CN112878655A - Shaping integral lifting type operation platform for light production well and construction method thereof - Google Patents

Shaping integral lifting type operation platform for light production well and construction method thereof Download PDF

Info

Publication number
CN112878655A
CN112878655A CN202110323479.2A CN202110323479A CN112878655A CN 112878655 A CN112878655 A CN 112878655A CN 202110323479 A CN202110323479 A CN 202110323479A CN 112878655 A CN112878655 A CN 112878655A
Authority
CN
China
Prior art keywords
operation platform
lifting type
construction method
integral lifting
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202110323479.2A
Other languages
Chinese (zh)
Inventor
楼成龙
王斌
梁扎根
周钰
潘先旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN202110323479.2A priority Critical patent/CN112878655A/en
Publication of CN112878655A publication Critical patent/CN112878655A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/16Struts or stiffening rods, e.g. diagonal rods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The lighting well regularization integral lifting type operation platform and the construction method thereof, the operation platform comprises a frame support, a support batten, a protective layer arranged on the support batten, a bearing structure arranged at the bottom of the operation platform, the bearing structure comprises a bearing rectangular steel beam fixed at the bottom of the operation platform and a rectangular bolt steel plate arranged in the bearing rectangular steel beam, the lighting well regularization integral lifting type operation platform is a regularization product developed by self, the installation is convenient and fast, the synchronous lifting along with the main structure meets the requirement of safe operation, a large number of steel pipes and the investment of raw materials such as fasteners can be reduced, the investment of labor cost is reduced while the investment of material cost is reduced, the integral stability is better, and the operation safety is more guaranteed.

Description

Shaping integral lifting type operation platform for light production well and construction method thereof
Technical Field
The invention relates to the field of building construction equipment, in particular to a setting integral lifting type operating platform of a light extraction well and a construction method thereof.
Background
The common practice of a production well operation platform is as follows: the platform is erected by adopting a fastener type steel pipe scaffold or a disc buckle type or wheel buckle type scaffold and is used as a safe operation platform during structural construction operation or decoration operation. The operation platform is firstly put on the structural plate, and the height of the operation platform is not more than 18 meters due to safety consideration. And starting the second picking, wherein each picking operation platform is positioned on the overhanging I-shaped steel, and the set height is not more than 18 m.
Objective disadvantages of the prior art:
(1) except that the seat of choosing first falls on the structural slab, all the other each choose before producing light well operation platform sets up, all need pre-buried anchor ring on the structural slab that corresponds for the installation of I-steel encorbelments is fixed, needs to occupy half a day's construction period, is unfavorable for the assurance of time limit for a project.
(2) The traditional method can occupy a large amount of raw materials such as steel pipes, fasteners and the like, and is not beneficial to saving material cost. The traditional method needs repeated erection operation along with the main structure, which is not beneficial to saving labor cost.
Disclosure of Invention
The invention aims to provide a setting integral lifting type operation platform for a light extraction well and a construction method thereof, and solves the problems that the prior art occupies a key construction period, occupies a large amount of raw materials such as steel pipes and fasteners, and is not beneficial to saving material cost and labor cost.
In order to achieve the purpose, the invention adopts the following technical scheme:
the shaping integral lifting type operation platform for the light production well and the construction method thereof are characterized in that: operation platform includes that the frame supports, supports the flitch, establishes at the inoxidizing coating that supports the flitch, establishes the load-carrying members of operation platform bottom, load-carrying members establishes including the rectangle bolt steel sheet in the bearing rectangle girder steel of fixing in the operation platform bottom and the bearing rectangle girder steel, the hard isolation steel in bottom turns over the board is established to whole promotion formula operation platform bottom.
Furthermore, the protective layer comprises a top operation protective layer and an interlayer operation protective layer, and the supporting battens comprise top operation protective layer supporting battens and interlayer isolation protective layer supporting battens.
Further, establish top hard isolation protection template on the top operation inoxidizing coating, establish the interlayer isolation protection template on the operation protection between layers, top hard isolation protection template is established on top operation inoxidizing coating supports the flitch, the interlayer isolation protection template is established on interlayer isolation inoxidizing coating supports the flitch.
Further, the frame supports and establishes whole promotion formula operation platform's the outside, the frame supports and includes vertical side's pipe, horizontal side's pipe, establish diagonal bracing side's pipe on the vertical side's pipe.
Furthermore, the bottom hard isolation steel turning plate is hinged with the horizontal square tube at the bottom through a hinge.
Furthermore, a lifting ring is arranged on the top operation protective layer and is arranged on the horizontal square pipe at the top.
Further, establish upper portion stiffening rib, lower part stiffening rib between vertical side's pipe and the horizontal side's pipe, upper portion stiffening rib and lower part stiffening rib are used for strengthening the bearing capacity of vertical side's pipe and horizontal side's pipe, improve stability.
Compared with the prior art, the invention has the following beneficial effects:
1. the whole lift-type operation platform of daylighting well regularization is the regularization product of self-control research and development, and it is convenient to install, promotes along with the major structure synchronization, satisfies the demand of safe operation.
2. Adopt the whole lift-type operation platform of lighting well regularization, can reduce the input of former materials such as steel pipe, fastener in a large number, reduce the input of labour cost when reducing the material cost input.
3. The setting integral lifting type operation platform of the light well is a setting product, the integral stability is better, and the operation safety is more guaranteed.
Drawings
FIG. 1 is a schematic view of the structure of the present invention.
FIG. 2 is an enlarged view of region A of FIG. 1 according to the present invention.
FIG. 3 is an enlarged view of area B of FIG. 1 according to the present invention.
FIG. 4 is an enlarged view of the area C of FIG. 1 according to the present invention.
FIG. 5 is an enlarged view of region D of FIG. 1 according to the present invention.
Figure 6 is a schematic view of the load bearing structure of the present invention.
Shown in the figure: 1. the steel plate comprises a lifting ring 2, a top layer hard isolation protection template 3, a top operation protective layer supporting batten 4, an upper stiffening rib 5, a lower stiffening rib 6, an interlayer isolation protection template 7, an interlayer isolation protective layer supporting batten 8, an oblique supporting square pipe 9, a vertical square pipe 10, a horizontal square pipe 11, a bottom hard isolation steel turning plate 12, a hinge 13, a bottom hard isolation pattern steel plate 14, a bearing rectangular steel beam 15 and a rectangular bolt steel plate.
Detailed Description
The invention is further described below with reference to fig. 1-6.
The operation platform comprises a frame support, a support batten, a protective layer arranged on the support batten, and a bearing structure arranged at the bottom of the operation platform, wherein the frame support is arranged on the outer side of the integral lifting type operation platform, the frame support comprises a vertical square pipe 9 and a horizontal square pipe 10, and an inclined support square pipe 8 is arranged on the vertical square pipe 9.
The protective layer comprises a top operation protective layer and an interlayer operation protective layer, and the supporting battens comprise top operation protective layer supporting battens 3 and interlayer isolation protective layer supporting battens 7. Establish top hard isolation protection template 2 on the top operation inoxidizing coating, establish layer isolation protection template 6 on the operation inoxidizing coating between the layers, top hard isolation protection template 2 is established on top operation inoxidizing coating support flitch 3, layer isolation protection template 6 is established on layer isolation inoxidizing coating support flitch 7 between the layers.
The bearing structure comprises a bearing rectangular steel beam 14 fixed at the bottom of the operating platform and a rectangular bolt steel plate 15 arranged in the bearing rectangular steel beam 14. The bottom hard isolation pattern steel plate 13 is arranged at the bottom of the lifting type operation platform, the bottom hard isolation pattern steel plate 13 is arranged between the horizontal square tubes at the bottom, the bottom hard isolation steel turning plate 11 is hinged with the horizontal square tubes at the bottom through hinges 12, and the bottom hard isolation steel turning plate 11 is hinged with the bottom hard isolation pattern steel plate 13. And a lifting ring 1 is arranged on the top operation protective layer, and the lifting ring 1 is arranged on a horizontal square pipe at the top. The lifting ring 1 is used for hooking a hook of a tower crane when the operation platform is lifted. Establish upper portion stiffening rib 4, lower part stiffening rib 5 between vertical square pipe 9 and the horizontal square pipe 10, upper portion stiffening rib 4 and lower part stiffening rib 5 are used for strengthening the bearing capacity of vertical square pipe and horizontal square pipe, improve stability.
The method comprises the following specific working steps:
the method comprises the following steps: and carrying out deepening design of the setting integral lifting type operating platform of the light well according to design construction drawings. Considering the working surface and safety requirements of related operations, the distance between the operating platform and the peripheral structure is preferably less than or equal to 250mm, and the height of the operating platform is considered according to the 3 layers of the covering structure.
Step two: a standard blanking list is provided according to a deepened design drawing, accurate blanking is carried out through a centralized processing workshop, and 40 multiplied by 3 vertical square tubes, horizontal square tubes, oblique supporting square tubes, upper and lower stiffening ribs, 80 multiplied by 160 multiplied by 5 rectangular bearing steel beams, 68 multiplied by 145 multiplied by 15 rectangular bolt steel plates, phi 20 lifting rings, 3mm thick pattern steel plates and the like are accurately equipped.
Step three: and assembling the shaped integral lifting type operation platform according to the deepened design drawing.
Step four: and hoisting the shaped integral lifting type operating platform to the corresponding lighting well by adopting a tower crane for installation and fixation. The operation platform is hoisted to about 500mm away from the supporting structure beam and the plate surface, the rectangular bolt steel plate is pulled out, and the installation position is manually finely adjusted to be seated on the supporting structure beam and the plate.
Step five: and installing and fixing protective support battens and laying protective templates at corresponding positions of the operation layer and the interlayer, so as to meet the requirement of safe operation. The hard isolation steel turning plate at the bottom is turned to be tightly attached to the peripheral structure so as to prevent the object from being hit.
Step six: and when the main structure is constructed for one layer, the tower crane is only needed to be lifted and installed in place. When the lifting installation is carried out, the bolt steel plate needs to be pushed into the bearing steel beam, the bottom hard isolation steel turning plate needs to be turned over to the bottom hard isolation pattern steel plate, and the collision between the lifting process and the structure is avoided.
Step seven: and repeating the operation process of the step six until the main body structure is capped.
Step eight: when the integrated lifting type operation platform is shaped to be dismantled, the tower crane is adopted for hoisting.
The above description is only for the preferred embodiment of the present invention, and the shown orientation or positional relationship is only for the convenience of describing the present invention and simplifying the description, the terms "disposed", "installed", "connected", "fixed", etc. should be understood in a broad sense, and various modifications and changes may be made to the present invention by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The shaping integral lifting type operation platform for the light production well and the construction method thereof are characterized in that: the operation platform comprises a frame support, a support batten, a protective layer arranged on the support batten and a bearing structure arranged at the bottom of the operation platform, wherein the bearing structure comprises a bearing rectangular steel beam fixed at the bottom of the operation platform and a rectangular bolt steel plate arranged in the bearing rectangular steel beam, and a bottom hard isolation steel turnover plate is arranged at the bottom of the integral lifting type operation platform;
the construction method comprises the following steps:
the method comprises the following steps: designing the operating platform according to a construction drawing;
step two: blanking according to the design result of the first step;
step three: assembling the integral lifting operation platform;
step four: installing and fixing the integrated lifting type operating platform assembled in the step three;
step five: laying a protective template on the operation layer, closely attaching the bottom hard isolation turning plate to the periphery, and placing an object to strike;
step six: after the construction of the corresponding floor is finished, the integral lifting type operating platform is lifted, the bolt steel plate is pushed into the bearing steel beam, the bottom hard isolation steel turnover plate is required to be turned over to the bottom hard isolation pattern steel plate, and the collision with the structure in the lifting process is avoided;
step seven: repeating the operation, and repeating the lifting action of the step six after the operation is finished until all the construction is finished;
step eight: when the integrated lifting type operation platform is dismantled, a tower crane is used for hoisting.
2. The daylighting well regularization integral lifting type operation platform and the construction method thereof as claimed in claim 1, wherein: the protective layer comprises a top operation protective layer and an interlayer operation protective layer, and the supporting battens comprise top operation protective layer supporting battens and interlayer isolation protective layer supporting battens.
3. The daylighting well stereotyped integral lifting type operation platform and the construction method thereof as claimed in claim 2, wherein: establish the hard protection template of keeping apart in top on the top operation inoxidizing coating, establish the isolation protection template between the layer on the operation inoxidizing coating between the layer, the hard protection template of keeping apart in top is established on top operation inoxidizing coating supports the flitch, the isolation protection template between the layer is established on the isolation inoxidizing coating supports the flitch between the layer.
4. The daylighting well-shaped integral lifting type operation platform and the construction method thereof according to claim 3, wherein the frame support is arranged on the outer side of the integral lifting type operation platform, the frame support comprises a vertical square pipe and a horizontal square pipe, and an oblique support square pipe is arranged on the vertical square pipe.
5. The daylighting well stereotyped integral lifting type operation platform and the construction method thereof as claimed in claim 4, wherein: the bottom hard isolation steel turning plate is hinged with the horizontal square tube at the bottom through a hinge.
6. The daylighting well-shaped integral lifting type operating platform and the construction method thereof as claimed in claim 5, wherein a lifting ring is arranged on the top operation protective layer, and the lifting ring is fixed on a horizontal square pipe on the top.
7. The production well finalized integral lift-type operation platform and its construction method according to claim 6, wherein an upper stiffening rib and a lower stiffening rib are provided between said vertical square tubes and horizontal square tubes.
CN202110323479.2A 2021-03-26 2021-03-26 Shaping integral lifting type operation platform for light production well and construction method thereof Withdrawn CN112878655A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110323479.2A CN112878655A (en) 2021-03-26 2021-03-26 Shaping integral lifting type operation platform for light production well and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110323479.2A CN112878655A (en) 2021-03-26 2021-03-26 Shaping integral lifting type operation platform for light production well and construction method thereof

Publications (1)

Publication Number Publication Date
CN112878655A true CN112878655A (en) 2021-06-01

Family

ID=76042397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110323479.2A Withdrawn CN112878655A (en) 2021-03-26 2021-03-26 Shaping integral lifting type operation platform for light production well and construction method thereof

Country Status (1)

Country Link
CN (1) CN112878655A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007154540A (en) * 2005-12-06 2007-06-21 Japan Steels International Inc Temporary scaffolding unit
CN205224567U (en) * 2015-11-19 2016-05-11 中国葛洲坝集团第六工程有限公司 Collapsible foldable elevartor shaft construction platform
CN105952129A (en) * 2016-06-20 2016-09-21 中国建筑第二工程局有限公司 Elevator shaft combined type integral lifting operation platform and construction method thereof
CN206769351U (en) * 2017-05-05 2017-12-19 中天建设集团有限公司 A kind of regularization hoistway operation platform hoisting frame
CN206957181U (en) * 2017-07-13 2018-02-02 广东建星建造集团有限公司 Elevator circulates steel operating platform
CN209413263U (en) * 2019-01-15 2019-09-20 四川省第六建筑有限公司 A tool-type overall hoisting operation platform for an elevator shaft
CN218758633U (en) * 2021-03-26 2023-03-28 中天建设集团有限公司 A stereotyped overall lifting operation platform for lighting wells

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007154540A (en) * 2005-12-06 2007-06-21 Japan Steels International Inc Temporary scaffolding unit
CN205224567U (en) * 2015-11-19 2016-05-11 中国葛洲坝集团第六工程有限公司 Collapsible foldable elevartor shaft construction platform
CN105952129A (en) * 2016-06-20 2016-09-21 中国建筑第二工程局有限公司 Elevator shaft combined type integral lifting operation platform and construction method thereof
CN206769351U (en) * 2017-05-05 2017-12-19 中天建设集团有限公司 A kind of regularization hoistway operation platform hoisting frame
CN206957181U (en) * 2017-07-13 2018-02-02 广东建星建造集团有限公司 Elevator circulates steel operating platform
CN209413263U (en) * 2019-01-15 2019-09-20 四川省第六建筑有限公司 A tool-type overall hoisting operation platform for an elevator shaft
CN218758633U (en) * 2021-03-26 2023-03-28 中天建设集团有限公司 A stereotyped overall lifting operation platform for lighting wells

Similar Documents

Publication Publication Date Title
CN101575911B (en) Top-down decreasing-formwork formwork system and construction method
CN105569358A (en) Construction method of special-shaped curved surface roof with large span and multiple curvatures
KR19990072014A (en) Lift-up method for building buildings from above to the ground
CN114319882B (en) Construction method and construction structure of steel bar truss floor bearing plate
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN202108242U (en) Elevator shaft construction scaffold device constructed and lifted together with a building main structure by layers
CN213418186U (en) Circular roofing steel truss structure
CN117145043A (en) Prefabricated corridor, corridor end connection structure and construction method
CN115126233B (en) Construction method for using cantilever beam plate high formwork with complex outer vertical surface as outer wall scaffold
CN218758633U (en) A stereotyped overall lifting operation platform for lighting wells
CN216476259U (en) Turnover lifting type elevator shaft operating platform
CN215212427U (en) Adjustable unloading platform with steel structure for building
CN112878655A (en) Shaping integral lifting type operation platform for light production well and construction method thereof
CN206267519U (en) A kind of light engine position hydraulic climbing die block system
CN113565346A (en) Assembled floor landing-free adjustable supporting structure and construction method
CN204850469U (en) Commercial building construction system
CN109531802B (en) T-beam combined steel template mounting and dismounting structure and method
CN107476423A (en) The assembling method of steel building
CN219826061U (en) Cable dome central support tower and operation platform comprehensive system
CN106988520B (en) Construction method and support system for high-rise suspension structure
CN110306784A (en) A kind of aluminum tunnel modular system and its operating method
CN214270021U (en) Operation radius lengthening device for tower crane
CN210508326U (en) Liftable well operation platform
CN211313311U (en) Assembled concrete structure regularization stair protection platform
CN111608270B (en) Prefabricated through long column concrete assembled frame structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20210601