CN113430950A CN202110917477.6A CN202110917477A CN113430950A CN 113430950 A CN113430950 A CN 113430950A CN 202110917477 A CN202110917477 A CN 202110917477A CN 113430950 A CN113430950 A CN 113430950A
Authority
CN
China
Prior art keywords
bridge
span
truss
spans
bailey
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110917477.6A
Other languages
Chinese (zh)
Inventor
戴公强
李海利
郝建波
揭振兴
宣泽鹏
冉琳
白鹏鹏
李树茂
任兴龙
张赫洋
王建兵
李明铜
滕博
刘一宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Traffic Engineering Branch of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Traffic Engineering Branch of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Traffic Engineering Branch of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN202110917477.6A priority Critical patent/CN113430950A/en
Publication of CN113430950A publication Critical patent/CN113430950A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Abstract

The invention discloses a construction method of a large-span Bailey bridge, and relates to the technical field of bridge construction. The invention comprises the following steps: pouring concrete foundations, namely pouring a plurality of concrete foundations between two lands for supporting the Bailey bridge; erecting a truss, namely erecting the truss on the outer side of the concrete foundation; splicing the bridge spans, namely splicing the bridge spans, and numbering the spliced bridge spans; positioning and mounting bridge spans, namely mounting a plurality of bridge spans to the upper end of a concrete foundation, and assembling to form a complete Bailey bridge; and (4) dismantling the truss. According to the invention, the bridge is erected through the steps of concrete foundation pouring, truss erection, bridge span splicing, bridge span positioning installation, truss dismantling and the like, so that the construction period can be greatly shortened, the construction cost is lower, the requirement on equipment is less, and the quality controllability is higher.

Description

Construction method of large-span Bailey bridge
Technical Field
The invention belongs to the technical field of bridge construction, and particularly relates to a construction method of a large-span Bailey bridge.
Background
With the development of the hydropower construction cause in China, the cascade development of hydropower of most rivers extends to the upstream, the engineering sites are mostly located in western mountainous areas with complex terrain and inconvenient traffic, bridges serving main engineering also frequently cross rivers with torrential water flow, and the construction sites are often located in mountainous areas with rare human smoke, traffic and inconvenience;
in the prior art, the construction period is long when the bridge is constructed, the construction cost is high, the requirement on equipment is high, and the quality controllability is low.
Disclosure of Invention
The invention aims to provide a construction method of a large-span Bailey bridge, which aims to solve the existing problems: in the prior art, the construction period is long when the bridge is constructed, the construction cost is high, the requirement on equipment is high, and the quality controllability is low.
In order to solve the technical problems, the invention is realized by the following technical scheme:
the invention relates to a construction method of a large-span Bailey bridge, which comprises the following steps:
pouring concrete foundations, namely pouring a plurality of concrete foundations between two lands for supporting the Bailey bridge;
erecting a truss, namely erecting the truss on the outer side of the concrete foundation;
splicing the bridge spans, namely splicing the bridge spans, and numbering the spliced bridge spans;
positioning and mounting bridge spans, namely mounting a plurality of bridge spans to the upper end of a concrete foundation, and assembling to form a complete Bailey bridge;
and (4) dismantling the truss, namely dismantling the panel, the cross beam, the support frame and the truss piece.
Furthermore, the concrete foundation at least comprises a pier and a pier cap, wherein the pier is formed by pouring C25 concrete, and the pier cap is formed by pouring C30 concrete.
Further, the truss erection comprises the following steps:
erecting truss pieces, and arranging a plurality of truss pieces between two landings;
erecting a support frame, wherein the support frame is erected on two adjacent truss pieces for reinforcing the truss pieces;
erecting a cross beam, wherein the cross beam is erected at the upper end of the support frame;
and (5) paving a panel, namely paving the panel at the upper end of the cross beam.
Furthermore, the truss sheets, the support frames, the cross beams and the panels are all made of Q345B steel.
Further, the bridge span splicing comprises the following steps:
assembling bridge spans;
the bridge spans are numbered, and the bridge spans are named as a No. 1 supporting bridge, a No. 2 supporting bridge, … and an N supporting bridge in sequence.
Further, the bridge span assembly sequence is as follows: lower chord → lower flat longitudinal coupling → crossbeam → anti-wind pull rod → montant → upper chord → upper flat longitudinal coupling → transverse coupling → truss assembly → dragging, lengthening → girder dragging in place → bridge deck pavement of a protective net → acceptance.
Further, the bridge span positioning installation comprises the following steps:
adjusting the bridge span position, namely sequentially using mechanical equipment to drive a plurality of bridge spans to horizontally move on the truss until the bridge spans move to the installation position;
a bridge is dropped, the bridge span is dropped to the upper end of the concrete foundation, and the bridge span is connected with the concrete foundation;
and (4) assembling the bridge spans, and connecting the bridge spans to form a complete Bailey bridge.
Further, the bridge span position adjustment sequence is support bridge No. 1, support bridge No. 2, …, support bridge No. N in proper order.
The invention has the following beneficial effects:
according to the invention, the bridge is erected through the steps of concrete foundation pouring, truss erection, bridge span splicing, bridge span positioning installation, truss dismantling and the like, so that the construction period can be greatly shortened, the construction cost is lower, the requirement on equipment is less, and the quality controllability is higher.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic flow diagram of a construction method of a large-span beret bridge according to the present invention;
FIG. 2 is a schematic structural diagram of a large-span Bailey bridge according to the present invention;
FIG. 3 is a front view of a large span Berea bridge of the present invention;
fig. 4 is a construction schematic diagram of a construction method of a large-span beret bridge according to the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. land; 2. a concrete foundation; 3. a bridge span; 4. and (4) mechanical equipment.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention relates to a construction method of a large-span beret bridge, including the following steps:
s1: pouring concrete foundations 2, pouring a plurality of concrete foundations 2 between the two lands 1 for supporting the Bailey bridge;
referring to fig. 2 and 3, before installing the bridge span 3, a plurality of formworks are erected between two lands 1, and then concrete is poured into the formworks until the concrete is cooled and formed to form a complete concrete foundation 2;
the concrete foundation 2 at least comprises a pier and a pier cap, wherein the pier is formed by pouring C25 concrete, and the pier cap is formed by pouring C30 concrete;
s2, erecting a truss, and erecting the truss on the outer side of the concrete foundation 2;
the truss erection comprises the following steps:
s201: the truss pieces are erected, and a plurality of truss pieces are arranged between the two landings 1;
s202: erecting a support frame, wherein the support frame is erected on two adjacent truss pieces for reinforcing the truss pieces;
s203: erecting a cross beam, wherein the cross beam is erected at the upper end of the support frame;
s204: paving a panel, namely paving the panel at the upper end of the cross beam;
the truss sheets, the support frames, the cross beams and the panels are all made of Q345B steel;
s3: splicing the bridge spans 3, and numbering the spliced bridge spans 3;
the bridge span 3 splicing comprises the following steps:
s301: assembling the bridge span 3;
the assembling sequence of the bridge span 3 is as follows: lower chord → lower flat longitudinal coupling → crossbeam → anti-wind pull rod → montant → upper chord → upper flat longitudinal coupling → transverse coupling → truss assembly → dragging, lengthening → girder dragging in place → bridge deck pavement of a protective net → acceptance;
s302, numbering bridge spans 3, and sequentially naming a plurality of bridge spans 3 as a No. 1 supporting bridge, a No. 2 supporting bridge, … and a No. N supporting bridge;
s4, positioning and installing the bridge spans 3, installing a plurality of bridge spans 3 to the upper end of the concrete foundation 2, and assembling to form a complete Bailey bridge;
the positioning and installation of the bridge span 3 comprises the following steps:
s401, adjusting the positions of the bridge spans 3, and sequentially using mechanical equipment 4 to drive the bridge spans 3 to horizontally move on the truss until the bridge spans 3 move to the installation positions;
the bridge span 3 is sequentially provided with a No. 1 supporting bridge, a No. 2 supporting bridge, … and a No. N supporting bridge in the position adjusting sequence;
referring to fig. 4, when installing, the mechanical device 4 horizontally pulls the bridge span 3, so that the bridge span 3 horizontally moves on the plurality of bridge spans 3 until the bridge span 3 moves to a predetermined installation position;
s402, dropping the bridge, namely dropping the bridge span 3 to the upper end of the concrete foundation 2, and connecting the bridge span 3 with the concrete foundation 2;
s403, assembling the bridge spans 3, and connecting the bridge spans 3 to form a complete Bailey bridge;
and S5, dismantling the truss, and dismantling the panel, the cross beam, the support frame and the truss sheet.
The method for erecting the bridge through the steps can greatly shorten the construction period, and is low in construction cost and high in quality controllability.
In the description herein, references to the description of "one embodiment," "an example," "a specific example" or the like are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the invention disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best utilize the invention. The invention is limited only by the claims and their full scope and equivalents.

Claims (8)

1. A construction method of a large-span Bailey bridge is characterized by comprising the following steps:
pouring concrete foundations (2), and pouring a plurality of concrete foundations (2) between two lands (1) for supporting the Bailey bridge;
erecting a truss, namely erecting the truss on the outer side of the concrete foundation (2);
splicing the bridge spans (3), and numbering the spliced bridge spans (3);
positioning and mounting the bridge spans (3), mounting a plurality of bridge spans (3) to the upper end of the concrete foundation (2), and assembling to form a complete Bailey bridge;
and (4) dismantling the truss, namely dismantling the panel, the cross beam, the support frame and the truss piece.
2. The construction method of the large-span beret bridge according to claim 1, wherein the concrete foundation (2) is composed of at least an abutment and a coping, the abutment is cast by C25 concrete, and the coping is cast by C30 concrete.
3. The construction method of the large-span Bailey bridge according to claim 1, wherein the truss erection comprises the following steps:
the truss pieces are erected, and a plurality of truss pieces are arranged between the two land areas (1);
erecting a support frame, wherein the support frame is erected on two adjacent truss pieces for reinforcing the truss pieces;
erecting a cross beam, wherein the cross beam is erected at the upper end of the support frame;
and (5) paving a panel, namely paving the panel at the upper end of the cross beam.
4. The construction method of the large-span Bailey bridge according to claim 3, wherein the truss sheets, the support frames, the cross beams and the panels are all made of Q345B steel.
5. The construction method of the large-span Bailey bridge according to claim 1, wherein the splicing of the bridge span (3) comprises the following steps:
assembling the bridge span (3);
the bridge spans (3) are numbered, and the bridge spans (3) are named as a No. 1 supporting bridge, a No. 2 supporting bridge, … and an N supporting bridge in sequence.
6. The construction method of the large-span Bailey bridge as claimed in claim 5, wherein the assembling sequence of the bridge span (3) is as follows: lower chord → lower flat longitudinal coupling → crossbeam → anti-wind pull rod → montant → upper chord → upper flat longitudinal coupling → transverse coupling → truss assembly → dragging, lengthening → girder dragging in place → bridge deck pavement of a protective net → acceptance.
7. The construction method of the large-span Bailey bridge according to claim 5, wherein the positioning and installation of the bridge span (3) comprises the following steps:
the bridge span (3) is adjusted in position, mechanical equipment (4) is sequentially used for driving the bridge spans (3) to horizontally move on the truss until the bridge spans (3) move to the installation position;
the bridge is dropped, the bridge span (3) is dropped to the upper end of the concrete foundation (2), and the bridge span (3) is connected with the concrete foundation (2);
and assembling the bridge spans (3), and connecting the bridge spans (3) to form a complete Bailey bridge.
8. The construction method of the large-span Bailey bridge as claimed in claim 7, wherein the position of the bridge span (3) is adjusted sequentially from No. 1 supporting bridge to No. 2 supporting bridge to No. … and N supporting bridge.
CN202110917477.6A 2021-08-11 2021-08-11 Construction method of large-span Bailey bridge Pending CN113430950A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110917477.6A CN113430950A (en) 2021-08-11 2021-08-11 Construction method of large-span Bailey bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110917477.6A CN113430950A (en) 2021-08-11 2021-08-11 Construction method of large-span Bailey bridge

Publications (1)

Publication Number Publication Date
CN113430950A true CN113430950A (en) 2021-09-24

Family

ID=77763199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110917477.6A Pending CN113430950A (en) 2021-08-11 2021-08-11 Construction method of large-span Bailey bridge

Country Status (1)

Country Link
CN (1) CN113430950A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206736743U (en) * 2017-05-17 2017-12-12 中国电建集团成都勘测设计研究院有限公司 Lay the easy structure of mountable steel bridge
CN107503296A (en) * 2017-08-31 2017-12-22 中国十九冶集团有限公司 Bailey bridge installation method
CN109653076A (en) * 2018-12-24 2019-04-19 四川港航建设工程有限公司 Combined type flood control is passed the flood period lock head shellfish Lei Gangqiao and construction method
CN210066464U (en) * 2019-04-26 2020-02-14 中建钢构有限公司 Bailey bridge
CN211735072U (en) * 2018-12-24 2020-10-23 杭州江润科技有限公司 Bailey steel bridge suspension-pushing erection system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206736743U (en) * 2017-05-17 2017-12-12 中国电建集团成都勘测设计研究院有限公司 Lay the easy structure of mountable steel bridge
CN107503296A (en) * 2017-08-31 2017-12-22 中国十九冶集团有限公司 Bailey bridge installation method
CN109653076A (en) * 2018-12-24 2019-04-19 四川港航建设工程有限公司 Combined type flood control is passed the flood period lock head shellfish Lei Gangqiao and construction method
CN211735072U (en) * 2018-12-24 2020-10-23 杭州江润科技有限公司 Bailey steel bridge suspension-pushing erection system
CN210066464U (en) * 2019-04-26 2020-02-14 中建钢构有限公司 Bailey bridge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
原创力文档: "大跨度贝雷桥分段拼装施工工法范本", 《原创力文档》 *

Similar Documents

Publication Publication Date Title
WO2021147256A1 (en) Single-side integral hoisted large-span overbridge crossing over multiple railway lines, and construction method therefor
CN107460830B (en) Scheme for erecting full prefabricated bridge without temporary way with medium and small span
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN111851519A (en) Space truss multilayer internal support system
CN114457847A (en) Basement exterior wall formwork dismantling-free supporting system and construction method thereof
CN206015882U (en) The steel structure of housing system that a kind of lateral resisting and antigravity separate
CN113430950A (en) Construction method of large-span Bailey bridge
CN208803649U (en) Light steel grating concrete folding stair
CN116837967A (en) Construction method of large-span cable-stayed truss structure
CN111335137A (en) Deck type arch bridge structure and construction method thereof
CN216892442U (en) Multiple lower chord type large-span beam string structure
CN111827119B (en) Connecting structure of cast-in-situ variable cross-section beam body formwork and construction method thereof
CN113216388A (en) Support-free assembled concrete beam column connecting structure and assembling method
CN210596966U (en) Large-span steel-concrete composite bridge structure
CN106869390A (en) A kind of Hyperbolic vaulted roof plate girder construction of string formula
CN210420862U (en) Stay cable tower end anchoring device
CN208803631U (en) Light steel grating concrete superposed column
CN102677594A (en) Quick construction method for urban bridge
CN207210930U (en) A kind of highway steel reinforced concrete combined beam structure based on assembling
CN112962455A (en) Cable-first-beam-second segment hoisting self-anchored suspension bridge construction method
Čandrlić et al. Design and construction of the Maslenica Highway Bridge
CN206693070U (en) Hybrid structure of arch and beam formula continuous rigid frame bridge winds up walking cradle construction device
CN216920899U (en) Profiled steel sheet floor structure with grid beam and bidirectional stress
CN218989851U (en) Fully assembled steel-concrete plate truss combined bridge
CN214245330U (en) Novel large-tonnage tension swing pier structure of cable-stayed bridge auxiliary pier

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20210924