CN113013896B - Coordination control method for jointly participating in primary frequency modulation of power grid by light storage - Google Patents

Coordination control method for jointly participating in primary frequency modulation of power grid by light storage Download PDF

Info

Publication number
CN113013896B
CN113013896B CN202110249651.4A CN202110249651A CN113013896B CN 113013896 B CN113013896 B CN 113013896B CN 202110249651 A CN202110249651 A CN 202110249651A CN 113013896 B CN113013896 B CN 113013896B
Authority
CN
China
Prior art keywords
energy storage
photovoltaic
frequency
power
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110249651.4A
Other languages
Chinese (zh)
Other versions
CN113013896A (en
Inventor
傅质馨
张晶晶
朱俊澎
袁越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN202110249651.4A priority Critical patent/CN113013896B/en
Publication of CN113013896A publication Critical patent/CN113013896A/en
Application granted granted Critical
Publication of CN113013896B publication Critical patent/CN113013896B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/24Arrangements for preventing or reducing oscillations of power in networks
    • H02J3/241The oscillation concerning frequency
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/48Controlling the sharing of the in-phase component
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • H02J2300/26The renewable source being solar energy of photovoltaic origin involving maximum power point tracking control for photovoltaic sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a coordination control method for jointly participating in primary frequency modulation of a power grid by light storage, which comprises the following steps: modeling a photovoltaic power generation system and an energy storage system respectively to obtain a photovoltaic power generation system model and an energy storage system model; the photovoltaic power generation system is used for participating in power grid frequency modulation through a dynamic variable load shedding method following system output and frequency change; on the basis of coordinated droop control and positive and negative virtual inertia control, an energy storage combined frequency modulation is adopted on the basis of an energy storage variable coefficient self-adaptive control strategy; the capacity of the stored energy is set, so that the inertial response matched with the synchronous generator set can be provided, and the coordination control of the primary frequency modulation of the light storage support power grid is realized by adopting photovoltaic variable load shedding and configured energy storage combined frequency modulation. The invention can improve the inertia and frequency response capability of the optical storage system, can also take frequency modulation and energy storage capacity into account, is beneficial to exerting comprehensive benefits, and improves the utilization rate of new energy while improving the stability level of the system.

Description

一种光储联合参与电网一次调频的协调控制方法A coordinated control method for the joint participation of photovoltaic and storage in the primary frequency regulation of the power grid

技术领域technical field

本发明属于新能源并网频率稳定性领域,涉及一次调频控制方法,具体涉及一种光储联合参与电网一次调频的协调控制方法。The invention belongs to the field of grid-connected frequency stability of new energy sources, relates to a primary frequency regulation control method, and in particular relates to a coordinated control method for the combined participation of photovoltaics and storage in the primary frequency regulation of a power grid.

背景技术Background technique

随着光伏发电渗透率的大幅增加,电力系统故障扰动下的频率调节特性显著恶化。为了提升光伏利用率,光伏发电一般工作在最大功率点,不提供惯量支撑以及未考虑必要的能量储备,对电网的电压、频率支撑作用极其有限。考虑到对系统的主动支撑作用,将光伏发电参与系统频率电压调节显得尤为迫切。此外,从利用新的支撑手段的角度,发挥储能快速灵活响应特性,开展光伏和储能的协调控制,有利于发挥综合效益,在提高系统稳定水平的同时,提升新能源的利用率。With the large increase in the penetration rate of photovoltaic power generation, the frequency regulation characteristics under the disturbance of power system faults deteriorate significantly. In order to improve the utilization rate of photovoltaics, photovoltaic power generation generally works at the maximum power point, does not provide inertia support and does not consider necessary energy reserves, and has extremely limited support for the voltage and frequency of the grid. Taking into account the active support of the system, it is particularly urgent to involve photovoltaic power generation in the frequency and voltage regulation of the system. In addition, from the perspective of using new support means, to give full play to the fast and flexible response characteristics of energy storage, and to carry out coordinated control of photovoltaics and energy storage, it is beneficial to exert comprehensive benefits, and to improve the utilization rate of new energy while improving the stability of the system.

但是现有的光伏调频策略对于如何实现光伏功频特性控制系数与减载备用容量动态匹配,以及储能调频控制策略中调频参数设置灵活性和自适应性等问题仍然有待改进。储能不仅可以平滑光伏的功率波动,又可以弥补光伏单独参与调频的不足。而目前涉及大电网中光储协调参与一次调频的研究较少,急需一个有效的技术方案来解决现存的技术问题。However, the existing photovoltaic frequency regulation strategies still need to be improved on how to realize the dynamic matching between the photovoltaic power frequency characteristic control coefficient and the load shedding reserve capacity, and the flexibility and adaptability of the frequency regulation parameter setting in the energy storage frequency regulation control strategy. Energy storage can not only smooth the power fluctuations of photovoltaics, but also make up for the lack of photovoltaics alone participating in frequency regulation. At present, there are few studies involving the coordination of photovoltaics and storage in large power grids to participate in primary frequency regulation, and an effective technical solution is urgently needed to solve the existing technical problems.

发明内容SUMMARY OF THE INVENTION

发明目的:针对光伏发电经电力电子接口并网不具有频率响应能力的问题,提供一种光储联合参与电网一次调频的协调控制方法,其能够提升光储系统的惯性以及频率响应能力,并且能兼顾调频和储能容量的保持效果,有利于发挥综合效益,在提高系统稳定水平的同时,提升新能源的利用率。Purpose of the invention: Aiming at the problem that photovoltaic power generation does not have frequency response capability when connected to the grid through a power electronic interface, to provide a coordinated control method for the joint participation of photovoltaics and storage in primary frequency regulation of the power grid, which can improve the inertia and frequency response capability of the photovoltaics storage system, and can Taking into account the maintenance effect of frequency regulation and energy storage capacity, it is beneficial to exert comprehensive benefits, and improve the utilization rate of new energy while improving the stability of the system.

技术方案:为实现上述目的,本发明提供一种光储联合参与电网一次调频的协调控制方法,包括如下步骤:Technical solution: In order to achieve the above purpose, the present invention provides a coordinated control method for the combined participation of photovoltaic and storage in the primary frequency regulation of the power grid, including the following steps:

S1:分别对光伏发电系统和储能系统进行建模,获取到光伏发电系统模型和储能系统模型;所述光伏发电系统包括光伏阵列、Boost变换器、并网逆变器、滤波器及其控制系统;所述储能系统包括储能电池、Buck-Boost变换器、并网逆变器、滤波器及其控制系统;S1: Model the photovoltaic power generation system and the energy storage system respectively, and obtain the photovoltaic power generation system model and the energy storage system model; the photovoltaic power generation system includes a photovoltaic array, a boost converter, a grid-connected inverter, a filter and its a control system; the energy storage system includes an energy storage battery, a Buck-Boost converter, a grid-connected inverter, a filter and a control system thereof;

S2:将光伏通过一种跟随系统出力及频率变化的动态可变减载方法参与电网调频;所述光伏跟随系统出力及频率变化的动态可变减载方法为:光伏采用最大功率点跟踪方式得到最大有功输出Pmppt,经过可变减载控制并限幅后作为光伏新的有功功率给定,输出给Boost变换器的控制系统;S2: The photovoltaic participates in the grid frequency regulation through a dynamic variable load shedding method that follows the system output and frequency changes; the dynamic variable load shedding method that the photovoltaic follows the system output and frequency changes is: the photovoltaic uses the maximum power point tracking method to obtain The maximum active power output P mppt is given as the new active power of photovoltaics after variable load shedding control and amplitude limiting, and is output to the control system of the Boost converter;

S3:在协调下垂控制以及正负虚拟惯性控制的基础下,基于储能变系数自适应控制策略,采用储能联合调频;S3: On the basis of coordinated droop control and positive and negative virtual inertia control, based on the energy storage variable coefficient adaptive control strategy, the energy storage joint frequency modulation is adopted;

S4:对储能的容量进行设置,使其可以提供和同步发电机组相匹配的惯性响应,采用光伏可变减载和配置储能联合调频,实现光储支撑电网一次调频的协调控制。S4: Set the capacity of the energy storage so that it can provide an inertial response that matches the synchronous generator set, and use photovoltaic variable load shedding and combined frequency modulation with energy storage to achieve coordinated control of the primary frequency modulation of the photovoltaic power grid.

进一步的,所述步骤S1中的光伏发电系统具体为:光伏阵列输出的直流电压Vpv和直流电流Ipv,经最大功率点跟踪控制器后产生直流电压参考值Vrefmppt,Vrefmppt和VPV的误差信号经积分后得到光伏输出有功功率给定Pref,Pref和boost变换器高压侧的有功功率Pdc经PI控制后生成占空比d,驱动Boost变换器工作,从而实现光伏阵列的MPPT 控制;并网逆变器工作在单位功率因数状态igq *=0,光伏阵列经Boost变换器升压后得到直流电压Udc,与电压参考值Uref做差后,通过PI控制生成电流内环参考值idref,再与采样所得的实际电流值id、iq做偏差经PI控制器和电流解耦控制后,得到电压给定usq、 usd,最后经坐标变换后通过脉宽调制后得到并网逆变器的触发脉冲Sg,从而实现并网逆变器有功无功的解耦控制及并网运行。Further, the photovoltaic power generation system in the step S1 is specifically: the DC voltage V pv and the DC current I pv output by the photovoltaic array are passed through the maximum power point tracking controller to generate the DC voltage reference values V refmppt , V refmppt and V PV . The error signal is integrated to obtain a given PV output active power P ref , P ref and the active power P dc on the high-voltage side of the boost converter are controlled by PI to generate a duty cycle d, which drives the boost converter to work, thereby realizing the photovoltaic array. MPPT control; the grid-connected inverter works in the state of unity power factor i gq * = 0, the photovoltaic array is boosted by the Boost converter to obtain the DC voltage U dc , after making a difference with the voltage reference value U ref , the current is generated by PI control The reference value idref of the inner loop is then deviated from the actual current values id and iq obtained by sampling . After the PI controller and the current decoupling control, the given voltage u sq and u sd are obtained. After wide modulation, the trigger pulse S g of the grid-connected inverter is obtained, so as to realize the decoupling control of the active and reactive power of the grid-connected inverter and the grid-connected operation.

进一步的,所述步骤S1中储能系统具体为:储能系统通过升降压斩波电路实现储能的充放电切换;采样Buck-Boost低压侧的电压电流VL、IL,相乘得到电池功率Pbat。当DC/DC变换器工作在放电模式时,将有功参考给定Pref与电池功率Pbat进行比较,采用PI控制器进行调节后得到占空比信号D_Boost,和变频锯齿波发生器产生的频率信号一起经插补触发脉冲生成驱动Boost变换器的脉冲信号GBoost。当变换器工作在充电模式时,将Pref取相反数,与电池功率Pbat做差后乘以-1,再进行和放电模式下类似的控制后,得到驱动Buck动作的触发信号GBuckFurther, the energy storage system in the step S1 is specifically: the energy storage system realizes the charging and discharging switching of the energy storage through the buck-boost chopper circuit; sampling the voltage and current VL and IL of the low-voltage side of the Buck-Boost, and multiplying them to obtain battery power P bat . When the DC/DC converter works in the discharge mode, compare the active reference reference P ref with the battery power P bat , and use the PI controller to adjust to obtain the duty cycle signal D_Boost, and the frequency generated by the variable frequency sawtooth wave generator. The signals are interpolated together to trigger pulses to generate a pulse signal G Boost that drives the boost converter. When the converter works in the charging mode, take the inverse number of P ref , make the difference with the battery power P bat and multiply it by -1, and then perform the similar control as in the discharging mode to obtain the trigger signal G Buck that drives the action of Buck .

进一步的,所述步骤S2中动态可变减载的控制特性曲线表达式如下:Further, the control characteristic curve expression of the dynamic variable load shedding in the step S2 is as follows:

σ%=K0×(Pmppt/PN+Δf/Δfmax) (1)σ%=K 0 ×(P mppt /P N +Δf/Δf max ) (1)

式中:PN为光伏系统在标况下的额定有功功率;Pmppt为光伏系统在当前工况的最大有功功率;Δfmax为系统允许的最大频率偏差;Δf为系统频率偏差;K0为初始情况下的减载率;σmax%为减载率的上限值。In the formula: P N is the rated active power of the photovoltaic system under standard conditions; P mppt is the maximum active power of the photovoltaic system in the current working condition; Δf max is the maximum allowable frequency deviation of the system; Δf is the system frequency deviation; K 0 is Load shedding rate in the initial condition; σ max % is the upper limit of the load shedding rate.

进一步的,所述步骤S3中下垂控制方法为Further, the droop control method in the step S3 is:

将储能分为四个区间:Smax:储能电池工作的最大限值;Shigh:储能电池正常工作的上限值;Slow:储能电池正常工作的下限值;Smin:储能电池工作的最小限值;The energy storage is divided into four intervals: S max : the maximum working limit of the energy storage battery; S high : the upper limit of the normal operation of the energy storage battery; S low : the lower limit of the normal operation of the energy storage battery; S min : The minimum limit for the operation of the energy storage battery;

采用Logistic函数对下垂系数进行自适应控制,其曲线函数表达式:The Logistic function is used to adaptively control the droop coefficient, and its curve function expression is:

Figure BDA0002965458390000021
Figure BDA0002965458390000021

式中:P0为初始值;K为终值;r衡量曲线增长的快慢;In the formula: P 0 is the initial value; K is the final value; r measures the speed of the curve growth;

以SOC作为自变量,P0和r作为参变量,充放电系数为因变量,构造如下等式:Taking SOC as the independent variable, P0 and r as the parameters, and the charge-discharge coefficient as the dependent variable, the following equation is constructed:

1)电池放电1) battery discharge

Figure BDA0002965458390000031
Figure BDA0002965458390000031

2)电池充电2) Battery charging

Figure BDA0002965458390000032
Figure BDA0002965458390000032

式中:Kmax为充放电时,下垂系数的终值;Ssoc为储能的荷电状态;Kbc和Kbd分别为放电和充电时对应的系数。In the formula: K max is the final value of the droop coefficient during charging and discharging; S soc is the state of charge of the energy storage; K bc and K bd are the corresponding coefficients during discharging and charging, respectively.

进一步的,所述步骤S3中正虚拟惯性控制方法为:Further, the positive virtual inertia control method in the step S3 is:

正虚拟惯性响应公式为:The formula for the positive virtual inertial response is:

ΔPbess=-Mbpdf/dt (5)ΔP bess = -M bp df/dt (5)

Figure BDA0002965458390000033
Figure BDA0002965458390000033

Figure BDA0002965458390000034
Figure BDA0002965458390000034

式中:Mbp为正虚拟惯性系数;Mbp-c、Mbp-d分别为储能充放电时的正虚拟惯性系数;Mp为随频率偏差变化的调节系数;n为参变量;c1为正虚拟惯性系数初始值。Dp为正虚拟惯性频率变化率死区。In the formula: M bp is the positive virtual inertia coefficient; M bp-c and M bp-d are the positive virtual inertia coefficients when the energy storage is charged and discharged respectively; M p is the adjustment coefficient that changes with the frequency deviation; n is the parameter; c 1 is the initial value of the positive virtual inertia coefficient. D p is the dead zone of the positive virtual inertia frequency change rate.

进一步的,所述步骤S3中负虚拟惯性控制方法为:Further, the negative virtual inertia control method in the step S3 is:

负虚拟惯性响应公式为:The negative virtual inertia response formula is:

ΔPbess=-Mbn df/dt (8)ΔP bess = -M bn df/dt (8)

Figure BDA0002965458390000035
Figure BDA0002965458390000035

Figure BDA0002965458390000036
Figure BDA0002965458390000036

式中:Mbn为负虚拟惯性系数;Mbn-c、Mbn-d分别为充放电时的负虚拟惯性系数;b1为负虚拟惯性系数初始值;Mb1为关于频率偏差变化的调节系数;fbess-d为储能调频死区; fmax为电网允许的最大频率偏差幅值。In the formula: M bn is the negative virtual inertia coefficient; M bn-c and M bn-d are the negative virtual inertia coefficients during charging and discharging respectively; b 1 is the initial value of the negative virtual inertia coefficient; M b1 is the adjustment of the frequency deviation change coefficient; f bess-d is the dead zone of energy storage frequency regulation; f max is the maximum frequency deviation amplitude allowed by the grid.

进一步的,所述步骤S4中配置储能容量的方法为:Further, the method for configuring the energy storage capacity in the step S4 is:

为了保证配置的储能可以提供和同步发电机组相匹配的惯性响应,对储能的容量大小设置如下:In order to ensure that the configured energy storage can provide an inertial response that matches the synchronous generator set, the capacity of the energy storage is set as follows:

当发电机转速为ω时,同步发电机具有的旋转动能为When the generator speed is ω, the rotational kinetic energy of the synchronous generator is

Figure BDA0002965458390000041
Figure BDA0002965458390000041

当电机转速跟随系统频率从ω0变化为ω1When the motor speed follows the system frequency from ω 0 to ω 1

Figure BDA0002965458390000042
Figure BDA0002965458390000042

同步发电机的转速正比于系统频率,一般在小范围内变化。电网运维准则规定,特殊情况下系统频率在短时间内可能上升到51Hz或者下降到48Hz。以频率下降分析,同步发电机转子的转速范围为0.95~1pu,可以释放的动能为:The rotational speed of a synchronous generator is proportional to the system frequency and generally varies within a small range. The grid operation and maintenance guidelines stipulate that the system frequency may rise to 51Hz or drop to 48Hz in a short period of time under special circumstances. Based on the frequency drop analysis, the rotational speed of the rotor of the synchronous generator ranges from 0.95 to 1pu, and the kinetic energy that can be released is:

Figure BDA0002965458390000043
Figure BDA0002965458390000043

储能装置只受限于SOC,通常可以实现大范围的功率吞吐,因此较小的储能容量就可以实现和常规发电机组相同的调频效果。当配置有储能的光伏电站取代常规发电机组并入电网时,由于储能充放电时间一般大于惯性响应时间,故储能功率满足要求时,容量也就满足要求。The energy storage device is only limited by the SOC, and can usually achieve a wide range of power throughput, so a smaller energy storage capacity can achieve the same frequency modulation effect as a conventional generator set. When a photovoltaic power station equipped with energy storage replaces the conventional generator set and is integrated into the power grid, since the charging and discharging time of the energy storage is generally longer than the inertia response time, when the energy storage power meets the requirements, the capacity also meets the requirements.

设储能系统在Δt内释放出的能量与同转子动能相同,则有:Assuming that the energy released by the energy storage system within Δt is the same as the kinetic energy of the same rotor, there are:

ΔEbess=PbessΔt=0.0784HSN (14)ΔE bess = P bess Δt = 0.0784HS N (14)

令Δt=2HLet Δt=2H

Pbess=0.0392SN (15)P bess = 0.0392S N (15)

式中:ΔEbess、Pbess分别为为储能的容量和功率;SN为发电机的额定容量;H为惯量常数;J为发电机的惯性时间常数。In the formula: ΔE bess and P bess are the capacity and power of the energy storage, respectively; S N is the rated capacity of the generator; H is the inertia constant; J is the inertia time constant of the generator.

进一步的,所述步骤S4中光储联合调频的方法为:Further, the method for combined frequency modulation of optical storage and storage in the step S4 is:

1)储能系统为电力系统频率变化初期提供与常规发电机组相匹配的惯性响应;1) The energy storage system provides an inertial response that matches the conventional generator set for the initial frequency change of the power system;

2)光伏利用可变减载调频策略和储能自适应控制策略联合参与一次调频。2) Photovoltaic uses variable load shedding and frequency regulation strategy and energy storage adaptive control strategy to jointly participate in primary frequency regulation.

本发明分别提出了光伏和储能参与电网一次调频的策略:光伏采用一种跟随系统出力及频率变化的动态可变减载调频策略,实时响应系统频率波动,提高光伏电站的频率稳定性。储能采用一种跟随荷电状态、频率变化率及频率偏差变化的自适应控制策略,下垂控制基于logistic函数动态调整控制系数;正虚拟惯性控制结合频率偏差和频率变化率的影响;负虚拟惯性综合考虑电池SOC、频率变化率及频率偏差来调整出力;实现了三者的协调与优势互补。为了尽量减少固定减载所造成的功率损失以及降低储能系统的成本,采用光伏可变减载和配置储能联合调频的措施:由储能为电力系统频率初始变化阶段提供惯性响应,光伏利用可变减载运行和储能联合参与一次调频,从而实现了储能和光伏的协调运行。The invention proposes a strategy for photovoltaic and energy storage to participate in the primary frequency regulation of the power grid: the photovoltaic adopts a dynamic variable load shedding and frequency regulation strategy that follows the system output and frequency changes, responds to the system frequency fluctuation in real time, and improves the frequency stability of the photovoltaic power station. The energy storage adopts an adaptive control strategy that follows the changes of the state of charge, frequency change rate and frequency deviation. The droop control dynamically adjusts the control coefficient based on the logistic function; positive virtual inertia control combines the effects of frequency deviation and frequency change rate; negative virtual inertia The output is adjusted comprehensively considering the battery SOC, frequency change rate and frequency deviation; the coordination and complementary advantages of the three are realized. In order to minimize the power loss caused by fixed load shedding and reduce the cost of the energy storage system, the measures of photovoltaic variable load shedding and combined frequency regulation with energy storage are adopted: the energy storage provides inertial response for the initial frequency change phase of the power system, and the photovoltaic utilization The variable load shedding operation and energy storage jointly participate in primary frequency regulation, thus realizing the coordinated operation of energy storage and photovoltaic.

本发明提出利用一种光储联合参与电网一次调频的协调控制方法。由于光伏受光照强度及温度等环境因素的影响,光伏发电具有随机性、波动性和不确定性等特点。光伏阵列一般工作在最大功率点,没有可以存储动能和提供惯量的旋转设备,无法为电网提供必要的电压、频率支撑和阻尼作用。随着光伏占比越来越高,电力电子接口逐渐规模化替代机械开关接口,电力系统整体惯性水平随之下降,其对电力系统的安全稳定运行的威胁愈加显现,光伏参与系统频率的调整越来越有必要。储能不仅可以平滑光伏的功率波动,又可以弥补光伏单独参与调频的不足。为了尽量减少固定减载所造成的功率损失以及降低储能系统的成本,采用光伏可变减载和配置储能联合调频的措施:因此给出一种光储联合参与电网一次调频的协调控制方法具有十分重要的现实意义。The present invention proposes a coordinated control method of utilizing a photovoltaic-storage joint to participate in the primary frequency regulation of the power grid. Due to the influence of environmental factors such as light intensity and temperature, photovoltaic power generation has the characteristics of randomness, volatility and uncertainty. Photovoltaic arrays generally work at the maximum power point, without rotating equipment that can store kinetic energy and provide inertia, and cannot provide the necessary voltage, frequency support and damping for the grid. As the proportion of photovoltaics becomes higher and higher, the power electronic interface gradually replaces the mechanical switch interface on a large scale, and the overall inertia level of the power system decreases, which threatens the safe and stable operation of the power system. more and more necessary. Energy storage can not only smooth the power fluctuations of photovoltaics, but also make up for the lack of photovoltaics alone participating in frequency regulation. In order to minimize the power loss caused by fixed load shedding and reduce the cost of the energy storage system, the measures of variable load shedding of photovoltaics and combined frequency regulation of energy storage are adopted. Therefore, a coordinated control method for the joint participation of photovoltaic and energy storage in primary frequency regulation of the power grid is given. has very important practical significance.

本发明首先对光伏系统和储能系统调频特性进行分析。其次分别提出了光伏和储能参与电网一次调频的策略:光伏采用一种跟随系统出力及频率变化的动态可变减载调频方法;储能采用一种跟随荷电状态、频率变化率及频率偏差变化的自适应控制方法。为了尽量减少固定减载所造成的功率损失以及降低储能系统的成本,采用光伏可变减载和配置储能联合调频的措施:由储能为电力系统频率初始变化阶段提供惯性响应,光伏利用可变减载运行和储能联合参与一次调频,从而实现了储能和光伏的协调运行。最后利用典型区域电网算例,对所提策略进行了仿真验证。The present invention first analyzes the frequency regulation characteristics of the photovoltaic system and the energy storage system. Secondly, the strategies for photovoltaic and energy storage to participate in the primary frequency regulation of the power grid are respectively proposed: photovoltaic adopts a dynamic variable load shedding and frequency regulation method that follows the system output and frequency changes; energy storage adopts a method that follows the state of charge, frequency change rate and frequency deviation Variation of adaptive control methods. In order to minimize the power loss caused by fixed load shedding and reduce the cost of the energy storage system, the measures of photovoltaic variable load shedding and combined frequency regulation with energy storage are adopted: the energy storage provides inertial response for the initial frequency change phase of the power system, and the photovoltaic utilization The variable load shedding operation and energy storage jointly participate in primary frequency regulation, thus realizing the coordinated operation of energy storage and photovoltaic. Finally, the proposed strategy is simulated and verified by a typical regional power grid example.

本发明提出一种光伏可变减载调频方法:光伏采用最大功率点跟踪方式得到最大有功输出Pmppt,经过可变减载控制并限幅后作为光伏新的有功功率给定,输出给Boost变换器控制系统。一方面可变减载控制系数能够跟随系统频率偏差和最大有功出力而动态变换出力,另一方面反向调节系统的减载率,使系统具有一次调频的能力,避免了使用减载和下垂的控制策略时,下垂特性斜率的选取问题,具有灵活的自适应性。The invention proposes a photovoltaic variable load shedding and frequency regulation method: the photovoltaic adopts the maximum power point tracking method to obtain the maximum active power output P mppt , which is given as a new photovoltaic active power after variable load shedding control and amplitude limiting, and is output to the Boost conversion controller control system. On the one hand, the variable load shedding control coefficient can dynamically change the output following the system frequency deviation and the maximum active power output. On the other hand, the load shedding rate of the system is adjusted inversely, so that the system has the ability of primary frequency regulation, avoiding the use of load shedding and drooping. When the control strategy is used, the selection of the slope of the droop characteristic has flexible adaptability.

本发明提出一种电池储能自适应控制方法:下垂控制基于Logistic函数的特点,利用对称性,在充放电区间内各仅设置一个函数,并采用SOC分区自适应调节下垂系数,避免了分段函数设置的复杂性;正负虚拟惯性系数利用频率偏差变化函数作为调节因子,结合频率变化率及SOC变化特点进行设置;三者的协调,既保证了储能的荷电状态又发挥了储能一次调频的优势。The invention proposes an adaptive control method for battery energy storage: the droop control is based on the characteristics of the Logistic function, uses symmetry to set only one function in the charging and discharging interval, and adopts the SOC partition to adaptively adjust the droop coefficient, avoiding segmentation The complexity of the function setting; the positive and negative virtual inertia coefficients use the frequency deviation change function as an adjustment factor, and are set in combination with the frequency change rate and SOC change characteristics; the coordination of the three not only ensures the state of charge of the energy storage, but also plays a role in the energy storage. One FM advantage.

本发明提出一种光储联合参与电网一次调频的协调控制方法。储能系统为电力系统频率变化初期提供与常规发电机组类似的惯性响应;光伏利用可变减载调频策略和储能自适应控制策略联合参与一次调频。既有效利用了光伏的减载备用容量,又减少了储能的容量配置占比。The present invention proposes a coordinated control method for the combined participation of photovoltaic and storage in the primary frequency regulation of the power grid. The energy storage system provides an inertial response similar to that of the conventional generator set in the initial stage of the frequency change of the power system; the photovoltaic uses the variable load shedding frequency regulation strategy and the energy storage adaptive control strategy to jointly participate in the primary frequency regulation. It not only effectively utilizes the load shedding reserve capacity of photovoltaics, but also reduces the proportion of energy storage capacity allocation.

本发明创新性在于光伏使用可变减载调频方法,一方面能够跟随系统频率偏差和最大有功出力而动态变换出力;另一方面反向调节系统的减载率,使系统具有一次调频的能力。避免了使用虚拟下垂控制策略时,下垂特性斜率的选取问题,具有灵活性。其创新性还在于下垂控制基于Logistic函数,利用SOC分区自适应调节下垂系数;正负虚拟惯性系数利用频率偏差变化函数作为调节因子,结合频率变化率及SOC变化特点进行设置;实现了三者的协调与优势互补,具有更好的自适应性。既保证了储能的荷电状态又发挥储能一次调频的优势。最后由储能为电力系统频率初始变化阶段提供惯性响应,光伏利用可变减载运行和储能联合参与一次调频,从而实现了储能和光伏的协调运行。The innovation of the invention lies in that the photovoltaic adopts the variable load shedding and frequency regulation method, on the one hand, it can dynamically change the output power following the system frequency deviation and the maximum active power output; It avoids the problem of selecting the slope of the droop characteristic when using the virtual droop control strategy, and has flexibility. Its innovation is also that the droop control is based on the Logistic function, and uses the SOC partition to adaptively adjust the droop coefficient; the positive and negative virtual inertia coefficients use the frequency deviation change function as the adjustment factor, and are set in combination with the frequency change rate and SOC change characteristics; Coordination and complementary advantages, with better adaptability. It not only ensures the state of charge of the energy storage, but also takes advantage of the primary frequency modulation of the energy storage. Finally, the energy storage provides inertial response for the initial frequency change stage of the power system, and the photovoltaic uses variable load shedding operation and energy storage to jointly participate in primary frequency regulation, thereby realizing the coordinated operation of energy storage and photovoltaic.

有益效果:本发明与现有技术相比,光伏和储能均采用功率外环,电流内环的双环控制策略,通过叠加各自调频控制策略得到的有功增量到有功控制环路中,实现了一次调频能力。储能控制策略中可变系数的正负惯性控制和下垂控制,能够动态调整储能的出力,既保证了储能的荷电状态又发挥储能一次调频的优势。光伏采用可变减载调频控制方法,该策略控制方式简单,并且能够跟随频率偏差和出力变化,动态改变光伏的减载系数,避免了常规控制策略中控制参数选取的不灵活性。利用储能在初始频率跌落阶段为电网提供惯性支撑,和光伏联合进行一次调频,系统的频率稳定性得到大大提升。在19.05%和28.57%的光伏占比下,储能容量分别节约了3%和2.5%,既有效利用了光伏的减载备用容量,又减少了储能的容量配置占比。Beneficial effect: Compared with the prior art, the present invention adopts the dual-loop control strategy of the power outer loop and the current inner loop for both photovoltaic and energy storage. One FM capability. The positive and negative inertia control and droop control of variable coefficients in the energy storage control strategy can dynamically adjust the output of the energy storage, which not only ensures the state of charge of the energy storage, but also takes advantage of the primary frequency modulation of the energy storage. Photovoltaic adopts the variable load shedding and frequency modulation control method. The control method of this strategy is simple, and can follow the frequency deviation and output changes to dynamically change the photovoltaic load shedding coefficient, avoiding the inflexibility of control parameter selection in conventional control strategies. The energy storage is used to provide inertial support for the power grid during the initial frequency drop stage, and a frequency regulation is performed in conjunction with photovoltaics, which greatly improves the frequency stability of the system. At 19.05% and 28.57% of the photovoltaic ratio, the energy storage capacity is saved by 3% and 2.5% respectively, which not only effectively utilizes the load shedding reserve capacity of photovoltaics, but also reduces the proportion of energy storage capacity allocation.

附图说明Description of drawings

图1为本发明的光储联合参与电网的一次调频协调控制流程框图;Fig. 1 is a flow chart of the primary frequency regulation coordination control process of the combined photovoltaic and storage power grid of the present invention;

图2为本发明的光伏发电系统示意图;FIG. 2 is a schematic diagram of the photovoltaic power generation system of the present invention;

图3为本发明的光伏可变减载策略示意图;3 is a schematic diagram of a photovoltaic variable load shedding strategy of the present invention;

图4为本发明的储能系统示意图;4 is a schematic diagram of an energy storage system of the present invention;

图5为本发明的储能工作区间设置示意图;FIG. 5 is a schematic diagram of setting up an energy storage working area according to the present invention;

图6为本发明的储能下垂控制系数Kb随P0、r的变化曲线图;Fig. 6 is the change curve diagram of energy storage droop control coefficient K b with P 0 and r of the present invention;

图7为本发明的储能正虚拟惯性控制中调节因子Mp和储能调频出力变化曲线图;FIG. 7 is a graph showing the variation curve of the regulation factor M p and the energy storage frequency modulation output in the positive virtual inertia control of the energy storage according to the present invention;

图8为本发明的储能负虚拟惯性控制中调节因子Mb1和负虚拟惯性系数Mbn变化曲线图;Fig. 8 is the change curve diagram of the adjustment factor M b1 and the negative virtual inertia coefficient M bn in the energy storage negative virtual inertia control of the present invention;

图9为本发明实施例仿真分析模拟的三机九节点典型区域电网调频仿真模型示意图;FIG. 9 is a schematic diagram of a frequency regulation simulation model of a typical regional power grid with three machines and nine nodes by simulation analysis and simulation according to an embodiment of the present invention;

图10为本发明实施仿真分析模拟的光伏减载备用下的频率和光伏出力特性曲线图;Fig. 10 is a characteristic curve diagram of frequency and photovoltaic output under photovoltaic load shedding and standby simulated by the present invention;

图11为本发明实施仿真分析模拟的储能初始SOC=0.6时的定K法和变K法的频率、SOC对比图;Fig. 11 is a frequency and SOC comparison diagram of the fixed K method and the variable K method when the initial SOC of the energy storage is 0.6 by the simulation analysis of the present invention;

图12为本发明实施仿真分析模拟的储能初始SOC=0.3时定K法和变K法的频率、SOC对比图;Fig. 12 is a frequency and SOC comparison diagram of the fixed K method and the variable K method when the initial SOC of the energy storage is 0.3 by the simulation analysis of the present invention;

图13为本发明实施仿真分析模拟的储能不同调频方式下的频率变化曲线及结果图;Fig. 13 is the frequency change curve and result diagram of the energy storage under different frequency modulation modes of the simulation analysis and simulation of the present invention;

图14为本发明实施仿真分析模拟的光储联合调频下19.05%光伏占比下的频率、光伏出力及储能出力特性曲线;FIG. 14 is the frequency, photovoltaic output and energy storage output characteristic curves under 19.05% photovoltaic ratio under the combined frequency modulation of photovoltaic and storage under the simulation analysis and simulation of the present invention;

图15为本发明实施仿真分析模拟的光储联合调频下28.57%光伏占比下的频率、光伏出力及储能出力特性曲线。FIG. 15 is the frequency, photovoltaic output and energy storage output characteristic curves under 28.57% photovoltaic ratio under the combined frequency modulation of photovoltaic and storage under the simulation analysis and simulation of the present invention.

具体实施方式Detailed ways

下面结合附图和具体实施例,进一步阐明本发明,应理解这些实施例仅用于说明本发明而不用于限制本发明的范围,在阅读了本发明之后,本领域技术人员对本发明的各种等价形式的修改均落于本申请所附权利要求所限定的范围。Below in conjunction with the accompanying drawings and specific embodiments, the present invention will be further clarified. It should be understood that these embodiments are only used to illustrate the present invention and not to limit the scope of the present invention. Modifications of equivalent forms all fall within the scope defined by the appended claims of this application.

本发明提供一种光储联合参与电网一次调频的协调控制方法,以下分别对该方案的整体设计原理、方法流程以及仿真分析进行说明。The present invention provides a coordinated control method for the combined participation of photovoltaics and storage in primary frequency regulation of a power grid. The overall design principle, method flow and simulation analysis of the scheme are described below.

1、一种光储联合参与电网一次调频的协调控制方法1. A coordinated control method for the joint participation of photovoltaic and storage in the primary frequency regulation of the power grid

本发明将首先分别提出了光伏和储能参与电网一次调频的策略:光伏采用一种跟随系统出力及频率变化的动态可变减载调频策略。储能采用一种跟随荷电状态、频率变化率及频率偏差变化的自适应控制策略,下垂控制基于logistic函数动态调整控制系数;正虚拟惯性控制结合频率偏差和频率变化率的影响;负虚拟惯性综合考虑电池SOC、频率变化率及频率偏差来调整出力;实现了三者的协调与优势互补。进一步地,为了尽量减少固定减载所造成的功率损失以及降低储能系统的成本,采用光伏可变减载和配置储能联合调频的措施:由储能为电力系统频率初始变化阶段提供惯性响应,光伏利用可变减载运行和储能联合参与一次调频,从而实现了储能和光伏的协调运行。最后利用典型区域电网算例,对所提策略进行了仿真验证。The present invention will firstly propose a strategy for photovoltaic and energy storage to participate in primary frequency regulation of the power grid: photovoltaic adopts a dynamic variable load shedding and frequency regulation strategy that follows system output and frequency changes. The energy storage adopts an adaptive control strategy that follows the changes of the state of charge, frequency change rate and frequency deviation. The droop control dynamically adjusts the control coefficient based on the logistic function; positive virtual inertia control combines the effects of frequency deviation and frequency change rate; negative virtual inertia The output is adjusted comprehensively considering the battery SOC, frequency change rate and frequency deviation; the coordination and complementary advantages of the three are realized. Further, in order to minimize the power loss caused by fixed load shedding and reduce the cost of the energy storage system, the measures of photovoltaic variable load shedding and combined frequency regulation with energy storage are adopted: the energy storage provides inertial response for the initial frequency change phase of the power system. , PV utilizes variable load shedding operation and energy storage to jointly participate in primary frequency regulation, thus realizing the coordinated operation of energy storage and PV. Finally, the proposed strategy is simulated and verified by a typical regional power grid example.

1.1、光伏发电系统和储能系统的模型1.1. Models of photovoltaic power generation systems and energy storage systems

对光伏发电系统和储能系统分别进行建模。如附图2所示,光伏发电系统主要由光伏阵列、Boost变换器、并网逆变器和滤波器及其控制系统组成。如附图4,储能系统主要由储能电池、Buck-Boost变换器、并网逆变器和滤波器其控制系统组成。Model the photovoltaic power generation system and the energy storage system separately. As shown in Figure 2, the photovoltaic power generation system is mainly composed of photovoltaic arrays, Boost converters, grid-connected inverters, filters and their control systems. As shown in Figure 4, the energy storage system is mainly composed of an energy storage battery, a Buck-Boost converter, a grid-connected inverter and a filter and its control system.

1.2、光伏可变减载备用调频方法1.2. PV variable load shedding backup frequency modulation method

由附图3可见,光伏采用最大功率点跟踪方式得到最大有功输出Pmppt,经过可变减载控制并限幅后作为光伏新的有功功率给定,输出给Boost变换器控制系统。其中,可变减载控制特性曲线表达式如下。It can be seen from Figure 3 that the photovoltaic adopts the maximum power point tracking method to obtain the maximum active power output P mppt , which is given as the new active power of the photovoltaic after variable load shedding control and amplitude limiting, and is output to the boost converter control system. Among them, the variable load shedding control characteristic curve is expressed as follows.

σ%=K0×(Pmppt/PN+Δf/Δfmax) (1)σ%=K 0 ×(P mppt /P N +Δf/Δf max ) (1)

当系统频率下降时,Δf为负,减载系数动态跟随频率偏差变小,增发有功出力。当系统频率上升时,Δf为正,减载系数动态随频率偏差变大,减少有功出力。从而响应电力系统频率变化参与一次调频。本文提出的可变减载调频控制策略中,一方面控制系数σ%能够跟随系统频率偏差和最大有功出力而动态变换出力。另一方面反向调节系统的减载率,使系统具有一次调频的能力。避免了使用减载和下垂的控制策略时,下垂特性斜率的选取问题,具有灵活的自适应性。When the system frequency decreases, Δf is negative, the load shedding coefficient dynamically follows the frequency deviation and becomes smaller, and the active power output is increased. When the system frequency increases, Δf is positive, and the load shedding coefficient dynamically increases with the frequency deviation, reducing the active power output. Thereby, it participates in the primary frequency regulation in response to the frequency change of the power system. In the variable load shedding and frequency modulation control strategy proposed in this paper, on the one hand, the control coefficient σ% can dynamically change the output power following the system frequency deviation and the maximum active power output. On the other hand, the load shedding rate of the system is reversely adjusted, so that the system has the ability of primary frequency modulation. It avoids the problem of selecting the slope of the droop characteristic when using the control strategy of load shedding and droop, and has flexible adaptability.

1.3储能自适应调频策略1.3 Energy storage adaptive frequency regulation strategy

下垂控制基于logistic函数动态调整控制系数,见附图6,通过变化曲线对P0和r进行选取;Logistic曲线具有天然的凹凸性。使得储能的自适应策略可以兼顾调频和SOC保持效果。当储能放电且储能容量充足时,曲线呈上凸性,可以保证储能的单位调节功率处于一个相对更大的值。如果储能容量不充足,曲线呈下凸性,随着SOC的下降,放电速度变慢,此时单位调节功率处于较小的值以保持SOC效果。正虚拟惯性控制结合频率偏差和频率变化率的影响;能兼顾到频率初始变化率大,然后逐渐变小,直到最大频率偏差点处变化率变为0的特点。在初始阶段的控制系数取稍小一点,在最大频率偏差点附近取的大一点。使储能能够均匀出力,同步改善初始频率变化率和最大频率偏差。负虚拟惯性综合考虑电池SOC、频率变化率及频率偏差来调整出力;考虑到频率恢复阶段,最大频率偏差大,但是频率变化率低,此时可以乘较大的系数,使系统的频率快速恢复。随着时间的延长,频率偏差减小,储能的SOC值降低,此时乘较小的系数,保证储能的 SOC维持效果。实现了三者的协调与优势互补。The droop control dynamically adjusts the control coefficient based on the logistic function, see Figure 6, and selects P 0 and r through the change curve; the logistic curve has natural concavo-convex. The adaptive strategy of energy storage can take into account the effects of frequency regulation and SOC retention. When the energy storage is discharged and the energy storage capacity is sufficient, the curve is convex, which can ensure that the unit regulation power of the energy storage is at a relatively larger value. If the energy storage capacity is not sufficient, the curve is downward convex. As the SOC decreases, the discharge speed becomes slower. At this time, the unit regulated power is at a small value to maintain the SOC effect. Positive virtual inertial control combines the effects of frequency deviation and frequency change rate; it can take into account the characteristics that the initial frequency change rate is large, and then gradually decreases until the change rate becomes 0 at the maximum frequency deviation point. The control coefficient in the initial stage is slightly smaller, and the control coefficient is larger in the vicinity of the maximum frequency deviation point. The energy storage can output evenly, and simultaneously improve the initial frequency change rate and the maximum frequency deviation. Negative virtual inertia comprehensively considers battery SOC, frequency change rate and frequency deviation to adjust the output; considering the frequency recovery stage, the maximum frequency deviation is large, but the frequency change rate is low. At this time, a larger coefficient can be multiplied to make the system frequency recover quickly . With the extension of time, the frequency deviation decreases, and the SOC value of the energy storage decreases. At this time, multiply the smaller coefficient to ensure the SOC maintenance effect of the energy storage. The coordination and complementary advantages of the three have been realized.

1.4光储联合参与电网一次调频的协调控制方法1.4 Coordinated control method of solar-storage joint participation in primary frequency regulation of power grid

储能系统为电力系统频率变化初期提供与常规发电机组类似的惯性响应。光伏利用可变减载调频策略和储能自适应控制策略联合参与一次调频。既有效利用了光伏的减载备用容量,又减少了储能的容量配置占比。The energy storage system provides an inertial response similar to that of a conventional generator set in the initial stage of the frequency change of the power system. Photovoltaic uses variable load shedding and frequency regulation strategy and energy storage adaptive control strategy to jointly participate in primary frequency regulation. It not only effectively utilizes the load shedding reserve capacity of photovoltaics, but also reduces the proportion of energy storage capacity allocation.

2、方法流程2. Method flow

如图1所示,本发明提供了一种光储联合系统参与电网一次调频控制方法。As shown in FIG. 1 , the present invention provides a method for controlling the primary frequency regulation of a power grid by a combined photovoltaic-storage system.

参照图1,具体步骤如下:Referring to Figure 1, the specific steps are as follows:

S1:给出光伏发电系统和储能系统的模型。光伏发电系统主要由光伏阵列、Boost变换器、并网逆变器、滤波器及其控制系统组成。储能系统主要由储能电池、Buck-Boost 变换器、并网逆变器、滤波器及其控制系统组成。S1: Models of photovoltaic power generation systems and energy storage systems are given. The photovoltaic power generation system is mainly composed of photovoltaic array, boost converter, grid-connected inverter, filter and its control system. The energy storage system is mainly composed of energy storage battery, Buck-Boost converter, grid-connected inverter, filter and its control system.

S2:现有的光伏调频策略主要从利用虚拟同步发电机技术,或者控制光伏输出电压不在最大功率点运行留减载调频备用展开。但是在实现功频特性控制系数与减载备用容量匹配上欠灵活性,为此采用一种跟随系统出力及频率变化的动态可变减载方法参与电网调频,实时响应系统频率波动,提高光伏电站的频率稳定性。S2: The existing photovoltaic frequency regulation strategy mainly starts from the use of virtual synchronous generator technology, or the control of photovoltaic output voltage not to operate at the maximum power point to reserve load shedding and frequency regulation for backup. However, it lacks flexibility in matching the power frequency characteristic control coefficient with the load shedding reserve capacity. Therefore, a dynamic variable load shedding method that follows the system output and frequency changes is adopted to participate in the grid frequency regulation, respond to the system frequency fluctuations in real time, and improve the photovoltaic power station. frequency stability.

S3:为增强光伏调频经济性,采用储能联合调频。现有储能调频控制策略中调频参数设置灵活性和自适应性等问题仍然有待改进。本文在协调下垂控制以及正负虚拟惯性控制的特点下,提出一种跟随荷电状态、频率偏差及频率变化率变化的储能变系数自适应控制策略,在提高调频效果的同时,又能很好的维持了储能的荷电状态。S3: In order to enhance the economy of photovoltaic frequency regulation, the combined frequency regulation of energy storage is adopted. The flexibility and adaptability of frequency regulation parameter settings in the existing energy storage frequency regulation control strategies still need to be improved. Under the characteristics of coordinated droop control and positive and negative virtual inertial control, this paper proposes an energy storage variable coefficient adaptive control strategy that follows the changes of state of charge, frequency deviation and frequency change rate. Good maintains the state of charge of the stored energy.

S4:为了尽量减少光伏单独调频时固定减载所造成的功率损失,以及降低储能系统的成本。对储能的容量进行设置,使其可以提供和同步发电机组类似的惯性响应。最后采用光伏可变减载和配置储能联合调频,从而实现光储支撑电网一次调频的协调控制。S4: In order to minimize the power loss caused by fixed load shedding when the photovoltaic frequency is adjusted separately, and to reduce the cost of the energy storage system. The capacity of the stored energy is set so that it provides an inertial response similar to that of a synchronous generator set. Finally, photovoltaic variable load shedding and combined frequency modulation with energy storage are used to realize the coordinated control of primary frequency modulation of the photovoltaic-storage-supported power grid.

光伏发电系统主要由光伏阵列、Boost变换器、并网逆变器及滤波器及其控制系统组成。本实施例中光伏阵列输出的直流电压Vpv和直流电流Ipv,经最大功率点跟踪控制器后产生直流电压参考值Vrefmppt,Vrefmppt和VPV的误差信号经积分后得到光伏输出有功功率给定Pref,Pref和Boost变换器高压侧的有功功率Pdc经PI控制后生成占空比d,驱动Boost变换器工作,从而实现光伏阵列的MPPT控制。逆变器的控制实质上是一个双闭环控制系统,主要由内环(电流控制环)和外环(功率控制环)组成。通常情况下,逆变器工作在单位功率因数状态,无功功率的电流参考值为iqref=0。光伏阵列经Boost 变换器升压后得到直流电压Udc,与电压参考值Uref做差后,通过PI控制生成电流内环参考值idref。再与采样所得的实际电流值id、iq做偏差经PI控制器和电流解耦控制后,得到电压给定usq、usd。最后经坐标变换后通过脉宽调制后得到逆变器的触发脉冲Sg。从而实现逆变器有功无功的解耦控制及并网运行。The photovoltaic power generation system is mainly composed of photovoltaic arrays, boost converters, grid-connected inverters, filters and their control systems. In this embodiment, the DC voltage V pv and the DC current I pv output by the photovoltaic array are passed through the maximum power point tracking controller to generate the DC voltage reference value V refmppt , and the error signals of V refmppt and V PV are integrated to obtain the photovoltaic output active power Given P ref , P ref and the active power P dc on the high-voltage side of the boost converter are controlled by PI to generate a duty cycle d, which drives the boost converter to work, thereby realizing the MPPT control of the photovoltaic array. The control of the inverter is essentially a double closed-loop control system, which is mainly composed of an inner loop (current control loop) and an outer loop (power control loop). Normally, the inverter works in the state of unity power factor, and the current reference value of reactive power is i qref =0. After the photovoltaic array is boosted by the Boost converter, the DC voltage U dc is obtained, and after making a difference with the voltage reference value U ref , the current inner loop reference value idref is generated through PI control. Then, the deviation from the actual current values id and i q obtained by sampling is controlled by the PI controller and the current decoupling to obtain the voltage given u sq , u sd . Finally, after coordinate transformation, the trigger pulse S g of the inverter is obtained through pulse width modulation. In this way, the decoupling control of the active and reactive power of the inverter and the grid-connected operation are realized.

储能系统主要由储能电池、Buck-Boost变换器、并网逆变器及滤波器及其控制系统组成。升降压斩波电路实现储能的充放电切换。采样Buck-Boost低压侧的电压电流VL、IL,相乘得到电池功率Pbat。当DC/DC变换器工作在放电模式时,将有功参考给定Pref与电池功率Pbat进行比较,采用PI控制器进行调节后得到占空比信号D_Boost,和变频锯齿波发生器产生的频率信号一起经插补触发脉冲生成驱动Boost变换器的脉冲信号 GBoost。当变换器工作在充电模式时,将Pref取相反数,与电池功率Pbat做差后乘以-1,再进行和放电模式下类似的控制后,得到驱动Buck动作的触发信号GBuck。并网逆变器的主要控制原理和光伏发电系统类似,此处不再赘述。The energy storage system is mainly composed of energy storage battery, Buck-Boost converter, grid-connected inverter, filter and its control system. The buck-boost chopper circuit realizes the charging and discharging switching of the energy storage. The voltage and current VL and IL of the low-voltage side of the Buck-Boost are sampled, and multiplied to obtain the battery power P bat . When the DC/DC converter works in the discharge mode, compare the active reference reference P ref with the battery power P bat , and use the PI controller to adjust to obtain the duty cycle signal D_Boost, and the frequency generated by the variable frequency sawtooth wave generator. The signals are interpolated together to trigger pulses to generate a pulse signal G Boost that drives the boost converter. When the converter works in the charging mode, take the inverse number of P ref , make the difference with the battery power P bat and multiply it by -1, and then perform the similar control as in the discharging mode to obtain the trigger signal G Buck that drives the action of Buck . The main control principle of the grid-connected inverter is similar to that of the photovoltaic power generation system, and will not be repeated here.

本实施例的步骤S2中光伏跟随系统出力及频率变化的动态可变减载方法如下:In step S2 of this embodiment, the dynamic variable load shedding method for the output and frequency changes of the photovoltaic follower system is as follows:

光伏采用最大功率点跟踪方式得到最大有功输出Pmppt,经过可变减载控制并限幅后作为光伏新的有功功率给定,输出给Boost变换器的控制系统。The photovoltaic adopts the maximum power point tracking method to obtain the maximum active power output P mppt , which is given as the new active power of the photovoltaic after variable load shedding control and amplitude limiting, and is output to the control system of the Boost converter.

可变减载控制特性曲线表达式如下:The variable load shedding control characteristic curve is expressed as follows:

σ%=K0×(Pmppt/PN+Δf/Δfmax) (1)σ%=K 0 ×(P mppt /P N +Δf/Δf max ) (1)

式中:PN为光伏系统在标况下的额定有功功率,MW;Pmppt为光伏系统在当前工况的最大有功功率,MW;Δfmax为系统允许的最大频率偏差,取0.5Hz;Δf为系统频率偏差, Hz;K0为初始情况下的减载率,使光伏具有随时参与调频的能力;σmax%为减载率的上限值;K0和σmax%可根据光伏电站出力情况确定。In the formula: P N is the rated active power of the photovoltaic system under the standard condition, MW; P mppt is the maximum active power of the photovoltaic system under the current working condition, MW; Δf max is the maximum allowable frequency deviation of the system, taken as 0.5Hz; Δf is the system frequency deviation, Hz; K 0 is the load shedding rate in the initial situation, so that the photovoltaic has the ability to participate in frequency regulation at any time; σ max % is the upper limit of the load shedding rate; K 0 and σ max % can be determined according to the output of the photovoltaic power station Situation ok.

由式(1)可知,当系统频率下降时,Δf为负,减载系数动态跟随频率偏差变小,增发有功出力。当系统频率上升时,Δf为正,减载系数动态随频率偏差变大,减少有功出力。从而响应电力系统频率变化参与一次调频。本文提出的可变减载调频控制策略中,一方面控制系数σ%能够跟随系统频率偏差和最大有功出力而动态变换出力。另一方面反向调节系统的减载率,使系统具有一次调频的能力。避免了使用减载和下垂的控制策略时,下垂特性斜率的选取问题,具有灵活的自适应性。It can be seen from formula (1) that when the system frequency decreases, Δf is negative, the load shedding coefficient dynamically follows the frequency deviation, and the active power output is increased. When the system frequency increases, Δf is positive, and the load shedding coefficient dynamically increases with the frequency deviation, reducing the active power output. Thereby, it participates in the primary frequency regulation in response to the frequency change of the power system. In the variable load shedding and frequency modulation control strategy proposed in this paper, on the one hand, the control coefficient σ% can dynamically change the output power following the system frequency deviation and the maximum active power output. On the other hand, the load shedding rate of the system is reversely adjusted, so that the system has the ability of primary frequency modulation. It avoids the problem of selecting the slope of the droop characteristic when using the control strategy of load shedding and droop, and has flexible adaptability.

本实施例的步骤S3中下垂控制方法为The droop control method in step S3 of this embodiment is:

参照附图5,本实施例将电池储能分为五个区间:Smax:电池工作的最大限值,这里取值0.9;Shigh:电池正常工作的上限值,这里取值0.55;Slow:电池正常工作的下限值,这里取值0.45;Smin:电池工作的最小限值,这里取值0.1。Referring to FIG. 5 , in this embodiment, the battery energy storage is divided into five intervals: S max : the maximum limit value of the battery operation, which is 0.9 here; S high : the upper limit value of the normal operation of the battery, which is 0.55 here; S low : the lower limit of the normal operation of the battery, which is 0.45 here; S min : the minimum limit of the battery's operation, which is 0.1 here.

Logistic函数具有天然的指数性、凹凸性和饱和性。本实施例采用其对下垂系数进行自适应控制。使得储能的自适应策略可以兼顾调频和SOC保持效果。其曲线函数表达式:Logistic functions are inherently exponential, bumpy, and saturated. This embodiment adopts it to adaptively control the droop coefficient. The adaptive strategy of energy storage can take into account the effects of frequency regulation and SOC retention. Its curve function expression:

Figure BDA0002965458390000101
Figure BDA0002965458390000101

式中:P0为初始值,P0值越大,达到饱和的时间越短;K为终值;r衡量曲线增长的快慢,r越大,增长越快。In the formula: P 0 is the initial value, the larger the P 0 value, the shorter the time to reach saturation; K is the final value; r measures the growth speed of the curve, the larger the r, the faster the growth.

当储能放电且储能容量充足时,曲线呈上凸形,可以保证储能的单位调节功率处于一个相对更大的值。当储能容量不充足时,曲线呈下凸性,随着SOC的下降,放电速度变慢,此时单位调节功率处于较小的值以保持SOC效果。当储能充电时,与上述过程类似。以SOC作为自变量,P0和r作为参变量,充放电系数为因变量。构造如下等式。When the energy storage is discharged and the energy storage capacity is sufficient, the curve is upwardly convex, which can ensure that the unit regulating power of the energy storage is at a relatively larger value. When the energy storage capacity is insufficient, the curve is downward convex, and as the SOC decreases, the discharge speed becomes slower. At this time, the unit regulating power is at a small value to maintain the SOC effect. When the energy storage is charged, the process is similar to the above. Take SOC as the independent variable, P 0 and r as the parameters, and the charge-discharge coefficient as the dependent variable. Construct the following equation.

1)电池放电1) battery discharge

Figure BDA0002965458390000111
Figure BDA0002965458390000111

2)电池充电2) Battery charging

Figure BDA0002965458390000112
Figure BDA0002965458390000112

式中:Kmax为充放电时,下垂系数的终值;Ssoc为储能的荷电状态;Kbc和Kbd分别为放电和充电时对应的系数。In the formula: K max is the final value of the droop coefficient during charging and discharging; S soc is the state of charge of the energy storage; K bc and K bd are the corresponding coefficients during discharging and charging, respectively.

r和P0分别变化时的Kb曲线如附图6所示。可以看出当r、P0过大时,Kb仅在一小段范围内跟随SOC有较大的变化,自适应能力比较弱。当r、P0变小时,Kb随SOC变化越敏感。The K b curves when r and P 0 are changed respectively are shown in Fig. 6 . It can be seen that when r and P 0 are too large, K b only has a large change following the SOC in a small range, and the adaptive ability is relatively weak. When r and P 0 become smaller, K b is more sensitive to changes in SOC.

为了使储能电池在正常工作的上下限值(0.45,0.55)内得到充分的利用。对r、P0进行适当选取。保证在储能工作的最大限值和储能正常工作的上限值内,有较大的控制系数。以储能放电为例,当SOC大于储能正常工作的上限值时,系数随着SOC而变化,仍然处于一个相对较大值。当SOC小于储能正常工作的下限值时,更多考虑SOC维持效果,减小控制系数。本文r取8、P0取0.02。In order to make the energy storage battery fully utilized within the upper and lower limits (0.45, 0.55) of normal work. Select r and P 0 appropriately. Ensure that there is a larger control coefficient within the maximum limit of energy storage work and the upper limit of normal operation of energy storage. Taking the energy storage discharge as an example, when the SOC is greater than the upper limit of the normal operation of the energy storage, the coefficient changes with the SOC and is still at a relatively large value. When the SOC is less than the lower limit of the normal operation of the energy storage, more consideration is given to the SOC maintenance effect and the control coefficient is reduced. In this paper, r is taken as 8, and P 0 is taken as 0.02.

本实施例提出的下垂控制基于Logistic函数的特点,利用对称性,在充放电区间内各仅设置一个函数,并采用SOC分区自适应调节下垂系数,不仅充分利用电池储能的调频能力,还兼顾了SOC的保持效果,避免了分段函数设置的复杂性。The droop control proposed in this embodiment is based on the characteristics of the Logistic function. By using symmetry, only one function is set in each charge and discharge interval, and the SOC partition is used to adjust the droop coefficient adaptively, which not only makes full use of the frequency regulation capability of battery energy storage, but also takes into account It can maintain the effect of SOC and avoid the complexity of setting the piecewise function.

本实施例中步骤S3中变系数正虚拟惯性控制方法为:In this embodiment, the variable coefficient positive virtual inertia control method in step S3 is:

虚拟惯性控制策略模拟同步发电机的惯性响应过程。由于发电机转子转速不能突变,机械功率短时间内保持不变,而电磁功率的增加使转子转速下降,释放动能。惯性响应公式如下:The virtual inertial control strategy simulates the inertial response process of the synchronous generator. Since the rotor speed of the generator cannot be changed suddenly, the mechanical power remains unchanged for a short time, while the increase of electromagnetic power causes the rotor speed to drop, releasing kinetic energy. The inertia response formula is as follows:

ΔPbess=-Mb df/dt (5)ΔP bess = -M b df/dt (5)

式中:Mb为惯性系数。Where: M b is the inertia coefficient.

在初始扰动阶段,df/dt较大,而△f较小,仅靠下垂控制无法满足调频需求。加入正虚拟惯性控制后,可以在降低初始频率变化率的同时,在一定程度上降低频率偏差。正虚拟惯性的响应时间很短,可不考虑储能的荷电状态。其响应公式为:In the initial disturbance stage, df/dt is large, while Δf is small, and the droop control alone cannot meet the frequency modulation requirements. After adding positive virtual inertia control, the frequency deviation can be reduced to a certain extent while reducing the initial frequency change rate. The response time of positive virtual inertia is very short, regardless of the state of charge of the stored energy. Its response formula is:

ΔPbess=-Mbpdf/dt (6)ΔP bess = -M bp df/dt (6)

Figure BDA0002965458390000113
Figure BDA0002965458390000113

Figure BDA0002965458390000121
Figure BDA0002965458390000121

式中:Mbp为正虚拟惯性系数;Mbp-c、Mbp-d分别为储能充放电时的正虚拟惯性系数;Mp为随频率偏差变化的调节系数;n为参变量;c1为正虚拟惯性系数初始值;Dp为正虚拟惯性频率变化率死区。In the formula: M bp is the positive virtual inertia coefficient; M bp-c and M bp-d are the positive virtual inertia coefficients when the energy storage is charged and discharged respectively; M p is the adjustment coefficient that changes with the frequency deviation; n is the parameter; c 1 is the initial value of the positive virtual inertia coefficient; D p is the dead zone of the positive virtual inertia frequency change rate.

本实施例中调节系数Mp和储能调频出力变化曲线图具体如图7所示。Mp的大小和变化速率与n的取值有关,n值过小,则Mp值较小,正虚拟惯性能力不能得到充分发挥;n值过大,则△f略有增大时将导致Mp急剧增大,频率曲线会发生抖动。综合考虑后本文选择n=6。In this embodiment, the regulation coefficient M p and the energy storage frequency modulation output change curve are specifically shown in FIG. 7 . The size and rate of change of M p are related to the value of n. If the value of n is too small, the value of M p will be small, and the positive virtual inertia ability cannot be fully exerted; if the value of n is too large, a slight increase of △f will lead to M p increases sharply, and the frequency curve will jitter. After comprehensive consideration, this paper chooses n=6.

本实施例提出的正虚拟惯性策略能兼顾到频率初始变化率大,然后逐渐变小,直到最大频率偏差点处变化率变为0的特点。在初始阶段的控制系数取稍小一点,在最大频率偏差点附近取的大一点。使储能能够均匀出力,同步改善初始频率变化率和最大频率偏差。The positive virtual inertia strategy proposed in this embodiment can take into account the characteristics that the initial frequency change rate is large, and then gradually decreases until the change rate becomes 0 at the maximum frequency deviation point. The control coefficient in the initial stage is slightly smaller, and the control coefficient is larger in the vicinity of the maximum frequency deviation point. The energy storage can output evenly, and simultaneously improve the initial frequency change rate and the maximum frequency deviation.

本实施例的步骤S3中变系数负虚拟惯性控制方法为:In step S3 of this embodiment, the variable coefficient negative virtual inertia control method is:

当频率偏差达到最大并开始进行频率恢复时,频率变化率的极性改变。正虚拟惯性的响应出力与调频需求方向相反,如果不加以修正,对系统来说将是一个新的扰动,不利于电网频率的恢复。故要切换成负虚拟惯性控制,负虚拟惯性的作用时间较长,需考虑储能的SOC。其响应公式为:When the frequency deviation reaches a maximum and frequency recovery begins, the polarity of the frequency change rate changes. The response output of positive virtual inertia is opposite to the direction of frequency regulation demand. If it is not corrected, it will be a new disturbance to the system, which is not conducive to the recovery of grid frequency. Therefore, to switch to negative virtual inertia control, the action time of negative virtual inertia is longer, and the SOC of energy storage needs to be considered. Its response formula is:

ΔPbess=-Mbn df/dt (9)ΔP bess = -M bn df/dt (9)

Figure BDA0002965458390000122
Figure BDA0002965458390000122

Figure BDA0002965458390000123
Figure BDA0002965458390000123

式中:Mbn为负虚拟惯性系数;Mbn-c、Mbn-d分别为充放电时的负虚拟惯性系数;b1为负虚拟惯性系数初始值;Mb1为关于频率偏差变化的调节系数;fbess-d为储能调频死区;fmax为电网允许的最大频率偏差幅值,这里取0.5Hz。In the formula: M bn is the negative virtual inertia coefficient; M bn-c and M bn-d are the negative virtual inertia coefficients during charging and discharging respectively; b 1 is the initial value of the negative virtual inertia coefficient; M b1 is the adjustment of the frequency deviation change coefficient; f bess-d is the dead zone of energy storage frequency modulation; f max is the maximum allowable frequency deviation amplitude of the power grid, which is taken as 0.5Hz here.

本实施例中调节系数Mb1和负虚拟惯性系数Mbn变化曲线图具体如图8所示。当n 过大时,Mb1随着频率偏差变小先急剧变小后缓慢减小,不利于负虚拟惯性控制能力的利用;n变小时,Mb1减小趋势逐渐趋于线性平稳,综合考虑后本文n取2。In this embodiment, the change curve diagrams of the adjustment coefficient M b1 and the negative virtual inertia coefficient M bn are specifically shown in FIG. 8 . When n is too large, M b1 decreases sharply at first and then decreases slowly as the frequency deviation decreases, which is not conducive to the utilization of the negative virtual inertia control capability; when n becomes smaller, the decreasing trend of M b1 gradually tends to be linear and stable. In this paper, n is taken as 2.

本实施例提出的负虚拟惯性策略考虑到频率恢复阶段,最大频率偏差大,但是频率变化率低,此时可以乘较大的系数,使系统的频率快速恢复。随着时间的延长,频率偏差减小,储能的SOC值降低,此时乘较小的系数,保证储能的SOC维持效果。The negative virtual inertia strategy proposed in this embodiment takes into account the frequency recovery stage, the maximum frequency deviation is large, but the frequency change rate is low. At this time, a larger coefficient can be multiplied to make the frequency of the system recover quickly. With the extension of time, the frequency deviation decreases, and the SOC value of the energy storage decreases. At this time, multiply the smaller coefficient to ensure the SOC maintenance effect of the energy storage.

本实施例的步骤S4中配置储能容量的方法为:The method for configuring the energy storage capacity in step S4 of this embodiment is:

为了保证配置的储能可以提供和同步发电机组类似的惯性响应,对储能的容量大小设置如下:In order to ensure that the configured energy storage can provide a similar inertial response to that of the synchronous generator set, the capacity of the energy storage is set as follows:

当发电机转速为ω时,同步发电机具有的旋转动能为When the generator speed is ω, the rotational kinetic energy of the synchronous generator is

Figure BDA0002965458390000131
Figure BDA0002965458390000131

当电机转速跟随系统频率从ω0变化为ω1When the motor speed follows the system frequency from ω 0 to ω 1

Figure BDA0002965458390000132
Figure BDA0002965458390000132

同步发电机的转速正比于系统频率,一般在小范围内变化。电网运维准则规定,特殊情况下系统频率在短时间内可能上升到51Hz或者下降到48Hz。以频率下降分析,同步发电机转子的转速范围为0.95~1pu,可以释放的动能为:The rotational speed of a synchronous generator is proportional to the system frequency and generally varies within a small range. The grid operation and maintenance guidelines stipulate that the system frequency may rise to 51Hz or drop to 48Hz in a short period of time under special circumstances. Based on the frequency drop analysis, the rotational speed of the rotor of the synchronous generator ranges from 0.95 to 1pu, and the kinetic energy that can be released is:

Figure BDA0002965458390000133
Figure BDA0002965458390000133

储能装置只受限于SOC,通常可以实现大范围的功率吞吐,因此较小的储能容量就可以实现和常规发电机组相同的调频效果。当配置有储能的光伏电站取代常规发电机组并入电网时,由于储能充放电时间一般大于惯性响应时间,故储能功率满足要求时,容量也就满足要求。The energy storage device is only limited by the SOC, and can usually achieve a wide range of power throughput, so a smaller energy storage capacity can achieve the same frequency modulation effect as a conventional generator set. When a photovoltaic power station equipped with energy storage replaces the conventional generator set and is integrated into the power grid, since the charging and discharging time of the energy storage is generally longer than the inertia response time, when the energy storage power meets the requirements, the capacity also meets the requirements.

设储能系统在Δt内释放出的能量与同转子动能相同,则有:Assuming that the energy released by the energy storage system within Δt is the same as the kinetic energy of the same rotor, there are:

ΔEbess=PbessΔt=0.0784HSN (15)ΔE bess = P bess Δt = 0.0784HS N (15)

这里发电机组的惯性时间常数H约为5s,令Δt=2H。Here, the inertia time constant H of the generator set is about 5s, so that Δt=2H.

Pbess=0.0392SN (16)P bess = 0.0392S N (16)

式中:ΔEbess、Pbess分别为为储能的容量和功率;SN为发电机的额定容量;H为惯量常数;J为发电机的惯性时间常数。由式(16)可知,当配置光伏电站额定功率的3.92%的储能时,可以实现和同步发电机组类似大小的惯性响应。考虑到储能上下调节情况,可将储能的容量放宽到额定功率的5%。In the formula: ΔE bess and P bess are the capacity and power of the energy storage, respectively; S N is the rated capacity of the generator; H is the inertia constant; J is the inertia time constant of the generator. It can be seen from equation (16) that when the energy storage of 3.92% of the rated power of the photovoltaic power station is configured, an inertial response similar to that of the synchronous generator set can be achieved. Considering the upper and lower regulation of energy storage, the capacity of energy storage can be relaxed to 5% of the rated power.

本实施例的步骤S4中光储联合调频的方法为:In the step S4 of this embodiment, the method for combined frequency modulation of optical storage and storage is as follows:

1)储能系统为电力系统频率变化初期提供与常规发电机组类似的惯性响应。1) The energy storage system provides an inertial response similar to that of the conventional generator set in the initial stage of the frequency change of the power system.

2)光伏利用可变减载调频策略和储能自适应控制策略联合参与一次调频。2) Photovoltaic uses variable load shedding and frequency regulation strategy and energy storage adaptive control strategy to jointly participate in primary frequency regulation.

3、仿真分析3. Simulation analysis

基于IEEE3机9节点典型系统,搭建PSCAD仿真系统模型,如图9所示。水电机组G1、火电机组G2、G3均由调速器和原动机组成参与调频,其总额定容量为567.5MVA,总负荷量为315+j115MVA。首先在Bus8母线分别接入光伏和储能验证本文所提策略的有效性。最后将光储联合投入,仿真光储联合系统参与电网一次调频协调控制策略的优越性。Based on the typical system of IEEE3 machine and 9 nodes, the PSCAD simulation system model is built, as shown in Figure 9. Hydropower unit G1, thermal power unit G2, G3 are all composed of governor and prime mover to participate in frequency regulation, their total rated capacity is 567.5MVA, and the total load is 315+j115MVA. Firstly, the bus8 busbar is connected to photovoltaic and energy storage respectively to verify the effectiveness of the strategy proposed in this paper. Finally, the combination of photovoltaic and storage is invested to simulate the superiority of the combined photovoltaic and storage system participating in the coordinated control strategy of primary frequency regulation of the power grid.

3.1光伏调频优化策略仿真验证3.1 Simulation verification of photovoltaic frequency regulation optimization strategy

在图9中Bus8母线处,接入90MW的光伏等值电源。在Bus6母线3s时增投16MW的负荷。仿真光伏不参与调频、光伏采用可变减载控制策略(初始减载率分别为5%和10%) 等3种情况。由图10可见,光伏不参与调频时,频率跌落最低点为49.4Hz。考虑本文所提可变减载调频策略后,光伏发电能够有效利用减载备用容量,随着系统频率变化而动态调整,提高频率恢复响应特性。当初始减载率为5%时,频率跌落最低点为49.5Hz。初始减载率为10%时,频率跌落最低点为49.65Hz。可以看出,初始减载水平越大其在暂态过程中可以增发的调频容量也越大,参与系统调频的能力越强。但由于过大的减载水平会使得光伏阵列的工作效率下降,造成正常运行情况下的功率损失,所以采用光伏单独调频受到减载容量的限制,调频效果仍不理想。At the bus bar of Bus8 in Fig. 9, a photovoltaic equivalent power supply of 90MW is connected. The load of 16MW will be added when the Bus6 busbar is 3s. Three situations are simulated, such as PV does not participate in frequency regulation and PV adopts variable load shedding control strategy (the initial load shedding rate is 5% and 10% respectively). It can be seen from Figure 10 that when the photovoltaic does not participate in the frequency modulation, the lowest point of the frequency drop is 49.4Hz. After considering the variable load shedding and frequency regulation strategy proposed in this paper, photovoltaic power generation can effectively utilize the load shedding reserve capacity, dynamically adjust with the system frequency changes, and improve the frequency recovery response characteristics. When the initial load shedding rate is 5%, the lowest point of frequency drop is 49.5Hz. When the initial load shedding rate is 10%, the lowest point of frequency drop is 49.65Hz. It can be seen that the larger the initial load shedding level is, the greater the frequency regulation capacity that can be issued during the transient process, and the stronger the ability to participate in the system frequency regulation. However, due to the excessive load shedding level, the working efficiency of the photovoltaic array will decrease, resulting in power loss under normal operation. Therefore, the use of photovoltaic independent frequency regulation is limited by the load shedding capacity, and the frequency regulation effect is still unsatisfactory.

3.2储能参与一次调频自适应控制方法验证3.2 Validation of energy storage participating in primary frequency modulation adaptive control method

将容量为4.5MW的储能等值电源接入图9Bus8母线。仿真对比阶跃负荷扰动下,下垂控制定K法和变K法(本文所用方法)的调频特性。在bus6母线3s时施加12MW 的负荷投入。在初始SOC为0.6和0.3两种情况进行仿真。Connect the energy storage equivalent power supply with a capacity of 4.5MW to the Bus8 bus in Figure 9. The simulation compares the frequency modulation characteristics of the droop control constant K method and variable K method (the method used in this paper) under the step load disturbance. A load of 12MW is applied when the bus6 busbar is 3s. The simulations are carried out in two cases where the initial SOC is 0.6 and 0.3.

从图11可以看出,当SOC初始值较高,即电池能量充足时。定K法效果与K的取值相关,K值越大,最大频率偏差越小,调频效果越好,但电池能量下降越快。通过对K的适当选取,可以实现调频效果和荷电状态与变K法相当。如图所示定K法K=9 时和变K法效果相当。选取定K法(K=9)和变K法对比。由图12可以看出当初始 SOC=0.3时,即电量较小时。为兼顾SOC的保持效果,下垂控制的出力减小,定K法的最大频率偏差为0.18Hz,变K法为0.2Hz。变K法调频效果稍弱于定K法。但是定 K法由于没有考虑储能SOC的影响。SOC变化曲线下降迅速,很容易达到储能的容量限值而提前退出调频,从而导致频率的二次跌落。It can be seen from Figure 11 that when the initial value of SOC is high, that is, when the battery energy is sufficient. The effect of the fixed K method is related to the value of K. The larger the K value, the smaller the maximum frequency deviation, and the better the frequency modulation effect, but the faster the battery energy declines. Through the proper selection of K, the frequency modulation effect and state of charge can be achieved equivalent to the variable K method. As shown in the figure, when the K method is set to K=9, the effect is equivalent to that of the variable K method. Select the fixed K method (K=9) and the variable K method for comparison. It can be seen from Fig. 12 that when the initial SOC = 0.3, that is, when the power is small. In order to take into account the effect of maintaining SOC, the output of droop control is reduced, the maximum frequency deviation of the fixed K method is 0.18Hz, and the variable K method is 0.2Hz. The frequency modulation effect of the variable K method is slightly weaker than that of the fixed K method. However, the fixed K method does not consider the influence of energy storage SOC. The SOC change curve drops rapidly, and it is easy to reach the capacity limit of the energy storage and exit the frequency modulation in advance, resulting in a secondary drop in frequency.

针对上述同一算例,仿真储能不参与调频、利用下垂控制(定K法)、下垂控制(变 K法)、下垂控制+虚拟惯性、本文所用方法等五种情况进行仿真,以验证本文所提方法的有效性和优越性。结合图13可以看出,采用本文所采用储能自适应控制策略,初始频率变化率最低为-0.03Hz/s,最大频率偏差为0.27Hz,在频率恢复后提供的负虚拟惯性可以明显提高频率恢复速度。由此可见所提方法的优越性。For the same example above, the simulated energy storage does not participate in frequency regulation, uses droop control (fixed K method), droop control (variable K method), droop control + virtual inertia, and the method used in this paper. The effectiveness and superiority of the proposed method. Combining with Figure 13, it can be seen that using the energy storage adaptive control strategy adopted in this paper, the minimum initial frequency change rate is -0.03Hz/s, and the maximum frequency deviation is 0.27Hz. The negative virtual inertia provided after the frequency recovery can significantly increase the frequency Recovery speed. This shows the superiority of the proposed method.

3.3光储联合调频控制策略验证3.3 Verification of the combined frequency modulation control strategy of optical storage and storage

在图9仿真系统中,将4.5MW储能和光伏联合接入Bus8母线。分别在光伏出力 60MW和90MW时,即占比为19.05%和28.57%的光伏占比下的电力系统,加入16MW 的负荷扰动,仿真光伏不参与调频,仅储能参与调频,仅光伏参与调频、光储协同参与调频(本文策略)等4种调频方式下系统的频率特性。In the simulation system in Fig. 9, 4.5MW energy storage and photovoltaic are connected to the Bus8 bus. When the photovoltaic output is 60MW and 90MW, that is, the power system with the photovoltaic ratio of 19.05% and 28.57%, the load disturbance of 16MW is added. The simulated photovoltaic does not participate in frequency regulation, only energy storage participates in frequency regulation, and only photovoltaic participates in frequency regulation, The frequency characteristics of the system under four frequency modulation modes, including the cooperative participation of optical storage and storage in frequency modulation (the strategy of this paper).

通过图14中的14a(频率曲线)和14b(光伏出力曲线)可以看出,仅常规发电机参与调频时,19.05%光伏占比下,频率最低点为49.45Hz。28.57%光伏占比下,频率最低点为49.41Hz。由此可见:光伏占比越大,频率跌落越严重。当系统加入光伏调频时,调频效果明显变好,但由于光伏减载备用有限,调频效果受总备用容量限制;仅储能调频方式下,储能能够积极响应频率变化:当光伏占比为19.05%时,储能峰值功率占光伏电站的13%,频率最低点比不加控制时提升51%;当光伏占比为28.57%时,储能峰值功率占光伏电站的9.2%,频率最低点比不加控制时提升54%。当采用光储联合调频时,在综合利用光伏的可变减载调频和储能的自适应调节策略后,电力系统的频率稳定性得到大大提升。结合图14、15可以看出:整个一次调频过程既充分利用了光伏的减载备用容量,储能调频的出力又没有明显的尖峰特性,有利于储能的荷电状态保持。从图14c(储能出力特性曲线)中可以看出,当频率最低点恢复到稳定值49.8Hz时,需要配置的储能容量占光伏电站的10%。同样根据图15,从图15中可以看出需要的储能容量为6.7%。采用光储协调控制后比储能单独调节分别节约了3%和2.5%。综上所述,所提方法在尽量减少储能配置容量的同时,又使得整个光储联合调频效果更好。From 14a (frequency curve) and 14b (photovoltaic output curve) in Figure 14, it can be seen that when only conventional generators participate in frequency regulation, the lowest frequency is 49.45Hz at 19.05% photovoltaic ratio. At 28.57% photovoltaic ratio, the lowest frequency is 49.41Hz. It can be seen that the larger the proportion of photovoltaics, the more serious the frequency drop. When PV frequency modulation is added to the system, the frequency modulation effect is obviously improved, but due to the limited PV load shedding reserve, the frequency modulation effect is limited by the total reserve capacity; only in the energy storage frequency modulation mode, the energy storage can actively respond to frequency changes: when the PV ratio is 19.05 %, the energy storage peak power accounts for 13% of the photovoltaic power station, and the frequency minimum point is 51% higher than that without control; when the photovoltaic ratio is 28.57%, the energy storage peak power accounts for 9.2% of the photovoltaic power station, and the frequency minimum point is higher than that of the photovoltaic power station. 54% increase when uncontrolled. When the combined frequency modulation of photovoltaic and storage is adopted, the frequency stability of the power system is greatly improved after the comprehensive utilization of the variable load shedding frequency modulation of photovoltaics and the adaptive adjustment strategy of energy storage. Combining with Figures 14 and 15, it can be seen that the entire primary frequency regulation process not only fully utilizes the load shedding reserve capacity of photovoltaics, but also has no obvious peak characteristics in the output of energy storage frequency regulation, which is conducive to maintaining the state of charge of energy storage. It can be seen from Figure 14c (energy storage output characteristic curve) that when the frequency lowest point returns to a stable value of 49.8 Hz, the energy storage capacity that needs to be configured accounts for 10% of the photovoltaic power station. Also according to Figure 15, it can be seen from Figure 15 that the required energy storage capacity is 6.7%. Compared with the independent regulation of energy storage, it saves 3% and 2.5% respectively after adopting the coordinated control of solar energy storage. To sum up, the proposed method not only reduces the energy storage configuration capacity as much as possible, but also makes the combined frequency modulation effect of the whole photovoltaic storage better.

Claims (7)

1.一种光储联合参与电网一次调频的协调控制方法,其特征在于:包括如下步骤:1. a coordinated control method for the joint participation of power grid in primary frequency regulation of power grid, is characterized in that: comprise the steps: S1:分别对光伏发电系统和储能系统进行建模,获取到光伏发电系统模型和储能系统模型;所述光伏发电系统包括光伏阵列、Boost变换器、并网逆变器、滤波器及其控制系统;所述储能系统包括储能电池、Buck-Boost变换器、并网逆变器、滤波器及其控制系统;S1: Model the photovoltaic power generation system and the energy storage system respectively, and obtain the photovoltaic power generation system model and the energy storage system model; the photovoltaic power generation system includes a photovoltaic array, a boost converter, a grid-connected inverter, a filter and its a control system; the energy storage system includes an energy storage battery, a Buck-Boost converter, a grid-connected inverter, a filter and a control system thereof; S2:将光伏通过一种跟随系统出力及频率变化的动态可变减载方法参与电网调频;所述光伏跟随系统出力及频率变化的动态可变减载方法为:光伏采用最大功率点跟踪方式得到最大有功输出Pmppt,经过可变减载控制并限幅后作为光伏新的有功功率给定,输出给Boost变换器控制系统;S2: The photovoltaic participates in the grid frequency regulation through a dynamic variable load shedding method that follows the system output and frequency changes; the dynamic variable load shedding method that the photovoltaic follows the system output and frequency changes is: the photovoltaic uses the maximum power point tracking method to obtain The maximum active power output P mppt is given as the new active power of photovoltaics after variable load shedding control and amplitude limiting, and is output to the boost converter control system; S3:在协调下垂控制以及正负虚拟惯性控制的基础下,基于储能变系数自适应控制策略,采用储能联合调频;S3: On the basis of coordinated droop control and positive and negative virtual inertia control, based on the energy storage variable coefficient adaptive control strategy, the energy storage joint frequency modulation is adopted; S4:对储能的容量进行设置,使其可以提供和同步发电机组相匹配的惯性响应,采用光伏可变减载和配置储能联合调频,实现光储支撑电网一次调频的协调控制;S4: Set the capacity of the energy storage so that it can provide an inertial response that matches the synchronous generator set, and use photovoltaic variable load shedding and combined frequency modulation with energy storage to realize the coordinated control of primary frequency modulation of the photovoltaic-storage-supported power grid; 所述步骤S1中的光伏发电系统具体为:The photovoltaic power generation system in the step S1 is specifically: 光伏阵列输出的直流电压Vpv和直流电流Ipv,经最大功率点跟踪控制器后产生直流电压参考值Vrefmppt,Vrefmppt和VPV的误差信号经积分后得到光伏输出有功功率给定Pref,Pref和boost变换器高压侧的有功功率Pdc经PI控制后生成占空比d,驱动Boost变换器工作,从而实现光伏阵列的MPPT控制;并网逆变器工作在单位功率因数状态igq *=0,光伏阵列经Boost变换器升压后得到直流电压Udc,与电压参考值Uref做差后,通过PI控制生成电流内环参考值idref,再与采样所得的实际电流值id、iq做偏差经PI控制器和电流解耦控制后,得到电压给定usq、usd,最后经坐标变换后通过脉宽调制后得到并网逆变器的触发脉冲Sg,从而实现并网逆变器有功无功的解耦控制及并网运行;The DC voltage V pv and DC current I pv output by the photovoltaic array are passed through the maximum power point tracking controller to generate the DC voltage reference value V refmppt , and the error signals of V refmppt and V PV are integrated to obtain the photovoltaic output active power given P ref , P ref and the active power P dc on the high-voltage side of the boost converter are controlled by PI to generate a duty cycle d, which drives the boost converter to work, thereby realizing the MPPT control of the photovoltaic array; the grid-connected inverter works in unity power factor state i gq * = 0, the photovoltaic array is boosted by the boost converter to obtain the DC voltage U dc , after making a difference with the voltage reference value U ref , the current inner loop reference value idref is generated by PI control, and then compared with the actual current value obtained by sampling After the deviation of id and i q is controlled by PI controller and current decoupling, the given voltages u sq and u sd are obtained. Finally, the trigger pulse S g of the grid-connected inverter is obtained after coordinate transformation and pulse width modulation. So as to realize the decoupling control and grid-connected operation of the grid-connected inverter active and reactive power; 所述步骤S1中储能系统具体为:In the step S1, the energy storage system is specifically: 储能系统通过升降压斩波电路实现储能的充放电切换;采样Buck-Boost低压侧的电压电流VL、IL,相乘得到电池功率Pbat;当DC/DC变换器工作在放电模式时,将有功参考给定Pref与电池功率Pbat进行比较,采用PI控制器进行调节后得到占空比信号D_Boost,和变频锯齿波发生器产生的频率信号一起经插补触发脉冲生成驱动Boost变换器的脉冲信号GBoost;当变换器工作在充电模式时,将Pref取相反数,与电池功率Pbat做差后乘以-1,再进行放电模式下的控制后,得到驱动Buck变换器动作的触发信号GBuckThe energy storage system realizes the charging and discharging switching of the energy storage through the buck-boost chopper circuit; the voltage and current VL and IL of the low-voltage side of the Buck-Boost are sampled and multiplied to obtain the battery power P bat ; when the DC/DC converter is working in discharging In mode, the active reference reference P ref is compared with the battery power P bat , and the duty cycle signal D_Boost is obtained after adjustment by the PI controller. The pulse signal G Boost of the boost converter; when the converter works in the charging mode, take the opposite number of P ref , make the difference with the battery power P bat and multiply by -1, and then control in the discharging mode to obtain the driving Buck The trigger signal G Buck for converter action. 2.根据权利要求1所述的一种光储联合参与电网一次调频的协调控制方法,其特征在于:所述步骤S2中动态可变减载的控制特性曲线表达式如下:2. The coordinated control method for the combined participation of photovoltaic and storage in power grid primary frequency regulation according to claim 1, characterized in that: the control characteristic curve expression of dynamic variable load shedding in the step S2 is as follows: σmax%=K0×(Pmppt/PN+Δf/Δfmax) (1)σ max %=K 0 ×(P mppt /P N +Δf/Δf max ) (1) 式中:PN为光伏系统在标况下的额定有功功率;Pmppt为光伏系统在当前工况的最大有功功率;Δfmax为系统允许的最大频率偏差;Δf为系统频率偏差;K0为初始情况下的减载率;σmax%为减载率的上限值。In the formula: P N is the rated active power of the photovoltaic system under standard conditions; P mppt is the maximum active power of the photovoltaic system in the current working condition; Δf max is the maximum allowable frequency deviation of the system; Δf is the system frequency deviation; K 0 is Load shedding rate in the initial condition; σ max % is the upper limit of the load shedding rate. 3.根据权利要求1所述的一种光储联合参与电网一次调频的协调控制方法,其特征在于:所述步骤S3中下垂控制方法为3. The coordinated control method for the combined participation of photovoltaic and storage in power grid primary frequency regulation according to claim 1, characterized in that: in the step S3, the droop control method is: 将储能分为四个区间:Smax:储能电池工作的最大限值;Shigh:储能电池正常工作的上限值;Slow:储能电池正常工作的下限值;Smin:储能电池工作的最小限值;The energy storage is divided into four intervals: S max : the maximum working limit of the energy storage battery; S high : the upper limit of the normal operation of the energy storage battery; S low : the lower limit of the normal operation of the energy storage battery; S min : The minimum limit for the operation of the energy storage battery; 采用Logistic函数对下垂系数进行自适应控制,其曲线函数表达式:The Logistic function is used to adaptively control the droop coefficient, and its curve function expression is:
Figure FDA0003721250140000021
Figure FDA0003721250140000021
式中:P0为初始值;K为终值;r衡量曲线增长的快慢;In the formula: P 0 is the initial value; K is the final value; r measures the speed of the curve growth; 以SOC作为自变量,P0和r作为参变量,充放电系数为因变量,构造如下等式:Taking SOC as the independent variable, P0 and r as the parameters, and the charge-discharge coefficient as the dependent variable, the following equation is constructed: 1)电池放电1) battery discharge
Figure FDA0003721250140000022
Figure FDA0003721250140000022
2)电池充电2) Battery charging
Figure FDA0003721250140000023
Figure FDA0003721250140000023
式中:Kmax为充放电时,下垂系数的终值;Ssoc为储能的荷电状态;Kbc和Kbd分别为放电和充电时对应的系数。In the formula: K max is the final value of the droop coefficient during charging and discharging; S soc is the state of charge of the energy storage; K bc and K bd are the corresponding coefficients during discharging and charging, respectively.
4.根据权利要求1所述的一种光储联合参与电网一次调频的协调控制方法,其特征在于:所述步骤S3中正虚拟惯性控制方法为:4. A kind of coordinated control method for the joint participation of optical storage and power grid in primary frequency regulation of power grid according to claim 1, it is characterized in that: in described step S3, the positive virtual inertia control method is: 正虚拟惯性响应公式为:The formula for the positive virtual inertial response is: ΔPbess=-Mbpdf/dt (5)ΔP bess = -M bp df/dt (5)
Figure FDA0003721250140000024
Figure FDA0003721250140000024
Figure FDA0003721250140000025
Figure FDA0003721250140000025
式中:Mbp为正虚拟惯性系数;Mbp-c、Mbp-d分别为储能充放电时的正虚拟惯性系数;Mp为随频率偏差变化的调节系数;n为参变量;c1为正虚拟惯性系数初始值;Dp为正虚拟惯性频率变化率死区。In the formula: M bp is the positive virtual inertia coefficient; M bp-c and M bp-d are the positive virtual inertia coefficients when the energy storage is charged and discharged respectively; M p is the adjustment coefficient that changes with the frequency deviation; n is the parameter; c 1 is the initial value of the positive virtual inertia coefficient; D p is the dead zone of the positive virtual inertia frequency change rate.
5.根据权利要求1所述的一种光储联合参与电网一次调频的协调控制方法,其特征在于:所述步骤S3中负虚拟惯性控制方法为:5. The coordinated control method for the combined participation of optical storage and storage in the primary frequency regulation of the power grid according to claim 1, wherein the negative virtual inertia control method in the step S3 is: 负虚拟惯性响应公式为:The negative virtual inertia response formula is: ΔPbess=-Mbndf/dt (8)ΔP bess = -M bn df/dt (8)
Figure FDA0003721250140000031
Figure FDA0003721250140000031
Figure FDA0003721250140000032
Figure FDA0003721250140000032
式中:Mbn为负虚拟惯性系数;Mbn-c、Mbn-d分别为充放电时的负虚拟惯性系数;b1为负虚拟惯性系数初始值;Mb1为关于频率偏差变化的调节系数;fbess-d为储能调频死区;fmax为电网允许的最大频率偏差幅值。In the formula: M bn is the negative virtual inertia coefficient; M bn-c and M bn-d are the negative virtual inertia coefficients during charging and discharging respectively; b 1 is the initial value of the negative virtual inertia coefficient; M b1 is the adjustment of the frequency deviation change coefficient; f bess-d is the dead zone of energy storage frequency regulation; f max is the maximum frequency deviation amplitude allowed by the grid.
6.根据权利要求1所述的光储联合参与电网一次调频的协调控制方法,其特征在于:所述步骤S4中配置储能容量的方法为:6. The coordinated control method for the combined participation of photovoltaic and storage in power grid primary frequency regulation according to claim 1, characterized in that: the method for configuring the energy storage capacity in the step S4 is: 为了保证配置的储能可以提供和同步发电机组相匹配的惯性响应,对储能的容量大小设置如下:In order to ensure that the configured energy storage can provide an inertial response that matches the synchronous generator set, the capacity of the energy storage is set as follows: 当发电机转速为ω时,同步发电机具有的旋转动能为When the generator speed is ω, the rotational kinetic energy of the synchronous generator is
Figure FDA0003721250140000033
Figure FDA0003721250140000033
当电机转速跟随系统频率从ω0变化为ω1When the motor speed follows the system frequency from ω 0 to ω 1
Figure FDA0003721250140000034
Figure FDA0003721250140000034
同步发电机的转速正比于系统频率,一般在小范围内变化,电网运维准则规定,特殊情况下系统频率在短时间内可能上升到51Hz或者下降到48Hz,以频率下降分析,同步发电机转子的转速范围为0.95~1pu,可以释放的动能为:The rotational speed of the synchronous generator is proportional to the system frequency, and generally varies within a small range. The grid operation and maintenance guidelines stipulate that the system frequency may rise to 51Hz or drop to 48Hz in a short period of time under special circumstances. Based on the frequency drop analysis, the synchronous generator rotor The rotational speed range of 0.95 ~ 1pu, the kinetic energy that can be released is:
Figure FDA0003721250140000035
Figure FDA0003721250140000035
储能装置只受限于SOC,通常可以实现大范围的功率吞吐,因此较小的储能容量就可以实现和常规发电机组相同的调频效果,当配置有储能的光伏电站取代常规发电机组并入电网时,由于储能充放电时间一般大于惯性响应时间,故储能功率满足要求时,容量也就满足要求;The energy storage device is only limited by the SOC, and can usually achieve a wide range of power throughput. Therefore, a smaller energy storage capacity can achieve the same frequency regulation effect as a conventional generator set. When a photovoltaic power station equipped with energy storage replaces the conventional generator set and When entering the power grid, since the charging and discharging time of the energy storage is generally longer than the inertia response time, when the power of the energy storage meets the requirements, the capacity also meets the requirements; 设储能系统在Δt内释放出的能量与同转子动能相同,则有:Assuming that the energy released by the energy storage system within Δt is the same as the kinetic energy of the same rotor, there are: ΔEbess=PbessΔt=0.0784HSN (14)ΔE bess = P bess Δt = 0.0784HS N (14) 令Δt=2HLet Δt=2H Pbess=0.0392SN (15)P bess = 0.0392S N (15) 式中:ΔEbess、Pbess分别为储能的容量和功率;SN为发电机的额定容量;H为惯量常数;J为发电机的惯性时间常数。In the formula: ΔE bess and P bess are the capacity and power of the energy storage, respectively; S N is the rated capacity of the generator; H is the inertia constant; J is the inertia time constant of the generator.
7.根据权利要求1所述的光储联合参与电网一次调频的协调控制方法,其特征在于:所述步骤S4中光储联合调频的方法为:7. The coordinated control method for the joint participation of photovoltaic and storage in power grid primary frequency regulation according to claim 1, characterized in that: the method for combined photovoltaic and storage frequency regulation in the step S4 is: 1)储能系统为电力系统频率变化初期提供与常规发电机组相匹配的惯性响应;1) The energy storage system provides an inertial response that matches the conventional generator set for the initial frequency change of the power system; 2)光伏利用可变减载调频策略和储能自适应控制策略联合参与一次调频。2) Photovoltaic uses variable load shedding and frequency regulation strategy and energy storage adaptive control strategy to jointly participate in primary frequency regulation.
CN202110249651.4A 2021-03-08 2021-03-08 Coordination control method for jointly participating in primary frequency modulation of power grid by light storage Active CN113013896B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110249651.4A CN113013896B (en) 2021-03-08 2021-03-08 Coordination control method for jointly participating in primary frequency modulation of power grid by light storage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110249651.4A CN113013896B (en) 2021-03-08 2021-03-08 Coordination control method for jointly participating in primary frequency modulation of power grid by light storage

Publications (2)

Publication Number Publication Date
CN113013896A CN113013896A (en) 2021-06-22
CN113013896B true CN113013896B (en) 2022-08-30

Family

ID=76407996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110249651.4A Active CN113013896B (en) 2021-03-08 2021-03-08 Coordination control method for jointly participating in primary frequency modulation of power grid by light storage

Country Status (1)

Country Link
CN (1) CN113013896B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113746134B (en) * 2021-08-20 2024-06-28 华北电力大学(保定) Feasible domain calculation method for inertia and primary frequency modulation control parameters of photovoltaic unit
CN113765384B (en) * 2021-09-27 2023-03-28 电子科技大学 Continuous maximum power point tracking method
CN114336670B (en) * 2021-09-28 2024-08-13 国电南瑞科技股份有限公司 Wind-solar-energy-storage combined frequency modulation method and system based on fuzzy logic control
CN113937790B (en) * 2021-10-12 2024-02-06 云南电网有限责任公司电力科学研究院 A method for combining primary frequency modulation and secondary frequency modulation in electrochemical energy storage systems
CN113949077B (en) * 2021-10-26 2023-09-22 燕山大学 Energy storage primary frequency modulation control method based on SOC sine function
CN114336678B (en) * 2021-12-17 2023-10-13 中国长江三峡集团有限公司 PMU-based primary frequency modulation control method for wind-solar energy storage station
CN114884090B (en) * 2022-05-17 2023-05-09 四川大学 A dual-mode frequency control method for photovoltaic systems considering the participation of DC capacitors
CN115133554B (en) * 2022-07-15 2023-08-15 燕山大学 Energy storage primary frequency modulation comprehensive control method based on double-layer constraint
CN115296308B (en) * 2022-10-09 2023-03-14 国网江西省电力有限公司电力科学研究院 Robust cooperative frequency modulation method considering energy storage charge state and adaptive inertia level
CN115864447B (en) * 2023-02-24 2023-06-16 国网江西省电力有限公司电力科学研究院 Frequency control method and system for photovoltaic energy storage hybrid system
CN116054207B (en) * 2023-03-29 2023-08-04 昆明理工大学 Wind-storage fusion primary frequency modulation control method based on fuzzy control load shedding rate
CN116054266B (en) * 2023-03-31 2023-07-18 西安热工研究院有限公司 A system and method for frequency regulation and peak regulation of controllable energy storage power station combined with thermal power unit
CN116760061B (en) * 2023-06-07 2023-12-05 广东电网有限责任公司广州供电局 Control method for cascade power conversion of inertia supporting type bidirectional charging pile
CN116937596A (en) * 2023-09-05 2023-10-24 国网冀北电力有限公司廊坊供电公司 Distributed photovoltaic energy storage system with grid-connected point voltage regulation function
CN117117905B (en) * 2023-10-23 2024-03-12 国网江西省电力有限公司电力科学研究院 A primary frequency modulation control method and system based on light-storage coordination
CN117239796B (en) * 2023-11-14 2024-02-06 湘江实验室 Control method, equipment and medium for optical storage system
CN118040721B (en) * 2024-04-12 2024-08-13 驭碳(福建)能源科技有限公司 5G base station hybrid energy storage and photovoltaic cooperative participation power distribution network regulation and control method
CN118554548B (en) * 2024-07-25 2024-10-01 昆明理工大学 A photovoltaic storage system to compensate for the water hammer effect of a turbine and its coordinated frequency modulation method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110970933A (en) * 2019-11-23 2020-04-07 国网辽宁省电力有限公司电力科学研究院 Virtual inertia compensation method of light-storage combined power generation system based on active support control

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110970933A (en) * 2019-11-23 2020-04-07 国网辽宁省电力有限公司电力科学研究院 Virtual inertia compensation method of light-storage combined power generation system based on active support control

Also Published As

Publication number Publication date
CN113013896A (en) 2021-06-22

Similar Documents

Publication Publication Date Title
CN113013896B (en) Coordination control method for jointly participating in primary frequency modulation of power grid by light storage
CN107196341B (en) Variable power point tracking two-stage type non-energy-storage photovoltaic virtual synchronous machine control method
CN113690873A (en) Photovoltaic direct-current micro-grid coordination control method containing hybrid energy storage
Kim et al. Dynamic modeling and control of a grid-connected hybrid generation system with versatile power transfer
CN112086997B (en) Photovoltaic coordination frequency modulation control method based on variable power tracking and super capacitor storage
Hu et al. Optimization of battery energy storage system with super-capacitor for renewable energy applications
CN106505616B (en) A kind of adjusting method of DC distribution net DC voltage
CN107968417A (en) A kind of three-phase two-stage type photovoltaic system participates in the control method for coordinating that mains frequency is adjusted
CN105226719A (en) For the energy storage control system of wind power regulation and control
CN111900721A (en) A frequency control method of smart grid based on wind-water synergistic power generation mode
CN111327041B (en) DC power distribution network control method regulated by virtual inertia control strategy of electric automobile
CN112803505A (en) Distributed voltage source converter cooperative control method and alternating current-direct current parallel-serial micro-grid
CN106712093B (en) The control method of isolated island parallel running based on large capacity energy-storage system
CN115714435A (en) Photovoltaic hybrid energy storage system power distribution and virtual inertia control method based on virtual synchronous generator
CN110120696A (en) A kind of extensive energy storage SOC balance coordination control system and method
Varghese et al. Power flow control of solar PV based islanded low voltage DC microgrid with battery management system
Albasheri et al. Control and power management of DC microgrid based wind/battery/supercapacitor
CN115864520A (en) A control method and system based on a high proportion of photovoltaic energy connected to a hybrid power grid
CN114552600A (en) Frequency adjusting method for photovoltaic grid-connected power generation participation system
CN117674192A (en) Hybrid energy storage participation wind-light energy storage station power distribution and frequency modulation strategy under multiple scenes
Thomas et al. Control strategy for a PV-wind based standalone DC microgrid with hybrid energy storage system
Hoang et al. Analysis of Uncertainties for the Operation and Stability of an Islanded Microgrid
Korada et al. Dynamic energy management in DC microgrid using composite energy storage system
Koulali et al. Sliding Fuzzy Controller for Energy Management of Residential Load by Multi-sources Power System Using Wind PV and Battery.
CN202019336U (en) Power generating unit and energy output equipment in power network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant