CN112942774B - A operation panel for independent capital portion concrete placement - Google Patents

A operation panel for independent capital portion concrete placement Download PDF

Info

Publication number
CN112942774B
CN112942774B CN202110123750.8A CN202110123750A CN112942774B CN 112942774 B CN112942774 B CN 112942774B CN 202110123750 A CN202110123750 A CN 202110123750A CN 112942774 B CN112942774 B CN 112942774B
Authority
CN
China
Prior art keywords
fixed
plate
rod
pivot
back plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110123750.8A
Other languages
Chinese (zh)
Other versions
CN112942774A (en
Inventor
尚恺喆
徐书龙
王海鱼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN202110123750.8A priority Critical patent/CN112942774B/en
Publication of CN112942774A publication Critical patent/CN112942774A/en
Application granted granted Critical
Publication of CN112942774B publication Critical patent/CN112942774B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Handcart (AREA)

Abstract

The invention discloses an operating platform for independent column top concrete pouring, which comprises two bottom rods which are symmetrically arranged, universal wheels are arranged at the lower ends of the bottom rods, fastening mechanisms are respectively arranged on the bottom rods and are used for being fixed with the ground, supporting columns are respectively fixed at the upper ends of the bottom rods, a top plate is fixed at the upper ends of the supporting columns, a back plate is fixed between the bottom rods, a balancing weight is arranged between the supporting columns, an operation hanging basket is fixed at one end, away from the balancing weight, of the back plate, a reinforcing rod is fixed between the back plate and the operation hanging basket, an inclined plate is arranged between the back plate and the top plate, two ends of the inclined plate are respectively fixed with the upper end of the back plate and the side edge of the upper end of the top plate, a carrying box is arranged on the inclined plate and is connected with a traction mechanism, and the traction mechanism is used for driving the carrying box to move along the inclined plate. The invention provides an operation platform for pouring concrete on the top of the independent column, can conveniently carry materials in the pouring process, and has good stability.

Description

A operation panel for independent capital portion concrete placement
Technical Field
The invention relates to a building construction device, in particular to an operating platform for pouring concrete at the top of an independent column.
Background
When construction of a building wall, an elevator shaft, and other parts is difficult, various temporary operation platforms or operation frames are often erected on a construction site to perform various operations such as masonry, decoration, painting, and the like. Before the operation platform is manufactured, professional technicians design the operation platform according to the used materials and the current corresponding specifications, a calculation book or a drawing is programmed into a construction organization design, the allowable load value of the operation platform is marked on the operation platform obviously, when the operation platform is used, the total weight of the operation personnel and materials does not exceed the designed allowable load, and the operation platform is equipped with a special person for monitoring, has necessary strength and stability, and does not shake in the use process. In the past, when concrete is poured on the top of the independent column on a construction site, the concrete pouring operation efficiency on the top of the independent column is very low due to the fact that no special operation platform is provided for workers to use, and meanwhile construction quality and safety of operators cannot be guaranteed.
Disclosure of Invention
The invention aims to provide an operation platform for independent column top concrete pouring, which provides an operation platform for independent column top concrete pouring, can conveniently carry materials in the pouring process and has good stability.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides an operation panel for independent capital portion concrete placement, two sill bars including the symmetry setting, the universal wheel is installed to the sill bar lower extreme, install fastening device on the sill bar respectively, fastening device is used for with ground fixed, the sill bar upper end is fixed with the support column respectively, the support column upper end is fixed with the roof, be fixed with the backplate between the sill bar, be provided with the balancing weight between the support column, the one end that the balancing weight was kept away from to the backplate is fixed with the operation hanging flower basket, be fixed with the stiffener between backplate and the operation hanging flower basket, be equipped with the swash plate between backplate and the roof, the swash plate both ends are fixed with backplate upper end and roof upper end side respectively, install the thing case on the swash plate, the thing case is connected with drive mechanism, drive mechanism is used for driving the thing case and removes along the swash plate.
Preferably, fastening device includes more than two screw rods, the screw rod passes through threaded connection with the sill bar respectively, the screw rod lower extreme passes the sill bar and is connected through the bearing with the sucking disc upper end, the screw rod upper end is fixed with the worm, just be located the sill bar top between the support column and be fixed with the connecting rod, connecting rod and sill bar parallel arrangement, be equipped with the installation cavity more than two in the connecting rod, the worm stretches into corresponding installation cavity respectively, install the worm wheel respectively in the installation cavity, the worm wheel is fixed in the pivot, the pivot both ends pass through the bearing with the connecting rod respectively and are connected, the worm wheel is connected with the worm meshing, the one end of pivot is stretched out the connecting rod and is fixed with the sprocket center, be connected through the driving chain between the sprocket, one of them pivot and handle one are fixed.
Preferably, just be located on the backplate and be fixed with two above backup pads between two sill bars, the backup pad upper end is fixed with the bearing frame, the balancing weight sets up on the bearing frame, balancing weight both sides end is installed and is removed the wheel, it is located the bearing frame both sides to remove the wheel.
Preferably, the movable wheel is installed on a rotating rod, and the rotating rod is connected with the balancing weight through a pin shaft.
Preferably, the limiting plate and the sliding groove are respectively arranged on the side wall of the balancing weight and at two ends of the rotating rod, the limiting plate is fixed on the side wall of the balancing weight, the sliding groove is vertically arranged, a sliding stop block is arranged in the sliding groove, and the sliding stop block is abutted to the rotating rod.
Preferably, the upper end of the bearing frame is provided with more than two first grooves, a moving plate is arranged in each first groove, a second groove is formed in the upper end of the moving plate, side plates are fixed to two ends of the moving plate respectively, the side plates are located at the upper end of the bearing frame, a limiting block matched with the two phases of the grooves is fixed to the lower end of the balancing weight, the limiting blocks are arranged in the second grooves, the upper ends of the side plates are in contact with the balancing weight, and a placing groove used for placing the moving plate and the side plates is formed in the bearing frame.
Preferably, the bottom rod is connected with the supporting plate through fixing rods, the bottom rod and the supporting plate are respectively provided with through holes, and the fixing rods sequentially penetrate through the through holes to connect the bottom rod with the supporting plate.
Preferably, drive mechanism is including fixing the slide rail in the swash plate upper end, it installs on the slide rail to carry the thing case, the symmetry is fixed with two mounting panels on the operation hanging flower basket inner wall, be equipped with the rotary drum between the mounting panel, the rotary drum is fixed in the pivot, the pivot both ends pass through the bearing with the mounting panel respectively and are connected, one of them mounting panel is stretched out to pivot one end and is fixed with two handles, the winding has stay cord one and stay cord two on the rotary drum, the one end of stay cord one is fixed with carrying thing case outer wall, two one ends of stay cord are passed and are carried the thing case and stretch to carry the thing incasement and couple fixedly, the couple is used for hooking the carrier, it is articulated with the opening plate to carry the one end that the operation hanging flower basket was kept away from to the thing case, the opening plate is fixed through magnetism with carrying the thing case.
Compared with the prior art, the invention has the beneficial effects that:
1) the operation table can be more stable by arranging the fastening mechanism and the balancing weight, so that the safety of workers is ensured, and the balancing weight can conveniently and independently move, so that the operation table is more labor-saving and more convenient in the carrying process;
2) through setting up the thing case of carrying, can conveniently transport the operation hanging flower basket with the required heavy object of operation in-process in to alleviate staff's intensity of labour.
Drawings
FIG. 1 is a front view of an operator's station for independent column top concrete placement in an embodiment of the present invention;
FIG. 2 is an enlarged view at A in FIG. 1;
FIG. 3 is a side view of an operator's station for independent column top concrete placement in an embodiment of the present invention;
FIG. 4 is a schematic view of the structure within the connecting rod in an embodiment of the present invention;
FIG. 5 is a side view of a carrier according to an embodiment of the present invention;
FIG. 6 is a top view of a portion of the mechanism of the pulling mechanism in an embodiment of the present invention;
in the figure, 1, a bottom rod, 2, a universal wheel, 3, a screw rod, 4, a sucker, 5, a worm, 6, a support column, 7, a top plate, 8, a connecting rod, 9, a mounting cavity, 10, a worm wheel, 11, a chain wheel, 12, a transmission chain, 13, a handle, 14, a back plate, 15, a balancing weight, 16, a support plate, 17, a fixing rod, 18, a bearing frame, 19, a moving wheel, 20, a rotating rod, 21, a pin shaft, 22, a limiting plate, 23, a sliding groove, 24, a sliding block, 25, a first groove, 26, a moving plate, 27, a second groove, 28, a side plate, 29, a limiting block, 30, a placing groove, 31, an operation hanging basket, 32, a reinforcing rod, 33, an inclined plate, 34, a carrying box, 35, a sliding rail, 36, a baffle, 37, a mounting plate, 38, a rotating drum, 39, a second handle, 40, a first pull rope, 41, a second pull rope, 42, a hook, 43 and an opening plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-6, an operating platform for concrete pouring of the top of an independent column comprises two bottom rods 1 which are symmetrically arranged, universal wheels 2 are mounted at the lower ends of the bottom rods 1, and locking mechanisms are mounted on the universal wheels 2. And the bottom rods 1 are respectively provided with a fastening mechanism which is used for being fixed with the ground. The fastening mechanism comprises more than two screw rods 3, the screw rods 3 are respectively in threaded connection with the bottom rod 1, the lower ends of the screw rods 3 penetrate through the bottom rod 1 and are connected with the upper ends of the suckers 4 through bearings, and the upper ends of the screw rods 3 are fixed with the worm 5. The upper ends of the bottom rods 1 are respectively fixed with supporting columns 6, and the upper ends of the supporting columns 6 are fixed with top plates 7. And a connecting rod 8 is fixed between the support columns 6 and above the bottom rod 1, and the connecting rod 8 is arranged in parallel with the bottom rod 1. More than two mounting cavities 9 are arranged in the connecting rod 8, and the worm 5 extends into the corresponding mounting cavities 9 respectively. The worm wheel 10 is respectively installed in the installation cavity 9, the worm wheel 10 is fixed on the rotating shaft, two ends of the rotating shaft are respectively connected with the connecting rod 8 through bearings, the worm wheel 10 is meshed with the worm 5, and one end of the rotating shaft extends out of the connecting rod 8 and is fixed with the center of the chain wheel 11. The chain wheels 11 are connected through a transmission chain 12, and one rotating shaft is fixed with the first handle 13.
A back plate 14 is fixed between the bottom rods 1, and the back plate 14 is respectively vertical to the bottom rods 1 and the top plate 7. A balancing weight 15 is arranged between the supporting columns 6, and more than two supporting plates 16 are fixed on the back plate 14 and positioned between the two bottom rods 1. The bottom rod 1 is connected with the supporting plate 16 through the fixing rod 17, the bottom rod 1 and the supporting plate 16 are respectively provided with a through hole, the fixing rod 17 sequentially penetrates through the through holes to connect the bottom rod 1 with the supporting plate 16, and the fixing rod 17 can strengthen the stability of the supporting plate 16. The upper end of the supporting plate 16 is fixed with a bearing frame 18, the balancing weight 15 is arranged on the bearing frame 18, the two sides of the balancing weight 15 are provided with moving wheels 19, and the moving wheels 19 are positioned on the two sides of the bearing frame 18. The moving wheel 19 is installed on a rotating rod 20, and the rotating rod 20 is connected with the balancing weight 15 through a pin 21. Limiting plates 22 and sliding grooves 23 are respectively arranged on the side wall of the balancing weight 15 and at two ends of the rotating rod 20, the limiting plates 22 are fixed on the side wall of the balancing weight 15, the sliding grooves 23 are vertically arranged, sliding stop blocks 24 are arranged in the sliding grooves 23, and the sliding stop blocks 24 are close to the rotating rod 20.
The upper end of the bearing frame 18 is provided with more than two first grooves 25, the first grooves 25 are internally provided with a moving plate 26, and the upper end of the moving plate 26 is provided with a second groove 27. Side plates 28 are respectively fixed at two ends of the moving plate 26, the moving plate 26 and the side plates 28 are of an integrated structure, the side plates 28 are located at the upper end of the bearing frame 18, a limiting block 29 matched with the second groove 27 is fixed at the lower end of the balancing weight 15, the limiting block 29 is arranged in the second groove 27, the upper end of the side plate 28 is in contact with the balancing weight 15, and a placing groove 30 for placing the moving plate 26 and the side plates 28 is formed in the bearing frame 18. When the moving wheel 19 contacts with the ground, gaps are reserved between the limiting block 29 and the first groove 25 and between the counterweight block 15 and the bearing frame 18, and the moving plate 26 and the side plate 28 are just inserted into the gaps.
An operation basket 31 is fixed on one end of the back plate 14 far away from the counterweight 15, and a reinforcing rod 32 is fixed between the back plate 14 and the operation basket 31. An inclined plate 33 is arranged between the back plate 14 and the top plate 7, and two ends of the inclined plate 33 are respectively fixed with the upper end of the back plate 14 and the upper end side of the top plate 7. The inclined plate 33 is provided with a carrying box 34, the carrying box 34 is connected with a traction mechanism, and the traction mechanism is used for driving the carrying box 34 to move along the inclined plate 33. The traction mechanism comprises a slide rail 35 fixed at the upper end of the inclined plate 33, the carrying box 34 is installed on the slide rail 35, and a baffle 36 is fixed at the tail end of the slide rail 35. Two mounting plates 37 are symmetrically fixed on the inner wall of the operation hanging basket 31, a rotary drum 38 is arranged between the mounting plates 37, and the rotary drum 38 is fixed on the rotary shaft. Two ends of the rotating shaft are respectively connected with the mounting plates 37 through bearings, and one end of the rotating shaft extends out of one of the mounting plates 37 and is fixed with the second handle 39. The drum 38 is wound with a first pull rope 40 and a second pull rope 41, one end of the first pull rope 40 is fixed with the outer wall of the carrier box 34, one end of the second pull rope 41 penetrates through the carrier box 34 and extends into the carrier box 34 to be fixed with a hook 42, and the hook 42 is used for hooking the carrier. One end of the carrying box 34 far away from the operation hanging basket 31 is hinged with the opening plate 43, and the opening plate 43 and the carrying box 34 are fixed through magnetic attraction.
The working principle is as follows: when needs are to detached top concrete placement, remove required position with operation platform earlier, then die with universal wheel 2 lock, prevent that universal wheel 2 from removing again. After the universal wheel 2 is locked, a first handle 13 starts to rotate, the first handle 13 drives the chain wheel 11 to rotate, the chain wheel 11 drives the rotating shaft and the worm wheel 10 to rotate, the worm wheel 10 drives the worm 5 to move in the vertical direction, and the worm 5 drives the screw rod 3 to rotate downwards, so that the sucker 4 is tightly sucked with the ground, and the operating table is fixed with the ground.
After the operation table is fixed, the fixing rod 17 is drawn out from the through hole, then the counterweight block 15 is pushed to the lower part of the top plate 7, the two groups of moving wheels 19 of the counterweight block 15 are respectively positioned at two sides of the supporting plate 16, when the limiting block 29 at the lower end of the counterweight block 15 is completely positioned in the first groove 25, the moving plate 26 and the side plate 28 are taken out from the placing groove 3031, the moving plate 26 is inserted into a gap between the first groove 25 and the limiting block 29, and the side plate 28 is inserted into a gap between the counterweight block 15 and the bearing frame 18. Then move sliding block 24 to spout 23 the top, rotate dwang 20, make dwang 20 rotatory 180, remove wheel 19 and leave ground, then move sliding block 24 to spout 23 the bottom, sliding block 24 and limiting plate 22 can restrict dwang 20 and rotate again, and the gravity of balancing weight 15 is arranged in completely on the bearing frame 18 this moment. The above operation can remove the frictional resistance when the weight block 15 moves to the bearing frame 1818, so as to facilitate the movement, and then the moving plate 26 and the side plate 28 are used to fill the gap between the weight block 15 and the bearing frame 18, so that the moving wheel 19 leaves the ground, and the weight block 15 falls on the bearing frame 18, so as to play a role of balancing weight. The fixing rod 17 is inserted into the through hole again, the supporting plate 16 and the bottom rod 1 are fixed by the fixing rod 17, and the stability of the supporting plate 16 is enhanced.
After the balancing weight 15 is installed, a worker enters the operation hanging basket 31, when materials need to be supplemented into the operation hanging basket 31, the worker in the operation hanging basket 31 can rotate the second handle 39, the second handle 39 drives the rotating drum 38 to rotate, the first pull rope 40 and the second pull rope 41 are both loosened, the carrying box 34 moves to the tail end of the sliding rail 35 along the inclined plate 33, and the baffle 36 limits the carrying box 34 to continue moving. If the material is lighter, the personnel on the ground can directly put the material into the carrying box 34; if the material is heavier, subaerial staff can open the division board 43, pulls couple 42, makes couple 42 hook on the material, then the staff in the operation hanging flower basket 31 rotates handle two 39, and subaerial staff upwards lifts the material simultaneously to put into the thing case 34 with the material smoothly, close division board 43. The operator in the work basket 31 continues to turn the second handle 39, pulls the carrier box 34 by the first pull cord 40 to the side of the work basket 31, and then removes the material from the carrier box 34.
The foregoing is merely exemplary and illustrative of the present invention and various modifications, additions and substitutions may be made by those skilled in the art to the specific embodiments described without departing from the scope of the present invention as defined in the accompanying claims.

Claims (4)

1. The utility model provides an operation panel for independent capital portion concrete placement which characterized in that: the lifting device comprises two bottom rods which are symmetrically arranged, universal wheels are installed at the lower ends of the bottom rods, fastening mechanisms are installed on the bottom rods respectively and are used for being fixed with the ground, supporting columns are fixed at the upper ends of the bottom rods respectively, a top plate is fixed at the upper ends of the supporting columns, a back plate is fixed between the bottom rods, a balancing weight is arranged between the supporting columns, an operation hanging basket is fixed at one end, away from the balancing weight, of the back plate, a reinforcing rod is fixed between the back plate and the operation hanging basket, an inclined plate is arranged between the back plate and the top plate, two ends of the inclined plate are fixed at the upper end of the back plate and the upper end side edge of the top plate respectively, a carrying box is installed on the inclined plate and is connected with a traction mechanism, the traction mechanism is used for driving the carrying box to move along the inclined plate, more than two supporting plates are fixed on the back plate and between the two bottom rods, and a bearing frame is fixed at the upper ends of the supporting plates, the counterweight block is arranged on a bearing frame, the two side ends of the counterweight block are provided with moving wheels which are positioned on the two sides of the bearing frame, the moving wheels are arranged on a rotating rod, the rotating rod is connected with the counterweight block through a pin shaft, the side wall of the counterweight block and the two ends of the rotating rod are respectively provided with a limiting plate and a sliding groove, the limiting plate is fixed on the side wall of the counterweight block, the sliding groove is vertically arranged, a sliding stop block is arranged in the sliding groove and is close to the rotating rod, the upper end of the bearing frame is provided with more than two first grooves, a moving plate is arranged in the first grooves, the upper end of the moving plate is provided with a second groove, the two ends of the moving plate are respectively fixed with a side plate, the side plate is positioned at the upper end of the bearing frame, the lower end of the counterweight block is fixed with a limiting block matched with the second grooves, the limiting block is arranged in the second grooves, and the upper end of the side plate is contacted with the counterweight block, and a placing groove for placing the moving plate and the side plate is arranged on the bearing frame.
2. An operating floor for independent column top concrete casting according to claim 1, characterized in that: fastening device includes the screw rod more than two, the screw rod passes through threaded connection with the sill bar respectively, the screw rod lower extreme passes the sill bar and is connected through the bearing with the sucking disc upper end, the screw rod upper end is fixed with the worm, just be located the sill bar top between the support column and be fixed with the connecting rod, connecting rod and sill bar parallel arrangement, be equipped with the installation cavity more than two in the connecting rod, the worm stretches corresponding installation cavity respectively in, install the worm wheel respectively in the installation cavity, the worm wheel is fixed in the pivot, the pivot both ends pass through the bearing with the connecting rod respectively and are connected, the worm wheel is connected with the worm meshing, the one end of pivot is stretched out the connecting rod and is fixed with the sprocket center, be connected through the driving chain between the sprocket, one of them the pivot is fixed with a handle.
3. An operating floor for independent column top concrete casting according to claim 1, characterized in that: the bottom rod is connected with the supporting plate through the fixing rod, the bottom rod and the supporting plate are respectively provided with a through hole, and the fixing rod sequentially penetrates through the through holes to connect the bottom rod with the supporting plate.
4. An operating floor for independent column top concrete casting according to claim 1, characterized in that: draw gear is including fixing the slide rail in the swash plate upper end, it installs on the slide rail to carry the thing case, the symmetry is fixed with two mounting panels on the operation hanging flower basket inner wall, be equipped with the rotary drum between the mounting panel, the rotary drum is fixed in the pivot, the pivot both ends pass through the bearing with the mounting panel respectively and are connected, one of them mounting panel is stretched out to pivot one end and is fixed with two handles, the winding has stay cord one and stay cord two on the rotary drum, the one end and the thing case outer wall of stay cord are fixed, two one ends of stay cord are passed and are carried the thing case and stretch to carry the thing incasement and fix with the couple, the couple is used for hooking and carries the thing, it is articulated with the division board to carry the one end that the operation hanging flower basket was kept away from to the thing case, the division board is fixed through magnetism with carrying the thing case.
CN202110123750.8A 2021-01-29 2021-01-29 A operation panel for independent capital portion concrete placement Active CN112942774B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110123750.8A CN112942774B (en) 2021-01-29 2021-01-29 A operation panel for independent capital portion concrete placement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110123750.8A CN112942774B (en) 2021-01-29 2021-01-29 A operation panel for independent capital portion concrete placement

Publications (2)

Publication Number Publication Date
CN112942774A CN112942774A (en) 2021-06-11
CN112942774B true CN112942774B (en) 2022-05-17

Family

ID=76239259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110123750.8A Active CN112942774B (en) 2021-01-29 2021-01-29 A operation panel for independent capital portion concrete placement

Country Status (1)

Country Link
CN (1) CN112942774B (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10724256B1 (en) * 2017-05-04 2020-07-28 Sam Carbis Asset Management, Llc. Enhanced safety cage apparatus for work areas on top of rolling stock such as rail tank cars
KR102171757B1 (en) * 2018-10-29 2020-10-30 임대우 Vertical lift type workbench
CN209958707U (en) * 2019-05-16 2020-01-17 江苏溱潼建设集团有限公司 Scaffold for building industry
CN210563301U (en) * 2019-06-25 2020-05-19 中建七局安装工程有限公司 Concrete pouring workbench for house construction
CN210947650U (en) * 2019-09-20 2020-07-07 中国建筑第二工程局有限公司 Assembly movable type lifting cantilever operation platform
KR102163026B1 (en) * 2020-03-30 2020-10-07 조진엽 Mobile scaffolding device
CN212078690U (en) * 2020-04-16 2020-12-04 重庆天地人建设集团有限公司 Trackless sliding form for concrete pouring of dam panel

Also Published As

Publication number Publication date
CN112942774A (en) 2021-06-11

Similar Documents

Publication Publication Date Title
CN210828276U (en) Hanging basket with high-rise sliding protection for building construction
CN210598069U (en) Scaffold with material lifting device
CN112591590A (en) Rope adjusting device for vertical shaft multi-rope friction hoist
CN113089894B (en) Method for mounting prefabricated wall panel of prefabricated building
CN113511583B (en) Multifunctional high-safety assembled building lifting clamp
CN214527793U (en) Bridge steel structure lifting device
CN117303197A (en) Movable hanging bracket
CN112758836A (en) Automatic lifting device of building engineering
CN112661030A (en) Hoisting, supporting and placing device applied to steel structure and using method thereof
CN112942774B (en) A operation panel for independent capital portion concrete placement
CN109441090B (en) Integral lifting elevator shaft construction platform
CN112850459A (en) Hoisting equipment for efficient assembly type building prefabricated part
CN209922752U (en) Special lifting support for electromechanical installation
CN112900828B (en) Movable type operation platform that encorbelments
CN217281825U (en) Support frame for automatic maintenance of power dispatching
CN217897244U (en) Spider people safety device is used in curtain cleaning maintenance
CN113682952A (en) Box transformer lifts by crane auxiliary operation device
CN113550554A (en) Guide rail type attached lifting accessory based on scaffold
CN212076191U (en) Special beam lifting machine for intercity light rail
CN210366804U (en) Access cover lifter
CN221093580U (en) Building hoisting frame
CN221091673U (en) Integral transfer frame of railway bridge prefabricated walking board
CN222743874U (en) Bridge-span type steel encircles hoist device for construction
CN210288180U (en) Town road sign
CN219451996U (en) Electromechanical engineering ladder for building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Room 21, Zhongyi film and television building, No. 8, Xiatang Road, Kunshan Development Zone, Suzhou, Jiangsu 215300

Applicant after: China Construction Seventh Engineering Bureau The Second Co.,Ltd.

Address before: 230000 No.51 Datong Road, Yaohai District, Hefei City, Anhui Province

Applicant before: China Construction Seventh Engineering Bureau The Second Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant