CN112942417B - Precast concrete guide wall bracket - Google Patents
Precast concrete guide wall bracket Download PDFInfo
- Publication number
- CN112942417B CN112942417B CN201911254445.1A CN201911254445A CN112942417B CN 112942417 B CN112942417 B CN 112942417B CN 201911254445 A CN201911254445 A CN 201911254445A CN 112942417 B CN112942417 B CN 112942417B
- Authority
- CN
- China
- Prior art keywords
- guide wall
- bracket
- concrete
- die
- holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/04—Producing shaped prefabricated articles from the material by tamping or ramming
- B28B1/045—Producing shaped prefabricated articles from the material by tamping or ramming combined with vibrating or jolting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/24—Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
- B28B11/245—Curing concrete articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/38—Treating surfaces of moulds, cores, or mandrels to prevent sticking
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Ceramic Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Structural Engineering (AREA)
- Manufacturing & Machinery (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The patent is a precast concrete guide wall bracket, and the technical field that it is located is the civil engineering specialty of building industry. The prefabricated guide wall bracket solves the problems that a concrete floor slab is not provided with a supporting point at a guide wall position of a hanging die, an inserted steel bracket is left behind after the bracket is removed, a 2.5cm < 2 > hole is left behind at the junction of a cast-in-situ plate surface and the guide wall, and the like. The prior art has the problems that the holes are poured for the second time, sundries are easy to enter the holes, the holes cannot be cleaned up, the number of the holes is large, and the like, and the effective repair cannot be realized. The water leakage phenomenon and the poor look and feel of the concrete structure floor slab are caused, and in the decoration process, the floor of the decoration wall and the like are seriously polluted, and the normal use functions of users are influenced. The precast concrete guide wall bracket not only solves the quality problem, but also saves labor cost to a great extent, improves work efficiency and reasonably utilizes concrete excess materials. The method effectively ensures the structure quality, improves the construction speed, and is widely applied to all projects of newly opened similar construction processes.
Description
Technical Field
This patent is a precast concrete guide wall support. The method is particularly suitable for a tunnel template construction process and a construction process requiring advanced pouring of guide walls, sill and upper counter beams.
Background
In the construction process of introducing Turkey tunnel templates by International engineering company of China railway construction group, aber and Liya company, pouring is completed and meets design requirements in the construction process of a matched plug-in steel guide wall bracket, after the bracket is removed, 2.5m2 holes are left on a cast-in-place floor slab, secondary pouring is needed for the holes, sundries are easy to enter the holes, the holes cannot be cleaned up, the number of the holes is large, and the like, so that effective repair cannot be achieved. The floor slab with the concrete structure is leaked, the appearance is extremely bad, and in the process of decoration and fitment, the floor engineering of the lower wall is seriously polluted, and the normal use function of a user is influenced.
Disclosure of Invention
The prefabricated concrete guide wall bracket is manufactured to replace the original inserted section steel guide wall bracket, so that the structural floor slab is effectively prevented from leaking water, pollution to later-stage decoration and fitment engineering is avoided, and the use function is improved. The concrete bracket is manufactured, and in the use process, labor cost and material cost are saved to a great extent, the construction speed is improved, the working procedures are reduced, and the waste of concrete excess materials is avoided. Can bring good economic effect for projects. The wall body and the plate surface thickness can be controlled by placing the guide wall side templates, and the guide wall side templates are poured in a concrete structure without dismantling, so that the concrete floor achieves the effect of self-waterproofing.
Drawings
This patent is further described below with reference to the drawings and the effects of implementation.
FIG. 1, single-sided bracket guide wall mold grid plate diagram, FIG. 2, double-sided bracket guide wall mold grid plate diagram, FIG. 3, plastic sleeve diagram between grids, FIG. 4, guide wall mold bottom mold diagram, FIG. 5, guide wall mold side helper diagram, FIG. 6, mold grid, screw, plastic sleeve, bottom plate combination diagram, FIG. 7, single-sided bracket guide wall mold assembly diagram, FIG. 8, double-sided bracket guide wall mold assembly diagram, FIG. 9, single-sided bracket guide wall mold assembly completion diagram, FIG. 10, double-sided bracket guide wall mold assembly completion diagram, FIG. 11, double-sided bracket precast concrete guide wall bracket diagram, FIG. 12, precast concrete guide wall bracket installation entity diagram, FIG. 13, entity diagram after the precast concrete guide wall bracket is disassembled.
Detailed Description
After the template is assembled, a bilateral bracket concrete guide wall mold is obtained, as shown in fig. 10, after the inner side and the outer side are uniformly coated with release agents, the residual concrete is poured by using a structure pouring, the receiving surface is vibrated, the receiving surface is covered by a plastic film, and curing is carried out before final curing (normal 8 hours to 12 hours). After pouring is completed for 24 hours, the die is disassembled, and a precast concrete guide wall bracket is obtained as shown in fig. 11; placing the precast concrete guide wall bracket into a standard curing room for curing, placing different specifications and sizes in batches for standard curing for 28 days, and transporting to a construction site to be installed together with the guide wall template when the curing test block under the same conditions meets the design strength requirement as shown in fig. 12; after pouring is completed, after the strength of the same-condition maintenance test block meets the design requirement, removing the mold, forming a concrete structure ceiling picture as shown in fig. 13, and meeting the requirements of bare concrete; each layer of structure plate surface adopts a limit picking mode, thereby avoiding erroneous picking and waste. And after pouring, carrying out water storage acceptance inspection on the prefabricated concrete guide wall bracket. The concrete structure floor slab is guaranteed to have a self-waterproof function.
Claims (1)
1. Prefabricated mixThe concrete guide wall support, its characterized in that: the mould for manufacturing the concrete guide wall bracket comprises: the plastic sleeve is arranged between the grid plates of the single-side bracket guide wall die, the grid plates of the double-side bracket guide wall die, the bottom die of the guide wall die, the side plates of the guide wall die and the screw; the grid plate of the unilateral bracket guide wall die isThe grid plate of the bilateral bracket guide wall die is in a cross shape; the process flow for manufacturing the precast concrete guide wall bracket comprises the steps of finishing the assembly of the guide wall mold of the unilateral bracket, finishing the assembly of the guide wall mold of the bilateral bracket, uniformly brushing a release agent on the inner side and the outer side after finishing the assembly, pouring residual concrete by using a structure, vibrating a receiving surface, covering by using a plastic film, curing after 8 hours to 12 hours after pouring and before final setting, and dismantling the mold after the completion of pouring for 24 hours to obtain the +>The method comprises the steps of (1) conveying a prefabricated concrete guide wall bracket and a cross-shaped prefabricated concrete guide wall bracket to a construction site to be installed together with a guide wall template when the same-condition maintenance test block reaches the design strength requirement, and removing a mould when the same-condition maintenance test block strength meets the design requirement after pouring is completed, so as to form a concrete structure ceiling; the precast concrete guide wall bracket can be used for placing side templates, can control the thickness of a shear wall, the thickness of a floor slab and the height of a guide wall, and is poured in a concrete structure without dismantling. />
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911254445.1A CN112942417B (en) | 2019-12-10 | 2019-12-10 | Precast concrete guide wall bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911254445.1A CN112942417B (en) | 2019-12-10 | 2019-12-10 | Precast concrete guide wall bracket |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112942417A CN112942417A (en) | 2021-06-11 |
CN112942417B true CN112942417B (en) | 2023-06-13 |
Family
ID=76225543
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911254445.1A Active CN112942417B (en) | 2019-12-10 | 2019-12-10 | Precast concrete guide wall bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112942417B (en) |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204098286U (en) * | 2014-08-01 | 2015-01-14 | 广厦湖北第六建设工程有限责任公司 | A kind of washroom dash leads wall |
CN106468101A (en) * | 2015-08-21 | 2017-03-01 | 广西建工集团第四建筑工程有限责任公司 | A kind of locating support for cast-in-place upper reversed beam side template |
CN206625254U (en) * | 2017-03-09 | 2017-11-10 | 中国建筑第八工程局有限公司 | The guidance system of cast-in-place piping lane sliding system |
CN207578686U (en) * | 2017-12-13 | 2018-07-06 | 中国建筑土木建设有限公司 | Self-adaptive precast concrete block manufacturing mold |
CN108247812A (en) * | 2018-01-31 | 2018-07-06 | 舒子杨 | A kind of production method of precast concrete |
CN209304757U (en) * | 2018-07-24 | 2019-08-27 | 上海石化安东混凝土有限公司 | Prefabricated beam mould |
CN109083400A (en) * | 2018-08-17 | 2018-12-25 | 上海建工二建集团有限公司 | Guide wall mold and construction method thereof |
-
2019
- 2019-12-10 CN CN201911254445.1A patent/CN112942417B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN112942417A (en) | 2021-06-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108858665B (en) | Production process of ceramic plate facing reverse-beating formed external wall plate or hanging plate | |
CN103233520A (en) | Self-waterproof system of building external wall structure and construction method of self-waterproof system | |
CN103266767A (en) | Construction method for preventing and treating cracks between concrete structure and filler wall | |
CN105696744B (en) | Steam-pressing aero-concrete integral wall and its production technology | |
CN105971166A (en) | Novel formed steel frame gypsum board non-dismantling formwork | |
CN108612233B (en) | Construction method of cast-in-situ facing clear concrete wall | |
CN105437354B (en) | The method of binding face tile when a kind of prefabricated concrete floor and wallboard | |
CN112942417B (en) | Precast concrete guide wall bracket | |
CN112412013A (en) | Construction method for plugging reserved hole of structural outer wall | |
CN112411798A (en) | Synchronous construction method for prefabricated guide wall and main structure of toilet | |
CN210507502U (en) | Prefabricated assembled concrete slab bed structure | |
CN109853803B (en) | Assembled integral floor slab and manufacturing and installing method | |
CN111136763A (en) | Manufacturing method of air conditioner hole and exhaust hole concrete precast block | |
CN114457953B (en) | Assembled insulation structure integrated window lower filling wall and manufacturing method thereof | |
CN215977966U (en) | Large-size UHPC double-sided hollow-out carving component | |
WO2012123964A2 (en) | Casting designer walls for building by using moulds | |
CN107558604A (en) | A kind of method for exempting from form removal raised table building | |
CN211850319U (en) | Laminated plate | |
CN209817245U (en) | Prefabricated building block with air conditioner hole | |
CN109763573B (en) | Water stop ridge and construction method thereof | |
CN209114685U (en) | A kind of lightweight assembled house floor | |
CN108409264B (en) | Preparation method of L-shaped prefabricated terrazzo decorative hanging plate | |
CN110863598A (en) | Construction method for cast-in-situ floor slab construction hole | |
CN111042531A (en) | Quick construction method for common plastering engineering plaster cake | |
CN110629927A (en) | On-site construction method of inner wall board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |