CN112909971A CN202110080940.6A CN202110080940A CN112909971A CN 112909971 A CN112909971 A CN 112909971A CN 202110080940 A CN202110080940 A CN 202110080940A CN 112909971 A CN112909971 A CN 112909971A
Authority
CN
China
Prior art keywords
alternating current
charging
energy storage
charging pile
distribution cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110080940.6A
Other languages
Chinese (zh)
Other versions
CN112909971B (en
Inventor
石正平
方焱琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Times Nebula Technology Co Ltd
Original Assignee
Fujian Times Nebula Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Times Nebula Technology Co Ltd filed Critical Fujian Times Nebula Technology Co Ltd
Priority to CN202110080940.6A priority Critical patent/CN112909971B/en
Publication of CN112909971A publication Critical patent/CN112909971A/en
Application granted granted Critical
Publication of CN112909971B publication Critical patent/CN112909971B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/50Charging stations characterised by energy-storage or power-generation means
    • B60L53/51Photovoltaic means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/50Charging stations characterised by energy-storage or power-generation means
    • B60L53/53Batteries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/63Monitoring or controlling charging stations in response to network capacity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/66Data transfer between charging stations and vehicles
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/10Flexible AC transmission systems [FACTS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles

Abstract

The invention provides a light storage and charging system and an operation method in the technical field of electric automobiles, wherein the system comprises: an AC distribution cabinet; the old alternating current charging pile is connected with the alternating current power distribution cabinet; the charging pile controller is connected with the alternating current power distribution cabinet and the old alternating current charging pile; at least one new AC charging pile connected with the charging pile controller; the alternating current photovoltaic power generation system is connected with the old alternating current charging pile and the charging pile controller; the energy storage converter is connected with the alternating current power distribution cabinet, the old alternating current charging pile, the charging pile controller and the alternating current photovoltaic power generation system; the battery energy storage system is connected with the energy storage converter; and the energy management system is respectively connected with the alternating current power distribution cabinet, the charging pile controller, the old alternating current charging pile, the new alternating current charging pile, the alternating current photovoltaic power generation system, the energy storage converter and the battery energy storage system. The invention has the advantages that: on the premise of not increasing the pressure of the power distribution network, the output power is greatly improved.

Description

Light storage and charging system and operation method
Technical Field
The invention relates to the technical field of electric automobiles, in particular to a light storage and charging system and an operation method.
Background
Along with the rapid increase of electric automobile stock, electric automobile's the demand of charging is also growing rapidly, and the electric pile quantity that fills in parking area, market, charging station and the residential quarter can't satisfy electric automobile's demand of charging gradually.
If the number of charging piles is further increased in an original site, the pressure of a power distribution network is increased, and meanwhile, the original distribution line needs to be modified; in addition, in areas with dense population and large charging demands, the power distribution capacity of a power grid is limited, the transformation is difficult, and the instability of a local power grid can be caused by simply increasing charging piles; in some old districts, the power distribution capacity of the power grid even reaches the upper limit, and the quantity of the charging piles cannot be increased continuously.
Therefore, how to provide an optical storage and charging system and an operation method thereof to achieve the purpose of improving the output power on the premise of not increasing the pressure of the power distribution network becomes a problem to be solved urgently.
Disclosure of Invention
The invention aims to provide an optical storage and charging system and an operation method thereof, which can improve the output power on the premise of not increasing the pressure of a power distribution network.
In a first aspect, the present invention provides a light charging and storage system comprising:
an AC distribution cabinet;
the old alternating current charging pile is connected with the alternating current power distribution cabinet;
the charging pile controller is connected with the alternating current power distribution cabinet and the old alternating current charging pile;
at least one new AC charging pile connected with the charging pile controller;
the alternating current photovoltaic power generation system is connected with the old alternating current charging pile and the charging pile controller;
the energy storage converter is connected with the alternating current power distribution cabinet, the old alternating current charging pile, the charging pile controller and the alternating current photovoltaic power generation system;
a battery energy storage system connected with the energy storage converter;
and the energy management system is respectively connected with the alternating current power distribution cabinet, the charging pile controller, the old alternating current charging pile, the new alternating current charging pile, the alternating current photovoltaic power generation system, the energy storage converter and the battery energy storage system.
Further, the alternating current photovoltaic power generation system includes:
the photovoltaic controllers are respectively connected with the old traffic charging pile, the charging pile controller and the energy management system;
and the photovoltaic module is connected with the photovoltaic controller.
Further, the battery energy storage system includes:
the BMS is respectively connected with the energy storage converter and the energy management system;
and the lithium iron phosphate batteries are respectively connected with the BMS and the energy storage converter.
Furthermore, the alternating current power distribution cabinet is provided with an alternating current bidirectional metering ammeter.
Further, still include:
a UPS coupled to the energy management system.
In a second aspect, the present invention provides a method for operating a light storage and charging system, comprising the steps of:
step S10, limiting the highest power output by the AC power distribution cabinet by the energy management system;
step S20, each electric automobile is connected with an old traffic charging pile or a new traffic charging pile;
step S30, performing real-time interaction between the old traffic charging pile or the new traffic charging pile and the electric automobile, acquiring charging parameters of the electric automobile and sending the charging parameters to the energy management system;
step S40, the energy management system creates a peak clipping and valley filling strategy, and controls an alternating current power distribution cabinet, an alternating current photovoltaic power generation system or a battery energy storage system to charge the electric automobile based on the peak clipping and valley filling strategy, the charging parameters and the highest power;
and step S50, the energy management system judges that the electric automobile is fully charged, the alternating current photovoltaic power generation system has no energy output and the battery energy storage system reaches the preset SOC based on the charging parameters, and then stops the power output of the alternating current power distribution cabinet, the alternating current photovoltaic power generation system or the battery energy storage system.
Further, the step S10 is specifically:
the energy management system limits the highest power output by the alternating current power distribution cabinet to be the sum of rated powers of all old alternating current charging piles.
Further, in step S30, the charging parameters at least include a maximum allowable total charging voltage of the power battery system, a maximum allowable charging current of the power battery system, a maximum allowable charging voltage of a single cell, a maximum allowable temperature of the single cell, a current voltage of the power battery system, a real-time SOC of the single cell, and a real-time SOC of the power battery system.
Further, the step S40 specifically includes:
step S41, the energy management system creates a peak clipping and valley filling strategy and sets a low electric quantity threshold;
step S42, the energy management system calculates the charging required power of the electric automobile based on the charging parameters;
step S43, the energy management system judges whether the power grid is on-line through the AC power distribution cabinet, if yes, the step S44 is executed; if not, disconnecting the AC power distribution cabinet from the power grid, controlling the AC photovoltaic power generation system and the battery energy storage system to charge the electric automobile based on the charging required power, and entering the step S50;
step S44, the energy management system judges whether the electric quantity of the battery energy storage system is lower than the low electric quantity threshold value, if yes, the step S45 is executed; if not, go to step S46;
step S45, the energy management system judges whether the charging demand power is larger than the output power of the alternating current photovoltaic power generation system, if so, the alternating current photovoltaic power generation system is preferentially utilized to charge the electric automobile, then, based on the peak clipping and valley filling strategy and the highest power, the alternating current power distribution cabinet and the alternating current photovoltaic power generation system are utilized to charge the electric automobile and the battery energy storage system, and the step S50 is carried out; if not, charging the electric automobile and the battery energy storage system by using the alternating current photovoltaic power generation system, and entering the step S50;
step S46, the energy management system judges whether the charging demand power is larger than the sum of the output power of the alternating current photovoltaic power generation system and the output power of the battery energy storage system, if yes, the energy management system charges the electric automobile by using the alternating current power distribution cabinet, the alternating current photovoltaic power generation system and the battery energy storage system in combination with the highest power, and the step S50 is entered; if not, the alternating current photovoltaic power generation system and the battery energy storage system are used for charging the electric automobile, and the process goes to step 50.
Further, in step S40, the peak clipping and valley filling strategy specifically includes:
setting time periods corresponding to the flat time period, the valley time period and the peak time period, judging whether the current time is in the flat time period, the valley time period or the peak time period,
if the time interval is flat, the electric automobile is charged by taking electricity from the power grid through the alternating-current power distribution cabinet, and the battery energy storage system is not charged through the alternating-current power distribution cabinet;
if the valley time period is, charging the electric automobile and the battery energy storage system by taking electricity from the power grid through the alternating-current power distribution cabinet;
if the peak time is the peak time, the alternating current photovoltaic power generation system and the battery energy storage system are preferentially utilized to charge the electric automobile.
The invention has the advantages that:
through setting up AC photovoltaic power generation system, energy storage converter and battery energy storage system, the realization utilizes the light energy to give electric automobile, battery energy storage system charges, the electric energy contravariant in with battery energy storage system through energy storage converter charges for electric automobile, and the peak clipping that establishes through energy management system fills in the valley tactics intelligence charges for battery energy storage system, inject the highest power of AC distribution cabinet output, finally realize under the prerequisite that does not increase electric power distribution network pressure, promote output, need not to carry out the dilatation to the electric wire netting promptly, need not to reform transform the circuit, alright increase the quantity of filling electric pile, and then charge for more electric automobile.
Drawings
The invention will be further described with reference to the following examples with reference to the accompanying drawings.
Fig. 1 is a schematic block circuit diagram of a light charging and storing system according to the present invention.
Fig. 2 is a schematic block circuit diagram of the battery energy storage system of the present invention.
Fig. 3 is a schematic block diagram of the circuit of the use state of the light storage and charging system of the invention.
Fig. 4 is a schematic diagram of the power output of an optical charging system of the present invention.
Fig. 5 is a flow chart of a method of operating a light charging and storage system of the present invention.
Description of the labeling:
100-a light storage and charging system, 1-an alternating current power distribution cabinet, 2-an old alternating current charging pile, 3-a charging pile controller, 4-a new alternating current charging pile, 5-an alternating current photovoltaic power generation system, 6-an energy storage converter, 7-a battery energy storage system, 8-an energy management system, 9-UPS, 10-load, 11-server, 12-electric vehicle, 51-a photovoltaic controller, 52-a photovoltaic module, 71-BMS and 72-a lithium iron phosphate battery.
Detailed Description
The technical scheme in the embodiment of the application has the following general idea: the alternating current photovoltaic power generation system 5 is arranged to convert light energy into electric energy to charge the electric automobile 12; the energy storage converter 6 and the battery energy storage system 7 are arranged, the battery energy storage system 7 is charged when the optical storage charging system 100 is idle, and the electric energy in the battery energy storage system 7 is inverted to charge the electric automobile 12 through the energy storage converter 6 when the electric automobile 12 has a charging requirement; setting a peak clipping and valley filling strategy to balance the peak-valley power of the power grid; the maximum power output by the alternating current power distribution cabinet 1 is limited, and the increase of the pressure of the power distribution network is avoided, so that the output power is improved on the premise of not increasing the pressure of the power distribution network.
Referring to fig. 1 to 5, a solid line represents a high voltage line, and a dashed line represents a communication line, a preferred embodiment of an optical charging and storage system 100 according to the present invention includes:
the alternating current power distribution cabinet 1 is used for accessing a power grid and distributing the power of the power grid to the old alternating current charging pile 2, the new alternating current charging pile 4, the charging pile controller 3, the load 10, the battery energy storage system 7 and the like for use;
the old alternating current charging pile 2 is connected with the alternating current power distribution cabinet 1 and has the functions of electric energy metering and insulation detection;
the charging pile controller 3 is connected with the alternating current power distribution cabinet 1 and the old alternating current charging pile 2 and is used for controlling the output power of the new alternating current charging pile 4, communicating with the electric automobile 12 through the new alternating current charging pile 4, reducing the output power of the new alternating current charging pile 4 when the electric quantity of the battery energy storage system 7 is insufficient and the alternating current photovoltaic power generation system 5 has no energy, and preferentially ensuring the power output of the old alternating current charging pile 2;
the new alternating-current charging pile 4 is connected with the charging pile controller 3 and has the functions of electric energy metering and insulation detection;
an alternating current photovoltaic power generation system 5 connected with the old alternating current charging pile 2 and the charging pile controller 3;
an energy storage converter (PCS)6 connected with the AC power distribution cabinet 1, the old AC charging pile 2, the charging pile controller 3 and the AC photovoltaic power generation system 5; the energy storage converter 6 is used for controlling the charging and discharging of a battery energy storage system 7, and receiving the energy allocation and control protection of the energy management system 8;
the battery energy storage system 7 is connected with the energy storage converter 6 and used for buffering in the energy allocation process, so that the purposes of peak clipping, valley filling, capacity increasing and capacity expanding are achieved, and the pressure of the power distribution capacity of a power grid is relieved;
an Energy Management System (EMS)8, which is respectively connected with the ac power distribution cabinet 1, the charging pile controller 3, the old ac charging pile 2, the new ac charging pile 4, the ac photovoltaic power generation system 5, the energy storage converter 6 and the battery energy storage system 7; the energy management system 8 is used for controlling the operation of the light storage and charging system 100 and uploading the charging data of the electric vehicle 12 to the server 11.
The alternating current photovoltaic power generation system 5 includes:
a photovoltaic controller 51, which is respectively connected with the old traffic charging pile 2, the charging pile controller 3 and the energy management system 8;
and a set of photovoltaic modules 52 connected with the photovoltaic controller 51. The photovoltaic controller 51 has an MPPT power tracking function, and realizes high-efficiency DC/AC conversion, and the DC energy output by the photovoltaic module 52 is converted into a voltage matched with the AC bus, and green energy is stored in the battery energy storage system 7 or directly used for the load 10.
The battery energy storage system 7 includes:
a BMS71 connected to the energy storage converter 6 and the energy management system 8, respectively;
the lithium iron phosphate batteries 72 are respectively connected with the BMS71 and the energy storage converter 6; and the lithium iron phosphate batteries 72 are connected in series and in parallel, and the BMS71 is used for carrying out data acquisition and control protection on the lithium iron phosphate batteries 72.
The ac distribution cabinet 1 is provided with an ac bidirectional metering meter (not shown).
Further comprising:
an UPS (uninterruptible power supply) 9 is connected to the energy management system 8 and is used to ensure uninterrupted operation of the energy management system 8 in the event of a power failure in the grid.
The invention discloses a preferred embodiment of an operation method of a light storage and charging system, which comprises the following steps:
step S10, limiting the highest power output by the AC power distribution cabinet by the energy management system;
step S20, each electric automobile is connected with an old alternating current charging pile or a new alternating current charging pile, an electronic lock is locked to prevent a gun head from falling off, a self-checking stage is started, a low-voltage auxiliary power supply loop is conducted to supply power to a control device of the electric automobile, insulation detection is carried out, and electric energy is input into a discharge loop to discharge energy after the insulation detection is finished;
step S30, performing real-time interaction between the old traffic charging pile or the new traffic charging pile and the electric automobile, acquiring charging parameters of the electric automobile and sending the charging parameters to the energy management system;
step S40, the energy management system creates a peak clipping and valley filling strategy, and controls an alternating current power distribution cabinet, an alternating current photovoltaic power generation system or a battery energy storage system to charge the electric automobile based on the peak clipping and valley filling strategy, the charging parameters and the highest power;
and step S50, the energy management system judges that the electric automobile is fully charged, the alternating current photovoltaic power generation system has no energy output and the battery energy storage system reaches the preset SOC based on the charging parameters, and then stops the power output of the alternating current power distribution cabinet, the alternating current photovoltaic power generation system or the battery energy storage system.
During specific implementation, the energy management system can record the power use condition of each time period, and then optimize power distribution and energy management based on the power use condition, so that the rationality of energy utilization is further improved.
The step S10 specifically includes:
the energy management system limits the highest power output by the alternating current power distribution cabinet to be the sum of rated powers of all old alternating current charging piles.
In step S30, the charging parameters at least include a maximum allowable total charging voltage of the power battery system, a maximum allowable charging current of the power battery system, a maximum allowable charging voltage of a single battery cell, a maximum allowable temperature of the single battery cell, a current voltage of the power battery system, a real-time SOC of the single battery cell, and a real-time SOC of the power battery system.
The step S40 specifically includes:
step S41, the energy management system creates a peak clipping and valley filling strategy and sets a low electric quantity threshold;
step S42, the energy management system calculates the charging required power of the electric automobile based on the charging parameters;
step S43, the energy management system judges whether the power grid is on-line through the AC power distribution cabinet, if yes, the step S44 is executed; if not, disconnecting the AC power distribution cabinet from the power grid, controlling the AC photovoltaic power generation system and the battery energy storage system to charge the electric automobile based on the charging required power, and entering the step S50;
step S44, the energy management system judges whether the electric quantity of the battery energy storage system is lower than the low electric quantity threshold value, if yes, the step S45 is executed; if not, go to step S46;
step S45, the energy management system judges whether the charging demand power is larger than the output power of the alternating current photovoltaic power generation system, if so, the alternating current photovoltaic power generation system is preferentially utilized to charge the electric automobile, then, based on the peak clipping and valley filling strategy and the highest power, the alternating current power distribution cabinet and the alternating current photovoltaic power generation system are utilized to charge the electric automobile and the battery energy storage system, and the step S50 is carried out; if not, charging the electric automobile and the battery energy storage system by using the alternating current photovoltaic power generation system, and entering the step S50;
step S46, the energy management system judges whether the charging demand power is larger than the sum of the output power of the alternating current photovoltaic power generation system and the output power of the battery energy storage system, if yes, the energy management system charges the electric automobile by using the alternating current power distribution cabinet, the alternating current photovoltaic power generation system and the battery energy storage system in combination with the highest power, and the step S50 is entered; if not, the alternating current photovoltaic power generation system and the battery energy storage system are used for charging the electric automobile, and the process goes to step 50.
In step S40, the peak clipping and valley filling strategy specifically includes:
setting time periods corresponding to the flat time period, the valley time period and the peak time period, judging whether the current time is in the flat time period, the valley time period or the peak time period,
if the time interval is flat, the electric automobile is charged by taking electricity from the power grid through the alternating-current power distribution cabinet, and the battery energy storage system is not charged through the alternating-current power distribution cabinet;
if the valley time period is, charging the electric automobile and the battery energy storage system by taking electricity from the power grid through the alternating-current power distribution cabinet;
if the peak time is the peak time, the alternating current photovoltaic power generation system and the battery energy storage system are preferentially utilized to charge the electric automobile.
The application has the following six working modes: 1. normal operation of the satisfaction rate: the method comprises the following steps that (1) an alternating current power distribution cabinet, an alternating current photovoltaic power generation system and a battery energy storage system are formed by an old alternating current charging pile, a new alternating current charging pile and a load; 2. under the condition that the alternating current photovoltaic power generation system has no power: the alternating current power distribution cabinet and the battery energy storage system are the old alternating current charging pile, the new alternating current charging pile and the load; 3. the condition that the charge of the battery energy storage system is lower than the low charge threshold: the alternating current power distribution cabinet and the alternating current photovoltaic power generation system are the old alternating current charging pile, the new alternating current charging pile and the load; 4. the AC power distribution cabinet charges the battery energy storage system: the method comprises the following steps that (1) an alternating current power distribution cabinet is composed of a battery energy storage system, an old alternating current charging pile, a new alternating current charging pile and a load; 5. the AC power distribution cabinet and the AC photovoltaic power generation system charge the battery energy storage system: the alternating current power distribution cabinet and the alternating current photovoltaic power generation system are a battery energy storage system, an old alternating current charging pile, a new alternating current charging pile and a load; 6. the alternating current photovoltaic power generation system and the battery energy storage system supply power to the charging pile: alternating current photovoltaic power generation system + battery energy storage system is the electric pile of old exchange + electric pile + load of new exchange.
In summary, the invention has the advantages that:
through setting up AC photovoltaic power generation system, energy storage converter and battery energy storage system, the realization utilizes the light energy to give electric automobile, battery energy storage system charges, the electric energy contravariant in with battery energy storage system through energy storage converter charges for electric automobile, and the peak clipping that establishes through energy management system fills in the valley tactics intelligence charges for battery energy storage system, inject the highest power of AC distribution cabinet output, finally realize under the prerequisite that does not increase electric power distribution network pressure, promote output, need not to carry out the dilatation to the electric wire netting promptly, need not to reform transform the circuit, alright increase the quantity of filling electric pile, and then charge for more electric automobile.
Although specific embodiments of the invention have been described above, it will be understood by those skilled in the art that the specific embodiments described are illustrative only and are not limiting upon the scope of the invention, and that equivalent modifications and variations can be made by those skilled in the art without departing from the spirit of the invention, which is to be limited only by the appended claims.

Claims (10)

1. A light charging and storage system, comprising: the method comprises the following steps:
an AC distribution cabinet;
the old alternating current charging pile is connected with the alternating current power distribution cabinet;
the charging pile controller is connected with the alternating current power distribution cabinet and the old alternating current charging pile;
at least one new AC charging pile connected with the charging pile controller;
the alternating current photovoltaic power generation system is connected with the old alternating current charging pile and the charging pile controller;
the energy storage converter is connected with the alternating current power distribution cabinet, the old alternating current charging pile, the charging pile controller and the alternating current photovoltaic power generation system;
a battery energy storage system connected with the energy storage converter;
and the energy management system is respectively connected with the alternating current power distribution cabinet, the charging pile controller, the old alternating current charging pile, the new alternating current charging pile, the alternating current photovoltaic power generation system, the energy storage converter and the battery energy storage system.
2. A light charging system as claimed in claim 1, wherein: the alternating current photovoltaic power generation system includes:
the photovoltaic controller is respectively connected with the old traffic charging pile, the charging pile controller and the energy management system;
and the set of photovoltaic modules is connected with the photovoltaic controller.
3. A light charging system as claimed in claim 1, wherein: the battery energy storage system includes:
the BMS is respectively connected with the energy storage converter and the energy management system;
and the lithium iron phosphate batteries are respectively connected with the BMS and the energy storage converter.
4. A light charging system as claimed in claim 1, wherein: the alternating current power distribution cabinet is provided with an alternating current bidirectional metering ammeter.
5. A light charging system as claimed in claim 1, wherein: further comprising:
a UPS coupled to the energy management system.
6. A method of operating a light storage and charging system, comprising: the method entails using a light charging and storage system as claimed in any one of claims 1 to 5, comprising the steps of:
step S10, limiting the highest power output by the AC power distribution cabinet by the energy management system;
step S20, each electric automobile is connected with an old traffic charging pile or a new traffic charging pile;
step S30, performing real-time interaction between the old traffic charging pile or the new traffic charging pile and the electric automobile, acquiring charging parameters of the electric automobile and sending the charging parameters to the energy management system;
step S40, the energy management system creates a peak clipping and valley filling strategy, and controls an alternating current power distribution cabinet, an alternating current photovoltaic power generation system or a battery energy storage system to charge the electric automobile based on the peak clipping and valley filling strategy, the charging parameters and the highest power;
and step S50, the energy management system judges that the electric automobile is fully charged, the alternating current photovoltaic power generation system has no energy output and the battery energy storage system reaches the preset SOC based on the charging parameters, and then stops the power output of the alternating current power distribution cabinet, the alternating current photovoltaic power generation system or the battery energy storage system.
7. A method of operating a light storage and charging system as claimed in claim 6, characterized by: the step S10 specifically includes:
the energy management system limits the highest power output by the alternating current power distribution cabinet to be the sum of rated powers of all old alternating current charging piles.
8. A method of operating a light storage and charging system as claimed in claim 6, characterized by: in step S30, the charging parameters at least include a maximum allowable total charging voltage of the power battery system, a maximum allowable charging current of the power battery system, a maximum allowable charging voltage of a single battery cell, a maximum allowable temperature of the single battery cell, a current voltage of the power battery system, a real-time SOC of the single battery cell, and a real-time SOC of the power battery system.
9. A method of operating a light storage and charging system as claimed in claim 6, characterized by: the step S40 specifically includes:
step S41, the energy management system creates a peak clipping and valley filling strategy and sets a low electric quantity threshold;
step S42, the energy management system calculates the charging required power of the electric automobile based on the charging parameters;
step S43, the energy management system judges whether the power grid is on-line through the AC power distribution cabinet, if yes, the step S44 is executed; if not, disconnecting the AC power distribution cabinet from the power grid, controlling the AC photovoltaic power generation system and the battery energy storage system to charge the electric automobile based on the charging required power, and entering the step S50;
step S44, the energy management system judges whether the electric quantity of the battery energy storage system is lower than the low electric quantity threshold value, if yes, the step S45 is executed; if not, go to step S46;
step S45, the energy management system judges whether the charging demand power is larger than the output power of the alternating current photovoltaic power generation system, if so, the alternating current photovoltaic power generation system is preferentially utilized to charge the electric automobile, then, based on the peak clipping and valley filling strategy and the highest power, the alternating current power distribution cabinet and the alternating current photovoltaic power generation system are utilized to charge the electric automobile and the battery energy storage system, and the step S50 is carried out; if not, charging the electric automobile and the battery energy storage system by using the alternating current photovoltaic power generation system, and entering the step S50;
step S46, the energy management system judges whether the charging demand power is larger than the sum of the output power of the alternating current photovoltaic power generation system and the output power of the battery energy storage system, if yes, the energy management system charges the electric automobile by using the alternating current power distribution cabinet, the alternating current photovoltaic power generation system and the battery energy storage system in combination with the highest power, and the step S50 is entered; if not, the alternating current photovoltaic power generation system and the battery energy storage system are used for charging the electric automobile, and the process goes to step 50.
10. A method of operating a light storage and charging system as claimed in claim 6, characterized by: in step S40, the peak clipping and valley filling strategy specifically includes:
setting time periods corresponding to the flat time period, the valley time period and the peak time period, judging whether the current time is in the flat time period, the valley time period or the peak time period,
if the time interval is flat, the electric automobile is charged by taking electricity from the power grid through the alternating-current power distribution cabinet, and the battery energy storage system is not charged through the alternating-current power distribution cabinet;
if the valley time period is, charging the electric automobile and the battery energy storage system by taking electricity from the power grid through the alternating-current power distribution cabinet;
if the peak time is the peak time, the alternating current photovoltaic power generation system and the battery energy storage system are preferentially utilized to charge the electric automobile.
CN202110080940.6A 2021-01-21 2021-01-21 Optical storage and filling system and operation method Active CN112909971B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110080940.6A CN112909971B (en) 2021-01-21 2021-01-21 Optical storage and filling system and operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110080940.6A CN112909971B (en) 2021-01-21 2021-01-21 Optical storage and filling system and operation method

Publications (2)

Publication Number Publication Date
CN112909971A true CN112909971A (en) 2021-06-04
CN112909971B CN112909971B (en) 2024-04-05

Family

ID=76117880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110080940.6A Active CN112909971B (en) 2021-01-21 2021-01-21 Optical storage and filling system and operation method

Country Status (1)

Country Link
CN (1) CN112909971B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113547946A (en) * 2021-07-05 2021-10-26 宁波三星智能电气有限公司 Charging control method of energy storage type charging pile
CN113568307A (en) * 2021-07-02 2021-10-29 福建时代星云科技有限公司 Control strategy optimization method for storage and charging station and terminal
CN115107550A (en) * 2022-07-11 2022-09-27 上海快卜新能源科技有限公司 Charging control system of energy storage charging station and charging method thereof
CN116683600A (en) * 2023-03-14 2023-09-01 深圳博浩远科技有限公司 Hybrid power supply optical storage and charging system and control method thereof
CN116819355A (en) * 2023-04-28 2023-09-29 广东恒翼能科技股份有限公司 Energy-saving test system for direct-current bus of micro-grid at rear section of battery cell

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207542817U (en) * 2017-11-03 2018-06-26 阳光电源股份有限公司 A kind of photovoltaic generation charging station
CN212373182U (en) * 2020-03-31 2021-01-19 福建时代星云科技有限公司 Light storage charging detection system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207542817U (en) * 2017-11-03 2018-06-26 阳光电源股份有限公司 A kind of photovoltaic generation charging station
CN212373182U (en) * 2020-03-31 2021-01-19 福建时代星云科技有限公司 Light storage charging detection system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113568307A (en) * 2021-07-02 2021-10-29 福建时代星云科技有限公司 Control strategy optimization method for storage and charging station and terminal
CN113568307B (en) * 2021-07-02 2022-04-01 福建时代星云科技有限公司 Control strategy optimization method for storage and charging station and terminal
WO2023272957A1 (en) * 2021-07-02 2023-01-05 福建时代星云科技有限公司 Control policy optimization method and terminal for storage and charging station
CN113547946A (en) * 2021-07-05 2021-10-26 宁波三星智能电气有限公司 Charging control method of energy storage type charging pile
CN113547946B (en) * 2021-07-05 2023-08-01 宁波三星智能电气有限公司 Charging control method for energy storage type charging pile
CN115107550A (en) * 2022-07-11 2022-09-27 上海快卜新能源科技有限公司 Charging control system of energy storage charging station and charging method thereof
CN116683600A (en) * 2023-03-14 2023-09-01 深圳博浩远科技有限公司 Hybrid power supply optical storage and charging system and control method thereof
CN116819355A (en) * 2023-04-28 2023-09-29 广东恒翼能科技股份有限公司 Energy-saving test system for direct-current bus of micro-grid at rear section of battery cell

Also Published As

Publication number Publication date
CN112909971B (en) 2024-04-05

Similar Documents

Publication Publication Date Title
CN112909971B (en) Optical storage and filling system and operation method
CN105846418B (en) A kind of isolated island type micro-capacitance sensor Real-Time Scheduling Energy Management System
WO2011162025A1 (en) Dc power distribution system
CN113794216B (en) Parameter configuration method and terminal of optical storage and charging system
CN112519620B (en) Flexible charging system for electric automobile and control method
CN102738836A (en) Alternating current and direct current hybrid micro power grid system and control method thereof
CN110783938B (en) Electric automobile charging system and method with energy storage function
EP3627648A1 (en) Hybrid energy storage system
CN109842139B (en) Micro-grid expansion planning method containing mobile energy storage
CN109768561A (en) A kind of Control of Electric Vehicles method and system
CN105141000A (en) Electric vehicle charging/discharging control method
CN113610374A (en) Wind-solar complementary power plan deviation dynamic compensation energy storage energy management method
Amir et al. Integration of EVs aggregator with microgrid and impact of V2G power on peak regulation
CN116780588A (en) Method of controlling a battery energy storage system of an electrical power system with a high dynamic load
CN111231713A (en) Electric automobile charging and discharging system and control method
CN113644675A (en) Peak clipping and valley filling control method for 5G base station optical storage power supply
CN214154033U (en) Intelligent charging system
CN112653164A (en) Multi-station integrated energy storage system
Nakamura et al. Green base station using robust solar system and high performance lithium ion battery for next generation wireless network (5G) and against mega disaster
CN110165686B (en) Charging device for electric automobile
EP4020743A1 (en) Power management system, server, and power supply and demand adjustment method
CN115378003A (en) Electric energy scheduling method
CN215322084U (en) Energy storage type direct current charging pile
CN212098472U (en) Photovoltaic energy storage charging station system
CN210838986U (en) Bidirectional DCDC high-voltage charging and discharging energy control management system for communication battery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant