CN112968206B - A battery production line - Google Patents

A battery production line Download PDF

Info

Publication number
CN112968206B
CN112968206B CN202110326760.1A CN202110326760A CN112968206B CN 112968206 B CN112968206 B CN 112968206B CN 202110326760 A CN202110326760 A CN 202110326760A CN 112968206 B CN112968206 B CN 112968206B
Authority
CN
China
Prior art keywords
machine
shaping
rack
clamping
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110326760.1A
Other languages
Chinese (zh)
Other versions
CN112968206A (en
Inventor
许家友
李晓荣
孙晨
邵伟明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Xinshengda Intelligent Equipment Co ltd
Original Assignee
Dongguan Xinshengda Intelligent Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Xinshengda Intelligent Equipment Co ltd filed Critical Dongguan Xinshengda Intelligent Equipment Co ltd
Priority to CN202110326760.1A priority Critical patent/CN112968206B/en
Publication of CN112968206A publication Critical patent/CN112968206A/en
Application granted granted Critical
Publication of CN112968206B publication Critical patent/CN112968206B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • H—ELECTRICITY
    • H01—ELECTRIC ELEMENTS
    • H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00—Secondary cells; Manufacture thereof
    • H01M10/04—Construction or manufacture in general
    • H01M10/0404—Machines for assembling batteries
    • H—ELECTRICITY
    • H01—ELECTRIC ELEMENTS
    • H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00—Secondary cells; Manufacture thereof
    • H01M10/05—Accumulators with non-aqueous electrolyte
    • H01M10/058—Construction or manufacture
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50—Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Battery Mounting, Suspending (AREA)
  • Secondary Cells (AREA)

Abstract

本发明公开了一种电池生产线,包括机架以及安装于机架上的上料机、整形测试裁切机、贴侧面胶机、焊接机、贴双面胶机以及贴成型胶机,上料机用于对电芯进行上料,整形测试裁切机用于对电芯进行整形、测试以及裁切,贴侧面胶机用于对电芯的侧面进行贴胶,焊接机用于将金属片和电芯的极耳焊接在一起,贴双面胶机用于对焊接后的电芯进行贴双面胶,贴成型胶机用于对贴双面胶后的电芯贴上成型胶,上料机、整形测试裁切机、贴侧面胶机、焊接机、贴双面胶机以及贴成型胶机沿机架的长度方向依次布置。本发明通过以上结构可对电芯进行上料、整形、测试、裁切、贴侧面胶、焊接、贴双面胶以及贴成型胶,使得对电芯的生产的自动化程度以及生产效率更高。

Figure 202110326760

The invention discloses a battery production line, comprising a rack and a feeding machine, a shaping test cutting machine, a side gluing machine, a welding machine, a double-sided gluing machine and a forming gluing machine installed on the frame. The machine is used to feed the battery cell, the shaping test cutting machine is used to shape, test and cut the battery cell, the side gluer is used to glue the side of the battery cell, and the welding machine is used to glue the metal sheet. It is welded with the tabs of the battery cells. The double-sided tape machine is used to apply double-sided tape to the welded cells. The molding glue machine is used to apply molding glue to the cells after the double-sided tape. The feeding machine, the plastic test cutting machine, the side gluer, the welding machine, the double-sided gluer and the gluer are arranged in sequence along the length of the frame. The invention can carry out feeding, shaping, testing, cutting, sticking side glue, welding, sticking double-sided tape and sticking molding glue to the battery cell through the above structure, so that the automation degree and production efficiency of the production of the battery core are higher.

Figure 202110326760

Description

一种电池生产线A battery production line

技术领域technical field

本发明涉及锂电池生产的技术领域,具体涉及一种电池生产线。The invention relates to the technical field of lithium battery production, in particular to a battery production line.

背景技术Background technique

众所周知,锂电池具有高能量、重量轻以及使用寿命长等优点,其被广泛地应用于笔记本电脑、手机、数码相机、电动车、电动工具、新能源汽车等各种产品。As we all know, lithium batteries have the advantages of high energy, light weight and long service life, and are widely used in various products such as notebook computers, mobile phones, digital cameras, electric vehicles, power tools, and new energy vehicles.

锂电池主要包括极片、隔膜、电解液以及外壳等几大部分。锂电池的生产制造过程包括了以下步骤:对电芯进行整形、测试、裁切的步骤,对电芯进行贴侧面胶的步骤,将电芯和金属片焊接在一起的步骤,对电芯的极耳贴双面胶的步骤以及对电芯贴成型胶的步骤。现有技术的生产线往往存在布局不合理,生产效率低,许多工序依靠人工完成,易混入灰尘杂质,产品质量差,自动化程度较低的问题。Lithium batteries mainly include pole pieces, separators, electrolytes, and shells. The production and manufacturing process of lithium batteries includes the following steps: the steps of shaping, testing and cutting the cells, the steps of applying side glue to the cells, the steps of welding the cells and the metal sheets together, and the The steps of attaching double-sided tape to the tabs and the steps of attaching molding glue to the battery core. The production lines of the prior art often have problems of unreasonable layout, low production efficiency, many processes are manually completed, dust impurities are easily mixed, product quality is poor, and the degree of automation is low.

因此,亟需一种电池生产线来解决上述问题。Therefore, there is an urgent need for a battery production line to solve the above problems.

发明内容SUMMARY OF THE INVENTION

本项发明是针对现在的技术不足,提供一种电池生产线。The present invention provides a battery production line in view of the current technical deficiencies.

本发明为实现上述目的所采用的技术方案是:The technical scheme that the present invention adopts for realizing the above-mentioned purpose is:

一种电池生产线,包括机架以及安装于所述机架上的上料机、整形测试裁切机、贴侧面胶机、焊接机、贴双面胶机以及贴成型胶机,所述上料机用于对电芯进行上料,所述整形测试裁切机用于对电芯进行整形、测试以及裁切,所述贴侧面胶机用于对电芯的侧面进行贴胶,所述焊接机用于将金属片和电芯的极耳焊接在一起,所述贴双面胶机用于对焊接后的电芯进行贴双面胶,所述贴成型胶机用于对贴双面胶后的电芯贴上成型胶,所述上料机、所述整形测试裁切机、所述贴侧面胶机、所述焊接机、所述贴双面胶机以及所述贴成型胶机沿所述机架的长度方向依次布置。A battery production line includes a rack and a feeding machine, a shaping test cutting machine, a side gluing machine, a welding machine, a double-sided gluing machine and a forming gluing machine installed on the frame. The machine is used for feeding the battery cell, the shaping test cutting machine is used for shaping, testing and cutting the battery core, the side gluing machine is used for gluing the side surface of the battery core, the welding The machine is used to weld the metal sheet and the tabs of the cell together, the double-sided tape machine is used to paste the double-sided tape on the welded cell, and the forming glue machine is used to paste the double-sided tape. The battery core is then pasted with molding glue, the feeding machine, the shaping test cutting machine, the side gluer, the welding machine, the double-sided gluer and the moulding gluer are The length directions of the racks are arranged in sequence.

作进一步改进,所述整形测试裁切机包括第一整形装置、测试装置、第一裁切装置、取料装置、第一夹紧装置和驱动组件,所述第一整形装置、所述测试装置以及所述第一裁切装置沿所述机架的长度方向呈间隔布置,所述取料装置安装于所述驱动组件的输出端并在该驱动组件的驱使下相对所述机架运动以将电芯于整形工位、测试工位以及裁切工位之间进行移动,所述第一夹紧装置至少有三个,且所述第一夹紧装置分别布置于所述第一整形装置、所述测试装置以及所述第一裁切装置的下方。For further improvement, the shaping test cutting machine includes a first shaping device, a testing device, a first cutting device, a reclaiming device, a first clamping device and a drive assembly, the first shaping device, the testing device And the first cutting devices are arranged at intervals along the length direction of the frame, the reclaiming device is installed at the output end of the drive assembly and is driven by the drive assembly to move relative to the frame to cut The cell moves between the shaping station, the testing station and the cutting station. There are at least three first clamping devices, and the first clamping devices are respectively arranged on the first shaping device and the cutting station. below the testing device and the first cutting device.

作进一步改进,所述贴侧面胶机包括贴胶机构、第二夹紧装置以及取料翻转组件,所述贴胶机构和所述取料翻转组件呈相对地布置,所述第二夹紧装置位于所述贴胶机构和所述取料翻转组件之间,所述贴胶机构至少有两组,两组所述贴胶机构沿所述机架的长度方向布置,每组所述贴胶机构的贴胶工位处均设置有所述第二夹紧装置,所述取料翻转组件可用于翻转电芯并将电芯于不同的第二夹紧装置之间进行转移。As a further improvement, the side-applying gluer includes a gluing mechanism, a second clamping device and a reclaiming and turning assembly, and the gluing mechanism and the reclaiming and turning assembly are arranged opposite to each other, and the second clamping device Located between the gluing mechanism and the reclaiming and turning assembly, there are at least two groups of the gluing mechanisms, and the two groups of the gluing mechanisms are arranged along the length of the frame, and each group of the gluing mechanisms The second clamping device is provided at the gluing stations of each of the two, and the reclaiming and turning assembly can be used to turn the battery cell and transfer the battery cell between different second clamping devices.

作进一步改进,所述焊接机包括输送机构、压紧机构以及焊接机构,所述输送机构至少有两个,且两个所述输送机构沿所述机架的长度方向并排地布置,所述输送机构沿所述机架的宽度方向输送电芯和金属片,所述焊接机构沿所述机架的长度方向布置以选择性地对两个所述输送机构之一者上的电芯和金属片进行焊接,所述压紧机构至少有两个,且所述压紧机构和所述输送机构一一对应,所述压紧机构位于所述输送机构的上方并压紧该输送机构所输送的金属片和电芯的极耳。As a further improvement, the welding machine includes a conveying mechanism, a pressing mechanism and a welding mechanism, there are at least two conveying mechanisms, and the two conveying mechanisms are arranged side by side along the length direction of the frame. The mechanism conveys cells and metal sheets along the width direction of the rack, and the welding mechanism is arranged along the length direction of the rack to selectively align the cells and metal sheets on one of the two conveying mechanisms For welding, there are at least two pressing mechanisms, and the pressing mechanism and the conveying mechanism correspond one by one, and the pressing mechanism is located above the conveying mechanism and compresses the metal conveyed by the conveying mechanism. Tabs and tabs of the cell.

作进一步改进,所述贴双面胶机包括放卷装置、拉带装置、第二裁切装置以及贴胶组件,所述放卷装置用于对双面胶进行放卷,所述拉带装置用于对放卷的双面胶进行拉出,所述第二裁切装置用于将被拉出的双面胶进行裁切,所述贴胶组件用于将裁切后的双面胶进行贴胶,所述拉带装置位于所述放卷装置的下方,所述拉带装置包括第一转动辊、第二转动辊以及步进电机,所述第一转动辊和所述第二转动辊沿所述机架的高度方向并排地布置,所述步进电机的输出端与所述第一转动辊连接以实现对放卷的双面胶进行步进式地拉出。As a further improvement, the double-sided adhesive tape machine includes an unwinding device, a tape pulling device, a second cutting device and a glue sticking assembly, the unwinding device is used to unwind the double-sided tape, and the tape pulling device The second cutting device is used to cut the double-sided tape that has been pulled out, and the sticking assembly is used to cut the cut double-sided tape. glue, the tape pulling device is located below the unwinding device, the tape pulling device includes a first rotating roller, a second rotating roller and a stepping motor, the first rotating roller and the second rotating roller Arranged side by side along the height direction of the frame, the output end of the stepping motor is connected with the first rotating roller to pull out the double-sided adhesive tape unrolled step by step.

作进一步改进,所述贴成型胶机包括转动盘、第二整形装置、剥胶贴胶机构以及下料装置,所述第二整形装置和所述下料装置沿所述机架的长度方向呈并排且间隔布置,所述剥胶贴胶机构和所述转动盘均位于所述整形装置和所述下料装置之间,且所述剥胶贴胶机构和所述转动盘沿所述机架的宽度方向呈并排且间隔地布置,所述转动盘可相对所述机架转动以使得该转动盘上的电芯依次经过整形工位、剥胶贴胶工位以及下料工位。As a further improvement, the pasting and forming glue machine includes a rotating disc, a second shaping device, a peeling and gluing mechanism, and a blanking device, and the second shaping device and the blanking device are arranged along the length direction of the frame. Arranged side by side and at intervals, the peeling and gluing mechanism and the rotating disk are both located between the shaping device and the unloading device, and the peeling and gluing mechanism and the rotating disk are located along the frame. They are arranged side by side and at intervals in the width direction, and the rotating disc can rotate relative to the frame so that the cells on the rotating disc pass through the shaping station, the glue stripping station and the blanking station in sequence.

作进一步改进,所述整形测试裁切机还包括用于将电芯抵顶于所述第一夹紧装置上的第一抵顶装置,所述第一抵顶装置安装于所述驱动组件的输出端,且所述第一抵顶装置位于所述取料装置的下方,所述第一抵顶装置包括基座以及安装于所述基座上的第一直线驱动装置和抵顶杆,所述抵顶杆位于其首段和末端之间的部位与所述基座呈可转动地连接,所述第一直线驱动装置的输出端与所述抵顶杆的末端连接并驱使所述抵顶杆相对所述基座转动。As a further improvement, the shaping test cutting machine also includes a first abutting device for pressing the battery cell against the first clamping device, and the first abutting device is installed on the driving assembly. an output end, and the first abutting device is located below the reclaiming device, and the first abutting device includes a base, a first linear drive device and an abutting rod mounted on the base, The part of the push rod between the first section and the end is rotatably connected with the base, and the output end of the first linear drive device is connected with the end of the push rod and drives the The push rod rotates relative to the base.

作进一步改进,所述第一夹紧装置包括第一夹紧块、第二夹紧块、第二直线驱动装置、弹性件以及固定件,所述第一夹紧块和所述第二夹紧块相对地布置,所述固定件安装于所述机架上,所述第一夹紧块通过所述弹性件安装于所述固定件上并在该弹性件的驱使下朝所述第二夹紧块的方向靠近,所述第二直线驱动装置安装于所述机架上并可将所述第一夹紧块朝远离所述第二夹紧块的方向抵顶。As a further improvement, the first clamping device includes a first clamping block, a second clamping block, a second linear drive device, an elastic member and a fixing member, the first clamping block and the second clamping block The blocks are arranged opposite to each other, the fixing piece is installed on the frame, the first clamping block is installed on the fixing piece through the elastic piece, and is driven by the elastic piece to face the second clamp The direction of the clamping block approaches, and the second linear drive device is mounted on the frame and can push the first clamping block toward the direction away from the second clamping block.

作进一步改进,所述整形测试裁切机还包括安装于所述机架上的调节座以及调节组件,所述固定件安装于所述调节座上,所述调节座呈可滑动地安装于所述机架上,所述第二夹紧块和所述第二直线驱动装置均安装于所述机架上,所述调节组件的输出端与所述调节座连接并驱使该调节座沿机架的长度方向运动。As a further improvement, the shaping test cutting machine also includes an adjustment seat and an adjustment assembly installed on the frame, the fixing piece is installed on the adjustment seat, and the adjustment seat is slidably installed on the adjustment seat. On the frame, the second clamping block and the second linear drive device are both installed on the frame, and the output end of the adjusting assembly is connected with the adjusting seat and drives the adjusting seat along the frame. movement in the length direction.

作进一步改进,所述调节组件包括齿条、齿轮以及旋转手柄,所述旋转手柄安装于所述调节座上,且所述旋转手柄的输出端穿过所述调节座并固定安装有所述齿轮,所述齿条安装于所述机架上并沿所述机架的长度方向布置,所述齿轮与所述齿条相啮合。As a further improvement, the adjusting assembly includes a rack, a gear and a rotating handle, the rotating handle is mounted on the adjusting base, and the output end of the rotating handle passes through the adjusting base and is fixedly mounted with the gear , the rack is mounted on the rack and arranged along the length direction of the rack, and the gear meshes with the rack.

本发明的有益效果:本发明的电池生产线,包括机架以及安装于机架上的上料机、整形测试裁切机、贴侧面胶机、焊接机、贴双面胶机以及贴成型胶机,上料机用于对电芯进行上料,整形测试裁切机用于对电芯进行整形、测试以及裁切,贴侧面胶机用于对电芯的侧面进行贴胶,焊接机用于将金属片和电芯的极耳焊接在一起,贴双面胶机用于对焊接后的电芯进行贴双面胶,贴成型胶机用于对贴双面胶后的电芯贴上成型胶,上料机、整形测试裁切机、贴侧面胶机、焊接机、贴双面胶机以及贴成型胶机沿机架的长度方向依次布置。因此本发明可以通过一条生产线实现对电芯的上料、整形、测试、裁切、贴侧面胶、焊接、贴双面胶以及贴成型胶等工艺,使得对电芯的生产的自动化程度更高以及生产效率更高。Beneficial effects of the present invention: The battery production line of the present invention includes a rack and a feeding machine, a shaping test cutting machine, a side gluing machine, a welding machine, a double-sided gluing machine and a forming gluing machine installed on the rack. , the feeding machine is used to feed the battery, the shaping test cutting machine is used to shape, test and cut the battery, the side gluer is used to glue the side of the battery, and the welding machine is used to Weld the metal sheet and the tabs of the cell together, the double-sided tape machine is used to paste the double-sided tape on the welded cell, and the molding machine is used to paste the double-sided tape on the cell. Glue, feeding machine, plastic test cutting machine, side glue machine, welding machine, double-sided glue machine and glue forming machine are arranged in sequence along the length of the frame. Therefore, the present invention can realize the processes of feeding, shaping, testing, cutting, attaching side glue, welding, attaching double-sided adhesive and attaching molding glue to the battery core through one production line, so that the production of the battery core can be more automated. and higher production efficiency.

下面结合附图与具体实施方式,对本发明进一步说明。The present invention will be further described below with reference to the accompanying drawings and specific embodiments.

附图说明Description of drawings

图1为本发明的电池生产线的俯视图;Fig. 1 is the top view of the battery production line of the present invention;

图2为本发明的整形测试裁切机的立体结构示意图;Fig. 2 is the three-dimensional structure schematic diagram of the shaping test cutting machine of the present invention;

图3为本发明的整形测试裁切机拆除各个加工装置后的立体结构示意图;Fig. 3 is the three-dimensional structure schematic diagram of the shaping test cutting machine of the present invention after each processing device is removed;

图4为本发明的整形测试裁切机的第一抵顶装置、第一夹紧装置、调节座、调节组件以及机架相接的立体结构示意图;4 is a schematic three-dimensional structural diagram of the connection of the first abutting device, the first clamping device, the adjusting seat, the adjusting assembly and the frame of the orthopedic test cutting machine of the present invention;

图5为本发明的贴侧面胶机的立体结构示意图;Fig. 5 is the three-dimensional structure schematic diagram of the side gluing machine of the present invention;

图6为本发明的贴侧面胶机的取料翻转组件和第二夹紧装置连接的立体结构示意图;6 is a schematic three-dimensional structural diagram of the connection between the reclaiming and turning assembly of the side gluing machine of the present invention and the second clamping device;

图7为本发明的贴侧面胶机的第二夹紧装置的立体结构示意图;7 is a schematic three-dimensional structure diagram of the second clamping device of the side gluing machine of the present invention;

图8为本发明的焊接机的立体结构示意图;Fig. 8 is the three-dimensional structure schematic diagram of the welding machine of the present invention;

图9为本发明的焊接机的第三夹紧装置和载具的立体结构示意图;9 is a schematic three-dimensional structure diagram of the third clamping device and the carrier of the welding machine of the present invention;

图10为本发明的贴双面胶机的立体结构示意图;Fig. 10 is the three-dimensional structure schematic diagram of the double-sided adhesive tape machine of the present invention;

图11为本发明的贴成型胶机的立体结构示意图。11 is a schematic diagram of the three-dimensional structure of the pasting and molding glue machine of the present invention.

图中:100.电池生产线,10.机架,20.上料机,30.整形测试裁切机,40.贴侧面胶机,50.焊接机,60.贴双面胶机,70.贴成型胶机,31.第一整形装置,32.测试装置,33.第一裁切装置,34.取料装置,35.第一夹紧装置,36.驱动组件,37.第一抵顶装置,371.基座,372.第一直线驱动装置,373.抵顶杆,351.第一夹紧块,352.第二夹紧块,353.第二直线驱动装置,354.弹性件,355.固定件,38.调节座,39.调节组件,391.齿条,392.齿轮,393.旋转手柄,341.取料架,342.取料头,41.贴胶机构,42.第二夹紧装置,43.取料翻转组件,431.驱动机构,432.安装架,433.旋转装置,434.吸取头,421.第一夹紧组件,422.第二夹紧组件,4211.安装座,4212.挡块组件,4213.第一夹紧件,4214.第二夹紧件,4215.弹性组件,4216.第三直线驱动装置,4212a.放置空间,4214a.凹陷空间,42131.延伸部,42132.第一倾斜面,42133.抵顶部,4221.第四直线驱动装置,4222.固定座,4223.摆动杆,42231.第一直杆部,42232.第二直杆部,51.输送机构,52.压紧机构,53.焊接机构,511.第五直线驱动装置,512.轨道,513.载具,514.第三夹紧装置,5141.定位板,5142.第六直线驱动装置,5143.顶推滚轮,5131.底板,5132.第一夹紧机构,5133.第二夹紧机构,5131a.凹陷部,51411.凸起部,61.放卷装置,62.拉带装置,63.第二裁切装置,64.贴胶组件,621.第一转动辊,622.第二转动辊,623.步进电机,624.固定块,625.滑动座,626.弹性机构,631.剪切组件,632.第七直线驱动装置,633.压合组件,633a.缺口,641.吸头,642.第八直线驱动装置,643.压紧组件,6431.第九直线驱动装置,6432.压紧块,6433.压紧部,6433a.竖直面,6433b.第二倾斜面,6433c.水平面,71.转动盘,72.第二整形装置,73.剥胶贴胶机构,74.下料装置。In the picture: 100. Battery production line, 10. Rack, 20. Feeder, 30. Plastic test cutting machine, 40. Side gluer, 50. Welding machine, 60. Double-sided gluer, 70. Sticker Forming glue machine, 31. First shaping device, 32. Testing device, 33. First cutting device, 34. Reclaiming device, 35. First clamping device, 36. Driving assembly, 37. First abutting device , 371. base, 372. first linear drive device, 373. push rod, 351. first clamping block, 352. second clamping block, 353. second linear drive device, 354. elastic piece, 355. Fixing part, 38. Adjusting seat, 39. Adjusting assembly, 391. Rack, 392. Gear, 393. Rotary handle, 341. Reclaiming rack, 342. Reclaiming head, 41. Gluing mechanism, 42. Section 2. Clamping device, 43. Reclaiming and turning assembly, 431. Driving mechanism, 432. Mounting frame, 433. Rotating device, 434. Suction head, 421. First clamping assembly, 422. Second clamping assembly, 4211. Mounting seat, 4212. Stopper assembly, 4213. First clamp, 4214. Second clamp, 4215. Elastic assembly, 4216. Third linear drive, 4212a. Placement space, 4214a. Recessed space, 42131. Extension, 42132. First inclined surface, 42133. Abutment, 4221. Fourth linear drive, 4222. Fixed seat, 4223. Swing rod, 42231. First straight rod, 42232. Second straight rod, 51 .Conveying mechanism, 52.Pressing mechanism, 53.Welding mechanism, 511.Fifth linear drive device, 512.Track, 513.Carrier, 514.Third clamping device, 5141.Locating plate, 5142.Sixth straight line Drive device, 5143. Pushing roller, 5131. Bottom plate, 5132. First clamping mechanism, 5133. Second clamping mechanism, 5131a. Recess, 51411. Protrusion, 61. Unwinding device, 62. Pulling belt device, 63. second cutting device, 64. glue assembly, 621. first rotating roller, 622. second rotating roller, 623. stepping motor, 624. fixing block, 625. sliding seat, 626. elastic mechanism , 631. Shear assembly, 632. Seventh linear drive, 633. Press assembly, 633a. Notch, 641. Suction head, 642. Eighth linear drive, 643. Press assembly, 6431. Ninth linear drive Device, 6432. Pressing block, 6433. Pressing part, 6433a. Vertical surface, 6433b. Second inclined surface, 6433c. Horizontal surface, 71. Rotating disc, 72. Second shaping device, 73. Peeling and sticking mechanism , 74. Cutting device.

具体实施方式Detailed ways

以下所述仅为本发明的较佳实施例,并不因此而限定本发明的保护范围。The following descriptions are only preferred embodiments of the present invention, and therefore do not limit the protection scope of the present invention.

请参考图1至图11,本发明的电池生产线100,包括机架10以及安装于机架10上的上料机20、整形测试裁切机30、贴侧面胶机40、焊接机50、贴双面胶机60以及贴成型胶机70。其中,上料机20用于对电芯进行上料,整形测试裁切机30用于对电芯进行整形、测试以及裁切,贴侧面胶机40用于对电芯的侧面进行贴胶,焊接机50用于将金属片和电芯的极耳焊接在一起,贴双面胶机60用于对焊接后的电芯进行贴双面胶,贴成型胶机70用于对贴双面胶后的电芯贴上成型胶,上料机20、整形测试裁切机30、贴侧面胶机40、焊接机50、贴双面胶机60以及贴成型胶机70沿机架10的长度方向依次布置。Please refer to FIGS. 1 to 11 , the battery production line 100 of the present invention includes a rack 10 , a feeder 20 mounted on the rack 10 , a shaping test cutting machine 30 , a side gluing machine 40 , a welding machine 50 , a The double-sided adhesive machine 60 and the paste-forming glue machine 70 are provided. Among them, the feeding machine 20 is used for feeding the battery cells, the shaping test cutting machine 30 is used for shaping, testing and cutting the battery cells, and the side gluing machine 40 is used for gluing the sides of the battery cells. The welding machine 50 is used for welding the metal sheet and the tabs of the battery cells together, the double-sided adhesive tape machine 60 is used for sticking double-sided tape on the welded battery cells, and the forming glue machine 70 is used for sticking the double-sided tape on the battery cells after welding. The battery cell is pasted with forming glue, the feeding machine 20, the plastic test cutting machine 30, the side gluer 40, the welding machine 50, the double-sided glue machine 60 and the forming glue machine 70 along the length direction of the rack 10. Arrange in order.

请参考图2至图4,整形测试裁切机30包括第一整形装置31、测试装置32、第一裁切装置33、取料装置34、第一夹紧装置35和驱动组件36。其中,第一整形装置31、测试装置32以及第一裁切装置33沿机架10的长度方向呈间隔布置,取料装置34安装于驱动组件36的输出端并在该驱动组件36的驱使下相对机架10运动以将电芯于整形工位、测试工位以及裁切工位之间进行移动,第一夹紧装置35至少有三个,且第一夹紧装置35分别布置于第一整形装置31、测试装置32以及第一裁切装置33的下方。Referring to FIGS. 2 to 4 , the shaping test cutting machine 30 includes a first shaping device 31 , a testing device 32 , a first cutting device 33 , a reclaiming device 34 , a first clamping device 35 and a driving assembly 36 . Among them, the first shaping device 31 , the testing device 32 and the first cutting device 33 are arranged at intervals along the length direction of the frame 10 . Move relative to the frame 10 to move the cell between the shaping station, the testing station and the cutting station. There are at least three first clamping devices 35, and the first clamping devices 35 are respectively arranged in the first shaping station. Below the device 31 , the testing device 32 and the first cutting device 33 .

请继续参考图2至图4,整形测试裁切机30还包括用于将电芯抵顶于第一夹紧装置35上的第一抵顶装置37,第一抵顶装置37安装于驱动组件36的输出端,且第一抵顶装置37位于取料装置34的下方,第一抵顶装置37包括基座371以及安装于基座371上的第一直线驱动装置372和抵顶杆373,抵顶杆373位于其首段和末端之间的部位与基座371呈可转动地连接,第一直线驱动装置372的输出端与抵顶杆373的末端连接并驱使抵顶杆373相对基座371转动。因此可以通过驱动组件36驱动第一抵顶装置37先将电芯顶推至第一夹紧装置35上,然后再通过第一直线驱动装置372使得抵顶杆373从上至下将电芯压紧。Please continue to refer to FIG. 2 to FIG. 4 , the shaping test cutting machine 30 further includes a first abutting device 37 for pressing the battery cells against the first clamping device 35 , and the first abutting device 37 is installed on the driving assembly The output end of 36, and the first abutting device 37 is located below the reclaiming device 34, the first abutting device 37 includes a base 371 and a first linear drive device 372 and an abutting rod 373 mounted on the base 371. , the position of the push rod 373 between its first section and the end is rotatably connected with the base 371, the output end of the first linear drive device 372 is connected with the end of the push rod 373 and drives the push rod 373 to face each other The base 371 is rotated. Therefore, the first pushing device 37 can be driven by the driving assembly 36 to push the battery cell to the first clamping device 35, and then the pushing rod 373 can push the battery cell from top to bottom through the first linear driving device 372. Press down.

请继续参考图2至图4,第一夹紧装置35包括第一夹紧块351、第二夹紧块352、第二直线驱动装置353、弹性件354以及固定件355,第一夹紧块351和第二夹紧块352相对地布置,固定件355安装于机架10上,第一夹紧块351通过弹性件354安装于固定件355上并在该弹性件354的驱使下朝第二夹紧块352的方向靠近,第二直线驱动装置353安装于机架10上并可将第一夹紧块351朝远离第二夹紧块352的方向抵顶。Please continue to refer to FIG. 2 to FIG. 4 , the first clamping device 35 includes a first clamping block 351 , a second clamping block 352 , a second linear driving device 353 , an elastic member 354 and a fixing member 355 . The first clamping block 351 and the second clamping block 352 are arranged opposite to each other, the fixing member 355 is installed on the frame 10, the first clamping block 351 is installed on the fixing member 355 through the elastic member 354 and is driven by the elastic member 354 towards the second clamping block 351. The direction of the clamping blocks 352 is approaching, and the second linear driving device 353 is installed on the frame 10 and can push the first clamping blocks 351 in a direction away from the second clamping blocks 352 .

请继续参考图2至图4,整形测试裁切机30还包括安装于机架10上的调节座38以及调节组件39,固定件355安装于调节座38上,调节座38呈可滑动地安装于机架10上,第二夹紧块352和第二直线驱动装置353均安装于机架10上,调节组件39的输出端与调节座38连接并驱使该调节座38沿机架10的长度方向运动。具体地,调节组件39包括齿条391、齿轮392以及旋转手柄393,旋转手柄393安装于调节座38上,且旋转手柄393的输出端穿过调节座38并固定安装有齿轮392,齿条391安装于机架10上并沿机架10的长度方向布置,齿轮392与齿条391相啮合。因此可以通过旋拧该旋转手柄393来使得第一夹紧块351和第二夹紧块352之间的夹紧空间得到放大或者减小,使得该第一夹紧装置35可以适用于夹紧各种尺寸的电芯。Please continue to refer to FIG. 2 to FIG. 4 , the shaping test cutting machine 30 further includes an adjusting base 38 and an adjusting assembly 39 mounted on the frame 10 , the fixing member 355 is mounted on the adjusting base 38 , and the adjusting base 38 is slidably installed On the frame 10 , the second clamping block 352 and the second linear driving device 353 are both mounted on the frame 10 , and the output end of the adjusting assembly 39 is connected with the adjusting seat 38 and drives the adjusting seat 38 along the length of the frame 10 . directional movement. Specifically, the adjustment assembly 39 includes a rack 391 , a gear 392 and a rotating handle 393 . The rotating handle 393 is installed on the adjustment base 38 , and the output end of the rotating handle 393 passes through the adjustment base 38 and is fixedly installed with the gear 392 , the rack 391 Installed on the rack 10 and arranged along the length direction of the rack 10 , the gear 392 meshes with the rack 391 . Therefore, the clamping space between the first clamping block 351 and the second clamping block 352 can be enlarged or reduced by screwing the rotating handle 393, so that the first clamping device 35 can be suitable for clamping each cells of various sizes.

请继续参考图2至图4,第一整形装置31、测试装置32以及第一裁切装置33呈并排地布置且相邻的任意两个加工工位之间的距离均相等,取料装置34与第一整形装置31相对立地布置。与此同时,取料装置34包括取料架341以及至少两个取料头342,取料头342呈间隔地安装于取料架341上,且相邻两个取料头342之间的距离等于相邻的两个加工工位之间的距离,取料架341安装于驱动组件36的输出端。因此当驱动组件36驱使取料装置34对电芯进行转移时,可以同时将至少两个不同加工工位处的电芯移动至下一加工工位进行加工,有效地增强了加工效率。Please continue to refer to FIG. 2 to FIG. 4 , the first shaping device 31 , the testing device 32 and the first cutting device 33 are arranged side by side and the distance between any two adjacent processing stations is equal, and the reclaiming device 34 It is arranged opposite to the first shaping device 31 . At the same time, the reclaiming device 34 includes a reclaiming frame 341 and at least two reclaiming heads 342, the reclaiming heads 342 are installed on the reclaiming frame 341 at intervals, and the distance between the adjacent two reclaiming heads 342 Equal to the distance between two adjacent processing stations, the reclaiming rack 341 is installed at the output end of the driving assembly 36 . Therefore, when the driving component 36 drives the reclaiming device 34 to transfer the cells, the cells in at least two different processing stations can be moved to the next processing station for processing, which effectively enhances the processing efficiency.

请参考图5至图7,贴侧面胶机40包括贴胶机构41、第二夹紧装置42以及取料翻转组件43,贴胶机构41和取料翻转组件43呈相对地布置,第二夹紧装置42位于贴胶机构41和取料翻转组件43之间,贴胶机构41至少有两组,两组贴胶机构41沿机架10的长度方向布置,每组贴胶机构41的贴胶工位处均设置有第二夹紧装置42,取料翻转组件43可用于翻转电芯并将电芯于不同的第二夹紧装置42之间进行转移。Please refer to FIG. 5 to FIG. 7 , the side gluer 40 includes a glue sticking mechanism 41 , a second clamping device 42 and a reclaiming and turning assembly 43 . The tightening device 42 is located between the gluing mechanism 41 and the material-receiving and flipping assembly 43. There are at least two groups of gluing mechanisms 41. The two groups of gluing mechanisms 41 are arranged along the length direction of the frame 10. A second clamping device 42 is provided at each work station, and the material reclaiming and turning assembly 43 can be used to turn over the battery cells and transfer the battery cells between different second clamping devices 42 .

请继续参考图5至图7,取料翻转组件43包括驱动机构431、安装架432、旋转装置433以及吸取头434,驱动机构431安装于机架10上,安装架432安装于驱动机构431的输出端,旋转装置433安装于安装架432的输出端且该旋转装置433的输出端安装有吸取头434。Please continue to refer to FIGS. 5 to 7 , the reclaiming and turning assembly 43 includes a driving mechanism 431 , a mounting frame 432 , a rotating device 433 and a suction head 434 , the driving mechanism 431 is installed on the frame 10 , and the installation frame 432 is installed on the At the output end, the rotating device 433 is mounted on the output end of the mounting frame 432 and the output end of the rotating device 433 is mounted with a suction head 434 .

请继续参考图5至图7,第二夹紧装置42包括用于对电芯于机架10的长度和宽度方向进行夹紧的第一夹紧组件421以及用于对电芯于机架10的高度方向进行夹紧的第二夹紧组件422,第一夹紧组件421和第二夹紧组件422均安装于机架10上。具体地,第一夹紧组件421包括安装座4211以及安装于安装座4211上的挡块组件4212、第一夹紧件4213、第二夹紧件4214、弹性组件4215和第三直线驱动装置4216,挡块组件4212上设置有供电芯放置用的放置空间4212a,挡块组件4212的一侧设置有第一夹紧件4213,挡块组件4212的另一侧设置有第二夹紧件4214,第一夹紧件4213通过弹性组件4215与安装座4211连接并在该弹性组件4215的作用下朝靠近第二夹紧件4214的方向运动,第三直线驱动装置4216的输出端可做往复运动以抵挡第一夹紧件4213并使得该第一夹紧件4213朝远离第二夹紧件4214的方向运动。Please continue to refer to FIG. 5 to FIG. 7 , the second clamping device 42 includes a first clamping component 421 for clamping the cells in the length and width directions of the rack 10 , and a first clamping component 421 for clamping the cells in the rack 10 . The second clamping assembly 422 for clamping in the height direction, the first clamping assembly 421 and the second clamping assembly 422 are both installed on the frame 10 . Specifically, the first clamping assembly 421 includes a mounting seat 4211 and a block assembly 4212 mounted on the mounting seat 4211, a first clamping member 4213, a second clamping member 4214, an elastic assembly 4215 and a third linear driving device 4216 , the block assembly 4212 is provided with a placement space 4212a for placing the power supply core, one side of the block assembly 4212 is provided with a first clamping member 4213, and the other side of the block assembly 4212 is provided with a second clamping member 4214, The first clamping member 4213 is connected to the mounting seat 4211 through the elastic component 4215 and moves towards the direction close to the second clamping member 4214 under the action of the elastic component 4215, and the output end of the third linear drive device 4216 can reciprocate to The first clamping member 4213 is resisted and the first clamping member 4213 is moved in a direction away from the second clamping member 4214 .

请继续参考图5至图7,第二夹紧件4214上设置有供电芯的极耳伸入的凹陷空间4214a,因此当电芯被第一夹紧件4213和第二夹紧件4214夹紧的时候也不会对电芯的极耳造成损伤。第一夹紧件4213面对凹陷空间4214a的一侧设置有伸入放置空间4212a的延伸部42131,以便于对放置空间4212a内的电芯进行推动并夹紧。举例而言,延伸部42131的顶面为从上至下朝第二夹紧件4214的方向倾斜布置的第一倾斜面42132,但不限于此。与此同时,第一夹紧件4213上还设置有用于与挡块组件4212相抵顶的抵顶部42133,因此可以防止第一夹紧件4213在弹性组件4215的作用下过度靠近第二夹紧件4214而损害电芯。Please continue to refer to FIG. 5 to FIG. 7 , the second clamping member 4214 is provided with a concave space 4214a into which the tabs of the power supply cores extend. Therefore, when the battery cells are clamped by the first clamping member 4213 and the second clamping member 4214 It will not cause damage to the pole ears of the battery. An extension portion 42131 extending into the placement space 4212a is provided on the side of the first clamping member 4213 facing the recessed space 4214a, so as to facilitate pushing and clamping the cells in the placement space 4212a. For example, the top surface of the extension portion 42131 is the first inclined surface 42132 inclined from top to bottom toward the direction of the second clamping member 4214, but is not limited thereto. At the same time, the first clamping member 4213 is also provided with a pressing portion 42133 for abutting against the block member 4212, so that the first clamping member 4213 can be prevented from being too close to the second clamping member under the action of the elastic member 4215. 4214 and damage the cell.

请继续参考图5至图7,第二夹紧组件422包括第四直线驱动装置4221、固定座4222以及摆动杆4223。其中,第四直线驱动装置4221和摆动杆4223均安装于固定座4222上,摆动杆4223位于其首端和末端之间的部位与固定座4222呈可转动地连接,第四直线驱动装置4221的输出端与摆动杆4223的首端连接并驱使该摆动杆4223于机架10的高度方向内摆动。较优的是,摆动杆4223包括第一直杆部42231和第二直杆部42232,第一直杆部42231的首端与第四直线驱动装置4221连接,第一直杆部42231与固定座4222呈可转动地连接,第一直杆部42231的末端朝远离第一夹紧件4213的方向弯折延伸后与第二直杆部42232连接。在实际的工作时,由于第一直杆部42231和第二直杆部42232形成有避让电芯的空间,因此更加有利于对电芯进行放置,且通过第二直杆部42232的末端将电芯压紧于放置空间4212a内还实现了对电芯于机架10高度方向上的定位。Please continue to refer to FIG. 5 to FIG. 7 , the second clamping assembly 422 includes a fourth linear driving device 4221 , a fixing base 4222 and a swing rod 4223 . Among them, the fourth linear drive device 4221 and the swing rod 4223 are both mounted on the fixed seat 4222, and the part of the swing rod 4223 between the head end and the end of the swing rod 4222 is rotatably connected to the fixed seat 4222. The output end is connected to the head end of the swing rod 4223 and drives the swing rod 4223 to swing in the height direction of the rack 10 . Preferably, the swing rod 4223 includes a first straight rod portion 42231 and a second straight rod portion 42232, the head end of the first straight rod portion 42231 is connected to the fourth linear drive device 4221, and the first straight rod portion 42231 is connected to the fixed seat. The 4222 is rotatably connected, and the end of the first straight rod portion 42231 is bent and extended in a direction away from the first clamping member 4213 and then connected to the second straight rod portion 42232 . In actual work, since the first straight rod portion 42231 and the second straight rod portion 42232 form a space for avoiding the battery cell, it is more convenient to place the battery cell, and the end of the second straight rod portion 42232 can remove the battery cell. The pressing of the core in the placement space 4212a also realizes the positioning of the battery core in the height direction of the rack 10 .

请参考图8和图9,焊接机50包括输送机构51、压紧机构52以及焊接机构53,输送机构51至少有两个,且两个输送机构51沿机架10的长度方向并排地布置,输送机构51沿机架10的宽度方向输送电芯和金属片,焊接机构53沿机架10的长度方向布置以选择性地对两个输送机构51之一者上的电芯和金属片进行焊接,压紧机构52至少有两个,且压紧机构52和输送机构51一一对应,压紧机构52位于输送机构51的上方并压紧该输送机构51所输送的金属片和电芯的极耳。8 and 9, the welding machine 50 includes a conveying mechanism 51, a pressing mechanism 52 and a welding mechanism 53. There are at least two conveying mechanisms 51, and the two conveying mechanisms 51 are arranged side by side along the length direction of the frame 10, The conveying mechanism 51 conveys cells and metal sheets along the width direction of the rack 10, and the welding mechanism 53 is arranged along the length direction of the rack 10 to selectively weld the cells and metal sheets on one of the two conveying mechanisms 51 , there are at least two pressing mechanisms 52, and the pressing mechanism 52 corresponds to the conveying mechanism 51 one-to-one. The pressing mechanism 52 is located above the conveying mechanism 51 and compresses the poles of the metal sheet and the battery core conveyed by the conveying mechanism 51. Ear.

请继续参考图8和图9,输送机构51包括第五直线驱动装置511、轨道512、用于承载电芯和金属片的载具513以及用于夹紧载具513的第三夹紧装置514,轨道512沿机架10的宽度方向布置,第五直线驱动装置511安装于机架10上,第三夹紧装置514滑设于轨道512上并与第五直线驱动装置511的输出端连接。具体地,第三夹紧装置514包括定位板5141、第六直线驱动装置5142以及顶推滚轮5143,第六直线驱动装置5142安装于定位板5141的底部,第六直线驱动装置5142的输出端与顶推滚轮5143连接并驱使该顶推滚轮5143靠近或远离定位板5141。更具体地,载具513包括底板5131、用于夹紧金属片的第一夹紧机构5132以及用于夹紧电芯的第二夹紧机构5133,第一夹紧机构5132和第二夹紧机构5133沿底板5131的宽度方向并排布置于底板5131上,底板5131靠近第二夹紧机构5133的一端凹陷有供顶推滚轮5143伸入用的凹陷部5131a。较优的是,凹陷部5131a的横截面呈V字型,且定位板5141远离顶推滚轮5143的一端向上凸设有用于供载具513定位用的凸起部51411。因此在实际工作时,可以先通过第五直线驱动装置511驱使第三夹紧装置514靠近载具513的上料工位处,然后通过工人将载具513放置于第三夹紧装置514上,然后通过第六直线驱动装置5142驱使顶推滚轮5143伸入凹陷部5131a内以将载具513夹紧于凸起部51411和顶推滚轮5143之间。Please continue to refer to FIG. 8 and FIG. 9 , the conveying mechanism 51 includes a fifth linear driving device 511 , a rail 512 , a carrier 513 for carrying cells and metal sheets, and a third clamping device 514 for clamping the carrier 513 , the rail 512 is arranged along the width direction of the frame 10 , the fifth linear driving device 511 is installed on the frame 10 , the third clamping device 514 is slidably arranged on the rail 512 and is connected with the output end of the fifth linear driving device 511 . Specifically, the third clamping device 514 includes a positioning plate 5141, a sixth linear driving device 5142 and a push roller 5143. The sixth linear driving device 5142 is mounted on the bottom of the positioning plate 5141, and the output end of the sixth linear driving device 5142 is connected to the The push roller 5143 is connected to and drives the push roller 5143 to approach or move away from the positioning plate 5141 . More specifically, the carrier 513 includes a bottom plate 5131, a first clamping mechanism 5132 for clamping the metal sheet, and a second clamping mechanism 5133 for clamping the cell, the first clamping mechanism 5132 and the second clamping mechanism 5132 The mechanisms 5133 are arranged side by side on the bottom plate 5131 along the width direction of the bottom plate 5131 , and one end of the bottom plate 5131 close to the second clamping mechanism 5133 is recessed with a concave portion 5131 a for the pushing roller 5143 to penetrate. Preferably, the cross section of the recessed portion 5131a is V-shaped, and one end of the positioning plate 5141 away from the push roller 5143 is upwardly protruded with a raised portion 51411 for positioning the carrier 513 . Therefore, in actual work, the third clamping device 514 can be driven by the fifth linear driving device 511 to be close to the loading station of the carrier 513, and then the carrier 513 can be placed on the third clamping device 514 by the worker. Then, the pushing roller 5143 is driven by the sixth linear driving device 5142 to extend into the recessed portion 5131 a to clamp the carrier 513 between the protruding portion 51411 and the pushing roller 5143 .

请参考图10,贴双面胶机60包括放卷装置61、拉带装置62、第二裁切装置63以及贴胶组件64。其中,放卷装置61用于对双面胶进行放卷,拉带装置62用于对放卷的双面胶进行拉出,第二裁切装置63用于将被拉出的双面胶进行裁切,贴胶组件64用于将裁切后的双面胶进行贴胶,拉带装置62位于放卷装置61的下方,拉带装置62包括第一转动辊621、第二转动辊622以及步进电机623,第一转动辊621和第二转动辊622沿机架10的高度方向并排地布置,步进电机623的输出端与第一转动辊621连接以实现对放卷的双面胶进行步进式地拉出。具体地,拉带装置62还包括固定块624、滑动座625以及弹性机构626,固定块624安装于机架10上,滑动座625滑设于固定块624上,弹性机构626安装于固定块624和滑动座625之间并将滑动座625向上抵顶,第二转动辊622呈可转动地安装于滑动座625上,因此可以保证第一转动辊621和第二转动辊622可以紧密地配合以对双面胶进行步进式地拉扯。Referring to FIG. 10 , the double-sided adhesive tape machine 60 includes an unwinding device 61 , a tape pulling device 62 , a second cutting device 63 and an adhesive tape assembly 64 . Among them, the unwinding device 61 is used to unwind the double-sided adhesive tape, the belt pulling device 62 is used to pull out the unrolled double-sided adhesive tape, and the second cutting device 63 is used to unwind the pulled out double-sided adhesive tape. The cutting and gluing assembly 64 is used for gluing the cut double-sided adhesive tape. The tape pulling device 62 is located below the unwinding device 61. The tape pulling device 62 includes a first rotating roller 621, a second rotating roller 622 and a The stepping motor 623, the first rotating roller 621 and the second rotating roller 622 are arranged side by side along the height direction of the frame 10, and the output end of the stepping motor 623 is connected with the first rotating roller 621 to realize the double-sided adhesive tape unwinding Pull out step by step. Specifically, the belt pulling device 62 further includes a fixing block 624 , a sliding seat 625 and an elastic mechanism 626 . The fixing block 624 is installed on the rack 10 , the sliding seat 625 is slidably mounted on the fixing block 624 , and the elastic mechanism 626 is installed on the fixing block 624 The second rotating roller 622 is rotatably mounted on the sliding seat 625, so that the first rotating roller 621 and the second rotating roller 622 can be tightly matched to Pull the double-sided tape step by step.

请继续参考图10,第二裁切装置63包括剪切组件631、用于驱使剪切组件631进行伸缩的第七直线驱动装置632以及用于驱使剪切组件631进行剪切动作的压合组件633,压合组件633开设有供剪切组件631穿过用的缺口633a,第七直线驱动装置632的输出端与剪切组件631连接并驱使该剪切组件631相对缺口633a做伸缩运动。因此在实际工作时,可以就通过第七直线驱动装置632带动剪切组件631伸出后,再通过压合组件633驱使剪切组件631对双面胶带进行裁切。Please continue to refer to FIG. 10 , the second cutting device 63 includes a cutting component 631 , a seventh linear driving device 632 for driving the cutting component 631 to expand and contract, and a pressing component for driving the cutting component 631 to perform a cutting action 633, the pressing component 633 is provided with a notch 633a for the shearing component 631 to pass through. The output end of the seventh linear drive device 632 is connected to the shearing component 631 and drives the shearing component 631 to telescopically move relative to the notch 633a. Therefore, in actual work, after the seventh linear driving device 632 drives the shearing assembly 631 to extend, the pressing assembly 633 drives the shearing assembly 631 to cut the double-sided tape.

请继续参考图10,贴胶组件64包括用于吸附双面胶的吸头641、用于驱使吸头641运动的第八直线驱动装置642以及用于压紧双面胶以防止吸头641上升时带动贴附于电芯杯口位置处的双面胶翘起的压紧组件643,第八直线驱动装置642的输出端与吸头641连接,压紧组件643和吸头641沿机板的长度方向并排布置。较优的是,压紧组件643包括第九直线驱动装置6431以及压紧块6432,第九直线驱动装置6431的输出端与压紧块6432连接,且第九直线驱动装置6431的输出端的运动轨迹与第八直线驱动装置642的输出端的运动轨迹呈相互倾斜地布置;因此可以避免压紧块6432与吸头641在运动过程中可能产生相互干扰。Please continue to refer to FIG. 10 , the gluing assembly 64 includes a suction head 641 for sucking the double-sided tape, an eighth linear driving device 642 for driving the suction head 641 to move, and an eighth linear driving device 642 for pressing the double-sided tape to prevent the suction head 641 from rising At the same time, the pressing component 643 of the double-sided tape attached to the position of the cup mouth of the cell is driven to lift up, and the output end of the eighth linear drive device 642 is connected to the suction head 641. The pressing component 643 and the suction head 641 are along the Arranged side by side in the length direction. Preferably, the pressing assembly 643 includes a ninth linear driving device 6431 and a pressing block 6432, the output end of the ninth linear driving device 6431 is connected to the pressing block 6432, and the movement trajectory of the output end of the ninth linear driving device 6431 is The movement trajectory of the output end of the eighth linear drive device 642 is arranged at an inclination to each other; therefore, it can be avoided that the pressing block 6432 and the suction head 641 may interfere with each other during the movement.

请继续参考图10,压紧块6432的一端向下延伸并形成有用于压紧双面胶的压紧部6433。具体地,压紧部6433靠近吸头641的一侧面为竖直面6433a,压紧部6433背对吸头641的一面为从上至下朝靠近吸头641的方向倾斜布置的第二倾斜面6433b。更具体地,压紧部6433的底部为水平布置的水平面6433c,且该水平面6433c的一端与竖直面6433a连接,水平面6433c的另一端与第二倾斜面6433b连接,但不限于此。Please continue to refer to FIG. 10 , one end of the pressing block 6432 extends downward and forms a pressing portion 6433 for pressing the double-sided adhesive tape. Specifically, the side of the pressing portion 6433 close to the suction head 641 is a vertical surface 6433a, and the side of the pressing portion 6433 facing away from the suction head 641 is a second inclined surface inclined from top to bottom toward the suction head 641 6433b. More specifically, the bottom of the pressing portion 6433 is a horizontally arranged horizontal surface 6433c, one end of the horizontal surface 6433c is connected to the vertical surface 6433a, and the other end of the horizontal surface 6433c is connected to the second inclined surface 6433b, but not limited thereto.

请参考图11,贴成型胶机70包括转动盘71、第二整形装置72、剥胶贴胶机构73以及下料装置74,第二整形装置72和下料装置74沿机架10的长度方向呈并排且间隔布置,剥胶贴胶机构73和转动盘71均位于整形装置和下料装置74之间,且剥胶贴胶机构73和转动盘71沿机架10的宽度方向呈并排且间隔地布置,转动盘71可相对机架10转动以使得该转动盘71上的电芯依次经过整形工位、剥胶贴胶工位以及下料工位。Referring to FIG. 11 , the gluing machine 70 includes a rotating disk 71 , a second shaping device 72 , a peeling and gluing mechanism 73 and a feeding device 74 . The second shaping device 72 and the feeding device 74 are along the length direction of the frame 10 . Arranged side by side and at intervals, the peeling and sticking mechanism 73 and the rotating disc 71 are both located between the shaping device and the unloading device 74, and the peeling and sticking mechanism 73 and the rotating disk 71 along the width direction of the frame 10 are side by side and spaced apart. The rotating disk 71 can be rotated relative to the frame 10 so that the cells on the rotating disk 71 sequentially pass through the shaping station, the glue stripping station and the cutting station.

本发明的有益效果:本发明的电池生产线100,包括机架10以及安装于机架10上的上料机20、整形测试裁切机30、贴侧面胶机40、焊接机50、贴双面胶机60以及贴成型胶机70,上料机20用于对电芯进行上料,整形测试裁切机30用于对电芯进行整形、测试以及裁切,贴侧面胶机40用于对电芯的侧面进行贴胶,焊接机50用于将金属片和电芯的极耳焊接在一起,贴双面胶机60用于对焊接后的电芯进行贴双面胶,贴成型胶机70用于对贴双面胶后的电芯贴上成型胶,上料机20、整形测试裁切机30、贴侧面胶机40、焊接机50、贴双面胶机60以及贴成型胶机70沿机架10的长度方向依次布置。因此本发明可以通过一条生产线实现对电芯的上料、整形、测试、裁切、贴侧面胶、焊接、贴双面胶以及贴成型胶等工艺,使得对电芯的生产的自动化程度更高以及生产效率更高。Beneficial effects of the present invention: The battery production line 100 of the present invention includes a rack 10, a feeder 20 mounted on the rack 10, a shaping test cutting machine 30, a side gluer 40, a welding machine 50, a double-sided sticker The gluer 60 and the sticking and forming gluer 70, the feeding machine 20 is used for feeding the battery cells, the shaping test cutting machine 30 is used for shaping, testing and cutting the battery cells, and the side gluer 40 is used for The side of the cell is glued, the welding machine 50 is used to weld the metal sheet and the tabs of the cell together, the double-sided tape machine 60 is used to paste the double-sided tape on the welded cell, and the forming glue machine 70 is used to apply forming glue to the battery cells after the double-sided tape, feeding machine 20, plastic test cutting machine 30, side glue machine 40, welding machine 50, double-sided glue machine 60 and pasting molding glue machine 70 are sequentially arranged along the length direction of the rack 10 . Therefore, the present invention can realize the processes of feeding, shaping, testing, cutting, attaching side glue, welding, attaching double-sided adhesive and attaching molding glue to the battery core through one production line, so that the production of the battery core can be more automated. and higher production efficiency.

本发明并不限于上述实施方式,采用与本发明上述实施例相同或近似结构、装置、工艺或方法,而得到的其他用于电池生产线,均在本发明的保护范围之内。The present invention is not limited to the above-mentioned embodiments, and other battery production lines obtained by adopting the same or similar structures, devices, processes or methods as the above-mentioned embodiments of the present invention are all within the protection scope of the present invention.

Claims (8)

1. A battery production line is characterized in that: the battery cell shaping and cutting machine comprises a rack, and a feeding machine, a shaping testing cutting machine, a side adhesive tape sticking machine, a welding machine, a side adhesive tape sticking machine and a side adhesive tape sticking machine which are arranged on the rack, wherein the feeding machine is used for feeding a battery cell, the shaping testing cutting machine is used for shaping, testing and cutting the battery cell, the side adhesive tape sticking machine is used for sticking adhesive tapes to the side surface of the battery cell, the welding machine is used for welding a metal sheet and a tab of the battery cell together, the side adhesive tape sticking machine is used for sticking the adhesive tapes to the welded battery cell, the side adhesive tape sticking machine is used for sticking the adhesive tapes to the battery cell stuck with the adhesive tapes, and the feeding machine, the shaping testing cutting machine, the side adhesive tape sticking machine, the welding machine, the side adhesive tape sticking machine and the side adhesive tape sticking machine are sequentially arranged along the length direction of the rack; the shaping testing cutting machine comprises a first shaping device, a testing device, a first cutting device, material taking devices, first clamping devices and a driving assembly, wherein the first shaping device, the testing device and the first cutting device are arranged at intervals along the length direction of the rack, the material taking devices are installed at the output end of the driving assembly and driven by the driving assembly to move relative to the rack so as to move the battery cell among the shaping station, the testing station and the cutting station, the number of the first clamping devices is at least three, and the first clamping devices are respectively arranged below the first shaping device, the testing device and the first cutting device; the shaping test cutting machine further comprises a first abutting device used for abutting the battery core against the first clamping device, the first abutting device is installed at the output end of the driving assembly and located below the material taking device, the first abutting device comprises a base, a first linear driving device and an abutting rod, the first linear driving device and the abutting rod are installed on the base, the portion, located between the head section and the tail end of the abutting rod, of the abutting rod is rotatably connected with the base, the output end of the first linear driving device is connected with the tail end of the abutting rod and drives the abutting rod to rotate relative to the base.
2. The battery production line of claim 1, wherein: paste side machine of gluing includes rubberizing mechanism, second clamping device and gets material upset subassembly, rubberizing mechanism with get material upset subassembly and be arranged relatively, second clamping device is located rubberizing mechanism with get between the material upset subassembly, rubberizing mechanism has two sets ofly at least, and is two sets of rubberizing mechanism follows the length direction of frame arranges, every group the rubberizing station department of rubberizing mechanism all is provided with second clamping device, get material upset subassembly and can be used to overturn electric core and shift electric core between the second clamping device of difference.
3. The battery production line of claim 1, wherein: the welding machine comprises at least two conveying mechanisms, at least two pressing mechanisms and at least two welding mechanisms, wherein the two conveying mechanisms are arranged side by side along the length direction of the rack, the conveying mechanisms convey the battery cells and the metal sheets along the width direction of the rack, the welding mechanisms are arranged along the length direction of the rack to selectively weld the battery cells and the metal sheets on one of the two conveying mechanisms, the number of the pressing mechanisms is at least two, the pressing mechanisms correspond to the conveying mechanisms one to one, and the pressing mechanisms are located above the conveying mechanisms and press the metal sheets conveyed by the conveying mechanisms and the tabs of the battery cells tightly.
4. The battery production line of claim 1, wherein: paste double-sided tape unit and include unwinding device, stretching strap device, second cutting device and rubberizing subassembly, unwinding device is used for unreeling the double faced adhesive tape, the stretching strap device is used for pulling out the double faced adhesive tape who unreels, second cutting device is used for cutting the double faced adhesive tape who is pulled out, the rubberizing subassembly is used for carrying out the rubberizing with the double faced adhesive tape after cutting, the stretching strap device is located unwinding device's below, the stretching strap device includes first live-rollers, second live-rollers and step motor, first live-rollers with the second live-rollers is followed the direction of height of frame is arranged side by side, step motor's output with first live-rollers is connected and is carried out step-by-step ground with the realization to the double faced adhesive tape who unreels and pull out.
5. The battery production line of claim 1, wherein: paste moulding machine and glue including rolling disc, second shaping device, shell and glue rubberizing mechanism and unloader, the second shaping device with unloader follows the length direction of frame is side by side and interval arrangement, shell glue rubberizing mechanism with the rolling disc all is located shaping device with between the unloader, just it glues rubberizing mechanism with the rolling disc is followed the width direction of frame is side by side and interval arrangement, the rolling disc can be relative the frame rotates so that electric core on this rolling disc is in proper order through the shaping station, shells and glues rubberizing station and unloading station.
6. The battery production line of claim 1, wherein: the first clamping device comprises a first clamping block, a second linear driving device, an elastic piece and a fixing piece, the first clamping block and the second clamping block are oppositely arranged, the fixing piece is installed on the rack, the first clamping block is installed on the fixing piece through the elastic piece and is driven by the elastic piece to approach to the second clamping block, and the second linear driving device is installed on the rack and can push the first clamping block to the direction far away from the second clamping block.
7. The battery production line of claim 6, wherein: shaping test guillootine still including install in adjust seat and adjusting part in the frame, the mounting install in adjust on the seat, adjust the seat be slidable install in the frame, the second press from both sides tight piece with second linear drive device all install in the frame, adjusting part's output with adjust the seat and connect and order about this and adjust the length direction motion of seat along the frame.
8. The battery production line of claim 7, wherein: the adjusting component comprises a rack, a gear and a rotating handle, the rotating handle is installed on the adjusting seat, the output end of the rotating handle penetrates through the adjusting seat and is fixedly installed with the gear, the rack is installed on the rack and is arranged along the length direction of the rack, and the gear is meshed with the rack.
CN202110326760.1A 2021-03-26 2021-03-26 A battery production line Active CN112968206B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110326760.1A CN112968206B (en) 2021-03-26 2021-03-26 A battery production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110326760.1A CN112968206B (en) 2021-03-26 2021-03-26 A battery production line

Publications (2)

Publication Number Publication Date
CN112968206A CN112968206A (en) 2021-06-15
CN112968206B true CN112968206B (en) 2022-06-28

Family

ID=76278614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110326760.1A Active CN112968206B (en) 2021-03-26 2021-03-26 A battery production line

Country Status (1)

Country Link
CN (1) CN112968206B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114142097B (en) * 2021-11-08 2023-12-29 惠州市兴源自动化设备有限公司 Lithium battery side rubberizing equipment
CN114614035A (en) * 2022-02-28 2022-06-10 深圳研赛自动化设备有限公司 Lithium battery automatic production line

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103123982B (en) * 2013-01-30 2016-02-03 东莞市鸿宝锂电科技有限公司 Full-automatic five-in-one lithium battery forming machine
US9954214B2 (en) * 2013-03-15 2018-04-24 Water Gremlin Company Systems and methods for manufacturing battery parts
CN107819145B (en) * 2016-09-14 2023-12-26 惠州市德赛自动化技术有限公司 Automatic mobile phone battery production line
CN110048152B (en) * 2019-05-06 2024-07-12 广东东博智能装备股份有限公司 Full-automatic rubberizing production line of battery
CN110085918A (en) * 2019-05-21 2019-08-02 深圳市时纬自动化有限公司 A kind of lithium ion battery full automatic production line and its production technology

Also Published As

Publication number Publication date
CN112968206A (en) 2021-06-15

Similar Documents

Publication Publication Date Title
CN106816608B (en) Rubberizing equipment
CN109119587B (en) Automatic welding, cutting, rubberizing and bending production line and production process for battery cell lugs
CN206619657U (en) Power battery automatic glue sticking, bending, buckle cage device
CN208986081U (en) A kind of cell polar ear automatic welding is cut, rubberizing and bending production line
CN107994263B (en) Battery tab rubberizing folding all-in-one
CN217062420U (en) Automatic rubberizing device of electricity core utmost point ear
CN109473728B (en) Rubberizing mechanism and rubberizing method
CN104466225B (en) Battery automatic shaping testing equipment
CN107819145B (en) Automatic mobile phone battery production line
CN106384836B (en) Power battery automatic sticking glue and automatic buckle holder device
CN112259924A (en) Lithium battery tab wrapping and gluing machine and gluing method
CN116230974A (en) Battery core combining and packaging machine
CN116119078B (en) Battery cell packaging machine
CN104485473A (en) Automatic battery folded corner shaping system
CN118610546B (en) Gluing device and battery production line
CN212355960U (en) Work piece rubberizing equipment
CN202712316U (en) Soft roll battery fuse welding machine
CN111180786A (en) Battery rubber coating twines gluey equipment
CN112968206A (en) Battery production line
CN112875444B (en) Automatic deviation rectifying rubberizing and winding machine for battery cell head
CN223957900U (en) Photovoltaic module PET membrane and busbar laying equipment
CN213716932U (en) Pole misalignment correction mechanism
CN212652914U (en) Bus bar bypass welding all-in-one machine
CN210200883U (en) A Mylar feeding mechanism and battery production line
CN206774623U (en) A kind of rubberizing equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant