CN113375238A - Capacity output control method for floor heating multi-split air conditioner using refrigerant - Google Patents

Capacity output control method for floor heating multi-split air conditioner using refrigerant Download PDF

Info

Publication number
CN113375238A
CN113375238A CN202110081728.1A CN202110081728A CN113375238A CN 113375238 A CN113375238 A CN 113375238A CN 202110081728 A CN202110081728 A CN 202110081728A CN 113375238 A CN113375238 A CN 113375238A
Authority
CN
China
Prior art keywords
floor heating
air conditioning
capacity
heating system
outdoor unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110081728.1A
Other languages
Chinese (zh)
Other versions
CN113375238B (en
Inventor
侯丽峰
袁晓军
张树前
高嵩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongguang Electric Appliances Co Ltd
Original Assignee
Zhejiang Zhongguang Electric Appliances Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongguang Electric Appliances Co Ltd filed Critical Zhejiang Zhongguang Electric Appliances Co Ltd
Priority to CN202110081728.1A priority Critical patent/CN113375238B/en
Publication of CN113375238A publication Critical patent/CN113375238A/en
Application granted granted Critical
Publication of CN113375238B publication Critical patent/CN113375238B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D15/00Other domestic- or space-heating systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/61Control or safety arrangements characterised by user interfaces or communication using timers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B29/00Combined heating and refrigeration systems, e.g. operating alternately or simultaneously
    • F25B29/003Combined heating and refrigeration systems, e.g. operating alternately or simultaneously of the compression type system

Abstract

The invention discloses a capacity output control method for a floor heating multi-split air conditioner using a refrigerant, when an outdoor unit cannot meet the capacity requirement of a floor heating system, if the difference value between the indoor temperature of an air conditioning system and the set temperature is less than a, the corresponding air conditioning system is stopped, if the difference value between the set temperature of all the air conditioning systems and the indoor temperature is more than or equal to a, the started air conditioning systems are controlled to run in low wind, then whether the capacity of the outdoor unit can meet the requirement of the floor heating system is judged, if yes, the judgment is carried out again after the time T, and if not, the started air conditioning systems are sequentially closed. The invention can give full play to the capacity of the outdoor unit, solve the problem of poor full-open effect of the floor heating system and the air conditioning system in the prior industry, and simultaneously reasonably give full play to the capacity of the outdoor unit to supply heat to the air conditioning system while meeting the requirement of the floor heating system through the priority.

Description

Capacity output control method for floor heating multi-split air conditioner using refrigerant
Technical Field
The invention relates to a capacity output control method for a floor heating multi-split air conditioner using a refrigerant.
Background
The multi-split air conditioner is generally known as an outdoor unit, and is connected with an air conditioning system consisting of a plurality of indoor units, wherein the capacity of the outdoor unit is allowed to be over 130 percent of that of the indoor units, and if the total capacity of the indoor units is more than 130 percent, the capacity of the outdoor unit is insufficient, so that the cooling and heating effects are influenced.
For a floor heating multi-split unit using a refrigerant, if an indoor air conditioner and a floor heating system are simultaneously started, the problem of insufficient capacity is also solved, however, for the multi-split unit floor heating system using the refrigerant, the wood floor has a heat insulation layer, so that the heat insulation time is long after heating, when the target requirement is approached, the frequency of an outdoor unit is gradually reduced, the capacity of the outdoor unit is gradually remained, and if an indoor unit of the air conditioner has a starting requirement at the moment, and the air conditioner is not allowed to be started, all requirements of customers cannot be met.
Disclosure of Invention
Aiming at the problems, the invention provides a capacity output control method for a floor heating multi-split air conditioner using a refrigerant, which effectively solves the problems pointed out in the background technology.
The technical scheme adopted by the invention is as follows:
a capacity output control method for a floor heating multi-split air conditioner using a refrigerant comprises an outdoor unit, at least one floor heating system and at least one air conditioning system, wherein the at least one floor heating system and the at least one air conditioning system are connected with the outdoor unit, and the capacity output control method comprises the following steps: in the process of floor heating multi-split operation, when the outdoor unit cannot meet the capacity requirement of the floor heating system, comparing and judging the set temperature and the indoor temperature of all the turned-on air conditioning systems, if the difference value between the indoor temperature and the set temperature of the air conditioning system is less than a, stopping the corresponding air conditioning system, if the difference between the set temperature of all the air conditioning systems and the indoor temperature is more than or equal to a, controlling the started air conditioning systems to run in low wind, then judging whether the capacity of the outdoor unit can meet the requirement of the floor heating system, if so, judging whether the capacity of the outdoor unit can meet the requirement of the floor heating system again after time T, if not, and sequentially closing the opened air conditioning systems until the capacity of the outdoor unit can meet the requirement of the floor heating system or all the opened air conditioning systems are completely closed.
Preferably, when an air conditioning system is started and a floor heating system is not started, if the floor heating system is started in the running process, the capacity requirement of the floor heating system to be started is calculated, the output ratio of a compressor of an outdoor unit is detected, if the capacity requirement of the floor heating system to be started is smaller than or equal to the residual capacity requirement of the outdoor unit, the floor heating system is directly started, if the capacity requirement of the floor heating system to be started is larger than the residual capacity requirement of the outdoor unit, the set temperature and the indoor temperature of all started air conditioning systems are compared and judged, if the difference value between the indoor temperature of the air conditioning system and the set temperature is smaller than a, the corresponding air conditioning system is shut down, if the difference value between the set temperature and the indoor temperature of all air conditioning systems is larger than or equal to a, the started air conditioning systems are controlled to run in low wind, and then whether the capacity of the outdoor unit can meet the requirement of the floor heating system is judged again, if the capacity of the outdoor unit can meet the requirement of the floor heating system, judging whether the capacity of the outdoor unit can meet the requirement of the floor heating system again after time T, if the capacity of the outdoor unit cannot meet the requirement of the floor heating system, closing the opened air conditioning systems in sequence until the capacity of the outdoor unit can meet the requirement of the floor heating system or all the opened air conditioning systems are closed.
Preferably, when the floor heating system is started, the outdoor unit operates at the target high pressure of 45 ℃ according to the floor heating system.
Preferably, when the air conditioning system is not started and the floor heating system is started, if the air conditioning system is started in the running process, firstly calculating the capacity requirement of the air conditioning system to be started, and simultaneously detecting the output ratio of a compressor of the outdoor unit, if the capacity requirement of the air conditioning system to be started is less than or equal to the residual capacity requirement of the outdoor unit and the high-pressure saturation temperature of the floor heating system is greater than or equal to 45 ℃, directly starting the air conditioning system and running in low wind, judging again after the time T, and if the capacity requirement of the air conditioning system to be started is greater than the residual capacity requirement of the outdoor unit, forbidding the air conditioning system to be started.
Preferably, when the air conditioning system and the floor heating system are both started, if a new floor heating system is started or the capacity requirement of the floor heating system is increased by b, comparing and judging the set temperature and the indoor temperature of all the turned-on air conditioning systems, if the difference value between the indoor temperature and the set temperature of the air conditioning system is less than a, stopping the corresponding air conditioning system, if the difference between the set temperature of all the air conditioning systems and the indoor temperature is more than or equal to a, controlling the started air conditioning systems to run in low wind, then judging whether the capacity of the outdoor unit can meet the requirement of the floor heating system, if so, judging whether the capacity of the outdoor unit can meet the requirement of the floor heating system again after time T, if not, and sequentially closing the opened air conditioning systems until the capacity of the outdoor unit can meet the requirement of the floor heating system or all the opened air conditioning systems are completely closed.
Preferably, b is 20%.
Preferably, a is 3-8 ℃ and T is 3-15 minutes.
The invention can give full play to the capacity of the outdoor unit, solve the problem of poor full-open effect of the floor heating system and the air conditioning system in the prior industry, and simultaneously reasonably give full play to the capacity of the outdoor unit to supply heat to the air conditioning system while meeting the requirement of the floor heating system through the priority.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a working principle diagram of the present invention.
Detailed Description
The invention is described in further detail below with reference to specific embodiments and with reference to the attached drawings.
Example 1
As shown in fig. 1 and 2, a capacity output control method for a floor heating multi-split air conditioner using a refrigerant, the floor heating multi-split air conditioner comprising an outdoor unit 1, and at least one floor heating system 2 and at least one air conditioning system 3 connected to the outdoor unit 1, the capacity output control method comprises the following steps: in the process of running the multi-split floor heating system, when the outdoor unit 1 cannot meet the capacity requirement of the floor heating system 2, comparing and judging the set temperature and the indoor temperature of all opened air conditioning systems 3, if the difference value between the indoor temperature and the set temperature of the air conditioning systems 3 is less than a, stopping the corresponding air conditioning systems 3, if the difference value between the set temperature and the indoor temperature of all the air conditioning systems 3 is more than or equal to a, controlling the opened air conditioning systems 3 to run in low wind, then judging whether the capacity of the outdoor unit 1 can meet the requirement of the floor heating system 2, if so, judging whether the capacity of the outdoor unit 1 can meet the requirement of the floor heating system 2 again after time T, if not, closing the opened air conditioning systems 3 in sequence until the capacity of the outdoor unit 1 can meet the requirement of the floor heating system 2 or all the opened air conditioning systems 3 are closed, the air conditioning system 3 is switched off from small to large according to the capacity requirement when switched off.
When an air conditioning system 3 is started and a floor heating system 2 is not started, if the floor heating system 2 is started in the running process, the capacity requirement of the floor heating system 2 to be started is calculated firstly, meanwhile, the output ratio of a compressor of an outdoor unit 1 is detected, if the capacity requirement of the floor heating system 2 to be started is smaller than or equal to the residual capacity requirement of the outdoor unit 1, the floor heating system 2 is directly started, if the capacity requirement of the floor heating system 2 to be started is larger than the residual capacity requirement of the outdoor unit 1, the set temperature and the indoor temperature of all started air conditioning systems 3 are compared and judged, if the difference value between the indoor temperature of the air conditioning system 3 and the set temperature is smaller than a, the corresponding air conditioning system 3 is stopped, if the difference value between the set temperature and the indoor temperature of all air conditioning systems 3 is larger than or equal to a, the started air conditioning systems 3 are controlled to run in low wind, and then judging whether the capacity of the outdoor unit 1 can meet the requirement of the floor heating system 2 again, if so, judging whether the capacity of the outdoor unit 1 can meet the requirement of the floor heating system 2 again after a time T, if not, closing the opened air conditioning systems 3 in sequence until the capacity of the outdoor unit 1 can meet the requirement of the floor heating system 2 or all the opened air conditioning systems 3 are closed, and closing the air conditioning systems 3 from small to large according to the capacity requirement when the air conditioning systems are closed.
When the floor heating system 2 is started, the outdoor unit 1 operates at a target high pressure of 45 ℃ according to the floor heating system 2.
When the air conditioning system 3 is not started and the floor heating system 2 is started, if the air conditioning system 3 is started in the running process, firstly calculating the capacity requirement of the air conditioning system 3 to be started, and simultaneously detecting the output ratio of a compressor of the outdoor unit 1, if the capacity requirement of the air conditioning system 3 to be started is less than or equal to the residual capacity requirement of the outdoor unit 1 and the saturation temperature of the high pressure of the floor heating system 2 is more than or equal to 45 ℃, directly starting the air conditioning system 3 and running in low wind, judging again after the time T, and if the capacity requirement of the air conditioning system 3 to be started is more than the residual capacity requirement of the outdoor unit 1, forbidding the air conditioning system 3 to be started.
When an air conditioning system 3 and a floor heating system 2 are both opened, if a new floor heating system 2 is opened or the capacity requirement of the floor heating system 2 is increased by b, comparing and judging the set temperature and the indoor temperature of all opened air conditioning systems 3, if the difference value between the indoor temperature of the air conditioning system 3 and the set temperature is less than a, stopping the corresponding air conditioning system 3, if the difference value between the set temperature and the indoor temperature of all air conditioning systems 3 is more than or equal to a, controlling the opened air conditioning system 3 to run in low wind, then judging whether the capacity of the outdoor unit 1 can meet the requirement of the floor heating system 2, if so, judging whether the capacity of the outdoor unit 1 can meet the requirement of the floor heating system 2 again after time T, if not, sequentially closing the opened air conditioning systems 3 until the capacity of the outdoor unit 1 can meet the requirement of the floor heating system 2 or all the opened air conditioning systems 3 are closed, the air conditioning system 3 is switched off from small to large according to the capacity requirement when switched off.
The b is 20 percent.
The temperature a is 3-8 ℃, and the temperature T is 3-15 minutes.
Finally, it should be noted that the above-mentioned list is only the specific embodiment of the present invention. Obviously, the present invention is not limited to the above embodiments, and many modifications are possible. All modifications which can be derived or suggested by a person skilled in the art from the disclosure of the present invention are to be considered within the scope of the invention.

Claims (7)

1. A capacity output control method for a floor heating multi-split air conditioner using a refrigerant is characterized in that the floor heating multi-split air conditioner comprises an outdoor unit (1), and at least one floor heating system (2) and at least one air conditioning system (3) which are connected with the outdoor unit (1), and the capacity output control method comprises the following steps: in the process of running of the multi-split floor heating system, when the outdoor unit (1) cannot meet the capacity requirement of the floor heating system (2), comparing and judging the set temperature and the indoor temperature of all opened air conditioning systems (3), if the difference value between the indoor temperature and the set temperature of the air conditioning systems (3) is smaller than a, stopping the corresponding air conditioning systems (3), if the difference value between the set temperature and the indoor temperature of all the air conditioning systems (3) is larger than or equal to a, controlling the opened air conditioning systems (3) to run at low wind, then judging whether the capacity of the outdoor unit (1) can meet the requirement of the floor heating system (2), if so, judging whether the capacity of the outdoor unit (1) can meet the requirement of the floor heating system (2) again after time T, if not, sequentially closing the opened air conditioning systems (3), until the capacity of the outdoor unit (1) can meet the requirement of the floor heating system (2) or all the opened air-conditioning systems (3) are closed.
2. The capacity output control method for the floor heating multi-split air conditioner using the refrigerant as claimed in claim 1, wherein when the air conditioning system (3) is turned on and the floor heating system (2) is not turned on, if the floor heating system (2) is turned on during operation, the capacity requirement of the floor heating system (2) to be turned on is calculated first, and the output ratio of the compressor of the outdoor unit (1) is detected, if the capacity requirement of the floor heating system (2) to be turned on is less than or equal to the remaining capacity requirement of the outdoor unit (1), the floor heating system (2) is directly turned on, if the capacity requirement of the floor heating system (2) to be turned on is greater than the remaining capacity requirement of the outdoor unit (1), the set temperature and the indoor temperature of all turned-on air conditioning systems (3) are compared and judged, and if the difference between the indoor temperature and the set temperature of the air conditioning system (3) is less than a, and stopping the corresponding air conditioning system (3), if the difference between the set temperature of all the air conditioning systems (3) and the indoor temperature is more than or equal to a, controlling the opened air conditioning systems (3) to run in low wind, then judging whether the capacity of the outdoor unit (1) can meet the requirement of the floor heating system (2) again, if so, judging whether the capacity of the outdoor unit (1) can meet the requirement of the floor heating system (2) again after time T, and if not, closing the opened air conditioning systems (3) in sequence until the capacity of the outdoor unit (1) can meet the requirement of the floor heating system (2) or all the opened air conditioning systems (3) are closed completely.
3. The capacity output control method for the floor heating multi-split air conditioner using the refrigerant as claimed in claim 2, wherein when the floor heating system (2) is turned on, the outdoor unit (1) is operated at a target high pressure of 45 ℃ of the floor heating system (2).
4. The capacity output control method for the floor heating multi-split air conditioner using the refrigerant according to claim 1, it is characterized in that when the air conditioning system (3) is not started and the floor heating system (2) is started, if the air conditioning system (3) is started in the running process, firstly calculating the capacity requirement of the air conditioning system (3) to be started, simultaneously detecting the output ratio of a compressor of the outdoor unit (1), if the capacity requirement of the air conditioning system (3) to be started is less than or equal to the residual capacity requirement of the outdoor unit (1) and the high-pressure saturation temperature of the floor heating system (2) is more than or equal to 45 ℃, and directly starting the air conditioning system (3) and running in low wind, judging again after the time T, and forbidding the air conditioning system (3) to be started if the capacity requirement of the air conditioning system (3) to be started is greater than the residual capacity requirement of the outdoor unit (1).
5. The capacity output control method for the floor heating multi-split air conditioner using the refrigerant as claimed in claim 1, wherein when both the air conditioning system (3) and the floor heating system (2) are turned on, if a new floor heating system (2) is turned on or the capacity demand of the floor heating system (2) is increased by b, the set temperature and the indoor temperature of all turned-on air conditioning systems (3) are compared and judged, if the difference between the indoor temperature of the air conditioning system (3) and the set temperature is less than a, the corresponding air conditioning system (3) is shut down, if the difference between the set temperature of all air conditioning systems (3) and the indoor temperature is greater than or equal to a, the turned-on air conditioning systems (3) are controlled to run in low wind, and then whether the capacity of the outdoor unit (1) can meet the requirement of the floor heating system (2) is judged, and if the capacity of the outdoor unit (1) can meet the requirement of the floor heating system (2) is judged again after a time T, and if the capacity of the outdoor unit (1) can meet the requirement of the floor heating system (2) If the capacity of the outdoor unit (1) can meet the requirement of the floor heating system (2) or all the opened air conditioning systems (3) are closed, the opened air conditioning systems (3) are closed in sequence.
6. The capacity output control method for the floor heating multi-split air conditioner using the refrigerant as set forth in claim 5, wherein b is 20%.
7. The capacity output control method using the refrigerant floor heating multi-split air conditioner according to any one of claims 1 to 5, wherein a is 3 to 8 ℃ and T is 3 to 15 minutes.
CN202110081728.1A 2021-01-21 2021-01-21 Capacity output control method for ground heating multi-split air conditioner using refrigerant Active CN113375238B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110081728.1A CN113375238B (en) 2021-01-21 2021-01-21 Capacity output control method for ground heating multi-split air conditioner using refrigerant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110081728.1A CN113375238B (en) 2021-01-21 2021-01-21 Capacity output control method for ground heating multi-split air conditioner using refrigerant

Publications (2)

Publication Number Publication Date
CN113375238A true CN113375238A (en) 2021-09-10
CN113375238B CN113375238B (en) 2022-11-25

Family

ID=77569596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110081728.1A Active CN113375238B (en) 2021-01-21 2021-01-21 Capacity output control method for ground heating multi-split air conditioner using refrigerant

Country Status (1)

Country Link
CN (1) CN113375238B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114811715A (en) * 2022-04-27 2022-07-29 浙江中广电器集团股份有限公司 Energy-saving control method for heat pump EVI waterless floor heating multi-split air conditioner
CN114909788A (en) * 2022-04-27 2022-08-16 浙江中广电器集团股份有限公司 Control method for simultaneous on-line ground heating and air conditioning of heat pump EVI (electric vacuum insulation) multi-split air conditioner

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11287501A (en) * 1998-03-31 1999-10-19 Sanyo Electric Co Ltd Air conditioning system
CN102650484A (en) * 2012-01-19 2012-08-29 浙江师范大学 Control method for multifunctional multi-connected unit
CN105276725A (en) * 2014-07-23 2016-01-27 珠海格力电器股份有限公司 Multi-connected air conditioner hot-water unit
CN107023960A (en) * 2017-04-13 2017-08-08 青岛海尔空调器有限总公司 A kind of ground heating type air conditioner and control method
CN107477805A (en) * 2017-09-12 2017-12-15 青岛海信日立空调系统有限公司 A kind of multi-gang air-conditioner ground heating system and its control method
CN107969168A (en) * 2015-03-31 2018-04-27 大金工业株式会社 The control system of coordinated signals multiple equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11287501A (en) * 1998-03-31 1999-10-19 Sanyo Electric Co Ltd Air conditioning system
CN102650484A (en) * 2012-01-19 2012-08-29 浙江师范大学 Control method for multifunctional multi-connected unit
CN105276725A (en) * 2014-07-23 2016-01-27 珠海格力电器股份有限公司 Multi-connected air conditioner hot-water unit
CN107969168A (en) * 2015-03-31 2018-04-27 大金工业株式会社 The control system of coordinated signals multiple equipment
CN107023960A (en) * 2017-04-13 2017-08-08 青岛海尔空调器有限总公司 A kind of ground heating type air conditioner and control method
CN107477805A (en) * 2017-09-12 2017-12-15 青岛海信日立空调系统有限公司 A kind of multi-gang air-conditioner ground heating system and its control method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114811715A (en) * 2022-04-27 2022-07-29 浙江中广电器集团股份有限公司 Energy-saving control method for heat pump EVI waterless floor heating multi-split air conditioner
CN114909788A (en) * 2022-04-27 2022-08-16 浙江中广电器集团股份有限公司 Control method for simultaneous on-line ground heating and air conditioning of heat pump EVI (electric vacuum insulation) multi-split air conditioner

Also Published As

Publication number Publication date
CN113375238B (en) 2022-11-25

Similar Documents

Publication Publication Date Title
CN106958926B (en) Air conditioner and defrosting control method thereof
CN105627524B (en) Air conditioner anti-freeze control method and air conditioner
CN102997368B (en) Intelligent defrosting control method for parallel multiple on-line unit with multiple compressors
CN103017295B (en) Refrigeration-to-heating mode starting method of multi-split air conditioner
CN105180349B (en) Air conditioner and its control method and control device
CN113375238B (en) Capacity output control method for ground heating multi-split air conditioner using refrigerant
CN105485771B (en) Air-conditioning system and its refrigerant recovering control method and device
CN107763792B (en) Control method of multi-connected air conditioning unit
CN106152414B (en) Air conditioner with surplus indoor unit control method and device
CN107101328A (en) Air-conditioning and its control method
EP3872422B1 (en) Air conditioning system, and method and device for controlling air conditioning system
CN102967022A (en) Control method for starting variable-frequency compressor of multi-connected air conditioning unit
CN110319541B (en) Unloading adjustment control method of large-displacement variable-frequency multi-split system
CN106288236B (en) Air conditioner compress control method and air conditioner
CN105180372A (en) Method and device for controlling air conditioner
CN108278723A (en) The control method of air-conditioning
CN112361560B (en) Control method of underground space condensation prevention control system
CN106080099A (en) The control method of mounted air conditioner system and mounted air conditioner system
CN105004086A (en) Control method and device for screw water chiller and air conditioner
CN103162384A (en) Draught fan control method of heat pump operation
CN106642589B (en) Enthalpy value control method of full fresh air constant temperature and humidity unit
CN108592297B (en) Defrosting control method for air conditioner
CN110260420A (en) Air-conditioning and air conditioner coolant recycling and control method
CN107289576B (en) Defrosting control method for air conditioner
CN110319542B (en) Unloading start-stop control method of large-displacement variable-frequency multi-split system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 323000 No.96 Yunjing Road, Shuige Industrial Park, Lishui City, Zhejiang Province

Applicant after: Zhejiang Zhongguang Electric Appliance Group Co.,Ltd.

Address before: 323000 No.96 Yunjing Road, Shuige Industrial Park, Lishui City, Zhejiang Province

Applicant before: ZHEJIANG ZHONGGUANG ELECTRIC APPLIANCES Co.,Ltd.

GR01 Patent grant
GR01 Patent grant