CN113559567A - Sampling pool - Google Patents

Sampling pool Download PDF

Info

Publication number
CN113559567A
CN113559567A CN202110867142.8A CN202110867142A CN113559567A CN 113559567 A CN113559567 A CN 113559567A CN 202110867142 A CN202110867142 A CN 202110867142A CN 113559567 A CN113559567 A CN 113559567A
Authority
CN
China
Prior art keywords
pool body
pool
top cover
wall
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110867142.8A
Other languages
Chinese (zh)
Inventor
解文生
王军
侯豪杰
张世祥
蔡宇泽
刘坤
刘春龙
王晓
韩磊
何宗阳
杨敬文
俞文浩
叶高业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Sinohydro Engineernig Bureau 4 South Zhuhai Engineering Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Sinohydro Engineernig Bureau 4 South Zhuhai Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd, Sinohydro Engineernig Bureau 4 South Zhuhai Engineering Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN202110867142.8A priority Critical patent/CN113559567A/en
Publication of CN113559567A publication Critical patent/CN113559567A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/02Settling tanks with single outlets for the separated liquid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/24Feed or discharge mechanisms for settling tanks
    • B01D21/2405Feed mechanisms for settling tanks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/24Feed or discharge mechanisms for settling tanks
    • B01D21/245Discharge mechanisms for the sediments
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/02Devices for withdrawing samples
    • G01N1/10Devices for withdrawing samples in the liquid or fluent state
    • G01N1/14Suction devices, e.g. pumps; Ejector devices

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

本发明提供一种取样池,包括池体和顶盖,池体的底面设置有倾斜底壁,倾斜底壁从池体的第一侧向第二侧向下倾斜,池体的第二侧设置有清理管和出水管,清理管位于倾斜底壁的底部,出水管位于清理管的上方;顶盖可拆卸地盖合在池体的顶部,顶盖开设有进水孔和多个预留孔,进水孔位于倾斜底壁的顶部上方,进水孔内设置有进水管,多个预留孔分设在顶盖的四个角部,且预留孔与池体内部连通。本发明可设置在一体化污水处理设备排水口处、方便取水样及在需要时方便清理池内沉淀物的取样池。

Figure 202110867142

The invention provides a sampling pool, comprising a pool body and a top cover. The bottom surface of the pool body is provided with an inclined bottom wall, and the inclined bottom wall is inclined downward from the first side of the pool body to the second side, and the second side of the pool body is provided with an inclined bottom wall. There are cleaning pipe and water outlet pipe, the cleaning pipe is located at the bottom of the inclined bottom wall, and the water outlet pipe is located above the cleaning pipe; the top cover is detachably covered on the top of the pool body, and the top cover is provided with a water inlet hole and a plurality of reserved holes , the water inlet hole is located above the top of the inclined bottom wall, the water inlet pipe is arranged in the water inlet hole, a plurality of reserved holes are arranged at the four corners of the top cover, and the reserved holes are communicated with the inside of the pool body. The invention can be arranged at the drainage outlet of the integrated sewage treatment equipment, which is convenient for taking water samples and cleaning the sediment in the pool when necessary.

Figure 202110867142

Description

Sampling pool
Technical Field
The invention relates to the technical field of sewage treatment, in particular to a sampling pool arranged at the tail end of integrated sewage treatment equipment.
Background
Sewage treatment is a process of purifying sewage to meet the water quality requirement of discharging the sewage into a certain water body or reusing the sewage. Sewage treatment is widely applied to various fields such as buildings, agriculture, traffic, energy, petrifaction, environmental protection, urban landscape, medical treatment, catering and the like, and is increasingly used in daily life of common people.
The integrated sewage treatment is one of the main modes for centralized sewage treatment, and clear water treated by the integrated sewage treatment equipment generally can reach the discharge standard. However, after the equipment is subjected to long-time sewage treatment or fails, the quality of the discharged clean water is reduced, so that workers need to perform sampling detection on the discharged clean water regularly to monitor whether the integrated sewage treatment equipment is in normal operation or not and monitor whether the effluent after sewage treatment reaches the standard or not.
Current integration sewage treatment device generally sets up to closed structure, because the restriction of its structure, inconvenient staff draws the water sample and carries out water sample detection. Traditional sewage treatment pond sets up to open, though conveniently extracts the water sample, nevertheless can gather more mud and dust after long-time work, because the bottom of a pool in traditional sewage treatment pond is flat, inconvenient clearance and the discharge of precipitate.
Disclosure of Invention
The invention aims to provide a sampling tank which is arranged at a water outlet of an integrated sewage treatment device and is convenient for taking a water sample and cleaning sediments in the tank when needed.
In order to achieve the purpose, the sampling pool provided by the invention comprises a pool body and a top cover, wherein an inclined bottom wall is arranged on the bottom surface of the pool body, the inclined bottom wall is inclined downwards from a first side to a second side of the pool body, a cleaning pipe and a water outlet pipe are arranged on the second side of the pool body, the cleaning pipe is positioned at the bottom of the inclined bottom wall, and the water outlet pipe is positioned above the cleaning pipe; top cap detachably lid closes at the top of cell body, and inlet opening and a plurality of preformed hole have been seted up to the top cap, and the inlet opening is located the top of slope diapire, is provided with the inlet tube in the inlet opening, and four bights at the top cap are established respectively to a plurality of preformed holes, and preformed hole and the inside intercommunication of cell body.
According to the scheme, the sampling tank is arranged at the water outlet of the integrated sewage treatment equipment, clear water discharged by the integrated sewage treatment equipment enters the sampling tank from the water inlet pipe, the clear water contains a small amount of sludge, dust and other sediments, and the sediments can slide towards the direction of the cleaning pipe along the inclined bottom wall by arranging the inclined bottom wall at the bottom of the tank body, so that most of the sediments in the water are accumulated near the cleaning pipe after the clear water discharged from the integrated sewage treatment equipment enters the sampling tank, the clarity of the upper layer of clear water is guaranteed, a worker can conveniently extract a water sample, and the sediments are convenient to clean and discharge; the water inlet pipe is arranged at the top of the slope of the inclined bottom wall, so that water entering the pool falls on the upper part of the inclined bottom wall, the impact force of the water can be weakened by the inclined bottom wall, the impact on sediments at the bottom of the slope in the falling process of the water can be reduced, and the sediments are prevented from being lifted again to influence the sedimentation effect in the sampling pool; the water outlet pipe is arranged above the cleaning pipe, so that water is fed into the sampling pool while settled clean water is discharged, and the sampling pool is prevented from overflowing; through setting up a plurality of preformed holes at the top cap, water sample in the accessible preformed hole extraction pond on the one hand, on the other hand accessible preformed hole upwards opens the top cap.
The further scheme is that step parts are arranged on the upper portion of the pool body, the step parts are downwards sunken from the top wall of the pool body, gaskets are arranged on the step parts, and the edge of the top cover abuts against the gaskets.
The further scheme is that the top cover is made of toughened glass, and the upper surface of the top cover is flush with the top wall of the tank body, or the upper surface of the top cover is lower than the top wall of the tank body.
The further scheme is that the gasket is made of materials such as rubber or silica gel, and the gasket is fixed on the step portion through viscose.
The further scheme is that the bottom of the pool body is a concrete floor, the wall of the pool body is a brick wall, a mortar layer is arranged on the outer side of the wall of the pool, and smooth tiles are inlaid on the inner side and the inclined bottom wall of the pool.
The further proposal is that one end of the cleaning pipe far away from the tank body is communicated with one end of the water outlet pipe far away from the tank body.
The further scheme is that a threaded plug is detachably arranged in the cleaning pipe and used for plugging the cleaning pipe.
The further proposal is that the water inlet pipe and the water outlet pipe are both provided with valves.
Drawings
FIG. 1 is a block diagram of an embodiment of the present invention.
Fig. 2 is an enlarged view at a in fig. 1.
Fig. 3 is a top view of an embodiment of the present invention.
The invention is further explained with reference to the drawings and the embodiments.
Detailed Description
Referring to fig. 1 to 3, the sampling tank provided in this embodiment is disposed at the end of the integrated sewage treatment apparatus, i.e., at the water outlet of the integrated sewage treatment apparatus, and is used for receiving the clean water discharged after the integrated sewage treatment apparatus is used for processing, so that the worker can conveniently and regularly extract the water sample from the sampling tank and detect the water sample, and regularly monitor whether the integrated sewage treatment apparatus is normally operated, and whether the clean water discharged by the integrated sewage treatment apparatus reaches the standard.
The sampling pool of this embodiment includes a pool body 1 and a top cover 2. The tank body 1 is rectangular, the length of the inner side of the tank body 1 is 1m, the width is 1m, the height is 0.6m, the bottom of the tank body 1 is a concrete floor formed by pouring C15 plain concrete, and the thickness of the concrete floor is 15 cm. The wall of the tank body 1 is a brick wall which is formed by brick building of cement mortar and MU10 bricks in a ratio of 1:2, wherein MU10 means that the average compressive strength of the building blocks is not less than 10 Mpa. The outside of pool wall is provided with the mortar layer that thickness is 20mm, and the inboard of pool wall is inlayed and is pasted light blue plain noodles ceramic tile, convenient clearance.
The bottom of cell body 1 is provided with slope diapire 11, and slope diapire 11 is from the first side of cell body 1 to the second side downward sloping, and in vertical direction, the slope top of slope diapire 11 equals or is slightly less than the half of cell body 1 height, and on the horizontal direction, there is the preset distance between the slope end of slope diapire 11 to the pool wall of the second side of cell body 1, and the preset distance is 15cm in this example.
Be provided with clearance pipe 3 and outlet pipe 4 on the second side pool wall of cell body 1, clearance pipe 3 is located the crossing department of 1 pool wall of cell body and diapire, and clearance pipe 3 is located the slope bottom of slope diapire 11 promptly, inlays on the slope diapire 11 and has pasted light blue plain noodles ceramic tile for the sediment that deposits down can slide to clearance pipe 3 along slope diapire 11. The water outlet pipe 4 is positioned above the cleaning pipe 3, and the lowest point of the water inlet of the water outlet pipe 4 is higher than or equal to the height of the slope top of the inclined bottom wall 11 in the vertical direction. One end of the cleaning pipe 3 far away from the tank body 1 is communicated with one end of the water outlet pipe 4 far away from the tank body 1. A threaded plug 6 for plugging the cleaning pipe 3 is detachably arranged in the cleaning pipe 3. The threaded plug 6 can seal the cleaning pipe 3 from the inside of the tank body 1, and can also seal the cleaning pipe from the outside of the tank body 1, and the former is preferred in the embodiment. The cleaning pipe 3 is DN75PVC pipe, the water outlet pipe 4 is DN110PVC pipe, and the peripheral walls of the cleaning pipe 3 and the water outlet pipe 4 are connected with the pool wall in a sealing way.
The top cover 2 is detachably covered on the top of the tank body 1 to prevent surface dust from entering the sampling tank. The top cover 2 is made of transparent toughened glass, so that the appearance is attractive, and workers can conveniently observe the transparency of water on the appearance of the pool. The top cap 2 has been seted up inlet opening 21 and four preformed holes 22, and wherein the diameter of inlet opening 21 is 80mm, and the diameter of preformed hole 22 is 50 mm. The inlet opening 21 is located the top on the slope top of slope diapire 11, is provided with inlet tube 5 in the inlet opening 21, and inlet tube 5 extends to cell body 1 inside from the inboard of top cap 2, and in vertical direction, the delivery port of inlet tube 5 is higher than the water inlet of outlet pipe 4. Clear water discharged by the integrated sewage treatment equipment enters the tank body 1 through the water inlet pipe 5 and falls on the slope top of the inclined bottom wall 11, so that trace sludge or dust in the clear water can slide along the surface of the inclined bottom wall 11 towards the cleaning pipe 3. Four preformed holes 22 divide and establish on four bights of top cap 2, and preformed hole 22 runs through the thickness direction and the inside intercommunication of cell body 1 of top cap 2, and the staff can follow the water sample of preformed hole 22 extraction cell body 1 interior different positions, and perhaps, the staff also can hold between the fingers top cap 2 and upwards open top cap 2 from preformed hole 22, then extracts appropriate amount of water sample.
The inlet tube 5 and the outlet pipe 4 all are provided with the valve (not shown in the figure), adjust the flow of inlet tube 5 and outlet pipe 4 through control valve's the degree of opening, conveniently adjust the water yield of outlet pipe 4 according to the inflow of inlet tube 5 for the state of intaking, going out water on one side is maintained all the time in the sample cell, prevents that the sample cell is excessive. Under the normality, clearance pipe 3 is in the shutoff state, just takes off plug 6 when the sampling basin is cleaned to needs, conveniently discharges sediment such as mud or dust completely.
In fig. 2, a step 12 is provided on the upper portion of the tank wall of the tank body 1, the step 12 is recessed downward from the top wall of the tank body 1, the recessed depth of the step 12 in this embodiment is 2cm, and the width of the step 12 in the horizontal direction is 6 cm. In the horizontal direction, steps 12 are arranged around the respective cell walls of the cell body 1. The step part 12 is provided with a gasket 13, and the edge of the top cover 2 abuts against the gasket 13 to protect the top cover 2 and prevent the top cover 2 from being broken. In the vertical direction, the upper surface of the top cover 2 is flush with the top wall of the tank body 1, or the upper surface of the top cover 2 is slightly lower than the top wall of the tank body 1. The gasket 13 of this embodiment is made of a flexible material such as rubber or silicone, and this embodiment is preferably a rubber gasket, and in order to prevent the gasket 13 from shifting, the gasket 13 may be fixed on the step portion 12 by glue.
In conclusion, the sampling tank is arranged at the water outlet of the integrated sewage treatment equipment, clear water discharged by the integrated sewage treatment equipment enters the sampling tank from the water inlet pipe, the clear water contains a small amount of sludge, dust and other sediments, and the sediments can slide towards the direction of the cleaning pipe along the inclined bottom wall by arranging the inclined bottom wall at the bottom of the tank body, so that most of the sediments in the water are accumulated near the cleaning pipe after the clear water discharged by the integrated sewage treatment equipment enters the sampling tank, the clarity of the clear water at the upper layer is ensured, the water sample can be conveniently extracted by workers, and the sediments can be conveniently cleaned and discharged; the water inlet pipe is arranged at the top of the slope of the inclined bottom wall, so that water entering the pool falls on the upper part of the inclined bottom wall, the impact force of the water can be weakened by the inclined bottom wall, the impact on sediments at the bottom of the slope in the falling process of the water can be reduced, and the sediments are prevented from being lifted again to influence the sedimentation effect in the sampling pool; the water outlet pipe is arranged above the cleaning pipe, so that water is fed into the sampling pool while settled clean water is discharged, and the sampling pool is prevented from overflowing; through setting up a plurality of preformed holes at the top cap, water sample in the accessible preformed hole extraction pond on the one hand, on the other hand accessible preformed hole upwards opens the top cap.
Finally, it should be emphasized that the above-described preferred embodiments of the present invention are merely examples of implementations, not limitations, and various changes and modifications may be made by those skilled in the art, without departing from the spirit and scope of the invention, and any changes, equivalents, improvements, etc. made within the spirit and scope of the present invention are intended to be embraced therein.

Claims (8)

1.一种取样池,其特征在于,包括:1. a sampling pool, is characterized in that, comprises: 池体,所述池体的底面设置有倾斜底壁,所述倾斜底壁从所述池体的第一侧向第二侧向下倾斜,所述池体的第二侧设置有清理管和出水管,所述清理管位于所述倾斜底壁的斜坡底,所述出水管位于所述清理管的上方;The pool body, the bottom surface of the pool body is provided with an inclined bottom wall, and the inclined bottom wall is inclined downward from the first side of the pool body to the second side, and the second side of the pool body is provided with a cleaning pipe and a water outlet pipe, the cleaning pipe is located at the bottom of the slope of the inclined bottom wall, and the water outlet pipe is located above the cleaning pipe; 顶盖,所述顶盖可拆卸地盖合在所述池体的顶部,所述顶盖开设有进水孔和多个预留孔,所述进水孔位于所述倾斜底壁的斜坡顶的上方,所述进水孔内设置有进水管,多个所述预留孔分设在所述顶盖的四个角部,且所述预留孔与所述池体内部连通。A top cover, the top cover is detachably covered on the top of the pool body, the top cover is provided with a water inlet hole and a plurality of reserved holes, and the water inlet hole is located at the top of the slope of the inclined bottom wall Above the water inlet pipe, a water inlet pipe is arranged in the water inlet hole, a plurality of the reserved holes are arranged at the four corners of the top cover, and the reserved holes are communicated with the inside of the pool body. 2.根据权利要求1所述的取样池,其特征在于:2. sampling pond according to claim 1, is characterized in that: 所述池体的上部设置有台阶部,所述台阶部从所述池体的顶壁向下凹陷,所述台阶部设置有垫片,所述顶盖的边缘抵接在所述垫片上。The upper part of the pool body is provided with a step portion, the step portion is recessed downward from the top wall of the pool body, the step portion is provided with a gasket, and the edge of the top cover abuts on the gasket . 3.根据权利要求2所述的取样池,其特征在于:3. sampling pond according to claim 2, is characterized in that: 所述顶盖采用钢化玻璃制成,所述顶盖的上表面与所述池体的顶壁平齐,或者,所述顶盖的上表面低于所述池体的顶壁。The top cover is made of tempered glass, and the upper surface of the top cover is flush with the top wall of the pool body, or the top surface of the top cover is lower than the top wall of the pool body. 4.根据权利要求2所述的取样池,其特征在于:4. sampling pond according to claim 2, is characterized in that: 所述垫片采用橡胶或硅胶等材料制成,所述垫片通过粘胶固定在所述台阶部上。The gasket is made of materials such as rubber or silica gel, and the gasket is fixed on the step portion by adhesive. 5.根据权利要求1所述的取样池,其特征在于:5. sampling pond according to claim 1, is characterized in that: 所述池体的池底为混凝土地板,所述池体的池壁为砖砌墙,所述池壁的外侧设置有砂浆层,所述池壁的内侧及所述倾斜底壁均镶贴有光面瓷砖。The bottom of the pond body is a concrete floor, the pond wall of the pond body is a brick wall, the outer side of the pond wall is provided with a mortar layer, and the inner side of the pond wall and the inclined bottom wall are all inlaid with Glossy tiles. 6.根据权利要求1所述的取样池,其特征在于:6. sampling pond according to claim 1, is characterized in that: 所述清理管远离所述池体的一端与所述出水管远离所述池体的一端连通。One end of the cleaning pipe away from the pool body communicates with one end of the water outlet pipe away from the pool body. 7.根据权利要求6所述的取样池,其特征在于:7. sampling pond according to claim 6, is characterized in that: 所述清理管内可拆卸地设置有螺纹塞,所述螺纹塞封堵所述清理管。A threaded plug is detachably arranged in the cleaning pipe, and the threaded plug blocks the cleaning pipe. 8.根据权利要求1至7任一项所述的取样池,其特征在于:8. the sampling pond according to any one of claims 1 to 7, is characterized in that: 所述进水管和所述出水管均设置有阀门。Both the water inlet pipe and the water outlet pipe are provided with valves.
CN202110867142.8A 2021-07-29 2021-07-29 Sampling pool Pending CN113559567A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110867142.8A CN113559567A (en) 2021-07-29 2021-07-29 Sampling pool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110867142.8A CN113559567A (en) 2021-07-29 2021-07-29 Sampling pool

Publications (1)

Publication Number Publication Date
CN113559567A true CN113559567A (en) 2021-10-29

Family

ID=78169221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110867142.8A Pending CN113559567A (en) 2021-07-29 2021-07-29 Sampling pool

Country Status (1)

Country Link
CN (1) CN113559567A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103319056A (en) * 2013-07-16 2013-09-25 重庆泰克环保工程设备有限公司 Hospital sewage treatment system
CN209043657U (en) * 2018-10-30 2019-06-28 北京博瑞环境工程有限公司 A kind of agricultural non-point source pollution monitoring analytical sampling pond
CN111167187A (en) * 2018-11-09 2020-05-19 史红桂 Advection type sedimentation tank
CN215505639U (en) * 2021-07-29 2022-01-14 中国水利水电第四工程局有限公司 Sampling pool

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103319056A (en) * 2013-07-16 2013-09-25 重庆泰克环保工程设备有限公司 Hospital sewage treatment system
CN209043657U (en) * 2018-10-30 2019-06-28 北京博瑞环境工程有限公司 A kind of agricultural non-point source pollution monitoring analytical sampling pond
CN111167187A (en) * 2018-11-09 2020-05-19 史红桂 Advection type sedimentation tank
CN215505639U (en) * 2021-07-29 2022-01-14 中国水利水电第四工程局有限公司 Sampling pool

Similar Documents

Publication Publication Date Title
CN215505639U (en) Sampling pool
CN205935038U (en) Initial rainwater abandoning device
CN201959604U (en) Valveless filter tank
CN113559567A (en) Sampling pool
CN106284589B (en) Automatic initial rainwater of control abandons a class device
WO2011103777A1 (en) Part of toilet bowl for removing foul odor of excrement
CN204703277U (en) A kind of building spiral-flow type draining manifold
CN206512847U (en) A kind of rain early-stage split-flow filter
CN208415478U (en) A kind of filtering sedimentation well
CN208229479U (en) A kind of sewage treatment scum collector
CN106320502A (en) Seepage-proofing compound floor drain and construction method thereof
CN207499071U (en) toilet
CN206288999U (en) One kind cone bottom skewed culvert filter residue air floatation machine
CN106955513B (en) A new air-water backwash filter
CN201082972Y (en) Self-sealing floor drain and self-sealing floor drain used in same layer drainage system
CN202148593U (en) High flow rate hidden-type floor drain
CN207499072U (en) toilet
CN219280830U (en) Washbowl wall drainage structures
CN209442819U (en) A sludge automatic return sedimentation tank
CN2632168Y (en) Controller for preventing sewge pipe from blocking, flowing back and odorizing
CN210684886U (en) A sink funnel for laboratory use
CN215715871U (en) Water seal device capable of automatically supplementing water
CN219471144U (en) A drainage device for engineering construction
CN205412474U (en) Prevent deposit contaminated water filtration apparatus
CN217068247U (en) A environmental protection filter equipment for handling dust

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211029