CN113187316A - Steel structure scaffold - Google Patents
Steel structure scaffold Download PDFInfo
- Publication number
- CN113187316A CN113187316A CN202110439395.5A CN202110439395A CN113187316A CN 113187316 A CN113187316 A CN 113187316A CN 202110439395 A CN202110439395 A CN 202110439395A CN 113187316 A CN113187316 A CN 113187316A
- Authority
- CN
- China
- Prior art keywords
- connecting shaft
- plate
- groove
- adjusting plate
- adjusting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 23
- 239000010959 steel Substances 0.000 title claims abstract description 23
- 230000001105 regulatory effect Effects 0.000 claims abstract description 11
- 238000010276 construction Methods 0.000 claims description 34
- 230000003028 elevating effect Effects 0.000 abstract 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
- E04H17/20—Posts therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
- E04H17/20—Posts therefor
- E04H17/22—Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
Description
技术领域technical field
本发明属于钢结构的技术领域,具体涉及一种钢结构施工架。The invention belongs to the technical field of steel structures, and in particular relates to a steel structure construction frame.
背景技术Background technique
现有的施工架在施工过程中,施工架放置在不同的施工底面时,如果施工底面凹凸不平,施工架的安装很难放置水平,如果施工架安装不平稳则会引起安全事故。目前现有技术的底部都是固定的,施工架的底部无法根据地面进行适应性安装,这给使用和安全施工带来了极大的不便。为此,急需开发一种能根据地面情况进行适应性安装的钢结构施工架。During the construction process of the existing construction frame, when the construction frame is placed on different construction bottom surfaces, if the construction bottom surface is uneven, it is difficult to install the construction frame horizontally, and if the construction frame is not installed smoothly, it will cause a safety accident. At present, the bottom of the existing technology is fixed, and the bottom of the construction frame cannot be installed adaptively according to the ground, which brings great inconvenience to the use and safe construction. For this reason, it is urgent to develop a steel structure construction frame that can be adaptively installed according to the ground conditions.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于针对现有技术的不足之处,提供一种钢结构施工架,该钢结构施工架能根据地面的情况进行适应性调整,从而保证施工架的安全和稳固。The purpose of the present invention is to provide a steel structure construction frame in view of the deficiencies of the prior art, the steel structure construction frame can be adaptively adjusted according to the ground conditions, thereby ensuring the safety and stability of the construction frame.
为解决上述技术问题,本发明采用如下技术方案:In order to solve the above-mentioned technical problems, the present invention adopts the following technical solutions:
一种钢结构施工架,包括多根第一架体、多根第二架体以及设置在第一架体端部的调节装置;其中,A steel structure construction frame, comprising a plurality of first frame bodies, a plurality of second frame bodies and an adjusting device arranged at the end of the first frame body; wherein,
第一架体,在其一端的端面上设置有凹槽,多根第一架体平行且间隔设置;The first frame body is provided with a groove on the end face of one end thereof, and a plurality of first frame bodies are arranged in parallel and at intervals;
第二架体,多根第一架体通过第二架体进行连接;The second frame body, a plurality of first frame bodies are connected through the second frame body;
调节装置,其包括滑动设置在第一凹槽相对的两侧壁上的第一调节板、用于调节第一调节板升降的升降装置,在第一调节板上沿高度方向设置有第一通孔,所述升降装置包括一端伸入至凹槽内并穿过第一通孔再转动设置在凹槽的侧壁上的第一连接轴、套设在第一连接轴上的第一齿轮、沿高度方向设置在第一通孔的侧壁上且与所述第一齿轮啮合的第一齿条;The adjusting device includes a first adjusting plate slidably arranged on two opposite side walls of the first groove, a lifting device for adjusting the lifting and lowering of the first adjusting plate, and a first adjusting plate is provided along the height direction on the first adjusting plate The lifting device includes a first connecting shaft with one end extending into the groove and passing through the first through hole and then being rotated and arranged on the side wall of the groove, a first gear sleeved on the first connecting shaft, a first rack that is arranged on the side wall of the first through hole in the height direction and meshes with the first gear;
转动第一连接轴,第一连接轴转动进而带动第一齿轮在第一齿条上转动从而使得与第一齿条连接的第一调节板上下移动。When the first connecting shaft is rotated, the first connecting shaft rotates and then drives the first gear to rotate on the first rack so that the first adjusting plate connected with the first rack moves up and down.
进一步地,所述调节装置还包括与所述升降装置连接的第二调节板,在第二调节板上沿其高度方向设置有第二通孔,所述升降装置还包括通过紧配合的方式套装在第一连接轴上的第一蜗杆、与第一蜗杆啮合的第一蜗轮、通过紧配合的方式设置在第一蜗轮上的第二连接轴、套装在第二连接轴顶端的第二蜗轮、与第二蜗轮啮合的第二蜗杆、与第二蜗杆通过紧配合的方式连接的第三连接轴、套设在第三连接轴上的第二齿轮、与第二齿轮啮合且沿高度方向设置在第二调节板的第二齿条。Further, the adjusting device further includes a second adjusting plate connected with the lifting device, a second through hole is provided on the second adjusting plate along the height direction thereof, and the lifting device further comprises a set by means of tight fitting. The first worm on the first connecting shaft, the first worm gear meshing with the first worm, the second connecting shaft set on the first worm gear by tight fitting, the second worm gear sleeved on the top of the second connecting shaft, The second worm that meshes with the second worm gear, the third connecting shaft that is connected to the second worm through a tight fit, the second gear that is sleeved on the third connecting shaft, that meshes with the second gear and is arranged in the height direction. The second rack of the second adjusting plate.
进一步地,在第一架体的侧壁上还设置有滑道,第二调节板通过滑块滑接在滑道中。Further, a slideway is also provided on the side wall of the first frame body, and the second adjustment plate is slidably connected to the slideway through the slider.
进一步地,所述调节装置还包括与第一调节板伸出凹槽外的一端垂直连接的支撑座,当所述升降装置带动所述第二调节板下降到一定距离后,所述第二调节板抵压在所述支撑座上。Further, the adjusting device further includes a support seat vertically connected to the end of the first adjusting plate protruding out of the groove, when the lifting device drives the second adjusting plate to descend to a certain distance, the second adjusting plate The plate is pressed against the support seat.
进一步地,还包括与第一连接轴连接的限位装置,限位装置包括与第一连接轴露出于第一通孔外的一端固定连接的旋转板、设置在旋转板上的孔、穿设在孔中的导向杆、套设在导向杆上的弹簧、设置在导向杆远离凹槽一端端侧的拉板以及设置在第一架体侧壁上且与导向杆对应设置的限位孔,其中,弹簧被限位在旋转板和拉板之间,当弹簧处于自然伸出状态下,导向杆卡设在限位孔中。Further, it also includes a limiting device connected with the first connecting shaft, and the limiting device includes a rotating plate fixedly connected with the end of the first connecting shaft exposed outside the first through hole, a hole provided on the rotating plate, a hole through the rotating plate, and a rotating plate. The guide rod in the hole, the spring sleeved on the guide rod, the pull plate set on the end side of the guide rod away from the groove, and the limit hole set on the side wall of the first frame body and corresponding to the guide rod, Wherein, the spring is limited between the rotating plate and the pulling plate, and when the spring is in a state of natural extension, the guide rod is clamped in the limiting hole.
进一步地,在凹槽的内壁上两相对的侧壁上沿其高度方向设置有滑槽,第一调节板的两侧分别通过滑板滑接在对应的滑槽中。Further, two opposite side walls on the inner wall of the groove are provided with sliding grooves along the height direction thereof, and two sides of the first regulating plate are respectively slidably connected to the corresponding sliding grooves through the sliding plates.
进一步地,在凹槽的侧壁上水平设置有一固定板,第二连接轴的一端转动地设置在固定板上,第二连接轴的另一端转动地设置在凹槽的底面上。Further, a fixing plate is horizontally arranged on the side wall of the groove, one end of the second connecting shaft is rotatably arranged on the fixing plate, and the other end of the second connecting shaft is rotatably arranged on the bottom surface of the groove.
与现有技术相比,本发明的有益效果为:本发明通过在第一架体的底部设置升降装置和限位装置等一系列构件,使施工架能够根据不同的施工地面进行适应性调节,让施工架能够始终保持平稳,在凹凸不平的路面也能够进行快速稳当的安装和使用,进而避免放置时发生不稳当的现象,大大提高了施工架的安全性和实用性。Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention enables the construction frame to be adaptively adjusted according to different construction grounds by arranging a series of components such as a lifting device and a limiting device at the bottom of the first frame body. The construction frame can be kept stable all the time, and it can be installed and used quickly and steadily on uneven road surfaces, thereby avoiding the phenomenon of instability during placement, and greatly improving the safety and practicability of the construction frame.
附图说明Description of drawings
图1为本发明实施例钢结构施工架的结构主视图;Fig. 1 is the structural front view of the steel structure construction frame of the embodiment of the present invention;
图2为本发明实施例钢结构施工架的A部分放大结构示意图;Fig. 2 is the enlarged structural schematic diagram of part A of the steel structure construction frame of the embodiment of the present invention;
图3为本发明实施例钢结构施工架的第二调节板结构侧视图;Fig. 3 is the side view of the second adjusting plate structure of the steel structure construction frame according to the embodiment of the present invention;
图4为本发明实施例钢结构施工架的第二蜗轮与第二蜗杆配合结构示意图。FIG. 4 is a schematic diagram of the matching structure of the second worm gear and the second worm of the steel structure construction frame according to the embodiment of the present invention.
具体实施方式Detailed ways
下面将结合本发明实施例对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动的前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
需要说明的是,在不冲突的情况下,本发明中的实施例及实施例中的特征可以相互组合。It should be noted that the embodiments of the present invention and the features of the embodiments may be combined with each other under the condition of no conflict.
下面结合具体实施例对本发明作进一步说明,但不作为本发明的限定。The present invention will be further described below in conjunction with specific embodiments, but not as a limitation of the present invention.
参照图1-4,本发明公开了一种钢结构施工架,包括间隔设置的多个第一架体1、多个第二架体2以及设置在第一架体2底端的调节装置。多个第一架体1平行且间隔设置,且多个第一架体2通过多个第二架体2连接,多个第二架体2在多个第一架体 1上平行且间隔设置。调节装置包括开设在第一架体1的底端端面上的第一凹槽3、滑动设置在第一凹槽3相对的两侧壁上的第一调节板5、用于调节第一调节板升降的升降装置、与升降装置连接且滑动设置在第一架体底端外侧壁上的第二调节板以及与第一调节板5底端固定连接的支撑座16。为了方便第一调节板5的滑动,在第一凹槽3 相对的两侧壁上沿高度方向对应设置有滑槽,第一调节板5的两侧分别通过滑板4对应地滑接在相应的滑槽中,其中第一调节板5伸出至第一凹槽3外的端侧固定有支撑座16。为了方便升降装置的安装,在第一调节板5上开设有沿水平方向贯穿的长条形第一通孔。1-4 , the present invention discloses a steel structure construction frame, which includes a plurality of
升降装置包括一端伸入至凹槽中并穿过第一通孔后转动设置在凹槽相对的另一侧壁上的第一连接轴6、套设在第一连接轴6上的第一齿轮、沿高度方向设置在第一通孔中且与第一齿轮啮合的第一齿条、通过紧配合的方式套装在第一连接轴6上的第一蜗杆、与第一蜗杆啮合的第一蜗轮、通过紧配合的方式设置在第一蜗轮轴上的第二连接轴12、套装在第二连接轴12顶端的第二蜗轮19、与第二蜗轮19啮合的第二蜗杆 18、与第二蜗杆18通过紧配合的方式连接的第三连接轴13、套设在第三连接轴13上的第二齿轮21、与第二齿轮21啮合且沿高度方向设置在第二调节板的第二齿条22。第一连接轴6的一端穿过凹槽的一侧壁和第一通孔后转动设置在凹槽相对的另一侧壁,第一连接轴6的另一端露出于凹槽外,从而便于转动第一连接轴6。第一齿条沿高度方向设置在第一通孔的侧壁上且其于第一齿轮啮合,这样当第一齿轮转动时,在第一齿轮的推动下,第一齿条上下移动从而带动第一调节板5上下移动,滑板4的设置可以提高第一调节板5运动过程中的稳定性。在凹槽的侧壁底部还水平设置有固定板11,第二连接轴12的一端转动地设置在固定板11上,第二连接轴12的另一端转动设置在凹槽的底面上,第一蜗杆转动过程中通过第一蜗轮带动第二连接轴12转动。第二连接轴12转动带动第二蜗轮转动进而通过第二蜗杆带动第三连接轴13转动。为了提高第三连接轴13的稳定性,将第三连接轴13的自由端可转动设置凹槽的侧壁上,第三连接轴13的另一端穿过凹槽的侧壁于第二调节板15转动连接。第三连接轴 13转动通过第二齿轮带动第二齿条上下移动进行带动第二调节板上下移动。在本实施例中,在第二调节板15上也沿其高度方向设置有长条形第二通孔20,第二齿条22沿高度方向设置在该长条形第二通孔20中。为了提高第二调节板15上下移动的稳定性,在第一架体1的外侧壁上设置有滑道,第二调节板15通过滑块14滑接在滑道中。The lifting device includes a first connecting shaft 6 with one end extending into the groove and passing through the first through hole and then rotatably arranged on the other side wall opposite to the groove, and a first gear sleeved on the first connecting shaft 6 , a first rack that is arranged in the first through hole in the height direction and meshed with the first gear, a first worm that is sleeved on the first connecting shaft 6 by a tight fit, and a first worm gear that meshes with the first worm , The second connecting
为了提高升降装置结构的稳定性,钢结构施工架还包括限位装置,该限位装置包括与第一连接轴6露出于第一通孔外的一端固定连接的旋转板7、设置在旋转板7上的圆孔、穿设在圆孔中的导向杆8、套设在导向杆8上的弹簧10、设置在导向杆8远离凹槽的一端端侧的拉板9以及设置在第一架体1的侧壁上且与导向杆8对应设置的限位孔。在本实施例中,在旋转板7上设置有多个圆孔,每个圆孔中均穿设有一导向杆8,导向杆8上的弹簧10被限位在拉板和旋转板7之间。在弹簧处于自然伸长状态下,导向杆卡设在第一架体1上的限位孔中。In order to improve the stability of the lifting device structure, the steel structure construction frame also includes a limit device, the limit device includes a rotating plate 7 fixedly connected to the end of the first connecting shaft 6 exposed outside the first through hole, a rotating plate 7 arranged on the rotating plate 7, the
在应用本实施例的钢结构施工架时,当在不同凹凸的地面使用该钢结构施工架时,移动第一架体1,通过拉动拉板9,拉板9带动导向杆8,导向杆8与限位孔分离,然后转动旋转板7,旋转板7带动第一连接轴6进行旋转,第一连接轴6带动第一齿轮进行旋转,第一齿轮与第一齿条之间啮合传动带动第一调节板5进行移动,第一调节板5带动支撑座16进行移动,调节支撑座16伸出的距离,使支撑座16接触地面,进行支撑,同时第一连接轴6带动第一蜗杆17进行旋转,第一蜗杆17与第一蜗轮啮合传动带动第二蜗轮19进行旋转,第二蜗轮19与第二蜗杆18进行旋转带动第三连接轴13进行旋转,第三连接轴13带动第二齿轮21进行旋转,使第二调节板15进行移动,增加支撑座16的稳定性,最后松开拉板9,在弹簧10的弹力作用下,导向杆8与被限位在限位孔中,从而升降装置也被限定,保证了结构的稳定性。When the steel structure construction frame of this embodiment is applied, when the steel structure construction frame is used on different uneven ground, the
以上仅为本发明较佳的实施例,并非因此限制本发明的实施方式及保护范围,对于本领域技术人员而言,应当能够意识到凡运用本发明说明书内容所作出的等同替换和显而易见的变化所得到的方案,均应当包含在本发明的保护范围内。The above are only preferred embodiments of the present invention, and are not intended to limit the embodiments and protection scope of the present invention. Those skilled in the art should be aware of the equivalent replacements and obvious changes made by using the contents of the description of the present invention. The obtained solutions should all be included in the protection scope of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110439395.5A CN113187316A (en) | 2021-04-23 | 2021-04-23 | Steel structure scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110439395.5A CN113187316A (en) | 2021-04-23 | 2021-04-23 | Steel structure scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN113187316A true CN113187316A (en) | 2021-07-30 |
Family
ID=76978476
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202110439395.5A Pending CN113187316A (en) | 2021-04-23 | 2021-04-23 | Steel structure scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN113187316A (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN208137380U (en) * | 2018-03-05 | 2018-11-23 | 天津创大科技发展有限公司 | A kind of construction site heavy frame |
| CN211425493U (en) * | 2020-03-27 | 2020-09-04 | 辽宁省产品质量监督检验院(辽宁省建筑材料监督检验院) | Indoor air quality sampling support |
| CN212650155U (en) * | 2020-07-07 | 2021-03-05 | 柳州市鑫鑫农业科技有限公司 | Novel water planting vegetable seedling planting basin |
| CN212743557U (en) * | 2020-05-24 | 2021-03-19 | 绵阳同心圆科技有限公司 | Self-growing self-supporting device |
| CN212945567U (en) * | 2020-09-10 | 2021-04-13 | 张青珣 | Drilling device for aerospace parts |
| CN212961337U (en) * | 2020-10-12 | 2021-04-13 | 齐鲁工业大学 | Rotatable landscape lamp |
-
2021
- 2021-04-23 CN CN202110439395.5A patent/CN113187316A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN208137380U (en) * | 2018-03-05 | 2018-11-23 | 天津创大科技发展有限公司 | A kind of construction site heavy frame |
| CN211425493U (en) * | 2020-03-27 | 2020-09-04 | 辽宁省产品质量监督检验院(辽宁省建筑材料监督检验院) | Indoor air quality sampling support |
| CN212743557U (en) * | 2020-05-24 | 2021-03-19 | 绵阳同心圆科技有限公司 | Self-growing self-supporting device |
| CN212650155U (en) * | 2020-07-07 | 2021-03-05 | 柳州市鑫鑫农业科技有限公司 | Novel water planting vegetable seedling planting basin |
| CN212945567U (en) * | 2020-09-10 | 2021-04-13 | 张青珣 | Drilling device for aerospace parts |
| CN212961337U (en) * | 2020-10-12 | 2021-04-13 | 齐鲁工业大学 | Rotatable landscape lamp |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112609973B (en) | A large concrete wall formwork support device | |
| CN113022369B (en) | A new energy vehicle battery dismantling device | |
| CN113202908A (en) | Adjusting device for chain of coal mine elevator | |
| CN210097120U (en) | A disc filter cleaning device that is easy to move and adjust the height | |
| CN216815405U (en) | Height measuring device for engineering investigation and monitoring | |
| CN113187316A (en) | Steel structure scaffold | |
| CN113182884B (en) | Self-positioning standard section total length shearing equipment and method of using the same | |
| CN212612504U (en) | Inner supporting structure for foundation pit | |
| CN216516763U (en) | But height-adjusting's multi-functional storing scaffold frame | |
| CN117039733A (en) | Cable laying frame for cable installation | |
| CN217327353U (en) | A lift-type tunnel steel arch support device | |
| CN110986862B (en) | New energy vehicle angle detection device that detection accuracy is high | |
| CN211094191U (en) | Fixing and adjusting device for X-ray source assembly | |
| CN212403204U (en) | Building construction lifting device | |
| CN210860364U (en) | Monitoring support convenient to adjust length | |
| CN210716779U (en) | Video recording device for micro-class teaching | |
| CN211597641U (en) | But height-adjusting's stable form engineering construction scaffold | |
| CN211502173U (en) | Three-axis intelligent computer screen | |
| CN220556083U (en) | Hydraulic pipeline supporting device for hydraulic engineering construction | |
| CN220819110U (en) | River levee monitoring facilities for hydraulic engineering | |
| CN216587578U (en) | Construction support of rural area construction engineering | |
| CN222486684U (en) | A lifting whiteboard | |
| CN218758529U (en) | Fireproof door installation and construction auxiliary device | |
| CN219730361U (en) | A kind of jacking structure of tower crane | |
| CN221777453U (en) | A kind of lifting equipment for subway platform installation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210730 |
|
| RJ01 | Rejection of invention patent application after publication |