CN113293977A - Attachment system of attached lifting scaffold and use method thereof - Google Patents

Attachment system of attached lifting scaffold and use method thereof Download PDF

Info

Publication number
CN113293977A
CN113293977A CN202110663894.2A CN202110663894A CN113293977A CN 113293977 A CN113293977 A CN 113293977A CN 202110663894 A CN202110663894 A CN 202110663894A CN 113293977 A CN113293977 A CN 113293977A
Authority
CN
China
Prior art keywords
wall
attached
piece
attachment
corner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110663894.2A
Other languages
Chinese (zh)
Other versions
CN113293977B (en
Inventor
顾友锋
张新
曹津铭
何晓
王鹏
李润哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Construction No 1 Group Co Ltd
Priority to CN202110663894.2A priority Critical patent/CN113293977B/en
Publication of CN113293977A publication Critical patent/CN113293977A/en
Application granted granted Critical
Publication of CN113293977B publication Critical patent/CN113293977B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00—Component parts or accessories for scaffolds
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00—Component parts or accessories for scaffolds
    • E04G5/001—Safety or protective measures against falling down relating to scaffoldings
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00—Component parts or accessories for scaffolds
    • E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses an attachment system of an attached lifting scaffold and a use method thereof, wherein the attachment system comprises the following components: the wall surface wall-attached piece comprises a horizontal beam, and an end plate and a seat plate which are arranged at two ends of the horizontal beam, wherein lifting lugs are respectively arranged at the upper side and the lower side of the horizontal beam positioned at one side of the end plate; the wall surface wall attaching part penetrates through the seat plate through a wall penetrating bolt and is arranged on the wall body of the shrinkage structure layer, and an end plate of the wall surface wall attaching part is aligned with the wall body of the non-shrinkage structure layer; the lower rigid inclined pulling piece is obliquely arranged between the lifting lug on the lower side of the wall surface wall attaching piece and a floor slab of a next structural layer; and the upper rigid inclined pulling piece is obliquely arranged between the lifting lug on the upper side of the wall surface wall attaching piece and the floor slab or the wall body of the upper structural layer. The invention can realize that the attached lifting scaffold climbs on the shrinkage structure layer, overcomes the safety risk of secondary disassembly and assembly, improves the construction efficiency and ensures the safety of the climbing process.

Description

Attachment system of attached lifting scaffold and use method thereof
Technical Field
The invention relates to the technical field of constructional engineering, in particular to an attachment system of an attached lifting scaffold and a using method thereof.
Background
The attached lifting scaffold is suitable for main body and outer wall decoration construction in high-rise and super high-rise building engineering, has the characteristics of safety, automation, environmental protection, attractiveness and the like, is widely applied to engineering with a more regular building main body structure, but cannot continuously climb on a corresponding structural change layer when working conditions such as special building appearance and structural contraction are met, and the conventional method is to change the overhanging scaffold before and after the construction of a contraction structure layer. In addition, when the contracted structure layer is in the middle of the building structure, in order to reduce the safety risk, the attached lifting scaffold needs to be installed secondarily on the contracted structure layer, and the frame body of the attached lifting scaffold needs to be hoisted to a specified elevation in the high altitude, so that the problem of large safety risk also exists.
Disclosure of Invention
The invention aims to solve the technical problem of providing an attachment system of an attached lifting scaffold and a use method thereof, and aims to solve the problems that the attached lifting scaffold cannot continuously climb a contracted structural layer and the safety risk caused by the transition construction of the contracted structural layer through an overhanging scaffold.
In order to solve the technical problems, the technical scheme provided by the invention is as follows: an attachment system for an attached lifting scaffold comprising:
the wall surface wall-attached piece comprises a horizontal beam, and an end plate and a seat plate which are arranged at two ends of the horizontal beam, wherein lifting lugs are respectively arranged at the upper side and the lower side of the horizontal beam positioned at one side of the end plate; the wall surface wall attaching part penetrates through the seat plate through a wall penetrating bolt and is arranged on the wall body of the shrinkage structure layer, and an end plate of the wall surface wall attaching part is aligned with the wall body of the non-shrinkage structure layer;
the lower rigid inclined pulling piece is obliquely arranged between the lifting lug on the lower side of the wall surface wall attaching piece and a floor slab of a next structural layer;
and the upper rigid inclined pulling piece is obliquely arranged between the lifting lug on the upper side of the wall surface wall attaching piece and the floor slab or the wall body of the upper structural layer.
Further, the attaching system of the attached lifting scaffold provided by the invention further comprises:
stress detection device includes:
the stress sensor is arranged on a lifting lug of the wall surface wall-attached part and is in contact connection with the axial end of the upper rigid inclined pulling part or the axial end of the lower rigid inclined pulling part; or the stress sensor is arranged between the lifting lug of the wall surface wall-attached piece and the horizontal beam.
And the controller is in wired or wireless connection with the stress sensor.
Further, the attaching system of the attached lifting scaffold provided by the invention further comprises:
the lower rigid inclined pulling piece is arranged on the floor slab of the corresponding structural layer through the hanging ring, and the upper rigid inclined pulling piece is arranged on the floor slab of the corresponding structural layer through the hanging ring.
Further, the attaching system of the attached lifting scaffold provided by the invention further comprises:
the wall connecting piece is arranged on the wall body of the shrinkage structure layer through a wall penetrating bolt; the upper rigid inclined pulling piece is arranged on the wall body of the corresponding layer of the shrinkage structure layer through the wall connecting piece.
Further, the attaching system of the attached lifting scaffold provided by the invention further comprises:
the corner wall attaching piece is arranged on a wall body of a structural column at a corner through a bracket and comprises a horizontal beam, one end of the horizontal beam is provided with an end plate, lifting lugs are respectively arranged on the upper side and the lower side of the horizontal beam positioned on one side of the end plate, and the end plate of the corner wall attaching piece is aligned with the wall body of the non-shrinkage structural layer;
the upper rigid inclined pulling piece is arranged between the lifting lug on the upper side of the corner wall attaching piece and the wall connecting piece arranged on the wall body of the structural column at the corner, and the lower rigid inclined pulling piece is arranged between the lifting lug on the lower side of the corner wall attaching piece and the wall connecting piece arranged on the wall body of the structural column at the corner.
Further, according to the attachment system of the attached lifting scaffold, the stress sensor is arranged on the lifting lug of the wall corner wall attaching piece, and the axial end of the upper rigid inclined pulling piece or the axial end of the lower rigid inclined pulling piece at the structural column are in contact connection with the corresponding stress sensor; or the stress sensor is arranged between the lifting lug of the corner wall-attached piece and the horizontal beam.
In order to solve the above technical problems, another technical solution provided by the present invention is: a method for using the attaching system of the attached lifting scaffold comprises the following steps:
installation wall attaches wall spare and rigidity diagonal draw piece from top to bottom thereof includes:
mounting a wall surface wall-attached part on the wall body of the shrinkage structure layer through a wall-penetrating bolt;
connecting the upper end of a lower rigid inclined pulling piece at the wall surface wall attaching piece to the upper end and the lower end of a lifting lug at the lower side of the wall surface wall attaching piece to lifting rings arranged on the next structural layer;
connecting the lower end of an upper rigid inclined pulling piece at the wall surface wall attaching piece to a lifting lug on the upper side of the wall surface wall attaching piece, and connecting the upper end of the upper rigid inclined pulling piece to a lifting ring of a floor slab arranged on the upper structural layer or a wall connecting piece arranged on a wall body of the upper structural layer;
and connecting the attached lifting scaffold, and connecting the wall attaching support on the attached lifting scaffold with the wall attaching piece through a bolt.
Further, the invention provides a use method of the attachment system of the attached lifting scaffold, which comprises the following steps:
installation corner attaches wall spare and rigidity diagonal draw piece from top to bottom thereof includes:
wall corner attaching parts are arranged on the wall body of the structural column at the corner through brackets;
connecting the upper end of a lower rigid inclined pulling piece at the corner wall attaching piece to the upper end and the lower end of a suspender at the lower side of the corner wall attaching piece to a wall connecting piece arranged on a wall;
connecting the lower end of an upper rigid inclined pulling piece at the wall corner wall attaching piece to a suspender on the upper side of the wall corner wall attaching piece, and connecting the upper end of the upper rigid inclined pulling piece to a wall connecting piece arranged on a wall body;
and connecting the wall attaching support on the attached lifting scaffold with the wall corner wall attaching piece through bolts.
Further, the invention provides a use method of the attachment system of the attached lifting scaffold, which comprises the following steps:
monitoring climbing safety, namely controlling the attached lifting scaffold to climb through an attached system of the attached lifting scaffold on a shrinkage structure layer, and monitoring the connection safety of the wall surface wall attaching piece and the wall corner wall attaching piece through the stress value of a stress sensor when the attached lifting scaffold climbs on the shrinkage structure layer so as to monitor whether the climbing process of the attached lifting scaffold on the shrinkage structure layer is safe or not;
before climbing safety monitoring, a stress sensor is installed, and the stress sensor is installed between a lifting lug of a wall-attached part on a wall surface and a horizontal beam and between a hanging rod of the wall-attached part at a corner and a long beam; or the stress sensor is arranged on the lifting lug of the wall surface wall-attached part and the suspension rod of the wall corner wall-attached part, and the axial end of the corresponding upper rigid inclined pulling part or the axial end of the corresponding lower rigid inclined pulling part is in contact with the stress sensor positioned on the lifting lug or the suspension rod.
Further, the use method of the attachment system of the attached lifting scaffold provided by the invention further comprises the following steps:
and the frame body safety monitoring is that the stress sensor is arranged between the steel bottom plate of the attached lifting scaffold and the inner frame and the outer frame, and before the frame body climbs, the change of the force is monitored by the stress sensor to judge whether the connection constraint exists between the frame body of the attached lifting scaffold and the buckle type scaffold erected in the structural layer or not so as to monitor the safety of the frame body.
Compared with the prior art, the invention has the following beneficial effects:
according to the attached system of the attached lifting scaffold and the using method thereof, the attached system of the attached lifting scaffold is arranged on the shrinkage structure layer of the building structure, so that the attached lifting scaffold keeps connection with the shrinkage structure layer and continuously climbs on the shrinkage structure layer through the attached system, and the problem that the attached lifting scaffold cannot continuously climb on the shrinkage structure layer is solved. Need not secondary dismouting inserted lift scaffold and set up overhanging type scaffold upset and climb around the shrink structure layer and carry out the transition construction to the safety risk of secondary dismouting and overhanging type scaffold dismouting process has been reduced, thereby has overcome the problem of the safety risk that the transition construction arouses at shrink structure layer through overhanging type scaffold. The used attached lifting scaffold can be kept to continuously climb on the shrinkage structure layer only by disassembling and assembling the attachment system on the shrinkage structure layer, and the attached lifting scaffold does not need to be disassembled and assembled for the second time and replaced by the overhanging scaffold, so that the overall construction efficiency of the building structure is improved.
The invention provides an attachment system of an attached lifting scaffold and a use method thereof, wherein a wall surface wall attaching piece is aligned with a wall body of a non-shrinkage structure layer, so that the shrinkage structure layer extends outwards through the wall surface wall attaching piece and keeps the wall body of the non-shrinkage structure layer aligned, a wall attaching support of the attached lifting scaffold can be arranged on the wall surface wall attaching piece to keep the attached lifting scaffold vertically arranged, wherein the upper and lower rigid inclined pulling pieces can ensure the stability and reliability of the installation of the wall surface wall attaching piece on the wall body, the risk that the wall surface wall attaching piece is displaced or even falls relative to the wall body under the driving of the upper and lower pulling forces of the attached lifting scaffold in the climbing process is prevented, and the safety of the climbing process is improved.
According to the attachment system of the attached lifting scaffold and the use method thereof, the wall surface wall attachment piece is connected through the upper rigid diagonal pulling piece and the lower rigid diagonal pulling piece, so that the dual functions of diagonal pulling and supporting are achieved, and the safety and the reliable connection of the wall surface wall attachment piece in the climbing process are guaranteed.
Drawings
Fig. 1 is a schematic structural view of an attached lifting scaffold and an attached system;
FIG. 2 is an enlarged view of a portion of FIG. 1 at A;
FIG. 3 is a schematic view of the construction of the wall attachment;
FIG. 4 is a block schematic diagram of a pressure sensing device;
FIG. 5 is a schematic cross-sectional view of the connection state of the wall surface wall attaching member, the wall corner wall attaching member and the rigid diagonal members on the structural column at the corner;
FIG. 6 is an enlarged view of a portion of the corner wall attachment;
FIG. 7 is a schematic structural view showing the connection state of wall surface wall attaching members, wall corner wall attaching members and rigid diagonal members on a structural column at a corner;
FIG. 8 is a schematic structural view showing the connection state of the attachment system to the attached lifting scaffold before and after the contracted structural layer;
fig. 9 is a schematic structural view showing the connection state of the attached lifting scaffold and the attachment system and the scaffold;
fig. 10 is a partial enlarged view at B in fig. 9;
shown in the figure:
100. an attachment system;
110. wall surface wall attaching pieces; 111. horizontal beams 112, end plates 113, lifting lugs 114, tie rods 114, 115 and seat plates;
120. a through-wall bolt;
130. a lower rigid diagonal member;
140. an upper rigid diagonal member;
150. a wall connecting piece;
160. a pressure detection device 161, a stress sensor 162 and a controller;
170. corner wall attachment 171, long beam 172, side plate 173, hanger rod 174 and bracket;
180. an attached lifting scaffold 181, an attached wall support 182 and a turning plate;
190. a non-shrinkable structural layer; 191. shrinkage structure layer, 192, rings, 193, button scaffold, 194, structural column.
Detailed Description
The invention is described in detail below with reference to the attached drawing figures: the advantages and features of the present invention will become more apparent from the following description. It is to be noted that the drawings are in a very simplified form and are not to precise scale, which is merely for the purpose of facilitating and distinctly claiming the embodiments of the present invention.
Referring to fig. 1 to 4, an embodiment of the present invention provides an attachment system 100 for an attached lifting scaffold 180, which may include:
the wall surface wall-attached part 110 comprises a horizontal beam 111, and an end plate 112 and a seat plate 115 which are respectively arranged at two ends of the horizontal beam 111, wherein lifting lugs 113 are respectively arranged at the upper side and the lower side of the horizontal beam 111 at one side of the end plate 112; the wall surface wall attaching part 110 is arranged on the wall body of the shrinkage structure layer 191 by penetrating the seat plate 115 through the wall penetrating bolt 120, and the end plate 112 of the wall surface wall attaching part 110 is arranged in alignment with the wall body of the non-shrinkage structure layer 190. In order to increase the structural stability of the wall surface wall attaching piece 110, the end plate 112 and the bottom plate 115 extend upwards out of the end surface of the horizontal beam 111, and a stiff rod 114 is obliquely arranged between the extending surface of the end plate 112 and the base plate 115 and the horizontal beam 111. At this time, the wall surface attachment member 110 is connected to the wall body of the shrinkage structure layer 191 only through the upper end of the seat plate 115 by the wall bolt 120, and the lower end of the seat plate 115 is not connected to the wall body, for the purpose of facilitating the removal after use. Wherein the through-wall bolt 120 may include a screw, a nut, and a washer.
A lower rigid diagonal member 130 obliquely disposed between the lifting lug 113 at the lower side of the wall surface wall attaching member 110 and the floor slab of the next structural layer; the structural layer may be an un-shrunk structural layer 190 or a shrunk structural layer 191, depending on the position of the lower rigid diagonal member 130.
And the upper rigid inclined pulling part 140 is obliquely arranged between the lifting lug 113 on the upper side of the wall surface wall attaching part 110 and the floor slab or the wall body of the previous structural layer. The structural layer may be an un-shrunk structural layer 190 or a shrunk structural layer 191, depending on the position of the upper rigid diagonal member 140. The lower rigid diagonal member 130 and the upper rigid diagonal member 140 both have the dual functions of diagonal pulling and supporting, and can be hollow pipe fittings or solid rod bodies.
Referring to fig. 1, fig. 2, fig. 4, and fig. 7 to fig. 10, in order to ensure the safety of the attached lifting scaffold 180 during climbing, the attachment system 100 of the attached lifting scaffold 180 according to the embodiment of the present invention may further include:
the stress detection device 160 includes: a stress sensor 161 and a controller 162. Wherein: the stress sensor 161 has the following two mounting methods. Wherein the stress detection apparatus 160 in fig. 1, 7-9 may each comprise only a stress sensor 161.
Referring to fig. 2, a stress sensor 161 is disposed on the lifting lug 113 of the wall-attached component 110, and the stress sensor 161 is connected to an axial end of the upper rigid diagonal member 140 or the lower rigid diagonal member 130 in a contact manner.
Referring to fig. 10, a stress sensor 161 is disposed between the lifting lug 113 and the horizontal beam 111 of the wall attachment 110.
Wherein the controller 162 is wired or wirelessly connected to the stress sensor 161. Wherein the controller 162 may also be a device with the controller 162, such as a computer, a smart phone, etc. Controller 162 may be located outside of attachment system 100 or within the attachment system, but is not under pressure.
Referring to fig. 1 and 9, in order to ensure a reliable connection between the rigid diagonal member and the structural layer, the attachment system 100 of the attached lifting scaffold 180 according to the embodiment of the present invention may further include:
the hanging rings 192 are pre-buried or arranged on the floor slabs of the structural layers through the wall penetrating bolts 120, the lower rigid diagonal members 130 are arranged on the floor slabs of the corresponding structural layers through the hanging rings 192, and the upper rigid diagonal members 140 are arranged on the floor slabs of the corresponding structural layers through the hanging rings 192.
Referring to fig. 1, the hanging ring 192 is pre-embedded on the non-shrinkable structural layer 190 or the shrinkable structural layer 191.
Referring to fig. 9, the hanging ring 192 is disposed on the non-shrinkable structural layer 190 or the shrinkable structural layer 191 through the wall bolts 120.
Referring to fig. 1, in order to improve the reliable connection of the wall-attached wall 110, the attachment system 100 of the attached lifting scaffold 180 according to the embodiment of the present invention may further include:
the wall connecting piece 150 is arranged on the wall body of the shrinkage structure layer 191 through the wall through bolt 120; the upper rigid diagonal members 140 are arranged on the wall body of the corresponding layer of shrink-fit structural layer 191 through the wall connecting members 150. At this time, the included angle between the upper rigid inclined pulling piece 140 and the wall surface wall attaching piece 110 is 50 degrees to 75 degrees, so that better upper pulling force can be improved, and the connection reliability of the wall surface wall attaching piece 110 is ensured. Compared with the situation that the upper rigid diagonal pulling piece 140 is arranged on the floor slab of the shrinkage structure layer 191, the included angle is increased, and the connection reliability is improved.
Referring to fig. 5 to 7, in order to realize the overall climbing of the attached lifting scaffold 180 along the periphery of the building main structure instead of the single-sided climbing, the attachment system 100 of the attached lifting scaffold 180 according to the embodiment of the present invention may further include:
the corner wall attaching part 170 is arranged on the wall body of the structural column 194 at the corner through the bracket 174, the corner wall attaching part 170 comprises a long beam 171, one end of the long beam 171 is provided with a side plate 172, the upper side and the lower side of the long beam 171 positioned at one side of the side plate 172 are respectively provided with a suspension rod 173, and the side plate 172 of the corner wall attaching part 170 is arranged in alignment with the wall body of the non-shrinkable structural layer 190.
The upper rigid diagonal member 140 is disposed between the hanger rod 113 on the upper side of the corner wall attaching member 170 and the wall connecting member 150 on the wall body of the structural column 194 disposed at the corner, and the lower rigid diagonal member 130 is disposed between the hanger rod 173 on the lower side of the corner wall attaching member 170 and the wall connecting member 150 on the wall body of the structural column 194 disposed at the corner. Wherein the wall connecting member 150 is mounted on the wall body by the wall through bolt 120.
The structure of the corner wall-attaching member 170 and the wall-attaching member 110 may be the same, and for the convenience of distinguishing, different names are used for expression, that is, the long beam 171 corresponds to the horizontal beam 111, the end plate 112 corresponds to the side plate 172, and the lifting lug 113 corresponds to the suspension rod 173. Except that the length of the long beam 171 of the corner wall attachment 170 is greater than that of the horizontal beam 111 of the wall attachment 110, and the other end of the corner wall attachment 170 may not be provided with the seat plate 115. The long beam 171 of the corner wall attaching member 170 and the horizontal beam 111 of the wall attaching member 110 can be welded by section steel such as channel steel.
It should be noted that the corner structural columns 194 include the wall attaching member 110 and its upper and lower rigid diagonal members, and the corner attaching member 170 and its upper and lower rigid diagonal members. During global climbing, the wall surface wall attaching piece 110 which is matched with the frame body of the attached lifting scaffold 180 and is installed on the wall body through bolts can be arranged on the structural column 194 at the corner of the wall. And the purpose of adding the corner attachment wall 170 is to improve the reliable connection and stable climbing with the attached lifting scaffold 180.
Referring to fig. 7, in order to monitor the climbing safety of the attached lifting scaffold 180, in the attachment system 100 of the attached lifting scaffold 180 according to the embodiment of the present invention, the stress sensor 161 is disposed on the suspension rod 173 of the corner wall attaching member 170, and the axial end of the upper rigid diagonal member 140 or the lower rigid diagonal member 130 at the structural column 194 is connected to the corresponding stress sensor 161 in a contacting manner; or the stress sensor 161 is arranged between the suspension rod 173 and the long beam 171 of the corner wall attachment 170.
With the two above-described mounting of the strain sensor 161. The wall corner wall attaching piece is suitable for mounting the wall surface wall attaching piece 110 and the wall corner wall attaching piece 170. The installation mode of fig. 2 can directly reflect the axial tension of the upper or lower rigid diagonal member, so as to determine whether the connection of any one wall surface wall attaching member 110 or wall corner wall attaching member 170 is reliable or safe through the tension change. For example, a preset value range is stored in the controller 162, and when the tension value of the stress sensor 161 exceeds the preset value range during climbing, the attached lifting scaffold 180 determines that the connection of the wall surface wall attaching piece 110 or the wall corner wall attaching piece 170 at the corresponding position is loosened or displaced, so as to remind a construction worker to maintain the connection of the wall surface wall attaching piece 110 or the wall corner wall attaching piece 170 and then control the attached lifting scaffold 180 to climb, thereby improving the safety of the climbing process. The installation manner of fig. 10 is that the lifting lug 113 or the suspension rod 173 is pulled by the rigid diagonal pulling member, so that the stress sensor 161 between the lifting lug 113 or the suspension rod 173 and the horizontal beam 111 or the long beam 171 responds to the upward or upward pulling force, and whether the connection of the horizontal beam 111 or the long beam 171 is reliable or not is monitored through the change of the pulling force value.
That is, the essential purpose of the stress sensor 161 is to detect the reliability and safety of the connection between the front cover wall attaching member 110 and the corner wall attaching member 170 in real time by the stress of the upper and lower rigid diagonal members to determine whether the climbing of the attached lifting scaffold 180 is safe.
Referring to fig. 1, an embodiment of the present invention further provides a method for using the attaching system 100 of the attached lifting scaffold 180, which may include:
step 310, pre-burying a pipe fitting, namely pre-burying a pipe fitting for the wall bolt 120 to penetrate through on the wall body of the shrinkage structure layer 191; wherein the tube is preferably a plastic tube. The pipe fitting is used as a mounting hole. In order to avoid plugging, the two ends of the pipe are sealed by rubberized fabric.
And step 320, embedding the conical sleeves, namely embedding the conical sleeves for mounting the brackets 174 on the outer wall of the structural column 194 at the corner of the wall. Wherein steps 310 through 320 are optional steps.
Step 330, installing the wall attaching member 110 and the upper and lower rigid diagonal members thereof, specifically comprising:
and step 331, installing the wall surface wall attaching part 110 on the wall body of the shrinkage structure layer 191 through the wall penetrating bolt 120.
Step 332, connecting the upper end of the lower rigid diagonal member 130 at the wall surface wall attaching member 110 to the upper end and the lower end of the lifting lug 113 at the lower side of the wall surface wall attaching member 110, and connecting the upper end and the lower end to the lifting ring 192 arranged at the next structural layer.
Step 333, connecting the lower end of the upper rigid diagonal member 140 at the wall surface wall attaching member 110 to the lifting lug 113 at the upper side of the wall surface wall attaching member 110, and connecting the upper end of the upper rigid diagonal member to the lifting ring 192 of the floor slab arranged on the upper structural layer or the wall connecting member 150 installed on the wall body of the upper structural layer.
Step 350, connecting the attached lifting scaffold 180. Specifically, the method includes step 351, connecting the wall-attached support of the attached lifting scaffold 180 with the wall-attached member 110 by bolts.
At this time, the attached lifting scaffold 180 on the wall surface can be controlled to climb on the contracted structure layer 191 through the attachment system 100 of the attached lifting scaffold 180, so that the attached lifting scaffold 180 can locally climb on one surface of the wall.
Referring to fig. 5 and 7, a method for using the attachment system 100 of the attached lifting scaffold 180 according to the embodiment of the present invention may further include:
step 340, installing the corner wall attaching piece 170 and the upper and lower rigid diagonal pulling pieces 130 thereof, specifically comprising:
at step 341, the corner wall attachment member 170 is installed on the wall of the structural column 194 at the corner through the bracket 174.
In step 342, the upper end of the lower rigid diagonal member 130 at the corner wall-attaching member 170 is connected to the upper end and the lower end of the hanger rod 173 at the lower side of the corner wall-attaching member 170, respectively, and then connected to the wall-attaching member 150 installed on the wall.
In step 343, the lower end of the upper rigid diagonal member 140 at the corner wall attaching member 170 is connected to the hanger rod 173 at the upper side of the corner wall attaching member 170, and the upper end is connected to the wall attaching member 150 installed on the wall.
And 352, connecting the wall attaching support on the attached lifting scaffold 180 with the wall corner wall attaching piece 170 through bolts.
At this time, the attached lifting scaffold 180 at the front cover and the corner can be controlled to climb on the contracted structure layer 191 through the attachment system 100 of the attached lifting scaffold 180 to realize the overall climbing of the attached lifting scaffold 180 on the periphery of the wall.
In order to realize the safety monitoring of the attached lifting scaffold 180, the use method of the attaching system 100 of the attached lifting scaffold 180 provided by the embodiment of the present invention may further include:
step 370, monitoring climbing safety, and controlling the attached lifting scaffold 180 to climb on the contracted structural layer 191 through the attached system 100 of the attached lifting scaffold 180; when the attached lifting scaffold 180 climbs in the contracted structural layer 191, the safety of the connection between the wall surface wall attaching piece 110 and the wall corner wall attaching piece 170 is monitored through the stress value of the stress sensor 161 so as to monitor whether the climbing process of the attached lifting scaffold 180 in the contracted structural layer 191 is safe.
Before climbing safety monitoring, a stress sensor 161 is required to be installed, and the stress sensor 161 is installed between the lifting lug 113 and the horizontal beam 111 of the wall surface wall attaching piece 110 and between the suspension rod 173 and the long beam 171 of the corner wall attaching piece 170; alternatively, the stress sensor 161 may be mounted on the lifting lug 110 of the wall attachment 110 and the suspension rod 173 of the corner attachment 170, and the axial end of the corresponding upper rigid diagonal member 140 or lower rigid diagonal member 130 may be disposed in contact with the stress sensor 161 located on the lifting lug 113 or suspension rod 173.
In order to improve the safety of the attached lifting scaffold 180 during climbing, the method for using the attaching system 100 of the attached lifting scaffold 180 according to the embodiment of the present invention may further include:
and 380, monitoring the safety of the frame body, namely, arranging the stress sensor 161 between the steel bottom plate of the attached lifting scaffold 180 and the inner frame and the outer frame, and monitoring the change of force by the stress sensor 161 before the frame body climbs to judge whether the connection constraint exists between the frame body of the attached lifting scaffold 180 and the buckled scaffold 193 erected in the structural layer or not so as to monitor the safety of the frame body. Can be used to detect whether there is load more than because of the improper contact of restraint when the attached lifting scaffold 180 climbs, avoid fastener formula scaffold 193 to take with and climb and warp and influence the process and the structural safety that climb.
According to the attachment system 100 of the attached lifting scaffold 180 and the using method thereof provided by the embodiment of the invention, the attachment system 100 of the attached lifting scaffold 180 is arranged on the contracted structural layer 191 of the building structure, so that the attached lifting scaffold 180 keeps connection on the contracted structural layer 191 and continuously climbs on the contracted structural layer 191 through the attachment system 100, and the problem that the attached lifting scaffold 180 cannot continuously climb on the contracted structural layer 191 is solved. Need not secondary dismouting inserted lift scaffold 180 around shrink structural layer 191 and set up the formula of encorbelmenting scaffold upset and climb and carry out the transition construction to the safety risk of secondary dismouting and the formula of encorbelmenting scaffold dismouting process has been reduced, thereby has overcome the problem of the safety risk that causes at shrink structural layer 191 through the formula of encorbelmenting scaffold transition construction. The used attached lifting scaffold 180 can be kept to continuously climb on the shrinkage structure layer 191 only by disassembling and assembling the attachment system 100 on the shrinkage structure layer 191, and the attached lifting scaffold 180 does not need to be disassembled and assembled for the second time and the overhanging scaffold is not needed to be replaced, so that the overall construction efficiency of the building structure is improved. In addition, for the overhanging scaffold, the attachment system 100 does not need a tower crane, and reduces the labor, equipment and material costs.
The embodiment of the invention provides an attachment system 100 of an attached lifting scaffold 180 and a use method thereof, the wall surface wall attaching piece 110 and the wall corner wall attaching piece 170 are aligned with the wall body of the non-shrinkable structural layer 190, so that the shrinkable structural layer 191 extends outwardly through the wall attachment 110 and the corner attachment 170 and remains aligned with the wall of the non-shrinkable structural layer 190, the wall attachment brackets of the attached lifting scaffold 180 can be mounted on the wall surface wall attachment 110 and the corner wall attachment 170, to keep the attached lifting scaffold 180 vertically arranged, the upper and lower rigid diagonal members 130 can ensure the stability and reliability of the wall surface wall attaching member 110 and the wall corner wall attaching member 170 mounted on the wall body, prevent the risk that the upper and lower pulling forces of the attached lifting scaffold 180 in the climbing process drive the wall surface wall attaching member 110 and the wall corner wall attaching member 170 to displace and even fall relative to the wall body, and improve the safety of the climbing process.
The attachment system 100 of the attached lifting scaffold 180 and the use method thereof provided by the embodiment of the invention connect the wall surface wall attaching piece 110 and the wall corner wall attaching piece 170 through the upper and lower rigid inclined pulling pieces 130, have double functions of inclined pulling and supporting, and ensure the safe and reliable connection of the wall surface wall attaching piece 110 and the wall corner wall attaching piece 170 in the climbing process.
According to the attachment system 100 of the attached lifting scaffold 180 and the use method thereof provided by the embodiment of the invention, the load data of the force can be recorded through the stress sensor 161, the overall climbing process can be controlled conveniently, and the safety and the detectable range of the overall climbing process of the scaffold can be obviously enhanced.
Referring to fig. 1 and 9, an attachment system 100 of an attached lifting scaffold 180 and a method for using the same according to an embodiment of the present invention are suitable for climbing a contracted structural layer of a capping structure.
Referring to fig. 8, the attachment system 100 of the attached lifting scaffold 180 and the method for using the same according to the embodiment of the present invention are suitable for a building structure with a contracted structural layer 191 in the middle. For example, layers 25 to 26 are shrink construction layers 191 and layer 27 is non-shrink construction layer 190. The wall attaching piece is subjected to stress analysis and verification calculation by the stress sensor 161, so that the attached lifting scaffold 180 can smoothly climb on a shrinkage structure layer, the safety protection problem of a construction working surface is guaranteed, and the overall construction safety is far higher than that of an overhanging scaffold. Especially, the construction safety in high-altitude edge and strong wind environment is improved.
The present invention is not limited to the above-described specific embodiments, and it is apparent that the above-described embodiments are some, not all, of the embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the described embodiments of the invention, are within the scope of the invention. Other levels of modification and variation of the present invention may be made by those skilled in the art. Thus, it is intended that the present invention cover the modifications and variations of this invention provided they come within the scope of the appended claims.

Claims (10)

1.一种附着式升降脚手架的附着体系,其特征在于,包括:1. an attachment system of an attached lifting scaffold, is characterized in that, comprises: 墙面附墙件,包括水平梁以及设置在所述水平梁两端的端板和座板,位于所述端板一侧的所述水平梁的上下侧分别设置有吊耳;所述墙面附墙件通过穿墙螺栓贯穿所述座板设置在收缩结构层的墙体上,所述墙面附墙件的端板与非收缩结构层的墙体对齐设置;The wall attachment wall piece includes a horizontal beam, an end plate and a seat plate arranged at both ends of the horizontal beam, and the upper and lower sides of the horizontal beam on one side of the end plate are respectively provided with lifting ears; The wall piece is arranged on the wall of the shrinkable structure layer through the seat plate through the wall bolt, and the end plate of the wall-attached wall piece is arranged in alignment with the wall of the non-shrinkable structure layer; 下刚性斜拉件,倾斜设置在所述墙面附墙件下侧的吊耳与下一层结构层的楼板之间;The lower rigid oblique-stayed piece is inclined and arranged between the lifting lug on the lower side of the wall-attached wall piece and the floor slab of the next structural layer; 上刚性斜拉件,倾斜设置在所述墙面附墙件上侧的吊耳与上一层结构层的楼板或者墙体之间。The upper rigid inclined member is inclined and arranged between the lifting lug on the upper side of the wall-attached wall member and the floor or wall of the upper structural layer. 2.根据权利要求1所述的附着式升降脚手架的附着体系,其特征在于,还包括:2. The attachment system of the attachment type lifting scaffold according to claim 1, is characterized in that, also comprises: 应力检测装置,包括:Stress detection device, including: 应力传感器,所述应力传感器设置在所述墙面附墙件的吊耳上,所述应力传感器与所述上刚性斜拉件或者下刚性斜拉件的轴向端相接触连接;或者所述应力传感器设置在所述墙面附墙件的吊耳与水平梁之间。A stress sensor, the stress sensor is arranged on the lifting lug of the wall-attached piece, and the stress sensor is in contact with the axial end of the upper rigid stay or the lower rigid stay; or the The stress sensor is arranged between the hanging lug of the wall attachment and the horizontal beam. 控制器,与所述应力传感器有线或者无线连接。A controller is wired or wirelessly connected to the stress sensor. 3.根据权利要求1所述的附着式升降脚手架的附着体系,其特征在于,还包括:3. The attachment system of the attachment type lifting scaffold according to claim 1, is characterized in that, also comprises: 吊环,预埋或者通过穿墙螺栓设置在结构层的楼板上,所述下刚性斜拉件通过所述吊环设置在相应层结构层的楼板上,所述上刚性斜拉件通过所述吊环设置在相应层结构层的楼板上。The lifting ring is pre-embedded or set on the floor of the structural layer by means of through-wall bolts, the lower rigid inclined member is set on the floor of the corresponding structural layer through the lifting ring, and the upper rigid diagonal member is set through the lifting ring on the floor of the corresponding structural layer. 4.根据权利要求1所述的附着式升降脚手架的附着体系,其特征在于,还包括:4. The attachment system of the attachment type lifting scaffold according to claim 1, is characterized in that, also comprises: 连墙件,通过穿墙螺栓设置在收缩结构层的墙体上;所述上刚性斜拉件通过所述连墙件设置在相应层收缩结构层的墙体上。The wall connecting piece is arranged on the wall of the shrinking structure layer through the wall bolt; the upper rigid oblique-staying piece is arranged on the wall of the shrinking structure layer of the corresponding layer through the connecting wall piece. 5.根据权利要求1所述的附着式升降脚手架的附着体系,其特征在于,还包括:5. The attachment system of the attachment type lifting scaffold according to claim 1, is characterized in that, also comprises: 墙角附墙件,通过牛腿设置在转角处的结构柱的墙体上,所述墙角附墙件包括水平梁,所述水平梁的一端设置有端板,位于所述端板一侧的水平梁的上下侧分别设置有吊耳,所述墙角附墙件的端板与非收缩结构层的墙体对齐设置;The corner attachment wall piece is arranged on the wall of the structural column at the corner through the corbel, and the wall corner attachment wall piece comprises a horizontal beam, one end of the horizontal beam is provided with an end plate, and the horizontal beam on one side of the end plate is horizontal The upper and lower sides of the beam are respectively provided with lifting ears, and the end plates of the wall-attached wall pieces are arranged in alignment with the walls of the non-shrinkable structural layer; 所述墙角附墙件上侧的吊耳与设置在转角处的结构柱的墙体上的连墙件之间设置有所述上刚性斜拉件,所述墙角附墙件下侧的吊耳与设置在转角处的结构柱的墙体上的连墙件之间设置有所述下刚性斜拉件。The upper rigid inclined member is arranged between the lifting lug on the upper side of the wall-attached wall member and the connecting wall member on the wall of the structural column arranged at the corner, and the lifting lug on the lower side of the wall-attached wall member is provided. The lower rigid oblique-stayed piece is arranged between it and the connecting wall piece arranged on the wall of the structural column at the corner. 6.根据权利要求5所述的附着式升降脚手架的附着体系,其特征在于,所述墙角附墙件的吊耳上设置有所述应力传感器,所述结构柱处的上刚性斜拉件或者下刚性斜拉件的轴向端与相应的应力传感器相接触连接;或者所述墙角附墙件的吊耳与水平梁之间设置有所述应力传感器。6 . The attachment system of the attached lifting scaffold according to claim 5 , wherein the stress sensor is provided on the lifting lugs of the wall-attached parts at the corners, and the upper rigid inclined members at the structural columns or The axial end of the lower rigid oblique stay is in contact with the corresponding stress sensor; or the stress sensor is arranged between the lifting lug of the corner attachment and the horizontal beam. 7.一种根据权利要求1-6中任一项所述的附着式升降脚手架的附着体系的使用方法,其特征在于,包括:7. A method of using the attachment system of the attached lifting scaffold according to any one of claims 1-6, characterized in that, comprising: 安装墙面附墙件及其上下刚性斜拉件,包括:Installation of wall attachments and their upper and lower rigid stay members, including: 在收缩结构层的墙体上通过穿墙螺栓安装墙面附墙件;Install wall attachments through wall bolts on the wall of the shrinking structure layer; 将墙面附墙件处的下刚性斜拉件的上端连接在墙面附墙件下侧的吊耳上、下端连接在设置在下一层结构层的吊环上;Connect the upper end of the lower rigid inclined-stayed piece at the wall-attached wall fitting to the lifting lug on the lower side of the wall-attached wall fitting, and connect the lower end to the lifting ring arranged on the next structural layer; 将墙面附墙件处的上刚性斜拉件的下端连接在墙面附墙件上侧的吊耳上、上端连接在设置在上一层结构层的楼板的吊环上或者连接在上一层结构层的墙体上安装的连墙件上;Connect the lower end of the upper rigid inclined-stayed piece at the wall attachment to the lifting lug on the upper side of the wall attachment, and connect the upper end to the lifting ring of the floor slab on the upper structural layer or to the upper floor On the connecting wall piece installed on the wall of the structural layer; 连接附着式升降脚手架,将附着式升降脚手架上的附墙支座与墙面附墙件通过螺栓连接。Connect the attached lifting scaffold, and connect the wall-attaching support on the attached lifting scaffold and the wall-attaching piece by bolts. 8.根据权利要求7所述的附着式升降脚手架的附着体系的使用方法,其特征在于,还包括:8. the using method of the attachment system of the attached lifting scaffold according to claim 7, is characterized in that, also comprises: 安装墙角附墙件及其上下刚性斜拉件,包括:Install the corner attachment and its upper and lower rigid stay, including: 在转角处的结构柱的墙体上通过牛腿安装的墙角附墙件;Corner attachments installed by corbels on the wall of the structural column at the corner; 将墙角附墙件处的下刚性斜拉件的上端连接在墙角附墙件下侧的吊杆上、下端连接在安装在墙体上的连墙件上;Connect the upper end of the lower rigid inclined-stayed piece at the corner attachment to the hanger on the lower side of the corner attachment, and connect the lower end to the connecting wall piece installed on the wall; 将墙角附墙件处的上刚性斜拉件的下端连接在墙角附墙件上侧的吊杆上、上端连接在安装在墙体上的连墙件上;Connect the lower end of the upper rigid diagonal-stayed piece at the corner attachment to the hanger on the upper side of the corner attachment, and connect the upper end to the connecting wall piece installed on the wall; 将附着式升降脚手架上的附墙支座与墙角附墙件通过螺栓连接。Connect the wall-attached support on the attached lifting scaffold with the corner-attached wall piece by bolts. 9.根据权利要求8所述的附着式升降脚手架的附着体系的使用方法,其特征在于,包括:9. The using method of the attachment system of the attached lifting scaffold according to claim 8, characterized in that, comprising: 爬升安全监测,控制附着式升降脚手架在收缩结构层通过附着式升降脚手架的附着体系爬升,在附着式升降脚手架在收缩结构层爬升时,通过应力传感器的应力值监测墙面附墙件和墙角附墙件的连接安全以监测附着式升降脚手架在收缩结构层的爬升过程是否安全;Climbing safety monitoring, control the attached lifting scaffold to climb through the attachment system of the attached lifting scaffold on the shrinking structure layer, when the attached lifting scaffold climbs in the shrinking structure layer, monitor the wall-attached wall parts and corner attachments through the stress value of the stress sensor. The connection of wall parts is safe to monitor whether the climbing process of the attached lifting scaffold on the shrinking structure layer is safe; 在爬升安全监测之前,安装应力传感器,将应力传感器安装在墙面附墙件吊耳与水平梁之间以及安装在墙角附墙件的吊杆与长梁之间;或者将应力传感器安装在墙面附墙件的吊耳及墙角附墙件的吊杆上,将相应的上刚性斜拉件或者下刚性斜拉件的轴向端与位于吊耳或者吊杆上的应力传感器相接触设置。Before climbing safety monitoring, install the stress sensor, install the stress sensor between the hanging lug of the wall attachment and the horizontal beam and between the hanger and the long beam of the corner attachment; or install the stress sensor on the wall On the lifting lugs of the face-attached wall fittings and the suspension rods of the corner-attached wall fittings, the axial ends of the corresponding upper or lower rigid diagonal-stayed members are arranged in contact with the stress sensors located on the lifting ears or the suspension rods. 10.根据权利要求8所述的附着式升降脚手架的附着体系的使用方法,其特征在于,还包括:10. The using method of the attachment system of the attached lifting scaffold according to claim 8, characterized in that, further comprising: 架体安全监测,通过在附着式升降脚手架的钢底板与内架及外架之间设置所述应力传感器,在架体爬升之前,通过该应力传感器监测的力的变化值以判定附着式升降脚手架的架体与结构层之内搭设的扣式脚手架是否存在连接约束,以对架体进行安全监测。Frame safety monitoring, by setting the stress sensor between the steel bottom plate of the attached lifting scaffold and the inner frame and the outer frame, before the frame climbs, the change value of the force monitored by the stress sensor is used to determine the attached lifting scaffold. Whether there is a connection constraint between the frame body and the buckle scaffolding erected in the structural layer, so as to monitor the safety of the frame body.
CN202110663894.2A 2021-06-16 2021-06-16 Attachment system of attached lifting scaffold and method of use thereof Active CN113293977B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110663894.2A CN113293977B (en) 2021-06-16 2021-06-16 Attachment system of attached lifting scaffold and method of use thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110663894.2A CN113293977B (en) 2021-06-16 2021-06-16 Attachment system of attached lifting scaffold and method of use thereof

Publications (2)

Publication Number Publication Date
CN113293977A true CN113293977A (en) 2021-08-24
CN113293977B CN113293977B (en) 2025-08-05

Family

ID=77328276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110663894.2A Active CN113293977B (en) 2021-06-16 2021-06-16 Attachment system of attached lifting scaffold and method of use thereof

Country Status (1)

Country Link
CN (1) CN113293977B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114659559A (en) * 2022-03-28 2022-06-24 江苏鑫昇腾科技发展股份有限公司 Intelligent building climbing frame working state monitoring system and method based on Internet of things
CN117513715A (en) * 2023-12-19 2024-02-06 广州协安建设工程有限公司 Protection system and construction method for attached lifting scaffolding to pass through the refuge floor
CN119860077A (en) * 2025-02-27 2025-04-22 中国五冶集团有限公司 Anti-overturning stabilizing device and method for scaffold

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201991207U (en) * 2011-03-17 2011-09-28 北城致远集团有限公司 Load alarm device for attached lifting scaffold
CN102486036A (en) * 2010-12-03 2012-06-06 沈阳铝镁设计研究院有限公司 Post-added triangular bracket supporting structure for concrete pile
CN205224571U (en) * 2015-12-15 2016-05-11 南通四建集团有限公司 Anchor of builder's jack
CN205558243U (en) * 2016-04-25 2016-09-07 中国建筑第八工程局有限公司 Bearing structure encorbelments
KR20160148757A (en) * 2015-06-16 2016-12-27 고려대학교 산학협력단 Climbing formwork apparatus for cast-in-place concrete with exterior insulation
CN206309004U (en) * 2016-12-07 2017-07-07 上海宏金设备工程有限公司 A kind of corner of strut-framed I-steel for disk buckle scaffold is encorbelmented girder construction
CN206438755U (en) * 2017-01-18 2017-08-25 南通四建集团有限公司 A kind of exterior wall steel pipe scaffold drawknot node structure
CN206844617U (en) * 2017-06-22 2018-01-05 中国新兴建筑工程总公司 A kind of builder's jack
WO2018232720A1 (en) * 2017-06-21 2018-12-27 河北盛卓建筑设备制造有限公司 Attached lifting aluminum alloy scaffolding
CN209293392U (en) * 2018-12-06 2019-08-23 广州丰利达安防科技有限公司 Staggered floor balcony type lift all steel scaffold for building
CN209742342U (en) * 2019-03-22 2019-12-06 中国建筑第五工程局有限公司 A climbing-type scaffold support growth component
JP6713599B1 (en) * 2019-07-29 2020-06-24 東阪工業株式会社 Wedge binding scaffolding morning glory device and wedge binding scaffolding morning glory device system
CN111439650A (en) * 2020-04-20 2020-07-24 上海建工集团股份有限公司 Connecting rod capable of monitoring axial force in real time
CN211286558U (en) * 2019-09-03 2020-08-18 江苏正方园建设集团有限公司 Pull rod type external scaffold external corner shaping tool structure
CN212671138U (en) * 2020-05-21 2021-03-09 中建一局集团第三建筑有限公司 Oblique-pulling type overhanging attached support attached to lifting scaffold
CN217353469U (en) * 2021-06-16 2022-09-02 上海建工一建集团有限公司 Adhesion system of adhesion type lifting scaffold

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102486036A (en) * 2010-12-03 2012-06-06 沈阳铝镁设计研究院有限公司 Post-added triangular bracket supporting structure for concrete pile
CN201991207U (en) * 2011-03-17 2011-09-28 北城致远集团有限公司 Load alarm device for attached lifting scaffold
KR20160148757A (en) * 2015-06-16 2016-12-27 고려대학교 산학협력단 Climbing formwork apparatus for cast-in-place concrete with exterior insulation
CN205224571U (en) * 2015-12-15 2016-05-11 南通四建集团有限公司 Anchor of builder's jack
CN205558243U (en) * 2016-04-25 2016-09-07 中国建筑第八工程局有限公司 Bearing structure encorbelments
CN206309004U (en) * 2016-12-07 2017-07-07 上海宏金设备工程有限公司 A kind of corner of strut-framed I-steel for disk buckle scaffold is encorbelmented girder construction
CN206438755U (en) * 2017-01-18 2017-08-25 南通四建集团有限公司 A kind of exterior wall steel pipe scaffold drawknot node structure
WO2018232720A1 (en) * 2017-06-21 2018-12-27 河北盛卓建筑设备制造有限公司 Attached lifting aluminum alloy scaffolding
CN206844617U (en) * 2017-06-22 2018-01-05 中国新兴建筑工程总公司 A kind of builder's jack
CN209293392U (en) * 2018-12-06 2019-08-23 广州丰利达安防科技有限公司 Staggered floor balcony type lift all steel scaffold for building
CN209742342U (en) * 2019-03-22 2019-12-06 中国建筑第五工程局有限公司 A climbing-type scaffold support growth component
JP6713599B1 (en) * 2019-07-29 2020-06-24 東阪工業株式会社 Wedge binding scaffolding morning glory device and wedge binding scaffolding morning glory device system
CN211286558U (en) * 2019-09-03 2020-08-18 江苏正方园建设集团有限公司 Pull rod type external scaffold external corner shaping tool structure
CN111439650A (en) * 2020-04-20 2020-07-24 上海建工集团股份有限公司 Connecting rod capable of monitoring axial force in real time
CN212671138U (en) * 2020-05-21 2021-03-09 中建一局集团第三建筑有限公司 Oblique-pulling type overhanging attached support attached to lifting scaffold
CN217353469U (en) * 2021-06-16 2022-09-02 上海建工一建集团有限公司 Adhesion system of adhesion type lifting scaffold

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114659559A (en) * 2022-03-28 2022-06-24 江苏鑫昇腾科技发展股份有限公司 Intelligent building climbing frame working state monitoring system and method based on Internet of things
CN114659559B (en) * 2022-03-28 2022-12-09 江苏鑫昇腾科技发展股份有限公司 Intelligent building climbing frame working state monitoring system and method based on Internet of things
CN117513715A (en) * 2023-12-19 2024-02-06 广州协安建设工程有限公司 Protection system and construction method for attached lifting scaffolding to pass through the refuge floor
CN119860077A (en) * 2025-02-27 2025-04-22 中国五冶集团有限公司 Anti-overturning stabilizing device and method for scaffold

Also Published As

Publication number Publication date
CN113293977B (en) 2025-08-05

Similar Documents

Publication Publication Date Title
CN113293977B (en) Attachment system of attached lifting scaffold and method of use thereof
CN109881585B (en) Assembled working platform for high pier construction
CN103206074B (en) Elevator shaft template construction method, platform and support
CN214834605U (en) A climb a structure that adheres to for structure disappearance layer
CN113401815B (en) High-altitude conversion system of core tube tower crane of super high-rise building and construction method thereof
CN104847102B (en) Attachment type raise scaffold is received attached wall method and the device thereof of section in external wall
CN218581152U (en) Integrated support device attached to lifting scaffold
CN105888229A (en) All-steel attached scaffold mounting method
CN217353469U (en) Adhesion system of adhesion type lifting scaffold
CN111456413A (en) Attached lifting scaffold and external wall connection structure
CN112282765B (en) Integral lifting operation platform for shaft in ultra-deep vertical shaft and construction method thereof
CN110359696B (en) Adjustable attached lifting scaffold and inclined climbing method thereof
CN113860190A (en) Cantilever tower crane girder-turning-free placing bracket and mounting method
CN111764623B (en) Hanging construction platform module and construction method of high altitude large cantilever steel roof frame
CN206581577U (en) Using housing construction builder's jack
CN210508317U (en) Overhanging type assembled floor-stopping device for construction elevator
JP3149454U (en) Temporary column for handrail
KR20020047071A (en) Rail railing (scaffolding) clamping device in the construction site.
CN213174742U (en) Top bracing steel stand structure
CN215594854U (en) Hanging basket device for construction of outer curtain wall of high-rise building
CN214575520U (en) Telescopic cantilever outer frame
KR200288007Y1 (en) Rail railing (scaffolding) clamping device in the construction site.
CN209742342U (en) A climbing-type scaffold support growth component
CN212154222U (en) Safety belt fixing device for steel structure construction
JP2013129961A (en) Temporary fixation method for steel staircase and pipe support for supporting steel staircase

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant