CN113530575B - An arch installation trolley for tunnel multi-function construction - Google Patents

An arch installation trolley for tunnel multi-function construction Download PDF

Info

Publication number
CN113530575B
CN113530575B CN202110714057.8A CN202110714057A CN113530575B CN 113530575 B CN113530575 B CN 113530575B CN 202110714057 A CN202110714057 A CN 202110714057A CN 113530575 B CN113530575 B CN 113530575B
Authority
CN
China
Prior art keywords
arch
rack
frame
platform
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110714057.8A
Other languages
Chinese (zh)
Other versions
CN113530575A (en
Inventor
张光明
王文胜
周聪
吕虎
刘新华
王嵽显
何亮
陈晓飞
杨奥飞
杜小刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Hanjiang Heavy Industry Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Hanjiang Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Hanjiang Heavy Industry Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN202110714057.8A priority Critical patent/CN113530575B/en
Publication of CN113530575A publication Critical patent/CN113530575A/en
Application granted granted Critical
Publication of CN113530575B publication Critical patent/CN113530575B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14—Lining predominantly with metal
    • E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40—Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T30/00—Transportation of goods or passengers via railways, e.g. energy recovery or reducing air resistance

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Bridges Or Land Bridges (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明提供了一种用于隧道多功法施工的拱架安装台车,包括车体、电气液压系统、走行机构和支撑机构,车体包括台架和工作平台,工作平台悬挂连接于台架的两侧;车体上设置有拱架安装单元,拱架安装单元包括顶拱拼装车、拱架运输车、悬臂吊、第一纵移机构、第二纵移机构、机械手、工作臂和拱架支撑杆,顶拱拼装车的左右两端均安装在第一纵移机构上,顶拱拼装车包括车架、拱架支撑组件以及拼装车纵移组件,拱架运输车安装在第二纵移机构上,悬臂吊设置于台架的后端,机械手和拱架支撑杆安装固定于工作平台的前端,工作臂安装固定于台架的前端。该拱架安装台车能够实现三榀拱架的快速安装,安装效率较高且适用性强。

The invention provides an arch installation trolley for tunnel multi-function construction, including a car body, an electro-hydraulic system, a running mechanism and a supporting mechanism, the car body includes a platform and a working platform, and the working platform is suspended and connected to the platform The two sides of the frame; the car body is provided with an arch installation unit, which includes a top arch assembly vehicle, an arch transport vehicle, a cantilever crane, a first longitudinal movement mechanism, a second longitudinal movement mechanism, a manipulator, a working arm and an arch The frame support rod, the left and right ends of the top arch assembly vehicle are installed on the first longitudinal movement mechanism, the top arch assembly vehicle includes the vehicle frame, the arch support assembly and the assembly vehicle longitudinal movement assembly, and the arch transport vehicle is installed on the second longitudinal movement mechanism. On the moving mechanism, the cantilever crane is arranged at the rear end of the platform, the manipulator and the arch support rod are installed and fixed at the front end of the working platform, and the working arm is installed and fixed at the front end of the platform. The arch installation trolley can realize the rapid installation of three arches, and has high installation efficiency and strong applicability.

Description

一种用于隧道多功法施工的拱架安装台车An arch installation trolley for tunnel multi-function construction

技术领域technical field

本发明涉及隧道施工技术领域,具体涉及一种用于隧道多功法施工的拱架安装台车。The invention relates to the technical field of tunnel construction, in particular to an arch installation trolley used for multi-function construction of tunnels.

背景技术Background technique

隧道施工现场环境差、安全性较低,随着国内人工成本的大幅度上升以及隧道施工安全要求日益严格,隧道施工智能化、信息化、机械化已成为共识。在隧道开挖过程中,需要及时对开挖断面进行快速且有效地支护,避免出现隧道失稳塌方问题,在隧道软弱围岩的初期支护中,经常采用拱架来加强初支结构的刚性。目前主要通过两种方式对拱架进行安装,一种方式是人工安装,拱架的位置通常需要人工进行调整,一次只能进行一榀拱架的安装,劳动强度大、用工人数多、安装效率低、安全系数低且安装质量难以控制。另一种方式是使用拱架安装三臂台车安装拱架,但是拱架安装三臂台车一次也只能进行一榀拱架的安装,安装效率低。The tunnel construction site has a poor environment and low safety. With the sharp increase in domestic labor costs and the increasingly stringent safety requirements for tunnel construction, intelligent, informatized, and mechanized tunnel construction has become a consensus. During the excavation process of the tunnel, it is necessary to quickly and effectively support the excavation section in time to avoid the problem of tunnel instability and collapse. In the initial support of the weak surrounding rock of the tunnel, arch frames are often used to strengthen the rigidity of the initial support structure . At present, there are mainly two ways to install the arch frame. One is manual installation. The position of the arch frame usually needs to be adjusted manually. Only one arch frame can be installed at a time. The labor intensity is high, the number of workers is large, and the installation efficiency is high. Low, low safety factor and difficult to control the installation quality. Another way is to use the arch frame to install the three-arm trolley to install the arch frame, but the arch frame installation three-arm trolley can only install one arch frame at a time, and the installation efficiency is low.

发明内容Contents of the invention

本发明提供了一种用于隧道多功法施工的拱架安装台车,该拱架安装台车能够实现三榀拱架的快速安装,安装效率较高且适用性强。The invention provides an arch installation trolley for multi-function construction of tunnels. The arch installation trolley can realize rapid installation of three arches, and has high installation efficiency and strong applicability.

实现本发明上述目的所采用的技术方案为:The technical scheme adopted to realize the above-mentioned purpose of the present invention is:

一种用于隧道多功法施工的拱架安装台车,至少包括车体、位于车体上的为台车上各组件提供运行动力的电气液压系统以及连接于车体底部的走行机构和支撑机构,所述车体包括台架和工作平台,其中台架垂直设置有两个,分别为上台架和下台架,上台架包括上顶板以及连接固定于上顶板下的上支架,下台架包括下顶板以及连接固定于下顶板下的下支架,所述上支架通过第三纵移机构连接于下顶板上,从而使上台架连接于下台架上并使上台架沿下台架纵向移动,工作平台悬挂连接于台架的两侧;所述车体上设置有拱架安装单元,拱架安装单元包括用于多榀顶拱预拼装的顶拱拼装车、拱架运输车、悬臂吊、第一纵移机构、第二纵移机构、机械手、工作臂和拱架支撑杆,所述第一纵移机构和第二纵移机构均安装于台架上并沿台车方向平行设置,且第二纵移机构位于台架上的外侧,第一纵移机构位于台架上的内侧,顶拱拼装车的左右两端均安装在第一纵移机构上并通过第一纵移机构纵向移动,所述顶拱拼装车包括整体呈拱形的车架、拱架支撑组件以及拼装车纵移组件,所述车架包括位于顶部的呈矩形的顶架、与顶架四角连接的呈半拱形的支撑架以及沿台车方向设置的连接于两根平行支撑架之间的纵架,三者连接为一体式结构,所述拱架支撑组件呈矩阵分布于顶架上,沿垂直于台车方向分布的拱架支撑组件为一组,拱架支撑组件设置有三组以上,用于支撑多榀顶拱,拱架运输车安装在第二纵移机构上并通过第二纵移机构纵向移动,所述悬臂吊设置于台架的后端,机械手和拱架支撑杆安装固定于工作平台的前端,且拱架支撑杆位于机械手的上方,工作臂安装固定于台架的前端。An arch installation trolley for tunnel multi-function construction, at least including a car body, an electro-hydraulic system located on the car body to provide operating power for each component on the trolley, and a running mechanism and support connected to the bottom of the car body mechanism, the vehicle body includes a platform and a working platform, wherein two platforms are arranged vertically, namely an upper platform and a lower platform, and the upper platform includes an upper roof and an upper bracket connected and fixed under the upper roof, and the lower The stand includes a lower top board and a lower bracket connected and fixed under the lower top board, and the upper bracket is connected to the lower top board through a third longitudinal movement mechanism, so that the upper stand is connected to the lower stand and the upper stand is moved along the lower The bench moves longitudinally, and the working platform is suspended and connected to both sides of the bench; the car body is provided with an arch installation unit, and the arch installation unit includes a top arch assembly vehicle for pre-assembly of multi-arch top arches, and arch transportation Car, cantilever crane, first longitudinal movement mechanism, second longitudinal movement mechanism, manipulator, working arm and arch support bar, the first longitudinal movement mechanism and the second longitudinal movement mechanism are all installed on the platform and along the trolley The directions are set in parallel, and the second longitudinal movement mechanism is located on the outside of the platform, the first longitudinal movement mechanism is located on the inner side of the platform, the left and right ends of the top arch assembly vehicle are installed on the first longitudinal movement mechanism and pass through the first The vertical movement mechanism moves longitudinally. The top arch assembly vehicle includes an overall arched vehicle frame, an arch support assembly and an assembly vehicle longitudinal movement assembly. The connected semi-arched support frame and the longitudinal frame connected between the two parallel support frames arranged along the direction of the trolley, the three are connected as an integrated structure, and the arch support components are distributed on the top frame in a matrix , the arch support assembly distributed along the direction perpendicular to the trolley is a group, and there are more than three sets of arch support assemblies for supporting multiple roof arches. The arch transport vehicle is installed on the second longitudinal movement mechanism and passes through the second The vertical movement mechanism moves longitudinally, the cantilever crane is arranged at the rear end of the platform, the manipulator and the arch support rod are installed and fixed on the front end of the working platform, and the arch support rod is located above the manipulator, and the working arm is installed and fixed on the bottom of the platform. front end.

所述第一纵移机构为双重纵移结构,包括连接固定于上台架上表面的固定轨、安装于固定轨内的滑轨、第一托轮、第一托轨、安装于滑轨两侧的靠近台车后端的第一滑轮、连接于滑轨底部的第一齿条以及连接于上支架上的固定连接的第一液压马达和第一齿轮,其中固定轨为由两条截面呈“[”型的钢轨拼装的沟槽式结构,所述第一齿轮与第一齿条啮合,通过第一液压马达驱动齿轮齿条传动,使滑轨在固定轨上移动,所述第一托轨连接于滑轨的底部并与第一齿条平行设置,第一托轮跨坐于第一托轨上并连接固定于靠近台车前端的上支架上,避免滑轨在纵移时脱离固定轨;所述滑轨顶部设置有顶拱拼装车轨道,顶拱拼装车安装于顶拱拼装车轨道上并沿滑轨纵向移动,滑轨和顶拱拼装车轨道的长度与上台架的长度一致。The first longitudinal movement mechanism is a double longitudinal movement structure, including a fixed rail connected and fixed on the upper surface of the upper platform, a slide rail installed in the fixed rail, a first support wheel, a first support rail, two The first pulley near the rear end of the trolley, the first rack connected to the bottom of the slide rail, and the fixedly connected first hydraulic motor and first gear connected to the upper bracket, wherein the fixed rail is composed of two sections in the shape of " [" type rail assembled groove structure, the first gear meshes with the first rack, drives the rack and pinion through the first hydraulic motor, so that the slide rail moves on the fixed rail, and the first support rail Connected to the bottom of the slide rail and set parallel to the first rack, the first support wheel straddles the first support rail and is connected and fixed on the upper bracket near the front end of the trolley to prevent the slide rail from detaching from the fixed rail during longitudinal movement The top of the slide rail is provided with a top arch assembly vehicle track, the top arch assembly vehicle is installed on the top arch assembly vehicle track and moves longitudinally along the slide rail, the length of the slide rail and the top arch assembly vehicle track is consistent with the length of the upper platform .

所述拱架顶升组件包括顶升油缸以及连接于顶升油缸顶部的呈凹槽型的顶升件,通过顶升油缸调节顶升件的高度,所述拼装车纵移组件包括沿台车方向设置的连接于两根平行支撑架底部的纵移架、安装于纵移架底部的拼装车走行轮、安装于纵移架侧面的固定连接的第五液压马达和马达输出轴齿轮以及固定连接于拼装车走行轮上的第五齿轮,拼装车走行轮跨坐于第二纵移机构上,马达输出轴齿轮和第五齿轮啮合,第五液压马达驱动马达输出轴齿轮和第五齿轮传动并带动拱架安装车整体纵向移动。The arch jacking assembly includes a jacking cylinder and a groove-shaped jacking piece connected to the top of the jacking cylinder. The height of the jacking piece is adjusted through the jacking cylinder. The vertical movement frame connected to the bottom of the two parallel support frames, the traveling wheel of the assembly vehicle installed at the bottom of the longitudinal movement frame, the fixedly connected fifth hydraulic motor and the motor output shaft gear installed on the side of the longitudinal movement frame, and the fixed connection The fifth gear on the running wheel of the assembled vehicle, the running wheel of the assembled vehicle straddles the second longitudinal movement mechanism, the motor output shaft gear meshes with the fifth gear, the fifth hydraulic motor drives the motor output shaft gear and the fifth gear Drive the arch installation vehicle to move longitudinally as a whole.

所述顶架上位于台车前后端的两侧通过伸缩油缸连接有呈“]”型的伸缩节,伸缩节上设置有一组以上的拱架支撑组件,通过伸缩油缸调节伸缩节上的拱架支撑组件与顶架上的拱架支撑组件之间的距离,从而调节每榀拱架的间距;所述支撑架为伸缩式结构,通过连接于纵架和纵移架之间的升降油缸调节支撑架的高度。The top frame is located on both sides of the front and rear ends of the trolley and is connected with "]"-shaped expansion joints through telescopic oil cylinders. There are more than one set of arch support components on the expansion joints, and the arch support on the expansion joints is adjusted by the telescopic oil cylinders. The distance between the component and the arch support component on the top frame, thereby adjusting the spacing of each arch; the support frame is a telescopic structure, and the support frame is adjusted through the lifting cylinder connected between the longitudinal frame and the longitudinal frame the height of.

所述第二纵移机构包括呈工字型的运输车轨道、跨坐于运输车轨道上的运输车支座、安装于运输车支座底部的运输车走行轮、位于工作臂支座上的固定连接的第二液压马达和马达输出轴齿轮以及固定连接于运输车走行轮上的第二齿轮,运输车支座与拱架运输车固定连接,马达输出轴齿轮和第二齿轮啮合,第二液压马达驱动马达输出轴齿轮和第二齿轮传动并带动拱架运输车整体纵向移动,运输车轨道连接于上台架上且运输车轨道的长度与上台架的长度一致;所述拱架运输车包括伸缩式结构的立柱以及连接于立柱顶部的拱架加紧装置,其中立柱通过升降油缸调节高度。The second longitudinal movement mechanism includes an I-shaped transport vehicle track, a transport vehicle support straddling the transport vehicle track, a transport vehicle running wheel installed at the bottom of the transport vehicle support, and a wheel located on the working arm support. The fixedly connected second hydraulic motor and the motor output shaft gear and the second gear fixedly connected to the traveling wheel of the transport vehicle, the support of the transport vehicle and the arch transport vehicle are fixedly connected, the motor output shaft gear meshes with the second gear, and the second The hydraulic motor drives the motor output shaft gear and the second gear transmission and drives the arch transport vehicle to move longitudinally as a whole. The transport vehicle track is connected to the upper platform and the length of the transport vehicle track is consistent with the length of the upper platform; the arch transport The car includes a telescopic column and an arch tightening device connected to the top of the column, wherein the height of the column is adjusted through a lifting cylinder.

所述上支架和下支架均为伸缩结构且均分布连接有升降油缸,使上台架和下台架的高度随升降油缸调节。Both the upper bracket and the lower bracket are telescopic structures and are evenly connected with lifting cylinders, so that the height of the upper platform and the lower platform can be adjusted with the lifting cylinders.

所述拱架支撑杆通过销轴连接有斜撑杆,便于拱架支撑杆的放平和立起。The arch support rod is connected with a diagonal strut through a pin shaft, which is convenient for laying down and erecting the arch support rod.

所述第三纵移机构包括连接固定于下顶板上的台架轨道、连接固定于上支架底部的且安装于台架轨道内的台架支座、第三托轮、第三托轨、安装于台架支座两侧的靠近台车后端的第三滑轮、连接于台架支座底部的第三齿条以及连接于上支架上的固定连接的第三液压马达和第三齿轮,其中台架轨道为由两条截面呈“[”型的钢轨拼装的沟槽式结构,所述第三齿轮与第三齿条啮合,通过第三液压马达驱动齿轮齿条传动,使台架支座和上台架整体在台架轨道上移动,所述第三托轨连接于台架支座的底部并与第三齿条平行设置,第三托轮跨坐于第三托轨上并连接固定于靠近台车前端的上支架上,避免台架支座在纵移时脱离台架轨道,台架轨道的长度与台架的长度一致。The third longitudinal movement mechanism includes a platform track connected and fixed on the lower top plate, a platform support connected and fixed on the bottom of the upper bracket and installed in the platform track, a third supporting wheel, a third supporting rail, and a mounting bracket. The third pulley near the rear end of the trolley on both sides of the platform support, the third rack connected to the bottom of the platform support, and the fixedly connected third hydraulic motor and third gear connected to the upper support. The rack track is a grooved structure assembled by two steel rails with a “[” shape in cross-section. The third gear meshes with the third rack and is driven by the third hydraulic motor to drive the rack and pinion to make the rack support and The upper platform moves on the platform track as a whole, the third support rail is connected to the bottom of the platform support and arranged in parallel with the third rack, the third support wheel straddles the third support rail and is connected and fixed on the On the upper bracket close to the front end of the trolley, prevent the stand support from deviating from the stand track when moving vertically, and the length of the stand track is consistent with the length of the stand.

所述工作臂设置有两个,均正置安装于上顶板的上表面;所述工作臂包括机架、回转组件、变幅组件、基础臂架和伸缩臂架,其中机架与上顶板连接,基础臂架通过回转组件与机架连接并在回转组件的带动下沿横向往返移动,伸缩臂架通过变幅组件与基础臂架连接并在变幅组件的带动下沿竖直方向往返移动,伸缩臂架内安装有伸缩油缸并在伸缩油缸的带动下沿纵向往返移动,使工作臂在三个自由度方向工作。There are two working arms, both of which are installed upright on the upper surface of the upper roof; the working arm includes a frame, a slewing assembly, a luffing assembly, a basic arm frame and a telescopic arm frame, wherein the frame is connected to the upper roof , the basic boom is connected to the frame through the rotary assembly and is driven by the rotary assembly to move back and forth in the horizontal direction; the telescopic boom is connected to the basic boom through the luffing assembly and is driven to and fro in the vertical direction by the luffing assembly. A telescopic oil cylinder is installed in the telescopic arm frame and is driven by the telescopic oil cylinder to move back and forth longitudinally, so that the working arm works in three directions of freedom.

所述工作平台的一侧连接设置有悬挂架且工作平台通过悬挂架与台架连接,所述悬挂架通过第四纵移机构悬挂连接于台架的两侧,使工作平台沿台架纵向移动,所述第四纵移机构包括连接于台架侧面的平台轨道、安装于平台轨道内的第四齿条、分布连接于悬挂架上且卡置于平台轨道内的悬挂盘、位于悬挂架上的固定连接的第四液压马达和第四齿轮,所述平台轨道为凹槽式结构,平台轨道平行设置有两个,悬挂盘在对应位置平行分布有两排,所述第四齿轮与第四齿条啮合,通过第四液压马达驱动齿轮齿条传动,使悬挂架在平台轨道上移动,从而使工作平台沿台架移动;工作平台上通过横移油缸连接设置有伸缩平台,伸缩平台在横移油缸的带动下沿工作平台上远离台架的一侧横向移动,伸缩平台位于工作平台的前端,所述工作平台的后端设置有架梯,便于施工人员上下台车。One side of the working platform is connected with a suspension frame and the working platform is connected to the platform through the suspension frame, and the suspension frame is suspended and connected to both sides of the platform through the fourth longitudinal movement mechanism, so that the working platform moves longitudinally along the platform , the fourth vertical movement mechanism includes a platform track connected to the side of the platform, a fourth rack installed in the platform track, a suspension plate connected to the suspension frame and clamped in the platform track, located on the suspension frame The fourth hydraulic motor and the fourth gear are fixedly connected, the platform track is a groove structure, two platform tracks are arranged in parallel, and two rows of suspension plates are distributed in parallel at the corresponding positions. The gear rack is engaged, and the fourth hydraulic motor drives the rack and pinion transmission, so that the suspension frame moves on the platform track, so that the working platform moves along the platform; Driven by the oil-moving cylinder, it moves laterally along the side of the working platform away from the platform. The telescopic platform is located at the front end of the working platform.

与现有技术相比,本发明提供的用于隧道多功法施工的拱架安装台车具有以下优点:1、本发明所提供拱架安装台车能够实现三榀拱架的快速安装,安装效率较高。2、本发明提供的拱架安装台车能够满足全断面法、二台阶法、三台阶法等多种工法中的拱架安装,适应性强。3、本发明提供的拱架安装台车下方可供出渣车自由出入,实现出渣和拱架安装的平行作业,提高隧道施工效率,降低施工成本。Compared with the prior art, the arch installation trolley provided by the present invention for tunnel multi-function method construction has the following advantages: 1. The arch installation trolley provided by the present invention can realize the rapid installation of three arches, and the installation Higher efficiency. 2. The arch installation trolley provided by the present invention can meet the installation of arches in various construction methods such as the full-section method, the two-step method, and the three-step method, and has strong adaptability. 3. The underside of the arch installation trolley provided by the present invention can freely enter and exit the slag discharging vehicle, realizing the parallel operation of slag discharging and arch installation, improving tunnel construction efficiency and reducing construction cost.

附图说明Description of drawings

图1为本发明提供的用于隧道多功法施工的拱架安装台车的立体结构图;Fig. 1 is the three-dimensional structural diagram of the arch frame installation trolley used for tunnel multi-function method construction provided by the present invention;

图2为本发明中台架和工作平台的结构图;Fig. 2 is the structural diagram of platform and working platform among the present invention;

图3为本发明中第三纵移机构的结构图;Fig. 3 is a structural diagram of the third longitudinal movement mechanism in the present invention;

其中(a)为第三纵移机构的侧视图,(b)(c)(d)均为第三纵移机构的剖面图;Wherein (a) is the side view of the third longitudinal movement mechanism, (b) (c) and (d) are the sectional views of the third longitudinal movement mechanism;

图4为本发明中上台架两侧的工作平台的结构图;Fig. 4 is the structural diagram of the working platform on both sides of the upper platform in the present invention;

图5为本发明中工作臂的结构图;Fig. 5 is the structural diagram of working arm among the present invention;

图6为本发明中悬臂吊、机械手和拱架支撑杆的结构图;Fig. 6 is the structural diagram of cantilever crane, manipulator and arch support bar in the present invention;

其中(a)为悬臂吊,(b)为机械手,(c)为拱架支撑杆;Wherein (a) is a cantilever crane, (b) is a manipulator, and (c) is an arch support rod;

图7为本发明中拱架运输车和第二纵移机构的结构图;Fig. 7 is the structural diagram of the arch transport vehicle and the second longitudinal movement mechanism in the present invention;

图8为本发明中第一纵移机构的结构图;Fig. 8 is a structural diagram of the first longitudinal movement mechanism in the present invention;

其中(a)为第一纵移机构的侧视图,(b)(c)(d)均为第一纵移机构的剖面图;Wherein (a) is the side view of the first longitudinal movement mechanism, and (b), (c) and (d) are the cross-sectional views of the first longitudinal movement mechanism;

图9为本发明中第一纵移机构不同方向的立体图;Fig. 9 is a perspective view of different directions of the first longitudinal movement mechanism in the present invention;

图10为本发明中顶拱拼装车不同方向的立体图;Fig. 10 is a perspective view of different directions of the top arch assembled vehicle in the present invention;

图11为本发明中走行机构的结构图,其中(a)(b)为不同方向的立体图;Figure 11 is a structural diagram of the running mechanism in the present invention, wherein (a) and (b) are perspective views in different directions;

图12为本发明中支撑机构的结构图;Fig. 12 is a structural diagram of a support mechanism in the present invention;

图中:1-台架,101-上台架,1011-上顶板,1012-上支架,102-下台架,1021-下顶板,1022-下支架,103-第三纵移机构,1031-台架轨道,1032-台架支座,1033-第三托轮,1034-第三托轨,1035-第三滑轮,1036-第三齿条,1037-第三液压马达,1038-第三齿轮,104-升降油缸A;Among the figure: 1-stand, 101-upper stand, 1011-upper top plate, 1012-upper support, 102-lower stand, 1021-lower top plate, 1022-lower support, 103-the third longitudinal movement mechanism, 1031- Bench track, 1032-bench support, 1033-third supporting wheel, 1034-third supporting rail, 1035-third pulley, 1036-third rack, 1037-third hydraulic motor, 1038-third gear , 104-lift cylinder A;

20-工作平台,21-悬挂架,22-伸缩平台,23-横移油缸,24-架梯,200-第四纵移机构,201-平台轨道,202-悬挂盘;20-work platform, 21-suspension frame, 22-telescopic platform, 23-transverse oil cylinder, 24-ladder, 200-the fourth longitudinal movement mechanism, 201-platform track, 202-suspension plate;

31-顶拱拼装车,311-车架,3111-顶架,3112-支撑架,3113-纵架,312-拱架顶升组件,3121-顶升油缸,3122-顶升件,313-拼装车纵移组件,3131-纵移架,3132-拼装车走行轮,3133-第五液压马达,314-伸缩节,315-升降油缸B;31-top arch assembly vehicle, 311-frame, 3111-top frame, 3112-support frame, 3113-longitudinal frame, 312-arch frame jacking assembly, 3121-jacking cylinder, 3122-jacking parts, 313-assembly Vehicle longitudinal movement components, 3131-longitudinal movement frame, 3132-assembly car running wheel, 3133-fifth hydraulic motor, 314-expansion joint, 315-lift cylinder B;

32-第一纵移机构,321-固定轨,322-滑轨,323-第一托轮,324-第一托轨,325-第一滑轮,326-第一齿条,327-第一液压马达,328-第一齿轮,329-顶拱拼装车轨道;32-the first longitudinal movement mechanism, 321-fixed rail, 322-sliding rail, 323-the first supporting wheel, 324-the first supporting rail, 325-the first pulley, 326-the first rack, 327-the first hydraulic pressure Motor, 328-first gear, 329-top arch assembly car track;

33-拱架运输车,331-立柱,332-拱架加紧装置,34-第二纵移机构,341-运输车轨道,342-运输车支座,35-悬臂吊,36-机械手;33-arch transport vehicle, 331-column, 332-arch tightening device, 34-second longitudinal movement mechanism, 341-transport vehicle track, 342-transport vehicle support, 35-cantilever crane, 36-manipulator;

37-工作臂,371-机架,372-回转组件,373-变幅组件,374-基础臂架,375-伸缩臂架;37-working arm, 371-frame, 372-slewing assembly, 373-luffing assembly, 374-basic boom, 375-telescopic boom;

38-拱架支撑杆,39-斜撑杆;38-arch support rod, 39-diagonal brace;

4-走行机构,401-转向组件,402-悬挂组件,403-轮胎,404-驱动马达,405-车桥;5-支撑机构,501-连接座,502-支撑油缸,503-支撑座。4-running mechanism, 401-steering assembly, 402-suspension assembly, 403-tire, 404-drive motor, 405-axle; 5-supporting mechanism, 501-connecting seat, 502-supporting cylinder, 503-supporting seat.

具体实施方式Detailed ways

下面结合附图对本发明做详细具体的说明。The present invention will be described in detail below in conjunction with the accompanying drawings.

本发明提供的用于隧道多功法施工的拱架安装台车整体结构如图1所示,包括车体、位于车体上的为台车上各组件提供运行动力的电气液压系统、连接于车体底部的走行机构4和支撑机构5以及拱架安装单元,其中车体包括台架1和工作平台20。The overall structure of the arch installation trolley used in tunnel multi-function construction provided by the present invention is shown in Figure 1, including a car body, an electro-hydraulic system located on the car body that provides operating power for each component on the trolley, connected to The traveling mechanism 4, supporting mechanism 5 and arch installation unit at the bottom of the car body, wherein the car body includes a platform 1 and a working platform 20.

本实施例中,台架1垂直设置有两个,分别为上台架101和下台架102,上台架包括上顶板1011以及连接固定于上顶板下的上支架1012,下台架包括下顶板1021以及连接固定于下顶板下的下支架1022,所述上支架通过第三纵移机构103连接于下顶板上,从而使上台架连接于下台架上并使上台架沿下台架纵向移动;所述上支架和下支架均为伸缩结构且均分布连接有升降油缸A104,使上台架和下台架的高度随升降油缸调节。台架的结构如图2所示,上台架和下台架左右两侧各设置有两个升降油缸。拱架安装台车在施工时,上台架通过纵移机构可向前纵移0~4m,另外,每个台架高度可调0~1m,拱架安装台车整体高度可调0~2m,满足全断面施工的同时能适应台阶法施工。另外下台架的高度通过升降油缸可达3.5m~4.5m(包含走行机构的高度),当钻爆孔完成后,出渣车可从下台架的下方进入开挖面并出渣,实现出渣和拱架安装的平行作业,提高隧道施工效率,降低施工成本。In this embodiment, there are two stands 1 arranged vertically, namely an upper stand 101 and a lower stand 102. The upper stand includes an upper top plate 1011 and an upper bracket 1012 connected and fixed under the upper top plate. The top plate 1021 and the lower support 1022 connected and fixed under the lower top plate, the upper support is connected to the lower top plate through the third longitudinal movement mechanism 103, so that the upper platform is connected to the lower platform and the upper platform is moved along the lower platform. The frame moves longitudinally; the upper frame and the lower frame are all telescopic structures and are evenly distributed and connected with lifting cylinders A104, so that the height of the upper frame and the lower frame can be adjusted with the lifting cylinders. The structure of the stand is shown in Figure 2, and two lift cylinders are respectively arranged on the left and right sides of the upper stand and the lower stand. During the construction of the arch installation trolley, the upper platform can move forward longitudinally by 0-4m through the longitudinal movement mechanism. In addition, the height of each platform can be adjusted by 0-1m, and the overall height of the arch installation trolley can be adjusted by 0-2m. , to meet the full-section construction and adapt to the step method construction. In addition, the height of the lower platform can reach 3.5m to 4.5m (including the height of the traveling mechanism) through the lifting cylinder. After the drilling and blasting holes are completed, the slag discharge vehicle can enter the excavation surface from the bottom of the lower platform and discharge slag, realizing The parallel operation of slag discharge and arch installation improves tunnel construction efficiency and reduces construction costs.

第三纵移机构103包括连接固定于下顶板上的台架轨道1031、连接固定于上支架底部的且安装于台架轨道内的台架支座1032、第三托轮1033、第三托轨1034、安装于台架支座两侧的靠近台车后端的第三滑轮1035、连接于台架支座底部的第三齿条1036以及连接于上支架上的固定连接的第三液压马达1037和第三齿轮1038,其中台架轨道为由两条截面呈“[”型的钢轨拼装的沟槽式结构,所述第三齿轮与第三齿条啮合,通过第三液压马达驱动齿轮齿条传动,使台架支座和上台架整体在台架轨道上移动,第三纵移机构的结构如图3所示,所述第三托轨连接于台架支座的底部并与第三齿条平行设置,第三托轮跨坐于第三托轨上并连接固定于靠近台车前端的上支架上,避免台架支座在纵移时脱离台架轨道,台架轨道的长度与台架的长度一致。The third vertical movement mechanism 103 includes a platform rail 1031 connected and fixed on the lower top plate, a platform support 1032 connected and fixed on the bottom of the upper support and installed in the platform track, a third supporting wheel 1033, and a third supporting rail. 1034, the third pulley 1035 near the rear end of the trolley installed on both sides of the platform support, the third rack 1036 connected to the bottom of the platform support and the fixedly connected third hydraulic motor 1037 connected to the upper support and The third gear 1038, wherein the platform track is a grooved structure assembled by two rails with a “[” shape in section, the third gear meshes with the third rack, and is driven by the third hydraulic motor to drive the rack and pinion , so that the platform support and the upper platform move on the platform track as a whole, the structure of the third longitudinal movement mechanism is shown in Figure 3, and the third support rail is connected to the bottom of the platform support and connected with the third tooth The third supporting wheel straddles the third supporting rail and is connected and fixed on the upper bracket near the front end of the trolley, so as to prevent the platform support from detaching from the platform track during longitudinal movement. The length of the platform track is the same as that of the platform. The racks are the same length.

工作平台20悬挂连接于台架的两侧,具体地,所述工作平台的一侧连接设置有悬挂架21且工作平台通过悬挂架与台架连接,工作平台结构如图2和图4所示;所述悬挂架通过第四纵移机构200悬挂连接于台架的两侧,使工作平台沿台架纵向移动,所述第四纵移机构包括连接于台架侧面的平台轨道201、安装于平台轨道内的第四齿条、分布连接于悬挂架上且卡置于平台轨道内的悬挂盘202、位于悬挂架上的固定连接的第四液压马达和第四齿轮,所述平台轨道为凹槽式结构,平台轨道平行设置有两个,悬挂盘在对应位置平行分布有两排,所述第四齿轮与第四齿条啮合,通过第四液压马达驱动齿轮齿条传动,使悬挂架在平台轨道上移动,从而使工作平台沿台架移动;上台架两侧的工作平台均设置有两层,下台架两侧的工作平台均设置有一层;工作平台上通过横移油缸连接设置有伸缩平台,伸缩平台22在横移油缸23的带动下沿工作平台上远离台架的一侧横向移动,伸缩平台位于工作平台的前端,本实施例中工作平台整体纵移距离为0~4m,同时伸缩平台设置有4m,横移距离为0~4m,以满足不同隧道施工方法的装药作业。所述工作平台的后端设置有架梯24,便于施工人员上下台车。The working platform 20 is suspended and connected to both sides of the platform. Specifically, one side of the working platform is connected with a suspension frame 21 and the working platform is connected to the platform through the suspension frame. The structure of the working platform is shown in Figure 2 and Figure 4 The suspension frame is suspended and connected to both sides of the platform through the fourth longitudinal movement mechanism 200, so that the working platform moves longitudinally along the platform, and the fourth longitudinal movement mechanism includes a platform track 201 connected to the side of the platform, installed on The fourth rack in the platform track, the suspension plate 202 connected to the suspension frame and clamped in the platform track, the fourth hydraulic motor and the fourth gear fixedly connected on the suspension frame, the platform track is a concave Groove structure, two platform rails are arranged in parallel, and two rows of suspension plates are distributed in parallel at corresponding positions. The platform moves on the track, so that the working platform moves along the platform; the working platforms on both sides of the upper platform are equipped with two layers, and the working platforms on both sides of the lower platform are equipped with one layer; the working platform is connected by a transverse cylinder. There is a telescopic platform, and the telescopic platform 22 is driven by the lateral movement cylinder 23 to move laterally along the side of the working platform away from the stand. The telescopic platform is located at the front end of the working platform. At the same time, the telescopic platform is set to 4m, and the traverse distance is 0-4m, so as to meet the charging operation of different tunnel construction methods. The rear end of the working platform is provided with a ladder 24, which is convenient for construction personnel to get on and off the trolley.

拱架安装单元包括用于多榀顶拱预拼装的顶拱拼装车31、拱架运输车33、悬臂吊35、第一纵移机构32、第二纵移机构34、机械手36、工作臂37和拱架支撑杆38,其中工作臂设置有两个,均正置安装固定于台架的前端并位于上顶板的上表面,工作臂的位置如图1所示,所述工作臂包括机架371、回转组件372、变幅组件373、基础臂架374和伸缩臂架375,其中机架与上顶板连接,基础臂架通过回转组件与机架连接并在回转组件的带动下沿横向往返移动,伸缩臂架通过变幅组件与基础臂架连接并在变幅组件的带动下沿竖直方向往返移动,伸缩臂架内安装有伸缩油缸并在伸缩油缸的带动下沿纵向往返移动,使工作臂在三个自由度方向工作,工作臂的结构如图5所示。拱架安装时,在工作臂上连接抓取手工作属具,这样工作臂配合人工将侧拱依次抓取至大致位置,靠在隧道边墙上。The arch installation unit includes an arch assembly vehicle 31 for pre-assembly of multiple arches, an arch transport vehicle 33, a cantilever crane 35, a first longitudinal movement mechanism 32, a second longitudinal movement mechanism 34, a manipulator 36, and a working arm 37 And arch support bar 38, wherein working arm is provided with two, all upright installation is fixed on the front end of stand and is positioned at the upper surface of upper top plate, and the position of working arm is as shown in Figure 1, and described working arm comprises frame 371. Swivel assembly 372, luffing assembly 373, basic arm frame 374 and telescopic arm frame 375, wherein the frame is connected to the upper top plate, and the basic arm frame is connected to the frame through the rotary assembly and driven by the rotary assembly to move back and forth laterally , the telescopic boom is connected with the basic boom through the luffing assembly and moves back and forth in the vertical direction under the drive of the luffing assembly. A telescopic oil cylinder is installed in the telescopic boom and moves back and forth longitudinally under the drive of the telescopic oil cylinder to make the work The arm works in the direction of three degrees of freedom, and the structure of the working arm is shown in Figure 5. When the arch frame is installed, the grabbing hand attachment is connected to the working arm, so that the working arm cooperates with the manual to grab the side arches to the approximate position in turn and lean against the side wall of the tunnel.

机械手和拱架支撑杆均安装固定于上台架两侧的工作平台的伸缩平台上且均位于伸缩平台的前端,拱架支撑杆位于上层伸缩平台上,机械手位于下层工作平台上。机械手具有三个自由度,可以实现侧拱的抓取、托举等辅助安装动作,代替人工实现侧拱与顶拱的对孔、调整等工作,有效节省人力,提高工作效率。拱架支撑杆通过销轴连接有斜撑杆39,拱架安装时,装上销轴,将拱架支撑杆立起,拱架安装完成后,拔下销轴,把拱架支撑杆放平,方便工人通行及作业,在顶拱与侧拱对孔连接时,拱架支撑杆用于支撑顶拱。悬臂吊设置于上台架的后端,悬臂吊用于顶拱的起吊,本实施例中,悬臂吊配置1t电动葫芦。拱架安装单元在上台架和工作平台上的安装位置见图1,悬臂吊、机械手和拱架支撑杆的结构如图6所示。The manipulator and the arch support bar are all installed and fixed on the telescopic platform of the work platform on both sides of the upper frame and are all positioned at the front end of the telescopic platform, the arch support bar is located on the upper telescopic platform, and the manipulator is located on the lower work platform. The manipulator has three degrees of freedom, which can realize auxiliary installation actions such as grasping and lifting of the side arch, instead of manually realizing the alignment and adjustment of the side arch and the top arch, effectively saving manpower and improving work efficiency. The arch support bar is connected with the inclined brace bar 39 by the pin shaft, when the arch frame is installed, load onto the pin shaft, the arch support bar is erected, after the arch frame installation is completed, pull out the pin shaft, and the arch support bar is laid flat , It is convenient for workers to pass and work. When the top arch and the side arch are connected to the holes, the arch support rod is used to support the top arch. The cantilever crane is arranged at the rear end of the upper platform, and the cantilever crane is used for hoisting the top arch. In this embodiment, the cantilever crane is equipped with a 1t electric hoist. The installation position of the arch installation unit on the upper frame and the working platform is shown in Figure 1, and the structure of the cantilever crane, manipulator and arch support rod is shown in Figure 6.

第一纵移机构和第二纵移机构均安装于上台架上并沿台车方向平行设置,且第二纵移机构位于上台架上的外侧,第一纵移机构位于上台架上的内侧,顶拱拼装车的左右两端均安装在第一纵移机构上并通过第一纵移机构纵向移动,拱架运输车安装在第二纵移机构上并通过第二纵移机构纵向移动,本实施例中,第二纵移机构34包括呈工字型的运输车轨道341、跨坐于运输车轨道上的运输车支座342、安装于运输车支座底部的运输车走行轮、位于工作臂支座上的固定连接的第二液压马达和马达输出轴齿轮以及固定连接于运输车走行轮上的第二齿轮,运输车支座与拱架运输车固定连接,马达输出轴齿轮和第二齿轮啮合,第二液压马达驱动马达输出轴齿轮和第二齿轮传动并带动拱架运输车整体纵向移动,运输车轨道连接于上台架上且运输车轨道的长度与上台架的长度一致。所述拱架运输车33包括伸缩式结构的立柱331以及连接于立柱顶部的拱架加紧装置332,其中立柱通过升降油缸调节高度。悬臂吊将起吊的顶拱放置于拱架运输车上,由拱架运输车纵移到顶拱拼装车对应位置后,将拱架运输车的高度调低,从而将顶拱放置于顶拱拼装车上,拱架运输车和第二纵移机构的结构如图7所示。Both the first longitudinal movement mechanism and the second longitudinal movement mechanism are installed on the upper platform and arranged in parallel along the trolley direction, and the second longitudinal movement mechanism is located outside the upper platform, and the first longitudinal movement mechanism is located on the upper platform The inner side of the top arch assembly vehicle is installed on the first longitudinal movement mechanism and moves longitudinally through the first longitudinal movement mechanism, and the arch transport vehicle is installed on the second longitudinal movement mechanism and moves longitudinally through the second longitudinal movement mechanism. To move, in this embodiment, the second longitudinal movement mechanism 34 includes an I-shaped transport vehicle track 341, a transport vehicle support 342 straddling the transport vehicle track, and transport vehicle running wheels installed at the bottom of the transport vehicle support. , the fixedly connected second hydraulic motor and motor output shaft gear on the working arm support and the second gear fixedly connected to the traveling wheel of the transport vehicle, the transport vehicle support is fixedly connected with the arch transport vehicle, and the motor output shaft gear Mesh with the second gear, the second hydraulic motor drives the output shaft gear of the motor and the second gear to drive the arch transport vehicle to move longitudinally as a whole, the transport vehicle track is connected to the upper platform and the length of the transport vehicle track is the same as that of the upper platform Same length. The arch transport vehicle 33 includes a telescopic column 331 and an arch tightening device 332 connected to the top of the column, wherein the height of the column is adjusted by a lifting cylinder. The cantilever crane places the hoisted top arch on the arch transport vehicle, and after the arch transport vehicle longitudinally moves to the corresponding position of the top arch assembly vehicle, the height of the arch transport vehicle is lowered, so that the top arch is placed on the top arch assembly vehicle Above, the structure of the arch transport vehicle and the second longitudinal movement mechanism is shown in Figure 7.

所述第一纵移机构32为双重纵移结构,能够实现滑轨和顶拱拼装车整体在上台架上移动,还能够实现顶拱拼装车在滑轨上移动。第一纵移机构包括连接固定于上台架上表面的固定轨321、安装于固定轨内的滑轨322、第一托轮323、第一托轨324、安装于滑轨两侧的靠近台车后端的第一滑轮325、连接于滑轨底部的第一齿条326以及连接于上支架上的固定连接的第一液压马达327和第一齿轮328,其中固定轨为由两条截面呈“[”型的钢轨拼装的沟槽式结构,所述第一齿轮与第一齿条啮合,通过第一液压马达驱动齿轮齿条传动,使滑轨在固定轨上移动,所述第一托轨连接于滑轨的底部并与第一齿条平行设置,第一托轮跨坐于第一托轨上并连接固定于靠近台车前端的上支架上,避免滑轨在纵移时脱离固定轨;所述滑轨顶部设置有顶拱拼装车轨道329,顶拱拼装车安装于顶拱拼装车轨道上并沿滑轨纵向移动,滑轨和顶拱拼装车轨道的长度与上台架的长度一致,第一纵移机构中滑轨及其它组件的连接结构如图8和图9所示。The first longitudinal movement mechanism 32 is a double longitudinal movement structure, which can realize the overall movement of the slide rail and the top arch assembly vehicle on the upper platform, and can also realize the movement of the top arch assembly vehicle on the slide rail. The first vertical movement mechanism includes a fixed rail 321 connected and fixed on the upper surface of the upper platform, a slide rail 322 installed in the fixed rail, a first support wheel 323, a first support rail 324, and adjacent platforms installed on both sides of the slide rail. The first pulley 325 at the rear end of the car, the first rack 326 connected to the bottom of the slide rail and the fixedly connected first hydraulic motor 327 and the first gear 328 connected to the upper bracket, wherein the fixed rail is composed of two sections in the shape of " [" type rail assembled groove structure, the first gear meshes with the first rack, drives the rack and pinion through the first hydraulic motor, so that the slide rail moves on the fixed rail, and the first support rail Connected to the bottom of the slide rail and set parallel to the first rack, the first support wheel straddles the first support rail and is connected and fixed on the upper bracket near the front end of the trolley to prevent the slide rail from detaching from the fixed rail during longitudinal movement The top of the slide rail is provided with a top arch assembly vehicle track 329, the top arch assembly vehicle is installed on the top arch assembly vehicle track and moves longitudinally along the slide rail, the length of the slide rail and the top arch assembly vehicle track is the same as the length of the upper platform Consistently, the connection structure of the slide rail and other components in the first longitudinal movement mechanism is shown in Figure 8 and Figure 9 .

所述顶拱拼装车31包括整体呈拱形的车架311、拱架顶升组件312以及拼装车纵移组件313,所述车架包括位于顶部的呈矩形的顶架3111、与顶架四角连接的呈半拱形的支撑架3112以及沿台车方向设置的连接于两根平行支撑架之间的纵架3113,三者连接为一体式结构,所述拱架顶升组件呈矩阵分布于顶架上,沿垂直于台车方向分布的拱架顶升组件为一组,拱架顶升组件设置有三组以上,所述顶架上位于台车前后端的两侧通过伸缩油缸连接有呈“]”型的伸缩节314,伸缩节上设置有一组以上的拱架顶升组件,通过伸缩油缸调节伸缩节上的拱架顶升组件与顶架上的拱架顶升组件之间的距离。本实施例中顶架上设置有三组拱架顶升组件,每组拱架顶升组件之间的距离为0.6m,两侧的伸缩节上各设置有一组拱架顶升组件,与顶架上位于中间的拱架顶升组件间用于三榀拱架的安装,在实现顶部三榀拱架的组装及整体立架的同时还能调节每榀拱架之间的距离调节间距为0.6m~1.2m,从而满足不同工况立架需求。所述支撑架为伸缩式结构,通过连接于纵架和纵移架之间的升降油缸B315调节支撑架的高度。拱架顶升组件包括顶升油缸3121以及连接于顶升油缸顶部的呈凹槽型的顶升件3122,通过顶升油缸调节顶升件的高度,所述拼装车纵移组件包括沿台车方向设置的连接于两根平行支撑架底部的纵移架3131、安装于纵移架底部的拼装车走行轮3132、安装于纵移架侧面的固定连接的第五液压马达3133和马达输出轴齿轮以及固定连接于拼装车走行轮上的第五齿轮,拼装车走行轮跨坐于第二纵移机构上,马达输出轴齿轮和第五齿轮啮合,第五液压马达驱动马达输出轴齿轮和第五齿轮传动并带动拱架安装车整体纵向移动,顶拱拼装车的结构如图10所示。The top arch assembly vehicle 31 includes an arched vehicle frame 311 as a whole, an arch lifting assembly 312 and an assembly vehicle longitudinal movement assembly 313, and the vehicle frame includes a rectangular top frame 3111 at the top, and four corners of the top frame. The connected semi-arch support frame 3112 and the vertical frame 3113 connected between the two parallel support frames arranged along the direction of the trolley, the three are connected as an integrated structure, and the arch lifting components are distributed in a matrix On the top frame, there is a group of arch lifting components distributed along the direction perpendicular to the trolley, and there are more than three sets of arch lifting components. The top frame is located on both sides of the front and rear ends of the trolley. ]” type expansion joint 314, the expansion joint is provided with more than one set of arch lifting components, and the distance between the arch lifting components on the expansion joint and the arch lifting components on the top frame is adjusted through the telescopic oil cylinder. In this embodiment, three sets of arch lifting assemblies are arranged on the top frame, the distance between each group of arch lifting assemblies is 0.6m, and a set of arch lifting assemblies are respectively arranged on the telescopic joints on both sides, which are connected with the top frame. The upper and middle arch lifting components are used for the installation of the three arches. While realizing the assembly of the top three arches and the overall erection, the distance between each arch can be adjusted to 0.6m. ~1.2m, so as to meet the requirements of different working conditions. The support frame is a telescopic structure, and the height of the support frame is adjusted through the lifting cylinder B315 connected between the longitudinal frame and the longitudinal shift frame. The arch jacking assembly includes a jacking cylinder 3121 and a groove-shaped jacking piece 3122 connected to the top of the jacking cylinder. The height of the jacking piece is adjusted through the jacking cylinder. The vertical movement frame 3131 connected to the bottom of the two parallel support frames, the assembly vehicle running wheel 3132 installed at the bottom of the longitudinal movement frame, the fixedly connected fifth hydraulic motor 3133 and the motor output shaft gear installed on the side of the longitudinal movement frame And the fifth gear fixedly connected to the traveling wheel of the assembled vehicle, the traveling wheel of the assembled vehicle straddles the second longitudinal movement mechanism, the motor output shaft gear meshes with the fifth gear, and the fifth hydraulic motor drives the motor output shaft gear and the fifth gear. The gear drives and drives the arch installation vehicle to move longitudinally as a whole, and the structure of the top arch assembly vehicle is shown in Figure 10.

本发明中走行机构4为轮胎式或履带式结构,本实施例中走行机构为轮胎式结构,见图11,走行机构包括转向组件401、悬挂组件402、轮胎403、驱动马达404和车桥405,转向组件通过驱动马达回转支承,可实现整个台车纵移、横移和转向等功能,悬挂组件通过悬挂油缸自动调节,保证轮胎受力均衡,可适应不平的路面。另外走行机构还可根据需要选配履带式的结构,履带式走行机构的负重能力和爬坡能力更强。支撑机构5包括连接座501、支撑油缸502和支撑座503组成,台车工作时支撑地面、稳定台车,本实施例中支撑座的结构如图12所示。In the present invention, the running mechanism 4 is a tire-type or crawler-type structure. In this embodiment, the running mechanism is a tire-type structure, as shown in FIG. , The steering component can realize the functions of vertical movement, lateral movement and steering of the whole trolley through the slewing support of the driving motor. The suspension component can be automatically adjusted through the suspension cylinder to ensure that the tires are evenly stressed and can adapt to uneven road surfaces. In addition, the running mechanism can also be equipped with a crawler structure according to needs, and the crawler running mechanism has stronger load capacity and climbing ability. The supporting mechanism 5 includes a connecting seat 501, a supporting oil cylinder 502 and a supporting seat 503. When the trolley is working, it supports the ground and stabilizes the trolley. The structure of the supporting seat in this embodiment is shown in FIG. 12 .

本发明提供的用于隧道施工的拱架安装台车进行拱架安装作业的步骤为:台车后端的悬臂吊将一榀顶拱吊放于台车上两侧的拱架运输车上,两个拱架运输车通过第二纵移机构同步移动并将顶拱驮运至与顶拱拼装车上的一组拱架顶升组件处于同一条直线上的位置处,将拱架运输车的高度调低,从而使顶拱放置于一组拱架顶升组件上,拱架运输车再次移动到台车后端,并循环上述操作直至顶拱拼装车放置有三榀拱架,每榀拱架之间的距离通过伸缩节进行调节。在隧道施工中出渣作业完成后,将台车移动至拱架安装位置并通过连接有抓取手工作属具的工作臂将侧拱抓取至边墙,顶拱拼装车通过第一纵移机构移动至与拱架支撑杆同一条直线上,调节顶拱拼装车的高度,使其中一榀顶拱放置于拱架支撑杆上,再通过机械手抓取一榀侧拱,并调整侧拱与顶拱的位置项对应,侧拱和顶拱对接完成后,通过人工进行拱架以及网片焊接,从而完成拱架安装作业。通过第三纵移机构以及双重纵移结构的第一纵移结构,能够满足全断面法和台阶法对拱架安装距离的要求,其中台阶法中,双重纵移结构的第一纵移结构能够实现台车整体位于施工面前,而顶拱拼装车可以直接纵移到上台阶上,从而实现上台阶上拱架的安装。另外顶拱拼装车通过伸缩式结构的支撑架以及拱架顶升组件可以实现拱架安装的高度调节,从而使顶拱拼装车能够满足不同高度台阶法的拱架安装施工,适用性强。The steps of the arch installation trolley for tunnel construction provided by the present invention are as follows: the cantilever crane at the rear end of the trolley hangs a top arch on the arch transport vehicles on both sides of the trolley, and the two The two arch transport vehicles move synchronously through the second longitudinal movement mechanism and transport the top arch to the position on the same straight line as a group of arch lifting components on the top arch assembly vehicle, and the height of the arch transport vehicle Turn down, so that the top arch is placed on a set of arch lifting components, the arch transport vehicle moves to the rear end of the trolley again, and repeat the above operation until the top arch assembly vehicle is placed with three arches. The distance between them is adjusted by telescopic joints. After the slag discharge operation in the tunnel construction is completed, move the trolley to the installation position of the arch frame and grab the side arch to the side wall through the working arm connected with the grabbing hand work attachment, and the top arch assembly vehicle passes through the first longitudinal movement The mechanism moves to the same straight line as the arch support rod, adjusts the height of the top arch assembly vehicle so that one of the top arches is placed on the arch support rod, and then grabs a side arch by the manipulator, and adjusts the alignment between the side arch and the arch support rod. The position of the top arch corresponds to the item. After the butt joint of the side arch and the top arch is completed, the arch frame and the mesh are welded manually to complete the installation of the arch frame. The third longitudinal movement mechanism and the first longitudinal movement structure of the double longitudinal movement structure can meet the requirements of the full-section method and the step method for the installation distance of the arch. In the step method, the first longitudinal movement structure of the double longitudinal movement structure can The trolley is placed in front of the construction as a whole, and the top arch assembly vehicle can be directly moved vertically to the upper step, so as to realize the installation of the upper arch on the upper step. In addition, the top arch assembly vehicle can realize the height adjustment of the arch installation through the telescopic structure support frame and the arch lifting component, so that the top arch assembly vehicle can meet the installation and construction of the arch frame with different height steps, and has strong applicability.

Claims (10)

1. An arch centering installation trolley for tunnel multi-work construction at least comprises a trolley body, an electric hydraulic system, a running mechanism and a supporting mechanism, wherein the electric hydraulic system is positioned on the trolley body and is used for providing running power for all components on the trolley body, and the running mechanism and the supporting mechanism are connected to the bottom of the trolley body, and the arch centering installation trolley is characterized in that: the vehicle body comprises two racks and a working platform, wherein the two racks are vertically arranged and are an upper rack and a lower rack respectively, the upper rack comprises an upper top plate and an upper bracket fixedly connected with the lower part of the upper top plate, the lower rack comprises a lower top plate and a lower bracket fixedly connected with the lower part of the lower top plate, the upper bracket is connected with the lower top plate through a third longitudinal moving mechanism, so that the upper rack is connected with the lower rack and longitudinally moves along the lower rack, and the working platform is connected with two sides of the racks in a hanging manner; the utility model provides a car body is last to be provided with the bow member installation unit, the bow member installation unit is including being used for the roof arch of many roof archs to assemble in advance roof arch assembly car, bow member transport vechicle, cantilever crane, first longitudinal movement mechanism, second longitudinal movement mechanism, manipulator, work arm and bow member bracing piece, first longitudinal movement mechanism and second longitudinal movement mechanism all install on the rack and along platform truck direction parallel arrangement, and the second longitudinal movement mechanism is located the outside on the rack, first longitudinal movement mechanism is located the inboard on the rack, the left and right sides both ends of roof arch assembly car all install on first longitudinal movement mechanism and through first longitudinal movement mechanism longitudinal movement, roof arch assembly car is including wholly being arched frame, bow member jack-up subassembly and the assembly car longitudinal movement subassembly, the frame is including being rectangle roof frame, the support frame that is half arch shape that is connected with the roof frame four corners and the connection between two parallel support frames that set up along the platform truck direction, the bow member jack-up subassembly is matrix and is arranged in the frame that the vertical movement mechanism is arranged in the platform truck, and the bow member is arranged in the vertical movement assembly of the frame, the manipulator is arranged in the vertical movement assembly of the frame, the platform truck is arranged in the vertical movement assembly is arranged in the vertical movement platform frame, and the vertical movement assembly is arranged in the vertical movement assembly of the frame, and the platform truck is arranged in front of the vertical movement assembly of the frame.
2. An arch centering and mounting trolley for multiple-job-practice tunnel according to claim 1, wherein: the first longitudinal moving mechanism is of a double longitudinal moving structure and comprises a fixed rail connected and fixed on the upper surface of the upper rack, a sliding rail arranged in the fixed rail, a first riding wheel, a first pulley arranged on two sides of the sliding rail and close to the rear end of the trolley, a first rack connected to the bottom of the sliding rail, and a first hydraulic motor and a first gear fixedly connected to the upper bracket, wherein the fixed rail is of a groove structure formed by assembling two steel rails with cross sections, the first gear is meshed with the first rack, the first hydraulic motor drives the gear rack to drive the sliding rail to move on the fixed rail, the first riding wheel is connected to the bottom of the sliding rail and is arranged in parallel with the first rack, and the first riding wheel straddles the first riding wheel and is connected and fixed on the upper bracket close to the front end of the trolley, so that the sliding rail is prevented from being separated from the fixed rail during longitudinal movement; the top of the sliding rail is provided with a top-arch assembling car rail, the top-arch assembling car is arranged on the top-arch assembling car rail and longitudinally moves along the sliding rail, and the lengths of the sliding rail and the top-arch assembling car rail are consistent with the length of the upper rack.
3. An arch centering and mounting trolley for multiple-job-practice tunnel according to claim 1, wherein: the arch centering jacking assembly comprises a jacking oil cylinder and a groove-shaped jacking piece connected to the top of the jacking oil cylinder, the height of the jacking piece is adjusted through the jacking oil cylinder, the assembly vehicle longitudinal moving assembly comprises a longitudinal moving frame, a assembly vehicle traveling wheel, a fifth hydraulic motor, a motor output shaft gear and a fifth gear, the longitudinal moving frame is arranged along the direction of a trolley, the longitudinal moving frame is connected to the bottoms of two parallel supporting frames, the assembly vehicle traveling wheel is arranged at the bottoms of the longitudinal moving frames, the fifth hydraulic motor is fixedly connected to the side face of the longitudinal moving frame, the fifth gear is fixedly connected to the assembly vehicle traveling wheel, the assembly vehicle traveling wheel is straddled on a second longitudinal moving mechanism, the motor output shaft gear is meshed with the fifth gear, and the fifth hydraulic motor drives the motor output shaft gear and the fifth gear to drive the arch centering installation vehicle to integrally longitudinally move.
4. An arch centering and mounting trolley for multiple-job-practice tunnel according to claim 1, wherein: expansion joints which are in a shape of a section are connected to the two sides of the front end and the rear end of the trolley through telescopic cylinders, more than one group of arch frame jacking assemblies are arranged on the expansion joints, and the distance between the arch frame jacking assemblies on the expansion joints and the arch frame jacking assemblies on the top frames is adjusted through the telescopic cylinders, so that the distance between each arch frame is adjusted; the support frame is telescopic structure, and the height of support frame is adjusted through the lift cylinder who connects between longitudinal frame and longitudinal frame.
5. An arch centering and mounting trolley for multiple-job-practice tunnel according to claim 1, wherein: the second longitudinal moving mechanism comprises an I-shaped carrier rail, a carrier support saddle straddling the carrier rail, a carrier travelling wheel arranged at the bottom of the carrier support saddle, a second hydraulic motor and a motor output shaft gear which are fixedly connected and positioned on the working arm support saddle, and a second gear which is fixedly connected on the carrier travelling wheel, wherein the carrier support saddle is fixedly connected with the arch carrier, the motor output shaft gear is meshed with the second gear, the second hydraulic motor drives the motor output shaft gear and the second gear to drive the arch carrier to integrally and longitudinally move, the carrier rail is connected on the upper rack, and the length of the carrier rail is consistent with that of the upper rack; the arch frame transport vehicle comprises an upright post with a telescopic structure and an arch frame clamping device connected to the top of the upright post, wherein the height of the upright post is adjusted through a lifting oil cylinder.
6. An arch centering and mounting trolley for multiple-job-practice tunnel according to claim 1, wherein: the upper support and the lower support are of telescopic structures and are connected with lifting cylinders in a uniformly distributed mode, so that the heights of the upper rack and the lower rack are adjusted along with the lifting cylinders.
7. An arch centering and mounting trolley for multiple-job-practice tunnel according to claim 1, wherein: the arch support rod is connected with an inclined strut through a pin shaft, so that the arch support rod can be conveniently laid flat and erected.
8. An arch centering and mounting trolley for multiple-job-practice tunnel according to claim 1, wherein: the third longitudinal moving mechanism comprises a rack rail connected and fixed on the lower top plate, a rack support, a third supporting wheel, a third supporting rail, a third pulley, a third rack, a third hydraulic motor and a third gear, wherein the rack support is connected and fixed on the bottom of the upper support, the rack support is installed in the rack rail, the third supporting wheel is installed in the rack rail, the third pulley is installed on two sides of the rack support and close to the rear end of the trolley, the third rack is connected to the bottom of the rack support, the third hydraulic motor is connected to the upper support and fixedly connected with the third gear, the rack rail is of a groove structure assembled by two steel rails with cross sections of being "[", the third gear is meshed with the third rack, the rack support and the upper rack are driven by the third hydraulic motor to move integrally on the rack rail, the third supporting rail is connected to the bottom of the rack support and is parallel to the third rack, the third supporting wheel is straddled on the third supporting rail and is connected and fixed on the upper support close to the front end of the trolley, the rack rail is prevented from being separated from the rack rail when the rack support is longitudinally moved, and the length of the rack rail is consistent with the rack rail.
9. An arch centering and mounting trolley for multiple-job-practice tunnel according to claim 1, wherein: the two working arms are arranged and are both arranged on the upper surface of the upper top plate in a positive way; the working arm comprises a frame, a rotation component, a luffing component, a basic arm support and a telescopic arm support, wherein the frame is connected with the upper top plate, the basic arm support is connected with the frame through the rotation component and moves back and forth along the transverse direction under the drive of the rotation component, the telescopic arm support is connected with the basic arm support through the luffing component and moves back and forth along the vertical direction under the drive of the luffing component, and a telescopic oil cylinder is arranged in the telescopic arm support and moves back and forth along the longitudinal direction under the drive of the telescopic oil cylinder, so that the working arm works in the three-degree-of-freedom direction.
10. An arch centering and mounting trolley for multiple-job-practice tunnel according to claim 1, wherein: the working platform is characterized in that one side of the working platform is connected with a hanging frame, the working platform is connected with a rack through the hanging frame, the hanging frame is connected to two sides of the rack through a fourth longitudinal moving mechanism in a hanging manner, the working platform longitudinally moves along the rack, the fourth longitudinal moving mechanism comprises a platform rail connected to the side face of the rack, a fourth rack installed in the platform rail, a hanging disc which is connected to the hanging frame in a distributed manner and is clamped in the platform rail, a fourth hydraulic motor and a fourth gear which are fixedly connected and positioned on the hanging frame, the platform rail is of a groove structure, two parallel arranged platform rails are arranged, two rows of hanging discs are distributed in parallel at corresponding positions, and the fourth gear is meshed with the fourth rack and is driven by the fourth hydraulic motor to move on the platform rail, so that the working platform moves along the rack; the telescopic platform is arranged on the working platform in a connecting mode through the transverse moving oil cylinder, and is driven by the transverse moving oil cylinder to transversely move along one side, far away from the rack, of the working platform, the telescopic platform is located at the front end of the working platform, a frame ladder is arranged at the rear end of the working platform, and workers can conveniently go up and down the trolley.
CN202110714057.8A 2021-06-25 2021-06-25 An arch installation trolley for tunnel multi-function construction Active CN113530575B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110714057.8A CN113530575B (en) 2021-06-25 2021-06-25 An arch installation trolley for tunnel multi-function construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110714057.8A CN113530575B (en) 2021-06-25 2021-06-25 An arch installation trolley for tunnel multi-function construction

Publications (2)

Publication Number Publication Date
CN113530575A CN113530575A (en) 2021-10-22
CN113530575B true CN113530575B (en) 2023-07-18

Family

ID=78096879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110714057.8A Active CN113530575B (en) 2021-06-25 2021-06-25 An arch installation trolley for tunnel multi-function construction

Country Status (1)

Country Link
CN (1) CN113530575B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135325B (en) * 2021-11-30 2024-04-26 中国铁建重工集团股份有限公司 Equipment and method for assembling arch steel structure in tunnel
CN115013013B (en) * 2022-06-21 2025-05-30 中铁工程装备集团有限公司 Arched steel structure transfer and assembly equipment and robotic arms suitable for narrow tunnels
CN116006205B (en) * 2022-09-27 2026-02-17 湖北工业大学 Tunnel tunneling construction operation vehicle and application method thereof
CN115726822A (en) * 2022-11-02 2023-03-03 中铁十八局集团有限公司 Automatic positioning and conveying mechanism for assembling TBM steel arch and method for conveying steel arch by automatic positioning and conveying mechanism
CN116241324B (en) * 2022-12-31 2025-12-02 中铁隧道局集团有限公司 A displacement mechanism and method for operating tunnel structure inspection and repair equipment
CN117231246B (en) * 2023-11-14 2024-03-12 中国三峡建工(集团)有限公司 Automatic trolley construction equipment and method
CN117846661A (en) * 2024-01-26 2024-04-09 中交二公局第四工程有限公司 An arch trolley for special-shaped section lining
CN119981983B (en) * 2025-03-21 2025-12-12 四川蓝海智能装备制造有限公司 Arch frame transfer platform and method
CN120798384A (en) * 2025-07-09 2025-10-17 中铁工程装备集团隧道设备制造有限公司 Arch frame assembly trolley

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207420596U (en) * 2017-11-14 2018-05-29 中交第一公路工程局有限公司 Tunnel bow member preassembling trolley
CN109538252A (en) * 2018-11-20 2019-03-29 四川蓝海智能装备制造有限公司 The erection method of multi-functional arch trolley and more Pin arches
CN209162667U (en) * 2018-09-18 2019-07-26 甘肃恒捷路桥养护科技有限公司 All-hydraulic automatically walk culvert abutment body trolley
CN209398433U (en) * 2018-11-20 2019-09-17 四川蓝海智能装备制造有限公司 Multi-functional arch trolley
CN111550261A (en) * 2020-04-29 2020-08-18 中铁二院工程集团有限责任公司 Railway tunnel bottom bulging deformation treatment structure and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207420596U (en) * 2017-11-14 2018-05-29 中交第一公路工程局有限公司 Tunnel bow member preassembling trolley
CN209162667U (en) * 2018-09-18 2019-07-26 甘肃恒捷路桥养护科技有限公司 All-hydraulic automatically walk culvert abutment body trolley
CN109538252A (en) * 2018-11-20 2019-03-29 四川蓝海智能装备制造有限公司 The erection method of multi-functional arch trolley and more Pin arches
CN209398433U (en) * 2018-11-20 2019-09-17 四川蓝海智能装备制造有限公司 Multi-functional arch trolley
CN111550261A (en) * 2020-04-29 2020-08-18 中铁二院工程集团有限责任公司 Railway tunnel bottom bulging deformation treatment structure and construction method

Also Published As

Publication number Publication date
CN113530575A (en) 2021-10-22

Similar Documents

Publication Publication Date Title
CN113530553B (en) Three-step construction process based on tunnel excavation and support integrated trolley
CN113530575A (en) An arch installation trolley for tunnel multi-function construction
CN113530554B (en) Full-section construction process based on tunnel excavation and support integrated trolley
CN113074001B (en) Multifunctional operation rack suitable for tunnel construction
CN113530552B (en) Tunnel comprehensive excavation trolley
CN114622920B (en) Lateral split starting construction method for shield machine in narrow space
CN1225589C (en) Light Rail Transit PC Track Girder Transportation Equipment and Construction Method
WO2024087901A1 (en) Cantilever casting and locomotion all-in-one machine
CN108798727B (en) Tunnel self-propelled waterproof board cloth hanging steel bar positioning integrated multifunctional trolley and application
CN207406359U (en) Tunnel three arms, three basket steel arch-shelf fitting machine
CN116181344B (en) A multifunctional comprehensive tunnel excavation trolley
CN207525777U (en) Prefabricated utility tunnel multidimension degree directional installation car
CN212454541U (en) Forepoling carrier for coal mine crossheading
CN107654246A (en) Tunnel the basket steel arch-shelf fitting machine of three arm three and steel arch frame construction method
CN112281557A (en) Track laying machine and track construction method
CN216553954U (en) Arch frame mounting trolley
CN112682076A (en) Tunnel arch center construction operation vehicle
CN110318798A (en) Crawler belt carries the mobile air crossing system of formula and construction method
CN116241291A (en) A kind of integrated tunnel trolley installed with arch frame
CN215256189U (en) Integral type platform truck is strutted in tunnel excavation
CN109487646A (en) Shield section and platform section running track traveling process become automatically across method
CN217481313U (en) Tunnel construction trolley with arch frame pre-assembled unit
CN108643941A (en) Gantry type arch installs trolley
CN220955643U (en) Multifunctional comprehensive operation trolley for arch-collecting installation
CN204716132U (en) Gantry type multifunctional rock drilling trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A gantry installation trolley for tunnel multi technique construction

Granted publication date: 20230718

Pledgee: Bank of China Limited Xiangyang Branch

Pledgor: CHINA RAILWAY 11 BUREAU HANJIANG HEAVY INDUSTRY CO.,LTD.

Registration number: Y2024980046885

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20230718

Pledgee: Bank of China Limited Xiangyang Branch

Pledgor: CHINA RAILWAY 11 BUREAU HANJIANG HEAVY INDUSTRY CO.,LTD.

Registration number: Y2024980046885

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A gantry installation trolley for tunnel multi technique construction

Granted publication date: 20230718

Pledgee: Bank of China Limited Xiangyang Branch

Pledgor: CHINA RAILWAY 11 BUREAU HANJIANG HEAVY INDUSTRY CO.,LTD.

Registration number: Y2025980067095