CN112857132A - Cooling tower, cooling tower detection control method, device, equipment and storage medium - Google Patents

Cooling tower, cooling tower detection control method, device, equipment and storage medium Download PDF

Info

Publication number
CN112857132A
CN112857132A CN202110020600.4A CN202110020600A CN112857132A CN 112857132 A CN112857132 A CN 112857132A CN 202110020600 A CN202110020600 A CN 202110020600A CN 112857132 A CN112857132 A CN 112857132A
Authority
CN
China
Prior art keywords
tower
cooling
temperature
cooling tower
preset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110020600.4A
Other languages
Chinese (zh)
Other versions
CN112857132B (en
Inventor
徐世宇
丁一
许磊
王明理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110020600.4A priority Critical patent/CN112857132B/en
Publication of CN112857132A publication Critical patent/CN112857132A/en
Application granted granted Critical
Publication of CN112857132B publication Critical patent/CN112857132B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28—HEAT EXCHANGE IN GENERAL
    • F28F—DETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F27/00—Control arrangements or safety devices specially adapted for heat-exchange or heat-transfer apparatus
    • F28F27/003—Control arrangements or safety devices specially adapted for heat-exchange or heat-transfer apparatus specially adapted for cooling towers
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70—Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

本申请提供一种冷却塔、冷却塔检测控制方法、装置、设备及存储介质,通过在室外湿球温度处于预设温度区段时,获取设定频率,控制检测模块的冷却塔风机采用设定频率工作,并持续预设时长,最后获取检测模块的下塔温度传感器检测到的预设时长内的下塔温度。该技术方案中,在室外湿球温度处于预设温度区段时,控制检测模块工作在设定频率并获取下塔温度传感器检测到的预设时长内的下塔温度,其能够精确控制水冷冷冻水系统的工况切换,在保证系统稳定性的同时,减低了系统耗能。

Figure 202110020600

The present application provides a cooling tower, a cooling tower detection and control method, device, equipment and storage medium. When the outdoor wet bulb temperature is in a preset temperature range, the set frequency is obtained, and the cooling tower fan of the detection module is controlled to adopt the set frequency. The frequency works for a preset period of time, and finally the temperature of the lower tower within the preset period of time detected by the lower tower temperature sensor of the detection module is obtained. In this technical solution, when the outdoor wet bulb temperature is in the preset temperature range, the control detection module works at the set frequency and obtains the lower tower temperature within the preset time period detected by the lower tower temperature sensor, which can accurately control the water cooling and freezing The switching of the working conditions of the water system not only ensures the stability of the system, but also reduces the energy consumption of the system.

Figure 202110020600

Description

冷却塔、冷却塔检测控制方法、装置、设备及存储介质Cooling tower, cooling tower detection and control method, device, equipment and storage medium

技术领域technical field

本申请涉及空调技术领域,尤其涉及一种冷却塔、冷却塔检测控制方法、装置、设备及存储介质。The present application relates to the technical field of air conditioning, and in particular, to a cooling tower, a cooling tower detection and control method, device, equipment and storage medium.

背景技术Background technique

在全年需要制冷的场合中,通常采用较为高效的水冷冷冻水系统,为了达到节能的目的,该水冷冷冻水系统会根据室外温度的不同,设置三种不同的工况(工作情况),即电制冷、半自由冷却、完全自由冷却。In occasions where cooling is required throughout the year, a more efficient water-cooled chilled water system is usually used. In order to achieve the purpose of saving energy, the water-cooled chilled water system will be set to three different working conditions (working conditions) according to the different outdoor temperatures, namely Electric refrigeration, semi-free cooling, completely free cooling.

现有技术中,对于水冷冷冻水系统三种工况之间的切换,通常是根据室外湿球温度的变化和冷却塔的下塔水温实现对水冷冷冻水系统工况之间的切换。具体的,根据室外湿球温度及冷却塔的制冷参数推测下塔水温可达到要求时,控制冷却塔的风扇满频运行,如下塔水温达到要求则进行工况切换;如不能达到要求,则仍然维持原状态。此方法会造成下塔水温过低,致使水冷冷冻水系统的冷机无法正常运行,系统稳定差。In the prior art, for the switching between the three operating conditions of the water-cooled chilled water system, the switching between the operating conditions of the water-cooled chilled water system is usually realized according to the change of the outdoor wet bulb temperature and the water temperature of the lower tower of the cooling tower. Specifically, according to the outdoor wet bulb temperature and the cooling parameters of the cooling tower, when it is inferred that the water temperature of the lower tower can meet the requirements, control the fan of the cooling tower to run at full frequency, and switch the working conditions if the water temperature of the lower tower reaches the requirements; maintain the original state. This method will cause the water temperature of the lower tower to be too low, so that the chiller of the water-cooled chilled water system cannot operate normally, and the system stability is poor.

然而,在水冷冷冻水系统中,为了保证水冷冷冻水系统能够正常运行,一般将室外湿球温度降低,以保证水冷冷冻水系统试运行后切换到下一状态的概率增加到100%。但是,因下塔水温受负荷、室外湿球温度、室外风速等诸多条件影响,为保证切换概率为100%,必须将室外湿球温度设定值降低很多,如此不能够发挥系统最大能力,而且系统耗能大的问题。However, in the water-cooled chilled water system, in order to ensure the normal operation of the water-cooled chilled water system, the outdoor wet bulb temperature is generally lowered to ensure that the probability of switching to the next state after the trial operation of the water-cooled chilled water system increases to 100%. However, because the water temperature of the lower tower is affected by many conditions such as load, outdoor wet bulb temperature, and outdoor wind speed, in order to ensure that the switching probability is 100%, the set value of outdoor wet bulb temperature must be reduced a lot, so the maximum capacity of the system cannot be exerted, and System power consumption problem.

发明内容SUMMARY OF THE INVENTION

本申请提供一种冷却塔、冷却塔检测控制方法、装置、设备及存储介质,以解决现有水冷冷冻水系统的工况切换存在的系统稳定性差、耗能大的问题。The present application provides a cooling tower, a cooling tower detection and control method, device, equipment and storage medium, to solve the problems of poor system stability and high energy consumption existing in the switching of operating conditions of the existing water-cooled chilled water system.

第一方面,本申请实施例提供一种冷却塔,包括:In a first aspect, the embodiments of the present application provide a cooling tower, including:

多个冷却模块,控制器,以及与所述控制器连接的下塔温度传感器;a plurality of cooling modules, a controller, and a lower tower temperature sensor connected to the controller;

每个冷却模块包括上塔阀门、下塔阀门、冷却塔风机;Each cooling module includes upper tower valve, lower tower valve, cooling tower fan;

所述多个冷却模块之间通过上塔总管分别与每个冷却模块的上塔阀门连接,并通过下塔总管分别与每个冷却模块的下塔阀门连接;The plurality of cooling modules are respectively connected with the upper tower valve of each cooling module through the upper tower header, and are respectively connected with the lower tower valve of each cooling module through the lower tower header;

每个冷却模块中的冷却塔风机与所述控制器连接,所述控制器用于控制每个冷却塔风机的工作频率;The cooling tower fan in each cooling module is connected to the controller, and the controller is used to control the working frequency of each cooling tower fan;

所述下塔温度传感器设置在检测模块的下塔阀门和所述下塔总管之间,其中,所述检测模块为所述多个冷却模块中的任一个模块。The lower tower temperature sensor is arranged between the lower tower valve of the detection module and the lower tower header, wherein the detection module is any one of the plurality of cooling modules.

在第一方面的一种可能设计中,所述冷却塔还包括:In a possible design of the first aspect, the cooling tower further includes:

与所述控制器连接的总温度传感器,所述总温度传感器设置在所述下塔总管的出口处,用于检测所述冷却塔的下塔总管中的温度。A total temperature sensor connected with the controller, the total temperature sensor is arranged at the outlet of the lower tower header pipe, and is used for detecting the temperature in the lower tower header pipe of the cooling tower.

第二方面,本申请实施例提供了一种冷却塔检测控制方法,应用于上述第一方面的冷却塔中的控制器中,所述方法包括:In a second aspect, an embodiment of the present application provides a method for detecting and controlling a cooling tower, which is applied to the controller in the cooling tower of the above-mentioned first aspect, and the method includes:

在室外湿球温度处于预设温度区段时,获取设定频率,所述设定频率是根据所述冷却塔中的检测模块的冷却塔风机的性能确定的;When the outdoor wet bulb temperature is in the preset temperature range, obtain a set frequency, where the set frequency is determined according to the performance of the cooling tower fan of the detection module in the cooling tower;

控制所述检测模块的冷却塔风机采用所述设定频率工作,并持续预设时长;Control the cooling tower fan of the detection module to work at the set frequency and continue for a preset period of time;

获取所述检测模块的下塔温度传感器检测到的所述预设时长内的下塔温度。Acquire the temperature of the lower tower within the preset time period detected by the lower tower temperature sensor of the detection module.

在第二方面的一种可能设计中,所述方法还包括:In a possible design of the second aspect, the method further includes:

若所述下塔温度达到预设温度,并且在所述预设温度稳定的时长大于设定时长,则控制所述冷却塔中除所述检测模块之外的其他冷却模块的冷却塔风机采用所述设定频率工作。If the temperature of the lower tower reaches the preset temperature, and the time period when the preset temperature is stable is longer than the preset time period, the cooling tower fans of the cooling towers other than the detection module are controlled to adopt the selected cooling tower fan. work at the set frequency.

在第二方面的另一种可能设计中,所述方法还包括:In another possible design of the second aspect, the method further includes:

若所述下塔温度未达到预设温度,和/或,所述下塔温度达到所述预设温度的稳定时长小于或等于设定时长,则控制所述检测模块的冷却塔风机结束工作。If the temperature of the lower tower does not reach the preset temperature, and/or the stable time period for the temperature of the lower tower to reach the preset temperature is less than or equal to the preset time period, the cooling tower fan of the detection module is controlled to stop working.

第三方面,本申请实施例提供了一种冷却塔检测控制装置,应用于上述第一方面的冷却塔中的控制器中,所述装置包括:In a third aspect, an embodiment of the present application provides a cooling tower detection and control device, which is applied to the controller in the cooling tower of the above-mentioned first aspect, and the device includes:

获取模块,用于在室外湿球温度处于预设温度区段时,获取设定频率,所述设定频率是根据所述冷却塔中的检测模块的冷却塔风机的性能确定的;an acquisition module, configured to acquire a set frequency when the outdoor wet bulb temperature is in the preset temperature range, where the set frequency is determined according to the performance of the cooling tower fan of the detection module in the cooling tower;

控制模块,用于控制所述检测模块的冷却塔风机采用所述设定频率工作,并持续预设时长;a control module, configured to control the cooling tower fan of the detection module to operate at the set frequency and continue for a preset period of time;

所述获取模块,还用于获取所述检测模块的下塔温度传感器检测到的所述预设时长内的下塔温度。The acquisition module is further configured to acquire the temperature of the lower tower within the preset time period detected by the lower tower temperature sensor of the detection module.

在第三方面的一种可能设计中,所述控制模块,还用于在所述下塔温度达到预设温度,并且在所述预设温度稳定的时长大于设定时长时,控制所述冷却塔中除所述检测模块之外的其他冷却模块的冷却塔风机采用所述设定频率工作。In a possible design of the third aspect, the control module is further configured to control the cooling when the temperature of the lower tower reaches a preset temperature, and when the preset temperature is stable for a period longer than a preset period The cooling tower fans of other cooling modules in the tower except the detection module work at the set frequency.

在第三方面的另一种可能设计中,所述控制模块,还用于在所述下塔温度未达到预设温度,和/或,所述下塔温度达到所述预设温度的稳定时长小于或等于设定时长时,控制所述检测模块的冷却塔风机结束工作。In another possible design of the third aspect, the control module is further configured to, when the temperature of the lower tower does not reach a preset temperature, and/or, the stable time period for which the temperature of the lower tower reaches the preset temperature When the time is less than or equal to the set time period, the cooling tower fan controlling the detection module stops working.

第四方面,本申请实施例提供一种控制设备,包括:In a fourth aspect, an embodiment of the present application provides a control device, including:

至少一个处理器;以及at least one processor; and

与所述至少一个处理器通信连接的存储器;其中,a memory communicatively coupled to the at least one processor; wherein,

所述存储器存储有可被所述至少一个处理器执行的指令,所述指令被所述至少一个处理器执行,以使所述电子设备能够执行上述第二方面及各可能设计所述的方法。The memory stores instructions executable by the at least one processor, the instructions being executed by the at least one processor to enable the electronic device to perform the method of the second aspect and possible designs described above.

第五方面,本申请实施例提供一种计算机可读存储介质,所述计算机可读存储介质中存储有计算机执行指令,所述计算机执行指令被处理器执行时用于实现如上述第二方面及各可能设计所述的方法。In a fifth aspect, embodiments of the present application provide a computer-readable storage medium, where computer-executable instructions are stored in the computer-readable storage medium, and when the computer-executable instructions are executed by a processor, are used to implement the above-mentioned second aspect and Each possible design of the described method.

第六方面,本申请实施例提供一种计算机程序,当该计算机程序被处理器执行时,用于执行如第二方面及各可能设计所述的方法。In a sixth aspect, embodiments of the present application provide a computer program, which, when the computer program is executed by a processor, is used to execute the method described in the second aspect and various possible designs.

第七方面,本申请实施例提供一种计算机程序产品,包括计算机程序,该计算机程序用于实现如第二方面及各可能设计所述的方法。In a seventh aspect, embodiments of the present application provide a computer program product, including a computer program, where the computer program is used to implement the method described in the second aspect and each possible design.

第八方面,本申请实施例提供了一种芯片,包括:处理模块与通信接口,该处理模块能执行上述第二方面及各可能设计所述的方法。In an eighth aspect, an embodiment of the present application provides a chip, including: a processing module and a communication interface, where the processing module can execute the method described in the second aspect and each possible design.

进一步地,该芯片还包括存储模块(如,存储器),存储模块用于存储指令,处理模块用于执行存储模块存储的指令,并且对存储模块中存储的指令的执行使得处理模块执行上述第二方面及各可能设计所述的方法。Further, the chip also includes a storage module (eg, memory), the storage module is used for storing instructions, the processing module is used for executing the instructions stored in the storage module, and the execution of the instructions stored in the storage module causes the processing module to execute the above-mentioned second. Aspects and possible designs of the described methods.

本申请实施例提供的冷却塔、冷却塔检测控制方法、装置、设备及存储介质,通过在室外湿球温度处于预设温度区段时,获取设定频率,控制检测模块的冷却塔风机采用设定频率工作,并持续预设时长,最后获取检测模块的下塔温度传感器检测到的预设时长内的下塔温度。该技术方案中,在室外湿球温度处于预设温度区段时,控制检测模块工作在设定频率并获取下塔温度传感器检测到的预设时长内的下塔温度,其能够精确控制水冷冷冻水系统的工况切换,在保证系统稳定性的同时,减低了系统耗能。The cooling tower, the cooling tower detection control method, device, equipment and storage medium provided by the embodiments of the present application obtain the set frequency when the outdoor wet bulb temperature is in the preset temperature range, and control the cooling tower fan of the detection module to adopt the set frequency. Work at a fixed frequency and continue for a preset period of time, and finally obtain the lower tower temperature within the preset period of time detected by the lower tower temperature sensor of the detection module. In this technical solution, when the outdoor wet bulb temperature is in the preset temperature range, the control detection module works at the set frequency and obtains the lower tower temperature within the preset time period detected by the lower tower temperature sensor, which can accurately control the water cooling and freezing The switching of the working conditions of the water system not only ensures the stability of the system, but also reduces the energy consumption of the system.

附图说明Description of drawings

图1为本申请实施例提供的冷却塔的结构示意图;1 is a schematic structural diagram of a cooling tower provided by an embodiment of the present application;

图2为本申请提供的冷却塔检测控制方法实施例一的流程示意图;2 is a schematic flowchart of Embodiment 1 of the cooling tower detection and control method provided by the application;

图3为本申请提供的冷却塔检测控制方法实施例二的流程示意图;3 is a schematic flowchart of Embodiment 2 of the cooling tower detection and control method provided by the application;

图4为本申请提供的冷却塔检测控制装置实施例的结构示意图;4 is a schematic structural diagram of an embodiment of a cooling tower detection and control device provided by the application;

图5为本申请实施例提供的控制设备的结构示意图。FIG. 5 is a schematic structural diagram of a control device provided by an embodiment of the present application.

具体实施方式Detailed ways

为使本申请实施例的目的、技术方案和优点更加清楚,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。In order to make the purposes, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be described clearly and completely below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments It is a part of the embodiments of the present application, but not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present application.

本申请的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的本申请的实施例例如能够以除了在这里图示或描述的那些以外的顺序实施。The terms "first", "second" and the like in the description and claims of the present application and the above drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It is to be understood that the data so used may be interchanged under appropriate circumstances such that the embodiments of the application described herein can, for example, be practiced in sequences other than those illustrated or described herein.

此外,术语“包括”和“具有”以及他们的任何变形,意图在于覆盖不排他的包含,例如,包含了一系列步骤或单元的过程、方法、系统、产品或设备不必限于清楚地列出的那些步骤或单元,而是可包括没有清楚地列出的或对于这些过程、方法、产品或设备固有的其它步骤或单元。Furthermore, the terms "comprising" and "having" and any variations thereof, are intended to cover non-exclusive inclusion, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those expressly listed Rather, those steps or units may include other steps or units not expressly listed or inherent to these processes, methods, products or devices.

冷却塔是一种利用喷淋水的蒸发和对流、向空气散热的设备。通常情况下,对于大部分的开式冷却塔,来自外部设备的供水从冷却塔上部的布液器喷出后,自上而下通过填料表面与空气换热,通过蒸发和对流的方式向空气散热、降温后,落入塔底的集水池,再送往外部设备执行冷却任务。对于逆流冷却塔,空气自下而上与喷淋水逆向流动。对于横流冷却塔,空气横向进入冷却塔与喷淋水交叉流动。空气的流动可以是通过冷却塔拔风实现自然通风,也可以通过风机的驱动实现机械通风。对于闭式冷却塔,被冷却的流体可以是水,也可以是其他流体,在塔内封闭式流动,而喷淋水是作为一种中间换热介质。A cooling tower is a device that uses the evaporation and convection of spray water to dissipate heat to the air. Usually, for most open cooling towers, after the water supply from external equipment is sprayed from the liquid distributor on the upper part of the cooling tower, it exchanges heat with the air from top to bottom through the surface of the packing, and transfers heat to the air by evaporation and convection. After cooling and cooling, it falls into the sump at the bottom of the tower, and then is sent to external equipment to perform cooling tasks. For counterflow cooling towers, the air flows countercurrent to the spray water from bottom to top. For cross-flow cooling towers, the air entering the cooling tower cross-flows with the spray water. The flow of air can be natural ventilation through the cooling tower, or mechanical ventilation through the drive of the fan. For a closed cooling tower, the fluid to be cooled can be water or other fluids, which flow in a closed manner in the tower, and spray water is used as an intermediate heat exchange medium.

针对现有技术中水冷冷冻水系统中工况之间切换时存在的系统稳定性差、耗能大的问题,本申请技术方案的技术构思过程如下:通过控制冷却塔的多个冷却模块中的某个冷却模块的风机,测出冷却塔的该冷却模块在当时环境温度下可达到下塔水温,从而确定整个冷却塔在当前环境温度下的制冷能力,这样可以保证水冷冷冻水系统在不同工况之间的切换后能够平稳正常的工作,而且由于通过检测手段检测出冷却塔在当前环境温度下的制冷能力,而不是通过室外湿球温度和冷却塔换热逼近度等参数进行推测,充分的利用了冷却塔的制冷能力,可延长完全自由冷却和半自由冷却的运行时间,从而达到节能的目的。Aiming at the problems of poor system stability and high energy consumption in the prior art when switching between operating conditions in a water-cooled chilled water system, the technical conception process of the technical solution of the present application is as follows: A fan of a cooling module is measured, and the cooling module of the cooling tower can reach the water temperature of the lower tower at the current ambient temperature, so as to determine the cooling capacity of the entire cooling tower at the current ambient temperature, which can ensure that the water-cooled chilled water system works under different working conditions. After switching between the two, it can work smoothly and normally, and because the cooling capacity of the cooling tower at the current ambient temperature is detected by means of detection, rather than guessed by parameters such as outdoor wet bulb temperature and cooling tower heat exchange approximation, it is sufficient. Using the cooling capacity of the cooling tower, it can extend the running time of complete free cooling and semi-free cooling, so as to achieve the purpose of energy saving.

基于上述技术构思过程,本申请实施例提供了一种冷却塔,该冷却塔可以包括多个冷却模块,控制器,以及与该控制器连接的下塔温度传感器,通过在多个冷却模块中确定出一个检测模块,将下塔温度传感器设置在检测模块的下塔阀门和所述下塔总管之间,利用控制器来控制每个冷却模块的冷却塔风机的工作频率。在本申请中,利用该检测模块获取冷却塔在当前环境下的制冷能力,使得工况之间的切换更加准确,且可保证切换后系统的稳定性。此外,因工况切换精准,因此,可在环境温度允许的条件下时进行不同工况的切换,充分的利用了冷却塔的制冷能力,可延长完全自由冷却和半自由冷却的运行时间,从而达到节能的目的,其中,电制冷需要开制冷机,最为费电。Based on the above technical conception process, the embodiments of the present application provide a cooling tower, the cooling tower may include a plurality of cooling modules, a controller, and a lower tower temperature sensor connected to the controller, by determining among the plurality of cooling modules A detection module is produced, the lower tower temperature sensor is arranged between the lower tower valve of the detection module and the lower tower header, and the controller is used to control the operating frequency of the cooling tower fan of each cooling module. In the present application, the detection module is used to obtain the cooling capacity of the cooling tower in the current environment, so that the switching between working conditions is more accurate, and the stability of the system after the switching can be ensured. In addition, due to the precise switching of working conditions, it is possible to switch between different working conditions when the ambient temperature allows, making full use of the cooling capacity of the cooling tower, and extending the operating time of complete free cooling and semi-free cooling. To achieve the purpose of energy saving, among them, electric refrigeration needs to turn on the refrigerator, which is the most expensive.

下面,通过具体实施例对本申请的技术方案和能实现的技术效果进行详细说明。需要说明的是,下面这几个具体的实施例可以相互结合,对于相同或相似的概念或过程可能在某些实施例中不再赘述。Hereinafter, the technical solutions of the present application and the technical effects that can be achieved will be described in detail through specific embodiments. It should be noted that the following specific embodiments may be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments.

示例性的,图1为本申请实施例提供的冷却塔的结构示意图。如图1所示,在本申请实施例提供的冷却塔可以包括:多个冷却模块100、控制器101、以及与该控制器101连接的下塔温度传感器102。Exemplarily, FIG. 1 is a schematic structural diagram of a cooling tower provided in an embodiment of the present application. As shown in FIG. 1 , the cooling tower provided in this embodiment of the present application may include: a plurality of cooling modules 100 , a controller 101 , and a lower tower temperature sensor 102 connected to the controller 101 .

其中,每个冷却模块包括上塔阀门、下塔阀门、冷却塔风机;Among them, each cooling module includes upper tower valve, lower tower valve, cooling tower fan;

多个冷却模块100之间通过上塔总管103分别与每个冷却模块的上塔阀门连接,并通过下塔总管104分别与每个冷却模块的下塔阀门连接;The multiple cooling modules 100 are respectively connected to the upper tower valve of each cooling module through the upper tower header 103, and are respectively connected to the lower tower valve of each cooling module through the lower tower header 104;

每个冷却模块中的冷却塔风机与控制器101连接,该控制器101用于控制每个冷却塔风机的工作频率;The cooling tower fan in each cooling module is connected to the controller 101, and the controller 101 is used to control the operating frequency of each cooling tower fan;

下塔温度传感器102设置在检测模块1001的下塔阀门和下塔总管104之间,其中,该检测模块1001为多个冷却模块100中的任一个模块。The lower tower temperature sensor 102 is disposed between the lower tower valve and the lower tower header 104 of the detection module 1001 , wherein the detection module 1001 is any one of the plurality of cooling modules 100 .

在本申请的实施例中,冷却塔包括的冷却模块数量可以是2个或2个以上,本申请实施例并不对其进行限定。在图1所示的冷却塔中,冷却模块的数量以4个为例进行解释说明。In the embodiment of the present application, the number of cooling modules included in the cooling tower may be two or more, which is not limited in the embodiment of the present application. In the cooling tower shown in FIG. 1 , the number of cooling modules is explained by taking 4 as an example.

如图1所示,由于每个冷却模块通过上塔阀门与上塔总管103连接,且通过下塔阀门与下塔总管104连接,因而,通过控制每个冷却模块的上塔阀门和下塔阀门的开闭可以控制上塔总管103中的液体通过某些冷却模块或全部冷却模块流入下塔总管104中,从而通过冷却模块对流经的液体进行冷却。As shown in FIG. 1 , since each cooling module is connected to the upper tower main pipe 103 through the upper tower valve, and is connected to the lower tower main pipe 104 through the lower tower valve, therefore, by controlling the upper tower valve and the lower tower valve of each cooling module The opening and closing of the upper tower main pipe 103 can control the liquid in the upper tower main pipe 103 to flow into the lower tower main pipe 104 through some cooling modules or all cooling modules, so that the liquid flowing through is cooled by the cooling modules.

参照图1所示,每个冷却模块的上方设置有一个冷却塔风机,通过该冷却塔风机可以控制每个冷却模块的工作频率,即控制每个冷却模块的工作模式。Referring to FIG. 1 , a cooling tower fan is arranged above each cooling module, and the operating frequency of each cooling module can be controlled by the cooling tower fan, that is, the working mode of each cooling module can be controlled.

在本申请的实施例中,通过在冷却塔包括的多个冷却模块100中任意选定一个冷却模块作为检测模块1001,在该检测模块1001的下塔支管上设置温度传感器,以在控制器101控制该检测模块1001工作在设定频率时,获取该检测模块1001中液体的实时温度。In the embodiment of the present application, a cooling module is arbitrarily selected as the detection module 1001 from among the plurality of cooling modules 100 included in the cooling tower, and a temperature sensor is set on the lower tower branch pipe of the detection module 1001, so that the controller 101 When the detection module 1001 is controlled to work at a set frequency, the real-time temperature of the liquid in the detection module 1001 is acquired.

在实际应用中,当水冷冷冻水系统所处的环境温度满足工况的预设切换温度时,通过控制器101可以控制每个冷却模块(包括检测模块和非检测模块)的运行模式,具体的,控制非检测模的块冷却塔风机按照正常设定下塔温度进行变频运行,控制检测模块1001的冷却塔风机按照目标切换的检测频率运行。In practical applications, when the ambient temperature of the water-cooled chilled water system meets the preset switching temperature of the working condition, the controller 101 can control the operation mode of each cooling module (including the detection module and the non-detection module). , the block cooling tower fan of the non-detection module is controlled to operate at variable frequency according to the normal set lower tower temperature, and the cooling tower fan of the control detection module 1001 is controlled to operate at the target switching detection frequency.

可选的,每个冷却模块的冷却塔风机均为变频运行风机,其频率范围一般为25Hz~50Hz之间。通常情况下,可以将检测模块1001中冷却塔风机的检测频率设置为45Hz(或其他设定值),此时,设定值与风机满频相差5Hz,能够给冷却塔的制冷能力留有余量,从而保证不会因为室外气温的波动引起水冷冷冻水系统在不同工况之间频繁切换,造成系统的不稳定。Optionally, the cooling tower fan of each cooling module is a variable frequency operation fan, and its frequency range is generally between 25Hz and 50Hz. Under normal circumstances, the detection frequency of the cooling tower fan in the detection module 1001 can be set to 45Hz (or other set values). At this time, the set value is 5Hz different from the full frequency of the fan, which can leave more than enough cooling capacity for the cooling tower. This ensures that the water-cooled chilled water system will not frequently switch between different operating conditions due to fluctuations in outdoor temperature, resulting in system instability.

可以理解的是,检测模块1001中冷却塔风机的检测频率也可以设置为其他的值,例如,40Hz,42Hz,48Hz等。本申请实施例并不对检测模块1001中实际设置的冷却塔风机的检测频率进行限定,其可以根据冷却塔风机的性能或其他条件确定,此处不作赘述。It can be understood that the detection frequency of the cooling tower fan in the detection module 1001 can also be set to other values, for example, 40Hz, 42Hz, 48Hz, and so on. The embodiment of the present application does not limit the detection frequency of the cooling tower fan actually set in the detection module 1001, which can be determined according to the performance of the cooling tower fan or other conditions, which will not be repeated here.

在实际应用中,冷却模块也可以称为冷却间,检测模块1001也可以称为检测间,本实施例并不对各检测模块1001的具体名称进行限定。In practical applications, the cooling module may also be called a cooling room, and the detection module 1001 may also be called a detection room. This embodiment does not limit the specific names of the detection modules 1001 .

本申请实施例提供的冷却塔,通过包括多个冷却模块、控制器,以及与所述控制器连接的下塔温度传感器,通过如下设置:多个冷却模块之间通过上塔总管分别与每个冷却模块的上塔阀门连接,并通过下塔总管分别与每个冷却模块的下塔阀门连接,每个冷却模块中的冷却塔风机与控制器连接,通过该控制器控制每个冷却塔风机的工作频率,在多个冷却模块中选择一个模块作为检测模块,并将下塔温度传感器设置在检测模块的下塔阀门和下塔总管之间,在本方案中,因为非检测模块与检测模块的运行环境基本一致,控制非检测模块的冷却塔风机按照检测模块的冷却塔风机的频率运行时,每个冷却模块的下塔水温均可以达到预设值,从而使得整个冷却塔的下塔水温也可达到预设值,可以保证水冷冷冻水系统的工作稳定性,也可充分的利用了冷却塔的制冷能力,减少系统的耗能。The cooling tower provided by the embodiments of the present application includes a plurality of cooling modules, a controller, and a lower tower temperature sensor connected to the controller, and is configured as follows: the upper tower header is connected between the plurality of cooling modules to each The upper tower valve of the cooling module is connected to the lower tower valve of each cooling module through the lower tower header, and the cooling tower fan in each cooling module is connected to the controller, through which the controller controls the operation of each cooling tower fan. Working frequency, select one module from multiple cooling modules as the detection module, and set the lower tower temperature sensor between the lower tower valve and the lower tower header of the detection module. The operating environment is basically the same. When the cooling tower fan of the non-detection module is controlled to operate at the frequency of the cooling tower fan of the detection module, the lower tower water temperature of each cooling module can reach the preset value, so that the lower tower water temperature of the entire cooling tower is also The preset value can be reached, which can ensure the working stability of the water-cooled chilled water system, and can also fully utilize the cooling capacity of the cooling tower to reduce the energy consumption of the system.

进一步的,在本申请的实施例中,如图1所示,该冷却塔还包括:与控制器101连接的总温度传感器105,该总温度传感器105设置在下塔总管104的出口处,用于检测冷却塔的下塔总管104中的温度。Further, in the embodiment of the present application, as shown in FIG. 1 , the cooling tower further includes: a total temperature sensor 105 connected to the controller 101 , and the total temperature sensor 105 is arranged at the outlet of the lower tower header pipe 104 for The temperature in the lower tower header 104 of the cooling tower is detected.

示例性的,当利用总温度传感器105检测到冷却塔的下塔总管104中的温度后,一方面可以将该温度与上述下塔温度传感器102检测到的温度进行对比,以确定该检测模块1001与其他冷却模块的制冷能力高低,另一方面也可以根据该下塔温度传感器102检测到的温度和该总温度传感器105检测到温度,更精确的确定该检测模块1001的工作状态是否处于稳定状态。Exemplarily, when the temperature in the lower tower header 104 of the cooling tower is detected by the total temperature sensor 105, on the one hand, the temperature can be compared with the temperature detected by the above-mentioned lower tower temperature sensor 102 to determine the detection module 1001. Compared with the cooling capacity of other cooling modules, on the other hand, according to the temperature detected by the lower tower temperature sensor 102 and the temperature detected by the total temperature sensor 105, it can be more accurately determined whether the working state of the detection module 1001 is in a stable state. .

需要说明的是,图1中仅示出了控制器101与冷却塔中的各个冷却模块的冷却塔风机的连接线,以及控制器101与下塔温度传感器102的连接线。应理解,控制器101还与图1中的各个阀门(冷却模块的下塔阀门和上塔阀门)、总温度传感器等连接,图1未示出全部连接线。另外,图1中的所有阀门可以都设置为电动阀门,以便控制器进行自动控制。It should be noted that FIG. 1 only shows the connection lines between the controller 101 and the cooling tower fans of each cooling module in the cooling tower, and the connection lines between the controller 101 and the lower tower temperature sensor 102 . It should be understood that the controller 101 is also connected with each valve (lower tower valve and upper tower valve of the cooling module), total temperature sensor, etc. in FIG. 1 , and all connection lines are not shown in FIG. 1 . In addition, all valves in Figure 1 can be set as electric valves for automatic control by the controller.

基于上述图1所示的冷却塔的结构,本申请实施例还提供了一种冷却塔检测控制方法,可以应用于上述图1所示的冷却塔中的控制器,通过该控制器实现对冷却塔的下塔温度的检测过程,下述通过具体的实施例对冷却塔检测控制方法进行解释说明。Based on the structure of the cooling tower shown in FIG. 1, the embodiment of the present application also provides a detection and control method for a cooling tower, which can be applied to the controller in the cooling tower shown in FIG. The detection process of the temperature of the lower tower of the tower will be explained below through specific examples to explain the detection and control method of the cooling tower.

示例性的,图2为本申请提供的冷却塔检测控制方法实施例一的流程示意图。该方法以图1所示冷却塔中的控制器作为执行主体进行解释说明。如图2所示,该冷却塔检测控制方法可以包括如下步骤:Exemplarily, FIG. 2 is a schematic flowchart of Embodiment 1 of the cooling tower detection and control method provided by the present application. The method is explained with the controller in the cooling tower shown in FIG. 1 as the main body of execution. As shown in Figure 2, the cooling tower detection and control method may include the following steps:

S201、在室外湿球温度处于预设温度区段时,获取设定频率,该设定频率是根据冷却塔中的检测模块的冷却塔风机的性能确定的。S201. When the outdoor wet bulb temperature is in a preset temperature range, obtain a set frequency, where the set frequency is determined according to the performance of the cooling tower fan of the detection module in the cooling tower.

在本申请的实施例中,在检测冷却塔的下塔温度之前,可以首先确定检测的预设温度区段,只有在室外湿球温度处于预设温度区段时,才可以利用半自由冷却工况,这是因为在室外湿球温度低于预设温度区段的最低温度时,这时可以采用自由冷却工况,而当室外湿球温度高于预设温度区段的最高温度时,直接利用电制冷工况。因此,水冷冷冻水系统的三种工况切换,发生在特定的室外湿球温度区段内,即预设温度区段内。In the embodiment of the present application, before detecting the temperature of the lower tower of the cooling tower, the detected preset temperature range can be determined first, and only when the outdoor wet bulb temperature is in the preset temperature range can the semi-free cooling process be used. This is because when the outdoor wet bulb temperature is lower than the minimum temperature of the preset temperature section, the free cooling condition can be used at this time, and when the outdoor wet bulb temperature is higher than the maximum temperature of the preset temperature section, the direct Use electric refrigeration. Therefore, the switching of the three operating conditions of the water-cooled chilled water system occurs in a specific outdoor wet bulb temperature section, that is, a preset temperature section.

因而,在利用冷却塔的检测模块检测冷却塔的制冷能力之前,首先需要获取室外湿球温度,并判断室外湿球温度是否处于预设温度区段内,只有室外湿球温度处于预设温度区段内时,才存在半自由冷却工况和自由冷却工况之间的切换和/或半自由冷却工况和电冷却工况之间的切换。Therefore, before using the detection module of the cooling tower to detect the cooling capacity of the cooling tower, it is first necessary to obtain the outdoor wet bulb temperature and determine whether the outdoor wet bulb temperature is within the preset temperature range, and only the outdoor wet bulb temperature is within the preset temperature range. The switching between the semi-free cooling condition and the free cooling condition and/or the switching between the semi-free cooling condition and the electric cooling condition exists only when the segment is within the range.

具体的,可以根据冷却塔的板式换热器性能、冷冻侧供回水温度和流量、冷却侧流量等因素确定不同工况之间切换时冷却塔下塔水温的临界温度,进而根据冷却塔选型参数及不同负荷率、不同下塔水温临界温度,计算或模拟出所需的室外湿球温度。Specifically, the critical temperature of the water temperature under the cooling tower when switching between different working conditions can be determined according to the performance of the plate heat exchanger of the cooling tower, the temperature and flow of the supply and return water at the freezing side, and the flow rate of the cooling side. Parameters and different load rates, different critical temperature of lower tower water temperature, calculate or simulate the required outdoor wet bulb temperature.

示例性的,在确定室外湿球温度处于预设温度区段,且处于不同工况之间的临界温度时,获取待切换工况的设定频率,进而在该设定频率下检测冷却塔在待切换工况下是否能够稳定工作。Exemplarily, when it is determined that the outdoor wet bulb temperature is in the preset temperature range and is at the critical temperature between different working conditions, the set frequency of the working condition to be switched is obtained, and then the cooling tower is detected at the set frequency. Whether it can work stably under the conditions to be switched.

可以理解的是,在本实施例中,设定频率是根据冷却塔中的检测模块的冷却塔风机的性能确定的。It can be understood that, in this embodiment, the set frequency is determined according to the performance of the cooling tower fan of the detection module in the cooling tower.

在本实施例中,通过设置开始检测温度和停止检测温度来确定需要检测的预设温度区段,在室外湿球温度在此预设温度区段内即开始检测,不在此预设温度区段时停止检测。例如,当检测到室外湿球温度处于需要检测的预设温度区段时,可以获取为检测模块设定的设定频率,则按照一定周期(如间隔1小时)开启检测运行模式。In this embodiment, the preset temperature range to be detected is determined by setting the start detection temperature and the stop detection temperature, and the outdoor wet bulb temperature starts to be detected within this preset temperature range, and is not in this preset temperature range stop detection. For example, when it is detected that the outdoor wet bulb temperature is in the preset temperature range that needs to be detected, the set frequency set for the detection module can be obtained, and the detection operation mode is turned on according to a certain period (eg, an interval of 1 hour).

通过设置预设温度区段,冷却塔的检测模块只在预设温度区段内进行检测,不必常年进行检测,节省了电能消耗。By setting the preset temperature section, the detection module of the cooling tower only detects in the preset temperature section, and does not need to be tested all the year round, which saves power consumption.

S202、控制检测模块的冷却塔风机采用设定频率工作,并持续预设时长。S202, the cooling tower fan of the control detection module works at a set frequency and continues for a preset time period.

示例性的,控制器在确定室外湿球温度处于预设温度区段时,便可以基于获取到的设定频率,控制冷却塔的检测模块的冷却塔风机采用该设定频率工作。Exemplarily, when the controller determines that the outdoor wet bulb temperature is in the preset temperature range, based on the acquired set frequency, the controller may control the cooling tower fan of the detection module of the cooling tower to operate at the set frequency.

可选的,为了保证检测模块在待切换工况的工作稳定性,可以控制检测模块的冷却塔风机采用该设定频率工作预设时长,以使检测模块中的水温达到稳定。Optionally, in order to ensure the working stability of the detection module in the working condition to be switched, the cooling tower fan of the detection module can be controlled to operate at the set frequency for a preset period of time, so that the water temperature in the detection module can be stabilized.

示例性的,在本实施例中,检测模块的冷却塔风机采用设定频率工作的预设时长可以是20分钟,30分钟或其他的时长,本实施例并不对其进行限定,其可以根据场景确定。Exemplarily, in this embodiment, the preset duration for the cooling tower fan of the detection module to work at the set frequency may be 20 minutes, 30 minutes or other durations, which are not limited in this embodiment, and may be determined according to the scene. Sure.

S203、获取检测模块的下塔温度传感器检测到的预设时长内的下塔温度。S203, acquiring the lower tower temperature within a preset time period detected by the lower tower temperature sensor of the detection module.

控制器在控制检测模块的冷却塔风机按照设定频率工作时,便可以利用检测模块的下塔温度传感器来获取检测模块的温度。具体的,可以在检测模块的冷却塔风机工作的预设时长内,利用下塔温度传感器持续获取检测模块的下塔支管内的液体温度,从而可以根据该下塔温度的取值和稳定工作的时长确定冷却塔是否可以切换到待切换工况。When the controller controls the cooling tower fan of the detection module to work according to the set frequency, the temperature sensor of the lower tower of the detection module can be used to obtain the temperature of the detection module. Specifically, the temperature sensor of the lower tower can be used to continuously acquire the temperature of the liquid in the branch pipe of the lower tower of the detection module within the preset time period of the operation of the cooling tower fan of the detection module, so that the value of the temperature of the lower tower and the working stability of the lower tower can be obtained. The duration determines whether the cooling tower can be switched to the condition to be switched.

本申请实施例提供的冷却塔检测控制方法,在室外湿球温度处于预设温度区段时,获取设定频率,该设定频率是根据冷却塔中的检测模块的冷却塔风机的性能确定的,控制检测模块的冷却塔风机采用设定频率工作,并持续预设时长,最后获取检测模块的下塔温度传感器检测到的预设时长内的下塔温度。该技术方案中,在室外湿球温度处于预设温度区段时,控制检测模块工作在设定频率并获取下塔温度传感器检测到的预设时长内的下塔温度,其能够精确控制水冷冷冻水系统的工况切换,在保证系统稳定性的同时,减低了系统耗能。In the cooling tower detection and control method provided by the embodiment of the present application, when the outdoor wet bulb temperature is in the preset temperature range, a set frequency is obtained, and the set frequency is determined according to the performance of the cooling tower fan of the detection module in the cooling tower , the cooling tower fan of the control detection module operates at a set frequency and continues for a preset period of time, and finally obtains the lower tower temperature within the preset period of time detected by the lower tower temperature sensor of the detection module. In this technical solution, when the outdoor wet bulb temperature is in the preset temperature range, the control detection module works at the set frequency and obtains the lower tower temperature within the preset time period detected by the lower tower temperature sensor, which can accurately control the water cooling and freezing The switching of the working conditions of the water system not only ensures the stability of the system, but also reduces the energy consumption of the system.

在上述实施例的基础上,图3为本申请提供的冷却塔检测控制方法实施例二的流程示意图。如图3所示,在上述S203之后,该方法还可以包括如下步骤:On the basis of the above embodiment, FIG. 3 is a schematic flowchart of Embodiment 2 of the cooling tower detection and control method provided by the present application. As shown in FIG. 3, after the above S203, the method may further include the following steps:

S301、判断上述下塔温度是否达到预设温度;若是,执行S302,若否,执行S304。S301. Determine whether the temperature of the lower tower has reached a preset temperature; if yes, go to S302, if not, go to S304.

在本实施例中,在检测模块的冷却塔风机工作在设定频率的时间段内,通过连接在检测模块下方的下塔温度传感器获取检测模块的下塔温度,并判断该下塔温度是否能够达到设定频率对应工况的预设温度。In this embodiment, during the time period when the cooling tower fan of the detection module operates at the set frequency, the lower tower temperature of the detection module is obtained through the lower tower temperature sensor connected under the detection module, and it is judged whether the lower tower temperature can be Reach the preset temperature corresponding to the working condition of the set frequency.

可选的,该预设温度可以是检测模块的冷却塔风机工作的设定频率对应工况的理论温度或额度温度。Optionally, the preset temperature may be a theoretical temperature or a rated temperature corresponding to the working condition of the set frequency of the cooling tower fan of the detection module.

作为一种示例,在检测到的下塔温度达到预设温度时,这时为了保证冷风塔在待切换工况下稳定工作,则可以执行下述S302判断检测模块在预设温度稳定的时长是否大于设定时长,进而确定是否执行工况的切换。As an example, when the detected temperature of the lower tower reaches the preset temperature, at this time, in order to ensure that the cooling tower works stably under the conditions to be switched, the following S302 may be executed to determine whether the detection module is stable at the preset temperature for a period of time It is longer than the set duration, and then it is determined whether to perform the switching of the working conditions.

作为另一种示例,在检测到的下塔温度不能达到预设温度时,则可以执行下述S304,控制检测模块的冷风塔风机结束工作本次的检测工作。As another example, when the detected temperature of the lower tower cannot reach the preset temperature, the following S304 may be executed to control the cooling tower fan of the detection module to end the current detection work.

S302、判断上述下塔温度在预设温度稳定的时长是否大于设定时长;若是,执行S303;若否,执行S304。S302. Determine whether the time period during which the temperature of the lower tower is stable at the preset temperature is greater than the preset time period; if so, go to S303; if not, go to S304.

示例性的,在检测模块的冷却塔风机以设定频率持续工作预设时长时,若下塔温度可以达到预设温度且达到预设温度稳定的时长是否大于设定时长,则表明冷却塔能够在待切换工况下稳定工作;若下塔温度可以达到预设温度但达到预设温度稳定的时长小于设定时长,则表明冷却塔具有待切换工况工作的条件,但是工作不稳定。Exemplarily, when the cooling tower fan of the detection module continues to work for a preset period of time at a set frequency, if the temperature of the lower tower can reach the preset temperature and whether the time period for reaching the preset temperature is stable is longer than the preset period, it indicates that the cooling tower can Work stably under the conditions to be switched; if the temperature of the lower tower can reach the preset temperature but the stable time to reach the preset temperature is less than the set time, it means that the cooling tower has the conditions to work under the conditions to be switched, but the operation is unstable.

可选的,在本申请的实施例中,设定时长可以是小于或等于预设时长的一个数值,例如,在上述预设时长为30min时,该设定时长可选为20min等。可理解,该设定时长的具体取值可以根据预设时长的取值和工况切换所需的时间确定,此处不再赘述。Optionally, in the embodiment of the present application, the set duration may be a value less than or equal to the preset duration. For example, when the preset duration is 30 minutes, the set duration may be 20 minutes or the like. It is understandable that the specific value of the set duration may be determined according to the value of the preset duration and the time required for switching of the working conditions, which will not be repeated here.

S303、控制冷却塔中除检测模块之外的其他冷却模块的冷却塔风机采用该设定频率工作。S303 , the cooling tower fans controlling other cooling modules in the cooling tower except the detection module work at the set frequency.

示例性的,若控制器确定检测模块下的下塔支管上设置的下塔温度传感器检测到下塔温度达到预设温度且持续稳定设定时长,则可表明当前温度下,整个冷却塔的制冷能力可以支持系统工况切换后的系统运行需求,则可进行系统工况的切换。也即,控制冷却塔中除检测模块之外的其他冷却模块的冷却塔风机采用检测模块的冷却塔风机的设定频率工作,以使下塔总管内的温度也达到预定温度。Exemplarily, if the controller determines that the lower tower temperature sensor set on the lower tower branch pipe under the detection module detects that the lower tower temperature reaches the preset temperature and continues to be stable for a set period of time, it can indicate that at the current temperature, the entire cooling tower is refrigerated. If the capability can support the system operation requirements after the system operating conditions are switched, the system operating conditions can be switched. That is, the cooling tower fans controlling other cooling modules in the cooling tower except the detection module operate at the set frequency of the cooling tower fans of the detection module, so that the temperature in the lower tower header also reaches the predetermined temperature.

S304、控制检测模块的冷却塔风机结束工作。S304, the cooling tower fan of the control detection module ends the work.

示例性的,若控制器确定检测模块下的下塔支管上设置的下塔温度传感器检测到下塔温度不能达到预设温度,或者,下塔温度传感器检测到下塔温度能达到预设温度但达到预设温度的时长小于或等于设定时长,则可表明当前温度下,整个冷却塔的制冷能力不足以支持系统工况切换后的系统运行需求,不能进行系统工况的切换,因而,可以直接控制检测模块的冷却塔风机结束工作,退出检测模块的检测运行模式。Exemplarily, if the controller determines that the lower tower temperature sensor provided on the lower tower branch pipe under the detection module detects that the lower tower temperature cannot reach the preset temperature, or, the lower tower temperature sensor detects that the lower tower temperature can reach the preset temperature but If the time to reach the preset temperature is less than or equal to the set time, it can indicate that at the current temperature, the cooling capacity of the entire cooling tower is not enough to support the system operation requirements after the system operating conditions are switched, and the system operating conditions cannot be switched. Therefore, it is possible to The cooling tower fan that directly controls the detection module ends its work and exits the detection operation mode of the detection module.

本申请实施例提供的冷却塔检测控制方法,若下塔温度达到预设温度,并且在预设温度稳定的时长大于设定时长,则控制冷却塔中除检测模块之外的其他冷却模块的冷却塔风机采用设定频率工作;若下塔温度未达到预设温度,和/或,下塔温度达到预设温度的稳定时长小于或等于设定时长,则控制检测模块的冷却塔风机结束工作。该技术方案中,通过判断检测模块的下塔温度能够达到预设温度或达到预设温度的设定时长,能够准确确定冷却塔在当前环境温度下的制冷能力,提高了工况切换的准确性和系统稳定性。In the cooling tower detection and control method provided by the embodiment of the present application, if the temperature of the lower tower reaches the preset temperature, and the stable time period at the preset temperature is longer than the preset time period, the cooling of other cooling modules in the cooling tower except the detection module is controlled. The tower fan works at the set frequency; if the temperature of the lower tower does not reach the preset temperature, and/or the stable time period for the temperature of the lower tower to reach the preset temperature is less than or equal to the set time period, the cooling tower fan of the control detection module will end working. In this technical solution, by judging that the temperature of the lower tower of the detection module can reach the preset temperature or the set time period for reaching the preset temperature, the cooling capacity of the cooling tower at the current ambient temperature can be accurately determined, and the accuracy of the switching of the working conditions is improved. and system stability.

下述为本申请装置实施例,可以用于执行本申请方法实施例。对于本申请装置实施例中未披露的细节,请参照本申请方法实施例。The following are apparatus embodiments of the present application, which can be used to execute the method embodiments of the present application. For details not disclosed in the device embodiments of the present application, please refer to the method embodiments of the present application.

图4为本申请提供的冷却塔检测控制装置实施例的结构示意图。该冷却塔检测控制装置应用于上述图1所示的冷却塔中的控制器中。如图4所示,该冷却塔检测控制装置可以包括:FIG. 4 is a schematic structural diagram of an embodiment of a cooling tower detection and control device provided by the present application. The cooling tower detection and control device is applied to the controller in the cooling tower shown in FIG. 1 . As shown in Figure 4, the cooling tower detection and control device may include:

获取模块401,用于在室外湿球温度处于预设温度区段时,获取设定频率,所述设定频率是根据所述冷却塔中的检测模块的冷却塔风机的性能确定的;an acquisition module 401, configured to acquire a set frequency when the outdoor wet bulb temperature is in a preset temperature range, where the set frequency is determined according to the performance of the cooling tower fan of the detection module in the cooling tower;

控制模块402,用于控制所述检测模块的冷却塔风机采用所述设定频率工作,并持续预设时长;A control module 402, configured to control the cooling tower fan of the detection module to operate at the set frequency and continue for a preset time period;

所述获取模块401,还用于获取所述检测模块的下塔温度传感器检测到的所述预设时长内的下塔温度。The acquisition module 401 is further configured to acquire the temperature of the lower tower within the preset time period detected by the lower tower temperature sensor of the detection module.

在本申请实施例的一种可能设计中,控制模块402,还用于在所述下塔温度达到预设温度,并且在所述预设温度稳定的时长大于设定时长时,控制所述冷却塔中除所述检测模块之外的其他冷却模块的冷却塔风机采用所述设定频率工作。In a possible design of the embodiment of the present application, the control module 402 is further configured to control the cooling when the temperature of the lower tower reaches a preset temperature, and when the preset temperature is stable for a period longer than a preset period The cooling tower fans of other cooling modules in the tower except the detection module work at the set frequency.

在本申请实施例的另一种可能设计中,控制模块402,还用于在所述下塔温度未达到预设温度,和/或,所述下塔温度达到所述预设温度的稳定时长小于或等于设定时长时,控制所述检测模块的冷却塔风机结束工作。In another possible design of the embodiment of the present application, the control module 402 is further configured to, when the temperature of the lower tower does not reach the preset temperature, and/or the stable time period for which the temperature of the lower tower reaches the preset temperature When the time is less than or equal to the set time period, the cooling tower fan controlling the detection module stops working.

本申请实施例提供的装置,可用于执行图2和图3所示实施例中的方法,其实现原理和技术效果类似,在此不再赘述。The apparatuses provided in the embodiments of the present application can be used to execute the methods in the embodiments shown in FIG. 2 and FIG. 3 , and the implementation principles and technical effects thereof are similar, and details are not described herein again.

需要说明的是,应理解以上装置的各个模块的划分仅仅是一种逻辑功能的划分,实际实现时可以全部或部分集成到一个物理实体上,也可以物理上分开。且这些模块可以全部以软件通过处理元件调用的形式实现;也可以全部以硬件的形式实现;还可以部分模块通过处理元件调用软件的形式实现,部分模块通过硬件的形式实现。例如,控制模块可以为单独设立的处理元件,也可以集成在上述装置的某一个芯片中实现,此外,也可以以程序代码的形式存储于上述装置的存储器中,由上述装置的某一个处理元件调用并执行以上控制模块的功能。其它模块的实现与之类似。此外这些模块全部或部分可以集成在一起,也可以独立实现。这里所述的处理元件可以是一种集成电路,具有信号的处理能力。在实现过程中,上述方法的各步骤或以上各个模块可以通过处理器元件中的硬件的集成逻辑电路或者软件形式的指令完成。It should be noted that it should be understood that the division of each module of the above apparatus is only a division of logical functions, and may be fully or partially integrated into a physical entity in actual implementation, or may be physically separated. And these modules can all be implemented in the form of software calling through processing elements; they can also all be implemented in hardware; some modules can also be implemented in the form of calling software through processing elements, and some modules can be implemented in hardware. For example, the control module may be a separately established processing element, or it may be integrated into a certain chip of the above-mentioned device to realize, in addition, it may also be stored in the memory of the above-mentioned device in the form of program code, and the control module can be controlled by a certain processing element of the above-mentioned device. Call and execute the functions of the above control module. The implementation of other modules is similar. In addition, all or part of these modules can be integrated together, and can also be implemented independently. The processing element described here may be an integrated circuit with signal processing capability. In the implementation process, each step of the above-mentioned method or each of the above-mentioned modules can be completed by an integrated logic circuit of hardware in the processor element or an instruction in the form of software.

例如,以上这些模块可以是被配置成实施以上方法的一个或多个集成电路,例如:一个或多个特定集成电路(application specific integrated circuit,ASIC),或,一个或多个微处理器(digital signal processor,DSP),或,一个或者多个现场可编程门阵列(field programmable gate array,FPGA)等。再如,当以上某个模块通过处理元件调度程序代码的形式实现时,该处理元件可以是通用处理器,例如中央处理器(centralprocessing unit,CPU)或其它可以调用程序代码的处理器。再如,这些模块可以集成在一起,以片上系统(system-on-a-chip,SOC)的形式实现。For example, the above modules may be one or more integrated circuits configured to implement the above methods, such as: one or more application specific integrated circuits (ASIC), or one or more digital microprocessors (digital) signal processor, DSP), or, one or more field programmable gate array (field programmable gate array, FPGA) and so on. For another example, when one of the above modules is implemented in the form of a processing element scheduling program code, the processing element may be a general-purpose processor, such as a central processing unit (CPU) or other processors that can invoke program codes. For another example, these modules can be integrated together and implemented in the form of a system-on-a-chip (SOC).

在上述实施例中,可以全部或部分地通过软件、硬件、固件或者其任意组合来实现。当使用软件实现时,可以全部或部分地以计算机程序产品的形式实现。所述计算机程序产品包括一个或多个计算机指令。在计算机上加载和执行所述计算机程序指令时,全部或部分地产生按照本申请实施例所述的流程或功能。所述计算机可以是通用计算机、专用计算机、计算机网络、或者其他可编程装置。所述计算机指令可以存储在计算机可读存储介质中,或者从一个计算机可读存储介质向另一个计算机可读存储介质传输,例如,所述计算机指令可以从一个网站站点、计算机、服务器或数据中心通过有线(例如同轴电缆、光纤、数字用户线(DSL))或无线(例如红外、无线、微波等)方式向另一个网站站点、计算机、服务器或数据中心进行传输。所述计算机可读存储介质可以是计算机能够存取的任何可用介质或者是包含一个或多个可用介质集成的服务器、数据中心等数据存储设备。所述可用介质可以是磁性介质,(例如,软盘、硬盘、磁带)、光介质(例如,DVD)、或者半导体介质(例如固态硬盘solid state disk(SSD))等。In the above-mentioned embodiments, it may be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented in software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, all or part of the processes or functions described in the embodiments of the present application are generated. The computer may be a general purpose computer, special purpose computer, computer network, or other programmable device. The computer instructions may be stored in or transmitted from one computer readable storage medium to another computer readable storage medium, for example, the computer instructions may be downloaded from a website site, computer, server or data center Transmission to another website site, computer, server, or data center is by wire (eg, coaxial cable, fiber optic, digital subscriber line (DSL)) or wireless (eg, infrared, wireless, microwave, etc.). The computer-readable storage medium may be any available medium that can be accessed by a computer or a data storage device such as a server, data center, etc. that includes an integration of one or more available media. The usable media may be magnetic media (eg, floppy disks, hard disks, magnetic tapes), optical media (eg, DVDs), or semiconductor media (eg, solid state disks (SSDs)), and the like.

图5为本申请实施例提供的控制设备的结构示意图。如图5所示,该控制设备可以包括:至少一个处理器501(图5中仅示出了一个处理器)、以及与至少一个处理器501通信连接的存储器502。FIG. 5 is a schematic structural diagram of a control device provided by an embodiment of the present application. As shown in FIG. 5 , the control device may include: at least one processor 501 (only one processor is shown in FIG. 5 ), and a memory 502 connected in communication with the at least one processor 501 .

其中,存储器502存储有可被至少一个处理器501执行的指令,所述指令被所述至少一个处理器501执行,以使控制设备能够执行前述方法实施例的各个步骤。The memory 502 stores instructions executable by the at least one processor 501, and the instructions are executed by the at least one processor 501, so that the control device can perform various steps of the foregoing method embodiments.

可选的,存储器502既可以是独立的,也可以跟处理器501集成在一起。Optionally, the memory 502 may be independent or integrated with the processor 501 .

进一步的,在本申请的实施例中,该控制设备还可以包括:通信接口503和系统总线504。其中,上述存储器502和通信接口503通过系统总线504与上述至少一个处理器501连接并完成相互间的通信,通信接口503用于和其他设备进行通信。Further, in the embodiment of the present application, the control device may further include: a communication interface 503 and a system bus 504 . The memory 502 and the communication interface 503 are connected to the at least one processor 501 through the system bus 504 and communicate with each other, and the communication interface 503 is used to communicate with other devices.

可以理解的是,图5中提到的系统总线可以是外设部件互连标准(peripheralcomponent interconnect,PCI)总线或扩展工业标准结构(extended industry standardarchitecture,EISA)总线等。所述系统总线可以分为地址总线、数据总线、控制总线等。为便于表示,图中仅用一条粗线表示,但并不表示仅有一根总线或一种类型的总线。通信接口用于实现数据库访问装置与其他设备(例如客户端、读写库和只读库)之间的通信。存储器可能包含随机存取存储器(random access memory,RAM),也可能还包括非易失性存储器(non-volatile memory),例如至少一个磁盘存储器。It can be understood that the system bus mentioned in FIG. 5 may be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus or the like. The system bus can be divided into an address bus, a data bus, a control bus, and the like. For ease of presentation, only one thick line is used in the figure, but it does not mean that there is only one bus or one type of bus. The communication interface is used to realize the communication between the database access device and other devices (eg client, read-write library and read-only library). The memory may include random access memory (RAM), and may also include non-volatile memory (non-volatile memory), such as at least one disk storage.

上述的处理器501可以是通用处理器,包括中央处理器CPU、网络处理器(networkprocessor,NP)等;还可以是数字信号处理器DSP、专用集成电路ASIC、现场可编程门阵列FPGA或者其他可编程逻辑器件、分立门或者晶体管逻辑器件、分立硬件组件。The above-mentioned processor 501 can be a general-purpose processor, including a central processing unit CPU, a network processor (NP), etc.; it can also be a digital signal processor DSP, an application-specific integrated circuit ASIC, a field programmable gate array FPGA, or other available processors. Programming logic devices, discrete gate or transistor logic devices, discrete hardware components.

可选的,本申请实施例还提供一种计算机可读存储介质,所述计算机可读存储介质中存储有计算机执行指令,当其在计算机上运行时,使得计算机执行如上述图2和图3所示实施例的方法。Optionally, an embodiment of the present application further provides a computer-readable storage medium, where computer-executable instructions are stored in the computer-readable storage medium, and when the computer-readable storage medium runs on a computer, the computer executes the instructions shown in FIG. 2 and FIG. 3 above. The method of the illustrated embodiment.

可选的,本申请实施例还提供一种运行指令的芯片,所述芯片用于执行上述图2和图3所示实施例的方法。Optionally, an embodiment of the present application further provides a chip for running instructions, where the chip is used to execute the methods of the embodiments shown in FIG. 2 and FIG. 3 .

本申请实施例还提供一种计算机程序产品,所述计算机程序产品包括计算机程序,所述计算机程序存储在计算机可读存储介质中,至少一个处理器可以从所述计算机可读存储介质中读取所述计算机程序,所述至少一个处理器执行所述计算机程序时可实现上述图2和图3所示实施例的方法。Embodiments of the present application further provide a computer program product, where the computer program product includes a computer program, and the computer program is stored in a computer-readable storage medium, and at least one processor can read from the computer-readable storage medium The computer program, when the at least one processor executes the computer program, can implement the methods of the embodiments shown in FIG. 2 and FIG. 3 .

本申请中,“至少一个”是指一个或者多个,“多个”是指两个或两个以上。“和/或”,描述关联对象的关联关系,表示可以存在三种关系,例如,A和/或B,可以表示:单独存在A,同时存在A和B,单独存在B的情况,其中A,B可以是单数或者复数。字符“/”一般表示前后关联对象是一种“或”的关系;在公式中,字符“/”,表示前后关联对象是一种“相除”的关系。“以下至少一项(个)”或其类似表达,是指的这些项中的任意组合,包括单项(个)或复数项(个)的任意组合。例如,a,b,或c中的至少一项(个),可以表示:a,b,c,a-b,a-c,b-c,或a-b-c,其中,a,b,c可以是单个,也可以是多个。In this application, "at least one" means one or more, and "plurality" means two or more. "And/or", which describes the association relationship of the associated objects, indicates that there can be three kinds of relationships, for example, A and/or B, which can indicate: the existence of A alone, the existence of A and B at the same time, and the existence of B alone, where A, B can be singular or plural. The character "/" generally indicates that the related objects before and after are an "or" relationship; in the formula, the character "/" indicates that the related objects are a "division" relationship. "At least one item(s) below" or similar expressions thereof refer to any combination of these items, including any combination of single item(s) or plural items(s). For example, at least one item (a) of a, b, or c can represent: a, b, c, a-b, a-c, b-c, or a-b-c, where a, b, c can be single or multiple indivual.

可以理解的是,在本申请的实施例中涉及的各种数字编号仅为描述方便进行的区分,并不用来限制本申请的实施例的范围。在本申请的实施例中,上述各过程的序号的大小并不意味着执行顺序的先后,各过程的执行顺序应以其功能和内在逻辑确定,而不应对本申请的实施例的实施过程构成任何限定。It can be understood that, the various numbers and numbers involved in the embodiments of the present application are only for the convenience of description, and are not used to limit the scope of the embodiments of the present application. In the embodiments of the present application, the size of the sequence numbers of the above-mentioned processes does not imply the sequence of execution, and the execution sequence of each process should be determined by its functions and internal logic, and should not constitute the implementation process of the embodiments of the present application. any restrictions.

最后应说明的是:以上各实施例仅用以说明本申请的技术方案,而非对其限制;尽管参照前述各实施例对本申请进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本申请各实施例技术方案的范围。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, but not to limit them; although the present application has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: The technical solutions described in the foregoing embodiments can still be modified, or some or all of the technical features thereof can be equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the technical solutions of the embodiments of the present application. scope.

Claims (10)

1.一种冷却塔,其特征在于,包括:1. a cooling tower, is characterized in that, comprises: 多个冷却模块,控制器,以及与所述控制器连接的下塔温度传感器;a plurality of cooling modules, a controller, and a lower tower temperature sensor connected to the controller; 每个冷却模块包括上塔阀门、下塔阀门、冷却塔风机;Each cooling module includes upper tower valve, lower tower valve, cooling tower fan; 所述多个冷却模块之间通过上塔总管分别与每个冷却模块的上塔阀门连接,并通过下塔总管分别与每个冷却模块的下塔阀门连接;The plurality of cooling modules are respectively connected with the upper tower valve of each cooling module through the upper tower header, and are respectively connected with the lower tower valve of each cooling module through the lower tower header; 每个冷却模块中的冷却塔风机与所述控制器连接,所述控制器用于控制每个冷却塔风机的工作频率;The cooling tower fan in each cooling module is connected to the controller, and the controller is used to control the working frequency of each cooling tower fan; 所述下塔温度传感器设置在检测模块的下塔阀门和所述下塔总管之间,其中,所述检测模块为所述多个冷却模块中的任一个模块。The lower tower temperature sensor is arranged between the lower tower valve of the detection module and the lower tower header, wherein the detection module is any one of the plurality of cooling modules. 2.根据权利要求1所述的冷却塔,其特征在于,所述冷却塔还包括:2. cooling tower according to claim 1, is characterized in that, described cooling tower also comprises: 与所述控制器连接的总温度传感器,所述总温度传感器设置在所述下塔总管的出口处,用于检测所述冷却塔的下塔总管中的温度。A total temperature sensor connected with the controller, the total temperature sensor is arranged at the outlet of the lower tower header pipe, and is used for detecting the temperature in the lower tower header pipe of the cooling tower. 3.一种冷却塔检测控制方法,其特征在于,应用于权利要求1或2所述的冷却塔中的控制器中,所述方法包括:3. a cooling tower detection control method, is characterized in that, is applied in the controller in the cooling tower described in claim 1 or 2, and described method comprises: 在室外湿球温度处于预设温度区段时,获取设定频率,所述设定频率是根据所述冷却塔中的检测模块的冷却塔风机的性能确定的;When the outdoor wet bulb temperature is in the preset temperature range, obtain a set frequency, where the set frequency is determined according to the performance of the cooling tower fan of the detection module in the cooling tower; 控制所述检测模块的冷却塔风机采用所述设定频率工作,并持续预设时长;Control the cooling tower fan of the detection module to work at the set frequency and continue for a preset period of time; 获取所述检测模块的下塔温度传感器检测到的所述预设时长内的下塔温度。Acquire the temperature of the lower tower within the preset time period detected by the lower tower temperature sensor of the detection module. 4.根据权利要求3所述的方法,其特征在于,所述方法还包括:4. The method according to claim 3, wherein the method further comprises: 若所述下塔温度达到预设温度,并且在所述预设温度稳定的时长大于设定时长,则控制所述冷却塔中除所述检测模块之外的其他冷却模块的冷却塔风机采用所述设定频率工作。If the temperature of the lower tower reaches the preset temperature, and the time period when the preset temperature is stable is longer than the preset time period, the cooling tower fans of the cooling towers other than the detection module are controlled to adopt the selected cooling tower fan. work at the set frequency. 5.根据权利要求3所述的方法,其特征在于,所述方法还包括:5. The method according to claim 3, wherein the method further comprises: 若所述下塔温度未达到预设温度,和/或,所述下塔温度达到所述预设温度的稳定时长小于或等于设定时长,则控制所述检测模块的冷却塔风机结束工作。If the temperature of the lower tower does not reach the preset temperature, and/or the stable time period for the temperature of the lower tower to reach the preset temperature is less than or equal to the preset time period, the cooling tower fan of the detection module is controlled to stop working. 6.一种冷却塔检测控制装置,其特征在于,应用于权利要求1或2所述的冷却塔中的控制器中,所述装置包括:6. A cooling tower detection and control device, characterized in that, applied in the controller in the cooling tower of claim 1 or 2, the device comprising: 获取模块,用于在室外湿球温度处于预设温度区段时,获取设定频率,所述设定频率是根据所述冷却塔中的检测模块的冷却塔风机的性能确定的;an acquisition module, configured to acquire a set frequency when the outdoor wet bulb temperature is in the preset temperature range, where the set frequency is determined according to the performance of the cooling tower fan of the detection module in the cooling tower; 控制模块,用于控制所述检测模块的冷却塔风机采用所述设定频率工作,并持续预设时长;a control module, configured to control the cooling tower fan of the detection module to operate at the set frequency and continue for a preset period of time; 所述获取模块,还用于获取所述检测模块的下塔温度传感器检测到的所述预设时长内的下塔温度。The acquisition module is further configured to acquire the temperature of the lower tower within the preset time period detected by the lower tower temperature sensor of the detection module. 7.根据权利要求6所述的装置,其特征在于,所述控制模块,还用于在所述下塔温度达到预设温度,并且在所述预设温度稳定的时长大于设定时长时,控制所述冷却塔中除所述检测模块之外的其他冷却模块的冷却塔风机采用所述设定频率工作。7 . The device according to claim 6 , wherein the control module is further configured to reach a preset temperature when the temperature of the lower tower reaches a preset temperature, and when the preset temperature is stable for a duration greater than a preset duration, 7 . The cooling tower fans controlling other cooling modules in the cooling tower except the detection module work at the set frequency. 8.根据权利要求6所述的装置,其特征在于,所述控制模块,还用于在所述下塔温度未达到预设温度,和/或,所述下塔温度达到所述预设温度的稳定时长小于或等于设定时长时,控制所述检测模块的冷却塔风机结束工作。8. The device according to claim 6, wherein the control module is further configured to not reach a preset temperature when the temperature of the lower tower does not reach the preset temperature, and/or, the temperature of the lower tower reaches the preset temperature When the stable duration is less than or equal to the set duration, the cooling tower fan of the detection module is controlled to stop working. 9.一种控制设备,其特征在于,包括:9. A control device, characterized in that, comprising: 至少一个处理器;以及at least one processor; and 与所述至少一个处理器通信连接的存储器;其中,a memory communicatively coupled to the at least one processor; wherein, 所述存储器存储有可被所述至少一个处理器执行的指令,所述指令被所述至少一个处理器执行,以使所述电子设备能够执行上述权利要求3至5中任一项所述的方法。The memory stores instructions executable by the at least one processor, the instructions being executed by the at least one processor to enable the electronic device to perform the method of any one of claims 3 to 5 above method. 10.一种计算机可读存储介质,其特征在于,所述计算机可读存储介质中存储有计算机执行指令,所述计算机执行指令被处理器执行时用于实现如上述权利要求3至5中任一项所述的方法。10. A computer-readable storage medium, characterized in that, computer-executable instructions are stored in the computer-readable storage medium, and when the computer-executable instructions are executed by a processor, the computer-executable instructions are used to implement any one of claims 3 to 5 above. one of the methods described.
CN202110020600.4A 2021-01-07 2021-01-07 Cooling tower, cooling tower detection control method, device, equipment and storage medium Active CN112857132B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110020600.4A CN112857132B (en) 2021-01-07 2021-01-07 Cooling tower, cooling tower detection control method, device, equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110020600.4A CN112857132B (en) 2021-01-07 2021-01-07 Cooling tower, cooling tower detection control method, device, equipment and storage medium

Publications (2)

Publication Number Publication Date
CN112857132A true CN112857132A (en) 2021-05-28
CN112857132B CN112857132B (en) 2022-11-18

Family

ID=76005065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110020600.4A Active CN112857132B (en) 2021-01-07 2021-01-07 Cooling tower, cooling tower detection control method, device, equipment and storage medium

Country Status (1)

Country Link
CN (1) CN112857132B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114206070A (en) * 2021-11-23 2022-03-18 中国农业银行股份有限公司安徽省分行 Cooling water temperature compensation control method
CN114838598A (en) * 2022-05-05 2022-08-02 中国联合网络通信集团有限公司 Closed cooling tower, control method, system, device and storage medium
CN115289896A (en) * 2022-08-03 2022-11-04 北京京能恒星能源科技有限公司 A kind of control method and device of cooling tower group for energy station
CN115682761A (en) * 2022-10-31 2023-02-03 武汉科技大学 Cooling tower cooling water return water temperature optimization control system and control method
CN117053619A (en) * 2023-10-13 2023-11-14 常州中冷环保技术有限公司 Cooling tower operation monitoring system and control method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4474027A (en) * 1983-01-31 1984-10-02 The Babcock & Wilcox Company Optimum control of cooling tower water temperature by function blocks
JPH109796A (en) * 1996-06-24 1998-01-16 Japan Tobacco Inc Matrix control method of cooling water temperature
CN203940777U (en) * 2013-12-17 2014-11-12 深圳百时得能源环保科技有限公司 A kind of cooling tower energy efficiency control system in parallel
CN205079668U (en) * 2015-10-19 2016-03-09 深圳市新环能科技有限公司 Cooling tower energy -saving control system based on efficiency control
CN106871364A (en) * 2017-03-09 2017-06-20 珠海格力电器股份有限公司 Method for controlling outlet water temperature of cooling tower of central air-conditioning system
CN107883519A (en) * 2017-10-23 2018-04-06 广东美的暖通设备有限公司 Central air-conditioning, the control method of its cooling tower, device and readable storage medium storing program for executing
CN110118509A (en) * 2019-06-11 2019-08-13 珠海派诺科技股份有限公司 A kind of blower fan of cooling tower energy-saving control method and system
CN110360868A (en) * 2019-07-17 2019-10-22 珠海格力电器股份有限公司 Cooling tower, method and device for adjusting upper limit frequency of variable frequency fan of cooling tower and air conditioning unit

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4474027A (en) * 1983-01-31 1984-10-02 The Babcock & Wilcox Company Optimum control of cooling tower water temperature by function blocks
JPH109796A (en) * 1996-06-24 1998-01-16 Japan Tobacco Inc Matrix control method of cooling water temperature
CN203940777U (en) * 2013-12-17 2014-11-12 深圳百时得能源环保科技有限公司 A kind of cooling tower energy efficiency control system in parallel
CN205079668U (en) * 2015-10-19 2016-03-09 深圳市新环能科技有限公司 Cooling tower energy -saving control system based on efficiency control
CN106871364A (en) * 2017-03-09 2017-06-20 珠海格力电器股份有限公司 Method for controlling outlet water temperature of cooling tower of central air-conditioning system
CN107883519A (en) * 2017-10-23 2018-04-06 广东美的暖通设备有限公司 Central air-conditioning, the control method of its cooling tower, device and readable storage medium storing program for executing
CN110118509A (en) * 2019-06-11 2019-08-13 珠海派诺科技股份有限公司 A kind of blower fan of cooling tower energy-saving control method and system
CN110360868A (en) * 2019-07-17 2019-10-22 珠海格力电器股份有限公司 Cooling tower, method and device for adjusting upper limit frequency of variable frequency fan of cooling tower and air conditioning unit

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114206070A (en) * 2021-11-23 2022-03-18 中国农业银行股份有限公司安徽省分行 Cooling water temperature compensation control method
CN114838598A (en) * 2022-05-05 2022-08-02 中国联合网络通信集团有限公司 Closed cooling tower, control method, system, device and storage medium
CN115289896A (en) * 2022-08-03 2022-11-04 北京京能恒星能源科技有限公司 A kind of control method and device of cooling tower group for energy station
CN115682761A (en) * 2022-10-31 2023-02-03 武汉科技大学 Cooling tower cooling water return water temperature optimization control system and control method
CN117053619A (en) * 2023-10-13 2023-11-14 常州中冷环保技术有限公司 Cooling tower operation monitoring system and control method
CN117053619B (en) * 2023-10-13 2024-01-02 常州中冷环保技术有限公司 Cooling tower operation monitoring system and control method

Also Published As

Publication number Publication date
CN112857132B (en) 2022-11-18

Similar Documents

Publication Publication Date Title
CN112857132B (en) Cooling tower, cooling tower detection control method, device, equipment and storage medium
US6886353B2 (en) Cooling system
CN115264643B (en) An air conditioning system and its control method
US20140069626A1 (en) Temperature control system and temperature control method thereof
US20030193777A1 (en) Data center energy management system
CN113375476B (en) Power control method and device for cooling tower fan group and computer equipment
CN115682453A (en) Chiller operation control method, device, electronic equipment and medium
CN112857131B (en) Cooling tower control method and device and cooling system
CN115930293B (en) Air conditioning system and control method thereof
TWI482581B (en) Temprature control system and temprature control method thereof
CN111102691B (en) Module combined air conditioning system
CN112378003B (en) Energy-saving air conditioner and control method thereof
JP2011226680A (en) Cooling water producing facility
CN112856722A (en) Cold source system control method, controller, system, storage medium and program product
CN112856723A (en) Cooling water pump control method and device, controller and refrigeration system
CN115523627A (en) Control method and device of air conditioner, air conditioner and storage medium
CN115397212B (en) A cooling system and control method thereof, electronic equipment and storage medium
CN115031355B (en) Air conditioning system external fan control method, device, electronic device and storage medium
CN116558142A (en) A dual-cycle temperature control device and its control method
CN119697954A (en) A control method for a heat dissipation system, a heat dissipation system, a device and a storage medium
CN116007078A (en) Method, device and equipment for obtaining operating parameters of a refrigeration system
CN113551374A (en) Control method, device and equipment of air conditioner outdoor unit and storage medium
CN119835908A (en) Converter valve anti-condensation device, cooling system, anti-condensation method and equipment
CN115581032A (en) Control method and related device of refrigeration system
CN113959128B (en) Control method, device, refrigeration equipment and medium for multi-head chiller

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant