CN113216522B - A method of connecting steel bars - Google Patents

A method of connecting steel bars Download PDF

Info

Publication number
CN113216522B
CN113216522B CN202110533352.3A CN202110533352A CN113216522B CN 113216522 B CN113216522 B CN 113216522B CN 202110533352 A CN202110533352 A CN 202110533352A CN 113216522 B CN113216522 B CN 113216522B
Authority
CN
China
Prior art keywords
steel bar
sleeve
steel
pier
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110533352.3A
Other languages
Chinese (zh)
Other versions
CN113216522A (en
Inventor
孟凡林
王福阳
宋敏
李世禹
李兆杰
殷承诺
桑思宇
李建科
梁媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuangji Construction Group Co ltd
Original Assignee
Jilin Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Jianzhu University filed Critical Jilin Jianzhu University
Priority to CN202110533352.3A priority Critical patent/CN113216522B/en
Publication of CN113216522A publication Critical patent/CN113216522A/en
Application granted granted Critical
Publication of CN113216522B publication Critical patent/CN113216522B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162—Connectors or means for connecting parts for reinforcements
    • E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165—Coaxial connection by means of sleeves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明一种钢筋连接套筒及钢筋连接方法,属于土木工程技术领域的钢筋连接技术,包括钢筋连接套筒、凸台、钢筋I、钢筋墩头、钢筋II、螺纹墩粗端、螺纹洞、螺栓;本申请的装置及连接方法,制备加工方便且效率高,制备和施工安装成本低且连接可靠;不设置螺纹洞及匹配的螺栓时,可以提供简便且经济的、仅有抗拉需要的钢筋连接方式;设置螺纹洞及匹配的螺栓时,也可以提供有抗拉压需要的钢筋连接方式。由于不需要窜动钢筋,且钢筋连接套筒凸台内径与钢筋直径之间的间隙可以消除部分安装公差,特别适合预制混凝土构件和成品钢筋笼施工安装的钢筋连接。

Figure 202110533352

The invention relates to a steel bar connection sleeve and a steel bar connection method, belonging to the steel bar connection technology in the technical field of civil engineering, including a steel bar connection sleeve, a boss, a steel bar I, a steel bar pier head, a steel bar II, a threaded pier thick end, a threaded hole, Bolts; the device and connection method of the present application are convenient in preparation and processing, high in efficiency, low in preparation, construction and installation costs, and reliable in connection; when threaded holes and matching bolts are not provided, simple and economical bolts that only require tensile strength can be provided. Reinforcement connection method; when setting threaded holes and matching bolts, it can also provide a reinforcement connection method that requires tensile and compression resistance. Because there is no need to move the steel bars, and the gap between the inner diameter of the boss of the steel bar connecting sleeve and the diameter of the steel bar can eliminate part of the installation tolerance, it is especially suitable for the steel bar connection of prefabricated concrete components and finished steel cage construction and installation.

Figure 202110533352

Description

一种钢筋连接方法A method of connecting steel bars

技术领域technical field

本发明属于土木工程技术领域的钢筋连接技术,特别是涉及到一种钢筋连接套筒及连接方法。The invention belongs to the steel bar connection technology in the technical field of civil engineering, and in particular relates to a steel bar connection sleeve and a connection method.

背景技术Background technique

装配式混凝土结构,在预制混凝土构件和成品钢筋笼施工安装时,钢筋的连接方式制约着工程质量、效率和成本;由于钢筋不能转动,无法采用可靠且成本低廉的直螺纹套筒连接。For prefabricated concrete structures, during the construction and installation of prefabricated concrete components and finished steel cages, the connection method of steel bars restricts the quality, efficiency and cost of the project; since the steel bars cannot be rotated, reliable and low-cost straight thread sleeve connections cannot be used.

对于竖向钢筋的连接,可以采用灌浆方法和挤压钢套筒进行连接,但因其连接质量广为诟病,有逐渐被边缘化的趋势;可以采用正反丝的直螺纹套筒连接,但由于在自重作用下极易破坏螺纹,造成连接失败,所以并没有得到运用;For the connection of vertical steel bars, grouting method and extruded steel sleeve can be used for connection, but because of its connection quality, it is widely criticized and tends to be gradually marginalized; straight thread sleeve connection with positive and negative wires can be used, but Because the thread is easily damaged under the action of its own weight, resulting in connection failure, it has not been used;

对于水平钢筋的连接,由于预制混凝土构件和成品钢筋笼不能水平窜动,采用灌浆套筒连接排气不充分、采用挤压钢套筒因钢筋间距过小不方便操作、常规的螺纹套筒无法窜动实施连接等,连接的问题和困难较多。For the connection of horizontal steel bars, since the prefabricated concrete members and finished steel cages cannot move horizontally, the connection of grouting sleeves is not sufficient for exhaust, and the use of extruded steel sleeves is inconvenient to operate due to the small spacing between steel bars. Conventional threaded sleeves cannot There are many problems and difficulties in connection such as moving and implementing connection.

鉴于装配式混凝土结构钢筋连接存在的问题,近年来涌现出了很多创新的连接方法。In view of the problems existing in the connection of steel bars in prefabricated concrete structures, many innovative connection methods have emerged in recent years.

发明专利申请说明书CN201910632283.4,公开了一种YK可调高强钢筋连接接头,包括连接套筒、连接于连接套筒两端的连接钢筋Ⅰ、Ⅱ,连接套筒内设置有第一内套筒,第一内套筒一端开设有中心沉头孔;连接套筒远离连接钢筋Ⅰ区段内壁设置有内螺纹,与增设的第二内套筒的一端筒壁上的外螺纹旋接,第二内套筒的中心孔为内螺纹通孔,连接钢筋Ⅱ外螺纹端和第二内套筒通过第三内套筒连接,第三内套筒的中心孔为内螺纹通孔或内螺纹沉头孔,第三内套筒的外壁设有外螺纹,连接钢筋Ⅱ外螺纹端全部旋入第三内套筒的中心孔内,第三内套筒旋入第二内套筒的中心孔内。该发明中通过在连接钢筋Ⅱ外螺纹端处旋接一个第三内套筒,避免连接钢筋Ⅱ的外螺纹外露出现脆性断裂的情况。Invention patent application specification CN201910632283.4 discloses a YK adjustable high-strength steel bar connection joint, including a connecting sleeve, connecting steel bars I and II connected to both ends of the connecting sleeve, and a first inner sleeve is arranged inside the connecting sleeve. One end of the first inner sleeve is provided with a central counterbore; the connecting sleeve is provided with an internal thread on the inner wall of the section away from the connecting steel bar I, which is screwed with the external thread on the wall of one end of the added second inner sleeve. The center hole of the sleeve is an internally threaded through hole, and the externally threaded end of the connecting steel bar II is connected with the second inner sleeve through the third inner sleeve, and the center hole of the third inner sleeve is an internally threaded through hole or an internally threaded countersunk hole , the outer wall of the third inner sleeve is provided with external threads, all the external thread ends of the connecting steel bar II are screwed into the center hole of the third inner sleeve, and the third inner sleeve is screwed into the center hole of the second inner sleeve. In this invention, a third inner sleeve is screwed to the external thread end of the connecting steel bar II to avoid the brittle fracture of the external thread of the connecting steel bar II.

实用新型专利授权说明书CN202020819611.X,公开了一种装配式预制构件钢筋直螺纹连接装置,包括第一螺套、第二螺套和连接套筒。第一螺套和第二螺套的内螺纹分别用于与第一钢筋丝头和第二钢筋丝头的外螺纹相旋合形成第一螺纹副和第二螺旋副,第二螺套和第一螺套分别从连接套筒的两侧与连接套筒进行连接,第二螺套和第一螺套的外螺纹分别与连接套筒的内螺纹相旋合形成第三螺纹副和第四螺纹副。第一螺纹副至第四螺纹副的螺距均相等,且第一螺纹副至第四螺纹副的轴向配合间隙叠加之和不小于一个所述螺距的尺寸。该实用新型能在两根钢筋不能沿径向和轴向移动、不能转动、且两根钢筋丝头螺纹的螺旋线存在偏差错位的情况下,实现两根钢筋之间的可靠连接。The utility model patent authorization specification CN202020819611.X discloses a prefabricated steel bar straight thread connection device, including a first screw sleeve, a second screw sleeve and a connecting sleeve. The internal threads of the first screw sleeve and the second screw sleeve are respectively used to screw together with the external threads of the first steel bar head and the second steel wire head to form a first thread pair and a second helical pair, and the second screw sleeve and the second screw thread A threaded sleeve is respectively connected to the connecting sleeve from both sides of the connecting sleeve, and the external threads of the second threaded sleeve and the first threaded sleeve are respectively screwed with the internal threads of the connecting sleeve to form a third thread pair and a fourth thread pair. vice. The pitches of the first thread pair to the fourth thread pair are all equal, and the sum of the axial fit clearances of the first thread pair to the fourth thread pair is not less than one pitch. The utility model can realize reliable connection between the two steel bars under the condition that the two steel bars cannot move radially and axially or rotate, and the helical lines of the threads of the two steel bars have deviations and dislocations.

实用新型专利授权说明书CN201521021063.1,公开了一种新型钢筋连接套筒,包括连接套筒、连接于连接套筒两端的连接钢筋I、Ⅱ,连接套筒一端部设置为直径大于连接钢筋I直径的等径缩口,连接套筒内设置有第一内套筒,所述第一内套筒外径大于等径缩口直径但小于连接套筒内径,所述第一内套筒一端开设有中心沉头孔,沉头孔加工有内螺纹,连接钢筋I端部段加工有外螺纹,连接钢筋I端部穿过等径缩口与第一内套筒沉头孔的内螺纹配合旋接,第一内套筒另一端设置有导向头,所述连接套筒另一端区段内壁设置有内螺纹,与增设的第二内套筒的一端筒壁上的外螺纹旋接,第二内套筒中心孔为通孔,通孔内壁加工有内螺纹,连接钢筋Ⅱ端部段加工有外螺纹与通孔内壁的内螺纹配合旋接,所述通孔孔径≥导向头直径。该实用新型有效防止轴向压力,提高连接强度,并可实现钢筋长度补偿、提高钢筋同心度、提高安装效率。The utility model patent authorization specification CN201521021063.1 discloses a new type of steel bar connecting sleeve, including the connecting sleeve, connecting steel bars I and II connected to both ends of the connecting sleeve, and the diameter of one end of the connecting sleeve is set to be larger than the diameter of the connecting steel bar I The equal-diameter necking, the connecting sleeve is provided with a first inner sleeve, the outer diameter of the first inner sleeve is larger than the diameter of the equal-diameter necking but smaller than the inner diameter of the connecting sleeve, and one end of the first inner sleeve is provided with Center counterbore, the counterbore hole is processed with internal thread, the end section of the connecting steel bar I is processed with external thread, the end of the connecting steel bar I passes through the equal-diameter shrinkage and is screwed with the internal thread of the counterbore hole of the first inner sleeve , the other end of the first inner sleeve is provided with a guide head, the inner wall of the other end section of the connecting sleeve is provided with an internal thread, which is screwed with the external thread on the wall of one end of the added second inner sleeve, and the second internal The central hole of the sleeve is a through hole, the inner wall of the through hole is processed with internal threads, and the end section of the connecting steel bar II is processed with external threads to cooperate with the internal threads on the inner wall of the through hole, and the diameter of the through hole is greater than or equal to the diameter of the guide head. The utility model effectively prevents axial pressure, improves connection strength, and can realize reinforcement length compensation, improve reinforcement concentricity, and improve installation efficiency.

上述公开的技术方案,普遍存在的问题是连接结构复杂、连接件较多、连接施工安装环节多,连接件的生产和连接施工安装效率低、成本高。The common problems of the above-mentioned disclosed technical solutions are that the connection structure is complicated, there are many connection parts, and there are many links in connection construction and installation, and the production and connection construction and installation of connection parts are inefficient and costly.

所以有必要开发一种结构简单,连接方便的技术方案,提高连接件的生产和连接施工安装效率低,降低制备和施工安装成本。Therefore, it is necessary to develop a technical solution with simple structure and convenient connection, which can improve the production and connection construction and installation efficiency of connectors, and reduce the cost of preparation and construction and installation.

发明内容Contents of the invention

本发明所要解决的技术问题是:提供一种钢筋连接套筒及连接方法,钢筋连接套筒的结构简单,制备加工方便且效率高,制备和施工安装成本低。The technical problem to be solved by the present invention is to provide a steel bar connecting sleeve and a connecting method. The steel bar connecting sleeve has a simple structure, convenient preparation and processing, high efficiency, and low preparation, construction and installation costs.

一种钢筋的连接方法,使用钢筋连接套筒连接,所述钢筋连接套筒为钢质或铸铁管材;所述钢筋连接套筒的一端设有内螺纹,另一端的内侧一体成型设置有环状的凸台,凸台的内径小于钢筋连接套筒的内径;其特征是:包括以下步骤,且以下步骤顺次进行,A method for connecting steel bars, which uses a steel bar connecting sleeve to connect, and the steel bar connecting sleeve is made of steel or cast iron pipes; one end of the steel bar connecting sleeve is provided with an internal thread, and the inner side of the other end is integrally formed with a ring-shaped The boss, the inner diameter of the boss is smaller than the inner diameter of the steel bar connecting sleeve; it is characterized in that it includes the following steps, and the following steps are carried out in sequence,

步骤一、钢筋连接套筒的选取Step 1. Selection of steel bar connection sleeve

根据需要连接的钢筋的情况选择钢筋连接套筒,钢筋的直径小于钢筋连接套筒中凸台的内径,将钢筋连接套筒套入钢筋I上,其中钢筋连接套筒带有内螺纹一端与钢筋I的连接端同侧;Select the steel bar connection sleeve according to the situation of the steel bar to be connected. The diameter of the steel bar is smaller than the inner diameter of the boss in the steel bar connection sleeve. Put the steel bar connection sleeve on the steel bar I, wherein the steel bar connection sleeve has an internal thread at one end and the steel bar. The connection end of I is on the same side;

步骤二、钢筋的加工Step 2. Processing of steel bars

将钢筋I的连接端加工成钢筋墩头,钢筋墩头的直径大于凸台的内径,小于钢筋连接套筒的内径;将钢筋II的端部墩粗,并在上面加工外螺纹形成螺纹墩粗端,螺纹墩粗端的外螺纹与钢筋连接套筒的内螺纹匹配;The connection end of steel bar I is processed into a steel bar pier head, the diameter of which is larger than the inner diameter of the boss and smaller than the inner diameter of the steel bar connecting sleeve; the end of the steel bar II is thickened, and the external thread is processed on it to form a threaded pier thick The external thread of the thick end of the threaded pier matches the internal thread of the connecting sleeve of the steel bar;

步骤三、螺纹墩粗端加工Step 3. Processing of threaded pier thick end

将螺纹墩粗端端部设置螺纹洞,螺纹洞匹配设置螺栓;Set the threaded hole at the thick end of the threaded pier, and the threaded hole matches the set bolt;

步骤四、连接Step 4. Connect

在钢筋II端部的螺栓处于拧紧的状态下,将钢筋I与钢筋II位置对应布置,螺栓的螺帽端与钢筋I的钢筋墩头端预留间隙,旋扭螺栓使其螺帽端部与钢筋I端部的钢筋墩头端部紧贴,移动钢筋I上的钢筋连接套筒,使钢筋墩头进入钢筋连接套筒内并被凸台卡住,扭转钢筋连接套筒,将钢筋连接套筒的内螺纹段拧入螺纹墩粗端并拧紧;When the bolt at the end of reinforcement II is in a tightened state, the positions of reinforcement I and reinforcement II are arranged correspondingly, the nut end of the bolt and the reinforcement pier end of reinforcement I reserve a gap, and the bolt is twisted so that the end of the nut is in line with The end of the steel bar head at the end of the steel bar I is close to the end, move the steel bar connecting sleeve on the steel bar I, so that the steel bar head enters the steel bar connecting sleeve and is stuck by the boss, twist the reinforcing bar connecting sleeve, and the steel bar connecting sleeve The inner threaded section of the barrel is screwed into the thick end of the threaded pier and tightened;

钢筋I与钢筋II连接完成。Rebar I is connected to Rebar II.

通过上述设计方案,本发明可以带来如下有益效果:本申请的装置及连接方法,制备加工方便且效率高,制备和施工安装成本低且连接可靠。不设置螺纹洞及匹配的螺栓时,可以提供简便且经济的、仅有抗拉需要的钢筋连接方式;设置螺纹洞及匹配的螺栓时,也可以提供有抗拉压需要的钢筋连接方式;由于不需要窜动钢筋,且钢筋连接套筒凸台内径与钢筋直径之间的间隙可以消除部分安装公差,特别适合预制混凝土构件和成品钢筋笼施工安装的钢筋连接。Through the above-mentioned design scheme, the present invention can bring the following beneficial effects: the device and connection method of the present application are convenient in preparation and processing, high in efficiency, low in preparation, construction and installation costs, and reliable in connection. When threaded holes and matching bolts are not provided, a simple and economical steel bar connection method that only requires tension resistance can be provided; when threaded holes and matching bolts are provided, a steel bar connection method that requires tensile and compression requirements can also be provided; because There is no need to move the steel bars, and the gap between the inner diameter of the boss of the steel bar connection sleeve and the steel bar diameter can eliminate part of the installation tolerance, especially suitable for the steel bar connection of prefabricated concrete components and finished steel cage construction and installation.

附图说明Description of drawings

以下结合附图和具体实施方式对本发明作进一步的说明:The present invention will be further described below in conjunction with accompanying drawing and specific embodiment:

图1为本发明的钢筋连接套筒的纵向剖面示意图。Fig. 1 is a schematic longitudinal sectional view of a steel bar connecting sleeve of the present invention.

图2为本发明的钢筋连接套筒的横向剖面示意图。Fig. 2 is a schematic cross-sectional view of the steel bar connection sleeve of the present invention.

图3为本发明的钢筋I与钢筋连接套筒的装配示意图。Fig. 3 is the assembly schematic diagram of steel bar I and steel bar connecting sleeve of the present invention.

图4为本发明的钢筋II的连接端示意图一。Fig. 4 is a first schematic diagram of the connection end of the steel bar II of the present invention.

图5为本发明的钢筋连接示意图一。Fig. 5 is a first schematic diagram of steel bar connection in the present invention.

图6为本发明的钢筋II的连接端示意图二。Fig. 6 is a second schematic diagram of the connection end of the steel bar II of the present invention.

图7为本发明的螺栓示意图。Fig. 7 is a schematic diagram of a bolt of the present invention.

图8为本发明的钢筋II与螺栓的连接示意图。Fig. 8 is a schematic diagram of the connection between steel bar II and bolts of the present invention.

图9为本发明的钢筋连接示意图二。Fig. 9 is a second schematic diagram of steel bar connection in the present invention.

图中1-钢筋连接套筒、11-凸台、2-钢筋I、3-钢筋墩头、4-钢筋II、41-螺纹墩粗端、411-螺纹洞、412-螺栓。Among the figure 1-steel bar connecting sleeve, 11-boss, 2-steel bar I, 3-steel bar pier head, 4-steel bar II, 41-threaded pier thick end, 411-threaded hole, 412-bolt.

具体实施方式detailed description

一种钢筋连接套筒,其特征是:所述钢筋连接套筒1为钢质或铸铁管材;A steel bar connection sleeve, characterized in that: the steel bar connection sleeve 1 is made of steel or cast iron pipe;

如图1和图2所示,所述钢筋连接套筒1的一端设有内螺纹,另一端一体成型设置有环状的凸台11,凸台11的内径小于钢筋连接套筒1的内径。As shown in FIGS. 1 and 2 , one end of the reinforcing bar connecting sleeve 1 is provided with an internal thread, and the other end is integrally formed with an annular boss 11 , the inner diameter of the boss 11 is smaller than that of the reinforcing bar connecting sleeve 1 .

一种钢筋的连接方法,如图3~图5所示,其特征是:采用所述的钢筋连接套筒1,包括以下步骤,且以下步骤顺次进行,A method for connecting steel bars, as shown in Figures 3 to 5, is characterized in that: adopting the steel bar connection sleeve 1 includes the following steps, and the following steps are carried out in sequence,

步骤一、钢筋连接套筒1的选取Step 1. Selection of steel bar connection sleeve 1

如图3所示,根据需要连接的钢筋的情况选择钢筋连接套筒1,钢筋的直径小于钢筋连接套筒1中凸台11的内径,将钢筋连接套筒1套入钢筋I2上,其中钢筋连接套筒1带有内螺纹一端与钢筋I2的连接端同侧;As shown in Figure 3, select the reinforcing bar connecting sleeve 1 according to the situation of the reinforcing bar to be connected, the diameter of the reinforcing bar is smaller than the inner diameter of the boss 11 in the reinforcing bar connecting sleeve 1, and the reinforcing bar connecting sleeve 1 is inserted into the reinforcing bar I2, wherein the reinforcing bar The connecting sleeve 1 has an internal thread end on the same side as the connecting end of the steel bar I2;

步骤二、钢筋的加工Step 2. Processing of steel bars

如图3所示,将钢筋I2的连接端加工成钢筋墩头3,钢筋墩头3的直径大于凸台11的内径,小于钢筋连接套筒1的内径;如图4所示,将钢筋II4的端部墩粗,并在上面加工外螺纹形成螺纹墩粗端41,螺纹墩粗端41的外螺纹与钢筋连接套筒1的内螺纹匹配;As shown in Figure 3, the connecting end of the steel bar I2 is processed into a steel bar head 3, and the diameter of the steel bar head 3 is larger than the inner diameter of the boss 11 and smaller than the inner diameter of the steel bar connecting sleeve 1; as shown in Figure 4, the steel bar II4 The end pier is thick, and external threads are processed on it to form a threaded pier thick end 41, and the external thread of the threaded pier thick end 41 matches the internal thread of the steel bar connecting sleeve 1;

步骤三、连接Step 3. Connect

如图5所示,将钢筋I2与钢筋II4位置对应布置,移动钢筋I2上的钢筋连接套筒1,使钢筋墩头3进入钢筋连接套筒1内并被凸台11卡住,扭转钢筋连接套筒1,将钢筋连接套筒1的内螺纹段拧入螺纹墩粗端41并拧紧;As shown in Figure 5, arrange the corresponding positions of steel bar I2 and steel bar II4, move the steel bar connection sleeve 1 on the steel bar I2, make the steel bar pier head 3 enter the steel bar connection sleeve 1 and be stuck by the boss 11, twist the steel bar connection Sleeve 1, screw the internal thread section of the steel bar connection sleeve 1 into the thick end 41 of the threaded pier and tighten it;

钢筋I2与钢筋II4连接完成。The connection between steel bar I2 and steel bar II4 is completed.

一种钢筋的连接方法,其特征是:A method for connecting steel bars, characterized in that:

所述步骤二、钢筋的加工与步骤三、连接之间还包括:步骤、螺纹墩粗端41加工,Said step 2, processing of steel bar and step 3, connection also include: step, processing of the butt end 41 of the threaded pier,

步骤、螺纹墩粗端41加工Step 41 processing of the butt end of the threaded pier

如图6所示,将螺纹墩粗端41端部设置螺纹洞411,如图7和图8所示,螺纹洞411匹配设置螺栓412;As shown in Figure 6, a threaded hole 411 is provided at the end of the thick end 41 of the threaded pier, as shown in Figures 7 and 8, the threaded hole 411 is matched with a bolt 412;

步骤三、连接Step 3. Connect

如图9所示,在钢筋II4端部的螺栓412处于拧紧的状态下,将钢筋I2与钢筋II4位置对应布置,螺栓412的螺帽端与钢筋I2的钢筋墩头3端预留间隙,旋扭螺栓412使其螺帽端部与钢筋I2端部的钢筋墩头3端部紧贴,移动钢筋I2上的钢筋连接套筒1,使钢筋墩头3进入钢筋连接套筒1内并被凸台11卡住,扭转钢筋连接套筒1,将钢筋连接套筒1的内螺纹段拧入螺纹墩粗端41并拧紧;As shown in Figure 9, when the bolt 412 at the end of the steel bar II4 is in a tightened state, the positions of the steel bar I2 and the steel bar II4 are arranged correspondingly, and a gap is reserved between the nut end of the bolt 412 and the steel bar head 3 of the steel bar I2, Twist the bolt 412 to make the end of the nut close to the end of the steel bar head 3 at the end of the steel bar I2, move the steel bar connection sleeve 1 on the steel bar I2, so that the steel bar head 3 enters the steel bar connection sleeve 1 and is protruded Platform 11 is stuck, twist the steel bar connecting sleeve 1, screw the internal thread section of the steel bar connecting sleeve 1 into the thick end 41 of the threaded pier and tighten it;

钢筋I2与钢筋II4连接完成。The connection between steel bar I2 and steel bar II4 is completed.

实施例1Example 1

一种钢筋的连接方法,如图3~图5所示,其特征是:采用所述的钢筋连接套筒1,包括以下步骤,且以下步骤顺次进行,A method for connecting steel bars, as shown in Figures 3 to 5, is characterized in that: adopting the steel bar connection sleeve 1 includes the following steps, and the following steps are carried out in sequence,

步骤一、钢筋连接套筒1的选取Step 1. Selection of steel bar connection sleeve 1

如图3所示,根据需要连接的钢筋的情况选择钢筋连接套筒1,钢筋的直径小于钢筋连接套筒1中凸台11的内径,将钢筋连接套筒1套入钢筋I2上,其中钢筋连接套筒1带有内螺纹一端与钢筋I2的连接端同侧;As shown in Figure 3, select the reinforcing bar connecting sleeve 1 according to the situation of the reinforcing bar to be connected, the diameter of the reinforcing bar is smaller than the inner diameter of the boss 11 in the reinforcing bar connecting sleeve 1, and the reinforcing bar connecting sleeve 1 is inserted into the reinforcing bar I2, wherein the reinforcing bar The connecting sleeve 1 has an internal thread end on the same side as the connecting end of the steel bar I2;

步骤二、钢筋的加工Step 2. Processing of steel bars

如图3所示,将钢筋I2的连接端加工成钢筋墩头3,钢筋墩头3的直径大于凸台11的内径,小于钢筋连接套筒1的内径;如图4所示,将钢筋II4的端部墩粗,并在上面加工外螺纹形成螺纹墩粗端41,螺纹墩粗端41的外螺纹与钢筋连接套筒1的内螺纹匹配;As shown in Figure 3, the connecting end of the steel bar I2 is processed into a steel bar head 3, and the diameter of the steel bar head 3 is larger than the inner diameter of the boss 11 and smaller than the inner diameter of the steel bar connecting sleeve 1; as shown in Figure 4, the steel bar II4 The end pier is thick, and external threads are processed on it to form a threaded pier thick end 41, and the external thread of the threaded pier thick end 41 matches the internal thread of the steel bar connecting sleeve 1;

步骤三、连接Step 3. Connect

如图5所示,将钢筋I2与钢筋II4位置对应布置,移动钢筋I2上的钢筋连接套筒1,使钢筋墩头3进入钢筋连接套筒1内并被凸台11卡住,扭转钢筋连接套筒1,将钢筋连接套筒1的内螺纹段拧入螺纹墩粗端41并拧紧;As shown in Figure 5, arrange the corresponding positions of steel bar I2 and steel bar II4, move the steel bar connection sleeve 1 on the steel bar I2, make the steel bar pier head 3 enter the steel bar connection sleeve 1 and be stuck by the boss 11, twist the steel bar connection Sleeve 1, screw the internal thread section of the steel bar connection sleeve 1 into the thick end 41 of the threaded pier and tighten it;

钢筋I2与钢筋II4连接完成。The connection between steel bar I2 and steel bar II4 is completed.

实施例2Example 2

一种钢筋的连接方法,如图3、图4、图6~图9所示,其特征是:采用所述的钢筋连接套筒1,包括以下步骤,且以下步骤顺次进行,A method for connecting steel bars, as shown in Figures 3, 4, and 6 to 9, is characterized in that: using the steel bar connecting sleeve 1 includes the following steps, and the following steps are carried out in sequence,

步骤一、钢筋连接套筒1的选取Step 1. Selection of steel bar connection sleeve 1

如图3所示,根据需要连接的钢筋的情况选择钢筋连接套筒1,钢筋的直径小于钢筋连接套筒1中凸台11的内径,将钢筋连接套筒1套入钢筋I2上,其中钢筋连接套筒1带有内螺纹一端与钢筋I2的连接端同侧;As shown in Figure 3, select the reinforcing bar connecting sleeve 1 according to the situation of the reinforcing bar to be connected, the diameter of the reinforcing bar is smaller than the inner diameter of the boss 11 in the reinforcing bar connecting sleeve 1, and the reinforcing bar connecting sleeve 1 is inserted into the reinforcing bar I2, wherein the reinforcing bar The connecting sleeve 1 has an internal thread end on the same side as the connecting end of the steel bar I2;

步骤二、钢筋的加工Step 2. Processing of steel bars

如图3所示,将钢筋I2的连接端加工成钢筋墩头3,钢筋墩头3的直径大于凸台11的内径,小于钢筋连接套筒1的内径;如图4所示,将钢筋II4的端部墩粗,并在上面加工外螺纹形成螺纹墩粗端41,螺纹墩粗端41的外螺纹与钢筋连接套筒1的内螺纹匹配;As shown in Figure 3, the connecting end of the steel bar I2 is processed into a steel bar head 3, and the diameter of the steel bar head 3 is larger than the inner diameter of the boss 11 and smaller than the inner diameter of the steel bar connecting sleeve 1; as shown in Figure 4, the steel bar II4 The end pier is thick, and external threads are processed on it to form a threaded pier thick end 41, and the external thread of the threaded pier thick end 41 matches the internal thread of the steel bar connecting sleeve 1;

步骤三、螺纹墩粗端41加工Step 3. Processing of the butt end 41 of the threaded pier

如图6所示,将螺纹墩粗端41端部设置螺纹洞411,如图7和图8所示,螺纹洞411匹配设置螺栓412;As shown in Figure 6, a threaded hole 411 is provided at the end of the thick end 41 of the threaded pier, as shown in Figures 7 and 8, the threaded hole 411 is matched with a bolt 412;

步骤四、连接Step 4. Connect

如图9所示,在钢筋II4端部的螺栓412处于拧紧的状态下,将钢筋I2与钢筋II4位置对应布置,螺栓412的螺帽端与钢筋I2的钢筋墩头3端预留间隙,旋扭螺栓412使其螺帽端部与钢筋I2端部的钢筋墩头3端部紧贴,移动钢筋I2上的钢筋连接套筒1,使钢筋墩头3进入钢筋连接套筒1内并被凸台11卡住,扭转钢筋连接套筒1,将钢筋连接套筒1的内螺纹段拧入螺纹墩粗端41并拧紧;As shown in Figure 9, when the bolt 412 at the end of the steel bar II4 is in a tightened state, the positions of the steel bar I2 and the steel bar II4 are arranged correspondingly, and a gap is reserved between the nut end of the bolt 412 and the steel bar head 3 of the steel bar I2, Twist the bolt 412 to make the end of the nut close to the end of the steel bar head 3 at the end of the steel bar I2, move the steel bar connection sleeve 1 on the steel bar I2, so that the steel bar head 3 enters the steel bar connection sleeve 1 and is protruded Platform 11 is stuck, twist the steel bar connecting sleeve 1, screw the internal thread section of the steel bar connecting sleeve 1 into the thick end 41 of the threaded pier and tighten it;

钢筋I2与钢筋II4连接完成。The connection between steel bar I2 and steel bar II4 is completed.

实施例1所述的钢筋连接方式,通过钢筋连接套筒1与螺纹墩粗端41的螺纹连接以及凸台11与钢筋墩头3的卡紧作用,钢筋连接套筒1能够有效传递连接钢筋的拉力,起到抗拉作用,由于连接钢筋的两端可能存在间隙,钢筋连接套筒1没有与钢筋I2实施螺纹连接,钢筋连接套筒1不能有效传递压力,不能起到抗压作用,但由于连接构造简单方便、成本低,特别适合没有抗压需求情况下的钢筋连接。In the steel bar connection method described in Embodiment 1, through the threaded connection between the steel bar connecting sleeve 1 and the thick end 41 of the threaded pier and the clamping action between the boss 11 and the steel bar pier head 3, the steel bar connecting sleeve 1 can effectively transmit the force of the connected steel bar. Tensile force plays the role of tensile force. Since there may be a gap between the two ends of the connecting steel bar, the steel bar connecting sleeve 1 is not threaded with the steel bar I2. The steel bar connecting sleeve 1 cannot effectively transmit pressure and cannot play a role in compressive resistance. The connection structure is simple and convenient, and the cost is low, and it is especially suitable for the connection of steel bars when there is no need for compression resistance.

实施例2所述的钢筋连接方式,是在实施例1解决了抗拉作用的基础上,增设了螺纹洞411和螺栓412,通过旋扭螺栓412使其螺帽端部与钢筋I2端部的钢筋墩头3端部紧贴,消除因方便安装需要而设置的螺栓412的螺帽端与钢筋I2的钢筋墩头3端得预留间隙,这样就能够有效传递压力而起到抗压作用,适合于既有抗拉、又有抗压需求情况下的钢筋连接。The steel bar connection method described in embodiment 2 is based on solving the tension effect in embodiment 1, and a threaded hole 411 and a bolt 412 are added, and the end of the nut is connected to the end of the steel bar I2 by twisting the bolt 412. The end of the steel bar head 3 is close to each other, eliminating the gap reserved between the nut end of the bolt 412 and the steel bar head 3 end of the steel bar I2 for the convenience of installation, so that the pressure can be effectively transmitted and the pressure resistance can be achieved. It is suitable for the connection of steel bars with both tensile and compressive requirements.

以上所述仅为本发明优选的实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (1)

1.一种钢筋的连接方法,使用钢筋连接套筒连接,所述钢筋连接套筒(1)为钢质或铸铁管材;所述钢筋连接套筒(1)的一端设有内螺纹,另一端的内侧一体成型设置有环状的凸台(11),凸台(11)的内径小于钢筋连接套筒(1)的内径;其特征是:包括以下步骤,且以下步骤顺次进行,1. A connection method for steel bars, using a steel bar connection sleeve to connect, and the steel bar connection sleeve (1) is steel or cast iron pipes; one end of the steel bar connection sleeve (1) is provided with an internal thread, and the other end An annular boss (11) is integrally formed on the inner side of the boss (11), and the inner diameter of the boss (11) is smaller than the inner diameter of the steel bar connection sleeve (1); it is characterized in that: the following steps are included, and the following steps are carried out in sequence, 步骤一、钢筋连接套筒(1)的选取Step 1. Selection of steel bar connection sleeve (1) 根据需要连接的钢筋的情况选择钢筋连接套筒(1),钢筋的直径小于钢筋连接套筒(1)中凸台(11)的内径,将钢筋连接套筒(1)套入钢筋I(2)上,其中钢筋连接套筒(1)带有内螺纹一端与钢筋I(2)的连接端同侧;Select the reinforcing bar connecting sleeve (1) according to the situation of the reinforcing bar to be connected, the diameter of the reinforcing bar is less than the inner diameter of the boss (11) in the reinforcing bar connecting sleeve (1), insert the reinforcing bar connecting sleeve (1) into the reinforcing bar I (2 ), where the end of the steel bar connecting sleeve (1) with internal thread is on the same side as the connecting end of the steel bar I (2); 步骤二、钢筋的加工Step 2. Processing of steel bars 将钢筋I(2)的连接端加工成钢筋墩头(3),钢筋墩头(3)的直径大于凸台(11)的内径,小于钢筋连接套筒(1)的内径;将钢筋II(4)的端部墩粗,并在上面加工外螺纹形成螺纹墩粗端(41),螺纹墩粗端(41)的外螺纹与钢筋连接套筒(1)的内螺纹匹配;The connecting end of reinforcing bar I (2) is processed into reinforcing bar pier (3), and the diameter of reinforcing bar pier (3) is greater than the inner diameter of boss (11), less than the inner diameter of reinforcing bar connecting sleeve (1); 4) the end pier is thick, and external threads are processed on it to form a threaded pier butt (41), and the external thread of the threaded pier butt (41) matches the internal thread of the steel bar connecting sleeve (1); 步骤三、螺纹墩粗端(41)加工Step 3. Processing of the butt end (41) of the threaded pier 将螺纹墩粗端(41)端部设置螺纹洞(411),螺纹洞(411)匹配设置螺栓(412);A threaded hole (411) is provided at the end of the butt end (41) of the threaded pier, and the threaded hole (411) is matched with a bolt (412); 步骤四、连接Step 4. Connect 在钢筋II(4)端部的螺栓(412)处于拧紧的状态下,将钢筋I(2)与钢筋II(4)位置对应布置,螺栓(412)的螺帽端与钢筋I(2)的钢筋墩头(3)端预留间隙,旋扭螺栓(412)使其螺帽端部与钢筋I(2)端部的钢筋墩头(3)端部紧贴,移动钢筋I(2)上的钢筋连接套筒(1),使钢筋墩头(3)进入钢筋连接套筒(1)内并被凸台(11)卡住,扭转钢筋连接套筒(1),将钢筋连接套筒(1)的内螺纹段拧入螺纹墩粗端(41)并拧紧;When the bolt (412) at the end of the reinforcing bar II (4) is in a tightened state, the reinforcing bar I (2) is arranged correspondingly to the position of the reinforcing bar II (4), and the nut end of the bolt (412) is connected to the position of the reinforcing bar I (2) Reserve a gap at the end of the steel bar pier (3), twist the bolt (412) to make the end of the nut close to the end of the steel bar pier (3) at the end of the steel bar I (2), move the steel bar I (2) the steel bar connecting sleeve (1), so that the steel bar pier head (3) enters the steel bar connecting sleeve (1) and is stuck by the boss (11), twists the reinforcing bar connecting sleeve (1), and the reinforcing bar connecting sleeve ( 1) The internal thread section is screwed into the thick end of the threaded pier (41) and tightened; 钢筋I(2)与钢筋II(4)连接完成。Reinforcement I (2) and reinforcement II (4) are connected.
CN202110533352.3A 2021-05-17 2021-05-17 A method of connecting steel bars Active CN113216522B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110533352.3A CN113216522B (en) 2021-05-17 2021-05-17 A method of connecting steel bars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110533352.3A CN113216522B (en) 2021-05-17 2021-05-17 A method of connecting steel bars

Publications (2)

Publication Number Publication Date
CN113216522A CN113216522A (en) 2021-08-06
CN113216522B true CN113216522B (en) 2022-12-23

Family

ID=77092285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110533352.3A Active CN113216522B (en) 2021-05-17 2021-05-17 A method of connecting steel bars

Country Status (1)

Country Link
CN (1) CN113216522B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117627285A (en) * 2023-12-05 2024-03-01 浙江数智交院科技股份有限公司 A componentized steel bar joint device and joint method

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007084300A1 (en) * 2006-01-13 2007-07-26 Erico International Corporation Reinforcing bar splice with threaded collars
CN201217890Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Nested grouting reinforced steel coupling sleeve
CN202324365U (en) * 2011-10-28 2012-07-11 张吉华 Steel bar connecting sleeve of fabricated constructional member of reinforced concrete member
CN102653989B (en) * 2012-04-24 2013-05-15 昆山市城建建筑安装工程有限公司 Steel bar rolling straight-thread sleeve connection construction method
CN104234326A (en) * 2014-09-12 2014-12-24 中国中建设计集团有限公司 Precast concrete member connected by straight thread and pier head lock anchor grouting sleeve, and method for assembling same
JP5869716B1 (en) * 2014-12-08 2016-02-24 株式会社トーカイ Threaded rebar joint of deformed bar
CN207829305U (en) * 2018-01-12 2018-09-07 中国水利水电第五工程局有限公司 A kind of anti-skidding straight thread connecting sleeve with cramping body
CN108316563A (en) * 2018-04-08 2018-07-24 李藏柱 Sleeve outer nut plug-in attachment device and its connection structure and its installation method
CN108360755A (en) * 2018-04-10 2018-08-03 四川林彬彬装配式建筑科技有限公司 A kind of reinforced concrete column joint reinforcing bar connection structure
CN209482595U (en) * 2018-07-27 2019-10-11 袁雪峰 Precast concrete connector
CN212295351U (en) * 2020-05-18 2021-01-05 何文娟 Assembly type structural steel bar straight thread connecting device

Also Published As

Publication number Publication date
CN113216522A (en) 2021-08-06

Similar Documents

Publication Publication Date Title
CN103899043B (en) Embedded pyramidal half grout sleeve
CN105666688B (en) A kind of prefabricated pile, pile body and production method
CN102051964A (en) Composite sleeve type steel bar connecting device
CN105155781A (en) Reinforced connecting structure and method between precast reinforced concrete components
CN205421238U (en) Prefabricated pile body
CN101509302B (en) Single steel strand stay plant and assembling method thereof
CN103469967B (en) Steel bar connecting sleeve of fabricated constructional member of reinforced concrete member
CN202131717U (en) Composite joint made of twisted steel and used for cement grouting
CN204112606U (en) The branch sleeve of steel concrete supporting
CN205348589U (en) One end extrusion anchored half grout sleeve steel bar connection connect
CN205329521U (en) Steel reinforcement cage owner muscle sleeve connecting device and steel reinforcement cage owner muscle connection structure
CN113914550A (en) Flexible connection node of non-collinear reinforcing steel bar mechanical sleeve
CN110616855A (en) Steel bar mechanical connection structure and connection method for prefabricated concrete structure
CN114517561B (en) A flexible reinforcement prefabricated assembly connection structure and construction method thereof
CN201991142U (en) Composite sleeve type rebar connecting device
CN101638913B (en) Non-stretching straight-thread connection method of concrete beam reinforcing steel bars between two section steel columns
CN113216522A (en) Steel bar connecting sleeve and steel bar connecting method
CN204098358U (en) Grout sleeve bar connecting assembly
CN107190918A (en) A kind of steel strand connector
CN211172720U (en) Mechanical connection structure of steel bars for prefabricated concrete structure
CN113404218B (en) Half grouting sleeve of screw hole is connected to no reinforcing bar
CN110388003A (en) A New Type of Reinforcement Connecting Components
CN215106623U (en) Prefabricated continuous-connection waist bar, assembled prefabricated concrete beam and beam column connecting joint
CN106639165A (en) Butt muff
CN208023421U (en) A kind of tensioning equipment accurately controlling prestress value

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20221202

Address after: 130118 No. 5088 Xincheng Street, Changchun City, Jilin Province

Applicant after: JILIN JIANZHU University

Address before: 130000 Yushan Road 2499, Changchun High-tech Zone, Jilin Province

Applicant before: Jilin Jianzhu University Design and Research Institute Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230529

Address after: 433001 No.13, Zhizhi Road, Xiantao Industrial Park, Hubei Province

Patentee after: Chuangji Construction Group Co.,Ltd.

Address before: 130118 No. 5088 Xincheng Street, Changchun City, Jilin Province

Patentee before: JILIN JIANZHU University

TR01 Transfer of patent right