CN113401809A - Curtain wall unit body hoisting system - Google Patents

Curtain wall unit body hoisting system Download PDF

Info

Publication number
CN113401809A
CN113401809A CN202110864192.0A CN202110864192A CN113401809A CN 113401809 A CN113401809 A CN 113401809A CN 202110864192 A CN202110864192 A CN 202110864192A CN 113401809 A CN113401809 A CN 113401809A
Authority
CN
China
Prior art keywords
curtain wall
wall unit
hoisting
guide
unit body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110864192.0A
Other languages
Chinese (zh)
Inventor
邹彬
刘文卓
贾杨
张运章
杨国涛
王晓琴
王晓平
刘晓阳
栾祖江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Zhongqing Jianan Construction Group Co Ltd
Original Assignee
Qingdao University of Technology
Zhongqing Jianan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology, Zhongqing Jianan Construction Group Co Ltd filed Critical Qingdao University of Technology
Priority to CN202110864192.0A priority Critical patent/CN113401809A/en
Publication of CN113401809A publication Critical patent/CN113401809A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C21/00Cable cranes, i.e. comprising hoisting devices running on aerial cable-ways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/10Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for preventing cable slack
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

一种幕墙单元体吊装系统,用于对幕墙单元体进行吊装,包括:吊装支架、引导缆绳、悬挂组件和第一卷扬机,吊装支架装设在屋面上;引导缆绳一端装设在吊装支架上,另一端装设在地面上;悬挂组件装设在引导缆绳上;第一卷扬机装设在屋面或吊装支架上,第一卷扬机牵引悬挂组件时,悬挂组件沿着引导缆绳升降,对固定在悬挂组件上的幕墙单元体进行吊装。本发明实施例中通过引导缆绳对悬挂组件的升降进行引导,并抵抗风力作用,使悬挂组件升降稳定,从而稳定的对幕墙单元体进行吊装,吊装过程中无须人工参与,作业过程省力且安全,并且系统结构简单,无须过多机械参与,解决了当前吊装方式中存在的既耗费机械又耗人力并且容易发生安全问题的技术问题。

Figure 202110864192

A curtain wall unit body hoisting system is used for hoisting a curtain wall unit body, comprising: a hoisting bracket, a guide cable, a suspension component and a first hoist, the hoisting bracket is installed on the roof; one end of the guide cable is installed on the hoisting bracket, The other end is installed on the ground; the suspension component is installed on the guide cable; the first hoist is installed on the roof or the hoisting bracket, when the first hoist pulls the suspension component, the suspension component moves up and down along the guide cable, and is fixed on the suspension component. The upper curtain wall unit is hoisted. In the embodiment of the present invention, the lifting and lowering of the suspension assembly is guided by the guiding cable, and the lifting of the suspension assembly is resisted against the action of wind, so that the lifting and lowering of the suspension assembly is stable, so that the curtain wall unit body can be stably hoisted. No manual participation is required in the hoisting process, and the operation process is labor-saving and safe. In addition, the system has a simple structure and does not require too much mechanical participation, which solves the technical problems that the current hoisting method consumes both machinery and manpower and is prone to safety problems.

Figure 202110864192

Description

Curtain wall unit body hoisting system
Technical Field
The invention belongs to the technical field of building construction equipment, and particularly relates to a curtain wall unit body hoisting system.
Background
With the rapid development of the building industry, the unit type curtain wall structure form is widely applied to buildings such as high-rise office buildings, workshops and the like. The unit curtain wall is formed by assembling and combining curtain wall unit bodies, wherein the curtain wall unit bodies are prefabricated into integral plates in a factory, the integral plates are transported to a construction site for centralized stacking, and are hoisted to a hoisting position by adopting hoisting machinery and then are hoisted in place by matching electric hoists with manpower.
At present, the curtain wall unit bodies are hoisted in a hoisting mode by manpower, so that the curtain wall unit bodies are guided by pulling mooring ropes, the machinery and the manpower are consumed, the high-altitude operation is easily influenced by weather, wind power and the like, the conditions are complex and changeable, and the safety problem is easily caused by manual operation.
Disclosure of Invention
Aiming at the defects in the related art, the invention provides a curtain wall unit body hoisting system, which aims to solve the technical problems that the existing hoisting mode consumes machinery and manpower and is easy to cause safety problems.
The invention provides a curtain wall unit body hoisting system, which is used for hoisting curtain wall unit bodies and comprises the following components:
the hoisting support is arranged on the roof;
one end of the guide cable is arranged on the hoisting bracket, and the other end of the guide cable is arranged on the ground;
a suspension assembly mounted on the guide cable;
the first winch is arranged on the roof or the hoisting support, and when the first winch pulls the suspension assembly, the suspension assembly goes up and down along the guide cable rope to hoist the curtain wall unit body fixed on the suspension assembly.
This technical scheme leads the subassembly that hangs of going up and down through should saying the hawser, guarantees the hoist and mount safety and the stability of curtain cell cube, simple structure labour saving and time saving.
In some of these embodiments, the suspension assembly comprises:
the suspension bracket is connected with the first winch, and the curtain wall unit body is suspended on the suspension bracket;
and the stabilizing frame is hung on the hanging frame and is slidably arranged on the guide cable, and the stabilizing frame is sleeved on the curtain wall unit body.
According to the technical scheme, the suspension frame and the stabilizing frame are used for supporting and limiting and guiding the curtain wall unit bodies respectively, the structure is split, the weight is light, and the load of the first winch is reduced.
In some of these embodiments, the suspension assembly further comprises:
and the top end of the first hoisting belt is arranged on the suspension bracket, and the bottom end of the first hoisting belt is fixed on the top end of the curtain wall unit body.
This technical scheme realizes the support of mounted frame to the curtain cell cube through first hoist and mount area, realizes the hoist and mount of curtain cell cube.
In some of these embodiments, the suspension assembly further comprises:
and the top end of the second hoisting belt is arranged on the suspension bracket, and the bottom end of the second hoisting belt is fixed at the top of one side of the curtain wall unit body.
This technical scheme is connected the mounted frame and curtain cell cube through second hoist and mount area, plays redundant effect, prevents that curtain cell cube hoist and mount in-process from dropping.
In some of these embodiments, the first and second hoisting belts are symmetrically arranged in two. This technical scheme is through two hoist and mount areas to evenly supporting curtain cell cube both sides, keeps the curtain cell cube steady.
In some of these embodiments, the stabilizer comprises:
the limiting part is hung on the suspension bracket, the middle part of the limiting part is provided with a limiting groove, and the curtain wall unit body penetrates through the limiting groove;
and the guiding part is arranged on the limiting part and is arranged on the guiding cable in a sliding way.
This technical scheme slides on the guide cable rope through the guide portion, realizes the guide that the guide hawser removed the steady rest.
In some of these embodiments, the guide portion has a guide hole through which the guide cable is threaded. This technical scheme is spacing to the steady rest through wearing to establish messenger's guide hawser, guarantees that it removes along the guide hawser.
In some embodiments, the guide portion has a guide wheel mounted thereon, and the guide wheel rolls on the guide cable when the suspension assembly is lifted. This technical scheme passes through the rolling contact of guide pulley and guide hawser, reduces wearing and tearing, makes the steady rest remove along guide hawser smoothly.
In some of these embodiments, two guide cables are spaced apart, and the suspension assembly is located between the two guide cables. This technical scheme guides the lift of hanging the subassembly through two guide hawsers, further improves its stability.
In some of these embodiments, further comprising:
the tensioning seat is provided with a tensioning wheel and is arranged on the ground;
and the second winch is arranged on the ground, the guide cable bypasses the tension wheel from the lower side and is connected with the second winch, and the second winch pulls the guide cable to be tensioned.
According to the technical scheme, the guide cable is tensioned through the traction of the second winch, the droop and the deflection of the guide cable are reduced, and the lifting stability of the suspension assembly is improved.
Based on the technical scheme, the lifting of the suspension assembly is guided by the guide cable and the suspension assembly is stably lifted under the action of resisting wind power, so that the curtain wall unit body is stably hoisted, manual participation is not needed in the hoisting process, labor is saved and safety in the operation process is realized, the system structure is simple, excessive mechanical participation is not needed, and the technical problems that machinery and labor are consumed and safety is easily caused in the conventional hoisting mode are solved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without limiting the invention. In the drawings:
FIG. 1 is a first structural schematic diagram of a curtain wall unit body hoisting system of the invention;
FIG. 2 is a structural schematic diagram II of the curtain wall unit body hoisting system;
in the figure:
1. hoisting a support; 11. a fixed pulley;
21. a guide cable; 22. pulling the cable; 23. connecting a cable;
3. a suspension assembly; 31. a suspension bracket; 32. a stabilizer frame; 321. a limiting part; 322. a guide section; 323. a limiting groove; 324. a guide hole; 325. a guide wheel; 33. a first hoisting belt; 34. a second hoisting belt;
41. a first winch; 42. a second hoist;
5. a tensioning seat; 51. a tension wheel;
A. a roof; B. a ground surface; C. curtain wall unit body.
Detailed Description
The technical solutions in the embodiments will be clearly and completely described below with reference to the drawings in the embodiments of the present invention. It is to be understood that the described embodiments are merely a few embodiments of the invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments of the present invention without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "central," "lateral," "longitudinal," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for convenience in describing the present invention and for simplicity in description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are therefore not to be considered limiting.
The terms "first", "second" and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", "third" may explicitly or implicitly include one or more of the features.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1 to 2, in one exemplary embodiment of the curtain wall unit hoist system of the present invention, the curtain wall unit hoist system includes a hoist bracket 1, a guide rope 21, a suspension assembly 3, and a first hoist 41.
The hoisting support 1 is installed on the roof A at the top of the building, one end of the guide cable 2 is installed on the hoisting support 1, and the other end is installed on the ground B. The suspension unit 3 is mounted on the guide cable 2 and the first hoisting machine 41 is mounted on the roof a or on the hoisting support 1 and is connected to the suspension unit 3 by means of the pulling cable 22.
The curtain wall unit C is fixed to the hanger assembly 3, and the first winding machine 41 draws the hanger assembly 3 through the pulling cable 22 to raise the hanger assembly 3 along the guide cable 21, thereby lifting the curtain wall unit C to a desired installation position on the top of the building. When the first winch 41 is fixed on the roof a at the top of the building as shown in fig. 2, the fixed pulley 11 is installed on the hoisting bracket 1, and the traction cable 22 is connected with the suspension assembly 3 downwards after passing around the fixed pulley 11; as shown in fig. 1, when the first hoist 41 is secured to the lifting bracket 1, the tow cable 22 is directly connected downwardly to the hitch unit 3.
In the above exemplary embodiment, the suspension assembly 3 in the curtain wall unit hoisting system is slidably mounted on the guide cable 21, the guide cable 21 can guide the lifting of the suspension assembly 3, so that the suspension assembly 3 is lifted along the guide cable 21, the lifting process is stable, the guide cable 21 can limit the suspension assembly 3 in the lifting process, the suspension assembly 3 is prevented from being separated from the fixed guide cable 21 and swinging on a horizontal plane, the windward side of the guide cable 21 is less, the influence of wind force can be resisted, and the suspension assembly 3 is difficult to swing, so that the lifting stability of the suspension assembly 3 under the action of wind force is still maintained, the curtain wall unit C can be stably lifted along with the suspension assembly 3, the safety in hoisting is higher, no manual participation is needed in the hoisting process, the operation is labor-saving, the system is simple in structure, and fewer mechanical devices are needed, and the technical problem that the safety problem is easily caused by mechanical and manpower consumption in the current hoisting mode is solved To give a title.
In some embodiments, the suspension assembly 3 includes a suspension bracket 31 and a stabilizer bracket 32. The curtain wall unit C is hung on the hanger bracket 31, the traction cable 22 is connected with the hanger bracket 31, and the first winch 41 directly pulls the hanger bracket 31 through the traction cable 22, thereby lifting the curtain wall unit C fixed on the hanger bracket 31. The stabilizer 32 is sleeved on the curtain wall unit body C, so that the stabilizer 32 surrounds the curtain wall unit body C, and the curtain wall unit body C is limited to shake in the horizontal direction and keep stable. The stabilizer 32 is slidably mounted on the guide cable 21 to be lifted along the guide cable 21 and restricts the curtain wall unit body C from being lifted along the guide cable 21. The stabilizing frame 32 is hung on the hanging frame 31 through the connecting cable 23, so that the hanging frame 31 is connected with the stabilizing frame 32, the distance between the hanging frame 31 and the stabilizing frame 32 is fixed, and the stabilizing frame 32 is kept sleeved on the curtain wall unit body C to continuously limit and guide the curtain wall unit body C. The suspension assembly 3 adopts the suspension bracket 31 and the stabilizing bracket 32 which are separated and connected, thereby reducing the weight of the structure and reducing the load when the first winch 41 is hoisted.
In some embodiments, the suspension assembly 3 further comprises a first sling 33. The top end of the first hoisting belt 33 is installed on the suspension bracket 31, and the bottom end of the first hoisting belt 33 is fixed on the top end of the curtain wall unit body C, so that the suspension bracket 31 is connected with the curtain wall unit body C, and the suspension bracket 31 is used for suspending and hoisting the curtain wall unit body C through the first hoisting belt 33. First hoist and mount area 33 is connected on curtain cell cube C top, makes curtain cell cube C whole can both freely droop, can not unbalance under the dead weight effect and take place the swing, guarantees hoist and mount stability.
In some embodiments, the suspension assembly 3 further comprises a second sling 34. The top end of the second hoisting belt 34 is installed on the suspension bracket 31, and the bottom end of the second hoisting belt 34 is connected to the upper part of one side edge of the curtain wall unit body C. The second hoisting belt 34 is used as redundancy for connecting the suspension frame 31 and the curtain wall unit body C, and when the first hoisting belt 33 is broken or a fixed point falls off, the second hoisting belt 34 keeps the suspension frame 31 in suspension and hoisting on the curtain wall unit body C, so that the safety is improved. The lateral part of curtain cell cube is connected to second hoist and mount area 34 to keep away from first hoist and mount area 33, avoid two hoist and mount contacts between the area and take place the winding, make first hoist and mount area 33 unable flare-ups, curtain cell cube C hangs unbalance.
In some embodiments, the first sling 33 and the second sling 34 are symmetrically arranged in two. The hoisting belts are symmetrically arranged, so that the two sides of the curtain wall unit body C are supported and kept stable.
In some embodiments, the stabilizer 32 includes a stop portion 321 and a guide portion 322. The stopper portion 321 is connected to the hanger 31 via the connecting cable 23, and is thus hung on the hanger 31. The middle of the limiting part 321 is provided with a limiting groove 323, and the curtain wall unit C penetrates through the limiting groove 323, so that the stabilizing frame 32 is sleeved on the curtain wall unit C. The guide portion 322 is mounted on the stopper portion 321, and is slidably mounted on the guide wire 21, so that the stabilizer 32 is lifted and lowered along the guide wire 21.
In some embodiments, the guide portion 322 has a guide hole 324, and the guide cable 21 is inserted through the guide hole 324, so that the guide cable 21 cannot be radially withdrawn from the guide portion 324, the sliding connection between the guide cable and the guide portion is maintained, and meanwhile, the guide cable 21 can limit the radial movement of the guide portion 322 through the guide hole 324, so as to prevent the stabilizing frame 32 from shaking, and keep the curtain wall unit C stably lifted.
In some embodiments, guide wheel 325 is mounted on guide 324. As the suspension assembly 3 is raised and lowered, the guide rollers 325 roll on the guide cables 21. Through the rolling contact of guide pulley 325 and guide cable 21, avoid the friction, reduce wearing and tearing, improve life. In order to keep the guide wheel 325 rolling on the guide cable 21, the guide wheel 325 may be provided with a wheel groove in which the guide cable 21 is located.
In some embodiments, two guide cables 21 are provided at intervals, the suspension assembly 3 is lifted and lowered in the space between the two guide cables 21, and both sides are slidably connected to the corresponding guide cables 21. Two guide cables 21 respectively guide the lifting of two sides of the same suspension assembly 3, so that the lifting stability of the suspension assembly 3 can be improved. In order to match the two guide cables 21, the stabilizer 32 has two guide portions 322 so that both sides of the stabilizer 32 are slidably mounted on the corresponding guide cables 21, respectively.
In some embodiments, the curtain wall unit hoist system further comprises a tension seat 5 and a second hoist 42. The tensioning seat 5 and the second winding machine 42 are both installed on the ground B, the tensioning seat 5 is provided with a tensioning wheel 51, and the bottom end of the guide rope 21 is connected with the second winding machine 42 after bypassing the tensioning wheel 51 from the lower side. The guiding cable 21 is tensioned under the traction of the second winch 42, so as to avoid the deformation of the guiding cable by the action of gravity, and the curtain wall unit C is prevented from colliding with the building body and being damaged by being too close to the building stairs in the process of lifting the suspension assembly 3 along the guiding cable 21. And the tensioned guide cable 21 can resist the action of wind power and keep stable, thereby improving the lifting stability and safety of the curtain wall unit body C.
Through the description of the embodiments of the curtain wall unit body hoisting system, it can be seen that the embodiments of the curtain wall unit body hoisting system at least have one or more of the following advantages:
1. the lifting of the suspension assembly is guided through the guide cable, the stability of lifting of the unit body of the curtain wall is improved, the safety of lifting is guaranteed, mechanical equipment is few in use, and time and labor are saved.
2. The suspension assembly adopts a split structure, so that the weight is light, and the load of the winch is reduced.
3. The curtain cell cube adopts two hoist and mount areas to connect, and connection structure is redundant, improves the security.
4. The guide hawser has two, hangs the subassembly both sides and goes up and down stably, improves curtain cell cube hoist and mount stability.
5. The guide cable is tensioned by ground equipment, so that the damage of the curtain wall unit body due to the contact with stairs is avoided, and meanwhile, the wind resistance is improved.
Finally, it should be noted that: the embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other.
The above examples are only intended to illustrate the technical solution of the present invention and not to limit it; although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art will understand that: modifications to the specific embodiments of the invention or equivalent substitutions for parts of the technical features may be made; without departing from the spirit of the present invention, it is intended to cover all aspects of the invention as defined by the appended claims.

Claims (10)

1. The utility model provides a curtain cell cube hoist and mount system for hoist and mount curtain cell cube, its characterized in that includes:
the hoisting support is arranged on the roof;
one end of the guide cable is arranged on the hoisting bracket, and the other end of the guide cable is arranged on the ground;
a suspension assembly mounted on the guide cable;
the first winch is arranged on the roof or on the hoisting support and used for towing the suspension assembly, the suspension assembly is lifted along the guide cable rope, and the curtain wall unit body on the suspension assembly is hoisted.
2. The curtain wall unit hoist system of claim 1, characterized in that the hang assembly includes:
the suspension bracket is connected with the first winch, and the curtain wall unit body is suspended on the suspension bracket;
and the stabilizing frame is hung on the hanging frame and is slidably installed on the guide cable, and the stabilizing frame is sleeved on the curtain wall unit body.
3. The curtain wall unit hoist system of claim 2, characterized in that the suspension assembly further includes:
and the top end of the first hoisting belt is arranged on the suspension bracket, and the bottom end of the first hoisting belt is fixed on the top end of the curtain wall unit body.
4. The curtain wall unit hoist system of claim 3, characterized in that the suspension assembly further includes:
and the top end of the second hoisting belt is arranged on the suspension bracket, and the bottom end of the second hoisting belt is fixed at the top of one side of the curtain wall unit body.
5. The curtain wall unit body hoisting system according to claim 4, wherein the first hoisting belt and the second hoisting belt are symmetrically provided with two belts.
6. The curtain wall unit hoisting system of claim 2, wherein the stabilizer frame comprises:
the limiting part is hung on the suspension bracket, the middle part of the suspension bracket is provided with a limiting groove, and the curtain wall unit body penetrates through the limiting groove;
and the guiding part is arranged on the limiting part and is arranged on the guiding cable in a sliding way.
7. The curtain wall unit hoisting system of claim 6 wherein the guide portion has a guide hole through which the guide cable is threaded.
8. The curtain wall unit hoisting system of claim 7, wherein guide wheels are mounted on the guide portions, and the guide wheels roll on the guide cables when the suspension assembly is lifted.
9. The curtain wall unit hoist system of claim 1, wherein the guide cables are spaced apart by two, and the suspension assembly is positioned between the two guide cables.
10. The curtain wall unit hoisting system of claim 1, further comprising:
the tensioning seat is provided with a tensioning wheel and is arranged on the ground;
and the second winch is arranged on the ground, the guide cable bypasses the tension wheel from the lower side and is connected with the second winch, and the second winch pulls the guide cable to be tensioned.
CN202110864192.0A 2021-07-29 2021-07-29 Curtain wall unit body hoisting system Pending CN113401809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110864192.0A CN113401809A (en) 2021-07-29 2021-07-29 Curtain wall unit body hoisting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110864192.0A CN113401809A (en) 2021-07-29 2021-07-29 Curtain wall unit body hoisting system

Publications (1)

Publication Number Publication Date
CN113401809A true CN113401809A (en) 2021-09-17

Family

ID=77687905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110864192.0A Pending CN113401809A (en) 2021-07-29 2021-07-29 Curtain wall unit body hoisting system

Country Status (1)

Country Link
CN (1) CN113401809A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120841393A (en) * 2025-09-24 2025-10-28 山西四建集团有限公司 A lightweight concrete wall panel mounting bracket

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201433079Y (en) * 2009-05-26 2010-03-31 中国建筑第八工程局有限公司 High-altitude inclined supporting wire lifting device for construction curtain wall
CN105003082A (en) * 2015-07-09 2015-10-28 深圳建业工程集团股份有限公司 Glass curtain wall mounting equipment and glass curtain mounting method
CN207361623U (en) * 2017-06-28 2018-05-15 马磊 A kind of curtain wall handling apparatus
CN208814562U (en) * 2018-07-11 2019-05-03 中国建筑装饰集团有限公司 A kind of visualization formula glass curtain wall plate vertical transit system
CN209835486U (en) * 2019-05-27 2019-12-24 龙志伟 High-rise hoisting equipment
CN211444692U (en) * 2019-12-11 2020-09-08 中国建筑第八工程局有限公司 Unit curtain wall hoisting tool

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201433079Y (en) * 2009-05-26 2010-03-31 中国建筑第八工程局有限公司 High-altitude inclined supporting wire lifting device for construction curtain wall
CN105003082A (en) * 2015-07-09 2015-10-28 深圳建业工程集团股份有限公司 Glass curtain wall mounting equipment and glass curtain mounting method
CN207361623U (en) * 2017-06-28 2018-05-15 马磊 A kind of curtain wall handling apparatus
CN208814562U (en) * 2018-07-11 2019-05-03 中国建筑装饰集团有限公司 A kind of visualization formula glass curtain wall plate vertical transit system
CN209835486U (en) * 2019-05-27 2019-12-24 龙志伟 High-rise hoisting equipment
CN211444692U (en) * 2019-12-11 2020-09-08 中国建筑第八工程局有限公司 Unit curtain wall hoisting tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120841393A (en) * 2025-09-24 2025-10-28 山西四建集团有限公司 A lightweight concrete wall panel mounting bracket

Similar Documents

Publication Publication Date Title
CN207827644U (en) A kind of opposed tracting structure of elevator
CN111847267B (en) A cantilever crane
CN110056177A (en) Suspension electric hanging basket and its construction method of installation
CN105645275B (en) Cable hoist and its construction method
CN201713229U (en) Steel box girder cable-loaded crane for suspension bridge construction
CN215626385U (en) Curtain wall unit hoisting system
CN219489388U (en) Marine wind turbine generator system generator hoisting accessory
CN113401809A (en) Curtain wall unit body hoisting system
CN213865135U (en) Truss hoisting device
CN101863423B (en) Steel box beam cable carrying lifter for construction of suspension bridge
CN213445900U (en) Building element lifting device
KR101355470B1 (en) Single girder hoist
CN212712504U (en) Electric block promotes installation device
CN202718381U (en) Transfer-free lifting device
CN218371215U (en) Synchronous automatic unhooking device of many hoisting points of offshore construction hoist and mount
CN218581149U (en) Building construction lift platform
CN101934994A (en) Building high-altitude vertical hoisting double-guide cable system and assisting method
CN111547249A (en) A steel structure wind-resistant tower parachute training device
CN217872568U (en) Lifting escape window
CN217732419U (en) Hoisting construction structure of scaffold and tower crane
CN110803174A (en) A dual-ropeway ramp transport device and method of using the same
CN110844801B (en) Split type cable carrying crane for erecting main beam of suspension bridge
CN202107400U (en) Anti-falling device for suspension cage of construction lifter
CN222908564U (en) An overhead man-carrying device in the catwalk portal of an ultra-long span suspension bridge
CN222758571U (en) A lifting clothes hanging rod

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210917