CN113152749B - A dry-hanging clay panel curtain wall structure - Google Patents

A dry-hanging clay panel curtain wall structure Download PDF

Info

Publication number
CN113152749B
CN113152749B CN202110440153.8A CN202110440153A CN113152749B CN 113152749 B CN113152749 B CN 113152749B CN 202110440153 A CN202110440153 A CN 202110440153A CN 113152749 B CN113152749 B CN 113152749B
Authority
CN
China
Prior art keywords
plate
bolt
hanging
groove
cross beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110440153.8A
Other languages
Chinese (zh)
Other versions
CN113152749A (en
Inventor
韩瑞峰
李旭峰
景凯
张强
倪秉良
冯瑞杰
王栋
董挚
霍鑫润
暴睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Construction Engineering Group Co Ltd
Original Assignee
Shanxi Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Construction Engineering Group Co Ltd filed Critical Shanxi Construction Engineering Group Co Ltd
Priority to CN202110440153.8A priority Critical patent/CN113152749B/en
Publication of CN113152749A publication Critical patent/CN113152749A/en
Application granted granted Critical
Publication of CN113152749B publication Critical patent/CN113152749B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Finishing Walls (AREA)

Abstract

本发明公开了一种干挂陶土板幕墙结构,包括墙体、陶土板、挂板和第一螺栓,所述墙体内部埋设有预埋件,且预埋件前侧固定安装有连接座,所述连接座前侧焊接固定有纵梁,且纵梁前侧焊接有连接板,所述纵梁前侧贴合设置有横梁,且横梁通过连接螺栓固定安装在连接板上,所述陶土板设置在横梁前方。该干挂陶土板幕墙结构,设置有第一螺栓、沟槽和螺槽,转动第一螺栓,第一螺栓推动沟槽内的横梁沿沟槽下滑,起到调整挂板以及对应陶土板垂直位置的作用,沿横梁滑动挂板,此时第二螺栓在螺槽内滑动,随后通过第二螺栓与压板的配合夹紧固定横梁,起到调整挂板以及对应陶土板水平位置的作用,便于根据实际使用需求进行微调,使用起来更具有实用性。

The present invention discloses a dry-hanging clay panel curtain wall structure, including a wall, a clay panel, a hanging plate and a first bolt. An embedded part is embedded in the wall, and a connecting seat is fixedly installed on the front side of the embedded part. A longitudinal beam is welded and fixed on the front side of the connecting seat, and a connecting plate is welded on the front side of the longitudinal beam. A crossbeam is fitted on the front side of the longitudinal beam, and the crossbeam is fixedly installed on the connecting plate by connecting bolts. The clay panel is arranged in front of the crossbeam. The dry-hanging clay panel curtain wall structure is provided with a first bolt, a groove and a screw groove. The first bolt is rotated, and the first bolt pushes the crossbeam in the groove to slide down along the groove, which plays a role in adjusting the vertical position of the hanging plate and the corresponding clay panel. The hanging plate is slid along the crossbeam. At this time, the second bolt slides in the screw groove, and then the crossbeam is clamped and fixed by the cooperation of the second bolt and the pressure plate, which plays a role in adjusting the horizontal position of the hanging plate and the corresponding clay panel. It is convenient to make fine adjustments according to actual use needs, and it is more practical to use.

Description

Dry-hanging argil board curtain wall structure
Technical Field
The invention relates to the technical field of curtain wall structures, in particular to a dry-hanging argil plate curtain wall structure.
Background
The curtain wall is an outer wall enclosure of a building, is a light wall body with a decoration effect, which is commonly used in high-rise buildings, mainly plays roles of rain prevention, sound insulation, heat insulation and the like, and is found that the prior curtain wall structure is typical through mass search, such as a curtain wall plate of a clamping type curtain wall and a clamping type curtain wall, and the curtain wall comprises a curtain wall plate body. The invention also discloses a clamping curtain wall, wherein the curtain wall plate is arranged on the clamping curtain wall, and adjacent curtain wall plates are tightly attached.
In summary, the existing curtain wall structure is not provided with a fine adjustment structure generally, and in the building construction process, errors are inevitably generated, and the curtain wall installation is affected after the errors are accumulated, so that part of the curtain wall needs to be reprocessed according to the actual construction condition, the workload is increased, the use has a certain limitation, the existing curtain wall structure needs to rotate bolts and nuts simultaneously during installation, but the gap between the curtain wall and a wall body is small, the operation difficulty of the existing fastening method is high, the use is not convenient enough, and the existing equipment needs to be improved according to the problems.
Disclosure of Invention
The invention aims to provide a dry-hanging argil plate curtain wall structure, which aims to solve the problems that the existing curtain wall structure provided in the background art is not provided with a fine adjustment structure, and in the building construction process, errors are inevitably generated, and the installation of a curtain wall is affected after the errors are accumulated, so that part of the curtain wall needs to be reprocessed according to the actual construction condition, the workload is increased, a certain limitation is provided in use, and the existing curtain wall structure needs to rotate bolts and nuts at the same time in installation, but the gap between the curtain wall and a wall body is small, the operation difficulty of the existing fastening method is high, and the use is not convenient.
In order to achieve the aim, the invention provides the technical scheme that the dry-hanging ceramic plate curtain wall structure comprises a wall body, ceramic plates, hanging plates and first bolts,
The embedded part is embedded in the wall body, the front side of the embedded part is fixedly provided with a connecting seat, the front side of the connecting seat is fixedly welded with a longitudinal beam, the front side of the longitudinal beam is welded with a connecting plate, the front side of the longitudinal beam is provided with a cross beam in a fitting way, and the cross beam is fixedly arranged on the connecting plate through a connecting bolt;
The ceramic plate is arranged in front of the cross beam, the back bolt is buried at the rear side of the ceramic plate, the hanging plate is arranged at the rear side of the ceramic plate in a laminating mode, the rear end of the back bolt penetrates through the hanging plate and is in threaded connection with the nut, the outer side of the hanging plate is slidably connected with the pressing plate, an elastic gasket is fixed on the upper side of the pressing plate, a groove is formed in the hanging plate, an opening communicated with the groove is formed in the left side of the hanging plate, a screw groove is formed in the upper side of the cross beam, the cross beam is laminated and arranged in the groove, second bolts are connected with the front side and the rear side of the hanging plate in a threaded mode, and the second bolts sequentially penetrate through the hanging plate, the screw groove and the elastic gasket and are in threaded connection with the pressing plate.
Preferably, the rearmost end of the back bolt and the foremost end of the groove are positioned on the same vertical plane.
Preferably, the hanging plate is connected with a first bolt in a threaded manner at the center, and the lower end of the first bolt penetrates through the hanging plate and is attached to the top of the cross beam.
Preferably, the height dimension of the opening is greater than the height dimension of the cross beam.
Preferably, the width dimension of the groove is larger than the diameter dimension of the second bolt, and the width dimension of the groove is smaller than the diameter dimension of the first bolt.
Preferably, two second bolts are symmetrically arranged on the front side and the rear side of the first bolt, and the two second bolts are simultaneously in threaded connection with the same pressing plate.
Compared with the prior art, the invention has the beneficial effects that the dry-hanging argil plate curtain wall structure,
(1) The first bolt, the groove and the screw groove are arranged, the first bolt is rotated, the cross beam in the groove is pushed by the first bolt to slide downwards along the groove, the hanging plate is adjusted, the corresponding argil plate is slid along the cross beam, the second bolt slides in the screw groove at the moment, then the cross beam is clamped and fixed through the cooperation of the second bolt and the pressing plate, the effect of adjusting the horizontal positions of the hanging plate and the corresponding argil plate is achieved, fine adjustment is facilitated according to actual use requirements, and the hanging plate is more practical in use;
(2) The clamp plate, link plate and second bolt are provided with, and the second bolt runs through link plate, helicoidal groove and elastic gasket and clamp plate threaded connection, rotate the second bolt, and second bolt pulling clamp plate is along the link plate upward slide until clamp plate and second bolt cooperation clamp beam, only rely on rotating the second bolt can accomplish the installation to the clay board, and simplified installation step is more convenient to use.
Drawings
FIG. 1 is a schematic diagram of a front view structure of the present invention;
FIG. 2 is a schematic diagram of a left side view cross-sectional structure of the present invention;
FIG. 3 is a schematic view of the rear view of the hanger plate of the present invention;
FIG. 4 is a schematic view of a rear view cross-section of the hanger plate of the present invention;
fig. 5 is an enlarged schematic view of the structure of fig. 2a according to the present invention.
In the figure, 1, a wall body, 2, an embedded part, 3, a connecting seat, 4, a longitudinal beam, 5, a connecting plate, 6, a cross beam, 7, a connecting bolt, 8, a clay plate, 9, a back bolt, 10, a hanging plate, 11, a nut, 12, a pressing plate, 13, an elastic gasket, 14, a groove, 15, an opening, 16, a screw groove, 17, a second bolt, 18 and a first bolt.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-5, the invention provides a technical scheme that as shown in fig. 1 and 2, an embedded part 2 is embedded in a wall body 1, a connecting seat 3 is fixedly arranged on the front side of the embedded part 2, a longitudinal beam 4 is fixedly welded on the front side of the connecting seat 3, a connecting plate 5 is welded on the front side of the longitudinal beam 4, a cross beam 6 is attached to the front side of the longitudinal beam 4, and the cross beam 6 is fixedly arranged on the connecting plate 5 through a connecting bolt 7.
As shown in fig. 2,3, 4 and 5, the clay plate 8 is arranged in front of the cross beam 6, the back bolt 9 is buried at the rear side of the clay plate 8, meanwhile, the hanging plate 10 is attached to the rear side of the clay plate 8, the rearmost end of the back bolt 9 and the foremost end of the groove 14 are positioned on the same vertical plane, the back bolt 9 is prevented from obstructing the cross beam 6, the cross beam 6 slides in the groove 14 more smoothly, the center of the hanging plate 10 is connected with a first bolt 18 through the hanging plate 10 through threads, the lower end of the first bolt 18 is attached to the top of the cross beam 6, the first bolt 18 is rotated, the first bolt 18 stretches into the groove 14 and pushes the cross beam 6, the effect of adjusting the vertical position of the hanging plate 10 is achieved, the rear end of the back bolt 9 is connected through the hanging plate 10 through threads with the nut 11, the outer side of the hanging plate 10 is slidingly connected with the pressing plate 12, the upper side of the pressing plate 12 is fixedly provided with an elastic gasket 13, the groove 14 is arranged inside the hanging plate 10, the left side of the hanging plate 10 is provided with an opening 15 communicated with the groove 14, the height dimension of the opening 15 is larger than the height dimension of the cross beam 6, the cross beam 6 can conveniently enter the groove 14 through the opening 15, the upper side of the cross beam 6 is provided with a screw groove 16, the cross beam 6 is attached to the inside of the groove 14, the width dimension of the screw groove 16 is larger than the diameter dimension of a second bolt 17, the width dimension of the screw groove 16 is smaller than the diameter dimension of a first bolt 18, the second bolt 17 can conveniently slide in the screw groove 16, meanwhile, the first bolt 18 is prevented from extending into the screw groove 16, the front side and the rear side of the hanging plate 10 are in threaded connection with the second bolts 17, the second bolts 17 sequentially penetrate through the hanging plate 10, the screw groove 16 and the elastic gaskets 13 and are in threaded connection with the pressing plate 12, the front side and the rear side of the first bolt 18 are symmetrically provided with two second bolts 17, the two second bolts 17 are simultaneously in threaded connection with the same pressing plate 12, the second bolts 17 are rotated, the second bolt 17 and the pressing plate 12 are matched to clamp the cross beam 6, and the hanging plate 10 is fixed.
Working principle: when the dry-hanging ceramic plate curtain wall structure is used, firstly, the longitudinal beam 4 is installed on the embedded part 2 through the connecting seat 3, the connecting bolt 7 is rotated, the cross beam 6 is connected and fastened with the connecting plate 5, the hanging plate 10 is attached to the rear side of the ceramic plate 8, the nut 11 is rotated, the nut 11 is matched with the back bolt 9, the hanging plate 10 is fixedly installed on the rear side of the ceramic plate 8, the ceramic plate 8 is lifted, the cross beam 6 passes through the opening 15 to enter the groove 14, at the moment, the ceramic plate 8 is hung on the cross beam 6 through the hanging plate 10, the first bolt 18 is rotated, the first bolt 18 stretches into the groove 14 and pushes the cross beam 6 to slide up and down along the groove 14, the hanging plate 10 and the corresponding ceramic plate 8 are adjusted, the hanging plate 10 is slid along the cross beam 6, the second bolt 17 penetrates through the hanging plate 10, the screw groove 16 and the elastic gasket 13 to be in threaded connection with the pressing plate 12, the second bolt 17 is pulled by the pressing plate 12 to slide up along the hanging plate 10 until the pressing plate 12 is matched with the second bolt 17, the cross beam 6 is adjusted, at the moment, the hanging plate 10 and the corresponding position of the ceramic plate 8 is used for the ceramic plate 8, the real-time is more convenient to complete the real-time operation of the wall structure, the dry-hanging ceramic plate curtain wall structure is more has the advantages of the technical requirements of being used, and is more convenient to use, the technical field, the practical requirements of the technical field is satisfied, and the technical field is well has been well-known, and the technical requirements are well, and the technical field is well has been used, and can be used, and is well and has the technical field and is used.

Claims (4)

1. The utility model provides a hang argil board curtain wall construction futilely, includes wall body (1), argil board (8), link plate (10) and first bolt (18), its characterized in that:
The embedded part (2) is embedded in the wall body (1), the connecting seat (3) is fixedly arranged on the front side of the embedded part (2), the longitudinal beam (4) is fixedly welded on the front side of the connecting seat (3), the connecting plate (5) is welded on the front side of the longitudinal beam (4), the cross beam (6) is attached to the front side of the longitudinal beam (4), and the cross beam (6) is fixedly arranged on the connecting plate (5) through the connecting bolt (7);
The ceramic plate (8) is arranged in front of the cross beam (6), the back bolt (9) is buried at the rear side of the ceramic plate (8), meanwhile, the hanging plate (10) is attached to the rear side of the ceramic plate (8), the rear end of the back bolt (9) penetrates through the hanging plate (10) to be in threaded connection with the nut (11), the outer side of the hanging plate (10) is slidably connected with the pressing plate (12), an elastic gasket (13) is fixed on the upper side of the pressing plate (12), a groove (14) is formed in the hanging plate (10), an opening (15) communicated with the groove (14) is formed in the left side of the hanging plate (10), a spiral groove (16) is formed in the upper side of the cross beam (6), the cross beam (6) is attached to the inside the groove (14), a second bolt (17) is connected to the front side and the rear side of the hanging plate (10) in a threaded manner, and the second bolt (17) sequentially penetrates through the hanging plate (10), the spiral groove (16) and the elastic gasket (13) to be in threaded connection with the pressing plate (12).
The rearmost end of the back bolt (9) and the foremost end of the groove (14) are positioned on the same vertical plane;
the center of the hanging plate (10) is connected with a first bolt (18) in a threaded mode, and the lower end of the first bolt (18) penetrates through the hanging plate (10) and is attached to the top of the cross beam (6).
2. A dry-hanging clay plate curtain wall construction according to claim 1, characterized in that the height dimension of the opening (15) is larger than the height dimension of the cross beam (6).
3. A dry-hanging clay plate curtain wall construction according to claim 1, wherein the width dimension of the groove (16) is larger than the diameter dimension of the second bolt (17), and the width dimension of the groove (16) is smaller than the diameter dimension of the first bolt (18).
4. The dry-hanging argil plate curtain wall structure according to claim 1, wherein two second bolts (17) are symmetrically arranged on the front side and the rear side of the first bolt (18), and the two second bolts (17) are simultaneously in threaded connection with the same pressing plate (12).
CN202110440153.8A 2021-04-22 2021-04-22 A dry-hanging clay panel curtain wall structure Active CN113152749B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110440153.8A CN113152749B (en) 2021-04-22 2021-04-22 A dry-hanging clay panel curtain wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110440153.8A CN113152749B (en) 2021-04-22 2021-04-22 A dry-hanging clay panel curtain wall structure

Publications (2)

Publication Number Publication Date
CN113152749A CN113152749A (en) 2021-07-23
CN113152749B true CN113152749B (en) 2025-01-14

Family

ID=76869761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110440153.8A Active CN113152749B (en) 2021-04-22 2021-04-22 A dry-hanging clay panel curtain wall structure

Country Status (1)

Country Link
CN (1) CN113152749B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463802B (en) * 2021-08-17 2022-04-29 江苏和源兴建设股份有限公司 Suspension type glass curtain wall
CN113775087B (en) * 2021-09-07 2022-07-08 苏州金螳螂幕墙有限公司 Zipper argil plate curtain wall and construction method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN215054335U (en) * 2021-04-22 2021-12-07 山西建筑工程集团有限公司 Hang argil board curtain wall construction futilely

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100852218B1 (en) * 2007-08-22 2008-08-13 백종균 Exterior wall construction device of building
CN202595973U (en) * 2012-04-19 2012-12-12 福建华泰集团有限公司 Installing structure for ceramic-plate combined curtain walls
CN104612298A (en) * 2013-11-04 2015-05-13 永升建设集团有限公司 Improved ceramic plate curtain wall dry hanging construction method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN215054335U (en) * 2021-04-22 2021-12-07 山西建筑工程集团有限公司 Hang argil board curtain wall construction futilely

Also Published As

Publication number Publication date
CN113152749A (en) 2021-07-23

Similar Documents

Publication Publication Date Title
CN113152749B (en) A dry-hanging clay panel curtain wall structure
CN215054335U (en) Hang argil board curtain wall construction futilely
CN206636082U (en) A kind of aluminium alloy railing being easily installed
CN219081012U (en) Telescopic adjusting horizontal pull rod
CN221878463U (en) Operating room wallboard structure
CN218437954U (en) Aluminum veneer mounting structure for decoration engineering
CN108999319B (en) A transverse clay stick system for building curtain walls
CN201358611Y (en) Clamping device for glass railing
CN113775137B (en) An exterior wall decorative panel that is easy to install
CN108672609A (en) A kind of big section steel strand wires tension workbench
CN114382209A (en) Connecting assembly for mounting building engineering curtain wall
CN116446574A (en) Curtain wall connecting structure and curtain wall construction method
CN218437913U (en) Metal grid plate system convenient to installation
CN220385677U (en) Keel support locking device
CN223562382U (en) Assembled arc aluminum plate curtain wall
CN209066663U (en) Building curtain wall transverse direction clay rod system
CN219316069U (en) building sound insulation board
CN220868537U (en) Water batch plate for metal curtain wall
CN216766400U (en) A kind of building decoration energy-saving curtain wall
CN217105717U (en) Novel energy-saving unit type super high-rise building curtain wall mounting structure
CN220889499U (en) Engineering template reinforcing apparatus
CN220725506U (en) Aluminum square through ceiling structure
CN207266069U (en) A kind of building talkback extension set mounting assembly installed and replaced easy to extension set
CN114215240B (en) Suspension type glass curtain wall
CN220377812U (en) Adjustable climbing frame fixtures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant