CN113264458B - Tower crane system and method for removing attachment rods thereof - Google Patents
Tower crane system and method for removing attachment rods thereof Download PDFInfo
- Publication number
- CN113264458B CN113264458B CN202010095255.6A CN202010095255A CN113264458B CN 113264458 B CN113264458 B CN 113264458B CN 202010095255 A CN202010095255 A CN 202010095255A CN 113264458 B CN113264458 B CN 113264458B
- Authority
- CN
- China
- Prior art keywords
- hoist
- attachment rod
- tower crane
- attachment
- operating platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/20—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C11/00—Trolleys or crabs, e.g. operating above runways
- B66C11/02—Trolleys or crabs, e.g. operating above runways with operating gear or operator's cabin suspended, or laterally offset, from runway or track
- B66C11/04—Underhung trolleys
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/16—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Jib Cranes (AREA)
Abstract
The invention relates to the field of building machinery, and provides a tower crane system. The tower crane system comprises a tower crane body, a cantilever crane, a first operation platform, a second operation platform and a second crane hoist. The first crane hoist of the cantilever crane is used for hanging and pulling the attachment rod, and the second crane hoist is used for lowering the attachment rod. By the cooperation of the two hoisting hoists, the attachment rod is pulled out of the building structure, and the first hoisting hoist can also convey the attachment rod to the lifting hook of the tower crane body. The first operating platform may act as a work platform for a constructor to detach the attachment bar from the cantilever crane and mount it to the hook. The second operation platform is used as a working platform for a constructor to detach the attachment rod from the tower crane body and install the attachment rod to the first crane block and the lifting hook. The invention aims to reduce the difficulty and safety risk of removing an attachment rod. The invention also provides a dismantling method of the attaching rod of the tower crane system.
Description
Technical Field
The invention relates to the field of building machinery, in particular to a tower crane system and a method for dismantling an attachment rod of the tower crane system.
Background
When the tower crane is required to be used with a height exceeding the maximum independent height, before the tower crane is further lifted, in order to avoid collapse of the tower crane, constructors can connect the tower crane to a building structure through the attaching rods. But removing the attachment bar of the tower crane is a dangerous operation. At present, most of the attaching rods of the tower cranes are detached by taking the tower crane as auxiliary lifting equipment. The conventional dismantling method has the following drawbacks:
(1) The rotation of the upper part of the tower crane is limited. Before the attachment bar is removed, the tower crane needs to be lowered to a height below the attached building structure, thus limiting the swing of the upper part of the tower crane.
(2) When the attachment bar is long, it is difficult to detach and the safety risk is large. When the tower crane itself disassembles the attachment bar, it is necessary to pull the attachment bar obliquely and obliquely. However, when the attachment bar is long, the weight of the attachment bar is large, or one end of the attachment bar is extended deep into the building structure, it becomes particularly difficult and dangerous to disassemble the attachment bar by means of the tower crane itself.
(3) The glass curtain wall may be damaged. When the tower crane is used for disassembling the attaching rod penetrating into the ultrahigh building structure, the glass curtain wall at the attaching point position on one side of the building structure is often installed, and a narrow hole is reserved at the attaching point. If the attachment rod is detached by using the self oblique-pulling oblique crane of the tower crane, the curtain wall glass is difficult to be ensured not to be damaged when the attachment rod moves out of the hole.
Disclosure of Invention
In order to reduce the difficulty and safety risk of detaching the attaching rod, the invention provides a tower crane system and a detaching method of the attaching rod.
The tower crane system comprises a tower crane body, a cantilever crane and a second operation platform, wherein the tower crane body comprises a sleeve frame, a lifting hook capable of lifting an attachment rod and a plurality of standard joints which are sequentially connected vertically, the cantilever crane is connected to the sleeve frame and comprises a track beam, a first crane block and at least one supporting arm, one end of the supporting arm is connected with the sleeve frame, the other end of the supporting arm extends towards a building structure connected with the attachment rod and is connected with the track beam, the first crane block can move along the track beam towards a direction close to or far from the lifting hook, the first crane block is used for lifting the attachment rod, the first operation platform is connected with the sleeve frame and is used for bearing constructors, so that the constructors can detach the attachment rod from the first crane block and install the lifting hook on the first crane block, the second operation platform is used for bearing constructors, and the second operation platform is used for bearing constructors to detach the attachment rod from one standard joint and install the attachment rod on the second crane block and detach the second crane block from the first crane block and install the attachment rod on the second crane block.
According to one embodiment of the invention, the device further comprises a third hoisting block, the third hoisting block and the attachment rod are connected to the same standard joint, the third hoisting block is arranged at a position higher than the second operation platform, and the third hoisting block is used for hoisting and pulling the attachment rod.
According to one embodiment of the invention, the first operating platform is provided with a first guy wire, which can be used for connecting the attachment bar.
According to one embodiment of the invention, the second operating platform is provided with a second guy wire, which can be used for connecting the attachment bar.
According to one embodiment of the invention, the lifting hook comprises a first lifting hook body and a second lifting hook body, wherein the first lifting hook body is connected with the first lifting hook body, and the second lifting hook body is connected with the second lifting hook body.
According to one embodiment of the invention, the third operating platform is provided with a third guy wire, which may be used for connecting the attachment bar.
According to one embodiment of the invention, the cantilever crane further comprises at least one diagonal brace and at least one stay cable, the support arms are connected to the sleeve frame through pin shafts, the at least one diagonal brace correspondingly supports the at least one support arm, and the at least one stay cable correspondingly hangs and pulls the at least one support arm.
According to one embodiment of the invention, both ends of the track beam are provided with limiting plates.
The invention also provides a method for removing an attachment bar of a tower crane system, comprising the steps of removing the attachment bar from a standard knot and mounting the attachment bar to a first crane, wherein the first crane is arranged on a sleeve frame above the standard knot, removing the attachment bar from a building structure and connecting the attachment bar to a second crane, wherein the second crane is arranged on the building structure, lifting the attachment bar by the first crane while lowering the attachment bar by the second crane, stopping the lifting of the attachment bar by the first crane when the attachment bar is completely removed from the building structure and continuing to lower the attachment bar by the second crane until the attachment bar reaches a vertical posture, removing the attachment bar from the second crane, moving the attachment bar to a position closest to a hook of the tower crane, then connecting the attachment bar to the hook, lifting the attachment bar by the hook, and removing the attachment bar from the attachment bar by the hook crane when a wire rope of the first crane is released, continuing to lift the attachment bar to the ground.
Compared with the prior art, the technical scheme provided by the embodiment of the application has the following advantages:
The first and second hoist may be connected to the attachment bar, respectively, and then the attachment bar disconnected from the building structure and standard knot, respectively. The first hoist then pulls up the attachment bar while the second hoist lowers the attachment bar until the attachment bar is pulled out of the building. Through the cooperation of the two hoisting hoists, the attaching rod can be safely and efficiently detached from the building. The first crane hoist can also drive the attachment rod to move towards the lifting hook so as to facilitate the safe and efficient connection of the attachment rod to the lifting hook, avoid the oblique lifting of the attachment rod by the lifting hook, and avoid the illegal operation of the tower crane. The first operating platform is used for bearing constructors so that the constructors can release the attaching rods from the first crane hoist and mount the attaching rods to the lifting hooks. The second operating platform is used for bearing constructors, so that the constructors can detach the attaching rods from one standard knot and mount the attaching rods to the first crane hoist, and the constructors can detach the attaching rods from the first crane hoist and mount the attaching rods to the lifting hooks. Therefore, the tower crane system and the method for dismantling the attached rod thereof can reduce the difficulty and the safety risk of dismantling the attached rod.
Drawings
FIG. 1 is a schematic illustration of an attachment bar connection in an embodiment of the present invention;
FIG. 2 is a schematic side view of a cantilever crane in accordance with one embodiment of the invention;
FIG. 3 is a schematic front view of a cantilever crane in accordance with one embodiment of the invention;
FIG. 4 is a partial schematic view of an attachment bar connection in an embodiment of the invention;
FIG. 5 is a partial schematic view of a first hoist, a second hoist and a third hoist respectively connected to an attachment bar in an embodiment of the present invention;
FIG. 6 is a partial schematic view of a hanger bar in accordance with one embodiment of the present invention;
FIG. 7 is a partial schematic view of a hanger bar in accordance with yet another embodiment of the present invention;
FIG. 8 is a partial schematic view of a hanger bar in accordance with yet another embodiment of the present invention;
FIG. 9 is a partial schematic view of a first hoist being moved toward a hook in accordance with one embodiment of the present invention;
FIG. 10 is a partial schematic view of an attachment bar coupled to a hook in accordance with one embodiment of the present invention;
FIG. 11 is a schematic view of a hook hanger attachment bar in an embodiment of the present invention;
Fig. 12 is a schematic view of a hanger bar in accordance with yet another embodiment of the present invention.
Reference numerals:
10. The crane comprises a tower crane body, 102, a sleeve frame, 104 standard knots, 12, cantilever crane, 121, a track beam, 122, a supporting arm, 123, a first crane block, 124, a diagonal brace, 125, a stay cable, 14, a first operation platform, 16, a second operation platform, 18, a second crane block, 20, a third crane block and 22, a third operation platform.
Detailed Description
In order that the above-recited objects, features and advantages of the present invention can be more clearly understood, a more particular description of the invention will be rendered by reference to specific embodiments thereof which are illustrated in the appended drawings. It is to be understood that the depicted embodiments are some, but not all, embodiments of the present invention. The specific embodiments described herein are to be considered in an illustrative rather than a restrictive sense. All other embodiments, which are obtained by a person skilled in the art based on the described embodiments of the invention, fall within the scope of protection of the invention.
As shown in fig. 1, in one embodiment of the present invention, a tower crane system includes a tower crane body 10. The tower crane body 10 includes a cradle 102, a plurality of standard knots 104, and hooks. The standard sections 104 are connected in series vertically and the gantry 102 is movable vertically along the standard sections 104, for example, the gantry 102 climbs up the standard sections 104. It should be noted that, the tower crane body 10 is a device known in the art, and the specific structure and operation method thereof are known to those skilled in the art (for example, the specific structure and connection manner of the hanger bracket 102 and the standard knot 104, the cooperation manner of the hook and the crane arm, etc.), and those skilled in the art will understand and implement the present invention without further description.
In one embodiment of the present invention, the tower crane system includes a cantilevered gantry 12. The cantilevered row crane 12 includes a track beam 121, a first hoist 123, and at least one support arm 122.
As shown in fig. 2 to 3, in the present embodiment, one end of the support arm 122 is connected to the nest 102, and the other end of the support arm 122 extends toward the building structure to which the attachment bar is connected (or, the support arm 122 is located on the same side of the tower crane body 10 as the attachment bar). The other end of the support arm 122 is connected (e.g., welded or pinned) to the rail beam 121. A diagonal brace 124 may be provided under the support arm 122, one end of the diagonal brace 124 being connected to the holster 102 and the other end being connected to the support arm 122. The diagonal braces 124 may act as auxiliary supports so that the support arms 122 may withstand greater tension. A stay cable 125 may be provided above the support arm 122, with one end of the stay cable 125 connected to the cradle 102 and the other end connected to the support arm 122. Stay 125 may act as an auxiliary support so that support arm 122 may withstand greater tension. Of course, the support of the support arm 122 may be enhanced by providing a plurality of diagonal braces 124. For example, the number of diagonal braces 124 is 2, and the two spaces are disposed at the same height of the holster 102.
As shown in fig. 2 to 3, in the present embodiment, the rail beam 121 extends toward a direction approaching the hook. In a preferred embodiment, the rail beams 121 may be connected to the other ends (i.e., free ends) of the two support arms 122, respectively, and the rail beams 121 are disposed to extend horizontally so that the first hoist 123 may move smoothly. The rail beam 121 may be machined from i-steel and thus may carry a large force.
As shown in fig. 2 to 3, in the present embodiment, a first hoist 123 is connected to the rail beam 121, and the first hoist 123 may be used to hoist (or pull up) the attachment bar. The first hoist 123 may move back and forth along the rail beam 121. That is, the first hoist 123 may move along the rail beam 121 in a direction approaching the hook or in a direction moving away from the hook. Both ends of the rail beam 121 may be provided with limiting plates, respectively, for preventing the first hoist block 123 from slipping off. It should be noted that, the first hoist 123 is a common hoist in the art, and a person skilled in the art knows the structure and the operation manner thereof, which are not described herein. The first hoist 123 is preferably an electric hoist (an electric hoist is provided with rollers for moving the electric hoist along the rail beam 121).
In one embodiment of the present invention, the tower crane system further includes a first operating platform 14 coupled to the gantry 102. The first operation platform 14 includes a bottom plate of a metal mesh sheet and a fence provided on the bottom plate (the fence can protect constructors). The first operating platform 14 may serve as a work platform for carrying construction personnel. By means of which a constructor can mount the cantilever crane 12 to the holster 102, and can also operate the first crane on the working platform, for example by connecting the attachment bar lifted by the first crane 123 to the hook, and can also disconnect the first crane 123 from the attachment bar. In addition, a first guy wire may be provided on the first operating platform 14. In the process that the attachment rod is hung and pulled by the lifting hook, the first cable rope can be connected with the attachment rod and stretched, so that the attachment rod is prevented from shaking back and forth.
As shown in fig. 4-8, in one embodiment of the present invention, the tower crane system may further include a second operating platform 16. The second operation platform 16 includes a bottom plate of a metal mesh sheet and a fence provided on the bottom plate (the fence can protect constructors). The second operating platform 16 is detachably mounted to the standard knot 104 connected to the attachment bar and the second operating platform 16 is located below the first operating platform 14. The second operating platform 16 may serve as a work platform for carrying construction personnel. By means of the working platform, a constructor can detach and install the attaching rod from the standard knot 104 to the first crane block 123, can connect the attaching rod pulled up by the first crane block 123 to the lifting hook, and can detach the first crane block 123 from being connected with the attaching rod. In addition, a second cable rope may be provided on the second operation platform 16, and the second cable rope may be connected to the attachment rod and stretched, so as to prevent the attachment rod from rocking back and forth. Of course, the first and second guy wires may be the same guy wire.
As shown in fig. 4-8, in one embodiment of the present invention, the tower crane system may further include a second hoist 18. The second hoist 18 is mounted to the building structure, for example, above or below the attachment point of the attachment bar. The second hoist 18 can hoist the attachment bar and can hoist and lower the attachment bar to a vertical position in cooperation with the first hoist 123. It should be noted that the second hoist 18 is a common hoist in the art, and the structure and operation of the second hoist are known to those skilled in the art and are not described herein. The second hoist 18 is preferably a wire rope lever hoist.
As shown in fig. 11-12, in one embodiment of the present invention, the tower crane system may include a third operating platform 22. The third operation platform 22 includes a bottom plate of a metal mesh sheet and a fence provided on the bottom plate (the fence can protect construction personnel). The third operator platform 22 is mounted to the holster 102 and is located below the first operator platform 14. The third operating platform 22 may serve as a work platform for carrying a constructor, by means of which the constructor may detach the attachment bar from the first hoist 123 and mount it to the hook of the tower crane body 10. Of course, the tower crane system may not be provided with the third operating platform 22, and the constructor may directly detach the attaching rod from the first hoist 123 and install the attaching rod to the hook of the tower crane body 10 by means of the first operating platform 14 or the second operating platform 16. In addition, a third guy wire may be provided on the third operating platform 22. In the process of hanging and pulling the attachment rod by the hanging hook, the third cable rope can be connected with the attachment rod and stretched, so that the attachment rod is prevented from shaking back and forth. Of course, the first, second and third cable lines may be the same cable line.
As shown in fig. 4-8, in one embodiment of the present invention, the tower crane system may further include a third hoist 20. The third hoist 20 is connected to the same standard node 104 as the second operating platform 16, and the third hoist 20 is mounted at a higher position than the second operating platform 16. The third hoist 20 may be connected to the attachment bar and hoisted simultaneously with the first hoist 123. The third hoist 20 prevents the attachment bar from rocking during disconnection from the standard knot 104. Of course, the third hoist 20 need not be provided, but the movement of the attachment bar needs to be controlled more carefully when the attachment bar is disconnected from the standard knot 104. It should be noted that, the third hoist 20 is a common hoist in the art, and the structure and operation of the third hoist are known to those skilled in the art and are not described herein. The third hoist 20 is preferably a chain block.
A first method of removing the attachment bar is described in detail below in connection with fig. 1-12.
As shown in fig. 1, the attachment bar is connected at one end to the building structure and at the other end to one standard section 104 of the tower crane body 10 (specifically, the attachment bar is connected to one standard section by an attachment frame).
In the first step, as shown in fig. 4 to 5, the wire rope of the first hoist 123 is lowered to the second operation platform 16, then the wire rope thereof is connected to the attachment bar, and then the attachment bar is disconnected from the standard knot 104.
In addition, when the tower crane system is provided with the third hoist 20, the chain block of the third hoist 20 may be put down and connected to the attachment bar, then the wire rope of the first hoist 123 is connected to the attachment bar, and then the connection of the third hoist 20 to the attachment bar is released. The chain block of the third hoist 20 prevents the attachment bar from swinging during its disconnection from the standard knot 104.
In the second step, as shown in fig. 4 to 5, the wire rope of the second hoist 18 is lowered, then connected to the attachment bar, and then the attachment bar is disconnected from the building structure.
Third, as shown in fig. 6, the wire rope of the first hoist 123 is lifted and simultaneously the wire rope of the second hoist 18 is lowered so that the attachment bar is slowly removed from the building structure. As shown in fig. 7, the first hoist 123 stops lifting when the attachment bar is completely removed from the building structure. As shown in fig. 7 to 8, the wire rope of the second hoist 18 is then continued to be lowered until the attachment bar reaches a vertical posture. The connection between the wire rope of the second hoist 18 and the attachment bar is then released. Of course, the constructor can release the connection between the attachment bar and the second hoist 18 on the second operating platform 16.
Fourth, the attachment bar continues to be pulled up by the first hoist 123 until the attachment bar reaches the first operating platform 14. As shown in fig. 9 to 10, the first hoist 123 is then controlled to move in a direction approaching the hook. The sling reserved on the attachment bar is then connected to the hook (on the third operating platform 22), as shown in fig. 11. Meanwhile, the first cable rope can be tied on the attachment rod (the first cable rope can prevent the attachment rod from shaking in the hanging and pulling process). The hook lifts the attachment rod until the wire rope of the first hoist 123 is released, and then releases the connection between the wire rope of the first hoist 123 and the attachment rod. As shown in fig. 12, the hook then continues to move the attachment bar while slowly releasing the first guy rope, gradually turning the attachment bar from the tilted state to the upright state (the attachment bar is in a tilted position when connected to the hook since the first hoist 123 is difficult to move just under the hook). When the attachment bar is completely turned into the vertical position, the first guy wires are completely loosened. And then the attaching rod is hoisted to the ground through the tower crane body 10, so that the whole attaching rod is detached.
The second method of removing the attachment bar is described in detail below.
The first to third steps are the same as the first removal method, and will not be described again.
Fourth, the attachment bar is continuously pulled up by the first hoist 123 until the attachment bar reaches the third operating platform 22, and then the first hoist 123 is controlled to move in a direction approaching the hook. The sling reserved on the attachment bar is then connected (on the third operating platform 22) to the hook. And a third cable rope can be tied on the attachment rod (the third cable rope can prevent the attachment rod from shaking in the process of hanging and pulling). The hook lifts the attachment rod until the wire rope of the first hoist 123 is released, and then releases the connection between the wire rope of the first hoist 123 and the attachment rod. The hook then continues to move the attachment bar while slowly releasing the third guy rope, gradually turning the attachment bar from the tilted state to the upright state (the attachment bar is in a slightly tilted position when connected to the hook since the first hoist 123 is difficult to reach just under the hook). When the attachment bar is completely turned into the vertical posture, the third guy rope is completely loosened, and then the attachment bar is hoisted to the ground through the tower crane body 10, thereby completing the detachment of the entire attachment bar.
A third method of removing the attachment bar is described in detail below.
In a first step, the wire rope of the first hoist 123 is lowered to the second operating platform 16, then connected to the attachment bar, and then disconnected from the standard knot 104.
In addition, when the tower crane system is provided with the third hoist 20, the chain block of the third hoist 20 may be put down and connected to the attachment bar, then the wire rope of the first hoist 123 is connected to the attachment bar, and then the connection of the third hoist 20 to the attachment bar is released.
In a second step, the wire rope of the second hoist 18 is lowered, then connected to the attachment bar, and then disconnected from the building structure.
Third, the wire rope of the first hoist 123 is lifted and simultaneously the wire rope of the second hoist 18 is lowered so that the attachment bar is slowly removed from the building structure. When the attachment bar is completely removed from the building structure, the first hoist 123 stops lifting. The wire rope of the second hoist 18 is then continued to be lowered until the attachment bar reaches a vertical position. The connection between the wire rope of the second hoist 18 and the attachment bar is then released. Of course, the constructor can release the connection between the attachment bar and the second hoist 18 on the second operating platform 16.
Fourth, the first hoist 123 is controlled to move in a direction approaching the hook. The sling reserved on the attachment bar is then connected to the hook (on the third operating platform 22), while a second guy rope can also be tied to the attachment bar (the second guy rope can prevent the attachment bar from rocking during the pulling of the hook). The hook lifts the attachment rod until the wire rope of the first hoist 123 is released, and then releases the connection between the wire rope of the first hoist 123 and the attachment rod. Then the lifting hook continuously drives the attaching rod to move, and simultaneously, the second cable rope is slowly loosened, so that the attaching rod is gradually changed into a vertical state from an inclined state. When the attachment bar is completely turned into the vertical posture, the second guy rope is completely loosened, and then the attachment bar is hoisted to the ground through the tower crane body 10, thereby completing the detachment of the entire attachment bar.
It should be noted that the above-mentioned embodiments are merely for illustrating the technical solution of the present invention, and not for limiting the same, and although the present invention has been described in detail with reference to the above-mentioned embodiments, it should be understood by those skilled in the art that the technical solution described in the above-mentioned embodiments may be modified or some technical features may be equivalently replaced, and these modifications or substitutions do not make the essence of the corresponding technical solution deviate from the spirit and scope of the technical solution of the embodiments of the present invention.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010095255.6A CN113264458B (en) | 2020-02-15 | 2020-02-15 | Tower crane system and method for removing attachment rods thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010095255.6A CN113264458B (en) | 2020-02-15 | 2020-02-15 | Tower crane system and method for removing attachment rods thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN113264458A CN113264458A (en) | 2021-08-17 |
| CN113264458B true CN113264458B (en) | 2025-05-09 |
Family
ID=77227376
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010095255.6A Active CN113264458B (en) | 2020-02-15 | 2020-02-15 | Tower crane system and method for removing attachment rods thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN113264458B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114031002B (en) * | 2021-11-03 | 2024-08-13 | 上海建工七建集团有限公司 | Tower crane wall-attached connecting piece dismantling device and method |
| CN116692699B (en) * | 2023-08-07 | 2023-10-13 | 山东启明风电有限公司 | Fastening assembly for fastening a tower to a wind turbine tower |
| CN119750406B (en) * | 2025-01-06 | 2026-02-10 | 中国化学工程第三建设有限公司 | Double-tower crane dismounting construction method for steel-structure cooling tower with built-in skin |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106365049A (en) * | 2016-10-26 | 2017-02-01 | 中国建筑第八工程局有限公司 | Transferring device of movable arm tower crane attachment supporting steel beam |
| CN207844936U (en) * | 2017-12-29 | 2018-09-11 | 郑州安正达租赁股份有限公司 | A kind of auxiliary lifting devices of tower crane attached mounting-demounting |
| CN211971577U (en) * | 2020-02-15 | 2020-11-20 | 中铁建设集团北京工程有限公司 | Tower crane system |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1935622B (en) * | 2005-09-20 | 2010-10-27 | 上海市机械施工有限公司 | Self-lifting wall-attaching crane for superhigh-rise building construction with core drum |
| CN207142692U (en) * | 2017-03-29 | 2018-03-27 | 昆明俊马建筑机械有限公司 | A kind of derrick crane adheres to frame mounting platform |
| CN110697585A (en) * | 2019-11-08 | 2020-01-17 | 中昇建机(南京)重工有限公司 | A mechanism for self-detaching attachment device |
-
2020
- 2020-02-15 CN CN202010095255.6A patent/CN113264458B/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106365049A (en) * | 2016-10-26 | 2017-02-01 | 中国建筑第八工程局有限公司 | Transferring device of movable arm tower crane attachment supporting steel beam |
| CN207844936U (en) * | 2017-12-29 | 2018-09-11 | 郑州安正达租赁股份有限公司 | A kind of auxiliary lifting devices of tower crane attached mounting-demounting |
| CN211971577U (en) * | 2020-02-15 | 2020-11-20 | 中铁建设集团北京工程有限公司 | Tower crane system |
Also Published As
| Publication number | Publication date |
|---|---|
| CN113264458A (en) | 2021-08-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN115066387B (en) | Method for lifting slender objects and lifting yoke | |
| CN108892060A (en) | A kind of crane upper mechanism is from dismantling device, crane and tears method open certainly | |
| CN113264458A (en) | Tower crane system and method for removing attachment rod thereof | |
| CN211971577U (en) | Tower crane system | |
| CN109132880B (en) | Method for disassembling portal crane | |
| CN105883645B (en) | Method for dismantling attachment device of tower crane | |
| CN207390874U (en) | A kind of movable type supplies installation construction device | |
| CN214653190U (en) | Adjustable portable lifting device | |
| CN211846945U (en) | Anti-falling hoisting device | |
| CN112279121A (en) | Method for dismantling tower crane | |
| CN116986478A (en) | Installation method of large flue ash hopper in sintering chamber | |
| CN205590182U (en) | Tower crane dismantles part and puts from hoist and mount | |
| CN110697585A (en) | A mechanism for self-detaching attachment device | |
| JP4835209B2 (en) | Crane winch removal method and upper swing body | |
| JP2004224520A (en) | Self-travelling tower crane | |
| JP5822521B2 (en) | Suspended load rope tensioning method for boom detachable crane vehicles | |
| JP4054800B2 (en) | Climbing scaffold | |
| CN106081913B (en) | Derrick mast crane control method | |
| CN105883646B (en) | Tower crane and derrick crane used by same | |
| JP3889521B2 (en) | Pile driver and its work floor mounting method | |
| CN223073889U (en) | A mobile aerial work platform structure with self-hoisting function | |
| JPH0192198A (en) | Method and equipment for mounting and dismounting jib to crane | |
| CN221343682U (en) | Wall-attached lifting device and tower crane | |
| CN115973367B (en) | Hoisting method for horizontal inhaul cable of offshore floating wind turbine generator | |
| CN216403580U (en) | A brick hanger |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |