CN113401815B - High-altitude conversion system of core tube tower crane of super high-rise building and construction method thereof - Google Patents

High-altitude conversion system of core tube tower crane of super high-rise building and construction method thereof Download PDF

Info

Publication number
CN113401815B
CN113401815B CN202110672388.XA CN202110672388A CN113401815B CN 113401815 B CN113401815 B CN 113401815B CN 202110672388 A CN202110672388 A CN 202110672388A CN 113401815 B CN113401815 B CN 113401815B
Authority
CN
China
Prior art keywords
tower crane
conversion
foundation
core tube
auxiliary frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202110672388.XA
Other languages
Chinese (zh)
Other versions
CN113401815A (en
Inventor
周予启
刘卫未
王晶
李静
范昕
车庭枢
蒋千重
车辕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Construction and Development Co Ltd
Original Assignee
China Construction First Group Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Construction and Development Co Ltd filed Critical China Construction First Group Construction and Development Co Ltd
Priority to CN202110672388.XA priority Critical patent/CN113401815B/en
Publication of CN113401815A publication Critical patent/CN113401815A/en
Application granted granted Critical
Publication of CN113401815B publication Critical patent/CN113401815B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/28Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
    • B66C23/283Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels with frameworks composed of assembled elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/208Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from the side, e.g. by walls of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/34Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Transportation (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

本发明公开了一种超高层建筑核心筒塔吊高空转换体系及其施工方法,转换体系包含核心筒及对应主体结构、连接于核心筒内部的塔吊内爬基础基座、连接于核心筒上方的转换临时结构、连接于转换临时结构上的夹持组件、连接于转换临时结构底部且位于核心筒上方的转换基础。本发明通过在核心筒筒顶再次设置转换基础的方式,保证了核心筒上部结构的进一步安装和塔吊的承力;通过转换临时结构的设置,利于在塔吊节转换底部基础时,先行在上方进行临时固定,保证下部的施工;通过夹持组件和转换基础底座的设置,既可以保证转换过程中塔吊节的固定,又可以保证利用下部核心筒结构保证转换临时结构的支撑,同时保证了下部核心筒内其他工序施工提前插入。

Figure 202110672388

The invention discloses a tower crane high-altitude conversion system for a core tube of a super high-rise building and a construction method thereof. The conversion system comprises a core tube and a corresponding main structure, a tower crane inner climbing foundation base connected inside the core tube, and a conversion unit connected above the core tube. A temporary structure, a clamping assembly connected to the conversion temporary structure, and a conversion base connected to the bottom of the conversion temporary structure and located above the core tube. The invention ensures the further installation of the upper structure of the core tube and the bearing capacity of the tower crane by setting the conversion foundation again on the top of the core tube; and by setting the temporary structure of the conversion, it is convenient for the tower crane section to convert the bottom foundation first. Temporary fixing to ensure the construction of the lower part; through the setting of the clamping components and the conversion foundation base, it can not only ensure the fixing of the tower crane section during the conversion process, but also ensure that the lower core tube structure is used to ensure the support of the temporary structure of the conversion, and at the same time, the lower core can be ensured. The construction of other processes in the cylinder is inserted in advance.

Figure 202110672388

Description

一种超高层建筑核心筒塔吊高空转换体系及其施工方法A kind of super high-rise building core tube tower crane high-altitude conversion system and its construction method

技术领域technical field

本发明属于塔吊施工技术领域,特别涉及一种超高层建筑核心筒塔吊高空转换体系及其施工方法。The invention belongs to the technical field of tower crane construction, and particularly relates to a tower crane high-altitude conversion system for a core tube of a super high-rise building and a construction method thereof.

背景技术Background technique

随着国内超高层建筑的迅猛发展,作为超高层建筑施工中最重要垂直运输工具的塔吊,其使用技术也日益成熟,塔吊基础是用于安装固定塔吊、保证塔吊正常使用且传递其各种作用到受力结构的构件。在超高层建筑施工,一般采取“核心筒先行,外框跟随”的施工组织模式。而塔吊内爬升作为一种安全经济的塔吊固定爬升方式,在超高层建筑施工中应用广泛。由于结构布局影响,经常会遇到核心筒墙体收缩情况,必须采取塔吊基础转换的方式保证塔吊向上爬升。一般超高层项目遇到塔吊基础转换的情况会优先选择外挂基础,鉴于核心筒结构布置的特殊性,由于外挂基础安装难度大、施工工期长、技术经济性差、与爬模干预等原因,需要考虑一种更经济安全的转换方式实现塔吊的顺利爬升。With the rapid development of super high-rise buildings in China, the tower crane, as the most important vertical transportation tool in the construction of super high-rise buildings, has increasingly mature technology. to the members of the stressed structure. In the construction of super high-rise buildings, the construction organization mode of "core tube first, outer frame follows" is generally adopted. As a safe and economical fixed climbing method for tower cranes, inner climbing of tower cranes is widely used in the construction of super high-rise buildings. Due to the influence of the structural layout, the shrinkage of the core tube wall is often encountered, and the tower crane foundation must be converted to ensure that the tower crane climbs upward. In general, super high-rise projects will give priority to the external hanging foundation when the tower crane foundation is converted. In view of the particularity of the core tube structure layout, due to the difficulty of the external hanging foundation installation, long construction period, poor technical economy, and climbing formwork intervention, it is necessary to consider A more economical and safe conversion method to achieve smooth climbing of the tower crane.

发明内容SUMMARY OF THE INVENTION

本发明提供了一种超高层建筑核心筒塔吊高空转换体系及其施工方法,用以解决高层或超高层中由于核心筒布局变化,内爬塔吊在高空转换爬升方式的筒顶转换、临时结构安装固定以及支撑结构的安装及施工等技术问题。The invention provides a tower crane high-altitude conversion system for a core tube of a super-high-rise building and a construction method thereof, which are used to solve the problem of the conversion and temporary structure installation of the inner-climbing tower crane in the high-altitude conversion and climbing mode due to the layout change of the core tube in the high-rise or super high-rise building. Technical issues such as fixing and installation and construction of supporting structures.

为实现上述目的,本发明采用如下技术方案:To achieve the above object, the present invention adopts the following technical solutions:

一种超高层建筑核心筒塔吊高空转换体系,包含核心筒及对应主体结构、连接于核心筒顶部上方的核心筒剪力墙、连接于核心筒内部的塔吊内爬基础基座、连接于核心筒上方的转换临时结构、连接于转换临时结构和核心筒剪力墙上的夹持组件、位于转换临时结构底部且连接于核心筒顶板上方的转换基础以及连接于转换基础上方的塔吊节;A tower crane high-altitude conversion system for a core tube of a super high-rise building, comprising a core tube and a corresponding main structure, a core tube shear wall connected above the top of the core tube, a tower crane inner climbing foundation base connected inside the core tube, and a core tube connected to the core tube. The upper transition temporary structure, the clamping components connected to the transition temporary structure and the shear wall of the core tube, the transition foundation located at the bottom of the transition temporary structure and connected to the top plate of the core tube, and the tower crane section connected to the top of the transition foundation;

所述转换临时结构包含与核心筒剪力墙和四周结构柱体连接的辅助架竖向杆、间隔连接于辅助架竖向杆水平向的辅助架水平杆,间隔连接于结构柱体与承重夹梁之间或结构柱体与辅助架水平杆之间的辅助架斜支撑,以及在塔吊临时固定楼层与辅助架竖向杆连接的辅助架承重杆;所述辅助架竖向杆和辅助架水平杆、辅助架承重杆形成框架体并通过夹持组件与塔吊节连接;The conversion temporary structure includes auxiliary frame vertical rods connected with the core tube shear wall and surrounding structural columns, auxiliary frame horizontal rods connected to the auxiliary frame vertical rods at intervals in the horizontal direction, and spaced connection between the structural column and the load-bearing clamp. The auxiliary frame diagonal support between the beams or between the structural column and the auxiliary frame horizontal rod, and the auxiliary frame bearing rod connected with the auxiliary frame vertical rod on the temporary fixed floor of the tower crane; the auxiliary frame vertical rod and the auxiliary frame horizontal rod . The auxiliary frame load-bearing rod forms a frame body and is connected with the tower crane joint through the clamping assembly;

所述夹持组件包含与塔吊节四周连接且水平设置的夹持杆和连接于核心筒剪力墙与辅助架承重杆之间的承重夹梁,所述承重夹梁临时可拆卸连接塔吊节底部;所述夹持杆端部与结构柱体和/或转换临时结构连接;The clamping assembly includes a clamping rod connected to the surrounding of the tower crane section and arranged horizontally and a load-bearing clamp beam connected between the core tube shear wall and the auxiliary frame load-bearing rod, and the load-bearing clamp beam is temporarily detachable and connected to the bottom of the tower crane section. ; the end of the clamping rod is connected with the structural column and/or the transition temporary structure;

所述转换基础包含呈方形布置的转基立柱、连接于转基立柱顶部平行设置的两个转基承重梁以及连接于两转基承重梁之间的转基加强撑,所述转基立柱通过转换基础底座与核心筒顶板中转换支撑梁连接;所述转基承重梁对应连接塔吊节底座,塔吊节底座上部安装塔吊节,塔吊节顶部连接起重机构。The conversion foundation includes a square-arranged swivel foundation column, two swivel foundation bearing beams connected to the top of the swivel foundation column and arranged in parallel, and a swivel foundation reinforcing brace connected between the two swivel foundation bearing beams. The conversion foundation base is connected with the conversion support beam in the top plate of the core tube; the rotary base bearing beam is correspondingly connected to the base of the tower crane section, the tower crane section is installed on the upper part of the tower crane section base, and the top of the tower crane section is connected to the hoisting mechanism.

进一步的,所述转换支撑梁下部还连接有结构加固斜撑,结构加固斜撑下方与核心筒固定连接。Further, the lower part of the conversion support beam is also connected with a structural reinforcement diagonal brace, and the lower part of the structural reinforcement diagonal brace is fixedly connected with the core tube.

进一步的,所述承重夹梁为两平行梁中部垂直连接有两平行横杆形成口字的双H形件,两平行梁均连接于辅助架承重杆和核心筒剪力墙间。Further, the load-bearing clamp beam is a double H-shaped piece with two parallel cross bars vertically connected in the middle of the two parallel beams to form a mouth, and the two parallel beams are both connected between the auxiliary frame load-bearing bar and the core tube shear wall.

进一步的,所述辅助架承重杆两端均连接于核心筒剪力墙对侧两辅助架竖向杆之间;所述辅助架水平杆包含水平连接于核心筒剪力墙对侧上两辅助架竖向杆之间的辅助架水平横杆和连接于结构柱体和辅助架竖向杆之间、核心筒剪力墙与结构柱体之间的辅助架水平斜杆;所述辅助架水平斜杆在辅助架竖向杆的垂向间隔设置。Further, both ends of the auxiliary frame load-bearing rod are connected between the two auxiliary frame vertical rods on the opposite side of the core tube shear wall; the auxiliary frame horizontal rod includes two auxiliary frames horizontally connected to the opposite side of the core tube shear wall. The auxiliary frame horizontal cross bar between the frame vertical bars and the auxiliary frame horizontal inclined bar connected between the structural column and the auxiliary frame vertical bar, and between the core tube shear wall and the structural column; the auxiliary frame horizontal The inclined rods are arranged at vertical intervals of the vertical rods of the auxiliary frame.

进一步的,所述塔吊内爬基础基座可拆卸连接于核心筒内部的两侧剪力墙,塔吊内爬基础基座包含口字形或H型的内爬支撑梁、连接于内爬基础四周并与核心筒连接的内爬斜撑以及内爬基础下方平行设置内爬横向支撑。Further, the inner climbing foundation base of the tower crane is detachably connected to the shear walls on both sides inside the core tube. The inner-climbing diagonal bracing connected to the core tube and the inner-climbing lateral support are arranged in parallel below the inner-climbing foundation.

进一步的,夹持杆间隔设置于转换临时结构,夹持杆分别与塔吊节、辅助架承重杆和核心筒剪力墙固定。Further, the clamping rods are arranged at intervals in the transition temporary structure, and the clamping rods are respectively fixed with the tower crane joint, the auxiliary frame bearing rod and the core tube shear wall.

进一步的,超高层建筑核心筒塔吊高空转换体系的施工方法,具体步骤如下:Further, the construction method of the high-altitude conversion system of the core tube tower crane of the super high-rise building, the specific steps are as follows:

步骤一、埋件安装Step 1. Embedded parts installation

在主体结构施工时提前将埋件安装固定在设计标注的轴线和标高处;Install and fix the embedded parts at the axis and elevation marked in the design in advance during the construction of the main structure;

步骤二、安装转换临时结构Step 2. Install and convert temporary structure

1)核心筒及主体结构施工完第N层,并完成核心筒的爬模改造后,爬模爬升至N+1层,而后安装转换临时结构;1) After the construction of the core tube and the main structure of the Nth floor, and the completion of the climbing formwork transformation of the core tube, the climbing formwork climbs to the N+1 floor, and then the temporary structure is installed and converted;

2)N+1层及N+4层承重夹梁安装时,核心筒截面缩小,混凝土墙向内收缩,埋件无法固定,安装转换临时结构用于支撑承重夹梁的安装;转换临时结构与核心筒顶板连接,其中转换支撑梁底部通过结构加固斜撑做成三角支撑,保证不会受压变形;2) When the load-bearing clamp beams on the N+1 and N+4 floors are installed, the cross-section of the core tube is reduced, the concrete wall shrinks inward, and the embedded parts cannot be fixed. The temporary structure is installed and converted to support the installation of the load-bearing clamp beam; The top plate of the core tube is connected, and the bottom of the conversion support beam is made into a triangular support through structural reinforcement and diagonal bracing to ensure that it will not be deformed by compression;

3)安装转换临时结构时,分两次安装,先安装辅助架竖向杆,固定完成后安装辅助架水平杆、辅助架斜支撑及辅助架承重杆构件,垂直度校正完成后统一进行焊接,然后进行下一节辅助架竖向杆、辅助架水平杆辅助架斜支撑及辅助架承重杆的安装和焊接;3) When installing and converting the temporary structure, install it twice. First install the vertical rod of the auxiliary frame. After fixing, install the horizontal rod of the auxiliary frame, the diagonal support of the auxiliary frame and the bearing rod of the auxiliary frame. After the verticality correction is completed, uniformly weld. Then proceed to the installation and welding of the vertical rod of the auxiliary frame, the horizontal rod of the auxiliary frame, the diagonal support of the auxiliary frame and the bearing rod of the auxiliary frame;

步骤三、安装夹持组件Step 3. Install the clamping components

安装塔吊节在第N+1层及上部间隔设置的承重夹梁和夹持杆,其中N为大于1的整数;由下向上依次进行安装;Install the load-bearing clamping beams and clamping rods of the tower crane section on the N+1th floor and the upper part, where N is an integer greater than 1; the installation is performed sequentially from bottom to top;

步骤四、爬升塔吊Step 4. Climb the tower crane

将塔吊内爬基础基座留置于核心筒内,通过内爬装置进一步爬升塔吊,安装第N层转换基础前,需要将塔吊先爬升至第N+1层,使塔吊节通过爬升框先临时安装在第N+1层的承重夹梁上;The tower crane inner climbing foundation base is left in the core tube, and the tower crane is further climbed by the inner climbing device. Before installing the Nth floor conversion foundation, the tower crane needs to be climbed to the N+1th floor first, so that the tower crane section is temporarily installed through the climbing frame. On the load-bearing clamp beam on the N+1 floor;

其中,承重夹梁为两平行梁中部垂直连接有两平行横杆形成口字的双H形件,两平行梁均连接于辅助架承重杆和核心筒剪力墙间;Among them, the load-bearing clamp beam is a double H-shaped piece with two parallel cross bars vertically connected in the middle of the two parallel beams, and the two parallel beams are both connected between the auxiliary frame load-bearing bars and the core tube shear wall;

步骤五、施工转换基础Step 5. Construction conversion foundation

将塔吊节爬升用转换临时结构安装完成并夹持固定,并施工完成N层的转换基础;其中,转换基础包含呈转换基础底座、方形布置的转基立柱、连接于转基立柱顶部平行设置的两个转基承重梁以及连接于两转基承重梁之间的转基加强撑;所述转基立柱通过转换基础底座与核心筒顶板中转换支撑梁连接;The conversion temporary structure for climbing the tower crane section is installed, clamped and fixed, and the conversion foundation of the N floor is completed; wherein, the conversion foundation includes the conversion foundation base, the square-arranged swivel foundation column, and the parallel set connected to the top of the swivel foundation column. Two revolving foundation load-bearing beams and a revolving foundation reinforcing brace connected between the two revolving foundation bearing beams; the revolving foundation upright column is connected with the converting support beam in the top plate of the core tube through the converting foundation base;

步骤六、塔吊落回转换基础Step 6. The tower crane is dropped back to the conversion foundation

待转换基础施工完毕,将塔吊节底座落回第N层,完成连接的基础转换;After the construction of the conversion foundation is completed, drop the base of the tower crane section back to the Nth floor to complete the foundation conversion of the connection;

步骤七、安装附墙拉杆和顶升套架Step 7. Install the wall-attached tie rod and the jacking frame

当塔吊节到指定高度后,安装塔吊节上部附墙拉杆和塔吊顶升套架;When the tower crane section reaches the specified height, install the upper wall tie rod of the tower crane section and the tower top lifting frame;

步骤八,拆除夹持组件及转换临时结构Step 8. Remove the clamping assembly and convert the temporary structure

利用另一台塔吊,配合手拉葫芦链拆除夹持组件及转换临时结构,至此完成塔吊基础整体转换。Use another tower crane to remove the clamping components and convert the temporary structure in conjunction with the chain hoist, thus completing the overall conversion of the tower crane foundation.

进一步的,对于步骤五中,第N层的转换基础安装时,将最下道内爬支撑梁下方运至第N层,此第N层架设转换基础,保证转换基础中心间距与塔吊节主肢中心间距相适应;将塔吊节中内爬基节下方与塔吊可拆卸地脚连接,塔吊节中可拆卸地脚直接落在新架设的转换基础上方,调整塔吊垂直度符合要求后,夹紧内爬框顶升螺栓后,将可拆卸地脚与新架设的转换基础焊接;Further, for the step 5, when the conversion foundation of the Nth floor is installed, the lower part of the inner climbing support beam in the lowermost road shall be transported to the Nth floor, and the conversion foundation shall be erected on the Nth floor to ensure the center distance of the conversion foundation and the center of the main limb of the tower crane section. The spacing is suitable; connect the lower part of the inner climbing base section in the tower crane section with the detachable foot of the tower crane, and the detachable foot in the tower crane section directly falls on the newly erected conversion foundation. After adjusting the verticality of the tower crane to meet the requirements, clamp the inner climber. After the frame jacks up the bolts, weld the detachable foundation to the newly erected conversion foundation;

其中,在转换基础底部安装有应力传感器和应变传感器,实时监控应力和位移的变化,并设定极限阈值后与控制装置连接用于预警。Among them, a stress sensor and a strain sensor are installed at the bottom of the conversion foundation to monitor the changes of stress and displacement in real time, and connect to the control device for early warning after setting the limit threshold.

进一步的,对于步骤七,塔吊节底座在转换基础重生根后,再安装塔吊顶升套架;通过相邻塔吊互装顶升套架,同时需借助倒链配合;顶升套架安装时,根据现场塔吊顶升踏步方向,确定顶升套架开口方向,即标准节引进方向。Further, for step 7, after the base of the tower crane section is re-rooted after the conversion foundation, the tower crane jacking frame is installed; Determine the opening direction of the jacking frame, that is, the introduction direction of the standard section, according to the lifting step direction of the on-site tower ceiling.

本发明的有益效果体现在:The beneficial effects of the present invention are embodied in:

1)本发明通过在核心筒筒顶再次设置转换基础的方式,保证了核心筒上部结构的进一步安装和塔吊的承力;1) The present invention ensures the further installation of the upper structure of the core tube and the bearing capacity of the tower crane by setting the conversion foundation again on the top of the core tube;

2)本发明通过转换临时结构的设置,利于在塔吊节转换底部基础时,先行在上方进行临时固定,保证下部的施工;2) The present invention facilitates the temporary fixation on the top when the tower crane section converts the bottom foundation to ensure the construction of the bottom through the setting of the temporary structure conversion;

3)本发明通过夹持组件和转换基础底座的设置,既可以保证转换过程中塔吊节的固定,又可以保证利用下部核心筒结构保证转换临时结构的支撑;3) The present invention can not only ensure the fixation of the tower crane section during the conversion process, but also ensure the support of the temporary structure of the conversion by using the lower core tube structure through the setting of the clamping assembly and the conversion foundation base;

此外,本发明设计的体系形式简单,节点设计简单,基础支撑受力小,对爬模影响小;较常用的外挂式基础,外附式转换基础钢构件截面小、安装量小,仅需一次转换构件装拆。转换基础施工与爬模及钢结构施工不冲突,基础施工节省劳动力、节约工期。本发明可广泛应用于超高层建筑内爬式塔吊因为结构布局变化,需要在高空转换塔吊爬升方式的塔吊基础选型及实施。In addition, the system designed by the invention is simple in form, simple in node design, small in force on the foundation support, and small in influence on the climbing form; compared with the commonly used externally-mounted foundation, the externally-attached conversion foundation steel member has a small cross-section and a small installation amount, and only needs to be installed once. Assembly and disassembly of conversion components. The conversion of foundation construction does not conflict with climbing formwork and steel structure construction, and foundation construction saves labor and construction time. The invention can be widely used in the selection and implementation of the tower crane foundation of the climbing tower crane in the super high-rise building because the structural layout changes.

本发明的其它特征和优点将在随后的说明书中阐述,并且部分地从说明书中变得显而易见,或者通过实施本发明而了解;本发明的主要目的和其它优点可通过在说明书中所特别指出的方案来实现和获得。Other features and advantages of the invention will be set forth in the description which follows, and in part will become apparent from the description, or may be learned by practice of the invention; the principal objects and other advantages of the invention may be particularly pointed out in the description programs to achieve and obtain.

附图说明Description of drawings

图1是超高层建筑核心筒塔吊高空转换体系施工示意图;Figure 1 is a schematic diagram of the construction of the tower crane high-altitude conversion system for the core tube of a super high-rise building;

图2为塔吊内爬基础支座连接示意图;Figure 2 is a schematic diagram of the connection of the inner climbing foundation support of the tower crane;

图3为本发明的塔吊高空转换基础立面示意图;3 is a schematic elevation view of a tower crane high-altitude conversion foundation of the present invention;

图4为本发明的塔吊转换临时结构立面示意图;4 is a schematic elevation view of the tower crane conversion temporary structure of the present invention;

图5为本发明的塔吊转换临时结构N层平面示意图;5 is a schematic plan view of the N-layer of the tower crane conversion temporary structure of the present invention;

图6为本发明的塔吊转换临时结构N+1层平面示意图;6 is a schematic plan view of the N+1 floor of the tower crane conversion temporary structure of the present invention;

图7为本发明的塔吊转换临时结构N+2~N+3层平面示意图;7 is a schematic plan view of the N+2~N+3 floors of the tower crane conversion temporary structure of the present invention;

图8为本发明的塔吊转换临时结构N+4层平面示意图;8 is a schematic plan view of the N+4 floor of the tower crane conversion temporary structure of the present invention;

图9为本发明的塔吊转换基础立面示意图;9 is a schematic elevation view of the tower crane conversion foundation of the present invention;

图10为本发明的塔吊转换基础平面示意图。10 is a schematic plan view of the tower crane conversion foundation of the present invention.

附图标记:1-核心筒、2-核心筒剪力墙、3-塔吊内爬基础基座、31-内爬支撑梁、32-内爬斜撑、33-内爬横向支撑、4-塔吊节、5-转换基础、51-转换支撑梁、52-转换基础底座、53-转基承重梁、54-转基立柱、55-结构加固斜撑、56-转基加强撑、6-夹持组件、61-承重夹梁、62-夹持杆、7-爬模、8-核心筒顶板、9-转换临时结构、91-辅助架竖向杆、92-辅助架斜支撑、93-辅助架水平杆、931-辅助架水平横杆、932-辅助架水平斜杆、94-辅助架承重杆、10-结构柱体、11-埋件。Reference signs: 1-core tube, 2-core tube shear wall, 3-inner climbing foundation base of tower crane, 31-inner climbing support beam, 32-inner climbing diagonal brace, 33-inner climbing lateral support, 4-tower crane Section, 5-Conversion Foundation, 51-Conversion Support Beam, 52-Conversion Foundation Base, 53-Turn Foundation Bearing Beam, 54-Turn Foundation Column, 55-Structural Reinforcement Diagonal Bracing, 56-Turn Foundation Reinforcing Bracing, 6-Clamping Components, 61-load-bearing clamp beam, 62-clamping rod, 7-climbing formwork, 8-core tube top plate, 9-transition temporary structure, 91-auxiliary frame vertical rod, 92-auxiliary frame diagonal support, 93-auxiliary frame Horizontal rod, 931-Auxiliary frame horizontal crossbar, 932-Auxiliary frame horizontal inclined rod, 94-Auxiliary frame load-bearing rod, 10-Structural column, 11-Embedded part.

具体实施方式Detailed ways

以某商业建筑为例,主塔楼为57层,裙房为5层; 主塔楼建筑高度为260m 。如图1所示,在施工时,在L25层以下采用内爬施工,由于塔吊在L25层需采用外附的方式进行塔吊顶升,考虑到本工程低区正式电梯机房位于L23-L24层间,故将塔吊高层基础设置在L25层楼板上,为保证塔吊高层基础能够顺利落在L25层。由此应用超高层建筑核心筒塔吊高空转换体系及其施工方法进行高空转换,以保证正常施工。Taking a commercial building as an example, the main tower is 57 floors and the podium is 5 floors; the main tower building height is 260m. As shown in Figure 1, during the construction, the internal climbing construction is adopted below the L25 floor. Since the tower crane needs to use an external method to lift the tower crane on the L25 floor, considering that the official elevator machine room in the lower area of the project is located between the L23-L24 floors Therefore, the tower crane high-rise foundation is set on the L25 floor, in order to ensure that the tower crane high-rise foundation can smoothly fall on the L25 floor. Therefore, the high-altitude conversion system and its construction method of the core tube tower crane of the super high-rise building are used for high-altitude conversion to ensure normal construction.

如图1至图10所示,包含核心筒1及对应主体结构、连接于核心筒1顶部上方的核心筒剪力墙2、连接于核心筒1内部的塔吊内爬基础基座3、连接于核心筒1上方的转换临时结构9、连接于转换临时结构9上的夹持组件6、位于核心筒1上方的转换基础5以及连接于转换基础5上方的塔吊节。As shown in Figures 1 to 10, it includes a core tube 1 and a corresponding main structure, a core tube shear wall 2 connected to the top of the core tube 1, a tower crane inner climbing foundation base 3 connected to the inside of the core tube 1, and a The conversion temporary structure 9 above the core tube 1 , the clamping assembly 6 connected to the conversion temporary structure 9 , the conversion foundation 5 located above the core tube 1 , and the tower crane section connected above the conversion foundation 5 .

本实施例中,塔吊内爬基础基座3可拆卸连接于核心筒1内部的两侧剪力墙,塔吊内爬基础基座3包含口字形的内爬支撑梁31、连接于内爬支撑梁31四周并与核心筒1连接的内爬斜撑32以及内爬支撑梁31之间的内爬横向支撑33。In this embodiment, the inner climbing foundation base 3 of the tower crane is detachably connected to the shear walls on both sides inside the core tube 1, and the inner climbing foundation base 3 of the tower crane includes a mouth-shaped inner climbing support beam 31, which is connected to the inner climbing support beam. The inner climbing diagonal braces 32 around the 31 and connected with the core tube 1 and the inner climbing lateral supports 33 between the inner climbing support beams 31 .

本实施例中,夹持组件6包含与塔吊节4四周连接且水平设置的夹持杆62和连接于核心筒剪力墙2与辅助架承重杆94之间的承重夹梁61,所述承重夹梁61临时可拆卸连接塔吊节4底部;所述夹持杆62端部与结构柱体10和/或转换临时结构9连接;In the present embodiment, the clamping assembly 6 includes a clamping rod 62 connected to the surrounding of the tower crane 4 and arranged horizontally, and a load-bearing clamping beam 61 connected between the core tube shear wall 2 and the auxiliary frame bearing rod 94 . The clamping beam 61 is temporarily detachably connected to the bottom of the tower crane section 4; the end of the clamping rod 62 is connected to the structural column 10 and/or the conversion temporary structure 9;

本实施例中,转换临时结构9包含与核心筒剪力墙2和四周结构柱体10连接的辅助架竖向杆91、间隔连接于辅助架竖向杆91水平向的辅助架水平杆93,连接于核心筒剪力墙2与辅助架水平杆93之间的承重夹梁61、间隔连接于结构柱体10与承重夹梁61之间或结构柱体10与辅助架水平杆93之间的辅助架斜支撑92,以及在塔吊临时固定楼层与辅助架竖向杆91连接的辅助架承重杆94;辅助架竖向杆91、辅助承重杆94和辅助架水平杆93形成框架体并通过夹持组件6与塔吊节4连接;承重夹梁61临时可拆卸连接塔吊节4底部。In this embodiment, the conversion temporary structure 9 includes an auxiliary frame vertical rod 91 connected to the core tube shear wall 2 and the surrounding structural columns 10, and an auxiliary frame horizontal rod 93 connected to the auxiliary frame vertical rod 91 in the horizontal direction at intervals, The load-bearing clamp beam 61 connected between the core tube shear wall 2 and the auxiliary frame horizontal rod 93, the auxiliary frame connected between the structural column 10 and the load-bearing clamp beam 61 or between the structural column 10 and the auxiliary frame horizontal rod 93 The frame diagonal support 92, and the auxiliary frame support rod 94 connected to the auxiliary frame vertical rod 91 on the temporarily fixed floor of the tower crane; the auxiliary frame vertical rod 91, the auxiliary load bearing rod 94 and the auxiliary frame horizontal rod 93 form a frame body and are clamped by The assembly 6 is connected to the tower crane section 4 ; the load-bearing clamp beam 61 is temporarily detachably connected to the bottom of the tower crane section 4 .

本实施例中,转换基础5包含呈方形布置的转基立柱54、连接于转基立柱54顶部平行设置的两个转基承重梁53以及连接于两转基承重梁53之间的转基加强撑56;转基承重梁53对应连接塔吊节底座,塔吊节底座上部安装塔吊节4,塔吊节4顶部连接起重机构。转基立柱54通过转换基础底座52与核心筒顶板8中转换支撑梁51连接。In this embodiment, the conversion foundation 5 includes a square-arranged swivel upright column 54 , two swivel foundation bearing beams 53 connected to the top of the swivel foundation column 54 and arranged in parallel, and a swivel foundation reinforcement connected between the two swivel foundation bearing beams 53 The support 56; the base bearing beam 53 is correspondingly connected to the base of the tower crane section, the tower crane section 4 is installed on the upper part of the tower crane section base, and the top of the tower crane section 4 is connected to the hoisting mechanism. The rotating base column 54 is connected with the transforming support beam 51 in the core tube top plate 8 through the transforming foundation base 52 .

本实施例中,转换基础5底部可拆卸连接于转换支撑梁51上,转换支撑梁51下部还连接有结构加固斜撑55,结构加固斜撑55下方与核心筒1固定连接。In this embodiment, the bottom of the conversion foundation 5 is detachably connected to the conversion support beam 51 , the lower part of the conversion support beam 51 is also connected with a structural reinforcement diagonal brace 55 , and the lower part of the structural reinforcement diagonal brace 55 is fixedly connected to the core tube 1 .

本实施例中,承重夹梁61为两平行梁中部垂直连接有两平行横杆形成口字的双H形钢件,两平行梁均连接于辅助架承重杆94和核心筒剪力墙2间。In this embodiment, the load-bearing clamp beam 61 is a double H-shaped steel piece with two parallel cross bars vertically connected in the middle of the two parallel beams to form a mouth, and the two parallel beams are connected between the auxiliary frame load-bearing bar 94 and the core tube shear wall 2 .

本实施例中,辅助架水平杆93包含水平连接于核心筒剪力墙2对侧上两辅助架竖向杆91之间的辅助架水平横杆931和连接于结构柱体10和辅助架竖向杆91之间、核心筒剪力墙2与结构柱体10之间的辅助架水平斜杆932;辅助架水平斜杆932在辅助架竖向杆91的垂向间隔设置。辅助架承重杆94在塔吊固定楼层连接于辅助架竖向杆91之间,并对应与承重夹梁61连接。In this embodiment, the auxiliary frame horizontal bars 93 include the auxiliary frame horizontal bars 931 horizontally connected between the two auxiliary frame vertical bars 91 on the opposite sides of the core tube shear wall 2, and the auxiliary frame horizontal bars 931 connected to the structural column 10 and the auxiliary frame vertical bars 91. Auxiliary frame horizontal inclined rods 932 between the vertical rods 91 and between the core tube shear wall 2 and the structural column 10; The auxiliary frame load-bearing rods 94 are connected between the auxiliary frame vertical rods 91 on the fixed floor of the tower crane, and are correspondingly connected with the load-bearing clamp beams 61 .

本实施例中,夹持杆间隔设置于转换临时结构,夹持杆包含塔吊节分别与辅助架承重杆、核心筒剪力墙固定。In this embodiment, the clamping rods are arranged at intervals in the transition temporary structure, and the clamping rods include tower crane sections which are respectively fixed to the auxiliary frame load-bearing rod and the core tube shear wall.

结合图1至图10,进一步说明超高层建筑核心筒塔吊高空转换体系的施工方法,具体步骤如下:1 to 10, the construction method of the super high-rise building core tube tower crane high-altitude conversion system is further described, and the specific steps are as follows:

步骤一、埋件安装Step 1. Embedded parts installation

在主体结构施工时提前将埋件11安装固定在设计标注的轴线和标高处。During the construction of the main structure, the embedded parts 11 are installed and fixed at the axes and elevations marked in the design in advance.

对于步骤一、在核心筒1及主体结构钢筋绑扎完成后,混凝土模板合模前,将埋件11点焊固定在设计图纸标注的轴线和标高处,偏差不得大于5mm;模板加固完成后,再次测量定位数据,如果偏差大于5mm,立即进行调整。For step 1, after the core tube 1 and the main structure steel bars are bound, and before the concrete formwork is closed, spot welding the embedded part 11 to the axis and elevation marked on the design drawing, and the deviation shall not be greater than 5mm; after the formwork reinforcement is completed, again Measure the positioning data, if the deviation is greater than 5mm, adjust it immediately.

本实施例中,支撑体系通过埋件11与主体结构相连,埋件11与支撑之间采用角焊缝焊接连接,焊缝等级为一级,探伤比例为100%。In this embodiment, the support system is connected to the main structure through the embedded part 11, and the embedded part 11 and the support are connected by fillet welding, the welding seam level is first-class, and the flaw detection ratio is 100%.

本实施例中,塔吊节4承重夹梁61上方1.5m~1.8m位置,在核心筒剪力墙2的墙体上埋设埋件11,用于转换临时结构9及夹持组件6安装时手动葫芦的固定点。In this embodiment, at a position of 1.5m~1.8m above the load-bearing clamp beam 61 of the tower crane section 4, the embedded part 11 is embedded on the wall of the core tube shear wall 2, which is used for the conversion of the temporary structure 9 and the manual installation of the clamping assembly 6. Fixing point for the gourd.

步骤二、安装转换临时结构9Step 2. Install and convert temporary structure 9

核心筒1及主体结构施工完第N层,并完成核心筒1的爬模7改造后,爬模7爬升至N+1层,而后安装转换临时结构9。After the construction of the core tube 1 and the main structure of the Nth floor, and the completion of the transformation of the climbing formwork 7 of the core tube 1, the climbing formwork 7 climbs to the N+1 floor, and then the temporary structure 9 for conversion is installed.

本实施例中,核心筒1竖向结构施工完L25层及完成核心筒1爬模7改造后,爬模7爬升至L26层,此时,开始安装塔吊爬升用转换临时结构9。核心筒1竖向墙体施工L27层完成,继续安装塔吊爬升用转换临时结构9并安装L26层塔吊在L26层夹持组件6。In this embodiment, after the construction of the vertical structure of the core tube 1 is completed on the L25 floor and the transformation of the climbing formwork 7 of the core tube 1 is completed, the climbing formwork 7 climbs to the L26 floor. At this time, the installation of the conversion temporary structure 9 for tower crane climbing begins. The vertical wall construction of the core tube 1 is completed on the L27 floor. Continue to install the tower crane climbing conversion temporary structure 9 and install the L26 floor tower crane on the L26 floor clamping assembly 6.

承重夹梁61安装时,核心筒1截面缩小,混凝土墙向内收缩,埋件11无法固定,安装转换临时结构9用于支撑承重夹梁61的安装;转换临时结构9与核心筒顶板8连接,转换临时结构9底部通过结构加固斜撑55做成三角支撑,保证不会受压变形。When the load-bearing clamp beam 61 is installed, the cross-section of the core tube 1 is reduced, the concrete wall shrinks inward, and the embedded part 11 cannot be fixed. The installation and conversion temporary structure 9 is used to support the installation of the load-bearing clamp beam 61; the conversion temporary structure 9 is connected with the core tube top plate 8 , the bottom of the conversion temporary structure 9 is made into a triangular support through the structural reinforcement diagonal brace 55 to ensure that it will not be deformed by compression.

本实施例中,在安装25层转换基础5前,需要将塔吊节4先爬升至26层,使塔吊节底座先坐在26层的承重夹梁61上,并在30层做第二道夹持,保证塔吊的整体稳定性;待25层塔吊转换基础5及相应支持安装完毕后,塔吊节底座下降至转换基础5上并固定。In this embodiment, before installing the conversion foundation 5 on the 25th floor, the tower crane section 4 needs to be climbed to the 26th floor first, so that the base of the tower crane section sits on the load-bearing clamp beam 61 on the 26th floor first, and the second clamp is made on the 30th floor. to ensure the overall stability of the tower crane; after the 25-story tower crane conversion foundation 5 and the corresponding support are installed, the tower crane joint base is lowered to the conversion foundation 5 and fixed.

安装转换临时结构9时,分两次安装,先安装辅助架竖向杆91,固定完成后安装辅助架水平杆93、辅助架斜支撑92及辅助架承重杆94构件,垂直度校正完成后统一进行焊接,然后进行下一节辅助架竖向杆91、辅助架水平杆92、辅助架斜支撑92及辅助架承重杆94的安装和焊接。When installing and converting the temporary structure 9, install it twice, first install the auxiliary frame vertical rod 91, and then install the auxiliary frame horizontal rod 93, the auxiliary frame inclined support 92 and the auxiliary frame bearing rod 94 after the completion of the fixing, and the verticality correction is completed. Welding is performed, and then the installation and welding of the next section of the vertical rod 91 of the auxiliary frame, the horizontal rod 92 of the auxiliary frame, the diagonal support 92 of the auxiliary frame and the bearing rod 94 of the auxiliary frame are carried out.

步骤三、安装夹持组件Step 3. Install the clamping components

在第N+1层及上部间隔设置的承重夹梁61和夹持杆62,其中N为大于1的整数。由下向上依次进行安装。The load-bearing clamping beams 61 and the clamping rods 62 are arranged at intervals on the N+1th layer and the upper part, wherein N is an integer greater than 1. Install from bottom to top.

步骤四、爬升塔吊Step 4. Climb the tower crane

将塔吊内爬基础基座3留置于核心筒1内,通过内爬装置进一步爬升塔吊,安装第N层转换基础5前,需要将塔吊先爬升至第N+1层,使塔吊节4通过爬升框先临时安装在第N+1层的承重夹梁61上。The inner climbing foundation base 3 of the tower crane is left in the core tube 1, and the tower crane is further climbed by the inner climbing device. Before installing the Nth floor conversion foundation 5, the tower crane needs to be climbed to the N+1th floor first, so that the tower crane section 4 can pass through the climb. The frame is temporarily installed on the load-bearing clamp beam 61 on the N+1th floor.

其中,承重夹梁61为两平行梁中部垂直连接有两平行横杆形成口字的双H形件,两平行梁均连接于辅助架承重杆94和核心筒剪力墙2间。Among them, the load-bearing clamp beam 61 is a double H-shaped piece with two parallel cross bars vertically connected in the middle of the two parallel beams, and the two parallel beams are both connected between the auxiliary frame load-bearing bar 94 and the core tube shear wall 2 .

本实施例中,进行塔吊节4的爬升,将塔吊节底座落在L22层。核心筒1竖向结构施工L31层完成,并将塔吊整体爬升用转换临时结构9安装完成;安装塔吊在L30层塔吊夹持组件6,并爬升塔吊,将塔吊节底座落在L25层。In this embodiment, the tower crane section 4 is climbed, and the base of the tower crane section is placed on the L22 floor. The vertical structure construction of the core tube 1 is completed on the L31 floor, and the conversion temporary structure 9 for the tower crane's overall climbing is completed;

其中,承重夹梁61为两平行梁中部垂直连接有两平行横杆形成口字的双H形件,两平行梁均连接于辅助架承重杆94和核心筒剪力墙2间。Among them, the load-bearing clamp beam 61 is a double H-shaped piece with two parallel cross bars vertically connected in the middle of the two parallel beams, and the two parallel beams are both connected between the auxiliary frame load-bearing bar 94 and the core tube shear wall 2 .

步骤五、施工转换基础Step 5. Construction conversion foundation

将塔吊节4爬升用转换临时结构9安装完成并夹持固定,并施工完成N层的转换基础5。The conversion temporary structure 9 for climbing the tower crane section 4 is installed, clamped and fixed, and the N-layer conversion foundation 5 is completed.

其中,转换基础5包含转换基础底座52、方形布置的转基立柱54、连接于转基立柱54顶部平行设置的两个转基承重梁53以及连接于两转基承重梁53之间的转基加强撑56;转基立柱54通过转换基础底座52与核心筒顶板8中转换支撑梁51连接。The conversion foundation 5 includes a conversion foundation base 52 , a square-arranged swivel foundation column 54 , two swivel foundation bearing beams 53 connected to the top of the swivel foundation column 54 and arranged in parallel, and a swivel foundation connected between the two swivel foundation bearing beams 53 Reinforcing support 56 ; swivel base upright column 54 is connected with the conversion support beam 51 in the core tube top plate 8 through the conversion base base 52 .

对于步骤五中,第N层的转换基础5安装时,将最下道内爬支撑梁31下方运至第N层,此第N层架设转换基础5,保证转换基础5中心间距与塔吊节4主肢中心间距相适应;将塔吊节4中内爬基节下方与塔吊可拆卸地脚连接,塔吊节4中可拆卸地脚直接落在新架设的转换基础5上方,调整塔吊垂直度符合要求后,夹紧内爬框顶升螺栓后,将可拆卸地脚与新架设的转换基础5焊接。In step 5, when the conversion foundation 5 on the Nth floor is installed, the lower part of the inner climbing support beam 31 in the lowermost road is transported to the Nth floor, where the conversion foundation 5 is erected on the Nth floor to ensure that the center distance of the conversion foundation 5 is the same as that of the tower crane joint 4. The distance between the centers of the limbs should be adapted; the lower part of the inner climbing base section in the tower crane section 4 is connected with the detachable feet of the tower crane, and the detachable feet in the tower crane section 4 fall directly above the newly erected conversion foundation 5. After adjusting the verticality of the tower crane to meet the requirements , After clamping the jacking bolts of the inner climbing frame, weld the detachable foundation to the newly erected conversion foundation 5.

整个塔吊垂直度符合要求后,夹紧内爬框顶升螺栓后,将可拆卸地脚与新架设的转换基础5焊接,600mm直径的可拆卸地脚底板圆弧四周围焊,焊脚高30mm。After the verticality of the entire tower crane meets the requirements, after clamping the jacking bolts of the inner climbing frame, weld the detachable foundation to the newly erected conversion foundation 5, and weld the 600mm diameter detachable foundation base plate around the arc, and the height of the welding feet is 30mm. .

其中,在转换基础5底部安装有应力传感器和应变传感器,实时监控应力和位移的变化,并设定极限阈值后与控制装置连接用于预警。Among them, a stress sensor and a strain sensor are installed at the bottom of the conversion foundation 5 to monitor the changes of stress and displacement in real time, and connect to the control device for early warning after setting the limit threshold.

步骤六、塔吊落回转换基础Step 6. The tower crane is dropped back to the conversion foundation

待核心筒顶板8施工完毕,将塔吊节底座落回第N层,完成连接的基础转换。After the construction of the top plate 8 of the core tube is completed, the base of the tower crane section is dropped back to the Nth floor to complete the foundation conversion of the connection.

步骤七、安装附墙拉杆和顶升套架Step 7. Install the wall-attached tie rod and the jacking frame

当塔吊节4到指定高度后,安装塔吊节4上部附墙拉杆和塔吊顶升套架;When the tower crane section 4 reaches the specified height, install the upper wall tie rod of the tower crane section 4 and the tower top lifting frame;

对于步骤七,塔吊节底座在转换基础5重生根后,再安装塔吊顶升套架;通过相邻塔吊互装顶升套架,同时需借助倒链配合;顶升套架安装时,根据现场塔吊顶升踏步方向,确定顶升套架开口方向,即标准节引进方向。For step 7, after the base of the tower crane section is re-rooted after the conversion foundation 5, the tower crane jacking frame is installed; the jacking frame is mutually installed by adjacent tower cranes, and the reverse chain is required at the same time; when the jacking frame is installed, according to the site The direction of the lifting step of the tower ceiling determines the opening direction of the jacking frame, that is, the introduction direction of the standard section.

本实施例中,塔吊顶升套架包含拉杆组件、连接件和标准节等。现场进行吊装附着框架。施工时,将一侧的附着框架吊至塔身附着点处。将另一侧附着框架吊起就位,然后将两外侧框连成一体。框架先调平后固定。吊装与墙体连接的双孔支座即附着耳板,焊接固定。打坡口焊接,焊脚高度14mm。采用焊接拉杆,吊装附着拉杆,拉杆销接并封上开口销,外套节与插件先镶嵌,暂不焊接,吊装前必须用φ8以上的铁丝将外套节及插件绑扎牢靠。In this embodiment, the tower-suspended ceiling-lifting frame includes a tie rod assembly, a connecting piece, a standard section, and the like. On-site hoisting to attach the frame. During construction, hang the attachment frame on one side to the attachment point of the tower body. Lift the other side attachment frame into place, then join the two outer frames together. The frame is leveled first and then fixed. The double-hole support connected to the wall is attached to the ear plate and fixed by welding. Bevel welding, the height of the welding leg is 14mm. Welding tie rods are used, the tie rods are hoisted and attached, the tie rods are pinned and sealed with cotter pins, the outer sleeve and the plug-in are inlaid first, and no welding is required for the time being.

本实施例中,调整塔身垂直度,调整时,应先吊起一重量适当重物,调整前后力矩,处于平衡位置后,用经纬仪监测塔身两方向的偏差,调整好垂直度偏差不超过2‰。采用焊接拉杆,则现场施焊,焊接上外套节与插件,每条焊缝焊接长度不低于400毫米,焊缝厚度为10毫米,焊缝不得有气孔、夹渣等缺陷;如采用拼接拉杆,则需调整调节螺栓至合适位置。附着验收合格后方可进行塔吊顶升。In this embodiment, to adjust the verticality of the tower body, when adjusting, a heavy object with an appropriate weight should be hoisted first, and the front and rear moments should be adjusted. After it is in a balanced position, use the theodolite to monitor the deviation of the tower body in both directions, and adjust the verticality deviation to not exceed 2‰. If the welding tie rod is used, the welding shall be carried out on site, and the upper outer joint and the plug-in shall be welded. The welding length of each welding seam shall not be less than 400 mm, the welding seam thickness shall be 10 mm, and the welding seam shall not have defects such as pores and slag inclusion; , you need to adjust the adjusting bolt to the appropriate position. After the attachment is qualified, the tower crane can be lifted.

步骤八,拆除夹持组件及转换临时结构Step 8. Remove the clamping assembly and convert the temporary structure

利用另一台塔吊,配合手拉葫芦链拆除夹持组件6及转换临时结构9,至此完成塔吊基础整体转换。Use another tower crane to remove the clamping assembly 6 and convert the temporary structure 9 in cooperation with the chain hoist, thus completing the overall conversion of the tower crane foundation.

以上所述仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内所想到的变化或替换,都应涵盖在本发明的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. should be included within the protection scope of the present invention.

Claims (10)

1. A super high-rise building core tube tower crane high idling exchange system is characterized by comprising a core tube (1) and a corresponding main body structure, a core tube shear wall (2) connected above the top of the core tube (1), a tower crane inner climbing foundation base (3) connected inside the core tube (1), a conversion temporary structure (9) connected above the core tube (1), a clamping assembly (6) connected on the conversion temporary structure (9) and the core tube shear wall (2), a conversion foundation (5) located at the bottom of the conversion temporary structure (9) and connected above a core tube top plate (8), and a tower crane section (4) connected above the conversion foundation (5);
the temporary conversion structure (9) comprises auxiliary frame vertical rods (91) connected with the core tube shear wall (2) and the surrounding structural columns (10), auxiliary frame horizontal rods (93) connected to the auxiliary frame vertical rods (91) in the horizontal direction at intervals, auxiliary frame inclined supports (92) connected between the structural columns (10) and the bearing clamp beams (61) or between the structural columns (10) and the auxiliary frame horizontal rods (93) at intervals, and auxiliary frame bearing rods (94) connected with the auxiliary frame vertical rods (91) at the temporary tower crane fixing floor; the auxiliary frame vertical rod (91), the auxiliary frame horizontal rod (93) and the auxiliary frame bearing rod (94) form a frame body and are connected with the tower crane section (4) through the clamping assembly (6);
the clamping assembly (6) comprises clamping rods (62) which are connected with the periphery of the tower crane section (4) and are horizontally arranged and a bearing clamping beam (61) which is connected between the core tube shear wall (2) and the auxiliary frame bearing rod (94), and the bearing clamping beam (61) is temporarily detachably connected with the bottom of the tower crane section (4); the end of the clamping rod (62) is connected with the structure column (10) and/or the conversion temporary structure (9);
the conversion foundation (5) comprises a rotating foundation upright post (54) which is arranged in a square shape, two rotating foundation bearing beams (53) which are connected to the tops of the rotating foundation upright posts (54) and arranged in parallel, and a rotating foundation reinforcing support (56) which is connected between the two rotating foundation bearing beams (53), wherein the rotating foundation upright post (54) is connected with a conversion support beam (51) in the core barrel top plate (8) through a conversion foundation base (52); the rotating base bearing beam (53) is correspondingly connected with a tower crane section base, a tower crane section (4) is installed on the upper portion of the tower crane section base, and the top of the tower crane section (4) is connected with a hoisting mechanism.
2. The super high-rise building core tube tower crane high-idle exchange system as claimed in claim 1, characterized in that the lower part of the conversion supporting beam (51) is further connected with a structural reinforcement inclined strut (55), and the lower part of the structural reinforcement inclined strut (55) is fixedly connected with the core tube (1).
3. The super high-rise building core tube tower crane high-idling system as claimed in claim 1, wherein the bearing clamp beam (61) is a double H-shaped member formed by two parallel beams vertically connected with two parallel cross bars in the middle, and the two parallel beams are connected between the auxiliary frame bearing bar (94) and the core tube shear wall (2).
4. The high-idle exchange system of the core tube tower crane of the super high-rise building as claimed in claim 3, characterized in that both ends of the auxiliary frame bearing rod (94) are connected between the two auxiliary frame vertical rods (91) at the opposite side of the core tube shear wall (2); the auxiliary frame horizontal rods (93) comprise auxiliary frame horizontal cross rods (931) horizontally connected between two auxiliary frame vertical rods (91) on the opposite side of the core barrel shear wall (2) and auxiliary frame horizontal inclined rods (932) connected between the structural column body (10) and the auxiliary frame vertical rods (91) and between the core barrel shear wall (2) and the structural column body (10); horizontal down tube (932) of auxiliary frame sets up at the vertical interval of auxiliary frame vertical pole (91).
5. The core tube tower crane high-idle exchange system of the super high-rise building, according to claim 1, is characterized in that the tower crane internal climbing foundation base (3) is detachably connected to the shear walls on two sides inside the core tube (1), the tower crane internal climbing foundation base (3) comprises an internal climbing support beam (31) in a square shape or an H shape, an internal climbing inclined strut (32) connected to the periphery of the internal climbing foundation and connected with the core tube (1), and an internal climbing transverse strut (33) arranged in parallel below the internal climbing foundation.
6. The high-idle conversion system of the core tube tower crane of the super high-rise building as claimed in claim 1, characterized in that the clamping rods (62) are arranged at intervals on the conversion temporary structure (9), and the clamping rods (62) are respectively fixed with the tower crane sections (4), the auxiliary frame bearing rods (94) and the core tube shear wall (2).
7. The construction method of the core tube tower crane high-altitude conversion system of the super high-rise building according to any one of claims 1 to 6, characterized by comprising the following specific steps:
step one, mounting embedded parts
When the main structure is constructed, the embedded part (11) is installed and fixed at the axis and the elevation of the design label in advance;
step two, installing and converting the temporary structure
1) Constructing the Nth layer of the core barrel (1) and the main structure, after the transformation of the creeping formwork (7) of the core barrel (1) is completed, climbing the creeping formwork (7) to the N +1 layer, and then installing a conversion temporary structure (9);
2) when the bearing clamping beams (61) of the N +1 layer and the N +4 layer are installed, the section of the core cylinder (1) is reduced, the concrete wall is contracted inwards, the embedded part (11) cannot be fixed, and the installation and conversion temporary structure (9) is used for supporting the installation of the bearing clamping beams (61); the conversion temporary structure (9) is connected with the top plate (8) of the core barrel, wherein the bottom of the conversion supporting beam (51) is made into a triangular support through a structure reinforcing inclined strut (55) to ensure that the conversion supporting beam cannot deform under pressure;
3) when the temporary structure (9) is installed and converted, the temporary structure is installed twice, an auxiliary frame vertical rod (91) is installed firstly, an auxiliary frame horizontal rod (93), an auxiliary frame inclined support (92) and an auxiliary frame bearing rod (94) component are installed after fixing is completed, welding is uniformly carried out after verticality correction is completed, and then installation and welding of the next auxiliary frame vertical rod (91), an auxiliary frame horizontal rod (93), an auxiliary frame inclined support (92) and an auxiliary frame bearing rod (94) are carried out;
step three, installing a clamping assembly
Installing bearing clamping beams (61) and clamping rods (62) of a tower crane section (4) which are arranged on the (N + 1) th layer and the upper part at intervals, wherein N is an integer greater than 1; sequentially mounting from bottom to top;
step four, climbing tower crane
The tower crane inner climbing foundation base (3) is left in the core tube (1), the tower crane is further climbed through an inner climbing device, before the Nth layer of conversion foundation (5) is installed, the tower crane needs to climb to the (N + 1) th layer, and the tower crane section (4) is temporarily installed on the bearing clamp beam (61) of the (N + 1) th layer through a climbing frame;
the bearing clamp beam (61) is a double H-shaped piece formed by vertically connecting two parallel cross rods to the middle parts of two parallel beams to form a square, and the two parallel beams are connected between the auxiliary frame bearing rod (94) and the core tube shear wall (2);
step five, construction conversion foundation
Completing installation, clamping and fixing of a temporary conversion structure (9) for climbing of the tower crane section (4), and completing construction of a conversion foundation (5) with N layers; the conversion foundation (5) comprises a conversion foundation base (52), a square-arranged foundation transfer column (54), two foundation transfer bearing beams (53) connected to the tops of the foundation transfer column (54) in parallel and a foundation transfer reinforcing support (56) connected between the two foundation transfer bearing beams (53); the foundation-rotating upright column (54) is connected with a conversion supporting beam (51) in the core barrel top plate (8) through a conversion foundation base (52);
step six, tower crane fall-back conversion foundation
After the construction of the conversion foundation (5) is finished, the tower crane section base falls back to the Nth layer to complete the connection foundation conversion;
seventhly, installing wall-attached pull rods and jacking sleeve frame
When the tower crane section (4) reaches a specified height, installing a wall-attached pull rod and a tower crane jacking sleeve frame on the upper part of the tower crane section (4);
step eight, dismantling the clamping assembly and converting the temporary structure
And (3) removing the clamping assembly (6) and the temporary conversion structure (9) by using another tower crane in cooperation with the chain block chain, so as to complete the whole conversion of the tower crane foundation.
8. The construction method of the core tube tower crane high-altitude conversion system of the super high-rise building according to claim 7, wherein for the step one, after the binding of the core tube (1) and the main structure steel bars is completed, and before the closing of the concrete template, the embedded part (11) is fixed at the marked axis and elevation of the design drawing by spot welding, and the deviation is not more than 5 mm; measuring the positioning data again after the template reinforcement is finished, and adjusting immediately if the deviation is more than 5 mm;
an embedded part (11) is buried in the core tube shear wall (2) at the position of 1.5-1.8 m above the bearing clamping beam (61) and is used for converting a temporary structure (9) and fixing points of a manual hoist during installation of the clamping assembly (6).
9. The construction method of the high-altitude conversion system of the core tube tower crane of the super high-rise building according to claim 8, characterized in that in the fifth step, when the conversion foundation (5) of the Nth floor is installed, the lower part of the lowest inner climbing support beam is transported to the Nth floor, the Nth floor is provided with the conversion foundation (5) in a erecting way, and the center distance of the conversion foundation (5) is ensured to be matched with the center distance of the main limb of the tower crane section (4); connecting the lower part of an inner climbing base section in a tower crane section (4) with a detachable foundation of the tower crane, directly dropping the detachable foundation in the tower crane section (4) above a newly erected conversion foundation (5), adjusting the verticality of the tower crane to meet the requirement, clamping a jacking bolt of an inner climbing frame, and welding the detachable foundation with the newly erected conversion foundation (5);
wherein, install stress sensor and strain sensor at conversion basis (5) bottom, the change of real time monitoring stress and displacement to be connected with controlling means and be used for the early warning after setting for the limit threshold value.
10. The construction method of the high-altitude conversion system of the core tube tower crane of the super high-rise building as claimed in claim 9, wherein for step seven, the tower crane jacking sleeve frame is installed after the tower crane joint base is rooted again on the conversion foundation (5); jacking sleeve frames are mutually installed through adjacent tower cranes, and meanwhile, the jacking sleeve frames need to be matched by virtue of chain blocks; when the jacking sleeve frame is installed, the opening direction of the jacking sleeve frame, namely the introduction direction of the standard knot, is determined according to the jacking step direction of the tower crane on site.
CN202110672388.XA 2021-06-17 2021-06-17 High-altitude conversion system of core tube tower crane of super high-rise building and construction method thereof Expired - Fee Related CN113401815B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110672388.XA CN113401815B (en) 2021-06-17 2021-06-17 High-altitude conversion system of core tube tower crane of super high-rise building and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110672388.XA CN113401815B (en) 2021-06-17 2021-06-17 High-altitude conversion system of core tube tower crane of super high-rise building and construction method thereof

Publications (2)

Publication Number Publication Date
CN113401815A CN113401815A (en) 2021-09-17
CN113401815B true CN113401815B (en) 2022-07-12

Family

ID=77684745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110672388.XA Expired - Fee Related CN113401815B (en) 2021-06-17 2021-06-17 High-altitude conversion system of core tube tower crane of super high-rise building and construction method thereof

Country Status (1)

Country Link
CN (1) CN113401815B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116220192B (en) * 2022-12-02 2025-10-21 悉地国际设计顾问(深圳)有限公司 A conversion system between diagonal braces and core tubes
CN115893231A (en) * 2022-12-30 2023-04-04 中韬华胜工程科技有限公司 A construction method and construction system based on an internal climbing tower crane structure
CN115973934B (en) * 2023-01-10 2025-08-22 上海建工一建集团有限公司 Adjustable locking support system and construction method for fastening standard sections
CN117661846B (en) * 2024-01-17 2026-03-31 中国建筑第二工程局有限公司 A high-altitude conversion construction method for building machines using variable cross-section shear walls
CN119637748B (en) * 2025-01-21 2026-01-23 广州市第二建筑工程有限公司 Construction method of super high-rise building tower crane
CN120887342B (en) * 2025-09-30 2025-11-28 中国铁建大桥工程局集团有限公司 Safety Early Warning Method and System for Support Beams of Self-Lifting Devices of Internal Climbing Tower Cranes

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006009421A (en) * 2004-06-25 2006-01-12 Sumitomo Mitsui Construction Co Ltd Building construction method using tower crane
CN104652813A (en) * 2015-01-30 2015-05-27 上海绿地建设(集团)有限公司 Tower crane construction technology used for super high-rise building steel structure
CN106219419A (en) * 2016-09-19 2016-12-14 中国建筑第八工程局有限公司 High-rise building large-scale swing arm tower crane is converted to plug-in construction method by interior climbing in situ
CN111115469A (en) * 2019-12-31 2020-05-08 上海市机械施工集团有限公司 Conversion mechanism, climbing system and method for climbing tower crane in separated core barrel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006009421A (en) * 2004-06-25 2006-01-12 Sumitomo Mitsui Construction Co Ltd Building construction method using tower crane
CN104652813A (en) * 2015-01-30 2015-05-27 上海绿地建设(集团)有限公司 Tower crane construction technology used for super high-rise building steel structure
CN106219419A (en) * 2016-09-19 2016-12-14 中国建筑第八工程局有限公司 High-rise building large-scale swing arm tower crane is converted to plug-in construction method by interior climbing in situ
CN111115469A (en) * 2019-12-31 2020-05-08 上海市机械施工集团有限公司 Conversion mechanism, climbing system and method for climbing tower crane in separated core barrel

Also Published As

Publication number Publication date
CN113401815A (en) 2021-09-17

Similar Documents

Publication Publication Date Title
CN113401815B (en) High-altitude conversion system of core tube tower crane of super high-rise building and construction method thereof
CN107100187B (en) Tower crane steel girder erection structure and installation method
CN114232805B (en) Construction method of ultrahigh-height large-span steel concrete beam hanging structure
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN112647425A (en) Integral hoisting construction method for pier stud reinforcement cage
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN112112284A (en) Integral jacking construction method for net rack
CN111809528B (en) A pier column vertical cage platform channel construction method and cage platform channel device
WO2023240812A1 (en) Overall construction platform structure and method for adding core tube wall body in air
CN115749255A (en) A combination system of core tube climbing formwork and horizontal structure aluminum formwork and its construction method
CN115788012B (en) A hydraulic climbing formwork integral climbing sliding device and method suitable for inclined wall construction
CN100365237C (en) A self-elevating deformable and detachable overall lifting steel platform system and construction method
CN117145043A (en) Prefabricated corridor, corridor end connection structure and construction method
CN109440942B (en) Installation structure and construction process of factory building roof grid
CN111847272A (en) Supporting method of tower crane for renovation of existing buildings
CN115538678A (en) Construction method for large-angle overhanging landscape platform side small platform
CN216787874U (en) Large-scale ring type truss hoisting structure in large-span high altitude
CN111764623B (en) Hanging construction platform module and construction method of high altitude large cantilever steel roof frame
CN208152583U (en) A kind of high-building construction ancillary equipment
CN118958482A (en) A method for positioning a large-span rigid entrance porch and arch columns
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof
CN215287772U (en) A tower crane conversion connection system
CN212269274U (en) Tower crane supporting system for reconstruction of existing building
CN116122579A (en) Hoisting method for bidirectional bending dome bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220712