CN113216644A - Construction method for installing building dry-hanging stone curtain wall - Google Patents
Construction method for installing building dry-hanging stone curtain wall Download PDFInfo
- Publication number
- CN113216644A CN113216644A CN202110591437.7A CN202110591437A CN113216644A CN 113216644 A CN113216644 A CN 113216644A CN 202110591437 A CN202110591437 A CN 202110591437A CN 113216644 A CN113216644 A CN 113216644A
- Authority
- CN
- China
- Prior art keywords
- clamping
- board
- curtain wall
- support
- slide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000004575 stone Substances 0.000 title claims abstract description 53
- 238000010276 construction Methods 0.000 title claims abstract description 43
- 238000009434 installation Methods 0.000 claims abstract description 43
- 238000000034 method Methods 0.000 claims description 14
- 239000000463 material Substances 0.000 claims description 13
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 238000002360 preparation method Methods 0.000 claims description 3
- 239000011435 rock Substances 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 238000001125 extrusion Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 244000309464 bull Species 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to a construction method for installing a building dry-hanging stone curtain wall, which uses a construction device for installing the dry-hanging stone curtain wall, and the construction device for installing the dry-hanging stone curtain wall comprises a base, a carrying device and a plate placing unit. The invention can solve the following problems: the curtain wall boards are hoisted to the mounting positions of the keel frame on the wall surface one by one through hoisting equipment, and then are aligned and locked manually, so that the mounting efficiency of the curtain wall boards is reduced, the stone curtain wall boards are heavy, and the hoisting equipment and the workers still bring high labor intensity; the connected mode between lifting device and the curtain board that uses adopts the rope to bind the mode, and the curtain board of hoisting like this can appear rocking, the problem of slope aloft, and the curtain board rocks aloft and still can bring the safety problem for the workman to such construction mode is unfavorable for the installation of curtain board.
Description
Technical Field
The invention relates to the field of building curtain walls, in particular to a mounting and construction method of a building dry-hanging stone curtain wall.
Background
The stone curtain wall is usually composed of stone panels and a supporting structure, does not bear the load and the function of a main structure, and is a building enclosure structure. The method is characterized in that a main stress point is arranged on a main structure, and the stone is fixed on a building through a metal hanging piece to form the stone decorative curtain wall.
At present, when the dry-hanging stone curtain wall plate is installed and constructed, the following problems exist:
firstly, when the existing stone curtain wall board is installed by a dry hanging method, the curtain wall boards are hung and moved to the installation position of a keel frame on the wall surface one by one through hoisting equipment, and then are aligned and locked manually, so that the installation efficiency of the curtain wall board is reduced due to the construction mode, the stone curtain wall board is heavy, the labor intensity of workers is still high through the hoisting equipment and the manpower alone, and certain safety risk exists;
when the existing stone curtain wall plate is installed by a dry hanging method, the connection mode between the used hoisting equipment and the curtain wall plate is a mode of binding ropes, so that the hoisted curtain wall plate can shake and incline in the air, the curtain wall plate is difficult to stably move to the installation position on the keel frame, and the shaking of the curtain wall plate in the air can bring safety problems to workers, so that the construction mode is not favorable for the installation of the curtain wall plate.
Disclosure of Invention
The invention aims to provide a construction method for installing a building dry-hanging stone curtain wall, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides a building hangs stone material curtain wall installation construction method futilely, it has used a dry-hanging stone material curtain wall installation construction equipment, and this dry-hanging stone material curtain wall installation construction equipment includes base, handling device and puts the board unit, when adopting the above-mentioned dry-hanging stone material curtain wall installation construction equipment to hang stone material curtain wall installation construction futilely, concrete method is as follows:
s1, preparation: debugging the installation construction equipment of the dry-hanging stone curtain wall, and completing the installation of the keel frame on the wall surface needing to be provided with the stone curtain wall plate according to the size requirement;
s2, manufacturing a dry hanging stone curtain wall board: the curtain wall board is produced by using the existing curtain wall board manufacturing equipment according to the size requirement, and dry hanging pieces are respectively installed at the corresponding positions on the curtain wall board and the keel frame;
s3, curtain wall board installation and construction: placing a plurality of curtain wall plates on the plate placing unit, installing a base on the existing lifting equipment, driving the base to move to a position which is proper to the wall surface by the lifting equipment, starting a carrying device to carry the curtain wall plates on the plate placing unit to the wall surface, aligning and locking dry hangers on the curtain wall plates with dry hangers on the keel frame, and repeating the steps to install the curtain wall plates on other places of the wall surface;
the upper surface of the base is sequentially provided with a carrying device and a plate placing unit along the length direction; wherein:
the conveying device comprises a conveying support, conveying support plates, a guide sliding groove, a guide sliding rod, a pushing sliding groove, a pushing sliding rod, a conveying support rod, a clamping unit, a conveying support, a conveying motor, a conveying rotating rod, a conveying push rod, a first sliding rail, a first sliding block, a second sliding rail and a second sliding block, wherein the upper surface of the base is provided with the conveying support, two pairs of conveying support plates are symmetrically arranged at two ends of the upper surface of the conveying support in the length direction, each pair of conveying support plates are symmetrical in position, the guide sliding groove is arranged on the conveying support plate close to the central position of the conveying support, the guide sliding rod is arranged in the guide sliding groove in a sliding manner, the pushing sliding groove is arranged on the conveying support plate far away from the central position of the conveying support, the pushing sliding rod is arranged in the pushing sliding manner in the pushing sliding groove, the conveying support rod is arranged in the middle of each pair of conveying support plates, one end of the guide sliding rod and one end of the pushing sliding rod are rotatably connected with the lower half section of the conveying support rod, two transport branch upper ends are provided with the centre gripping unit jointly, the base upper surface is located transport support length direction both ends position department symmetry and is provided with the transport support, be provided with the transport motor on the transport support, the fixed transport bull stick that is provided with of transport motor output, the base upper surface is located under the transport support position both ends symmetry rotation and is provided with the transport push rod, the lower extreme of transport push rod is provided with the slide rail No. one, slide in the slide rail and be provided with the slider No. one, the one end and the slider rotation of transport bull stick are connected, the upper end of transport push rod is provided with the slide rail No. two, slide in No. two slide rails and be provided with the slider No. two, the other end that promotes the slide bar rotates with the slider No. two and is connected.
As a further scheme of the invention: put the board unit including putting the board support, put the board slide, put the board extension board, put the board kicking block and put the board screw rod, the base upper surface is provided with puts the board support, puts the board support upper surface and is provided with along its length direction both ends symmetry and puts the board slide, puts and evenly slides in the board slide and is provided with and puts the board extension board, put and has set gradually two on the board extension board and put the board kicking block, put the board slide internal rotation and be provided with and put the board screw rod, put the board extension board and put and be connected through screw-thread fit between the board screw rod.
As a further scheme of the invention: the middle part of the guide sliding groove is of a V-shaped structure, the included angle is included, and the two end parts of the guide sliding groove are of linear structures and are positioned on the same horizontal line with the pushing sliding groove.
As a further scheme of the invention: the clamping unit comprises a clamping support, a clamping slide way, clamping rods, a first screw rod, a clamping slide groove, a clamping slide block, a second screw rod, a clamping groove and a clamping block, the clamping support is symmetrically arranged at the upper ends of two carrying support rods, the clamping slide way is symmetrically arranged on the upper surface of the clamping support along the length direction of the clamping support, the clamping slide way is of an L-shaped structure, two clamping rods are arranged in the clamping slide way in a sliding manner, the first screw rod is arranged at the two ends of the clamping slide way in a threaded fit manner, the clamping slide block is in contact connection with the first screw rod, the clamping slide groove is vertically arranged on the clamping rods, the clamping slide groove is provided with a clamping slide block in a sliding manner, a supporting spring is connected between the clamping slide groove and the clamping slide block, the second screw rod is arranged on the clamping slide way in a threaded fit manner, the clamping slide block is in contact connection with the second screw rod, and the clamping groove is formed in the clamping slide block, the clamping groove is internally provided with a clamping fixture block in a sliding way, and a return spring is connected between the clamping fixture block and the clamping fixture block.
As a further scheme of the invention: put one end that the board slide is close to handling device and keep away from one side of putting board support central point and putting and be provided with the breach, put the one end that is close to the breach on the board screw rod and do not have the screw thread and cup jointed the shore spring, put the board extension board and put the position swing joint that does not have the screw thread on the board screw rod.
As a further scheme of the invention: put and seted up spacing spout on the board kicking block, it is provided with spacing fixture block and is connected with spacing spring between the two to slide in the spacing spout.
As a further scheme of the invention: a fixed support plate is arranged between the upper end of the carrying support rod and the clamping support, the upper end of the carrying support rod is connected with the middle of the lower surface of the fixed support plate in a sliding manner, the middle of the lower surface of the clamping support is connected with the middle of the upper surface of the fixed support plate through a fixed spring, fixed jacking blocks are symmetrically arranged at two ends of the fixed support plate, fixed grooves are symmetrically arranged at two ends of the clamping support, the fixed jacking blocks are connected with the fixed grooves in a sliding manner, a fixed top plate is arranged in the fixed grooves in a sliding manner, a reset spring is connected between the fixed jacking blocks and the fixed support plate in a rotating manner, a fixed support rod is arranged on the fixed top plate in a rotating manner, a fixed sliding rod is arranged at one end of the fixed support rod, a fixed sliding groove is arranged on the side wall of the fixed groove and is connected with the fixed sliding groove in a sliding manner, a fixed inserting block is arranged between the clamping slideway and the fixed groove, one end of the fixed top plate is in a contact with the fixed inserting block, a fixed inserting groove is arranged at the lower end of a right trapezoid structure, the fixed insert is in fit contact with the fixed slot.
As a further scheme of the invention: the fixed sliding groove consists of three sections, namely a type sliding groove, a linear sliding groove and an L-shaped sliding groove.
Compared with the prior art, the invention has the following advantages:
1. can solve the problem that the prior curtain wall board for dry hanging stone has the following problems in installation and construction:
firstly, when the existing stone curtain wall board is installed by a dry hanging method, the curtain wall boards are hung and moved to the installation position of a keel frame on the wall surface one by one through hoisting equipment, and then are aligned and locked manually, so that the installation efficiency of the curtain wall board is reduced due to the construction mode, the stone curtain wall board is heavy, the labor intensity of workers is still high through the hoisting equipment and the manpower alone, and certain safety risk exists;
when the existing stone curtain wall plate is installed by a dry hanging method, the connection mode between the used hoisting equipment and the curtain wall plate is a rope binding mode, so that the hoisted curtain wall plate can shake and incline in the air, the curtain wall plate is difficult to stably move to the installation position on the keel frame, and the shaking of the curtain wall plate in the air can bring safety problems to workers, so that the construction mode is not beneficial to the installation of the curtain wall plate;
2. when the device is used for mounting and constructing the curtain wall board with the dry hanging stone, the board placing unit can place a plurality of curtain wall boards at one time, and the curtain wall boards can move towards the carrying device by manually controlling the board placing unit, so that the carrying device can firstly clamp and fix the curtain wall boards, then turn over the curtain wall boards for 180 degrees, and then under the manual matching operation, the dry hanging pieces on the curtain wall boards can be aligned with the dry hanging pieces on the keel frame, thereby completing the mounting operation of the curtain wall boards through the alignment and locking of the dry hanging pieces;
3. when the device disclosed by the invention is used for mounting and constructing the dry-hanging stone curtain wall board, after the lifting equipment moves the device to the position for mounting the curtain wall board, the carrying device can be correspondingly adjusted according to the size of the curtain wall board, so that the curtain wall board can be clamped, fixed and turned more stably and smoothly, the labor intensity of workers can be reduced, and the safety risk of the workers can be avoided.
Drawings
The invention is further illustrated with reference to the following figures and examples.
FIG. 1 is a flow chart of a method of operation of the present invention;
FIG. 2 is a perspective view of the present invention from a first perspective;
FIG. 3 is a perspective view of the present invention from a second perspective;
FIG. 4 is a side plan view of the present invention;
FIG. 5 is a schematic cross-sectional perspective view taken at A-A of FIG. 4 in accordance with the present invention;
FIG. 6 is a schematic cross-sectional perspective view taken at B-B of FIG. 4 in accordance with the present invention;
FIG. 7 is a cross-sectional view of the clamping bar of the present invention;
fig. 8 is a schematic plan view of the installation and construction process of the curtain wall panel according to the present invention.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the effects of the invention easy to understand, the invention is further explained with reference to fig. 1 to 8.
The utility model provides a building hangs stone material curtain installation construction method futilely, it has used one to hang stone material curtain installation construction equipment futilely, should hang stone material curtain installation construction equipment including base 1, handling device 2 and put board unit 3 futilely, when adopting above-mentioned dry stone material curtain installation construction equipment of hanging to hang stone material curtain and install construction futilely, concrete method is as follows:
s1, preparation: debugging the installation construction equipment of the dry-hanging stone curtain wall, and completing the installation of the keel frame on the wall surface needing to be provided with the stone curtain wall plate according to the size requirement;
s2, manufacturing a dry hanging stone curtain wall board: the curtain wall board is produced by using the existing curtain wall board manufacturing equipment according to the size requirement, and dry hanging pieces are respectively installed at the corresponding positions on the curtain wall board and the keel frame;
s3, curtain wall board installation and construction: placing a plurality of curtain wall plates on the plate placing unit 3, installing the base 1 on the existing lifting equipment, driving the base 1 to move to a position which is proper to the wall surface by the lifting equipment, starting the carrying device 2 to carry the curtain wall plates on the plate placing unit 3 to the wall surface, aligning and locking dry hangers on the curtain wall plates with dry hangers on the keel frame, and repeating the steps to install the curtain wall plates on other positions of the wall surface;
the upper surface of the base 1 is sequentially provided with a carrying device 2 and a plate placing unit 3 along the length direction; wherein:
the carrying device 2 comprises a carrying support 2a, a carrying support plate 2b, a guide sliding groove 2c, a guide sliding rod 2d, a pushing sliding groove 2e, a pushing sliding rod 2f, a carrying support rod 2g, a clamping unit 2h, a carrying support 2i, a carrying motor 2j, a carrying rotating rod 2k, a carrying push rod 2m, a first sliding rail 2n, a first sliding block 2p, a second sliding rail 2q and a second sliding block 2r, wherein the upper surface of the base 1 is provided with the carrying support 2a, two pairs of carrying support plates 2b are symmetrically arranged at two ends of the upper surface of the carrying support 2a in the length direction, each pair of carrying support plates 2b are symmetrically arranged, the guide sliding groove 2c is arranged on the carrying support plate 2b close to the center of the carrying support 2a, the middle part of the guide sliding groove 2c is of a V-shaped structure and has an included angle of 90 degrees, two end parts of the guide sliding groove 2c are of linear structures, the guide sliding rod 2d is arranged in the guide sliding groove 2c, a pushing chute 2e is arranged on a carrying support plate 2b far away from the center of the carrying support 2a, a linear structure part of a guide chute 2c and the pushing chute 2e are positioned on the same horizontal line, a pushing slide bar 2f is arranged in the pushing chute 2e in a sliding manner, a carrying support rod 2g is arranged in the middle of each pair of carrying support plates 2b, one end of the guide slide bar 2d and one end of the pushing slide bar 2f are both rotatably connected with the lower half section of the carrying support rod 2g, the upper ends of the two carrying support rods 2g are provided with a clamping unit 2h together, carrying supports 2i are symmetrically arranged at the positions of the two ends of the upper surface of the base 1 in the length direction of the carrying support 2a, a carrying motor 2j is arranged on each carrying support 2i, a carrying rotating rod 2k is fixedly arranged at the output end of each carrying motor 2j, and carrying push rods 2m are symmetrically and rotatably arranged at the two ends of the upper surface of the base 1 in the position under the carrying support 2a, a first slide rail 2n is arranged at the lower end of the carrying push rod 2m, a first slide block 2p is arranged in the first slide rail 2n in a sliding manner, one end of a carrying rotary rod 2k is rotatably connected with the first slide block 2p, a second slide rail 2q is arranged at the upper end of the carrying push rod 2m, a second slide block 2r is arranged in the second slide rail 2q in a sliding manner, and the other end of a push slide rod 2f is rotatably connected with the second slide block 2 r;
during specific work, the corresponding position of the keel frame for carrying the curtain wall plates on the plate placing unit 3 to the wall comprises the following processes:
firstly, the top end of a carrying support rod 2g is required to face a plate placing unit 3, so that a clamping unit 2h can clamp curtain wall plates, the initial position of the carrying support rod 2g is in a vertical state, at the moment, a guide slide rod 2d is positioned at the lowest position of a V-shaped structure at the middle part of a guide slide groove 2c, a push slide rod 2f is positioned at the middle position of a push slide groove 2e, when a carrying motor 2j is started, the carrying motor 2j drives a carrying rotating rod 2k to carry out circular motion, the carrying rotating rod 2k drives a first slide block 2p which is rotationally connected with the carrying rotating rod 2k to carry out synchronous circumferential motion, the first slide block 2p slides in a first slide rail 2n at the lower section of a carrying push rod 2m, the lower end of the carrying push rod 2m is rotationally connected with a base 1, and when the first slide block 2p carries out circumferential motion, the first slide block 2p has an extrusion effect on the first slide rail 2n, so that the carrying push rod 2m performs reciprocating swing left and right at the connecting point with the base 1;
when the carrying push rod 2m swings to and fro left and right at the connecting point with the base 1, the second slide rail 2q at the upper section of the carrying push rod 2m extrudes the second slide block 2r along with the left and right swing of the carrying push rod 2m, and the second slide block 2r is rotatably connected with the pushing slide bar 2f positioned in the pushing slide groove 2e, so that the reciprocating sliding of the second slide block 2r in the second slide rail 2q can drive the pushing slide bar 2f to slide to and fro in the pushing slide groove 2 e;
when the pushing slide bar 2f slides in the pushing slide groove 2e in a reciprocating manner, because the linear structure part of the guide slide groove 2c and the pushing slide groove 2e are positioned on the same horizontal line, when the guide slide bar 2d moves to the linear structure from the lowest position of the V-shaped structure at the middle part of the guide slide groove 2c, the guide slide bar 2d and the pushing slide bar 2f are positioned on the same horizontal position, so that the upper end of the carrying support bar 2g can be inclined to enable the upper end of the carrying support bar 2g to face the plate placing unit 3 or the wall body;
when the top of transport branch 2g is just towards putting board unit 3, centre gripping unit 2h carries out the centre gripping to curtain panel, and when the top of transport branch 2g was towards the wall body, the top orientation of transport branch 2g takes place 180 conversion, has just realized the upset to curtain panel position, later alright install curtain panel on the keel frame.
The clamping unit 2h comprises a clamping support 2h0, a clamping slide way 2h1, a clamping rod 2h2, a first screw rod 2h3, a clamping slide way 2h4, a clamping slide block 2h5, a second screw rod 2h6, a clamping groove 2h7 and a clamping fixture block 2h8, the upper ends of two carrying support rods 2g are symmetrically provided with clamping support supports 2h0, the upper surface of the clamping support 2h0 is symmetrically provided with clamping slide ways 2h1 along the length direction, the clamping slide way 2h1 is in an L-shaped structure, two clamping rod 2h2 are arranged in the clamping slide way 2h1 in a sliding manner, two ends of the clamping slide way 2h1 are provided with the first screw rod 2h3 through threaded fit, the clamping slide block 2h5 is connected with the first screw rod 2h3 in a contact manner, the clamping slide way 2h2 is vertically provided with the clamping slide way 2h4, a clamping slide way 2h5 is arranged in the clamping slide way 2h4, and a clamping slide block 2h4 is connected with a supporting spring 5, a second screw rod 2h6 is arranged on the clamping sliding groove 2h4 in a threaded fit mode, a clamping sliding block 2h5 is in contact connection with the second screw rod 2h6, a clamping groove 2h7 is formed in the clamping sliding block 2h5, a clamping block 2h8 is arranged in the clamping groove 2h7 in a sliding mode, and a reset spring is connected between the clamping sliding block and the clamping sliding groove;
when the curtain wall board extruding device works, according to the length, the width and the thickness of a curtain wall board, the first screw rod 2h3 is rotated to adjust the position of the clamping rod 2h2 in the clamping slide way 2h1, the second screw rod 2h6 is rotated to adjust the position of the clamping slide block 2h5 in the clamping slide way 2h4, so that the distance between the clamping rods 2h2 can be suitable for the length of the curtain wall board, the distance between the clamping block 2h8 on the clamping rod 2h2 and the upper surface of the clamping support 2h0 can also be suitable for the thickness of the curtain wall board, when the top end of the carrying support rod 2g faces the board placing unit 3, the clamping support 2h0 is driven to gradually approach the curtain wall board, the edge of the curtain wall board extrudes the clamping block 2h8, so that the clamping block 2h8 slides into the clamping groove 2h7, after the curtain wall board is attached to the surface of the clamping support 2h0, the clamping block can release the extrusion effect of the clamping block 8, then under supporting spring's elastic force effect, roll-off in centre gripping fixture block 2h8 follow centre gripping draw-in groove 2h7, alright carry out the centre gripping fixedly with cooperation contact support 2h0 to curtain panel, after curtain panel is overturned 180, need be connected curtain panel and keel frame cooperation, after curtain panel and keel frame installation are accomplished, through the artifical centre gripping of removing centre gripping kelly 2h2 to curtain panel, alright in order to realize the installation to curtain panel.
A fixed support plate 2h00 is arranged between the upper end of the carrying support rod 2g and the clamping support 2h0, the upper end of the carrying support rod 2g is in sliding connection with the middle of the lower surface of the fixed support plate 2h00, the middle of the lower surface of the clamping support 2h0 is connected with the middle of the upper surface of the fixed support plate 2h00 through a fixed spring, two ends of the fixed support plate 2h00 are symmetrically provided with a fixed top block 2h01, two ends of the clamping support 2h0 are symmetrically provided with fixed grooves 2h02, the fixed top block 2h01 is in sliding connection with the fixed grooves 2h02, a fixed top plate 2h03 is arranged in the fixed grooves 2h02 in a sliding mode, a reset spring is connected between the fixed top plate 2h03 and is rotatably provided with a fixed support rod 2h04, one end of the fixed support rod 2h04 is provided with a fixed slide rod 2h05, the side wall of the fixed groove 2h02 is provided with a fixed chute 2h06, the fixed chute 2h06 is composed of three sections which are respectively an M-like chute, a straight chute and an L-type chute, the fixed slide bar 2h05 is in sliding connection with the fixed slide groove 2h06, a fixed inserting block 2h07 is arranged between the clamping slide way 2h1 and the fixed groove 2h02 in a sliding mode, one end of the fixed top plate 2h03 is in contact with the fixed inserting block 2h07, a fixed inserting groove 2h08 is arranged at the lower end of the clamping slide bar 2h2, the fixed inserting groove 2h08 is of a right-angle trapezoid structure, and the fixed inserting block 2h07 is in matched contact with the fixed inserting groove 2h 08;
during specific work, sliding connection in the middle of transport branch 2 g's upper end and the fixed extension board 2h00 lower surface, when centre gripping unit 2h removed curtain panel to keel frame like this, can be through promoting fixed extension board 2h00 for centre gripping unit 2h can take curtain panel better to aim at with keel frame, help the installation and construction of curtain panel to go on fast, carry out the centre gripping to panel at centre gripping unit 2h and fix and contact the centre gripping and include following process:
firstly, when the clamping unit 2h is vertically upward, the clamping unit is at an initial position, at this time, the fixed top blocks 2h01 at the two ends of the fixed support plate 2h00 are at the lowest position in the fixed groove 2h02 under the elastic force action of the fixed spring, the fixed top plate 2h05 in the fixed groove 2h02 is at the fixed top block 2h01 under the action of the reset spring, and the fixed sliding rod 2h05 on the fixed support rod 2h04 is at the lowest position in the fixed sliding groove 2h06, namely at the corner of the L-shaped sliding groove;
secondly, when the clamping unit 2h gradually approaches to the curtain wall plate and begins to be attached with a certain extrusion effect, the fixed top block 2h01 pushes the fixed top plate 2h05 to move in the fixed groove 2h02, thereby pushing the fixed slide bar 2h05 to move clockwise from the corner of the L-shaped chute to the similar M-shaped chute in the fixed chute 2h06 through the fixed support bar 2h04, in this process, the fixed top plate 2h05 presses the fixed insert 2h07 to make the fixed insert 2h07 move into the fixed slot 2h08 at the lower end of the clamping rod 2h2, thus, the fixed insert 2h07 will press the fixed slot 2h08, so that the clamping rod 2h2 will move downwards in the clamping slideway 2h1, therefore, the curtain wall plate can be clamped more tightly by the clamping fixture block 2h8 and the clamping support 2h0 until the fixing slide bar 2h05 moves to the middle position of the M-shaped sliding groove, and the curtain wall plate can be stably clamped;
when clamping unit 2h takes curtain panel to be close to keel frame gradually, when keel frame had the extrusion to curtain panel, fixed slide bar 2h05 began to slide towards sharp spout from the centre of type M type spout in fixed spout 2h06 this moment, slide the corner of L type spout again at last, centre gripping fixture block 2h8 presss from both sides tightly to curtain panel with centre gripping support 2h0 and can relieve like this, later curtain panel and keel frame installation accomplish the back, the rethread manual work with centre gripping fixture block 2h2 with the separation of curtain panel can.
The plate placing unit 3 comprises a plate placing support 3a, a plate placing slide 3b, a plate placing support plate 3c, a plate placing top block 3d and a plate placing screw 3e, the plate placing support 3a is arranged on the upper surface of the base 1, the plate placing slide 3b is symmetrically arranged on the upper surface of the plate placing support 3a along the length direction, the plate placing support plate 3c is uniformly arranged in the plate placing slide 3b in a sliding manner, the plate placing support plate 3c is sequentially arranged on the plate placing support plate 3c, the plate placing screw 3e is rotationally arranged in the plate placing slide 3b, the plate placing support plate 3c is connected with the plate placing screw 3e through thread fit, a notch is arranged on one side of one end of the plate placing slide 3b close to the conveying device 2, which is far away from the central position of the plate placing support 3a, a thread is not arranged on one end of the plate placing screw 3e, which is close to the notch, a top support spring is sleeved on the plate placing support plate 3c, and the position of the screw which is not provided with the thread, the plate placing top block 3d is provided with a limiting sliding groove 3d0, a limiting clamping block 3d1 is arranged in the limiting sliding groove 3d0 in a sliding mode, and a limiting spring is connected between the limiting sliding block and the limiting sliding groove;
when the curtain wall plate clamping device works specifically, a dry hanging piece is arranged at a corresponding position on one side surface of the curtain wall plate, a plate placing top block 3d on a plate placing support plate 3c can be in contact with the dry hanging piece to support the dry hanging piece, a limiting clamping block 3d1 is arranged in a limiting sliding groove 3d0 in the plate placing top block 3d in a sliding mode, the upper end of the limiting clamping block 3d1 can be inserted into a dry hanging piece locking hole in the curtain wall plate under the elastic action of a limiting spring, so that the curtain wall plate can be limited to ensure the stability of the curtain wall plate in the moving process, when the clamping unit 2h clamps the nearest curtain wall plate, due to the pulling of the carrying device 2, the locking hole of the dry hanging piece extrudes the limiting clamping block 3d1 to enable the limiting sliding groove 3d0 to enable the position of the curtain wall plate to be relieved, and the curtain wall plate can be carried away by the carrying device 2, and then, the plate placing screw rod 3e is rotated, so that the plate placing support plate 3c slides towards the conveying device 2 in the plate placing slide way 3b, and when the plate placing support plate 3c without the curtain wall plate moves to the notch, the plate placing support plate 3c is rotated towards the notch manually, so that the plate placing support plate 3c at the back cannot be influenced to carry the curtain wall plate to move towards the conveying device 2.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are given by way of illustration of the principles of the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the invention as defined by the appended claims. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (8)
1. The utility model provides a building hangs stone material curtain installation construction method futilely, it has used a hang stone material curtain installation construction equipment futilely, should hang stone material curtain installation construction equipment futilely include base (1), handling device (2) and put board unit (3), its characterized in that: when the dry-hanging stone curtain wall mounting construction equipment is used for mounting construction of the dry-hanging stone curtain wall, the concrete method is as follows:
s1, preparation: debugging the installation construction equipment of the dry-hanging stone curtain wall, and completing the installation of the keel frame on the wall surface needing to be provided with the stone curtain wall plate according to the size requirement;
s2, manufacturing a dry hanging stone curtain wall board: the curtain wall board is produced by using the existing curtain wall board manufacturing equipment according to the size requirement, and dry hanging pieces are respectively installed at the corresponding positions on the curtain wall board and the keel frame;
s3, curtain wall board installation and construction: placing a plurality of curtain wall plates on the plate placing unit (3), installing the base (1) on the existing lifting equipment, driving the base (1) to move to a position which is proper to the wall surface by the lifting equipment, starting the carrying device (2) to carry the curtain wall plates on the plate placing unit (3) to the wall surface, aligning and locking dry hangers on the curtain wall plates with dry hangers on the keel frame, and repeating the steps to install the curtain wall plates on other places of the wall surface;
the upper surface of the base (1) is sequentially provided with a carrying device (2) and a plate placing unit (3) along the length direction; wherein:
the conveying device (2) comprises a conveying support (2a), conveying support plates (2b), a guide sliding groove (2c), a guide sliding rod (2d), a pushing sliding groove (2e), a pushing sliding rod (2f), a conveying support rod (2g), a clamping unit (2h), a conveying support (2i), a conveying motor (2j), a conveying rotating rod (2k), a conveying push rod (2m), a first sliding rail (2n), a first sliding block (2p), a second sliding rail (2q) and a second sliding block (2r), the upper surface of the base (1) is provided with the conveying support (2a), two pairs of conveying support plates (2b) are symmetrically arranged at two ends of the upper surface of the conveying support (2a) in the length direction, each pair of conveying support plates (2b) is symmetrical in position, and the guide sliding groove (2c) is arranged on the conveying support plate (2b) close to the central position of the conveying support plate (2a), a guide slide bar (2d) is arranged in the guide chute (2c) in a sliding manner, a pushing chute (2e) is arranged on a carrying support plate (2b) far away from the central position of the carrying support (2a), a pushing slide bar (2f) is arranged in the pushing chute (2e) in a sliding manner, a carrying support rod (2g) is arranged in the middle of each pair of carrying support plates (2b), one end of the guide slide bar (2d) and one end of the pushing slide bar (2f) are both rotatably connected with the lower half section of the carrying support rod (2g), a clamping unit (2h) is arranged at the upper end of each pair of the two carrying support rods (2g), carrying supports (2i) are symmetrically arranged on the upper surface of the base (1) at the two ends of the carrying support (2a) in the length direction, a carrying motor (2j) is arranged on each carrying support (2i), and a carrying rotating rod (2k) is fixedly arranged at the output end of each carrying motor (2j), the upper surface of the base (1) is located under the carrying support (2a), two ends of the upper surface of the base are symmetrically and rotatably provided with a carrying push rod (2m), the lower end of the carrying push rod (2m) is provided with a first slide rail (2n), a first slide block (2p) is slidably arranged in the first slide rail (2n), one end of the carrying rotary rod (2k) is rotatably connected with the first slide block (2p), the upper end of the carrying push rod (2m) is provided with a second slide rail (2q), a second slide block (2r) is slidably arranged in the second slide rail (2q), and the other end of the pushing slide rod (2f) is rotatably connected with the second slide block (2 r).
2. The installation and construction method of the building dry-hanging stone curtain wall according to claim 1, characterized in that: put board unit (3) including putting board support (3a), put board slide (3b), put board extension board (3c), put board kicking block (3d) and put board screw rod (3e), base (1) upper surface is provided with puts board support (3a), it has set up along its length direction both ends symmetry and puts board slide (3b) to put board support (3a) upper surface, it is provided with in board slide (3b) and puts board extension board (3c) to evenly slide, it puts board kicking block (3d) to have set gradually two on board extension board (3c), it is provided with and puts board screw rod (3e) to put board slide (3b) internal rotation, it is connected through screw-thread fit to put board extension board (3c) and put between board screw rod (3 e).
3. The installation and construction method of the building dry-hanging stone curtain wall according to claim 1, characterized in that: the middle part of the guide sliding groove (2c) is of a V-shaped structure, the included angle is 90 degrees, and the two end parts of the guide sliding groove (2c) are of linear structures and are positioned on the same horizontal line with the pushing sliding groove (2 e).
4. The installation and construction method of the building dry-hanging stone curtain wall according to claim 1, characterized in that: the clamping unit (2h) comprises a clamping support (2h0), a clamping slide way (2h1), a clamping rod (2h2), a first screw (2h3), a clamping sliding groove (2h4), a clamping sliding block (2h5), a second screw (2h6), a clamping groove (2h7) and a clamping block (2h8), wherein the upper ends of two carrying support rods (2g) are symmetrically provided with the clamping support (2h0), the upper surface of the clamping support (2h0) is symmetrically provided with the clamping slide way (2h1) along the length direction thereof, the clamping slide way (2h1) is of an L-shaped structure, two clamping rod (2h2) are arranged in the clamping slide way (2h1) in a sliding mode, the first screw rods (2h3) are arranged at the two ends of the clamping slide way (2h1) in a threaded fit mode, the clamping sliding block (2h5) is connected with the first screw rod (2h3) in a contact mode, and the clamping slide way (2h2 6) is arranged on the clamping rod (2h4) in a vertical mode, clamping sliding block (2h5) is arranged in the clamping sliding groove (2h4) in a sliding mode, a supporting spring is connected between the clamping sliding groove (2h4) and the clamping sliding block (2h5), a second screw rod (2h6) is arranged on the clamping sliding groove (2h4) in a threaded fit mode, the clamping sliding block (2h5) is connected with the second screw rod (2h6) in a contact mode, a clamping groove (2h7) is formed in the clamping sliding block (2h5), a clamping block (2h8) is arranged in the clamping groove (2h7) in a sliding mode, and a reset spring is connected between the clamping sliding block and the clamping sliding block.
5. The installation and construction method of the building dry-hanging stone curtain wall according to claim 2, characterized in that: put one end that board slide (3b) is close to handling device (2) and keep away from one side of putting board support (3a) central point and put and be provided with the breach, put the one end that is close to the breach on board screw rod (3e) and do not have the screw thread and cup jointed the shore spring, put board extension board (3c) and put the position swing joint that does not have the screw thread on board screw rod (3 e).
6. The installation and construction method of the building dry-hanging stone curtain wall according to claim 2, characterized in that: put and seted up spacing spout (3d0) on board kicking block (3d), spacing spout (3d0) are slided and are provided with spacing fixture block (3d1) and are connected with spacing spring between the two.
7. The installation and construction method of the building dry-hanging stone curtain wall according to claim 4, characterized in that: a fixed support plate (2h00) is arranged between the upper end of the carrying support rod (2g) and the clamping support (2h0), the upper end of the carrying support rod (2g) is in sliding connection with the middle of the lower surface of the fixed support plate (2h00), the middle of the lower surface of the clamping support (2h0) is connected with the middle of the upper surface of the fixed support plate (2h00) through a fixed spring, fixed jacking blocks (2h01) are symmetrically arranged at the two ends of the fixed support plate (2h00), fixed fixing grooves (2h02) are symmetrically arranged at the two ends of the clamping support (2h0), a fixed jacking block (2h01) is in sliding connection with a fixing groove (2h02), a fixed top plate (2h03) is arranged in a sliding manner in the fixing groove (2h02) and a reset spring is connected between the fixed jacking block and the fixed jacking block (2h03), a fixed support rod (2h04) is rotatably arranged on the fixing top plate (2h04), a fixed slide rod (2h05) is arranged at one end, a fixed chute (2h06) is arranged on the side wall of the fixing groove (2h02), fixed slide bar (2h05) and fixed spout (2h06) sliding connection, it is provided with fixed inserted block (2h07) to slide between centre gripping slide (2h1) and fixed slot (2h02), contacts between fixed roof (2h03) one end and fixed inserted block (2h07), and the lower extreme of centre gripping kelly (2h2) is provided with fixed slot (2h08), fixed slot (2h08) are the right trapezoid structure, fixed inserted block (2h07) and fixed slot (2h08) cooperation contact.
8. The installation and construction method of the building dry-hanging stone curtain wall according to claim 7, characterized in that: the fixed sliding groove (2h06) is composed of three sections, namely an M-shaped sliding groove, a linear sliding groove and an L-shaped sliding groove.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110591437.7A CN113216644A (en) | 2021-05-28 | 2021-05-28 | Construction method for installing building dry-hanging stone curtain wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110591437.7A CN113216644A (en) | 2021-05-28 | 2021-05-28 | Construction method for installing building dry-hanging stone curtain wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN113216644A true CN113216644A (en) | 2021-08-06 |
Family
ID=77099136
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202110591437.7A Withdrawn CN113216644A (en) | 2021-05-28 | 2021-05-28 | Construction method for installing building dry-hanging stone curtain wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN113216644A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115749303A (en) * | 2022-11-25 | 2023-03-07 | 中建三局科创产业发展有限公司 | Assembled wallboard overturning, self-discharging and mounting device |
| CN116791904A (en) * | 2023-05-16 | 2023-09-22 | 中建八局第一建设有限公司 | Auxiliary installation system for carrying building curtain wall |
-
2021
- 2021-05-28 CN CN202110591437.7A patent/CN113216644A/en not_active Withdrawn
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115749303A (en) * | 2022-11-25 | 2023-03-07 | 中建三局科创产业发展有限公司 | Assembled wallboard overturning, self-discharging and mounting device |
| CN116791904A (en) * | 2023-05-16 | 2023-09-22 | 中建八局第一建设有限公司 | Auxiliary installation system for carrying building curtain wall |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN114892998A (en) | Assembly type building wall installation equipment and use method thereof | |
| CN113047639B (en) | Installation and construction method for reinforced light steel keel partition wall | |
| CN210504678U (en) | Vacuum carrying device | |
| CN116480108A (en) | A kind of installation equipment and method of prefabricated fair-faced concrete exterior wall hanging board | |
| CN113547650B (en) | A decorative ceramic tile cutting and positioning device | |
| CN217097412U (en) | Mechanical fixture platform is used in machine parts processing | |
| CN109037784A (en) | A kind of pcb board adjustment device for hot pressing battery formation clamp | |
| CN116290833B (en) | Roof steel frame construction device suitable for slope roof | |
| CN220847715U (en) | Waterstop steel plate fixed installation structure that is easy to install and adjust | |
| CN208801443U (en) | A kind of plastic plate positioning drilling equipment | |
| CN218292816U (en) | Connecting frame for civil engineering processing | |
| CN217304846U (en) | A jig for anti-slip test of steel pipe scaffolding | |
| CN215051903U (en) | Concrete curing means is under construction to town road engineering | |
| CN213566382U (en) | Unmanned ship for all-weather light show | |
| CN209986960U (en) | Clamping jaw structure for taking and placing main magnetic block | |
| CN220226276U (en) | Concrete trowelling mechanism | |
| CN216616981U (en) | Make things convenient for adjustable formwork mounting structure of dismouting | |
| CN214743814U (en) | Finished C-shaped steel support hanger tool | |
| CN219189989U (en) | Airtight valve installation auxiliary device of people's air defense system | |
| CN221524234U (en) | Template clamp | |
| CN208763306U (en) | A kind of fixed device of anchor clipper | |
| CN220892419U (en) | Outdoor hanging machine structure of heating ventilation air conditioner | |
| CN221856249U (en) | Assembled building construction hoist and mount side direction braced system | |
| CN223225630U (en) | High-efficiency adjustable hoisting frame | |
| CN223433165U (en) | Cement product hoisting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WW01 | Invention patent application withdrawn after publication | ||
| WW01 | Invention patent application withdrawn after publication |
Application publication date: 20210806 |
|
| DD01 | Delivery of document by public notice | ||
| DD01 | Delivery of document by public notice |
Addressee: Wuhan sage Engineering Technology Co.,Ltd. Document name: Refund Approval Notice |