CN113062610B - New wall building and building system and method based on old wall body - Google Patents

New wall building and building system and method based on old wall body Download PDF

Info

Publication number
CN113062610B
CN113062610B CN202110444666.6A CN202110444666A CN113062610B CN 113062610 B CN113062610 B CN 113062610B CN 202110444666 A CN202110444666 A CN 202110444666A CN 113062610 B CN113062610 B CN 113062610B
Authority
CN
China
Prior art keywords
fixedly connected
building
telescopic
motor
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110444666.6A
Other languages
Chinese (zh)
Other versions
CN113062610A (en
Inventor
王长财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Zhongyuan Construction Engineering Construction Co Ltd
Original Assignee
Fujian Zhongyuan Construction Engineering Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Zhongyuan Construction Engineering Construction Co ltd filed Critical Fujian Zhongyuan Construction Engineering Construction Co ltd
Priority to CN202110444666.6A priority Critical patent/CN113062610B/en
Publication of CN113062610A publication Critical patent/CN113062610A/en
Application granted granted Critical
Publication of CN113062610B publication Critical patent/CN113062610B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A new wall building and building method based on an old wall body comprises the following steps: the method comprises the following steps: determining the position of the device by depending on the old wall body, and building the length of the wall body according to the requirement; step two: determining and adjusting the levelness and the verticality of the device; step three: the building cement can rise along with the rising of the building wall; step four: the constructor can adjust along with building the timely height of wall body, conveniently builds the operation. The device has the advantages of being capable of depending on the old wall to determine the position of building a new wall and fixing the length of the built wall, and comprises a horizontal position adjusting assembly, a picking basket side arm, a verticality determining assembly, a height adjusting assembly, a branch supporting mechanism and a cement extracting mechanism, wherein the picking basket side arm is fixedly connected to the front side of the upper end of the horizontal position adjusting assembly, and the height adjusting assembly is fixedly connected to the upper end of the horizontal position adjusting assembly.

Description

New wall building and building system and method based on old wall
Technical Field
The invention relates to the technical field of wall construction, in particular to a new wall construction and building system and method based on an old wall.
Background
The publication number CN112376926A discloses a building wall construction system and a construction method thereof, the building wall construction system comprises a guide rail assembly arranged along the vertical direction, and an ash scraping assembly connected to the guide rail assembly in a sliding manner along the vertical direction, wherein the ash scraping assembly is provided with a driving assembly for driving the ash scraping assembly to move up and down along the guide rail assembly, and a cleaning assembly for cleaning the scraped cement waste; the building wall construction system is simple in structure and can rapidly remove cement waste extruded between bricks. But can not rely on old wall body to confirm build new wall body position and carry out the shortcoming of fixed length to building wall body length.
Disclosure of Invention
The invention aims to provide a new wall building system and method based on an old wall, which have the advantages of determining the position of building a new wall by depending on the old wall and fixing the length of the built wall.
The purpose of the invention is realized by the following technical scheme:
a new wall building and building method based on an old wall body is characterized in that: the method comprises the following steps:
the method comprises the following steps: determining the position of the device by depending on the old wall body, and building the length of the wall body according to the requirement;
step two: determining and adjusting the levelness and the verticality of the device;
step three: the building cement can rise along with the rising of the building wall;
step four: the constructor can be along with building the timely height adjustment of wall body, conveniently builds the operation.
The new wall building method based on the old wall body relates to a new wall building system based on the old wall body;
the new wall building system based on the old wall body comprises a horizontal position adjusting assembly, a picking basket side arm, a verticality determining assembly, a height adjusting assembly, branch supporting mechanisms and a cement extracting mechanism, wherein the picking basket side arm is fixedly connected to the front side of the upper end of the horizontal position adjusting assembly, the height adjusting assembly is fixedly connected to the upper end of the horizontal position adjusting assembly, the picking basket side arm is fixedly connected to the height adjusting assembly, the verticality determining assembly is fixedly connected to the upper end of the height adjusting assembly, the two branch supporting mechanisms are both connected to the height adjusting assembly in a sliding mode, and the cement extracting mechanism is fixedly connected to the two branch supporting mechanisms;
the horizontal position adjusting assembly comprises a telescopic support frame, a scale telescopic rod, racks, a gear, a motor, a central connecting block and a horizontal ruler, wherein the central connecting block is fixedly connected to the upper end of the telescopic support frame;
the side arm of the cantilever basket comprises a lifting motor, an inner threaded rod, a threaded rod, an upper supporting block, auxiliary telescopic rods and a limiting plate, wherein the inner threaded rod is fixedly connected to an output shaft of the lifting motor, the threaded rod and the inner threaded rod are in threaded transmission, the upper supporting block is fixedly connected to the threaded rod, the two auxiliary telescopic rods are respectively and fixedly connected to the front side and the rear side of the upper supporting block, the limiting plate is fixedly connected to the rear end of the limiting plate, the lifting motor is fixedly connected to the upper end of a central connecting block, and the limiting plate is fixedly connected to the upper end of a telescopic supporting frame;
the perpendicularity determining assembly comprises a take-up box, a take-up motor, a take-up pulley, connecting wires and a heavy hammer, wherein the take-up box is fixedly connected to the upper end of the upper supporting block, the take-up motor is fixedly connected to the take-up box, the take-up pulley is fixedly connected to an output shaft of the take-up motor, the connecting wires are fixedly connected to the take-up pulley, and the heavy hammers are fixedly connected to the connecting wires respectively;
the height adjusting assembly comprises a telescopic arm, an adjusting motor, an auxiliary supporting rod and a hanging basket arm, the upper end and the lower end of the telescopic arm are respectively and fixedly connected to the auxiliary telescopic rod and the telescopic supporting frame, the hanging basket arm is rotatably connected to the telescopic arm, the auxiliary supporting rod is rotatably connected to the telescopic arm, the hanging basket arm is rotatably connected to the auxiliary supporting rod, the adjusting motor is fixedly connected to the telescopic arm, and the hanging basket arm is fixedly connected to an output shaft of the adjusting motor;
the branch supporting mechanism comprises an upper connecting plate, a connecting telescopic rod, a bearing bottom plate and horizontal adjusting rods, wherein the upper connecting plate is fixedly connected to the upper end of the connecting telescopic rod;
cement draw mechanism including be the feed cylinder, put thing platform, sliding stand and go up and down to be the feed cylinder, two put thing platform fixed connection respectively on two are the feed cylinders, two go up and down to be the feed cylinder difference sliding connection in two are the feed cylinders, sliding stand sliding connection puts the thing bench at two, two are feed cylinder difference fixed connection on two connect the telescopic link, go up and down to be provided with electric putter between feed cylinder and the sliding stand.
The new wall building and building system and method based on the old wall body have the beneficial effects that: the invention relates to a new wall building and building system and a method based on an old wall, wherein a horizontal ruler of a horizontal position adjusting assembly of a device and a vertical degree determine a protruding shell of the assembly and the old wall to depend on, and the method can be suitable for building a new wall at a position adjacent to the old wall; when the two racks on the inner side of the horizontal position adjusting assembly are in contact with the old wall body, the old wall body is used for extending and building, and the levelness and the verticality of the device are determined and standardized through the horizontal position adjusting assembly and the verticality determining assembly during building; the extension length of the horizontal adjusting rods of the two branch supporting mechanisms is adjusted, a certain amount of cement can be stored in the cement extracting mechanism before construction, and the material taking time in the construction process is shortened.
Drawings
The invention is described in further detail below with reference to the accompanying drawings and specific embodiments.
In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "top", "bottom", "inner", "outer" and "upright", etc., indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected, directly or indirectly connected through an intermediate medium, and may be a communication between two members. The specific meanings of the above terms in the present invention can be understood in a specific case to those of ordinary skill in the art.
In addition, in the description of the present invention, the meaning of "a plurality", and "a plurality" is two or more unless otherwise specified.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the horizontal position adjustment assembly of the present invention;
FIG. 3 is a schematic structural view of a side arm of the pick basket of the present invention;
FIG. 4 is a schematic structural view of the perpendicularity determining assembly of the present invention;
FIG. 5 is a schematic view of the height adjustment assembly of the present invention;
FIG. 6 is a schematic structural view of the branch support mechanism of the present invention;
fig. 7 is a schematic structural view of the cement extracting mechanism of the present invention.
In the figure: a horizontal position adjusting component 1; a telescopic support frame 1-1; 1-2 of a scale telescopic rod; 1-3 of a rack; gears 1-4; 1-5 of a motor; 1-6 of a central connecting block; 1-7 of a horizontal ruler; a basket-picking side arm 2; a lifting motor 2-1; 2-2 parts of an inner threaded rod; 2-3 parts of a threaded rod; an upper support block 2-4; 2-5 of an auxiliary telescopic rod; 2-6 of limiting plates; a perpendicularity determining assembly 3; 3-1 of a take-up box; a take-up motor 3-2; 3-3 of a take-up pulley; 3-4 of a connecting line; 3-5 of a heavy hammer; a height adjustment assembly 4; 4-1 of a telescopic arm; adjusting a motor 4-2; 4-3 of an auxiliary supporting rod; 4-4 of a hanging basket arm; a branch support mechanism 5; an upper connecting plate 5-1; connecting a telescopic rod 5-2; 5-3 of a bearing bottom plate; 5-4 of a horizontal adjusting rod; a cement extraction mechanism 6; is a charging barrel 6-1; 6-2 of a placement table; 6-3 of a sliding table; lifting to form a charging barrel 6-4.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The first specific implementation way is as follows:
the embodiment is described below with reference to fig. 1 to 7, and a new wall building method based on an old wall body includes the following steps:
the method comprises the following steps: determining the position of the device by means of an old wall body, and building the length of the wall body according to the requirement;
step two: determining and adjusting the levelness and the verticality of the device;
step three: the building cement can rise along with the rising of the building wall;
step four: the constructor can adjust along with building the timely height of wall body, conveniently builds the operation.
The new wall building method based on the old wall body relates to a new wall building system based on the old wall body;
the new wall building system based on the old wall body comprises a horizontal position adjusting component 1, a picking basket side arm 2, a verticality determining component 3, a height adjusting component 4, branch supporting mechanisms 5 and a cement extracting mechanism 6, wherein the picking basket side arm 2 is fixedly connected to the front side of the upper end of the horizontal position adjusting component 1, the height adjusting component 4 is fixedly connected to the upper end of the horizontal position adjusting component 1, the picking basket side arm 2 is fixedly connected to the height adjusting component 4, the verticality determining component 3 is fixedly connected to the upper end of the height adjusting component 4, the two branch supporting mechanisms 5 are both connected to the height adjusting component 4 in a sliding mode, and the cement extracting mechanism 6 is fixedly connected to the two branch supporting mechanisms 5;
the method is suitable for building a new wall body at a position adjacent to an old wall body, when two racks 1-3 on the inner side of the horizontal position adjusting assembly 1 are in contact with the old wall body, the old wall body is extended and built, the levelness and the verticality of the device are determined and standardized through the horizontal position adjusting assembly 1 and the verticality determining assembly 3 during building, the extending length of horizontal adjusting rods 5-4 of two branch supporting mechanisms 5 is adjusted, and a certain amount of cement can be stored in a cement extracting mechanism before construction to reduce the material taking time in the construction process.
The second embodiment is as follows:
the embodiment is described below with reference to fig. 1 to 7, wherein the horizontal position adjusting assembly 1 includes a telescopic support frame 1-1, a scale telescopic rod 1-2, a rack 1-3, a gear 1-4, a motor 1-5, a central connecting block 1-6 and a level bar 1-7, the central connecting block 1-6 is fixedly connected to the upper end of the telescopic support frame 1-1, the level bar 1-7 is fixedly connected to the central connecting block 1-6, the motor 1-5 is fixedly connected to the central connecting block 1-6, the gear 1-4 is fixedly connected to an output shaft of the motor 1-5, two racks 1-3 are fixedly connected to the telescopic support frame 1-1, and the two racks 1-3 are in meshing transmission with the gear 1-4;
the horizontal direction can be horizontally calibrated through the leveling ruler 1-7, the gear 1-4 can be rotated through the starting motor 1-5, the two racks 1-3 can simultaneously move in opposite directions due to meshing transmission, the length of the telescopic support frame 1-1 can be increased or shortened, and the determined verticality and levelness can be accurately built by means of the two racks 1-3 when a wall body is built.
The third concrete implementation mode:
the embodiment is described below with reference to fig. 1-7, the cantilever basket side arm 2 includes a lifting motor 2-1, an internal thread rod 2-2, a threaded rod 2-3, the lifting device comprises upper supporting blocks 2-4, auxiliary telescopic rods 2-5 and limiting plates 2-6, wherein an inner threaded rod 2-2 is fixedly connected to an output shaft of a lifting motor 2-1, the threaded rod 2-3 and the inner threaded rod 2-2 are in threaded transmission, the upper supporting blocks 2-4 are fixedly connected to the threaded rod 2-3, the two auxiliary telescopic rods 2-5 are respectively and fixedly connected to the front side and the rear side of the upper supporting block 2-4, the limiting plates 2-6 are fixedly connected to the rear ends of the limiting plates 2-6, the lifting motor 2-1 is fixedly connected to the upper ends of central connecting blocks 1-6, and the limiting plates 2-6 are fixedly connected to the upper ends of telescopic supporting frames 1-1;
the lifting motor 2-1 is started to enable the inner threaded rod 2-2 to rotate, the threaded rod 2-3 is driven to rotate and move upwards under the pushing of the threads, meanwhile, the limiting plate 2-6 extends, the height adjusting assembly 4 extends and can drive the externally hung hanging basket to ascend.
The fourth concrete implementation mode is as follows:
the present embodiment will be described with reference to fig. 1-7, wherein the verticality determining assembly 3 includes a wire-rewinding box 3-1, a wire-rewinding motor 3-2, a wire-rewinding wheel 3-3, a connecting wire 3-4 and a weight 3-5, the wire-rewinding box 3-1 is fixedly connected to the upper end of the upper supporting block 2-4, the wire-rewinding motor 3-2 is fixedly connected to the wire-rewinding box 3-1, the wire-rewinding wheel 3-3 is fixedly connected to the output shaft of the wire-rewinding motor 3-2, a plurality of connecting wires 3-4 are fixedly connected to the wire-rewinding wheel 3-3, and a plurality of weights 3-5 are respectively fixedly connected to the connecting wires 3-4;
the wire take-up wheel 3-3 is rotated by starting the wire take-up motor 3-2, the heavy hammer 3-5 can be put down by releasing the connecting wires 3-4, and the verticality can be more conveniently determined.
The fifth concrete implementation mode is as follows:
the present embodiment is described below with reference to fig. 1-7, wherein the height adjustment assembly 4 includes a telescopic boom 4-1, an adjustment motor 4-2, an auxiliary support rod 4-3 and a basket boom 4-4, the upper and lower ends of the telescopic boom 4-1 are respectively and fixedly connected to an auxiliary telescopic rod 2-5 and a telescopic support frame 1-1, the basket boom 4-4 is rotatably connected to the telescopic boom 4-1, the auxiliary support rod 4-3 is rotatably connected to the telescopic boom 4-1, the basket boom 4-4 is rotatably connected to the auxiliary support rod 4-3, the adjustment motor 4-2 is fixedly connected to the telescopic boom 4-1, and the basket boom 4-4 is fixedly connected to an output shaft of the adjustment motor 4-2;
the hanging basket arm 4-4 can hang an external hanging basket, the adjusting motor 4-2 is started to enable the hanging basket arm 4-4 to rotate, and meanwhile the auxiliary supporting rod 4-3 is fixed, so that the hanging basket arm 4-4 can be fixed and supported.
The sixth specific implementation mode is as follows:
the present embodiment is described below with reference to fig. 1 to 7, wherein the branch supporting mechanism 5 includes an upper connecting plate 5-1, a connecting telescopic rod 5-2, a bearing bottom plate 5-3 and a horizontal adjusting rod 5-4, the upper connecting plate 5-1 is fixedly connected to the upper end of the connecting telescopic rod 5-2, the connecting telescopic rod 5-2 is fixedly connected to the upper end of the bearing bottom plate 5-3, a plurality of horizontal adjusting rods 5-4 are all fixedly connected to the bearing bottom plate 5-3, and two upper connecting plates 5-1 are both fixedly connected to the auxiliary telescopic rods 2-5;
whether the set levels 1-7 and the verticality determining component 3 can be regulated and determined according to the levelness and the verticality of the device by regulating the extension lengths of the horizontal regulating rods 5-4 at the bottoms of the two branch supporting mechanisms 5.
The seventh embodiment:
the present embodiment is described below with reference to fig. 1-7, wherein the cement extracting mechanism 6 includes a material presenting cylinder 6-1, a material placing table 6-2, a sliding table 6-3 and a material lifting and presenting cylinder 6-4, the two material placing tables 6-2 are fixedly connected to the two material presenting cylinders 6-1, the two material lifting and presenting cylinders 6-4 are slidably connected to the two material presenting cylinders 6-1, the sliding table 6-3 is slidably connected to the two material placing tables 6-2, the two material presenting cylinders 6-1 are fixedly connected to the two connecting telescopic rods 5-2, and an electric push rod is arranged between the material lifting and presenting cylinders 6-4 and the sliding table 6-3.
The mixed cement is injected into the lifting material forming barrel 6-4 before the building is carried out, a certain amount of cement can be stored in the building stage and can be used after the device is lifted to a certain height, the material taking time during building in the wall is reduced, and after the length of the wall body needing building is determined, a plurality of practical tools can be placed through the two object placing tables 6-2 and the sliding table 6-3, so that the building device is convenient for workers to work and use.
The invention relates to a new wall building and building system and a method based on an old wall body, wherein the using principle is as follows: the method is suitable for building a new wall body at a position adjacent to an old wall body, when two racks 1-3 at the inner side of a horizontal position adjusting component 1 are in contact with the old wall body, the method extends and builds depending on the old wall body, the levelness and the verticality of the device are determined and standardized by the horizontal position adjusting component 1 and the verticality determining component 3 during building, the extending length of a horizontal adjusting rod 5-4 of two branch supporting mechanisms 5 is adjusted by adjusting, a certain amount of cement can be stored in a cement extracting mechanism before construction, the material taking time in the construction process is reduced, the horizontal direction can be horizontally calibrated by the leveling instrument 1-7, and gears 1-4 can be rotated by starting motors 1-5, because the two racks 1-3 can simultaneously move in opposite directions by meshing transmission, the length of the telescopic support frame 1-1 can be increased or shortened, when a wall is built, the wall can be built more accurately with determined verticality and levelness by depending on the two racks 1-3, the inner threaded rod 2-2 is rotated by starting the lifting motor 2-1, the threaded rod 2-3 is driven to rotate and move upwards by being pushed by threads, meanwhile, the limiting plate 2-6 is extended, the height adjusting component 4 is extended and can drive the externally hung basket to ascend, the take-up pulley 3-3 is rotated by starting the take-up motor 3-2, the heavy punch 3-5 can be put down by releasing a plurality of connecting wires 3-4, the verticality can be more conveniently determined, the external hung basket can be hung on the basket arm 4-4, the hanging basket arm 4-4 can be fixed and supported by starting the adjusting motor 4-2, and the auxiliary support rod 4-3 can be fixed at the same time, the levelness and the verticality of the device can be standardized and determined by adjusting the extension length of the horizontal adjusting rod 5-4 at the bottom of the two branch supporting mechanisms 5 and adjusting whether the set level ruler 1-7 and the verticality determining component 3 are horizontal or not, the mixed cement is injected into the lifting and forming material cylinder 6-4 before building, a certain amount of cement can be stored in the building stage and can be used after the device is lifted to a certain height, the material taking time in building in a wall is reduced, and some practical tools can be placed through the two object placing platforms 6-2 and the sliding platform 6-3 after the length of the wall needing building is determined, the convenience is brought to workers for working and using.
It is to be understood that the above description is not intended to limit the present invention, and the present invention is not limited to the above examples, and that various changes, modifications, additions and substitutions which are within the spirit and scope of the present invention and which may be made by those skilled in the art are also within the scope of the present invention.

Claims (3)

1. A new wall building and building method based on an old wall body is characterized in that: the method comprises the following steps:
the method comprises the following steps: determining the position of the device by depending on the old wall body, and determining the length of the wall body to be built;
step two: determining and adjusting the levelness and the verticality of the device;
step three: the building cement can rise along with the rising of the building wall;
step four: the constructor can adjust the height of the built wall body at proper time, so that the building operation is facilitated;
the new wall building method based on the old wall body relates to a new wall building device based on the old wall body;
the new wall building and erecting device based on the old wall body comprises a horizontal position adjusting component (1), a picking basket side arm (2), a verticality determining component (3), a height adjusting component (4), branch supporting mechanisms (5) and a cement extracting mechanism (6), wherein the picking basket side arm (2) is fixedly connected to the front side of the upper end of the horizontal position adjusting component (1), the height adjusting component (4) is fixedly connected to the upper end of the horizontal position adjusting component (1), the picking basket side arm (2) is fixedly connected to the height adjusting component (4), the verticality determining component (3) is fixedly connected to the upper end of the height adjusting component (4), the two branch supporting mechanisms (5) are both connected to the height adjusting component (4) in a sliding mode, and the cement extracting mechanism (6) is fixedly connected to the two branch supporting mechanisms (5);
the horizontal position adjusting component (1) comprises a telescopic support frame (1-1), a scale telescopic rod (1-2), a rack (1-3), a gear (1-4), a motor (1-5), a central connecting block (1-6) and a horizontal ruler (1-7), the central connecting block (1-6) is fixedly connected to the upper end of the telescopic support frame (1-1), the horizontal ruler (1-7) is fixedly connected to the central connecting block (1-6), the motor (1-5) is fixedly connected to the central connecting block (1-6), the gear (1-4) is fixedly connected to an output shaft of the motor (1-5), the two racks (1-3) are fixedly connected to the telescopic support frame (1-1), and the two racks (1-3) are in meshing transmission with the gear (1-4);
the lifting basket side arm (2) comprises a lifting motor (2-1), an internal thread rod (2-2), a threaded rod (2-3), an upper supporting block (2-4), auxiliary telescopic rods (2-5) and limiting plates (2-6), wherein the internal threaded rod (2-2) is fixedly connected to an output shaft of the lifting motor (2-1), the threaded rod (2-3) and the internal threaded rod (2-2) are in threaded transmission, the upper supporting block (2-4) is fixedly connected to the threaded rod (2-3), the two auxiliary telescopic rods (2-5) are respectively and fixedly connected to the front side and the rear side of the upper supporting block (2-4), the limiting plates (2-6) are fixedly connected to the end parts of the auxiliary telescopic rods (2-5), and the lifting motor (2-1) is fixedly connected to the upper end of a central connecting block (1-6), the limiting plate (2-6) is fixedly connected to the upper end of the telescopic support frame (1-1);
the perpendicularity determining assembly (3) comprises a take-up box (3-1), a take-up motor (3-2), a take-up wheel (3-3), a connecting wire (3-4) and a heavy hammer (3-5), wherein the take-up box (3-1) is fixedly connected to the upper end of an upper supporting block (2-4), the take-up motor (3-2) is fixedly connected to the take-up box (3-1), the take-up wheel (3-3) is fixedly connected to an output shaft of the take-up motor (3-2), a plurality of connecting wires (3-4) are fixedly connected to the take-up wheel (3-3), and the heavy hammers (3-5) are respectively and fixedly connected to the connecting wires (3-4);
the height adjusting assembly (4) comprises a telescopic arm (4-1), an adjusting motor (4-2), an auxiliary support rod (4-3) and a hanging basket arm (4-4), the upper end and the lower end of the telescopic arm (4-1) are fixedly connected to an auxiliary telescopic rod (2-5) and a telescopic support frame (1-1) respectively, the hanging basket arm (4-4) is rotatably connected to the telescopic arm (4-1), the auxiliary support rod (4-3) is rotatably connected to the telescopic arm (4-1), the hanging basket arm (4-4) is rotatably connected to the auxiliary support rod (4-3), the adjusting motor (4-2) is fixedly connected to the telescopic arm (4-1), and the hanging basket arm (4-4) is fixedly connected to an output shaft of the adjusting motor (4-2);
the leveling rod of the horizontal position adjusting component (1) and the protruding shell and the old wall of the verticality determining component (3) depend on each other, the levelness and the verticality of the device are determined and standardized through the horizontal position adjusting component (1) and the verticality determining component (3) when the building is carried out, the cement extracting mechanism enables the cement for building to rise along with rising of the building wall, and the height adjusting component (4) extends and can drive the externally hung hanging basket to rise.
2. The method for constructing and building a new wall based on the old wall body as claimed in claim 1, wherein: the branch supporting mechanism (5) comprises an upper connecting plate (5-1), connecting telescopic rods (5-2), a bearing bottom plate (5-3) and horizontal adjusting rods (5-4), wherein the upper connecting plate (5-1) is fixedly connected to the upper ends of the connecting telescopic rods (5-2), the connecting telescopic rods (5-2) are fixedly connected to the upper ends of the bearing bottom plate (5-3), the horizontal adjusting rods (5-4) are fixedly connected to the bearing bottom plate (5-3), and the two upper connecting plates (5-1) are fixedly connected to the auxiliary telescopic rods (2-5).
3. The method for constructing and building a new wall based on an old wall as claimed in claim 2, wherein: the cement extraction mechanism (6) comprises two material presenting barrels (6-1), two material placing platforms (6-2), a sliding platform (6-3) and lifting material presenting barrels (6-4), wherein the two material placing platforms (6-2) are fixedly connected to the two material presenting barrels (6-1) respectively, the two lifting material presenting barrels (6-4) are connected to the two material presenting barrels (6-1) respectively in a sliding mode, the sliding platform (6-3) is connected to the two material placing platforms (6-2) in a sliding mode, the two material presenting barrels (6-1) are fixedly connected to the two connecting telescopic rods (5-2) respectively, and an electric push rod is arranged between the lifting material presenting barrels (6-4) and the sliding platform (6-3).
CN202110444666.6A 2021-04-24 2021-04-24 New wall building and building system and method based on old wall body Active CN113062610B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110444666.6A CN113062610B (en) 2021-04-24 2021-04-24 New wall building and building system and method based on old wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110444666.6A CN113062610B (en) 2021-04-24 2021-04-24 New wall building and building system and method based on old wall body

Publications (2)

Publication Number Publication Date
CN113062610A CN113062610A (en) 2021-07-02
CN113062610B true CN113062610B (en) 2022-08-30

Family

ID=76567505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110444666.6A Active CN113062610B (en) 2021-04-24 2021-04-24 New wall building and building system and method based on old wall body

Country Status (1)

Country Link
CN (1) CN113062610B (en)

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3967750B2 (en) * 2005-02-23 2007-08-29 日本ビソー株式会社 Cable fall prevention device
JP4654055B2 (en) * 2005-03-04 2011-03-16 キャンペックス工業株式会社 Lifting device for material transportation used for building scaffolding
CN102561713B (en) * 2012-02-23 2014-03-19 中国十七冶集团有限公司 Method for controlling building quality of concrete frame structure walls
CN203160722U (en) * 2013-04-12 2013-08-28 山东电力建设第二工程公司 Construction wall building constructing device
US9255416B1 (en) * 2015-03-02 2016-02-09 Eric Snell Construction hoist system
CN204645580U (en) * 2015-05-17 2015-09-16 高伟 A kind of building suspension bracket
CN105201197A (en) * 2015-10-26 2015-12-30 江苏理工学院 Combined movable lifting scaffold
CN107795113A (en) * 2016-09-06 2018-03-13 淄博夸克医药技术有限公司 It is a kind of to build the suspension bracket hanging basket used
CN207959897U (en) * 2018-03-01 2018-10-12 浙江铭友环境工程有限公司 A kind of construction hanging basket built for room
CN209837646U (en) * 2019-03-20 2019-12-24 中建七局建筑装饰工程有限公司 Movable suspension structure of large-span aerial work platform
CN209760765U (en) * 2019-03-27 2019-12-10 济源职业技术学院 Building outer wall construction hanging flower basket
CN210152208U (en) * 2019-04-07 2020-03-17 正太集团有限公司 A multifunctional scaffold
CN110878639B (en) * 2019-11-29 2021-05-11 重庆科技学院 A mobile masonry wall grouting positioning method
CN111155755A (en) * 2020-01-08 2020-05-15 金色建设集团有限公司 Building outer wall hanging flower basket device
CN212406053U (en) * 2020-03-18 2021-01-26 盐城工业职业技术学院 Multi-functional hanging flower basket construction equipment for building
CN212689505U (en) * 2020-04-28 2021-03-12 山东兴华建设集团有限公司 Safe scaffold is used in construction of building wall
CN112361913B (en) * 2020-10-13 2022-07-15 中国一冶集团有限公司 Guiding rule for building coke oven head and using method thereof

Also Published As

Publication number Publication date
CN113062610A (en) 2021-07-02

Similar Documents

Publication Publication Date Title
CN113062610B (en) New wall building and building system and method based on old wall body
CN110959885B (en) Feed and processing device and processing technology thereof
CN111957222A (en) Feed processing technology
CN117776002A (en) Swing arm type crane
CN117737865A (en) Device for erecting foundation group templates of hollow box intensive single crystal furnace
CN114455486B (en) Stretching counterweight balance tower crane
CN215714669U (en) Hanging basket for bridge section construction operation
CN213950475U (en) Lifting machine for constructional engineering
CN210622701U (en) Drilling equipment for engineering geological investigation
CN215798205U (en) Lifting type positioning pile for exploration platform
CN211816170U (en) Strutting arrangement is used in geotechnical engineering investigation
CN210878499U (en) Assembly table is used in production of hydraulic forklift scale
CN220453183U (en) Mapping instrument positioning device for mapping
CN213302225U (en) Slump cone
CN220539158U (en) Construction structure of building outer wall
CN218595980U (en) Cantilever crane for steel rolling roller way
CN221515230U (en) Scaffold steel pipe classification device for construction site
CN217398262U (en) Portable retractable fixing frame for crane
CN220537339U (en) Hoisting device for bridge blasting demolition
CN216310006U (en) Concrete slump detection device
CN216196582U (en) Early-dismantling supporting template for aluminum alloy top plate
CN219623596U (en) Supporting device
CN220664772U (en) Auxiliary device for electrical installation of building engineering
CN220565795U (en) Movable stage transmission device
CN211978917U (en) Concrete slump tester

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220803

Address after: 362000 1st floor, No.2 Changsheng Road, Donghai street, Fengze District, Quanzhou City, Fujian Province

Applicant after: Fujian Asia Pacific Intellectual Property Operation Co.,Ltd.

Address before: No. 1718 Anhui Road, Binhe District, Yining City, Yili Kazak Autonomous Prefecture, Xinjiang Uygur Autonomous Region 835001

Applicant before: Wang Changcai

Effective date of registration: 20220803

Address after: No. 1688 Huandao East Road, Meizhou Town, Xiuyu District, Putian City, Fujian Province 351154

Applicant after: Fujian Zhongyuan Construction Engineering Construction Co., Ltd.

Address before: 362000 1st floor, No.2 Changsheng Road, Donghai street, Fengze District, Quanzhou City, Fujian Province

Applicant before: Fujian Asia Pacific Intellectual Property Operation Co.,Ltd.

GR01 Patent grant
GR01 Patent grant