CN113417410A - Waterproof construction method for roof, basement outer wall and basement roof - Google Patents

Waterproof construction method for roof, basement outer wall and basement roof Download PDF

Info

Publication number
CN113417410A
CN113417410A CN202110535512.8A CN202110535512A CN113417410A CN 113417410 A CN113417410 A CN 113417410A CN 202110535512 A CN202110535512 A CN 202110535512A CN 113417410 A CN113417410 A CN 113417410A
Authority
CN
China
Prior art keywords
waterproof
layer
thick
roof
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110535512.8A
Other languages
Chinese (zh)
Inventor
孟祥宝
李建全
鲁周航
张文锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN202110535512.8A priority Critical patent/CN113417410A/en
Publication of CN113417410A publication Critical patent/CN113417410A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D11/00Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
    • E04D11/02Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/665Sheets or foils impervious to water and water vapor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Building Environments (AREA)

Abstract

A roof waterproof construction method is a construction method of the 1 st inversion method from top to bottom, and is characterized by comprising the following steps: a. a C20 fine-stone concrete protective layer with the thickness of 40mm, and phi 4@150 steel bars are matched in the protective layer; b. 10 thick low grade cement mortar isolation layer or 0.4mm thick plastic film isolation layer; c. a heat insulation layer arranged on the flame-retardant XPS heat insulation plate with the thickness of 70 mm; d. SBS modified asphalt waterproof coiled material with thickness of 4 mm; e. 1.5mm polyurethane waterproof coating film or 1.5mm JS waterproof coating film; f. the reinforced concrete roof board is polished to smooth the surface or finish layer, and the dust is removed. The waterproof construction method for the roof, the basement outer wall and the basement roof has the advantages that the waterproof performance of reinforced concrete is enhanced, the construction quality of the coating waterproof layer is controlled, the leakage probability is greatly reduced, the maintenance cost is reduced, the unknown loss is reduced, the leveling layer is reduced, and the construction cost is saved.

Description

Waterproof construction method for roof, basement outer wall and basement roof
Technical Field
The invention relates to a building waterproof construction method, in particular to a roof, basement outer wall and basement roof waterproof construction method.
Background
At present, various large design houses adopt related methods in a 16CJ40-14 building waterproof system and a 10J301 underground building waterproof structure mainly for roof building waterproof methods, basement outer wall waterproof methods and basement roof waterproof methods. By organizing the above atlas and the related practices of the design institute, the following can be concluded:
firstly, a roof waterproof method mainly comprises the following steps: (page 16CJ 40-13) the respective processes from the top to the bottom
The method comprises the following steps: a waterproof layer; 1:2.5 cement mortar leveling layer with the thickness of 20 mm; a fine stone concrete protective layer with the thickness of 40 mm; a heat insulation layer; reinforced concrete roof boarding.
The 2 nd method comprises the following steps: a C20 fine-stone concrete protective layer with the thickness of 40mm, and phi 4@150 steel bars are matched in the protective layer; 10 thick low grade cement mortar isolation layer; the SBS modified asphalt waterproof coiled material with the thickness of 4mm is firstly (or the SBS modified asphalt waterproof coiled material with the thickness of 3mm plus 3mm is secondly); 1:2.5 cement mortar leveling layer with the thickness of 20 mm; flame retardant extruded polystyrene board (XPS) B1 flame rating of 45mm thickness; 2% slope layer of light aggregate concrete with the thickness of 30mm at the thinnest part; reinforced concrete roof boarding.
And (3) carrying out: the 130-thick C30 fine stone concrete is internally matched with three-level steel phi 8@150 steel bars, and the separation joint is not more than 6mX6 m; laying asphalt felt empty; modified asphalt waterproof coiled material with thickness of 4mm for roads and bridges; 1.2mm thick high polymer modified asphalt waterproof coating; 15, 1:2.5 of cement mortar leveling layer; a reinforced concrete floor.
And 4, carrying out: a C20 fine-stone concrete protective layer with the thickness of 40mm, and phi 4@200 steel bars are matched in the protective layer; 10 thick low grade cement mortar isolation layer; one step of SBS modified asphalt waterproof coiled material with the thickness of 4 mm; 1:2.5 cement mortar leveling layer with the thickness of 20 mm; a rock wool heat-insulating layer with the thickness of 100 mm; a polyurethane coating vapour barrier layer with the thickness of 1.2 mm; 1:3 cement mortar leveling layer with the thickness of 20 mm; a reinforced concrete floor.
Secondly, basement exterior wall waterproofing (16 CJ40-7 pages or 10J 301-exterior wall 1 a-F2-3), and all the working procedures are from outside to inside
The method of the 1 st method is characterized in that the external patch is externally prevented: 2:8, ramming the lime soil layer by layer; the material and thickness of the protective layer or the heat-insulating layer are designed; a waterproof layer of coiled material; 1:2.5 cement mortar leveling layer with the thickness of 20 mm; waterproof reinforced concrete outer wall.
The 2 nd method comprises the following steps: placing outside and sticking inside: a retaining wall; leveling layer; a waterproof layer of coiled material; or 20-thick 1:2.5 cement mortar leveling layer; waterproof concrete outer wall.
Thirdly, waterproof method for basement roof (16 CJ40-23 pages or 10J 301), comprising the steps of from top to bottom
The method comprises the following steps: a protective layer; an isolation layer; waterproof layer of coiled material or waterproof paint; 20, 1:2.5 of cement mortar leveling layer; waterproof concrete roof.
The 2 nd method comprises the following steps: a protective layer; an isolation layer; waterproof coating waterproof layer; waterproof concrete roof.
And (3) carrying out: a protective layer; an isolation layer; waterproof layer of coiled material or waterproof paint; a cement-based capillary crystalline waterproof coating; waterproof concrete roof.
However, when the construction is finished according to the method, leakage of individual parts of the roof and the basement frequently occurs in different degrees, and great adverse effects are caused on later repair and rework and the use problems of the building. We carefully study and find that, the problem of building waterproof practice in an atlas and each design institute does not exist, but depends on whether the operation of each process worker is proper, the quality of responsibility center of the worker, the material characteristics, the construction quality, the maintenance condition of each process, the natural condition and other factors on one hand, and the problem of building water seepage and water leakage can be caused when a problem occurs in one link in the practice, so that the key to solve the problem is to eliminate uncertain factors brought by each intermediate process link to the maximum extent.
It can be summarized from the atlas 16CJ40-14 construction waterproofing system, 10J 301-underground construction waterproofing construction and design institute practices:
the method comprises the following steps that 1, whether the method for the water proofing of the positive roof or the method for the water proofing of the inverted roof is adopted, the method can be unified into the steps that a leveling layer or a slope layer is made on a waterproof concrete top plate, and then waterproof layer construction is carried out, wherein the waterproof layer construction is divided into a strip spreading method, a full spreading method and a point bonding method;
2, the basement exterior wall waterproofing method can be unified into that waterproof construction is carried out after waterproof coiled materials are directly paved or leveling layers are made on the outer sides of waterproof concrete exterior walls;
and 3, the waterproof methods of the basement top plate can be unified into two methods, and 1, a leveling layer is made on the waterproof concrete top plate and a waterproof coiled material or waterproof coating is made on the waterproof concrete top plate. (2) The waterproof concrete top plate is used as a cement-based capillary crystalline waterproof coating and then is used as a waterproof coating or a waterproof coiled material.
The reason for the leakage of the conventional waterproofing practice is:
1, from the structural analysis, the roof concrete roof plate is allowed to work with cracks, the waterproof layer construction method comprises a strip laying method, a full laying method and a point bonding method, no matter which construction method, the whole waterproof layer is difficult to ensure to have no wire gap by 100% according to the randomness of the existing manual construction, and the wire gap is also the root cause of the existing roof waterproof leakage, so the waterproof control key is to control the engineering quality of the concrete and reduce the possibility of the cracks, and control the construction quality of each process of a mortar leveling layer, a slope finding layer and the waterproof layer between the concrete and the waterproof layer, the mortar leveling layer and other layers have no waterproof capability, and even if the waterproof mortar is adopted, the waterproof capability of the waterproof mortar is greatly reduced under the influence of manual factors, weather reasons and the drying shrinkage of the mortar material in the whole large-area construction process, once the waterproof layer leaks, water can find the weakness of the leveling layer or the leveling layer, and the weakness reaches the waterproof concrete top plate and leaks from the crack of the concrete top plate, so that the leakage point of the waterproof layer is difficult to accurately find once the existing roof waterproof method leaks.
2, aiming at the basement outer wall waterproof method, the waterproof layer and the leveling layer are subjected to the randomness of manual operation, the characteristics of materials, the environment and other factors, the integrity of the whole waterproof layer is difficult to guarantee, the outer wall waterproof concrete is allowed to work with cracks, the outer wall is influenced by the through-wall screws and other factors, the cracks are more, the main factors are outer wall leakage, and the reason for accurately finding the leakage point of the waterproof layer is difficult to find.
3, directly making a leveling layer on the waterproof concrete of the roof plate of the basement and then making a waterproof coiled material or waterproof coating, so that the roof plate of the roof and the outer wall of the basement have the same waterproof leakage condition; when the waterproof concrete roof is used for cement-based capillary crystalline waterproofing and then is used for waterproof coating, a base film is formed on the surface of concrete, the waterproof capability of the concrete is improved, but the cement-based capillary crystalline waterproof coating belongs to rigid waterproof coating and has small deformation, the waterproof effect can be influenced if a large crack exists in the concrete, and particularly the influence of environmental factors is large in the construction process, so that the waterproof coating is easy to lose water and generate cracks. Simultaneously basement roof upper portion pipe network is numerous, and when meetting the steel pipe and wearing the roof, the waterproof requirement of two kinds of different material matrixs can't be satisfied to cement base infiltration crystallization waterproof coating, so need find the better waterproof material of another material and solve.
Therefore, the known waterproof construction methods for roofs, outer walls of basements and roofs of basements have various inconveniences and problems.
Disclosure of Invention
The invention aims to provide a safe and reliable waterproof construction method for a concrete roof, an outer wall of a basement and a top plate of the basement.
In order to achieve the purpose, the technical solution of the invention is as follows:
a roof waterproof construction method is a construction method of the 1 st inversion method from top to bottom, and is characterized by comprising the following steps:
a. a C20 fine-stone concrete protective layer with the thickness of 40mm, and phi 4@150 steel bars are matched in the protective layer;
b. 10 thick low grade cement mortar isolation layer or 0.4mm thick plastic film isolation layer;
c. a heat insulation layer arranged on the flame-retardant XPS heat insulation plate with the thickness of 70 mm;
d. SBS modified asphalt waterproof coiled material with thickness of 4 mm;
e. 1.5mm polyurethane waterproof coating film or 1.5mm JS waterproof coating film;
f. the reinforced concrete roof board is polished to smooth the surface or finish layer, and the dust is removed.
A roof waterproof construction method is a 2 nd inversion construction method which is constructed from top to bottom, and is characterized by comprising the following steps:
a. a C20 fine-stone concrete protective layer with the thickness of 40mm, and phi 4@150 steel bars are matched in the protective layer;
b. 10 thick low grade cement mortar isolation layer or 0.4mm thick plastic film isolation layer;
c. a heat insulation layer arranged on the flame-retardant XPS heat insulation plate with the thickness of 70 mm;
d. the synthetic polymer waterproof coiled material is made of polyethylene polypropylene fiber and has the specification of 400 g;
e. 1.5mmJS waterproof paint film;
f. the reinforced concrete roof board is polished to smooth the surface or finish layer, and the dust is removed.
A roof waterproof construction method is a positive method construction from top to bottom, and is characterized by comprising the following steps:
a. the SBS modified asphalt waterproof coiled material with the thickness of 3mm +3 mm;
b. a C20 fine-stone concrete protective layer with the thickness of 40mm, and phi 4@150 steel bars are matched in the protective layer;
c. a heat insulation layer arranged on the flame-retardant XPS heat insulation plate with the thickness of 40 mm;
d. a cement mortar protective layer with the thickness of 20mm and the ratio of 1: 3;
e. 1.5mm polyurethane waterproof coating film or 1.5mm JS waterproof coating film;
f. the reinforced concrete roof board is polished to smooth the surface or finish layer, and the dust is removed.
A basement exterior wall waterproof construction method is constructed from top to bottom and is characterized by comprising the following steps:
a. 2:8, ramming the lime soil layer by layer;
b. a protective or insulating layer;
c. the SBS modified asphalt waterproof coiled material with the thickness of 3mm +3 mm;
d. a cement mortar protective layer with the thickness of 20mm and the ratio of 1: 3;
e. from waterproof reinforced concrete outer wall, the wall screw rod waterproof mortar shutoff of wearing, the outer wall surface course is polished smoothly, clears away the dust.
A basement roof waterproof construction method is constructed from top to bottom and is characterized by comprising the following steps:
a. a C25 fine-stone concrete protective layer with the thickness of 70mm, and a phi 6@150 steel bar protective layer is internally matched;
b. 10 thick low grade cement mortar isolation layer or 0.4mm thick plastic film isolation layer;
c. SBS modified asphalt waterproof coiled material with thickness of 4 mm;
d. 1.5mm polyurethane waterproof coating film or 1.5mm JS waterproof coating film;
e. the self-waterproof reinforced concrete roof is polished to be smooth or the surface layer is polished to be smooth, and dust is removed.
By adopting the technical scheme, the waterproof construction method for the roof, the basement outer wall and the basement top plate has the following advantages:
1. the waterproof performance of the reinforced concrete is enhanced;
2. the construction quality of the coating waterproof layer is controlled, and the influence of manual operation and environment randomness is eliminated;
3. greatly reducing the leakage probability, reducing the maintenance cost, reducing the unknown loss, reducing the leveling layer and saving the construction cost.
Detailed Description
The present invention will be further described with reference to the following examples.
Example 1
The invention discloses a roof waterproof construction method, which is a construction method of the 1 st inversion method from top to bottom and is characterized by comprising the following steps of:
a. a C20 fine-stone concrete protective layer with the thickness of 40mm, and phi 4@150 steel bars are matched in the protective layer;
b. 10 thick low grade cement mortar isolation layer or 0.4mm thick plastic film isolation layer;
c. a heat insulation layer arranged on the flame-retardant XPS heat insulation plate with the thickness of 70 mm;
d. SBS modified asphalt waterproof coiled material with thickness of 4 mm;
e. 1.5mm polyurethane waterproof coating film or 1.5mm JS waterproof coating film;
f. the reinforced concrete roof board is polished to smooth the surface or finish layer, and the dust is removed.
Example 2
The invention relates to a roof waterproof construction method, which is a 2 nd inversion construction method from top to bottom, and is characterized by comprising the following steps of:
a. a C20 fine-stone concrete protective layer with the thickness of 40mm, and phi 4@150 steel bars are matched in the protective layer;
b. 10 thick low grade cement mortar isolation layer or 0.4mm thick plastic film isolation layer;
c. a heat insulation layer arranged on the flame-retardant XPS heat insulation plate with the thickness of 70 mm;
d. the synthetic polymer waterproof coiled material is made of polyethylene polypropylene fiber and has the specification of 400 g;
e. 1.5mmJS waterproof paint film;
f. the reinforced concrete roof board is polished to smooth the surface or finish layer, and the dust is removed.
Example 3
The roof waterproof construction method is a positive method construction from top to bottom, and is characterized by comprising the following steps of:
a. the SBS modified asphalt waterproof coiled material with the thickness of 3mm +3 mm;
b. a C20 fine-stone concrete protective layer with the thickness of 40mm, and phi 4@150 steel bars are matched in the protective layer;
c. a heat insulation layer arranged on the flame-retardant XPS heat insulation plate with the thickness of 40 mm;
d. a cement mortar protective layer with the thickness of 20mm and the ratio of 1: 3;
e. 1.5mm polyurethane waterproof coating film or 1.5mm JS waterproof coating film;
f. the reinforced concrete roof board is polished to smooth the surface or finish layer, and the dust is removed.
Example 4
The basement exterior wall waterproof construction method is constructed from top to bottom, and is characterized by comprising the following steps of:
a. 2:8, ramming the lime soil layer by layer;
b. a protective or insulating layer;
c. the SBS modified asphalt waterproof coiled material with the thickness of 3mm +3 mm;
d. a cement mortar protective layer with the thickness of 20mm and the ratio of 1: 3;
e. from waterproof reinforced concrete outer wall, the wall screw rod waterproof mortar shutoff of wearing, the outer wall surface course is polished smoothly, clears away the dust.
Example 5
The basement roof waterproof construction method is constructed from top to bottom and is characterized by comprising the following steps of:
a. a C25 fine-stone concrete protective layer with the thickness of 70mm, and a phi 6@150 steel bar protective layer is internally matched;
b. 10 thick low grade cement mortar isolation layer or 0.4mm thick plastic film isolation layer;
c. SBS modified asphalt waterproof coiled material with thickness of 4 mm;
d. 1.5mm polyurethane waterproof coating film or 1.5mm JS waterproof coating film;
e. the self-waterproof reinforced concrete roof is polished to be smooth or the surface layer is polished to be smooth, and dust is removed.
The invention has substantive characteristics and obvious technical progress, and the main ideas of the waterproof construction method for the roof, the outer wall and the top plate of the basement are as follows: compared with the conventional waterproof method, no matter the roof waterproof method, the basement roof waterproof method or the basement side wall waterproof method, the polyurethane waterproof coating or the JS waterproof coating is directly coated on the surface layer of the reinforced concrete after treatment, then the waterproof coiled material is made, but not the waterproof coating film or the waterproof coiled material is made after the slope layer or the leveling layer is made on the surface layer of the reinforced concrete, the main reason is that the polyurethane or the JS waterproof coating film is directly coated on the outer surface of the reinforced concrete, and the waterproof coiled material has good adhesive force with the concrete, has the functions of moisture resistance and steam insulation, and also has the capability of sealing the reinforced concrete cracks, meanwhile, the paint has good ductility and deformability, and more importantly, the construction quality of the coating waterproof layer is controlled, and the construction quality is slightly influenced by the randomness of the operation of workers and the environment. The method can greatly reduce the leakage probability, reduce the maintenance cost, reduce the unknown loss of owners due to the penetration, reduce the leveling layer, be beneficial to saving the cost and improve the waterproof effect.
The above embodiments are provided only for illustrating the present invention and not for limiting the present invention, and those skilled in the art can make various changes or modifications without departing from the spirit and scope of the present invention. Accordingly, all equivalents are intended to fall within the scope of the invention, which is defined in the claims.

Claims (5)

1.一种屋面防水施工方法,由上向下施工的第1种倒置法施工,其特征在于包括以下步骤:1. a roof waterproofing construction method, the 1st inversion method construction of top-down construction is characterized in that comprising the following steps: a、40mm厚C20细石混凝土保护层,内配Φ4@150钢筋;a. 40mm thick C20 fine stone concrete protective layer, equipped with Φ4@150 steel bars; b、10厚低标号水泥砂浆隔离层或0.4mm厚塑料薄膜隔离层;b. 10-thick low-grade cement mortar isolation layer or 0.4mm thick plastic film isolation layer; c、70mm厚难燃型XPS保温板设置的保温层;c. Insulation layer set on 70mm thick flame-retardant XPS insulation board; d、4mm厚SBS改性沥青防水卷材;d. 4mm thick SBS modified bitumen waterproofing membrane; e、1.5mm聚氨酯防水涂膜或1.5mmJS防水涂料涂膜;e. 1.5mm polyurethane waterproof coating film or 1.5mmJS waterproof coating film; f、钢筋混凝土屋面板收光抹面或面层打磨平整,清除灰尘。f. The reinforced concrete roof panel is polished and smoothed or the surface layer is polished to remove dust. 2.一种屋面防水施工方法,由上向下施工的第2种倒置法施工,其特征在于包括以下步骤:2. a roof waterproofing construction method, the 2nd kind of inversion method construction by top-down construction is characterized in that comprising the following steps: a、40mm厚C20细石混凝土保护层,内配Φ4@150钢筋;a. 40mm thick C20 fine stone concrete protective layer, equipped with Φ4@150 steel bars; b、10厚低标号水泥砂浆隔离层或0.4mm厚塑料薄膜隔离层;b. 10-thick low-grade cement mortar isolation layer or 0.4mm thick plastic film isolation layer; c、70mm厚难燃型XPS保温板设置的保温层;c. Insulation layer set on 70mm thick flame-retardant XPS insulation board; d、合成高分子防水卷材,其材质为聚乙烯丙纶,规格400g;d. Synthetic polymer waterproofing membrane, its material is polyethylene polypropylene, the specification is 400g; e、1.5mmJS防水涂料涂膜;e, 1.5mmJS waterproof coating film; f、钢筋混凝土屋面板收光抹面或面层打磨平整,清除灰尘。f. The reinforced concrete roof panel is polished and smoothed or the surface layer is polished to remove dust. 3.一种屋面防水施工方法,由上向下施工的正置法施工,其特征在于包括以下步骤:3. a roof waterproofing construction method, the upright method construction of construction from top to bottom, is characterized in that comprising the following steps: a、3mm+3mm厚SBS改性沥青防水卷材;a. 3mm+3mm thick SBS modified bitumen waterproofing membrane; b、40mm厚C20细石混凝土保护层,内配Φ4@150钢筋;b, 40mm thick C20 fine stone concrete protective layer, equipped with Φ4@150 steel bars; c、40mm厚难燃型XPS保温板设置的保温层;c. The thermal insulation layer provided by the 40mm thick flame-retardant XPS thermal insulation board; d、20mm厚1:3水泥砂浆保护层;d, 20mm thick 1:3 cement mortar protective layer; e、1.5mm聚氨酯防水涂膜或1.5mmJS防水涂料涂膜;e. 1.5mm polyurethane waterproof coating film or 1.5mmJS waterproof coating film; f、钢筋混凝土屋面板收光抹面或面层打磨平整,清除灰尘。f. The reinforced concrete roof panel is polished and smoothed or the surface layer is polished to remove dust. 4.一种地下室外墙防水施工方法,由上向下施工,其特征在于包括以下步骤:4. A waterproof construction method for basement exterior wall, which is constructed from top to bottom, and is characterized in that comprising the following steps: a、2:8灰土分层夯实;a, 2:8 lime-soil layered compaction; b、保护层或保温层;b, protective layer or insulation layer; c、3mm+3mm厚SBS改性沥青防水卷材;c. 3mm+3mm thick SBS modified bitumen waterproofing membrane; d、20mm厚1:3水泥砂浆保护层;d, 20mm thick 1:3 cement mortar protective layer; e、自防水钢筋混凝土外墙,穿墙螺杆防水砂浆封堵,外墙面层打磨平整,清除灰尘。e. Self-waterproof reinforced concrete outer wall, plugged with waterproof mortar through the wall, and the outer wall layer is polished and smoothed to remove dust. 5.一种地下室顶板防水施工方法,由上向下施工,其特征在于包括以下步骤:5. a basement roof waterproof construction method, from top to bottom construction, is characterized in that comprising the following steps: a、70mm厚C25细石混凝土保护层,内配Φ6@150钢筋保护层;a, 70mm thick C25 fine stone concrete protective layer, with Φ6@150 steel protective layer inside; b、10厚低标号水泥砂浆隔离层或0.4mm厚塑料薄膜隔离层;b. 10-thick low-grade cement mortar isolation layer or 0.4mm thick plastic film isolation layer; c、4mm厚SBS改性沥青防水卷材;c. 4mm thick SBS modified bitumen waterproofing membrane; d、1.5mm聚氨酯防水涂膜或1.5mmJS防水涂料涂膜;d. 1.5mm polyurethane waterproof coating film or 1.5mmJS waterproof coating film; e、自防水钢筋混凝土顶板收光抹面或面层打磨平整,清除灰尘。e. The self-waterproof reinforced concrete top plate is polished and smoothed or the surface layer is polished to remove dust.
CN202110535512.8A 2021-05-17 2021-05-17 Waterproof construction method for roof, basement outer wall and basement roof Pending CN113417410A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110535512.8A CN113417410A (en) 2021-05-17 2021-05-17 Waterproof construction method for roof, basement outer wall and basement roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110535512.8A CN113417410A (en) 2021-05-17 2021-05-17 Waterproof construction method for roof, basement outer wall and basement roof

Publications (1)

Publication Number Publication Date
CN113417410A true CN113417410A (en) 2021-09-21

Family

ID=77712496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110535512.8A Pending CN113417410A (en) 2021-05-17 2021-05-17 Waterproof construction method for roof, basement outer wall and basement roof

Country Status (1)

Country Link
CN (1) CN113417410A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116838032A (en) * 2023-05-23 2023-10-03 湖北晶骉建设工程有限公司 Pool roof structure for improving waterproof quality and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205224089U (en) * 2015-11-20 2016-05-11 北京汇英利防水技术有限公司 Basement waterproofing side wall
CN109057179A (en) * 2018-08-06 2018-12-21 合肥中通防水工程有限公司 A kind of flat roof deck self energy freedom from repairs waterproof system and its construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205224089U (en) * 2015-11-20 2016-05-11 北京汇英利防水技术有限公司 Basement waterproofing side wall
CN109057179A (en) * 2018-08-06 2018-12-21 合肥中通防水工程有限公司 A kind of flat roof deck self energy freedom from repairs waterproof system and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116838032A (en) * 2023-05-23 2023-10-03 湖北晶骉建设工程有限公司 Pool roof structure for improving waterproof quality and construction method thereof

Similar Documents

Publication Publication Date Title
CN104358341B (en) A kind of building masonry and construction masonry method
CN104264717A (en) Basement rigid material and flexible material combined waterproof construction method
WO2014139252A1 (en) Method for constructing large raft foundation in high-temperature environment
CN204492025U (en) The waterproof construction of the contour deformation joint of roofing
CN110805212A (en) Construction method for roof flashing
CN105714992A (en) Pottery tile laying structure and laying method thereof
CN108661250A (en) Inversion-type waterproof heat-retaining roof structure and its construction method
CN112695959A (en) Passive heat-bridge-free slope roof 300 mm-thick heat-insulation and decoration integrated construction process
CN206352400U (en) Positively fixed type parapet of roofing position waterproof modular repair structure
CN106836663A (en) The construction method of water-proof insulating roof
CN204492022U (en) The waterproof construction of parapet high-low bay deformation joint
CN103669746B (en) The construction method of inverted roof heat-insulation system
CN114645604B (en) Construction method for waterproof treatment nodes of deformation joints of boarding and parking roofs
CN205077753U (en) Waterproof construction at roofing expansion joint
CN205688670U (en) A kind of roofworks system structure
CN113417410A (en) Waterproof construction method for roof, basement outer wall and basement roof
CN204252414U (en) Roof covering water-proof structure
CN107190873A (en) One kind building surface recombination heat-insulation layer and its installation method
Borle et al. Comparative study of conventional and modern waterproofing techniques
CN208329409U (en) A kind of parapet of roofing water leak-proof structure
CN202899319U (en) Waterproof panel point of side wall of existing building and roof of new-built building
CN207685984U (en) A kind of overlength underground garage external wall structure
CN104074292A (en) A damp-proof and heat insulating ground system and a construction method thereof
CN207436295U (en) A kind of building surface recombination insulating layer
CN204266404U (en) A kind of outer-wall crack-resisting anti-leakage structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210921

RJ01 Rejection of invention patent application after publication