- CN112928578B CN112928578B CN202110267145.8A CN202110267145A CN112928578B CN 112928578 B CN112928578 B CN 112928578B CN 202110267145 A CN202110267145 A CN 202110267145A CN 112928578 B CN112928578 B CN 112928578B
- Authority
- CN
- China
- Prior art keywords
- terminal
- conveying
- guide
- arm
- slide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000003780 insertion Methods 0.000 title claims abstract description 48
- 230000037431 insertion Effects 0.000 title claims abstract description 48
- 230000007246 mechanism Effects 0.000 claims abstract description 130
- 238000003825 pressing Methods 0.000 claims abstract description 30
- 239000000463 material Substances 0.000 claims description 12
- 239000000872 buffer Substances 0.000 claims description 7
- 238000000034 method Methods 0.000 description 27
- 238000010586 diagram Methods 0.000 description 14
- 238000005520 cutting process Methods 0.000 description 4
- 238000001514 detection method Methods 0.000 description 4
- 238000005452 bending Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 101000827703 Homo sapiens Polyphosphoinositide phosphatase Proteins 0.000 description 1
- 102100023591 Polyphosphoinositide phosphatase Human genes 0.000 description 1
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 1
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007723 transport mechanism Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R43/00—Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors
- H01R43/20—Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors for assembling or disassembling contact members with insulating base, case or sleeve
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Manufacturing Of Electrical Connectors (AREA)
Abstract
本发明提供一种连接器端子快速插入设备,包括底座,设置在底座上的端子输送机构、连接器壳体输送机构、连接器壳体导拨机构、以及端子快速插入机构;端子输送机构包括端子输送框架、滑动机构、端子压料输送机构和端子导向机构;连接器壳体输送机构包括输送轨道,连接器壳体导拨机构包括升降机构、横向移动机构、连接器导拨组件,端子快速插入机构包括凸轮组件、摆臂组件、端子夹持组件。本发明能够实现在端子和连接器壳体输送的同时将端子快速插入连接器的壳体内;通过连接器导拨组件将连接器壳体导拨到相应的位置,供端子快速插入机构将端子插入,利用凸轮与摆臂的配合,实现夹臂的上下、左右移动,从而实现端子的夹紧和插入。
The present invention provides a connector terminal quick insertion device, including a base, a terminal conveying mechanism, a connector housing conveying mechanism, a connector housing guide mechanism, and a terminal quick insertion mechanism arranged on the base; the terminal conveying mechanism includes a terminal conveying frame, a sliding mechanism, a terminal pressing conveying mechanism, and a terminal guiding mechanism; the connector housing conveying mechanism includes a conveying track, the connector housing guide mechanism includes a lifting mechanism, a lateral moving mechanism, and a connector guide assembly, and the terminal quick insertion mechanism includes a cam assembly, a swing arm assembly, and a terminal clamping assembly. The present invention can realize the quick insertion of the terminal into the connector housing while the terminal and the connector housing are conveyed; the connector housing is guided to a corresponding position by the connector guide assembly for the terminal quick insertion mechanism to insert the terminal, and the cam and the swing arm are used to cooperate to realize the up and down, left and right movement of the clamping arm, thereby realizing the clamping and insertion of the terminal.
Description
技术领域Technical Field
本发明涉及连接器加工设备技术领域,尤其是一种连接器端子快速插入设备。The invention relates to the technical field of connector processing equipment, in particular to a connector terminal quick insertion device.
背景技术Background Art
在制造连接器的过程中,有时,需要将连接器上的导电端子插入连接器壳体中,然后在弯折预定角度,例如,弯折90度。In the process of manufacturing the connector, sometimes, it is necessary to insert the conductive terminals on the connector into the connector housing and then bend them at a predetermined angle, for example, 90 degrees.
在现有技术中,一般采用人工手动将端子插入连接器壳体中,但是,采用人工手动插入一次只能插入一根导电端子,而且效率低下,因此,导致插入成本高,效率非常低。In the prior art, the terminal is generally inserted into the connector housing manually. However, only one conductive terminal can be inserted at a time by manual insertion, and the efficiency is low. Therefore, the insertion cost is high and the efficiency is very low.
此外,人工手动插入端子的精度难以保证,经常出现插错位置,导致端子损坏,这会导致损坏之后的导电端子难以正确地安装到电路板上,降低了导电端子的导电性能,同时造成端子浪费、返工。In addition, the accuracy of manual insertion of terminals is difficult to ensure, and the wrong position is often inserted, resulting in terminal damage. This will make it difficult to correctly install the damaged conductive terminals on the circuit board, reducing the conductive performance of the conductive terminals and causing terminal waste and rework.
此外,在人工弯折时,工人需要借助钳子等工具来夹持住导电端子,这会在导电端子的表面上形成刮痕,降低了导电端子的质量。In addition, during manual bending, workers need to use tools such as pliers to clamp the conductive terminals, which may form scratches on the surfaces of the conductive terminals, thereby reducing the quality of the conductive terminals.
为了解决上述问题,现有技术提供了相应的连接器端子弯折设备,但是,由于端子种类多,经常需要切换,导致手工线换线设备多,占用产线空间;其次,手工线信号针的折弯成型效果不稳定,报废多,人力多,人工工作强度极大,且工作效率低。In order to solve the above problems, the prior art provides corresponding connector terminal bending equipment. However, due to the large number of terminal types, frequent switching is required, resulting in a large number of manual line changing equipment, which occupies production line space. Secondly, the bending and forming effect of manual line signal pins is unstable, resulting in a large number of scraps, a large amount of manpower, extremely high manual work intensity, and low work efficiency.
如专利CN110932056A端子裁切插入设备,包括机体、升降机构、端子送料机构和裁切插入机构,所述机体上固定有升降机构,升降机构的升降端安装有数个从上到下排列的端子送料机构,机体上安装有裁切插入机构。具体地,所述裁切插入机构由电机、轴杆、柱形凸轮、平板凸轮、上连杆、下连杆、摆杆、上刀、载座、气缸和水平滑块,电机固定在机体上,轴杆转动连接在机体上,轴杆上固定有两个柱形凸轮和一个平板凸轮,上连杆的杆体和下连杆的杆体分别铰接在机体上,上连杆的两端分别转动连接有辊子,上连杆一端的辊子置于上方的柱形凸轮的环槽内,上连杆另一端的辊子置于上刀的凹槽内,下连杆的两端分别转动连接有辊子,下连杆一端的辊子置于下方的柱形凸轮的环槽内,下连杆另一端的辊子置于载座的凹槽内,水平滑块滑动连接在机体的水平轨道上,水平滑块的一端设有垂直轨道,上刀和载座分别滑动连接在水平滑块的垂直轨道上,水平滑块的另一端固定在气缸的活塞杆上,气缸的缸体固定在机体上,摆杆一端铰接在机体上,摆杆另一端转动连接有辊子,摆杆的辊子置于水平滑块的凹槽内,摆杆的杆体上转动连接有辊子,摆杆杆体上的辊子贴合在平板凸轮上。For example, the terminal cutting and inserting device of patent CN110932056A includes a machine body, a lifting mechanism, a terminal feeding mechanism and a cutting and inserting mechanism. The lifting mechanism is fixed on the machine body, and the lifting end of the lifting mechanism is installed with several terminal feeding mechanisms arranged from top to bottom, and the cutting and inserting mechanism is installed on the machine body. Specifically, the cutting and inserting mechanism consists of a motor, a shaft, a cylindrical cam, a flat cam, an upper connecting rod, a lower connecting rod, a rocker arm, an upper knife, a carrier, a cylinder and a horizontal slider. The motor is fixed on the machine body, and the shaft is rotatably connected to the machine body. Two cylindrical cams and a flat cam are fixed on the shaft. The rod body of the upper connecting rod and the rod body of the lower connecting rod are respectively hinged to the machine body, and rollers are rotatably connected to both ends of the upper connecting rod. The roller at one end of the upper connecting rod is placed in the annular groove of the upper cylindrical cam, and the roller at the other end of the upper connecting rod is placed in the groove of the upper knife. The rollers at both ends of the lower connecting rod are rotatably connected to both ends of the lower connecting rod. The roller at one end is placed in the annular groove of the cylindrical cam below, and the roller at the other end of the lower connecting rod is placed in the groove of the carrier. The horizontal slider is slidably connected to the horizontal track of the machine body, and one end of the horizontal slider is provided with a vertical track. The upper knife and the carrier are respectively slidably connected to the vertical track of the horizontal slider, and the other end of the horizontal slider is fixed to the piston rod of the cylinder, and the cylinder body of the cylinder is fixed to the machine body. One end of the rocker arm is hinged to the machine body, and the other end of the rocker arm is rotatably connected with a roller. The roller of the rocker arm is placed in the groove of the horizontal slider, and the rod body of the rocker arm is rotatably connected with a roller, and the roller on the rod body of the rocker arm fits on the flat cam.
专利CN109217071A公开了一种转盘式插座端子全自动插入设备,包括分度旋转工序、壳体上料工序、壳体压入工序、第一端子送料工序、第一端子装配工序、第二端子送料工序、第二端子装配工序和检测下料工序;所述分度旋转工序:将十个用于放置插座壳体和端子的插座治具两两一组放置在分度旋转装置上,通过旋转底座固定直驱马达分度盘,通过直驱马达分度盘驱动转盘分度旋转,通过转盘均匀固定十个插座治具;所述壳体上料工序:将插座壳体移送至插座治具上,通过插座壳振动盘对插座壳体进行自动排序和送料,通过错位机构进行错位,使两个插座壳体可以同时被搬运机构搬运到一组插座治具上;所述壳体压入工序:将两个插座壳体同时压装到一组插座治具上,通过第一压入气缸、第二压入气缸提供壳体压装的驱动力;所述第一端子送料工序:将四个端子送至第一端子装配装置上,通过端子振动盘对端子进行排序并输送,通过直振器将端子送端子振动盘送至第一端子装配装置上;所述第一端子装配工序:将四个第一端子装配到插座壳体上,通过端子输送机构输送端子,通过端子下定位组件对端子进行下定位,通过端子上定位组件对端子进行上定位,通过端子下压机构将四个端子压入到一组插座治具中的一个插座治具上,完成插座壳体与端子的装配;所述第二端子送料工序:所述第二端子送料工序与所述第一端子送料工序流程一致,将四个端子送至第二端子装配装置上;所述第二端子装配工序:所述第二端子装配工序与所述第一端子装配工序流程一致,通过第二端子装配装置的端子下压机构将四个端子压入到一组插座治具中的另一个插座治具上,完成插座壳体与端子的装配;所述检测下料工序;对完成组装的插座壳体和端子装配体进行检测,合格的产品送入良品箱,不合格的产品送入不良品盒,通过前后滑动组件、左右滑动组件、上下滑动组件移动检测下料组件,通过产品顶出机构将产品顶出,通过检测下料组件对产品进行检测并下料。Patent CN109217071A discloses a fully automatic insertion device for a turntable socket terminal, including an indexing rotation process, a shell loading process, a shell pressing process, a first terminal feeding process, a first terminal assembly process, a second terminal feeding process, a second terminal assembly process and a detection and unloading process; the indexing rotation process: ten socket jigs for placing socket shells and terminals are placed in groups of two on the indexing rotation device, the direct-drive motor indexing disk is fixed by a rotating base, the turntable is driven to index and rotate by the direct-drive motor indexing disk, and the ten socket jigs are evenly fixed by the turntable; the shell The material feeding process: the socket shell is transferred to the socket jig, the socket shell is automatically sorted and fed by the socket shell vibration plate, and the dislocation is performed by the dislocation mechanism, so that the two socket shells can be simultaneously transported to a group of socket jigs by the transport mechanism; the shell pressing process: the two socket shells are simultaneously pressed onto a group of socket jigs, and the driving force for the shell pressing is provided by the first pressing cylinder and the second pressing cylinder; the first terminal feeding process: the four terminals are sent to the first terminal assembly device, the terminals are sorted and transported by the terminal vibration plate, and the terminals are sent to the terminal vibration plate by the straight vibrator. A terminal assembly device; the first terminal assembly process: assembling four first terminals onto a socket housing, conveying the terminals through a terminal conveying mechanism, positioning the terminals downward through a terminal lower positioning assembly, positioning the terminals upward through a terminal upper positioning assembly, pressing the four terminals into one of a group of socket fixtures through a terminal pressing mechanism, and completing the assembly of the socket housing and the terminals; the second terminal feeding process: the second terminal feeding process is consistent with the first terminal feeding process flow, and the four terminals are conveyed to a second terminal assembly device; the second terminal assembly process: the second terminal assembly process is consistent with the first terminal assembly process flow, and the four terminals are pressed into another socket fixture in a group of socket fixtures through a terminal pressing mechanism of the second terminal assembly device, and the assembly of the socket housing and the terminals is completed; the detection and unloading process: inspecting the assembled socket housing and terminal assembly, sending qualified products into a good product box, and sending unqualified products into a defective product box, moving the detection and unloading assembly through the front and rear sliding assembly, the left and right sliding assembly, and the up and down sliding assembly, ejecting the product through the product ejection mechanism, and inspecting and unloading the product through the detection and unloading assembly.
上述专利公开的技术方案不仅结构复杂,而且实用性不强,针对以上问题,亟需要一种可对多种规格的端子进行插入的设备。The technical solution disclosed in the above patent is not only complex in structure, but also not very practical. In view of the above problems, there is an urgent need for a device that can insert terminals of various specifications.
发明内容Summary of the invention
针对现有技术的不足,本发明提供一种连接器端子快速插入设备,该设备能够实现在端子和连接器壳体输送的过程中完成端子的插入,同时可适用于各种规格的连接器和端子。In view of the deficiencies in the prior art, the present invention provides a connector terminal quick insertion device, which can complete the insertion of the terminal during the process of conveying the terminal and the connector housing, and is applicable to connectors and terminals of various specifications.
本发明的技术方案为:一种连接器端子快速插入设备,包括底座,以及设置在底座上的端子输送机构、连接器壳体输送机构、连接器壳体导拨机构、以及端子快速插入机构。The technical solution of the present invention is: a connector terminal quick insertion device, comprising a base, and a terminal conveying mechanism, a connector housing conveying mechanism, a connector housing guiding mechanism, and a terminal quick insertion mechanism arranged on the base.
作为优选的,所述的端子输送机构包括端子输送框架、以及设置在输送框架上的滑动机构,所述的滑动机构上设置有端子压料输送机构和端子导向机构。Preferably, the terminal conveying mechanism comprises a terminal conveying frame and a sliding mechanism arranged on the conveying frame, and the sliding mechanism is provided with a terminal pressing and conveying mechanism and a terminal guiding mechanism.
作为优选的,所述的连接器壳体输送机构包括输送轨道,所述的输送轨道内设置有输送带,所述的输送带与相应的驱动电机和辊轴连接。Preferably, the connector housing conveying mechanism comprises a conveying track, a conveying belt is arranged in the conveying track, and the conveying belt is connected to a corresponding driving motor and a roller shaft.
作为优选的,所述的连接器壳体导拨机构包括横向移动机构、升降机构、连接器导拨组件,所述的横向移动机构设置在升降机构上,并且所述的连接器导拨组件设置在横向移动机构上并与连接器壳体输送机构相配合,从而通过连接器导拨组件将连接器壳体导拨到相应的位置,使端子快速插入机构将相应的端子插入连接器壳体内。Preferably, the connector housing guide mechanism comprises a transverse moving mechanism, a lifting mechanism, and a connector guide assembly. The transverse moving mechanism is arranged on the lifting mechanism, and the connector guide assembly is arranged on the transverse moving mechanism and cooperates with the connector housing conveying mechanism, so that the connector housing is guided to a corresponding position by the connector guide assembly, so that the terminal quick insertion mechanism inserts the corresponding terminal into the connector housing.
作为优选的,所述的端子快速插入机构包括凸轮组件、摆臂组件,以及通过摆臂组件与凸轮组件连接的端子夹持组件。Preferably, the terminal quick insertion mechanism comprises a cam assembly, a swing arm assembly, and a terminal clamping assembly connected to the cam assembly via the swing arm assembly.
作为优选的,所述的滑动机构包括移动气缸,移动滑板,所述的移动气缸设置在端子输送框架的侧壁上,并且所述的移动气缸通过一连接座与移动滑板连接,所述的移动滑板还与设置在端子输送框架上的滑轨滑动连接。Preferably, the sliding mechanism includes a moving cylinder and a moving slide. The moving cylinder is arranged on the side wall of the terminal conveying frame, and the moving cylinder is connected to the moving slide via a connecting seat. The moving slide is also slidably connected to a slide rail arranged on the terminal conveying frame.
作为优选的,所述的端子输送框架两端上还设置有缓冲器,所述的缓冲器位于移动滑板外侧的端子输送框架上。Preferably, buffers are provided on both ends of the terminal conveying frame, and the buffers are located on the terminal conveying frame outside the movable slide.
作为优选的,所述的端子压料输送机构包括电机框架、端子输送电机、端子输送轮、端子压轮组件、端子支撑板,所述的电机框架设置在移动滑板上,所述的端子输送电机设置在电机框架内,并且所述的端子输送轮与端子输送电机连接,并且所述的端子输送轮位于端子支撑板内的凹槽内,并且所述的端子输送轮通过端子支撑板上端开设的开口与端子支撑板上的端子接触;Preferably, the terminal pressing and conveying mechanism comprises a motor frame, a terminal conveying motor, a terminal conveying wheel, a terminal pressing wheel assembly, and a terminal supporting plate, wherein the motor frame is arranged on a movable slide plate, the terminal conveying motor is arranged in the motor frame, and the terminal conveying wheel is connected to the terminal conveying motor, and the terminal conveying wheel is located in a groove in the terminal supporting plate, and the terminal conveying wheel contacts the terminal on the terminal supporting plate through an opening provided at the upper end of the terminal supporting plate;
所述的电机框架上端还设置有用于与端子输送轮相配合的端子压轮组件,通过所述的端子输送轮与压轮组件相配合,实现端子的输送和压紧。The upper end of the motor frame is also provided with a terminal pressing wheel assembly for cooperating with the terminal conveying wheel. The conveying and pressing of the terminal are realized by cooperating with the terminal conveying wheel and the pressing wheel assembly.
作为优选的,所述的端子压轮组件包括第一压轮和第二压轮,以及通过相应的压轮轴与第一压轮和第二压轮相配合的压轮固定座,所述的第一压轮和第二压轮上均设置有相应的拨料齿条,所述的第一压轮和第二压轮延伸到端子支撑板上方,并且所述的第一压轮通过端子支撑板上的开口与端子输送轮相配合。Preferably, the terminal pressure wheel assembly includes a first pressure wheel and a second pressure wheel, and a pressure wheel fixing seat that cooperates with the first pressure wheel and the second pressure wheel through corresponding pressure wheel shafts, the first pressure wheel and the second pressure wheel are both provided with corresponding material removal racks, the first pressure wheel and the second pressure wheel extend above the terminal support plate, and the first pressure wheel cooperates with the terminal conveying wheel through an opening on the terminal support plate.
作为优选的,所述的端子导向机构包括端子导向支撑板、端子料带导向架,以及设置在端子导向支撑板上的端子导向组件,所述的端子导向支撑板设置在端子支撑板侧壁上;Preferably, the terminal guide mechanism comprises a terminal guide support plate, a terminal material strip guide frame, and a terminal guide assembly arranged on the terminal guide support plate, and the terminal guide support plate is arranged on a side wall of the terminal support plate;
所述的端子料带导向架设置在两端子支撑板之间;The terminal strip guide frame is arranged between the two terminal support plates;
所述的端子导向组件包括相配合的第一导向轮和第二导向轮,所述的第一导向轮和第二导向轮通过相应的导向轮安装板设置在端子导向支撑板上,并且所述的第一导向轮上还等间距设置有多个导向齿条,端子料带位于第一导向轮和第二导向轮之间。The terminal guide assembly includes a first guide wheel and a second guide wheel that match each other. The first guide wheel and the second guide wheel are arranged on a terminal guide support plate through corresponding guide wheel mounting plates, and a plurality of guide racks are also arranged at equal intervals on the first guide wheel. The terminal material strip is located between the first guide wheel and the second guide wheel.
作为优选的,所述的升降机构包括升降固定框架、升降电机、压轧滚珠丝杠、升降滑板,所述的升降固定框架设置在底座上,并且所述的升降固定框架上沿竖直方向设置有相应的升降滑轨,所述的升降滑板通过升降滑轨与升降固定框架滑动连接,Preferably, the lifting mechanism comprises a lifting fixed frame, a lifting motor, a rolled ball screw, and a lifting slide plate. The lifting fixed frame is arranged on a base, and a corresponding lifting slide rail is arranged on the lifting fixed frame in a vertical direction. The lifting slide plate is slidably connected to the lifting fixed frame through the lifting slide rail.
所述的升降电机设置在底座上,并且所述的升降电机与设置在升降固定框架上的压轧滚珠丝杠连接,所述的升降滑板通过丝杠座与压轧滚珠丝杠连接,从而通过升降电机驱动压轧滚珠丝杠转动,从而驱动升降滑板升降,所述的升降滑板上还设置有支撑架。The lifting motor is arranged on the base, and the lifting motor is connected to the rolled ball screw arranged on the lifting fixed frame. The lifting slide plate is connected to the rolled ball screw through the screw seat, so that the rolled ball screw is driven to rotate by the lifting motor, thereby driving the lifting slide plate to rise and fall. A support frame is also arranged on the lifting slide plate.
作为优选的,所述的横向移动机构包括横板、横梁、横向移动电机、横向移动丝杆、横向移动滑板,所述的横板设置在支撑架上,并且所述的横梁设置在横板上,所述的横梁一侧设置有横向电机,所述的横向电机与设置在横梁上的横向移动丝杆连接,所述的横向移动滑板通过丝杆座与横向移动丝杆连接。Preferably, the transverse moving mechanism includes a transverse plate, a transverse beam, a transverse moving motor, a transverse moving screw and a transverse moving slide plate. The transverse plate is arranged on a support frame, and the transverse beam is arranged on the transverse plate. A transverse motor is arranged on one side of the transverse beam. The transverse motor is connected to the transverse moving screw arranged on the transverse beam, and the transverse moving slide plate is connected to the transverse moving screw through a screw seat.
作为优选的,所述的连接器导拨组件包括导拨气缸、以及与导拨气缸连接的导拨架,所述的导拨架位于输送轨道上方,并且所述的导拨架下端还设置有多个导拨杆。Preferably, the connector guide assembly includes a guide cylinder and a guide frame connected to the guide cylinder, the guide frame is located above the conveying track, and a plurality of guide rods are also provided at the lower end of the guide frame.
作为优选的,所述的凸轮组件包括凸轮驱动电机、凸轮轴、以及设置在凸轮轴上的第一凸轮和第二凸轮,以及两共轭凸轮,所述的凸轮驱动电机通过固定座设置在凸轮箱体上,并且所述的凸轮驱动电机通过皮带与设置在凸轮轴上的皮带轮连接。Preferably, the cam assembly includes a cam drive motor, a camshaft, a first cam and a second cam arranged on the camshaft, and two conjugate cams. The cam drive motor is arranged on the cam housing through a fixed seat, and the cam drive motor is connected to a pulley arranged on the camshaft through a belt.
作为优选的,所述的摆臂组件包括第一摆臂、第二摆臂、第三摆臂,所述的第一摆臂的下端与第一凸轮连接,所述的第一摆臂的上端连接有第一连接杆,所述的第一连接杆的另一端与上臂摆动滑板连接,所述的上臂摆动滑板通过相应的滑座与设置在摆动支撑板上的滑轨滑动连接,从而通过所述的第一凸轮带动第一摆臂和第一连接杆上下摆动,从而带动上臂摆动滑板在摆动支撑板的滑轨上上下滑动;Preferably, the swing arm assembly comprises a first swing arm, a second swing arm, and a third swing arm, the lower end of the first swing arm is connected to the first cam, the upper end of the first swing arm is connected to the first connecting rod, the other end of the first connecting rod is connected to the upper arm swing slide plate, the upper arm swing slide plate is slidably connected to the slide rail provided on the swing support plate through the corresponding slide seat, so that the first swing arm and the first connecting rod are driven to swing up and down through the first cam, thereby driving the upper arm swing slide plate to slide up and down on the slide rail of the swing support plate;
所述的第二摆臂的下端与第二凸轮连接,所述的第二摆臂的上端通过一连接板与下臂摆动滑板连接,所述的下臂摆动滑板与设置在摆动支撑板上的滑轨滑动连接,从而通过所述的第二凸轮带动第二摆臂上下摆动,从而带动下臂摆动滑板在摆动支撑板的滑轨上上下滑动;The lower end of the second swing arm is connected to the second cam, the upper end of the second swing arm is connected to the lower arm swing slide plate through a connecting plate, and the lower arm swing slide plate is slidably connected to the slide rail provided on the swing support plate, so that the second swing arm is driven to swing up and down by the second cam, thereby driving the lower arm swing slide plate to slide up and down on the slide rail of the swing support plate;
所述的第三摆臂为倒Y型结构,并且所述的倒Y型结构的第三摆臂的下端与两共轭凸轮连接,该所述的倒Y型结构的第三摆臂的上端设置有一卡座,所述的第三摆臂在两共轭凸轮的作用下可以带动其上端的卡座左右摆动。The third swing arm is an inverted Y-shaped structure, and the lower end of the third swing arm of the inverted Y-shaped structure is connected to two conjugate cams. The upper end of the third swing arm of the inverted Y-shaped structure is provided with a socket. Under the action of the two conjugate cams, the third swing arm can drive the socket at its upper end to swing left and right.
作为优选的,所述的端子夹持组件包括端子上夹臂和端子下夹臂,所述的端子上夹臂和端子下夹臂上分别设置有用于夹持端子的上夹持座和下夹持杆;Preferably, the terminal clamping assembly comprises an upper clamping arm and a lower clamping arm of the terminal, and the upper clamping arm and the lower clamping arm of the terminal are respectively provided with an upper clamping seat and a lower clamping rod for clamping the terminal;
所述的端子上夹臂通过端子上夹臂滑杆与设置在上臂摆动滑板上的滑座滑动连接;The terminal upper clamp arm is slidably connected to a slide seat arranged on the upper arm swing slide plate through the terminal upper clamp arm slide bar;
所述的端子下夹臂通过端子下夹臂滑杆与设置在下臂摆动滑板上的滑座滑动连接;The terminal lower clamp arm is slidably connected to a slide seat arranged on the lower arm swing slide plate through a terminal lower clamp arm slide bar;
并且所述的端子下夹臂滑杆还通过相应的卡座与倒Y型结构的第三摆臂的上端连接,所述的端子上夹臂滑杆上还设置有一用于卡座相配合的U型卡块,部分所述的卡座位于U型卡块的U型槽内。In addition, the lower clamp arm slide rod of the terminal is also connected to the upper end of the third swing arm of the inverted Y-shaped structure through a corresponding clamping seat, and a U-shaped clamping block for matching the clamping seat is also provided on the upper clamp arm slide rod of the terminal, and part of the clamping seat is located in the U-shaped groove of the U-shaped clamping block.
作为优选的,所述的上夹持座下端开设有一用于容纳端子的卡槽。Preferably, a slot for accommodating the terminal is provided at the lower end of the upper clamping seat.
本发明的有益效果为:The beneficial effects of the present invention are:
1、本发明结构简单,实用性强,并且本发明能够实现端子和连接器的输送,同时在输送过程中通过端子快速插入机构将端子快速插入连接器的壳体内;1. The present invention has a simple structure and strong practicability, and can realize the conveyance of terminals and connectors, and at the same time, the terminals can be quickly inserted into the housing of the connector through the terminal quick insertion mechanism during the conveyance process;
2、本发明在端子输送过程中可以实现端子的压紧,并且通过设置料带导向机构,可保证端子的顺利输送;2. The present invention can realize the compaction of the terminal during the terminal conveying process, and by providing a material belt guiding mechanism, the smooth conveying of the terminal can be ensured;
3、本发明连接器壳体在输送过程中,通过连接器导拨组件将连接器壳体导拨到相应的位置,供端子快速插入机构将端子插入,插入端子后通过连接器壳体输送机构输送至下一工序;3. During the conveying process, the connector housing of the present invention is guided to a corresponding position by the connector guide assembly, so that the terminal quick insertion mechanism can insert the terminal, and after the terminal is inserted, it is conveyed to the next process by the connector housing conveying mechanism;
4、本发明端子快速插入机构利用凸轮与摆臂相配合的方式,实现夹臂的上下、左右移动,从而实现端子的夹紧和插入;4. The terminal quick insertion mechanism of the present invention utilizes the cooperation between the cam and the swing arm to realize the up and down and left and right movement of the clamping arm, thereby realizing the clamping and insertion of the terminal;
5、本发明的通过凸轮的转动,可实现端子的快速夹紧、以及插入动作,插入效率高。5. The present invention can realize rapid clamping and insertion of the terminal through the rotation of the cam, and the insertion efficiency is high.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本发明的结构示意图;Fig. 1 is a schematic structural diagram of the present invention;
图2为本发明的另一结构示意图;FIG2 is another schematic structural diagram of the present invention;
图3为本发明端子输送机构的结构示意图;FIG3 is a schematic structural diagram of a terminal conveying mechanism of the present invention;
图4为本发明端子输送机构的另一侧面的结构示意图;FIG4 is a schematic structural diagram of another side surface of the terminal conveying mechanism of the present invention;
图5为本发明滑动机构的结构示意图;FIG5 is a schematic structural diagram of a sliding mechanism of the present invention;
图6为本发明的端子压料输送机构的结构示意图;FIG6 is a schematic structural diagram of a terminal pressing and conveying mechanism of the present invention;
图7为本发明的端子导向机构的结构示意图;FIG7 is a schematic structural diagram of a terminal guide mechanism of the present invention;
图8为本发明连接器壳体导拨机构的结构示意图;FIG8 is a schematic structural diagram of the guide mechanism of the connector housing of the present invention;
图9为本发明连接器导拨组件的结构示意图;FIG9 is a schematic structural diagram of a connector guide assembly according to the present invention;
图10为本发明端子快速插入机构的结构示意图;10 is a schematic diagram of the structure of the terminal quick insertion mechanism of the present invention;
图11为本发明凸轮组件的结构示意图;FIG11 is a schematic structural diagram of a cam assembly of the present invention;
图12为本发明摆臂组件的结构示意图;FIG12 is a schematic structural diagram of a swing arm assembly of the present invention;
图13为本发明端子夹持组件的结构示意图;FIG13 is a schematic structural diagram of a terminal clamping assembly according to the present invention;
图14为本发明上夹持座的的结构示意图;FIG14 is a schematic structural diagram of the upper clamping seat of the present invention;
图中,1-底座,2-端子输送机构,3-连接器壳体输送机构,4-连接器壳体导拨机构,5-端子快速插入机构;In the figure, 1-base, 2-terminal conveying mechanism, 3-connector housing conveying mechanism, 4-connector housing guiding mechanism, 5-terminal quick insertion mechanism;
21-端子输送框架,22-滑动机构,23-端子压料输送机构,24-端子导向机构21-terminal conveying frame, 22-sliding mechanism, 23-terminal pressing and conveying mechanism, 24-terminal guiding mechanism
211-移动气缸,212-移动滑板,213连接座,214-缓冲器;211-moving cylinder, 212-moving slide plate, 213 connecting seat, 214-buffer;
231-电机框架,232-端子输送电机,233-端子输送轮,234-端子支撑板,235-第一压轮,236-第二压轮,237-压轮固定座,238-拨料齿条;231-motor frame, 232-terminal conveying motor, 233-terminal conveying wheel, 234-terminal supporting plate, 235-first pressing wheel, 236-second pressing wheel, 237-pressing wheel fixing seat, 238-feeding rack;
241-端子导向支撑板,242-端子料带导向架,243-第一导向轮,244-第二导向轮,245-导向齿条,246-导向轮安装板;241-terminal guide support plate, 242-terminal material strip guide frame, 243-first guide wheel, 244-second guide wheel, 245-guide rack, 246-guide wheel mounting plate;
31-括输送轨道;31-conveying track;
41-升降机构,42-横向移动机构,43-连接器导拨组件;41-lifting mechanism, 42-lateral movement mechanism, 43-connector guide assembly;
411-升降固定框架,412-升降电机,413-压轧滚珠丝杠,414-升降滑板;411-lifting fixed frame, 412-lifting motor, 413-rolled ball screw, 414-lifting slide plate;
421-横板,422-横梁,423-横向移动电机;421- horizontal plate, 422- horizontal beam, 423- horizontal movement motor;
431-导拨气缸,432-导拨架,433-导拨杆;431-guide cylinder, 432-guide frame, 433-guide rod;
51-凸轮组件,52-摆臂组件,53-端子夹持组件;51- cam assembly, 52- swing arm assembly, 53- terminal clamping assembly;
511-凸轮箱体,512-凸轮驱动电机,513-凸轮轴,514-第一凸轮,515-第二凸轮,516-共轭凸轮;511-cam housing, 512-cam drive motor, 513-cam shaft, 514-first cam, 515-second cam, 516-conjugate cam;
521-第一摆臂,522-第二摆臂,523-第三摆臂,524-第一连接杆,525-上臂摆动滑板,526-摆动支撑板,527-滑轨,528-下臂摆动滑板,529-卡座;521-first swing arm, 522-second swing arm, 523-third swing arm, 524-first connecting rod, 525-upper arm swing slide, 526-swing support plate, 527-slide rail, 528-lower arm swing slide, 529-card holder;
531-端子上夹臂,532-端子下夹臂,533-上夹持座,534-下夹持杆;535-端子上夹臂滑杆;536-端子下夹臂滑杆,537-U型卡块,538-卡槽。531-upper clamping arm of the terminal, 532-lower clamping arm of the terminal, 533-upper clamping seat, 534-lower clamping rod; 535-upper clamping arm sliding rod of the terminal; 536-lower clamping arm sliding rod of the terminal, 537-U-shaped clamping block, 538-cage.
具体实施方式DETAILED DESCRIPTION
下面结合附图对本发明的具体实施方式作进一步说明:The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings:
如图1和图2所示,本实施例提供一种连接器端子快速插入设备,包括底座1,以及设置在底座1上的端子输送机构2、连接器壳体输送机构3、连接器壳体导拨机构4、以及端子快速插入机构5。本实施例中,所述的端子输送机构2用于输送料带端子,所述的连接器壳体输送机构3用于输送连接器壳体,连接器壳体在连接器壳体输送机构3上输送时,通过所述的连接器壳体导拨机构4将需要插入端子的连接器壳体固定,然后通过端子快速插入机构5快速插入端子,同时通过连接器壳体导拨机构4导拨连接器壳体,从而实现多个端子的插入。As shown in Figures 1 and 2, this embodiment provides a connector terminal quick insertion device, including a base 1, and a terminal conveying mechanism 2, a connector housing conveying mechanism 3, a connector housing guide mechanism 4, and a terminal quick insertion mechanism 5 arranged on the base 1. In this embodiment, the terminal conveying mechanism 2 is used to convey the strip terminal, and the connector housing conveying mechanism 3 is used to convey the connector housing. When the connector housing is conveyed on the connector housing conveying mechanism 3, the connector housing to be inserted with the terminal is fixed by the connector housing guide mechanism 4, and then the terminal is quickly inserted by the terminal quick insertion mechanism 5, and the connector housing is guided by the connector housing guide mechanism 4, so as to realize the insertion of multiple terminals.
作为本实施例优选的,如图3和4所示,所述的端子输送机构2包括端子输送框架21、以及设置在输送框架21上的滑动机构22,所述的滑动机构22上设置有端子压料输送机构23和端子导向机构24。As a preferred embodiment of the present invention, as shown in FIGS. 3 and 4 , the terminal conveying mechanism 2 includes a terminal conveying frame 21 and a sliding mechanism 22 arranged on the conveying frame 21 , and the sliding mechanism 22 is provided with a terminal pressing and conveying mechanism 23 and a terminal guiding mechanism 24 .
作为本实施例优选的,如图5所示,所述的滑动机构22包括移动气缸211,移动滑板212,所述的移动气缸211设置在端子输送框架21的侧壁上,并且所述的移动气缸211通过一连接座213与移动滑板212连接,所述的移动滑板212还通过多个滑座与设置在端子输送框架21上的滑轨滑动连接。所述的端子输送框架21两端上还设置有相应的缓冲器214,所述的缓冲器214位于移动滑板212外侧的端子输送框架21上。As a preferred embodiment of the present invention, as shown in FIG5 , the sliding mechanism 22 includes a moving cylinder 211 and a moving slide 212. The moving cylinder 211 is arranged on the side wall of the terminal conveying frame 21, and the moving cylinder 211 is connected to the moving slide 212 via a connecting seat 213. The moving slide 212 is also slidably connected to the slide rails arranged on the terminal conveying frame 21 via a plurality of slide seats. Corresponding buffers 214 are also arranged at both ends of the terminal conveying frame 21, and the buffers 214 are located on the terminal conveying frame 21 outside the moving slide 212.
作为本实施例优选的,如图6所示,所述的端子压料输送机构23包括电机框架231、端子输送电机232、端子输送轮233、端子压轮组件、端子支撑板234,所述的电机框架231设置在移动滑板212上,所述的端子输送电机232设置在电机框架231内,并且所述的端子输送轮233与端子输送电机232连接,并且所述的端子输送轮233位于端子支撑板234内的凹槽内,所述的端子输送轮233通过端子支撑板234上端开设的开口与端子支撑板234上的端子接触。As a preferred embodiment of the present invention, as shown in Figure 6, the terminal pressing and conveying mechanism 23 includes a motor frame 231, a terminal conveying motor 232, a terminal conveying wheel 233, a terminal pressing wheel assembly, and a terminal support plate 234. The motor frame 231 is arranged on the movable slide 212, the terminal conveying motor 232 is arranged in the motor frame 231, and the terminal conveying wheel 233 is connected to the terminal conveying motor 232, and the terminal conveying wheel 233 is located in a groove in the terminal support plate 234, and the terminal conveying wheel 233 contacts the terminal on the terminal support plate 234 through an opening opened at the upper end of the terminal support plate 234.
所述的电机框架231上端还设置有用于与端子输送轮233相配合的端子压轮组件,通过所述的端子输送轮233与压轮组件相配合,实现端子的输送和压紧。本实施例中,所述的端子压轮组件包括第一压轮235和第二压轮236,以及通过相应的压轮轴与第一压轮235和第二压轮236相配合的压轮固定座237,所述的第一压轮235和第二压轮236上均设置有相应的拨料齿条238,所述的第一压轮235和第二压轮236延伸到端子支撑板234上方,并且所述的第一压轮235通过端子支撑板234上的开口与端子输送轮233相配合。The upper end of the motor frame 231 is also provided with a terminal pressure wheel assembly for cooperating with the terminal conveying wheel 233. The terminal conveying wheel 233 cooperates with the pressure wheel assembly to realize the conveying and pressing of the terminal. In this embodiment, the terminal pressure wheel assembly includes a first pressure wheel 235 and a second pressure wheel 236, and a pressure wheel fixing seat 237 that cooperates with the first pressure wheel 235 and the second pressure wheel 236 through corresponding pressure wheel shafts. The first pressure wheel 235 and the second pressure wheel 236 are both provided with corresponding material-selecting racks 238. The first pressure wheel 235 and the second pressure wheel 236 extend above the terminal support plate 234, and the first pressure wheel 235 cooperates with the terminal conveying wheel 233 through an opening on the terminal support plate 234.
作为本实施例优选的,如图7所示,所述的端子导向机构24包括端子导向支撑板241、端子料带导向架242,以及设置在端子导向支撑板241上的端子导向组件,所述的端子导向支撑板241设置在端子支撑板234侧壁上;所述的端子料带导向架242设置在两端子支撑板234之间;As a preferred embodiment of the present invention, as shown in FIG. 7 , the terminal guide mechanism 24 includes a terminal guide support plate 241, a terminal material strip guide frame 242, and a terminal guide assembly arranged on the terminal guide support plate 241, wherein the terminal guide support plate 241 is arranged on the side wall of the terminal support plate 234; the terminal material strip guide frame 242 is arranged between the two terminal support plates 234;
所述的端子导向组件包括相配合的第一导向轮243和第二导向轮244,所述的第一导向轮243和第二导向轮244通过相应的导向轮安装板246设置在端子导向支撑板241上,并且所述的第一导向轮243上还等间距设置有多个导向齿条245,端子料带位于第一导向轮243和第二导向轮244之间。The terminal guide assembly includes a first guide wheel 243 and a second guide wheel 244 that match each other. The first guide wheel 243 and the second guide wheel 244 are arranged on the terminal guide support plate 241 through corresponding guide wheel mounting plates 246, and a plurality of guide racks 245 are also arranged at equal intervals on the first guide wheel 243. The terminal material strip is located between the first guide wheel 243 and the second guide wheel 244.
本实施例中,所述的连接器壳体输送机构3包括输送轨道31,所述的输送轨道31内设置有输送带,所述的输送带套设在相应的主动辊和从动辊上,并且所述的主动辊还通过皮带与相应的驱动电机连接,另外,所述的输送带还套设在相应的托辊上。In this embodiment, the connector shell conveying mechanism 3 includes a conveying track 31, and a conveying belt is arranged in the conveying track 31. The conveying belt is sleeved on the corresponding active roller and the driven roller, and the active roller is also connected to the corresponding driving motor through a belt. In addition, the conveying belt is also sleeved on the corresponding roller.
作为本实施例优选的,如图8所示,所述的连接器壳体导拨机构4包括横向移动机构42、升降机构41、连接器导拨组件43,所述的横向移动机构42设置在升降机构41上,并且所述的连接器导拨组件43设置在横向移动机构42上并与连接器壳体输送机构3相配合,从而通过连接器导拨组件43将连接器壳体导拨到相应的位置,使端子快速插入机构5将相应的端子插入连接器壳体内。As a preferred embodiment of the present invention, as shown in FIG8 , the connector housing guide mechanism 4 includes a lateral moving mechanism 42, a lifting mechanism 41, and a connector guide assembly 43. The lateral moving mechanism 42 is arranged on the lifting mechanism 41, and the connector guide assembly 43 is arranged on the lateral moving mechanism 42 and cooperates with the connector housing conveying mechanism 3, so that the connector housing is guided to a corresponding position by the connector guide assembly 43, so that the terminal quick insertion mechanism 5 inserts the corresponding terminal into the connector housing.
作为本实施例优选的,如图8所示,所述的升降机构41包括升降固定框架411、升降电机412、压轧滚珠丝杠413、升降滑板414,所述的升降固定框架411设置在底座1上,并且所述的升降固定框架411上沿竖直方向设置有相应的升降滑轨,所述的升降滑板414通过升降滑轨与升降固定框架411滑动连接,所述的升降电机412设置在底座1上,并且所述的升降电机412与设置在升降固定框架411上的压轧滚珠丝杠413连接,所述的升降滑板414通过丝杠座与压轧滚珠丝杠413连接,从而通过升降电机412驱动压轧滚珠丝杠413转动,从而驱动升降滑板414升降,所述的升降滑板414上还设置有支撑架。As a preferred embodiment of the present invention, as shown in FIG8 , the lifting mechanism 41 includes a lifting and fixing frame 411, a lifting motor 412, a rolled ball screw 413, and a lifting and fixing slide 414. The lifting and fixing frame 411 is arranged on the base 1, and a corresponding lifting and fixing rail is arranged on the lifting and fixing frame 411 in the vertical direction. The lifting and fixing slide 414 is slidingly connected to the lifting and fixing frame 411 through the lifting and fixing rail. The lifting motor 412 is arranged on the base 1, and the lifting motor 412 is connected to the rolled ball screw 413 arranged on the lifting and fixing frame 411. The lifting and fixing slide 414 is connected to the rolled ball screw 413 through a screw seat, so that the rolled ball screw 413 is driven to rotate by the lifting motor 412, thereby driving the lifting and fixing slide 414 to rise and fall. A support frame is also arranged on the lifting and fixing slide 414.
作为本实施例优选的,所述的横向移动机构42包括横板421、横梁422、横向移动电机423、横向移动丝杆、横向移动滑板,所述的横板421设置在支撑架上,并且所述的横梁422设置在横板421上,所述的横梁422一侧设置有横向电机423,所述的横向电机423与设置在横梁422上的横向移动丝杆连接,所述的横向移动滑板通过丝杆座与横向移动丝杆连接。As a preferred embodiment of the present invention, the transverse moving mechanism 42 includes a transverse plate 421, a transverse beam 422, a transverse moving motor 423, a transverse moving screw, and a transverse moving slide plate. The transverse plate 421 is arranged on a support frame, and the transverse beam 422 is arranged on the transverse plate 421. A transverse motor 423 is arranged on one side of the transverse beam 422. The transverse motor 423 is connected to the transverse moving screw arranged on the transverse beam 422, and the transverse moving slide plate is connected to the transverse moving screw through a screw seat.
作为本实施例优选的,参见图9所示,所述的连接器导拨组件43包括导拨气缸431、以及与导拨气缸431连接的导拨架432,所述的导拨架432位于输送轨道31上方,并且所述的导拨架432下端还设置有多个导拨杆433。As a preferred embodiment of the present invention, as shown in FIG. 9 , the connector guide assembly 43 includes a guide cylinder 431 and a guide rack 432 connected to the guide cylinder 431 , wherein the guide rack 432 is located above the conveying track 31 , and a plurality of guide rods 433 are also provided at the lower end of the guide rack 432 .
在使用过程中,通过、升降机构41、横向移动机构42实现连接器导拨组件43的升降和横向移动,并且通过所述的导拨气缸431控制导拨架432动作,当连接器壳体输送至端子快速插入机构5的位置,所述的导拨气缸431控制导拨架432卡住相应的连接器,并将其移动到端子快速插入机构5位置,插入端子后,导拨架432控制连接器壳体移动一定距离,从而插入下一个端子,当相应的端子插入完成后,导拨架432从连接器壳体上移除,从而通过输送带输送至下一工序。During use, the lifting and lowering and lateral movement of the connector guide assembly 43 are achieved through the lifting mechanism 41 and the lateral movement mechanism 42, and the guide rack 432 is controlled by the guide cylinder 431. When the connector housing is transported to the position of the terminal quick insertion mechanism 5, the guide cylinder 431 controls the guide rack 432 to clamp the corresponding connector and move it to the position of the terminal quick insertion mechanism 5. After the terminal is inserted, the guide rack 432 controls the connector housing to move a certain distance so as to insert the next terminal. When the corresponding terminal is inserted, the guide rack 432 is removed from the connector housing so as to be transported to the next process through the conveyor belt.
作为本实施例优选的,如图10所示,所述的端子快速插入机构5包括凸轮组件51、摆臂组件52,以及通过摆臂组件52与凸轮组件51连接的端子夹持组件53。As a preferred embodiment of the present invention, as shown in FIG. 10 , the terminal quick insertion mechanism 5 includes a cam assembly 51 , a swing arm assembly 52 , and a terminal clamping assembly 53 connected to the cam assembly 51 via the swing arm assembly 52 .
作为本实施例优选的,如图11所示,所述的凸轮组件51包括凸轮驱动电机512、凸轮轴513、以及设置在凸轮轴513上的第一凸轮514和第二凸轮515,以及两共轭凸轮516,所述的凸轮驱动电机512通过固定座设置在凸轮箱体511上,并且所述的凸轮驱动电机512通过皮带与设置在凸轮轴513上的皮带轮连接。As a preferred embodiment of the present invention, as shown in FIG11 , the cam assembly 51 includes a cam drive motor 512, a camshaft 513, and a first cam 514 and a second cam 515 arranged on the camshaft 513, and two conjugate cams 516. The cam drive motor 512 is arranged on the cam housing 511 through a fixed seat, and the cam drive motor 512 is connected to a pulley arranged on the camshaft 513 through a belt.
作为本实施例优选的,如图12所示,所述的摆臂组件53包括第一摆臂521、第二摆臂522、第三摆臂523,所述的第一摆臂521的下端与第一凸轮514连接,所述的第一摆臂521的上端连接有第一连接杆524,所述的第一连接杆524的另一端与上臂摆动滑板525连接,所述的上臂摆动滑板525通过相应的滑座与设置在摆动支撑板526上的滑轨527滑动连接,从而通过所述的第一凸轮514带动第一摆臂521和第一连接杆524上下摆动,从而带动上臂摆动滑板525在摆动支撑板526的滑轨527上上下滑动。As a preferred embodiment of the present invention, as shown in Figure 12, the swing arm assembly 53 includes a first swing arm 521, a second swing arm 522, and a third swing arm 523. The lower end of the first swing arm 521 is connected to the first cam 514, and the upper end of the first swing arm 521 is connected to the first connecting rod 524. The other end of the first connecting rod 524 is connected to the upper arm swing slide 525. The upper arm swing slide 525 is slidably connected to the slide rail 527 provided on the swing support plate 526 through a corresponding slide seat, so that the first swing arm 521 and the first connecting rod 524 are driven to swing up and down through the first cam 514, thereby driving the upper arm swing slide 525 to slide up and down on the slide rail 527 of the swing support plate 526.
所述的第二摆臂522的下端与第二凸轮515连接,所述的第二摆臂522的上端通过一连接板与下臂摆动滑板528连接,所述的下臂摆动滑板528与设置在摆动支撑板526上的滑轨527滑动连接,从而通过所述的第二凸轮515带动第二摆臂522上下摆动,从而带动下臂摆动滑板528在摆动支撑板526的滑轨527上上下滑动。The lower end of the second swing arm 522 is connected to the second cam 515, and the upper end of the second swing arm 522 is connected to the lower arm swing slide 528 through a connecting plate. The lower arm swing slide 528 is slidably connected to the slide rail 527 set on the swing support plate 526, so that the second swing arm 522 is driven to swing up and down through the second cam 515, thereby driving the lower arm swing slide 528 to slide up and down on the slide rail 527 of the swing support plate 526.
所述的第三摆臂513为倒Y型结构,并且所述的倒Y型结构的第三摆臂513的下端与两共轭凸轮516连接,该所述的倒Y型结构的第三摆臂513的上端设置有一卡座529,所述的第三摆臂513在两共轭凸轮516的作用下可以带动其上端的卡座529左右摆动。The third swing arm 513 is an inverted Y-shaped structure, and the lower end of the third swing arm 513 of the inverted Y-shaped structure is connected to the two conjugate cams 516. The upper end of the third swing arm 513 of the inverted Y-shaped structure is provided with a socket 529. Under the action of the two conjugate cams 516, the third swing arm 513 can drive the socket 529 at its upper end to swing left and right.
作为本实施例优选的,如图13所示,所述的端子夹持组件53包括端子上夹臂531和端子下夹臂532,所述的端子上夹臂531和端子下夹臂532上分别设置有用于夹持端子的上夹持座533和下夹持杆534。As a preferred embodiment of the present invention, as shown in FIG13 , the terminal clamping assembly 53 includes an upper clamping arm 531 and a lower clamping arm 532 , and the upper clamping arm 531 and the lower clamping arm 532 are respectively provided with an upper clamping seat 533 and a lower clamping rod 534 for clamping the terminal.
如图14所示,所述的上夹持座533下端开设有一用于容纳端子的卡槽538,在使用时,端子卡设在卡槽538内,然后通过下夹持杆534夹紧。As shown in FIG. 14 , a slot 538 for accommodating a terminal is provided at the lower end of the upper clamping seat 533 . When in use, the terminal is clamped in the slot 538 and then clamped by the lower clamping rod 534 .
所述的端子上夹臂531通过端子上夹臂滑杆535与设置在上臂摆动滑板525上的滑座滑动连接;The terminal upper clamp arm 531 is slidably connected to a slide seat provided on the upper arm swing slide plate 525 via a terminal upper clamp arm slide bar 535;
所述的端子下夹臂532通过端子下夹臂滑杆536与设置在下臂摆动滑板528上的滑座滑动连接;The terminal lower clamp arm 532 is slidably connected to a slide seat provided on the lower arm swing slide plate 528 via a terminal lower clamp arm slide bar 536;
并且所述的端子下夹臂滑杆536还通过相应的卡座529与倒Y型结构的第三摆臂523的上端连接,所述的端子上夹臂滑杆535上还设置有一用于卡座529相配合的U型卡块537,部分所述的卡座529位于U型卡块537的U型槽内。In addition, the lower clamp arm slide 536 of the terminal is also connected to the upper end of the third swing arm 523 of the inverted Y-shaped structure through the corresponding clamping seat 529, and the upper clamp arm slide 535 of the terminal is also provided with a U-shaped clamping block 537 for matching with the clamping seat 529, and part of the clamping seat 529 is located in the U-shaped groove of the U-shaped clamping block 537.
本实施例通过第一摆臂521与第一凸轮514的相配合,以及通过第二摆臂522与第二凸轮515的相配合,从而控制上夹持座533和下夹持杆534夹紧或者松开端子。另外,通过所述的第三摆臂513与两共轭凸轮516相配合,从而控制上夹持座533和下夹持杆534前后移动,从而实现端子的快速插入。In this embodiment, the upper clamping seat 533 and the lower clamping rod 534 are controlled to clamp or release the terminal by the cooperation of the first swing arm 521 and the first cam 514, and the cooperation of the second swing arm 522 and the second cam 515. In addition, the upper clamping seat 533 and the lower clamping rod 534 are controlled to move forward and backward by the cooperation of the third swing arm 513 and the two conjugate cams 516, so as to achieve rapid insertion of the terminal.
上述实施例和说明书中描述的只是说明本发明的原理和最佳实施例,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。The above embodiments and descriptions are only for illustrating the principles and best embodiments of the present invention. Without departing from the spirit and scope of the present invention, the present invention may be subject to various changes and improvements, all of which fall within the scope of the present invention to be protected.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110267145.8A CN112928578B (en) | 2021-03-11 | 2021-03-11 | Quick insertion equipment for connector terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110267145.8A CN112928578B (en) | 2021-03-11 | 2021-03-11 | Quick insertion equipment for connector terminal |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112928578A CN112928578A (en) | 2021-06-08 |
CN112928578B true CN112928578B (en) | 2024-10-29 |
Family
ID=76172770
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110267145.8A Active CN112928578B (en) | 2021-03-11 | 2021-03-11 | Quick insertion equipment for connector terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112928578B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113809616B (en) * | 2021-09-26 | 2025-05-16 | 深圳市益鸿智能科技有限公司 | Terminal insertion mechanism and connector assembly equipment |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN214849505U (en) * | 2021-03-11 | 2021-11-23 | 富加宜连接器(东莞)有限公司 | Quick insertion equipment for connector terminal |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3262195B2 (en) * | 1995-06-09 | 2002-03-04 | 矢崎総業株式会社 | Terminal insertion method and terminal insertion device into connector housing |
CN210074397U (en) * | 2019-04-18 | 2020-02-14 | 翁翠来 | Automatic end-plugging machine of connector |
CN110875568B (en) * | 2019-12-05 | 2024-04-12 | 苏州艾欧科机器人科技有限公司 | Full-automatic pin inserting machine |
CN111064060B (en) * | 2019-12-06 | 2020-12-15 | 苏州新亚电通有限公司 | Rubber core and fixing piece assembling device of connector |
CN111064061B (en) * | 2019-12-06 | 2020-12-15 | 苏州新亚电通有限公司 | Connector assembling device |
CN112421340B (en) * | 2020-11-20 | 2022-11-18 | 青岛铭毅智能科技有限公司 | Connector terminal bending and pin inserting integrated machine |
-
2021
- 2021-03-11 CN CN202110267145.8A patent/CN112928578B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN214849505U (en) * | 2021-03-11 | 2021-11-23 | 富加宜连接器(东莞)有限公司 | Quick insertion equipment for connector terminal |
Also Published As
Publication number | Publication date |
---|---|
CN112928578A (en) | 2021-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109794748B (en) | A shrapnel assembly machine for a charger plug | |
CN106571255B (en) | Automatic test mechanism that assembles of switch | |
CN206259600U (en) | An Automatic Connector Seat Assembly Machine That Improves Productivity and High Efficiency | |
CN109755842B (en) | Full-automatic production system and production method of power distribution cabinet | |
CN110586516B (en) | Optical fiber wiring terminal and production method thereof | |
CN203775538U (en) | Full-automatic mechanical high-speed pin inserting machine | |
CN105904187A (en) | Multi-station waterproof blind plug automatic insert-in device capable of being fast changed | |
CN112928578B (en) | Quick insertion equipment for connector terminal | |
CN116728078A (en) | A fully automatic assembly machine for finished dual filter switchers | |
CN204761851U (en) | Fully automatic high-speed three-head inserting machine | |
CN112605648A (en) | Automatic motor part assembly production line and production and assembly method thereof | |
CN112114822A (en) | OTP (one time programmable) burning equipment and OTP burning method | |
CN113707496B (en) | ARM push-piece coil assembling equipment | |
CN108512014A (en) | Electronic connector plug terminal assembling machine | |
CN109904704B (en) | Needle clamping mechanism for producing power distribution cabinet connecting terminal and needle clamping method thereof | |
CN110936003A (en) | Welding lug machine for single button cell and welding method thereof | |
CN114310306A (en) | A kind of assembly equipment of multi-contact sensor assembly | |
CN214849505U (en) | Quick insertion equipment for connector terminal | |
CN118720493A (en) | A fully automatic residual heat spring automatic welding machine | |
CN118179991A (en) | Conductivity detection device and application thereof in electronic element packaging | |
CN109787065B (en) | intelligent manufacturing production process of Type-C connector | |
CN215143683U (en) | Quick bending equipment for connector terminal | |
CN211465238U (en) | Automatic assembling equipment for mobile phone motor | |
CN209935095U (en) | A glue-spraying mechanism for an automatic wire-bonding machine for data lines | |
CN221967290U (en) | Automatic equipment of jack catch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |