CN112982274A - Desilting method for restoring reservoir sediment storage capacity by utilizing daily incoming water - Google Patents

Desilting method for restoring reservoir sediment storage capacity by utilizing daily incoming water Download PDF

Info

Publication number
CN112982274A
CN112982274A CN202110231217.3A CN202110231217A CN112982274A CN 112982274 A CN112982274 A CN 112982274A CN 202110231217 A CN202110231217 A CN 202110231217A CN 112982274 A CN112982274 A CN 112982274A
Authority
CN
China
Prior art keywords
water
reservoir
building
sand
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110231217.3A
Other languages
Chinese (zh)
Inventor
谢遵党
宋修昌
毛重阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN202110231217.3A priority Critical patent/CN112982274A/en
Publication of CN112982274A publication Critical patent/CN112982274A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02B—HYDRAULIC ENGINEERING
    • E02B1/00—Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02B—HYDRAULIC ENGINEERING
    • E02B5/00—Artificial water canals, e.g. irrigation canals
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02B—HYDRAULIC ENGINEERING
    • E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02—Fixed barrages
    • E02B7/04—Dams across valleys
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02B—HYDRAULIC ENGINEERING
    • E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20—Movable barrages; Lock or dry-dock gates
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F5/00—Dredgers or soil-shifting machines for special purposes
    • E02F5/28—Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Sewage (AREA)

Abstract

The invention provides a dredging method for restoring reservoir sediment storage capacity of a reservoir by utilizing daily incoming water, which comprises the steps of accumulating incoming water in an non-flood period by utilizing a hydraulic building, then carrying out water bundling and sand washing by building a ditch in a reservoir area, washing sand into a sand washing funnel, and discharging the sand outside a dam through a sand discharge gate; the method comprises the steps of building a water retaining building at the tail of a reservoir, storing water in a non-flood period, and then building a ditch in a reservoir area to carry out water binding and sand flushing; when the inflow of the main river channel is small and the flow speed required by silt flushing cannot be achieved, the water can be stopped and stored by lowering the gate, and after enough water is stored, the gate is opened and the water is discharged for silt flushing; on the other hand, the hydraulic building has the characteristic of full-section overflowing at the beginning of a flood season.

Description

Desilting method for restoring reservoir sediment storage capacity by utilizing daily incoming water
Technical Field
The invention relates to the technical field of reservoir sediment storage capacity regeneration, in particular to a dredging method for restoring reservoir sediment storage capacity by utilizing daily incoming water.
Background
The reservoir is used as an important comprehensive hydro-junction, and the exertion of all functions of the reservoir provides important guarantee for solving the problems of frequent drought and waterlogging and the like in China, efficiently utilizing water resources, promoting economic development and maintaining social stability.
The water flow of the natural river channel is generally carried with silt with different particle sizes, and a large amount of silt is often deposited in the running process of the reservoir. A large number of medium and small reservoirs are built in the middle of the last century in China, and after years of application, the phenomenon of sediment accumulation in most reservoirs is relatively serious, so that the annual sediment accumulation loss of the reservoir capacity is reduced, the comprehensive benefit of reservoir engineering is influenced, and the normal operation of the reservoir is also influenced. The reservoir in the season wind climate area of China has the characteristic of uneven distribution of the time and space of the warehousing water and sand, the river sand content in the flood season is large, and the sand content in the non-flood season is small. Therefore, the conventional reservoir dredging method comprises natural flushing, mechanical dredging and the like in the flood season.
The natural flushing in the flood season adopts a mode of reducing the water level of the reservoir and continuously flushing the reservoir by using the water coming from the flood season, the water coming from the flood season is drained in a white and white manner, the sand flushing range is limited to the range of the main trough, most of reservoir area siltation parts are difficult to relate to, and the desilting amount is limited; the mechanical dredging requires that the water level of the reservoir is reduced or even the reservoir is emptied in the non-flood season, and the problems of strict dredging conditions, small dredging range, high cost and the like exist.
Disclosure of Invention
The invention aims to provide a dredging method for restoring reservoir deposition capacity of a reservoir by utilizing daily incoming water aiming at the defects of the prior art; the invention is beneficial to the self-dredging method of the reservoir by the incoming water in the non-flood season: a water retaining building is built at the tail of a reservoir of the reservoir, water coming in the non-flood period is stored, and then water bundling and sand washing are carried out by building a ditch in a reservoir area.
The technical scheme of the invention is as follows: a desilting method for restoring the sediment reservoir capacity of a reservoir by utilizing daily incoming water comprises the steps of accumulating the incoming water in a non-flood period by utilizing a hydraulic building, then carrying out water binding and sand washing by building a ditch in a reservoir area, washing the sand into a sand washing funnel, and discharging the sand out of a dam through a sand discharge gate;
the hydraulic structure comprises a water blocking structure arranged at the tail of the reservoir, a water discharging structure arranged at the tail of the reservoir and a water inlet channel arranged at the reservoir area;
the dredging method specifically comprises the following steps:
the method comprises the following steps: construction of water retaining buildings
Building a water retaining structure at the tail of the reservoir, and digging water diversion channels along a certain elevation on two banks of the reservoir area;
step two: construction of a Sand-washing funnel
Digging a ditch from the water diversion ditches at the two banks to the center of the river channel to a main river channel or a sand washing funnel formed by a sand discharge building;
step three: emptying storage capacity of reservoir
Newly building a reservoir tail water blocking building to lower a gate for storing water, opening the gate of a reservoir and emptying the reservoir capacity;
step four: sand washing and dredging
After the reservoir tail impounds the water to the designed water consumption, the gate is opened to drain water, and water is introduced into the dug ditch from the water diversion ditch to wash away sand.
Further, the water blocking building meets the use requirements of water storage in the non-flood season and full-section overflow in the flood season, and specifically adopts any one of a gravity dam, an earth-rock dam or a rock-fill dam.
Further, the gravity dam is a concrete gravity dam; and the water outlet building is arranged on the gravity dam body; the gravity dam has the advantages of simple construction and better endurance.
Furthermore, the earth and rockfill dam adopts a rolling earth and rockfill dam; and the water release building is arranged on the earth-rock dam body; the earth-rock dam can be made of local materials, long-distance transportation of dam building materials is reduced, and construction is easier in actual application.
Furthermore, the rock-fill dam is a gravity wall type rock-fill dam; and the water outlet building is arranged on the rock-fill dam body; the rock-fill dam has a simple construction method and good earthquake resistance.
Furthermore, the bottom of the water outlet building is provided with a drainage bottom hole, and the drainage bottom hole is provided with a drainage gate for controlling water storage and drainage sand washing.
Furthermore, the diversion canal is arranged along the landform on both sides, and a plurality of strip canals which are uniformly arranged at intervals along the water flow direction are arranged on the diversion canal; and a simple gate is arranged at the position of the diversion canal where the strip canal is arranged.
Further, the lateral canal extends from the water diversion canal to the center of the river channel to the main river channel; the diversion canal can be used for flushing sand by utilizing flow water to flush sand into the sand flushing funnel in a subarea mode.
Furthermore, the distance between the strip channels is divided into channels according to the channel section bottom width b in the scouring and silting balance.
Furthermore, the distance between the strip channels is divided into channels according to the channel section bottom width B in the scouring and silting balance.
Compared with the prior art, the invention has the beneficial effects that:
1. the method comprises the steps of building a water retaining building at the tail of a reservoir, storing water in a non-flood period, and then building a ditch in a reservoir area to carry out water binding and sand flushing; when the inflow of the main river channel is small and the flow speed required by silt flushing cannot be achieved, the water can be stopped and stored by lowering the gate, and after enough water is stored, the gate is opened and the water is discharged for silt flushing; on the other hand, when the flood season comes, the hydraulic building has the characteristic of full-section overflowing;
2. the invention has the advantages of low overall cost, large-scale dredging characteristic and suitability for mass popularization.
Drawings
FIG. 1 is a schematic structural view of embodiment 1 of the present invention;
FIG. 2 is a schematic view of the arrangement of trenches in example 2 of the present invention;
FIG. 3 is a schematic view of an arrangement of trenches in accordance with example 4 of the present invention;
Detailed Description
Example 1: a desilting method for restoring the sediment reservoir capacity of a reservoir by utilizing daily incoming water comprises the steps of accumulating the incoming water in a non-flood period by utilizing a hydraulic building, then carrying out water binding and sand washing by building a ditch in a reservoir area, washing the sand into a sand washing funnel, and discharging the sand out of a dam through a sand discharge gate;
as shown in fig. 1, the hydraulic structure includes a water intercepting structure provided at the tail of the reservoir, a water discharging structure provided at the tail of the reservoir, and an aqueduct provided at the reservoir area;
the water retaining building meets the use requirements of water storage in the non-flood season and full-section overflowing in the flood season, and specifically adopts a concrete gravity dam; and the water outlet building is arranged on the dam body of the concrete gravity dam; the bottom of the water outlet structure is provided with a drainage bottom hole, and the drainage bottom hole is provided with a drainage gate for controlling water storage and drainage sand washing;
the diversion channel is arranged along landforms on two banks, and a plurality of strip channels which are uniformly arranged at intervals along the water flow direction are arranged on the diversion channel; and a simple gate is arranged at the position where the diversion canal is provided with the strip canal; the strip channel extends from the water channel to the center of the river channel to the main river channel;
the dredging method specifically comprises the following steps:
the method comprises the following steps: construction of water retaining buildings
Building a water retaining structure at the tail of the reservoir, and digging water diversion channels along a certain elevation on two banks of the reservoir area;
step two: construction of a Sand-washing funnel
Digging a ditch from the water diversion ditches at the two banks to the center of the river channel to a main river channel or a sand washing funnel formed by a sand discharge building;
step three: emptying storage capacity of reservoir
Newly building a reservoir tail water blocking building to lower a gate for storing water, opening the gate of a reservoir and emptying the reservoir capacity;
step four: sand washing and dredging
After the reservoir tail impounds the water to the designed water consumption, the gate is opened to drain water, and water is introduced into the dug ditch from the water diversion ditch to wash away sand.
Example 2: the difference from example 1 is: as shown in fig. 2, the spacing between the trenches is divided into trenches by the trench section bottom width b at the time of erosion-deposition balance.
Example 3: a desilting method for restoring the sediment reservoir capacity of a reservoir by utilizing daily incoming water comprises the steps of accumulating the incoming water in a non-flood period by utilizing a hydraulic building, then carrying out water binding and sand washing by building a ditch in a reservoir area, washing the sand into a sand washing funnel, and discharging the sand out of a dam through a sand discharge gate;
the hydraulic structure comprises a water blocking structure arranged at the tail of the reservoir, a water discharging structure arranged at the tail of the reservoir and a water inlet channel arranged at the reservoir area;
the water retaining building meets the use requirements of water storage in the non-flood season and full-section overflowing in the flood season, and particularly adopts a rolling type earth-rock dam; and the water release structure is arranged on the rolling earth-rock dam body; the bottom of the water outlet structure is provided with a drainage bottom hole, and the drainage bottom hole is provided with a drainage gate for controlling water storage and drainage sand washing;
the diversion channel is arranged along landforms on two banks, and a plurality of strip channels which are uniformly arranged at intervals along the water flow direction are arranged on the diversion channel; and a simple gate is arranged at the position where the diversion canal is provided with the strip canal; the strip channel extends from the water channel to the center of the river channel to the main river channel;
the dredging method specifically comprises the following steps:
the method comprises the following steps: construction of water retaining buildings
Building a water retaining structure at the tail of the reservoir, and digging water diversion channels along a certain elevation on two banks of the reservoir area;
step two: construction of a Sand-washing funnel
Digging a ditch from the water diversion ditches at the two banks to the center of the river channel to a main river channel or a sand washing funnel formed by a sand discharge building;
step three: emptying storage capacity of reservoir
Newly building a reservoir tail water blocking building to lower a gate for storing water, opening the gate of a reservoir and emptying the reservoir capacity;
step four: sand washing and dredging
After the reservoir tail impounds the water to the designed water consumption, the gate is opened to drain water, and water is introduced into the dug ditch from the water diversion ditch to wash away sand.
Example 4: the difference from example 2 is: as shown in fig. 3, the spacing between the trenches is divided into trenches by the width of the top of the trench section at the time of erosion-deposition balance.
Example 5: a desilting method for restoring the sediment reservoir capacity of a reservoir by utilizing daily incoming water comprises the steps of accumulating the incoming water in a non-flood period by utilizing a hydraulic building, then carrying out water binding and sand washing by building a ditch in a reservoir area, washing the sand into a sand washing funnel, and discharging the sand out of a dam through a sand discharge gate;
the hydraulic structure comprises a water blocking structure arranged at the tail of the reservoir, a water discharging structure arranged at the tail of the reservoir and a water inlet channel arranged at the reservoir area;
the water retaining building meets the use requirements of water storage in the non-flood season and full-section overflowing in the flood season, and particularly adopts a gravity wall type rock-fill dam; and the water outlet building is arranged on the dam body of the gravity wall type rock-fill dam; the bottom of the water outlet structure is provided with a drainage bottom hole, and the drainage bottom hole is provided with a drainage gate for controlling water storage and drainage sand washing;
the diversion channel is arranged along landforms on two banks, and a plurality of strip channels which are uniformly arranged at intervals along the water flow direction are arranged on the diversion channel; and a simple gate is arranged at the position where the diversion canal is provided with the strip canal; the strip channel extends from the water channel to the center of the river channel to the main river channel;
the dredging method specifically comprises the following steps:
the method comprises the following steps: construction of water retaining buildings
Building a water retaining structure at the tail of the reservoir, and digging water diversion channels along a certain elevation on two banks of the reservoir area;
step two: construction of a Sand-washing funnel
Digging a ditch from the water diversion ditches at the two banks to the center of the river channel to a main river channel or a sand washing funnel formed by a sand discharge building;
step three: emptying storage capacity of reservoir
Newly building a reservoir tail water blocking building to lower a gate for storing water, opening the gate of a reservoir and emptying the reservoir capacity;
step four: sand washing and dredging
After the reservoir tail impounds the water to the designed water consumption, the gate is opened to drain water, and water is introduced into the dug ditch from the water diversion ditch to wash away sand.

Claims (10)

1. A desilting method for restoring the sediment reservoir capacity of a reservoir by utilizing daily incoming water comprises the steps of accumulating the incoming water in a non-flood period by utilizing a hydraulic building, then carrying out water binding and sand washing by building a ditch in a reservoir area, washing the sand into a sand washing funnel, and discharging the sand out of a dam through a sand discharge gate;
the hydraulic structure is characterized by comprising a water retaining building arranged at the tail of a reservoir, a water outlet building arranged at the tail of the reservoir and a water inlet channel arranged at a reservoir area;
the dredging method specifically comprises the following steps:
the method comprises the following steps: construction of water retaining buildings
Building a water retaining structure at the tail of the reservoir, and digging water diversion channels along a certain elevation on two banks of the reservoir area;
step two: construction of a Sand-washing funnel
Digging a ditch from the water diversion ditches at the two banks to the center of the river channel to a main river channel or a sand washing funnel formed by a sand discharge building;
step three: emptying storage capacity of reservoir
Newly building a reservoir tail water blocking building to lower a gate for storing water, opening the gate of a reservoir and emptying the reservoir capacity;
step four: sand washing and dredging
After the reservoir tail impounds the water to the designed water consumption, the gate is opened to drain water, and water is introduced into the dug ditch from the water diversion ditch to wash away sand.
2. The dredging method for restoring the reservoir capacity of the reservoir deposit by using the daily incoming water according to claim 1, wherein the water retaining building meets the use requirements of water storage in the non-flood season and full-section overflowing in the flood season, and specifically adopts any one of a gravity dam, an earth-rock dam or a rock-fill dam.
3. The dredging method for restoring the sediment storage capacity of the reservoir by utilizing the daily incoming water according to claim 2, wherein the gravity dam is a concrete gravity dam; and the water outlet building is arranged on the gravity dam body.
4. The method of claim 2, wherein the earth-rock dam is a rolling earth-rock dam; and the water outlet building is arranged on the earth-rock dam body.
5. The method as claimed in claim 2, wherein the rock-fill dam is a gravity wall type rock-fill dam; and the water outlet building is arranged on the rock-fill dam body.
6. The method as claimed in any one of claims 3 to 5, wherein a drainage bottom hole is formed in the bottom of the drainage structure, and a discharge gate for controlling water storage and discharge sand washing is formed in the drainage bottom hole.
7. The dredging method for restoring the sediment storage capacity of the reservoir by utilizing the daily incoming water as claimed in claim 1, wherein the aqueduct is arranged along the landform on both sides, and a plurality of strip canals are arranged on the aqueduct at regular intervals along the water flow direction; and a simple gate is arranged at the position of the diversion canal where the strip canal is arranged.
8. The method of claim 7, wherein the lateral channel extends from the penstock to the center of the river to the main channel.
9. The method as claimed in claim 7, wherein the interval between the channels is divided into channels according to the channel section bottom width b in the balance of erosion and deposition.
10. The method as claimed in claim 7, wherein the interval between the channels is divided into channels according to the channel section bottom width B in the scouring balance.
CN202110231217.3A 2021-03-02 2021-03-02 Desilting method for restoring reservoir sediment storage capacity by utilizing daily incoming water Pending CN112982274A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110231217.3A CN112982274A (en) 2021-03-02 2021-03-02 Desilting method for restoring reservoir sediment storage capacity by utilizing daily incoming water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110231217.3A CN112982274A (en) 2021-03-02 2021-03-02 Desilting method for restoring reservoir sediment storage capacity by utilizing daily incoming water

Publications (1)

Publication Number Publication Date
CN112982274A true CN112982274A (en) 2021-06-18

Family

ID=76352097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110231217.3A Pending CN112982274A (en) 2021-03-02 2021-03-02 Desilting method for restoring reservoir sediment storage capacity by utilizing daily incoming water

Country Status (1)

Country Link
CN (1) CN112982274A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113550277A (en) * 2021-08-06 2021-10-26 黄河勘测规划设计研究院有限公司 Water-bundling sand washing method adopting vertical bidirectional rotary gate
CN116289788A (en) * 2023-03-27 2023-06-23 黄河水利委员会黄河水利科学研究院 A gate dam at a tributary outlet and a method for controlling siltation in a reservoir area based on the gate dam

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938591A (en) * 2014-02-27 2014-07-23 黄河水利委员会河南黄河河务局 Method for reducing heavily silt-carrying river reservoir deposition
CN105089020A (en) * 2014-05-21 2015-11-25 天津虹炎科技有限公司 Siltation reduction method for reservoir
CN105421288A (en) * 2015-11-20 2016-03-23 中国电建集团贵阳勘测设计研究院有限公司 Large reservoir disc reservoir silt beach sand flushing structure and construction method thereof
CN108256194A (en) * 2018-01-10 2018-07-06 黄河勘测规划设计有限公司 A kind of design method and dam structure for restoring reservoir dam-break storage capacity
CN110055925A (en) * 2019-03-18 2019-07-26 黄河水利委员会黄河水利科学研究院 A separation system for water storage and sediment discharge in large and medium-sized reservoirs of sandy rivers during flood season

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938591A (en) * 2014-02-27 2014-07-23 黄河水利委员会河南黄河河务局 Method for reducing heavily silt-carrying river reservoir deposition
CN105089020A (en) * 2014-05-21 2015-11-25 天津虹炎科技有限公司 Siltation reduction method for reservoir
CN105421288A (en) * 2015-11-20 2016-03-23 中国电建集团贵阳勘测设计研究院有限公司 Large reservoir disc reservoir silt beach sand flushing structure and construction method thereof
CN108256194A (en) * 2018-01-10 2018-07-06 黄河勘测规划设计有限公司 A kind of design method and dam structure for restoring reservoir dam-break storage capacity
CN110055925A (en) * 2019-03-18 2019-07-26 黄河水利委员会黄河水利科学研究院 A separation system for water storage and sediment discharge in large and medium-sized reservoirs of sandy rivers during flood season

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113550277A (en) * 2021-08-06 2021-10-26 黄河勘测规划设计研究院有限公司 Water-bundling sand washing method adopting vertical bidirectional rotary gate
CN116289788A (en) * 2023-03-27 2023-06-23 黄河水利委员会黄河水利科学研究院 A gate dam at a tributary outlet and a method for controlling siltation in a reservoir area based on the gate dam
CN116289788B (en) * 2023-03-27 2026-04-10 黄河水利委员会黄河水利科学研究院 A tributary outlet gate dam and a method for controlling sedimentation in the reservoir area based on the dam.

Similar Documents

Publication Publication Date Title
CN109537520B (en) Peak clipping and flood regulating system and method for construction project flood discharge prevention small reservoir emptying capacity
CN102535384A (en) In-trench water-stone separation siphoning-drainage debris flow control method
CN109778774B (en) A permeable spur dam structure
CN109338982B (en) Diversion engineering head storage dredging and dredging regulation reservoir
CN117107876A (en) A combined overflow pollution control system and treatment method based on working condition regulation
CN106702968A (en) Arc type overflow dam capable of automatically washing away sand and reducing siltation and running method of arc type overflow dam
CN207295638U (en) The draining deep layer tunnel of small flow channel is set
CN110714436A (en) Retaining system of check dam
CN204644994U (en) A kind of outlet structure escape works structure
CN219195796U (en) Mountain area silt processing apparatus
CN116289788B (en) A tributary outlet gate dam and a method for controlling sedimentation in the reservoir area based on the dam.
CN111472434A (en) A kind of mountain rain and flood collection and excretion device and excretion method
CN110396990A (en) One kind cutting conductivity type eco-drainage ditch
CN116289817A (en) A water inlet structure of a high head hydropower station without a sedimentation tank and a sedimentation and discharge method
CN206337480U (en) Ecological side drain
CN210597186U (en) Side type multifunctional reservoir
CN215052616U (en) Storage capacity system for sedimentation storage capacity regeneration of medium and small-sized reservoirs
CN212224164U (en) Irrigation system with controllable water storage and drainage
CN210049347U (en) Water storage system for water interception of mine slope
CN215857796U (en) Prevent ponding high-efficient type soil and water conservation and use side slope nursing device
CN206554031U (en) It is a kind of sand washing to subtract the arc line type overflow dam of silt automatically
CN208167941U (en) Catchment pool structure for a kind of dry-hot valley forest land
CN222701135U (en) Inside rainwater interception and drainage construction structure of tailing pond
CN221480710U (en) A low excavation diversion open channel for impoundment dam
CN221855403U (en) Scour-preventing river bank protection structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination