CA3133618C (https=)
DK (1) DK3942154T3 (https=)
EA (1) EA202192429A1 (https=)
ES (1) ES2927425T3 (https=)
GB (1) GB2582376B (https=)
MX (1) MX2021011532A (https=)
MY (1) MY209706A (https=)
PL (1) PL3942154T3 (https=)
PT (1) PT3942154T (https=)
SA (1) SA521430384B1 (https=)
SG (1) SG11202110350UA (https=)
WO (1) WO2020193960A1 (https=)
ZA (2) ZA202106987B (https=)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2582376B (en) * 2019-03-22 2021-06-09 Hypertunnel Ip Ltd Method and system of constructing an underground tunnel
CN111119913B (zh) * 2020-02-24 2024-05-17 中铁二院工程集团有限责任公司 一种隧道施工中tbm脱困处理方法及隧道施工结构
GB2592699B (en) * 2020-09-21 2022-03-16 Hypertunnel Ip Ltd Tunnelling shield
CN112267899A (zh) * 2020-10-12 2021-01-26 广东冠粤路桥有限公司 一种隧道出洞施工方法
WO2023082168A1 (zh) * 2021-11-12 2023-05-19 于宙 一种钻地机器人和免开挖地面的管道铺设方法
AU2022462279A1 (en) * 2022-06-10 2025-01-02 Epiroc Rock Drills Aktiebolag Control system, drill rig and method therein
GB2638709A (en) * 2024-02-28 2025-09-03 Hypertunnel Ip Ltd A pipe for lining a bore drilled by directional drilling apparatus and a method of conveying material underground

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62273392A (ja) * 1986-05-19 1987-11-27 鹿島建設株式会社 液圧チユ−ブによるトンネル掘削工法
US4786206A (en) * 1987-02-06 1988-11-22 Tekken Construction Co., Ltd. Lining tunnel wall made by shield type tunnel excavator
US5505558A (en) * 1993-11-09 1996-04-09 Brown; David M. Underground horizontal pipe installation method and apparatus
CN101403314A (zh) * 2008-11-18 2009-04-08 河南理工大学 煤矿井下钻孔水力压裂增透抽采瓦斯工艺
CN104863602A (zh) * 2015-04-09 2015-08-26 重庆大学 一种土质盾构隧道施工病害超前预报方法
CN105756700A (zh) * 2016-03-11 2016-07-13 中铁十八局集团有限公司 超大断面隧道穿煤系地层段的施工方法及封孔结构
CN106050243A (zh) * 2016-07-28 2016-10-26 中冶建工集团有限公司 超浅埋小间距大断面的多隧道并行施工方法
CN106089174A (zh) * 2016-06-30 2016-11-09 太原理工大学 水压致裂化学膨胀剂充填快速掘进巷道的方法
US20160348439A1 (en) * 2012-08-23 2016-12-01 Ramax, Llc Drill with remotely controlled operating modes and system and method for providing the same
WO2018049311A1 (en) * 2016-09-09 2018-03-15 Schlumberger Technology Corporation Drilling and stimulating of subterranean formation
CN107905834A (zh) * 2017-12-20 2018-04-13 中原工学院 一种低渗高突煤层体系化瓦斯开采方法

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US528367A (en) * 1894-10-30 Robert l
FR1363959A (fr) * 1963-04-05 1964-06-19 Perfectionnements au creusement des puits et des galeries dans les sables et terrainsaquifères
US3943722A (en) * 1970-12-31 1976-03-16 Union Carbide Canada Limited Ground freezing method
US4017121A (en) * 1974-11-25 1977-04-12 Allied Chemical Corporation Longwall mining of trona with prefracturing to prevent slabbing
JPS5236834U (https=) * 1975-09-09 1977-03-15
JPS5236834A (en) 1975-09-18 1977-03-22 Nippon Kokan Kk <Nkk> Quake resisting wall made of steel
JPS5918895A (ja) * 1982-07-24 1984-01-31 古河鉱業株式会社 トンネルの掘進方法およびトンネル掘進機
JP2593356B2 (ja) * 1990-03-16 1997-03-26 清水建設株式会社 トンネル構築工法
JP2932197B2 (ja) * 1990-03-28 1999-08-09 株式会社間組 大断面ないし超大断面トンネルの掘削工法
WO1991016524A1 (fr) * 1990-04-25 1991-10-31 Kabushiki Kaisha Komatsu Seisakusho Procede de creusement d'un tunnel
JPH06102957B2 (ja) * 1990-08-24 1994-12-14 鉄建建設株式会社 シールドトンネルの地中接合方法
JP2920851B2 (ja) * 1991-04-02 1999-07-19 清水建設株式会社 コンクリート壁面の補修方法
JPH0742483A (ja) * 1993-07-28 1995-02-10 Tekken Constr Co Ltd 「全面開放型シールド掘進機」
JP3567939B2 (ja) * 1994-05-09 2004-09-22 鉄建建設株式会社 トンネルの築造方法
JP2874561B2 (ja) * 1994-07-22 1999-03-24 株式会社大林組 導坑による先行脚部補強型フォアパイリング工法
JPH11280093A (ja) * 1998-03-27 1999-10-12 Hazama Gumi Ltd 地下岩盤タンクの水封構造
US6520718B1 (en) * 1998-11-27 2003-02-18 Shigeki Nagatomo, Et Al. Sardine-bone construction method for large-section tunnel
JP2001254595A (ja) * 2000-03-10 2001-09-21 Maeda Corp トンネル掘削装置
JP3391444B2 (ja) * 2000-10-30 2003-03-31 株式会社アグルー・ジャパン トンネルライニング方法
JP4480907B2 (ja) * 2001-02-15 2010-06-16 島田 巌乃 トンネルの掘削工法
JP4253801B2 (ja) * 2004-09-30 2009-04-15 清水建設株式会社 トンネル構築工法
JP4425299B2 (ja) 2007-08-02 2010-03-03 大豊建設株式会社 地盤改良方法およびシールド
JP5642130B2 (ja) * 2012-02-23 2014-12-17 日本シビックコンサルタント株式会社 トンネルボーリングマシン
JP5807096B2 (ja) * 2014-07-08 2015-11-10 鹿島建設株式会社 地下構造物および地下構造物の断面構造
CN105822316B (zh) * 2016-03-18 2019-06-18 张清林 一体式坑隧道掘进机
JP2017172280A (ja) * 2016-03-25 2017-09-28 清水建設株式会社 本体覆工壁およびその施工方法
KR101922175B1 (ko) * 2017-03-06 2018-11-27 주식회사 장평건설 다중 와이어쏘를 이용한 암벽 절삭장치 및 절삭방법과 이를 이용한 굴착공법
KR101910351B1 (ko) * 2017-10-26 2018-10-23 주식회사 건석이엔지 천공 절단식 암벽 굴착 공법과 이를 위한 천공기구
GB2582376B (en) * 2019-03-22 2021-06-09 Hypertunnel Ip Ltd Method and system of constructing an underground tunnel

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62273392A (ja) * 1986-05-19 1987-11-27 鹿島建設株式会社 液圧チユ−ブによるトンネル掘削工法
US4786206A (en) * 1987-02-06 1988-11-22 Tekken Construction Co., Ltd. Lining tunnel wall made by shield type tunnel excavator
US5505558A (en) * 1993-11-09 1996-04-09 Brown; David M. Underground horizontal pipe installation method and apparatus
CN101403314A (zh) * 2008-11-18 2009-04-08 河南理工大学 煤矿井下钻孔水力压裂增透抽采瓦斯工艺
US20160348439A1 (en) * 2012-08-23 2016-12-01 Ramax, Llc Drill with remotely controlled operating modes and system and method for providing the same
CN104863602A (zh) * 2015-04-09 2015-08-26 重庆大学 一种土质盾构隧道施工病害超前预报方法
CN105756700A (zh) * 2016-03-11 2016-07-13 中铁十八局集团有限公司 超大断面隧道穿煤系地层段的施工方法及封孔结构
CN106089174A (zh) * 2016-06-30 2016-11-09 太原理工大学 水压致裂化学膨胀剂充填快速掘进巷道的方法
CN106050243A (zh) * 2016-07-28 2016-10-26 中冶建工集团有限公司 超浅埋小间距大断面的多隧道并行施工方法
WO2018049311A1 (en) * 2016-09-09 2018-03-15 Schlumberger Technology Corporation Drilling and stimulating of subterranean formation
CN107905834A (zh) * 2017-12-20 2018-04-13 中原工学院 一种低渗高突煤层体系化瓦斯开采方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
兰州铁道学院: "隧道工程", vol. 1, 31 May 1977, 人民铁道出版社, pages: 79 - 87 *
李锋: "开敞式硬岩掘进机长时间停机状态保持方案研究", 甘肃科技, vol. 34, no. 007, pages 58 - 61 *

Also Published As

Publication number Publication date
US20220003115A1 (en) 2022-01-06
BR112021018735A2 (pt) 2021-12-21
EA202192429A1 (ru) 2021-12-13
ES2927425T3 (es) 2022-11-04
GB201903979D0 (en) 2019-05-08
EP4019737A1 (en) 2022-06-29
ZA202400177B (en) 2024-05-30
CA3133618A1 (en) 2020-10-01
CA3149384C (en) 2023-11-14
JP2022524893A (ja) 2022-05-10
PL3942154T3 (pl) 2022-11-07
AU2023201956B2 (en) 2024-07-11
CA3133618C (en) 2022-04-05
MY209706A (en) 2025-07-30
WO2020193960A1 (en) 2020-10-01
US12378884B2 (en) 2025-08-05
MX2021011532A (es) 2021-10-22
AU2023201956A1 (en) 2023-05-18
SA521430384B1 (ar) 2022-06-27
AU2020249771A1 (en) 2021-10-14
EP3942154B1 (en) 2022-08-17
CA3149384A1 (en) 2020-10-01
DK3942154T3 (da) 2022-10-03
GB2582376B (en) 2021-06-09
GB2582376A (en) 2020-09-23
AU2020249771B2 (en) 2023-04-27
EP3942154A1 (en) 2022-01-26
JP2023113780A (ja) 2023-08-16
ZA202106987B (en) 2024-04-24
US11591908B2 (en) 2023-02-28
PT3942154T (pt) 2022-10-17
SG11202110350UA (en) 2021-10-28
US20230175395A1 (en) 2023-06-08

Similar Documents

Publication Publication Date Title
AU2023201956B2 (en) Method and System of Constructing an Underground Tunnel
EP4214400B1 (en) Tunnelling shield
Phadke et al. Construction of tunnels, by new austrian tunneling method (NATM) and by tunnel boring machine (TBM)
JP2025531340A (ja) 地下構造を構築する方法及びシステム
JPWO2020193960A5 (https=)
HK40057221A (en) Method and system of constructing an underground tunnel
GB2591691A (en) Method and system of constructing an underground tunnel
CN214660179U (zh) 一种盾构矿山组合工法海底隧道微型拆机洞室
EA046986B1 (ru) Способ и система строительства подземного тоннеля
EA044537B1 (ru) Способ и система строительства подземного тоннеля
EA051579B1 (ru) Тоннелепроходческий щит и способ эксплуатации тоннелепроходческого щита
JPH06100080B2 (ja) 大断面トンネルの施工方法及び地盤固化柱造成装置
JP4587219B2 (ja) 既設コンクリート管更新用圧気掘進機とそれを用いた既設コンクリート管の更新工法。
Committee on Construction Equipment and Techniques Trenchless excavation construction methods: classification and evaluation
Babendererde et al. Anchor recovery under extreme conditions in downtown Leipzig, Germany
JPH01163399A (ja) シールド掘削工法
Ressi di Cervia New techniques in difficult ground tunneling
Martin CHICAGO SEWER SYSTEM TUNNELS AND SHAFTS
JPS63165693A (ja) シ−ルド掘進装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 40057221

Country of ref document: HK

RJ01 Rejection of invention patent application after publication

Application publication date: 20211123

RJ01 Rejection of invention patent application after publication