CN112909871B - High-voltage overhead line electric cross arm - Google Patents
High-voltage overhead line electric cross arm Download PDFInfo
- Publication number
- CN112909871B CN112909871B CN202110075359.5A CN202110075359A CN112909871B CN 112909871 B CN112909871 B CN 112909871B CN 202110075359 A CN202110075359 A CN 202110075359A CN 112909871 B CN112909871 B CN 112909871B
- Authority
- CN
- China
- Prior art keywords
- positioning
- shifting
- sliding
- clamping
- slide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/10—Truss-like structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/18—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/24—Cross arms
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/05—Suspension arrangements or devices for electric cables or lines
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/20—Spatial arrangements or dispositions of lines or cables on poles, posts or towers
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Insulators (AREA)
Abstract
本发明提供了一种高压架空线路电力横担,包括安装架、绝缘子、移位滑槽、卡接转轴、卡接转杆、卡接滑块、卡接弹簧、移位机构、定位机构、支撑座和支撑弹簧,本发明解决了目前的高压架空线路电力横担往往采用单一的钢结构桁架进行组装拼接而成,难以根据实际的安装的线束规格调整绝缘子之间的间隔距离,使其保持一定的安全距离,而且电力横担在安装固定时常处于高空作业,且需要进行拼装固定的支撑架数量较多,增加了工人安装作业的作业强度以及作业量,而且电力横担上的绝缘子一般为固定安装,在损坏需更换时需借助专用的拆卸工具,人工作业量大,难以提升绝缘子拆卸安装作业的作业效率等问题。
The invention provides a power crossarm for high-voltage overhead lines, which includes a mounting frame, an insulator, a shifting chute, a clamping shaft, a clamping rod, a clamping slider, a clamping spring, a displacement mechanism, a positioning mechanism, a support seat and support spring, the present invention solves the problem that the current high-voltage overhead line power cross-arm is often assembled and spliced by a single steel structure truss, and it is difficult to adjust the distance between the insulators according to the actual installed wiring harness specifications to keep it constant The safe distance, and the power cross-arm is often in high-altitude operation when it is installed and fixed, and the number of support frames that need to be assembled and fixed increases, which increases the work intensity and workload of the workers' installation work, and the insulators on the power cross-arm are generally fixed. Installation requires the use of special disassembly tools when it is damaged and needs to be replaced. The manual workload is large, and it is difficult to improve the work efficiency of insulator disassembly and installation operations.
Description
技术领域technical field
本发明涉及电力横担技术领域,特别涉及一种高压架空线路电力横担。The invention relates to the technical field of electric power cross-arms, in particular to a power cross-arm for high-voltage overhead lines.
背景技术Background technique
电力横担是杆塔中重要的组成部分,电力横担是在电线杆顶部横向固定的角铁,上面有瓷瓶,是用来安装绝缘子及金具,以支承导线、避雷线,并使之按规定保持一定的安全距离。The power cross arm is an important part of the pole tower. The power cross arm is an angle iron fixed horizontally on the top of the utility pole. There is a porcelain bottle on it, which is used to install insulators and fittings to support the wires and lightning conductors and keep them in accordance with regulations. A certain safe distance.
目前的高压架空线路电力横担往往采用单一的钢结构桁架进行组装拼接而成,组装拼接成型后的的高压架空线路电力横担多为固定结构,难以根据实际的安装的线束规格调整绝缘子之间的间隔距离,使其保持一定的安全距离,而且电力横担在安装固定时常处于高空作业,且需要进行拼装固定的支撑架数量较多,增加了工人安装作业的作业强度以及作业量,而且电力横担上的绝缘子一般为固定安装,在损坏需更换时需借助专用的拆卸工具,人工作业量大,难以提升绝缘子拆卸安装作业的作业效率。The current power cross-arms of high-voltage overhead lines are often assembled and spliced by a single steel structure truss. After assembly and splicing, the power cross-arms of high-voltage overhead lines are mostly fixed structures, and it is difficult to adjust the distance between insulators according to the actual wiring harness specifications. The distance between them keeps a certain safe distance, and the power cross-arm is often operated at high altitude when it is installed and fixed, and the number of support frames that need to be assembled and fixed is large, which increases the work intensity and workload of workers' installation operations, and the electric power The insulators on the cross-arm are generally installed fixedly. When they are damaged and need to be replaced, special disassembly tools are required. The manual workload is large, and it is difficult to improve the efficiency of disassembly and installation of insulators.
为了提高高压架空线路电力横担的适用性,保证高压架空线路电力横担安装位置的多样性;本发明提供了一种高压架空线路电力横担。In order to improve the applicability of the power cross-arm of the high-voltage overhead line and ensure the diversity of installation positions of the power cross-arm of the high-voltage overhead line; the invention provides a power cross-arm of the high-voltage overhead line.
发明内容Contents of the invention
为了实现上述目的,本发明采用以下技术方案,一种高压架空线路电力横担,包括安装架、绝缘子、移位滑槽、卡接转轴、卡接转杆、卡接滑块、卡接弹簧、移位机构、定位机构、支撑座和支撑弹簧,安装架的侧壁上左右对称均匀开设有移位滑槽,移位滑槽内通过滑动配合安装有移位机构,移位机构上通过滑动配合均匀安装有绝缘子,移位机构内安装有定位机构,且定位机构与绝缘子卡接配合,安装架的内侧壁通过转动配合左右对称安装有卡接转轴,卡接转轴上安装有通过花键均匀安装有卡接转杆,卡接转杆内通过滑动配合对称安装有卡接滑块,卡接滑块与卡接转杆之间通过卡接弹簧相连接且卡接滑块通过滑动配合抵靠在对侧安装的卡接转轴的侧壁上,位于卡接转杆内侧的安装架上通过转动配合左右对称安装有支撑座,且支撑座与安装架之间通过支撑弹簧相连接,通过卡接弹簧的弹力作用使位于卡接转杆内的卡接滑块与对侧的卡接转轴互相卡接,以此实现对称安装在电杆两侧的安装架互相卡接,实现安装架与电杆之间的初步抱紧定位,设置的支撑弹簧可通过自身弹力使位于电杆四周的支撑座紧密贴合在电杆的侧壁上,通过辅助支撑作用使电杆位于安装架的居中位置,设置于卡接转杆上的橡胶层可适应电杆直径的渐变作用,进一步提升对称安装的卡接转杆对于电杆夹持的稳定性。In order to achieve the above object, the present invention adopts the following technical solutions, a high-voltage overhead line power cross arm, including a mounting frame, an insulator, a shift chute, a snap-in rotating shaft, a snap-in rotating rod, a snap-in slider, a snap-in spring, Shifting mechanism, positioning mechanism, support seat and supporting spring, the side wall of the mounting frame is symmetrically and uniformly provided with shifting chute, the shifting chute is equipped with a shifting mechanism through sliding fit, and the shifting mechanism is fitted through sliding fit The insulator is evenly installed, and the positioning mechanism is installed in the shifting mechanism, and the positioning mechanism is snapped and matched with the insulator. There is a clamping rotating rod, and a clamping slider is symmetrically installed in the clamping rotating rod through a sliding fit. The clamping slider and the clamping rotating rod are connected by a clamping spring, and the clamping slider leans against the On the side wall of the clamping rotating shaft installed on the opposite side, the mounting frame located on the inside of the clamping rotating rod is installed with a support base symmetrically through rotation and left and right, and the support base and the mounting frame are connected by a support spring, and the clamping spring The elastic force makes the snap-in slider located in the snap-in rotating rod and the snap-in rotating shaft on the opposite side snap into each other, so as to realize the snap-fitting of the mounting frames symmetrically installed on both sides of the pole, and realize the connection between the mounting frame and the pole. Preliminary tight positioning between the poles, the set support spring can make the support seat located around the pole closely fit on the side wall of the pole through its own elastic force, and the pole is located in the center of the installation frame through the auxiliary support function, and is set on the The rubber layer on the clamping rotating rod can adapt to the gradual change of the diameter of the electric pole, further improving the stability of the symmetrically installed clamping rotating rod for the clamping of the electric pole.
所述的移位机构包括移位滑座、移位弹簧、连接杆、移位齿条、移位齿轮、移位转轴、限位滑筒、限位滑块、限位滑座、限位滑槽、限位弹簧、限位滑杆和旋钮,移位滑槽内通过滑动配合均匀安装有移位滑座,移位滑座与安装架之间通过移位弹簧相连接,且位于移位滑槽内的第一移位滑座与第三移位滑座以及第二移位滑座与第四移位滑座之间分别通过连接杆连接传动,位于电杆单侧安装架内的连接杆数量为二,且连接杆的内侧壁对称安装有移位齿条,位于移位齿条内侧的安装架内通过转动配合安装有移位转轴,移位转轴的下端通过花键安装有移位齿轮,且移位齿轮分别与两侧的移位齿条啮合传动,位于移位转轴上端的安装架内安装有限位滑座、且限位滑座位于移位转轴的外侧,位于限位滑座上方的安装架内通过滑动配合安装有限位滑杆,限位滑杆的上端安装有旋钮,限位滑杆的下端安装有限位滑筒,且位于限位滑筒与安装架之间的限位滑杆上套设有限位弹簧,移位转轴的上端位于限位滑筒内且限位滑筒与移位转轴通过滑动配合相连接,限位滑筒的外侧壁均匀设置有限位滑块,限位滑座上沿其周向均匀开设有限位滑槽,通过连接杆的两端与间隔分布的移位滑座相连接,故通过对称安装在移位齿轮两侧的连接杆的相对运动可进一步带动位于电杆两侧的移位滑座进行相对移动,进一步调整均匀安装在安装架上的移位滑座之间的间隔距离,进一步带动绝缘子进行移动到合适的距离,使其间隔一定的距离,以此适应不同线束安装作业时所要求的的不同间隔安全距离。The displacement mechanism includes a displacement slide seat, a displacement spring, a connecting rod, a displacement rack, a displacement gear, a displacement rotating shaft, a limit slide cylinder, a limit slide block, a limit slide seat, a limit slide Groove, limit spring, limit slide rod and knob. The shift slide seat is evenly installed in the shift chute through sliding fit. The shift slide seat and the mounting frame are connected by a shift spring and located The first shifting slide seat and the third shifting slide seat and the second shifting slide seat and the fourth shifting slide seat in the groove are respectively connected and driven by connecting rods, and the connecting rods located in the mounting frame on one side of the electric pole The number is two, and the inner wall of the connecting rod is symmetrically installed with a shifting rack, and the shifting shaft is installed in the mounting frame inside the shifting rack through rotation, and the lower end of the shifting shaft is installed with a shifting gear through a spline , and the shifting gears are respectively engaged with the shifting racks on both sides for transmission, and the limit slide seat is installed in the mounting frame at the upper end of the shift shaft, and the limit slide seat is located outside the shift shaft and above the limit slide seat The limit slide bar is installed in the installation frame by sliding fit, the upper end of the limit slide bar is installed with a knob, the lower end of the limit slide bar is installed with a limit slide tube, and the limit slide bar located between the limit slide tube and the installation frame A limit spring is set on the rod, the upper end of the displacement shaft is located in the limit slider and the limit slider and the shift shaft are connected by sliding fit, and the outer wall of the limit slider is uniformly equipped with a limit slider, and the limit A limited chute is evenly set up on the sliding seat along its circumferential direction, and the two ends of the connecting rod are connected with the shifting sliding seats distributed at intervals, so the relative movement of the connecting rods symmetrically installed on both sides of the shifting gear can be further driven. The shifting slides located on both sides of the pole move relatively to further adjust the distance between the shifting slides evenly installed on the mounting frame, and further drive the insulators to move to a suitable distance so that they are separated by a certain distance. In order to adapt to the different safety distances required for different wire harness installation operations.
所述的定位机构包括定位转筒、定位滑筒、固定杆、复位弹簧、定位连杆、连接滑槽、定位座、定位滑块、定位弹簧、定位转盘、定位滑槽、卡接滑杆和卡接滑槽,移位滑座的内侧均匀安装有定位转筒,定位转筒的下端中部安装有固定杆,固定杆上通过滑动配合安装有定位滑筒,且定位滑筒与定位转筒之间通过复位弹簧相连接,定位滑筒的外侧壁沿其周向通过转动配合均匀安装有定位连杆,定位转筒的侧壁上沿其周向均匀开设有连接滑槽,定位连杆的中部位于连接滑槽内且定位连杆与定位转筒滑动配合,位于连接滑槽上方的定位转筒上通过转动配合均匀安装有定位座,定位座的下端与定位连杆之间通过转动配合相连接,定位座的上端通过滑动配合均匀安装有定位滑块,且定位滑块与定位座之间通过定位弹簧相连接,绝缘子的下端安装有定位转盘,定位转盘的侧壁上沿其周向均匀开设有定位滑槽,定位滑块的下端通过滑动配合抵靠在定位滑槽的内侧壁上,位于定位转盘下方的绝缘子外壁沿其周向均匀开设有卡接滑槽,位于绝缘子外侧的定位滑筒上均匀安装有卡接滑杆设置的定位弹簧可通过自身弹力作用使定位滑块与定位滑槽互相卡接,实现对定位转盘的夹持定位作业,进一步实现对绝缘子的定位作业,在绝缘子转动的过程中,进一步通过绝缘子下端的T字形卡接滑槽与卡接滑杆之间的滑动卡接配合实现对绝缘子高度位置的卡接定位。The positioning mechanism includes a positioning drum, a positioning slide, a fixed rod, a return spring, a positioning connecting rod, a connecting chute, a positioning seat, a positioning slider, a positioning spring, a positioning dial, a positioning chute, a clamping slide bar and The clamping chute, the inner side of the shifting slide seat is evenly installed with a positioning drum, the middle part of the lower end of the positioning drum is installed with a fixed rod, and the positioning slider is installed on the fixed rod through sliding fit, and the position between the positioning slider and the positioning drum The outer wall of the positioning slide cylinder is evenly installed with a positioning connecting rod through rotation and fit along its circumferential direction, and the side wall of the positioning drum is uniformly provided with a connecting chute along its circumferential direction, and the middle part of the positioning connecting rod It is located in the connecting chute and the positioning connecting rod is slidingly matched with the positioning drum, and the positioning drum located above the connecting chute is evenly installed with a positioning seat through rotation fit, and the lower end of the positioning seat is connected with the positioning connecting rod through rotating fit , the upper end of the positioning seat is evenly installed with a positioning slider through sliding fit, and the positioning slider and the positioning seat are connected by a positioning spring. The lower end of the insulator is equipped with a positioning turntable, and the side wall of the positioning turntable is uniformly opened There is a positioning chute, and the lower end of the positioning slider abuts against the inner side wall of the positioning chute through sliding fit. The outer wall of the insulator located under the positioning turntable is uniformly provided with a clamping chute along its circumference, and the positioning sliding cylinder located outside the insulator The positioning springs evenly installed with clamping slide rods can make the positioning slider and the positioning chute engage with each other through their own elastic force, so as to realize the clamping and positioning operation of the positioning turntable, and further realize the positioning operation of the insulator. During the process, the clamping and positioning of the height position of the insulator is further realized through the sliding and clamping cooperation between the T-shaped clamping chute at the lower end of the insulator and the clamping slide bar.
优选的,所述的安装架数量为二,且安装架对称安装在电杆的两侧,位于电杆两侧安装架上的卡接转杆为上下错位安装,且卡接转杆的内侧壁设置有与电杆外壁弯曲度相配合的橡胶层。Preferably, the number of the installation racks is two, and the installation racks are symmetrically installed on both sides of the electric pole, and the clamping rotating rods on the mounting racks on both sides of the electric pole are installed in an up and down dislocation, and the inner wall of the clamping rotating rod A rubber layer matching the curvature of the outer wall of the electric pole is provided.
优选的,所述的移位转轴上端截面为正六边形结构,且限位滑筒为正六边形滑筒,移位转轴的上端位于限位滑筒内且移位转轴与限位滑筒滑动配合。Preferably, the cross-section of the upper end of the shift shaft is a regular hexagonal structure, and the limit slider is a regular hexagon slider, the upper end of the shift shaft is located in the limit slider and the shift shaft and the limit slider slide Cooperate.
优选的,所述的限位滑座上端沿其周向均匀开设有限位滑槽,限位滑筒位于限位滑槽的内侧且限位滑块与限位滑槽滑动卡接配合。Preferably, the upper end of the limit sliding seat is evenly provided with a limit chute along its circumference, the limit slide is located inside the limit chute, and the limit slider is slidably engaged with the limit chute.
优选的,所述的卡接滑槽为沿绝缘子的下端侧壁周向均匀设置,且卡接滑槽为T字形滑槽,卡接滑杆的端部位于卡接滑槽内且卡接滑杆与绝缘子滑动配合。Preferably, the clamping chute is evenly arranged along the circumference of the lower end side wall of the insulator, and the clamping chute is a T-shaped chute, the end of the clamping slide bar is located in the clamping chute and the clamping slide The rod is a sliding fit with the insulator.
优选的,所述的连接滑槽直径宽度大于定位连杆的直径宽度,定位连杆在沿着连接滑槽进行滑动的同时可同步进行自由转动。Preferably, the diameter width of the connecting chute is greater than that of the positioning link, and the positioning link can freely rotate synchronously while sliding along the connecting chute.
本发明的有益效果是:The beneficial effects of the present invention are:
一、本发明人工通过卡接弹簧的弹力作用使位于卡接转杆内的卡接滑块与对侧的卡接转轴互相卡接,以此实现对称安装在电杆两侧的安装架互相卡接,实现安装架与电杆之间的初步抱紧定位,设置的支撑弹簧可通过自身弹力使位于电杆四周的支撑座紧密贴合在电杆的侧壁上,通过辅助支撑作用使电杆位于安装架的居中位置,设置于卡接转杆上的橡胶层可适应电杆直径的渐变作用,进一步提升对称安装的卡接转杆对于电杆夹持的稳定性,减少人工在进行安装架后期固定作业时扶持作业的作业量,提升安装架安装固定作业的作业效率。1. The present invention manually engages the snap-in slider located in the snap-in rotating rod with the snap-in rotating shaft on the opposite side through the elastic force of the snap-in spring, so as to realize mutual snapping of the mounting frames symmetrically installed on both sides of the electric pole Connect to realize the initial tight positioning between the installation frame and the pole. The set support spring can make the support seat located around the pole closely fit on the side wall of the pole through its own elastic force, and make the pole Located in the center of the installation frame, the rubber layer set on the clamping rod can adapt to the gradual change of the diameter of the pole, further improving the stability of the symmetrically installed clamping rod for the clamping of the pole, and reducing manual installation. The workload of supporting work during the later fixing work improves the work efficiency of the installation and fixing work of the installation frame.
二、本发明移位机构通过截面形状均为正六边形设置的限位滑筒与移位转轴之间的滑动配合,可实现限位滑杆与移位齿轮之间的传动连接配合,通过限位滑块与限位滑槽之间的卡接配合可实现对移位齿轮的锁定效果,通过连接杆的两端与间隔分布的移位滑座相连接,故通过对称安装在移位齿轮两侧的连接杆的相对运动可进一步带动位于电杆两侧的移位滑座进行相对移动,进一步调整均匀安装在安装架上的移位滑座之间的间隔距离,进一步带动绝缘子进行移动到合适的距离,使其间隔一定的距离,以此适应不同线束安装作业时所要求的的不同间隔安全距离。2. The shifting mechanism of the present invention can realize the transmission connection and cooperation between the limiting slide bar and the shifting gear through the sliding cooperation between the limiting sliding cylinder and the shifting shaft whose cross-sectional shape is regular hexagonal. The snap fit between the position slider and the limit chute can realize the locking effect on the shift gear, and the two ends of the connecting rod are connected with the shift slide seats distributed at intervals, so it is symmetrically installed on both sides of the shift gear. The relative movement of the connecting rod on the side can further drive the shifting slides located on both sides of the pole to move relatively, further adjust the distance between the shifting slides evenly installed on the mounting frame, and further drive the insulators to move to a suitable position. The distance, so that it is separated by a certain distance, so as to adapt to the different safety distances required for different wiring harness installation operations.
三、本发明定位机构通过人工将绝缘子沿着移位滑座的上端侧壁向定位转筒内进行安装,在安装的过程中,绝缘子的下端进一步通过抵靠作用推动定位滑筒沿着固定杆向下进行滑动,进一步通过铰接传动在带动定位连杆向下移动的同时同步沿着连接滑槽向外侧滑动,进一步通过铰接配合推动定位座进行转动,使定位座的上端抵靠到定位转盘的侧壁上,之后,通过人工将绝缘子转动一定的角度,在绝缘子转动的过程中,定位滑块进一步通过滑动作用滑落到定位滑槽内,设置的定位弹簧可通过自身弹力作用使定位滑块与定位滑槽互相卡接,实现对定位转盘的夹持定位作业,进一步实现对绝缘子的定位作业,在绝缘子转动的过程中,进一步通过绝缘子下端的T字形卡接滑槽与卡接滑杆之间的滑动卡接配合实现对绝缘子高度位置的卡接定位,通过活动卡接安装的绝缘子可进一步提升后期维护更换作业作业的作业效率。3. The positioning mechanism of the present invention manually installs the insulator into the positioning drum along the upper side wall of the shifting slide seat. During the installation process, the lower end of the insulator further pushes the positioning slide along the fixed rod through the abutting action. Sliding downward, further driving the positioning connecting rod to move downward through the hinge transmission, and synchronously sliding outward along the connecting chute, and further pushing the positioning seat to rotate through the hinge cooperation, so that the upper end of the positioning seat abuts against the position of the positioning turntable On the side wall, after that, the insulator is manually rotated at a certain angle. During the rotation of the insulator, the positioning slider further slides down into the positioning chute through sliding action. The positioning chute is clamped with each other to realize the clamping and positioning operation of the positioning turntable, and further realize the positioning operation of the insulator. During the rotation of the insulator, it is further passed between the T-shaped clamping chute at the lower end of the insulator and the clamping slide bar. The sliding clamping fit realizes the positioning of the height position of the insulator, and the insulators installed through the movable clamping can further improve the operating efficiency of the later maintenance and replacement operations.
附图说明Description of drawings
下面结合附图和实施例对本发明进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
图1是本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2是本发明图1的第一剖视示意图;Fig. 2 is the first sectional schematic diagram of Fig. 1 of the present invention;
图3是本发明图1的第二剖视示意图;Fig. 3 is the second sectional schematic diagram of Fig. 1 of the present invention;
图4是本发明图2的A处局部放大示意图;Fig. 4 is a partial enlarged schematic diagram of A place in Fig. 2 of the present invention;
图5是本发明移位机构的局部立体结的示意图;Fig. 5 is the schematic diagram of the partial three-dimensional junction of the displacement mechanism of the present invention;
图6是本发明定位机构的局部立体结的示意图。Fig. 6 is a schematic diagram of a partial three-dimensional junction of the positioning mechanism of the present invention.
具体实施方式Detailed ways
下面参考附图对本发明的实施例进行说明。在此过程中,为确保说明的明确性和便利性,我们可能对图示中线条的宽度或构成要素的大小进行夸张的标示。Embodiments of the present invention will be described below with reference to the drawings. In the process, in order to ensure the clarity and convenience of illustration, we may exaggerate the width of the lines or the size of the constituent elements in the diagram.
另外,下文中的用语基于本发明中的功能而定义,可以根据使用者、运用者的意图或惯例而不同。因此,这些用语基于本说明书的全部内容进行定义。In addition, the following terms are defined based on the functions in the present invention, and may be different according to the user's or operator's intention or practice. Therefore, these terms are defined based on the entire content of this specification.
如图1至图6所示,一种高压架空线路电力横担,包括安装架1、绝缘子2、移位滑槽3、卡接转轴4、卡接转杆5、卡接滑块6、卡接弹簧7、移位机构8、定位机构9、支撑座10和支撑弹簧11,所述的安装架1数量为二,且安装架1对称安装在电杆的两侧,安装架1的侧壁上左右对称均匀开设有移位滑槽3,移位滑槽3内通过滑动配合安装有移位机构8,移位机构8上通过滑动配合均匀安装有绝缘子2,移位机构8内安装有定位机构9,且定位机构9与绝缘子卡接配合,安装架1的内侧壁通过转动配合左右对称安装有卡接转轴4,卡接转轴4 上安装有通过花键均匀安装有卡接转杆5,位于电杆两侧安装架1上的卡接转杆5为上下错位安装,且卡接转杆5的内侧壁设置有与电杆外壁弯曲度相配合的橡胶层,卡接转杆5内通过滑动配合对称安装有卡接滑块6,卡接滑块6与卡接转杆5之间通过卡接弹簧7相连接且卡接滑块6通过滑动配合抵靠在对侧安装的卡接转轴4的侧壁上,位于卡接转杆5内侧的安装架1上通过转动配合左右对称安装有支撑座10,且支撑座10与安装架1之间通过支撑弹簧11相连接。As shown in Figures 1 to 6, a power crossarm for high-voltage overhead lines includes a mounting frame 1, an
具体工作时,通过人工将安装架1贴合电杆的两侧进行对称放置,之后,并使支撑座10 的侧壁贴合到电杆的侧壁上进行辅助支撑,之后,通过人工转动卡接转杆5进行转动,通过卡接弹簧7的弹力作用使位于卡接转杆5内的卡接滑块6与对侧的卡接转轴4互相卡接,以此实现对称安装在电杆两侧的安装架1互相卡接,设置的支撑弹簧11可通过自身弹力使位于电杆四周的支撑座10紧密贴合在电杆的侧壁上,使电杆位于安装架1的居中位置,设置于卡接转杆5上的橡胶层可进一步提升对称安装的卡接转杆5对于电杆夹持的稳定性,之后,通过现有固定设备将安装架1与电杆之间进行进一步的固定作业。During the specific work, the installation frame 1 is placed symmetrically on both sides of the electric pole manually, and then the side wall of the support base 10 is attached to the side wall of the electric pole for auxiliary support, and then manually rotate the clamp The connecting
所述的移位机构8包括移位滑座8a、移位弹簧8b、连接杆8c、移位齿条8d、移位齿轮8e、移位转轴8f、限位滑筒8g、限位滑块8h、限位滑座8j、限位滑槽8k、限位弹簧8m、限位滑杆8n和旋钮8p,移位滑槽3内通过滑动配合均匀安装有移位滑座8a,移位滑座8a与安装架1之间通过移位弹簧8b相连接,且位于移位滑槽3内的第一移位滑座8a与第三移位滑座8a以及第二移位滑座8a与第四移位滑座8a之间分别通过连接杆8c连接传动,位于电杆单侧安装架1内的连接杆8c数量为二,且连接杆8c的内侧壁对称安装有移位齿条8d,位于移位齿条8d内侧的安装架1内通过转动配合安装有移位转轴8f,移位转轴8f的下端通过花键安装有移位齿轮8e,且移位齿轮8e分别与两侧的移位齿条8d啮合传动,位于移位转轴8f 上端的安装架1内安装有限位滑座8j、且限位滑座8j位于移位转轴8f的外侧,位于限位滑座8j上方的安装架1内通过滑动配合安装有限位滑杆8n,限位滑杆8n的上端安装有旋钮8p,限位滑杆8n的下端安装有限位滑筒8g,且位于限位滑筒8g与安装架1之间的限位滑杆8n 上套设有限位弹簧8m,移位转轴8f上端截面为正六边形结构,且限位滑筒8g为正六边形滑筒,移位转轴8f的上端位于限位滑筒8g内且移位转轴8f与限位滑筒8g滑动配合,限位滑筒8g的外侧壁均匀设置有限位滑块8h,限位滑座8j上端沿其周向均匀开设有限位滑槽8k,限位滑筒8g位于限位滑槽8k的内侧且限位滑块8h与限位滑槽8k滑动卡接配合。The
具体工作时,当安装架1与电杆之间固定完成之后,通过人工将旋钮8p沿着安装架1向上提起,进一步通过限位滑杆8n带动限位滑筒8g沿着移位转轴8f的上端侧壁向上滑动,进一步使设置于限位滑筒8g下端的限位滑块8h从限位滑槽8k内进行移出,在此过程中,限位弹簧8m处于压缩状态,之后,通过人工转动旋钮8p,进一步通过限位滑筒8g带动移位转轴8f进行转动,进一步带动移位齿轮8e进行转动,移位齿轮8e通过啮合作用进一步带动移位齿条8d进行移动,进一步带动连接杆8c进行移动,由于连接杆8c与间隔分布的移位滑座 8a相连接,故通过对称安装在移位齿轮8e两侧的连接杆8c的相对运动进一步带动位于电杆两侧的移位滑座8a进行相对移动,进一步调整移位滑座8a之间的间隔距离,使其处于合适的位置,调整完成之后,通过人工松开对于旋钮8p的拉动作用,之后在限位弹簧8m弹力复位的推动下进一步使限位滑筒8g沿着移位转轴8f向下滑动,进一步使限位滑块8h再次落入到限位滑槽8k内,通过限位滑块8h与限位滑槽8k之间的卡接配合实现对限位滑筒8g进行定位,进一步通过限位滑筒8g与移位转轴8f之间的卡接配合实现对移位齿轮8e的定位,进一步实现移位滑座8a的定位作业。During specific work, after the fixing between the installation frame 1 and the electric pole is completed, the
所述的定位机构9包括定位转筒9a、定位滑筒9b、固定杆9c、复位弹簧9d、定位连杆9e、连接滑槽9f、定位座9g、定位滑块9h、定位弹簧9j、定位转盘9k、定位滑槽9m、卡接滑杆9n和卡接滑槽9p,移位滑座8a的内侧均匀安装有定位转筒9a,定位转筒9a的下端中部安装有固定杆9c,固定杆9c上通过滑动配合安装有定位滑筒9b,且定位滑筒9b与定位转筒9a之间通过复位弹簧9d相连接,定位滑筒9b的外侧壁沿其周向通过转动配合均匀安装有定位连杆9e,定位转筒9a的侧壁上沿其周向均匀开设有连接滑槽9f,定位连杆9e的中部位于连接滑槽9f内且定位连杆9e与定位转筒9a滑动配合,连接滑槽9f直径宽度大于定位连杆9e的直径宽度,定位连杆9e在沿着连接滑槽9f进行滑动的同时可同步进行自由转动,位于连接滑槽9f上方的定位转筒9a上通过转动配合均匀安装有定位座9g,定位座9g的下端与定位连杆9e之间通过转动配合相连接,定位座9g的上端通过滑动配合均匀安装有定位滑块9h,且定位滑块9h与定位座9g之间通过定位弹簧9j相连接,绝缘子2的下端安装有定位转盘9k,定位转盘9k的侧壁上沿其周向均匀开设有定位滑槽9m,定位滑块9h的下端通过滑动配合抵靠在定位滑槽9m的内侧壁上,位于定位转盘9k下方的绝缘子2外壁开设有卡接滑槽9p,卡接滑槽9p为沿绝缘子2的下端侧壁周向均匀设置,且卡接滑槽9p为T字形滑槽,位于绝缘子2外侧的定位滑筒9b上均匀安装有卡接滑杆9n,卡接滑杆9n的端部位于卡接滑槽9p内且卡接滑杆9n与绝缘子2滑动配合。The
具体工作时,当移位滑座8a定位完成之后,通过人工将绝缘子2沿着移位滑座8a的上端侧壁向定位转筒9a内进行安装,在安装的过程中,绝缘子2的下端进一步通过抵靠作用推动定位滑筒9b沿着固定杆9c向下进行滑动,进一步带动定位连杆9e的内端向下进行移动,在此过程中,复位弹簧9d处于压缩状态,由于定位连杆9e的中部位于连接滑槽9f内,在定位连杆9e的内端向下移动的同时定位连杆9e开始沿着连接滑槽9f的侧壁向外侧进行滑动,进一步通过铰接配合推动定位座9g进行转动,使定位座9g的上端抵靠到定位转盘9k的侧壁上,之后,通过人工将绝缘子2转动一定的角度,在绝缘子2转动的过程中,定位滑块9h进一步通过滑动作用滑落到定位滑槽9m内,设置的定位弹簧9j可通过自身弹力作用使定位滑块9h与定位滑槽9m互相卡接,实现对定位转盘9k的夹持定位作业,在绝缘子2转动的过程中,进一步使设置于绝缘子2下端的卡接滑槽9p沿着卡接滑杆9n的端部进行滑动,并通过卡接滑杆9n与卡接滑槽9p之间的卡接配合实现对绝缘子2高度位置的卡接定位,通过人工依此步骤逐一完成绝缘子2的安装作业后,整个高压架空线路电力横担安装作业安装完成。During specific work, after the positioning of the shifting
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110075359.5A CN112909871B (en) | 2021-01-20 | 2021-01-20 | High-voltage overhead line electric cross arm |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110075359.5A CN112909871B (en) | 2021-01-20 | 2021-01-20 | High-voltage overhead line electric cross arm |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN112909871A CN112909871A (en) | 2021-06-04 |
| CN112909871B true CN112909871B (en) | 2022-11-18 |
Family
ID=76116660
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202110075359.5A Active CN112909871B (en) | 2021-01-20 | 2021-01-20 | High-voltage overhead line electric cross arm |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN112909871B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114135144B (en) * | 2021-11-09 | 2023-06-02 | 东台市新杰科机械有限公司 | Assembled cross arm structure applied to electric tower |
| CN116181146A (en) * | 2023-03-13 | 2023-05-30 | 国网湖北省电力有限公司鄂州供电公司 | A cross arm used for transmission tower |
| CN116378490B (en) * | 2023-03-28 | 2023-09-22 | 国网安徽省电力有限公司固镇县供电公司 | A distribution network frame |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111706148A (en) * | 2020-06-28 | 2020-09-25 | 赵青山 | Electric power cross arm is connected to electric power construction circuit |
| CN111764668A (en) * | 2020-07-17 | 2020-10-13 | 汤仁超 | Steel structure bridge truss installation system and installation process |
| CN112878783A (en) * | 2021-01-13 | 2021-06-01 | 蔡鸿玲 | Electric power staple bolt of acting as go-between |
-
2021
- 2021-01-20 CN CN202110075359.5A patent/CN112909871B/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111706148A (en) * | 2020-06-28 | 2020-09-25 | 赵青山 | Electric power cross arm is connected to electric power construction circuit |
| CN111764668A (en) * | 2020-07-17 | 2020-10-13 | 汤仁超 | Steel structure bridge truss installation system and installation process |
| CN112878783A (en) * | 2021-01-13 | 2021-06-01 | 蔡鸿玲 | Electric power staple bolt of acting as go-between |
Also Published As
| Publication number | Publication date |
|---|---|
| CN112909871A (en) | 2021-06-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112909871B (en) | High-voltage overhead line electric cross arm | |
| CN113346435A (en) | Improved generation electric power conductor spacer | |
| CN116651675B (en) | Insulator anti-pollution flashover coating spraying device | |
| CN117498221A (en) | Anti-drop type insulator string auxiliary monomer replacement device | |
| CN116730091A (en) | Pulling equipment for manufacturing wires and cables | |
| CN119209095A (en) | An assembled wire and cable installation device for a box-type substation | |
| CN219677970U (en) | Cable end wire stripping device | |
| CN113964743A (en) | a tinkering robot | |
| CN219642609U (en) | Winding type glass fiber silicone resin sleeve | |
| CN112024465A (en) | Snow sweeping device for high-voltage wire | |
| CN109347035B (en) | Adjustable insulating support rod | |
| CN203301073U (en) | Installation apparatus of conducting rod | |
| CN208257283U (en) | A kind of mineral cable guiding trestle traction device | |
| CN215419334U (en) | Power transmission and distribution line construction maintenance tool | |
| CN209266987U (en) | A kind of disconnecting switch saves pre-assembled tooling up and down | |
| CN116799529A (en) | A grounding wire device for switch cabinets | |
| CN111790940B (en) | Steel pipe cutting device is used in CV ring production and processing | |
| CN211958568U (en) | A Novel Specular Reflective W-pin Remover | |
| CN209419106U (en) | A kind of electricity overhead power transmission line goes out insulator apparatus for examination and repair | |
| CN110071456B (en) | Shorten 10 kilovolt electrified tools and tools of withdrawing pole setting time | |
| CN113958185B (en) | Adjustable high-voltage power transmission tower | |
| CN221227018U (en) | Novel compound fireproof bridge | |
| CN220384105U (en) | Bird-preventing placeholder | |
| CN223583682U (en) | Support structure for high voltage power distribution lines | |
| CN119994754B (en) | A power transmission line optimization auxiliary device for complex environments |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20221028 Address after: No.52, Qingnian Middle Road, Nantong City, Jiangsu Province, 226000 Applicant after: Nantong Power Supply Company of State Grid Jiangsu Electric Power Company Address before: 210012, No. 30, Xi An Road, Yuhua West Road, Yuhuatai District, Jiangsu, Nanjing Applicant before: Lu Tongyu |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant |
