CN113250370B - Installation mechanism and installation method for suspended ceiling low-level plate - Google Patents
Installation mechanism and installation method for suspended ceiling low-level plate Download PDFInfo
- Publication number
- CN113250370B CN113250370B CN202110465412.2A CN202110465412A CN113250370B CN 113250370 B CN113250370 B CN 113250370B CN 202110465412 A CN202110465412 A CN 202110465412A CN 113250370 B CN113250370 B CN 113250370B
- Authority
- CN
- China
- Prior art keywords
- plate
- main body
- clamping
- fixing
- baffle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000007246 mechanism Effects 0.000 title claims abstract description 36
- 238000000034 method Methods 0.000 title claims abstract description 24
- 238000009434 installation Methods 0.000 title claims description 25
- 210000001503 joint Anatomy 0.000 claims 2
- 238000005034 decoration Methods 0.000 abstract description 9
- 230000003014 reinforcing effect Effects 0.000 description 13
- 230000000694 effects Effects 0.000 description 11
- 230000001105 regulatory effect Effects 0.000 description 6
- 230000009471 action Effects 0.000 description 4
- 230000000149 penetrating effect Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 125000003003 spiro group Chemical group 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The application relates to and discloses a mounting mechanism and a mounting method of a suspended ceiling low-level plate. Relates to the technical field of building decoration. The application specifically comprises a top plate arranged on a top wall, a wallboard arranged on a vertical wall surface, a suspender, a closing plate, an adjusting plate and a clamping plate device, wherein one end of the suspender is fixedly connected to the top wall, the closing plate is fixedly connected to the bottom of the suspender, one end of the adjusting plate is fixedly connected with one side end of the closing plate, and the clamping plate device is arranged in the middle of the suspender; the top plate bottom is separated from the wallboard top by a certain distance, the other side end of the closing plate is abutted to the vertical wall surface, the wallboard is fixedly connected to the closing plate and is abutted to the bottom of one side end of the vertical wall surface, and the other end of the adjusting plate is abutted to the bottom of the top plate. According to the application, the suspender is fixed on the top wall, one end of the adjusting plate and one end of the top plate are fixed together through the clamping plate device, the closing plate is fixedly connected with the adjusting plate, and finally the wall plate is fixedly connected to the bottom of the closing plate, so that the high-position top plate and the low-position wall plate can be quickly installed.
Description
Technical Field
The invention relates to the technical field of building decoration, in particular to a mounting mechanism and a mounting method of a suspended ceiling low-level plate.
Background
In modern architectural decoration, the suspended ceiling occupies a very important position in the whole room decoration, and the suspended ceiling is arranged on the top surface of the room, so that the suspended ceiling not only has the functions of heat preservation, heat insulation, sound absorption and the like, but also can beautify the indoor environment and create rich and colorful space artistic images. Most of the existing suspended ceilings are integrally leveled, in the installation of some special occasions or drop-level suspended ceilings, the height difference is required between the top plate and the wallboard of the suspended ceilings, the installation mode of the height difference between the top plate and the wallboard of the existing suspended ceilings is complex, the installation operation steps are more, and the requirements of the existing architectural decoration on the decoration efficiency cannot be met.
Chinese patent CN201687118U, publication No. 2010-12-29 disclose a high-low staggered floor suspended ceiling, comprising a buckle plate and a main keel, characterized by: the hanger is provided with a staggered profile provided with an upper mounting bar and a lower mounting bar, an upper auxiliary keel matched with the upper mounting bar and a lower auxiliary keel matched with the lower mounting bar; the upper mounting strips and the lower mounting strips are respectively positioned on two sides of the staggered section bar, the height of the upper mounting strips is higher than that of the lower mounting strips, the buckle plates comprise an upper buckle plate and a lower buckle plate, the upper buckle plate is fixed on the upper mounting strips of the staggered section bar through an upper auxiliary keel, the lower buckle plate is fixed on the lower mounting strips of the staggered section bar through a lower auxiliary keel, and the main keel is fixed on the staggered section bar through a hanging piece. The utility model has reasonable structural design, convenient use and high space utilization rate of rooms. However, the high-low staggered floor suspended ceiling is complex in installation form, more in installation operation steps and incapable of meeting the requirements of the existing building decoration on decoration efficiency.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, and provides a mounting mechanism and a mounting method for a suspended ceiling low-level plate, which can realize rapid mounting of a high-level top plate and a low-level wallboard, and are simple in mounting steps and convenient to operate.
The invention provides a mounting mechanism of a suspended ceiling low-level plate, which is used for mounting a high-level top plate and a low-level wallboard, and comprises a top plate mounted on a top wall, a wallboard mounted on a vertical wall surface, a suspender with one end fixedly connected to the top wall, a closing plate fixedly connected to the bottom of the suspender, an adjusting plate with one end fixedly connected with one side end of the closing plate, and a clamping plate device arranged in the middle of the suspender; the top plate bottom is separated from the top of the wallboard by a certain distance, the other side end of the closing plate is abutted to the vertical wall surface, the wallboard is fixedly connected to the bottom of one side end of the closing plate, which is abutted to the vertical wall surface, the other end of the adjusting plate is abutted to the bottom of the top plate, and the clamping plate device is used for fixedly connecting the adjusting plate and the top plate.
Further, the hanger rod comprises a hanger rod main body, an expansion bolt sleeve piece arranged at the top of the hanger rod main body and used for fixing the hanger rod on a top wall, a clamping device arranged at the bottom of the hanger rod main body and used for fixedly connecting the bottom of the hanger rod with the closing plate, and a fixing device arranged at the middle of the hanger rod main body and used for fixing the clamping plate device on the hanger rod.
Further, be equipped with the external screw thread in the jib main part, clamping device includes that the middle part is equipped with cavity, bottom open-ended fixture, the fixture bottom with binding off board fixed connection, the fixture top be equipped with the first through-hole of cavity intercommunication, and be in when jib main part bottom runs through first through-hole in the cavity with the first nut of jib main part bottom spiro union.
Further, the adjusting plate comprises a connecting part with one end fixedly connected with the closing plate, an abutting part with one end abutting against the top plate, and a supporting part with one end connected with the connecting part and the other end connected with the abutting part.
Further, the clamping plate device comprises a first baffle plate which is used for being abutted with the top of the top plate, a second baffle plate which is used for being abutted with the bottom of the abutting part, and a fixing plate with one end connected with the first baffle plate and the other end connected with the second baffle plate.
Further, the fixing plate is provided with a second through hole, and the fixing device comprises a second nut which is in threaded connection with the boom main body and is abutted to the bottom of the fixing plate when the fixing plate is sleeved at the middle part of the boom main body through the second through hole, and a third nut which is in threaded connection with the boom main body and is abutted to the top of the fixing plate.
Further, the locking device is used for locking the first baffle plate and the second baffle plate when the first baffle plate is abutted with the top of the top plate and the second baffle plate is abutted with the bottom of the abutting part.
Further, the clamping plate device comprises two clamping plates, wherein the clamping plates comprise a first baffle plate abutted with the top plate or the abutting part, and a fixing plate with one end connected with the first baffle plate.
Further, the connecting portion one end is equipped with first joint groove, binding off board one end is equipped with the second joint groove, still include one end peg graft in first joint groove, the other end peg graft in the joint piece of second joint groove.
The installation method of the installation mechanism of the suspended ceiling low-level plate comprises the following steps:
S1: mounting the top plate on the top wall;
s2: fixing the suspender on the top wall through an expansion bolt sleeve;
s3: the adjusting plate and the top plate are fixed together through a clamping plate device on the suspender;
s4: fixing a closing plate at the bottom of the suspender, and fixedly connecting one side end of the closing plate with one end of the adjusting plate;
s5: the wallboard is fixedly connected to the bottom of the closing plate, and the wallboard is fixed on a vertical wall surface.
The installation mechanism and the installation method of the suspended ceiling low-level plate have the following gain effects:
(1) The mounting mechanism is characterized in that a top plate and a suspender are fixed on a top wall, one end of an adjusting plate and one end of the top plate are fixed together through a clamping plate device arranged in the middle of the suspender, a closing plate is fixed at the bottom of the suspender, one end of the closing plate is fixedly connected with the other end of the adjusting plate, a wallboard is fixedly connected to the bottom of the closing plate, and meanwhile the wallboard is fixed on a vertical wall surface, so that the mounting between the high-position top plate and the low-position wallboard is realized;
(2) The suspender of the mounting mechanism comprises a suspender main body, an expansion bolt sleeve member which is arranged at the top of the suspender main body and used for fixing the suspender on a top wall, a clamping device which is arranged at the bottom of the suspender main body and used for fixedly connecting the bottom of the suspender with a closing plate, and a fixing device which is arranged at the middle of the suspender main body and used for fixing a clamping plate device on the suspender. On the jib, through the expansion bolts external member of locating jib main part top, in driving the expansion bolts external member into the top wall to fix the jib on the top wall, through the joint device of locating the jib bottom, with binding off board fixed connection in the jib bottom, when the jib is fixed on the top wall, the position of binding off board is also fixed. The hanger rod also comprises a fixing device arranged in the middle of the hanger rod main body, the clamping plate device is fixed on the hanger rod main body through the fixing device, and when the clamping plate device fixes the top plate and the adjusting plate together, the fixing device can fix the top plate, the adjusting plate and the hanger rod;
(3) The suspender main body of the mounting mechanism is provided with external threads, the clamping device comprises a clamp with a cavity and an opening at the bottom, the bottom of the clamp is fixedly connected with a closing plate, the top of the clamp is provided with a first through hole communicated with the cavity, and a first nut which is in threaded connection with the bottom of the suspender main body in the cavity when the bottom of the suspender main body penetrates through the first through hole. The outer threads are arranged on the suspender main body, when the bottom of the suspender main body penetrates through the first through hole of the fixture, the cavity of the fixture is in threaded connection with the part of the suspender main body penetrating through the first through hole of the fixture through the first nut, so that the fixture is sleeved on the suspender main body and cannot fall off from the suspender main body;
(4) The adjusting plate of the mounting mechanism comprises a connecting part, one end of the connecting part is fixedly connected with the closing plate, one end of the connecting part is abutted with the top plate, and one end of the supporting part is connected with the connecting part while the other end is connected with the abutting part. The adjusting plate is of a U-shaped structure and comprises a connecting part and an abutting part which are horizontally arranged and a supporting part which is vertically arranged, wherein the connecting part and the abutting part are connected by the supporting part, one end of the connecting part is fixedly connected with one end of the closing part, the adjusting plate is connected with the closing plate, the abutting part is abutted against the bottom of the top plate, when the clamping plate device is abutted against the top of the top plate and the bottom of the abutting part respectively, the adjusting plate is fixed with the top plate, the supporting part is used for connecting and supporting the abutting part and the connecting part, and in the application, the height difference between the top plate and the wall plate is equal to the height of the supporting part, so that the height of the supporting part is only required to be arranged according to the requirement, and the installation height between the top plate and the wall plate can be controlled;
(5) The adjusting plate of the mounting mechanism comprises a connecting part, one end of the connecting part is fixedly connected with the closing plate, one end of the connecting part is abutted with the top plate, and one end of the supporting part is connected with the connecting part while the other end is connected with the abutting part. The adjusting plate is of a U-shaped structure and comprises a connecting part and an abutting part which are horizontally arranged and a supporting part which is vertically arranged, wherein the connecting part and the abutting part are connected by the supporting part, one end of the connecting part is fixedly connected with one end of the closing part, the adjusting plate is connected with the closing plate, the abutting part is abutted against the bottom of the top plate, when the clamping plate device is abutted against the top of the top plate and the bottom of the abutting part respectively, the adjusting plate is fixed with the top plate, the supporting part is used for connecting and supporting the abutting part and the connecting part, and in the application, the height difference between the top plate and the wall plate is equal to the height of the supporting part, so that the height of the supporting part is only required to be arranged according to the requirement, and the installation height between the top plate and the wall plate can be controlled;
(6) The clamping plate device of the mounting mechanism comprises a first baffle plate which is used for being abutted with the top of the top plate, a second baffle plate which is used for being abutted with the bottom of the abutting part, and a fixing plate with one end connected with the first baffle plate and the other end connected with the second baffle plate. When the butt portion carries out the butt with the roof bottom, splint device passes through the top butt of first baffle and roof, and second baffle and butt portion bottom to fix regulating plate and roof together, be connected with first baffle through fixed plate one end, the other end is connected with the second baffle, is connected first baffle and second baffle, makes splint device structure as an organic whole, when fixing device with fixed plate fixed connection in the jib main part, just can realize splint device's fixed on the jib.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description, serve to explain the principles of the invention. In the drawings, like reference numerals are used to identify like elements.
FIG. 1 is a schematic diagram of a mechanism and method for installing a ceiling low-level board according to an embodiment of the present invention;
FIG. 2 is a front view of a hanger bar of a mounting mechanism and method for a ceiling low panel according to an embodiment of the present invention;
FIG. 3 is a schematic structural view of a fixture for a mounting mechanism and a mounting method for a ceiling low-level board according to an embodiment of the present invention;
FIG. 4 is a schematic structural view of a clamping plate device of a mounting mechanism and a mounting method for a ceiling lower plate according to an embodiment of the present invention;
FIG. 5 is a schematic view of another embodiment of a clamping plate device for a mounting mechanism and a mounting method for a ceiling low-level plate according to an embodiment of the present invention;
FIG. 6 is a left side view of an adjustment plate of a ceiling low panel mounting mechanism and mounting method according to an embodiment of the present invention;
FIG. 7 is a front view of a closing plate of a mounting mechanism and mounting method for a ceiling low panel according to an embodiment of the present invention;
fig. 8 is a front view of a wall panel fixture for a ceiling low panel mounting mechanism and mounting method according to an embodiment of the present invention.
In the figure: 1. a top plate; 2. a wallboard; 3. a top wall; 4. a vertical wall surface; 5. a boom; 51. a boom body; 52. an expansion bolt kit; 53. a clamp; 531. a cavity; 532. a first through hole; 54. a first nut; 55. a second nut; 56. a third nut; 6. a closing plate; 61. a second clamping groove; 7. an adjusting plate; 71. a connection part; 72. an abutting portion; 73. a support part; 74. a first clamping groove; 8. a clamping plate device; 81. a first baffle; 82. a second baffle; 83. a fixing plate; 831. a second through hole; 9. a locking device; 10. a clamping block; 11. wallboard fixing pieces; 111. a groove; 12. reinforcing blocks.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention, and all other embodiments obtained by those skilled in the art without making any creative effort based on the embodiments of the present invention are included in the protection scope of the present invention.
The application provides a mounting mechanism of a suspended ceiling low-level plate, which is used for mounting a high-level top plate 1 and a low-level wall plate 2, and comprises a top plate 1 mounted on a top wall 3, the wall plate 2 mounted on a vertical wall surface 4, a suspender 5 with one end fixedly connected on the top wall 3, a closing plate 6 fixedly connected at the bottom of the suspender 5, an adjusting plate 7 with one end fixedly connected with one side end of the closing plate 6, and a clamping plate device 8 arranged in the middle of the suspender 5; the top plate 1 bottom is separated from the wallboard 2 top by a certain distance, and close up plate 6 opposite side end butt is in vertical wall 4, and wallboard 2 fixed connection is in close up plate 6 butt in the bottom of the one side end of vertical wall 4, and the regulating plate 7 other end butt is in the bottom of roof 1, and splint device 8 is used for carrying out fixed connection to regulating plate 7 and roof 1, and specific effect see fig. 1. According to the application, the hanging rod 5 is fixed on the top wall 3, one end of the adjusting plate 7 and one end of the top plate 1 are fixed together through the clamping plate device 8 arranged in the middle of the hanging rod 5, one end of the closing plate 6 is fixedly connected with the other end of the adjusting plate 7, the closing plate 6 is fixed at the bottom of the hanging rod 5, the wall plate 2 is fixedly connected at the bottom of the closing plate 6, and meanwhile, the wall plate 2 is fixed on the vertical wall surface 4, so that quick installation between the high-position top plate 1 and the low-position wall plate 2 is realized.
Because adjusting plate 7 top and roof 1 bottom butt, one side end and the binding off board 6 one side end fixed connection of adjusting plate 7, and wallboard 2 is fixed in binding off board 6 bottom, consequently the difference in height between roof 1 and the wallboard 2 equals with adjusting plate 7, can be according to changing the adjusting plate 7 of different height, the difference in height of installation between roof 1 and the wallboard 2 is controlled. Carry out fixed connection between roof 1 and the regulating plate 7, fixed connection between wallboard 2 and the binding off board 6 carries out fixed connection between binding off board 6 and the regulating plate 7 again, and binding off board 6 and regulating plate 7 all fix on jib 5 at last, consequently realize the fixed connection between high-order roof 1 and the low-order wallboard 2.
In this embodiment, the boom 5 includes a boom main body 51, an expansion bolt set 52 disposed at the top of the boom main body 51 for fixing the boom 5 to the top wall 3, a clamping device disposed at the bottom of the boom main body 51 for fixedly connecting the bottom of the boom 5 to the closing plate 6, and a fixing device disposed at the middle of the boom main body 51 for fixing the clamping plate device 8 to the boom 5, as shown in fig. 2. The hanger rod 5 is fixed to the top wall 3 by driving the expansion bolt set 52 into the top wall 3 through the expansion bolt set 52 provided at the top of the hanger rod main body 51, and the closing plate 6 is fixedly connected to the bottom of the hanger rod 5 through the clamping device provided at the bottom of the hanger rod 5, so that the position of the closing plate 6 is also fixed when the hanger rod 5 is fixed to the top wall 3. The boom 5 further comprises a fixing device arranged in the middle of the boom main body 51, the clamping plate device 8 is fixed on the boom main body 51 through the fixing device, and when the clamping plate device 8 fixes the top plate 1 and the adjusting plate 7 together, the fixing device can fix the top plate 1, the adjusting plate 7 and the boom 5.
In this embodiment, the boom main body 51 is provided with an external thread, the clamping device includes a clamp 53 with a cavity 531 in the middle and an opening at the bottom, the bottom of the clamp 53 is fixedly connected with the closing plate 6, the top of the clamp 53 is provided with a first through hole 532 which is communicated with the cavity 531, and a first nut 54 which is screwed with the bottom of the boom main body 51 in the cavity 531 when the bottom of the boom main body 51 penetrates through the first through hole 532, and the specific effects are shown in fig. 1, 2 and 3. When the first through hole 532 of the clamp 53 is penetrated through the bottom of the boom main body 51, the first nut 54 is screwed with the part of the boom main body 51 penetrating through the first through hole 532 of the clamp 53 in the cavity 531 of the clamp 53, so that the clamp 53 is sheathed on the boom main body 51 and cannot fall off from the boom main body 51.
The adjusting plate 7 includes a connecting portion 71 having one end fixedly connected to the closing plate 6, an abutting portion 72 having one end abutting against the top plate 1, and a supporting portion 73 having one end connected to the connecting portion 71 and the other end connected to the abutting portion 72, as shown in fig. 6. The adjusting plate 7 is of a U-shaped structure and comprises a connecting part 71 and an abutting part 72 which are horizontally arranged and a supporting part 73 which is vertically arranged, wherein the connecting part 71 and the abutting part 72 are connected by the supporting part 73, one end of the connecting part 71 is fixedly connected with one end of the closing part, the adjusting plate 7 is connected with the closing plate 6, the abutting part 72 abuts against the bottom of the top plate 1, when the clamping plate device 8 abuts against the top of the top plate 1 and the bottom of the abutting part 72 respectively, the adjusting plate 7 and the top plate 1 are fixed together, and the supporting part 73 is used for connecting and supporting the abutting part 72 and the connecting part 71.
In this embodiment, the clamping device 8 is a first baffle 81 abutting against the top of the top plate 1, a second baffle 82 abutting against the bottom of the abutting portion 72, and a fixing plate 83 with one end connected to the first baffle 81 and the other end connected to the second baffle 82, as shown in fig. 4. When the abutting portion 72 abuts against the bottom of the top plate 1, the clamping plate device 8 abuts against the top of the top plate 1 through the first baffle 81, and the second baffle 82 abuts against the bottom of the abutting portion 72, so that the adjusting plate 7 and the top plate 1 are fixed together, one end of the fixing plate 83 is connected with the first baffle 81, the other end of the fixing plate is connected with the second baffle 82, the first baffle 81 and the second baffle 82 are connected, the clamping plate device 8 is of an integral structure, and when the fixing plate 83 is fixedly connected to the suspender main body 51 through the fixing device, the clamping plate device 8 can be fixed on the suspender 5.
In this embodiment, the fixing plate 83 is provided with a second through hole 831, and the fixing device includes a second nut 55 screwed with the boom main body 51 and abutting against the bottom of the fixing plate 83, and a third nut 56 screwed with the boom main body 51 and abutting against the top of the fixing plate 83 when the fixing plate 83 is sleeved on the middle of the boom main body 51 through the second through hole 831, as shown in fig. 1 and 2. The fixing plate 83 is provided with a second through hole 831, and the component mounting sequence on the boom main body 51 is: when the hanger rod 5 is mounted on the top wall 3 by the expansion bolt set 52 provided on the top of the hanger rod main body 51, the third nut 56 is first sleeved on the hanger rod main body 51 from the bottom of the hanger rod main body 51, then the fixing plate 83 is sleeved on the hanger rod main body 51 from the bottom of the hanger rod main body 51 by the second through hole 831, then the second nut 55 is sleeved on the hanger rod main body 51 from the bottom of the hanger rod main body 51, the position of the third nut 56 on the hanger rod main body 51 is adjusted, the fixing plate 83 is abutted with the third nut 56, and finally the second nut 55 is abutted with the fixing plate 83, so that the fixing of the fixing plate 83 on the hanger rod 5 is realized. After the position of the fixing plate 83 on the boom 5 is determined, the clamp 53 is sleeved on the boom main body 51 from the bottom of the boom main body 51, and finally the first nut 54 is screwed on the bottom of the boom main body 51 to prevent the clamp 53 from falling off from the boom main body 51.
The locking device 9 is used for locking the first baffle plate 81 and the second baffle plate 82 when the first baffle plate 81 is abutted with the top of the top plate 1 and the second baffle plate 82 is abutted with the bottom of the abutting part 72, and the specific effect is shown in fig. 1. The present application further includes a locking device 9 for locking the first baffle 81 and the second baffle 82 when the first baffle 81 abuts against the top of the top plate 1 and the second baffle 82 abuts against the bottom of the abutting portion 72, so that when the first baffle 81 abuts against the top plate 1 and the second baffle 82 abuts against the abutting portion 72, the fixing strength of the first baffle 81 and the second baffle 82 is not high enough, and both are easy to fall off, and the first baffle 81 and the second baffle 82 clamp only the top plate 1 and the abutting portion 72, so that the adjusting plate 7 moves outwards under the action of external force, and the adjusting plate 7 is easy to fall off from the clamping device, thereby affecting the use of the installation mechanism. In practical use, the locking device 9 may be configured such that through holes are formed in the first baffle 81, the top plate 1, the abutting portion 72 and the second baffle 82, and when the four through holes are aligned, one end of the bolt sequentially penetrates through the through holes in the first baffle 81, the top plate 1, the abutting portion 72 and the second baffle 82, and then is screwed with the nut, so that the locking of the top plate 1 and the abutting portion 72 in the clamping plate device 8 can be achieved.
In the present application, the clamping plate device 8 is also provided as a split structure formed by two clamping plates, wherein the clamping plates comprise a first baffle 81 abutted against the top plate 1 or the abutting part 72, and a fixing plate 83 with one end connected with the first baffle 81, and the specific effect is shown in fig. 5. After the third nut 56 is sleeved on the boom main body 51 from the bottom of the boom main body 51, one clamping plate is sleeved on the boom main body 51 from the bottom of the boom main body 51, the other clamping plate is reversely sleeved on the boom main body 51 from the bottom of the boom main body 51, the fixing parts of the two clamping plates are abutted together, the integrated clamping plate device 8 is formed, and finally the second nut 55 is sleeved and fixed, so that the use method of the integrated clamping plate device is the same as that of the integrated clamping plate device 8. The split splint device 8 has the following disadvantages compared with the integrated splint device 8: when the clamping plate device 8 is sleeved on the suspender main body 51, two operations are needed, time is wasted, and the structure of the split type clamping plate device 8 is not stable; the advantages are that: when the integrated clamping plate device 8 is adopted, the top plate 1 and the abutting part 72 are required to be inserted into the slots formed by the first baffle 81 and the second baffle 82 respectively, but the slots formed by the first baffle 81 and the second baffle 82 are required to clamp the top plate 1 and the abutting part 72 together, so that the top plate 1 and the abutting part 72 cannot have too large clearance after being inserted into the slots, the top plate 1 which is inserted firstly can be inserted easily, but the abutting part 72 which is inserted later can be difficult to be inserted, so that the use of the installation mechanism is inconvenient, and the split clamping plate device 8 is adopted, so that the top plate 1 can be abutted with the clamping plate which is sleeved on the boom main body 51 firstly, then the abutting part 72 is abutted with the bottom of the top plate 1, and finally the clamping plate which is sleeved on the boom main body 51 is abutted with the bottom of the abutting part 72, thereby completing the clamping of the clamping plate device 8 on the top plate 1 and the adjusting plate 7, and the installation mechanism is convenient and quick and easy to operate.
In this embodiment, one end of the connecting portion 71 is provided with a first clamping groove 74, one end of the closing plate 6 is provided with a second clamping groove 61, and the embodiment further includes a clamping block 10 with one end inserted in the first clamping groove 74 and the other end inserted in the second clamping groove 61, and the specific effects are shown in fig. 1,6 and 7. The first clamping groove 74 is formed in one end of the connecting portion 71, the second clamping groove 61 is formed in one end of the closing plate 6, one end of the clamping block 10 is inserted into the first clamping groove 74, the other end of the clamping block is inserted into the second clamping groove 61, the connecting portion 71 and the closing plate 6 are fixedly connected, and accordingly the adjusting plate 7 and the closing plate 6 are connected together, the adjusting plate 7 and the closing plate 6 are connected in the mode, and the clamping block 10 is fast and convenient to clamp the first clamping groove 74 and the second clamping groove 61, so that installation efficiency is improved, and the practicability of the installation mechanism is higher.
Still include wallboard mounting 11, be equipped with on the wallboard mounting 11 and be used for holding the recess 111 of wallboard 2 side to and run through recess 111, with the first screw of binding off board 6 spiro union, run through wallboard mounting 11 side, carry out the second screw of spiro union with vertical wall 4, specific effect see fig. 1 and 8. In the application, the wallboard 2 is fixedly connected to the bottom of the closing plate 6 and the vertical wall surface 4 through the wallboard fixing piece 11, a first screw penetrates through the groove 111 of the wallboard fixing piece 11 and is in threaded connection with the closing plate 6, so that the wallboard fixing piece 11 is fixed on the closing plate 6, a second screw penetrates through one side end of the wallboard fixing piece 11 and is in threaded connection with the vertical wall surface 4, thereby realizing the fixation between the wallboard fixing piece 11 and the vertical wall surface 4, and finally the wallboard 2 is spliced with the groove 111 of the wallboard fixing piece 11, so that the wallboard 2 is fixed through the wallboard fixing piece 11. The wall board 2 is fixed on the closing-in plate 6 and the vertical wall surface 4 by adopting the wall board fixing piece 11, so that the wall board 2 is prevented from being directly fixed on the closing-in plate 6 and the vertical wall surface 4, the wall board 2 can be damaged by the screw, the decoration effect of the wall board 2 after being installed can be influenced on one hand, and on the other hand, the strength of the wall board 2 can be influenced, so that the service life of the wall board 2 is influenced.
The concrete effect is shown in fig. 1, and the concrete effect is that the concrete effect is shown in fig. 1 also comprises a reinforcing block 12 which is arranged at the top of the closing plate 6 and is in threaded connection with the groove 111 and the closing plate 6 when the first screw sequentially penetrates through the reinforcing block 12 and is in threaded connection with the vertical wall surface 4 at one end. The reinforcing block 12 is added at the top of the closing plate 6, because the closing plate 6 is only hoisted at the bottom of the suspender 5 through the clamp 53, the thickness of the closing plate 6 cannot be too thick, on one hand, the cost is reduced, and on the other hand, the burden of fixing the closing plate 6 by the clamp 53 and the suspender 5 is reduced. When the first screw is in threaded connection with the closing plate 6 through the groove 111, in order to prevent the first screw from affecting the plugging of the wallboard 2 in the groove 111, the nut of the first screw is screwed to be abutted against the top of the groove 111, and at the moment, if the thickness of the closing plate 6 is far smaller than the length of the first screw, the first screw can be led to continuously penetrate through the closing plate 6 after penetrating through the groove 111, so that the tip of the first screw extends out of the closing plate 6, and on one hand, when a person carelessly bumps, the first screw is hurt to the person to form a potential safety hazard; on the other hand, the fastening strength of the closing plate 6 to the wall plate fastening member 11 is insufficient. Therefore, the reinforcing block 12 is added at the top of the closing plate 6, one end of the third screw penetrates through the reinforcing block 12 to be screwed on the vertical wall surface 4, the reinforcing block 12 is fixed on the vertical wall surface 4, and thus, after the first screw penetrates through the groove 111 and the closing plate 6 in sequence, the reinforcing block 12 is screwed, as the length of the reinforcing block 12 is not required, and the reinforcing plate is directly fixed on the vertical wall surface 4, the load on the hanging rod 5 is not caused, so that the thickness of the reinforcing block 12 can be set to be larger than the length of the first screw, and when the first screw is screwed with the reinforcing block 12, the tip of the first screw is hidden in the reinforcing block 12, so that potential safety hazards are not caused, the fixing strength of the closing plate 6 to the wall plate fixing piece 11 can be reinforced, and the structure of the mounting mechanism is more stable.
The installation method of the installation mechanism of the suspended ceiling low-level plate comprises the following steps:
S1: fixing the suspender on the top wall through an expansion bolt sleeve;
s2: sleeving a third nut on the boom main body from the bottom of the boom main body;
S3: sleeving the clamping plate device on the suspender main body from the bottom of the suspender main body;
s4: sleeving a second nut on the boom main body from the bottom of the boom main body;
S5: adjusting the positions of the third nut, the clamping plate device and the second nut on the boom body, and fixing the clamping plate device on the boom body through the third nut and the second nut;
S6: the abutting part of the adjusting plate is abutted with the bottom of the top plate and is inserted into the clamping plate device, and the clamping plate device is locked through the locking device;
S7: inserting the clamping block into the first clamping groove of the adjusting plate;
s8: inserting the second clamping groove of the closing plate into the other end of the clamping block;
S9: bonding the top of the closing plate with the bottom of the clamp through an adhesive;
s10: respectively fixing the wallboard fixing piece with the closing plate and the vertical wall surface;
s11: the wallboard is inserted into the groove of the wallboard fixing piece.
The above description may be implemented alone or in various combinations and these modifications are within the scope of the present invention.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises an element.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solution of the present invention, and are not limiting. Although the invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical scheme described in the foregoing embodiments can be modified or some technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims (7)
1. The utility model provides a mounting mechanism of furred ceiling low level board for carry out the installation of high-order roof (1) and low-order wallboard (2), its characterized in that: the lifting device comprises a top plate (1) arranged on a top wall (3), a wallboard (2) arranged on a vertical wall surface (4), a lifting rod (5) with one end fixedly connected to the top wall (3), a closing plate (6) fixedly connected to the bottom of the lifting rod (5), an adjusting plate (7) with one end fixedly connected with one side end of the closing plate (6), and a clamping plate device (8) arranged in the middle of the lifting rod (5); the bottom of the top plate (1) is separated from the top of the wallboard (2) by a certain distance, the other side end of the closing plate (6) is abutted against the vertical wall surface (4), the wallboard (2) is fixedly connected with the bottom of one side end of the closing plate (6) abutted against the vertical wall surface (4), the other end of the adjusting plate (7) is abutted against the bottom of the top plate (1), the clamping plate device (8) is used for fixedly connecting the adjusting plate (7) and the top plate (1), the hanging plate (5) comprises a hanging rod main body (51), an expansion bolt sleeve (52) which is arranged at the top of the hanging rod main body (51) and used for fixing the hanging rod (5) on the top wall (3), a clamping device which is arranged at the bottom of the hanging rod main body (51) and used for fixedly connecting the bottom of the hanging rod (5) with the closing plate (6), a fixing device which is used for fixing the clamping plate device (8) on the top plate (5), the adjusting plate (7) comprises a hanging rod main body (51), an expansion bolt sleeve (52) which is arranged at the top of the top plate (1) and a connecting part (72) which is fixedly connected with the other end (71) of the hanging rod main body (51), the clamping plate device (8) comprises a first baffle (81) which is used for being abutted with the top of the top plate (1), a second baffle (82) which is used for being abutted with the bottom of the abutting part (72), and a fixing plate (83) with one end connected with the first baffle (81) and the other end connected with the second baffle (82).
2. The mounting mechanism for a ceiling low panel of claim 1, wherein: the hanger rod main body (51) is provided with external threads, the clamping device comprises a clamp (53) with a cavity (531) in the middle and an opening at the bottom, the bottom of the clamp (53) is fixedly connected with the closing plate (6), the top of the clamp (53) is provided with a first through hole (532) communicated with the cavity (531), and a first nut (54) which is in threaded connection with the bottom of the hanger rod main body (51) in the cavity (531) when the bottom of the hanger rod main body (51) penetrates through the first through hole (532).
3. The mounting mechanism for a ceiling low panel of claim 1, wherein: the fixing plate (83) is provided with a second through hole (831), and the fixing device comprises a second nut (55) which is in threaded connection with the suspender main body (51) and is in butt joint with the bottom of the fixing plate (83) when the fixing plate (83) is sleeved at the middle part of the suspender main body (51) through the second through hole (831), and a third nut (56) which is in threaded connection with the suspender main body (51) and is in butt joint with the top of the fixing plate (83).
4. The mounting mechanism for a ceiling low panel of claim 1, wherein: the device further comprises a locking device (9) for locking the first baffle plate (81) and the second baffle plate (82) when the first baffle plate (81) is abutted with the top of the top plate (1) and the second baffle plate (82) is abutted with the bottom of the abutting part (72).
5. The mounting mechanism for a ceiling low panel of claim 1, wherein: the clamping plate device (8) comprises two clamping plates, wherein the clamping plates comprise a first baffle plate (81) abutted with the top plate (1) or the abutting part (72), and a fixed plate (83) with one end connected with the first baffle plate (81).
6. The mounting mechanism for a ceiling low panel of claim 1, wherein: the connecting part (71) one end is equipped with first joint groove (74), binding off board (6) one end is equipped with second joint groove (61), still include one end peg graft in first joint groove (74), the other end peg graft in joint piece (10) of second joint groove (61).
7. The method for installing a mounting mechanism for a ceiling low panel according to claim 1, comprising the steps of:
S1: fixing the suspender on the top wall through an expansion bolt sleeve;
s2: fixing the clamping plate device on the suspender;
s3: the adjusting plate and the top plate are fixed together through a clamping plate device on the suspender;
S4: one side end of the closing plate is fixedly connected with one end of the adjusting plate, and the closing plate is fixed at the bottom of the suspender;
s5: the wallboard is fixedly connected to the bottom of the closing plate, and the wallboard is fixed on a vertical wall surface.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110465412.2A CN113250370B (en) | 2021-04-28 | 2021-04-28 | Installation mechanism and installation method for suspended ceiling low-level plate |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110465412.2A CN113250370B (en) | 2021-04-28 | 2021-04-28 | Installation mechanism and installation method for suspended ceiling low-level plate |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN113250370A CN113250370A (en) | 2021-08-13 |
| CN113250370B true CN113250370B (en) | 2024-09-06 |
Family
ID=77222318
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202110465412.2A Active CN113250370B (en) | 2021-04-28 | 2021-04-28 | Installation mechanism and installation method for suspended ceiling low-level plate |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN113250370B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115324266A (en) * | 2022-08-26 | 2022-11-11 | 浙江亚厦装饰股份有限公司 | Split-level ceiling structure and installation method |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN217128685U (en) * | 2021-04-28 | 2022-08-05 | 浙江亚厦装饰股份有限公司 | Installation mechanism of suspended ceiling low-level plate |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009002129A (en) * | 2007-06-20 | 2009-01-08 | Hashimoto Shoten:Kk | Ceiling joist retainer for hanging wall |
| KR101835128B1 (en) * | 2016-01-28 | 2018-03-08 | (주)엠제이스틸 | Hanger bracket for constructing ceiling of clean room and method for constructing ceiling of clean room using this same |
| CN211691012U (en) * | 2019-12-24 | 2020-10-16 | 浙江中为建设有限公司 | Indoor suspended ceiling and side wall edge-closing connecting node structure |
| CN212388828U (en) * | 2020-05-08 | 2021-01-22 | 浙江美赫集成家居股份有限公司 | Split-level type suspended ceiling mounting structure |
| CN112443066B (en) * | 2020-11-25 | 2024-06-21 | 浙江亚厦装饰股份有限公司 | Novel wall top closing-in piece and installation method |
-
2021
- 2021-04-28 CN CN202110465412.2A patent/CN113250370B/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN217128685U (en) * | 2021-04-28 | 2022-08-05 | 浙江亚厦装饰股份有限公司 | Installation mechanism of suspended ceiling low-level plate |
Also Published As
| Publication number | Publication date |
|---|---|
| CN113250370A (en) | 2021-08-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN218714232U (en) | Light steel keel gypsum board suspended ceiling | |
| CN105863207A (en) | Timber veneer finish clamp type assembling component and mounting method | |
| CN112360052A (en) | Suspended ceiling mounting structure of pre-buried bolt of assembled calcium silicate furred ceiling board | |
| CN107217810A (en) | A kind of cladding suspension member of decoration panel detachably installed and mount system and method | |
| CN207988316U (en) | Receive side drop level furred ceiling | |
| CN217128685U (en) | Installation mechanism of suspended ceiling low-level plate | |
| CN111188448B (en) | Unit type adjustable suspended ceiling structure | |
| CN111139966A (en) | Nailing-free module ceiling structure | |
| CN205677192U (en) | Wood facing cassette mounting structure | |
| CN213682775U (en) | Ceiling installation structure with pre-embedded bolts for prefabricated calcium silicate ceiling panels | |
| CN201635297U (en) | A ceiling system with good sound insulation effect | |
| CN113250370A (en) | Installation mechanism and installation method of suspended ceiling low-level plate | |
| CN210316246U (en) | An ancient building roof insulation reinforcement layer | |
| CN211114330U (en) | Honeycomb type decorative ceiling structure | |
| CN211229139U (en) | A light-weight suspended ceiling base load-bearing reinforcement structure | |
| CN215716487U (en) | Pre-buried jib structure | |
| CN201635225U (en) | A direct hoisting system for painted keels | |
| CN110284631A (en) | A kind of wall surface and its installation method | |
| CN112050125B (en) | Assembled lamps and lanterns hoist device | |
| CN201704839U (en) | Practical novel ceiling system for corridor passageway | |
| CN201635228U (en) | A new type of light and shade frame ceiling system | |
| CN211172659U (en) | A ceiling stone connecting component | |
| CN222525652U (en) | Ceiling groove convenient installation structure | |
| CN210459732U (en) | Ceiling keel | |
| CN115247469B (en) | Anti-cracking suspended ceiling structure and construction method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |