CN112758839B - A vertical lifting construction equipment hoisting device - Google Patents
A vertical lifting construction equipment hoisting device Download PDFInfo
- Publication number
- CN112758839B CN112758839B CN202110087182.0A CN202110087182A CN112758839B CN 112758839 B CN112758839 B CN 112758839B CN 202110087182 A CN202110087182 A CN 202110087182A CN 112758839 B CN112758839 B CN 112758839B
- Authority
- CN
- China
- Prior art keywords
- wall
- hook
- plate
- fixedly mounted
- movably connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title abstract description 13
- 239000000725 suspension Substances 0.000 claims description 7
- 239000011435 rock Substances 0.000 claims 1
- 238000007789 sealing Methods 0.000 claims 1
- 239000000463 material Substances 0.000 abstract description 18
- 238000005457 optimization Methods 0.000 description 8
- 230000000694 effects Effects 0.000 description 7
- 238000000034 method Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/06—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs mounted for jibbing or luffing movements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
- B66C1/34—Crane hooks
- B66C1/36—Crane hooks with means, e.g. spring-biased detents, for preventing inadvertent disengagement of loads
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
本发明涉及建筑设备技术领域,且公开了一种垂直升降的建筑设备吊装装置,包括工作台、吊臂、吊绳、吊钩座、吊装封闭组件、晃动锁紧组件和挂钩,所述工作台的顶端与吊臂的底端固定安装,所述吊臂的顶端与吊绳的顶端固定安装,所述吊绳的底端与吊钩座的顶端固定安装,该垂直升降的建筑设备吊装装置,随着吊臂的伸长鉴于物料本身质量使得置物板移动,置物板的移动带动着移动板移动使得节杆摆动缩进,节杆的摆动配合着半齿带动着齿板在限位座的限制下移动,当挂绳在调取物料阶段随着高度提升造成晃动,挂钩在进行晃荡时带动着晃动锁紧组件开始工作,从而实现了在对物料进行调取阶段,挂绳无法脱钩以及挂绳晃荡自动锁紧的功能。
The invention relates to the technical field of construction equipment, and discloses a vertical lifting construction equipment hoisting device, including a workbench, a boom, a sling, a hook seat, a hoisting closure assembly, a shaking locking assembly, and a hook. The top of the boom is fixedly installed with the bottom end of the boom, the top of the boom is fixedly installed with the top of the sling, the bottom of the sling is fixedly installed with the top of the hook seat, the vertical lifting construction equipment hoisting device, With the extension of the boom, the storage plate moves due to the quality of the material itself. The movement of the storage plate drives the movement of the moving plate to make the joint bar swing and retract. The swing of the joint bar cooperates with the half tooth to drive the tooth plate to limit the limit seat. Moving down, when the lanyard shakes as the height rises during the stage of material transfer, the hook drives the shaking locking component to start working when sloshing, thus realizing that the lanyard cannot be unhooked and the lanyard Sloshing automatic locking function.
Description
技术领域technical field
本发明涉及建筑设备技术领域,具体为一种垂直升降的建筑设备吊装装置。The invention relates to the technical field of construction equipment, in particular to a vertical lifting construction equipment hoisting device.
背景技术Background technique
西欧作为最初出现吊架型重机,随着机械工业的发展,在起重机的重要磨损件处采用金属材料制造,依靠水利来进行驱动源,为了追逐建筑所需的脚步,起重机得到了更为深次的改进,在一定程度上解决了重大劳动力,起重机作为便于更换场地的其中设备,其运用的便捷性受到了多数企业的重视,但是起重机的作业方式需要人们对其认真对待,避免设备事故发生。As the first hanger-type crane in Western Europe, with the development of the machinery industry, the important wear parts of the crane are made of metal materials, relying on water conservancy as the driving source, in order to chase the footsteps required by construction, the crane has been further developed This improvement solves the problem of labor force to a certain extent. As one of the equipment that is convenient for changing the site, the convenience of its use has been valued by most enterprises. However, the operation method of the crane requires people to take it seriously to avoid equipment accidents. .
目前市场上,起重机的种类很多,为了提高作业效率配合少数人工操作来进行物料的搬运,当起重机运动在建筑行业时,鉴于所要吊取的物料质量较重,同时面临着吊取高度相对较高,容易在调取的阶段发生吊绳脱钩的现象,随着吊取高度的提升,在上移的过程中物料会产生晃荡的情况,这种现象的出现会造成事故产生,因此需要一种垂直升降的建筑设备吊装装置,具备在对物料进行调取阶段,挂绳无法脱钩以及挂绳晃荡自动锁紧的功能。At present, there are many types of cranes on the market. In order to improve the operation efficiency and cooperate with a small number of manual operations to carry out material handling, when the crane is moving in the construction industry, in view of the heavy quality of the materials to be lifted, the lifting height is relatively high. , it is easy for the sling to be unhooked during the retrieving stage. With the increase of the lifting height, the material will slosh during the upward movement. The occurrence of this phenomenon will cause accidents. Therefore, a vertical The hoisting device for lifting construction equipment has the function of automatically locking the lanyard that cannot be unhooked and the swaying lanyard during the material retrieval stage.
发明内容Contents of the invention
为实现上述挂绳规避脱钩,晃荡锁紧的目的,本发明提供如下技术方案:一种垂直升降的建筑设备吊装装置,包括工作台、吊臂、吊绳、吊钩座、吊装封闭组件、晃动锁紧组件和挂钩,所述工作台的顶端与吊臂的底端固定安装,所述吊臂的顶端与吊绳的顶端固定安装,所述吊绳的底端与吊钩座的顶端固定安装,所述吊钩座的底端与挂钩的顶端固定安装,所述挂钩的内壁与吊装封闭组件的外壁活动连接,所述晃动锁紧组件的外壁与挂钩的内壁活动连接。In order to achieve the purpose of avoiding decoupling and sloshing locking of the above-mentioned lanyard, the present invention provides the following technical solution: a vertically lifting construction equipment hoisting device, including a workbench, a boom, a sling, a hook seat, a hoisting closure assembly, a swaying Locking components and hooks, the top of the workbench is fixed to the bottom of the boom, the top of the boom is fixed to the top of the sling, and the bottom of the sling is fixed to the top of the hook seat , the bottom end of the hook seat is fixedly installed with the top end of the hook, the inner wall of the hook is movably connected with the outer wall of the hoisting closure assembly, and the outer wall of the rocking locking assembly is movably connected with the inner wall of the hook.
作为优化,所述吊装封闭组件包括置物板,所述置物板的底端固定安装有移动板,所述置物板的左侧与右侧均固定安装有导向杆,所述移动板的正面铰接有节杆,所述节杆的底端固定安装有半齿,所述半齿的外壁活动连接有齿板,所述齿板的底端固定安装有弹簧伸缩杆,所述齿板的顶端固定安装有卡头,所述齿板的外壁活动连接有限位座。As an optimization, the hoisting closure assembly includes a storage board, the bottom end of the storage board is fixedly installed with a moving plate, the left side and the right side of the storage board are fixedly equipped with guide rods, and the front of the moving board is hinged with a A section bar, the bottom end of the section bar is fixedly equipped with a half tooth, the outer wall of the half tooth is movably connected with a tooth plate, the bottom end of the tooth plate is fixedly installed with a spring telescopic rod, and the top end of the tooth plate is fixedly installed There is a chuck, and the outer wall of the tooth plate is movably connected with a limited seat.
作为优化,所述晃动锁紧组件包括对位卡勾,所述对位卡勾的顶端固定安装有套筒,所述套筒的内壁活动连接有活塞板,所述活塞板的正面铰接有摆杆,所述摆杆的顶端铰接有铰接座,所述铰接座的背面固定安装有转轮,所述转轮的内壁活动连接有限位轴。As an optimization, the sway locking assembly includes an alignment hook, a sleeve is fixedly installed on the top end of the alignment hook, a piston plate is movably connected to the inner wall of the sleeve, and a swing plate is hinged on the front of the piston plate. Rod, the top of the pendulum is hinged with a hinge seat, the back of the hinge seat is fixedly mounted with a runner, and the inner wall of the runner is movably connected with a limit shaft.
作为优化,所述移动板由凸板、套板、连接板、气压杆、对位杆和置物槽组成,所述移动板的底端与凸板的顶端固定安装,所述凸板的外壁与套板的外壁活动连接,所述套板的外壁与连接板的内壁固定安装,所述连接板的顶端与气压杆的底端固定安装,所述气压杆的顶端与置物槽的内壁固定安装,所述套板的外壁与对位杆的外壁活动连接。As an optimization, the moving plate is composed of a convex plate, a cover plate, a connecting plate, an air pressure rod, an alignment rod and a storage slot, the bottom end of the moving plate is fixedly installed with the top of the convex plate, and the outer wall of the convex plate is connected to the top of the convex plate. The outer wall of the cover plate is movably connected, the outer wall of the cover plate is fixedly installed with the inner wall of the connecting plate, the top of the connecting plate is fixedly installed with the bottom end of the air pressure rod, and the top of the air pressure rod is fixedly installed with the inner wall of the storage tank, The outer wall of the sleeve plate is flexibly connected with the outer wall of the alignment rod.
作为优化,所述导向杆的外壁与挂钩的内壁活动连接,所述半齿的背面与挂钩的内壁活动连接,所述移动板的外壁与挂钩的内壁活动连接,为了保证置物板在移动过程中的稳定,同时避免挂绳在进行悬挂阶段出现位置偏移的效果。As an optimization, the outer wall of the guide rod is movably connected with the inner wall of the hook, the back side of the half tooth is movably connected with the inner wall of the hook, and the outer wall of the moving plate is movably connected with the inner wall of the hook. stability, while avoiding the effect of the position shifting of the lanyard during the suspension phase.
作为优化,转轮的左侧与对位杆的右侧固定安装,所述套板的外壁与挂钩的内壁活动连接,所述连接板的外壁与置物槽的内壁活动连接,为了实现挂钩的移动带动着对位杆对位移动,避免套板在对位阶段发生位置偏移的效果。As an optimization, the left side of the runner is fixedly installed with the right side of the alignment rod, the outer wall of the sleeve plate is movably connected with the inner wall of the hook, and the outer wall of the connecting plate is movably connected with the inner wall of the storage slot, in order to realize the movement of the hook It drives the alignment rod to move in alignment, so as to avoid the effect of position deviation of the sleeve during the alignment stage.
作为优化,所述节杆及节杆的所属结构数量为两组,两组节杆及节杆的所属结构以移动板的垂直中心线为中心对称均匀分布,为了保证置物板在移动过程中的稳定性,同时当挂绳脱离置物板时,能够自动复位的效果。As an optimization, the number of the joint bars and the structures of the joint bars is two groups, and the two sets of joint bars and the structures of the joint bars are symmetrically and evenly distributed around the vertical center line of the moving plate. Stability, and at the same time, when the lanyard is detached from the storage board, it can automatically reset.
作为优化,所述挂钩的正面与转轮的背面固定安装,所述限位轴的正面与背面均与转轮的内壁固定安装,为了实现挂钩在进行摆动的时候带动着转轮移动,同时带动着对位卡勾移动,实现挂绳的包裹性固定。As an optimization, the front of the hook is fixedly installed on the back of the runner, and the front and back of the limit shaft are fixed and installed on the inner wall of the runner. Move with the alignment hook to realize the wrapping and fixing of the lanyard.
作为优化,所述弹簧伸缩杆的底端与挂钩的内壁固定安装,所述限位座的背面与挂钩的内壁固定安装,为了保证弹簧伸缩杆在移动过程中的稳定性,避免出现晃荡造成置物板运动不稳定的效果。As an optimization, the bottom end of the spring telescopic rod is fixedly installed with the inner wall of the hook, and the back of the limit seat is fixedly installed with the inner wall of the hook. The effect of unstable board movement.
本发明的有益效果是:该垂直升降的建筑设备吊装装置,通过使用者将拴紧后的挂绳放置在挂钩的内壁,随着吊臂的伸长鉴于物料本身质量使得置物板移动,置物板的移动带动着移动板移动使得节杆摆动缩进,节杆的摆动配合着半齿带动着齿板在限位座的限制下移动,齿板的移动逐渐拉扯弹簧伸缩杆,当挂绳在调取物料阶段随着高度提升造成晃动,挂绳的晃动带动着挂钩的晃动,挂钩在进行晃荡时带动着晃动锁紧组件开始工作,最终对位卡勾移动与置物板配合使得挂绳锁紧,从而实现了在对物料进行调取阶段,挂绳无法脱钩以及挂绳晃荡自动锁紧的功能。The beneficial effects of the present invention are: the vertically lifting construction equipment hoisting device, through the user placing the fastened hanging rope on the inner wall of the hook, with the elongation of the boom, the storage board is moved in view of the quality of the material itself, and the storage board The movement of the moving plate drives the movement of the moving plate to make the joint rod swing and retract. The swing of the joint rod cooperates with the half tooth to drive the tooth plate to move under the limit of the limit seat. The movement of the tooth plate gradually pulls the spring telescopic rod. When the lanyard is adjusted During the material fetching stage, as the height rises, shaking is caused. The shaking of the hanging rope drives the shaking of the hook. When the hook is shaking, it drives the shaking and locking components to start working. Finally, the alignment hook moves and cooperates with the storage plate to lock the hanging rope. Thereby, the function that the lanyard cannot be unhooked and the lanyard sloshes can be automatically locked during the material retrieval stage is realized.
附图说明Description of drawings
图1为本发明吊装设备正视结构示意图;Fig. 1 is the front structural schematic diagram of hoisting equipment of the present invention;
图2为本发明挂钩正视剖视结构示意图;Fig. 2 is a schematic cross-sectional structure schematic diagram of the hook of the present invention;
图3为本发明图2中A处局部放大图;Fig. 3 is a partial enlarged view of place A in Fig. 2 of the present invention;
图4为本发明挂钩后视剖视结构示意图;Fig. 4 is a rear view sectional structure schematic diagram of the hook of the present invention;
图5为本发明图2中B处局部放大图;Fig. 5 is a partial enlarged view of place B in Fig. 2 of the present invention;
图6为本发明吊钩座正视剖视结构示意图。Fig. 6 is a schematic cross-sectional structure schematic diagram of the hook seat according to the present invention.
图中:1、工作台;2、吊臂;3、吊绳;4、吊钩座;5、吊装封闭组件;501、置物板;502、移动板;5021、凸板;5022、套板;5023、连接板;5024、气压杆;5025、对位杆;5026、置物槽;503、导向杆;504、节杆;505、半齿;506、齿板;507、弹簧伸缩杆;508、限位座;509、卡头;6、晃动锁紧组件;601、对位卡勾;602、套筒;603、活塞板;604、摆杆;605、铰接座;606、转轮;607、限位轴;7、挂钩。In the figure: 1, workbench; 2, boom; 3, sling; 4, hook seat; 5, hoisting closure assembly; 501, storage board; 5023, connecting plate; 5024, air pressure rod; 5025, alignment rod; 5026, storage slot; 503, guide rod; 504, section rod; 505, half tooth; seat; 509, chuck; 6, shaking locking assembly; 601, alignment hook; 602, sleeve; 603, piston plate; 604, swing rod; 605, hinged seat; 606, runner; 607, limit bit axis; 7, hook.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
请参阅图1-2,根据图1结合图2可以得出,一种垂直升降的建筑设备吊装装置,包括工作台1、吊臂2、吊绳3、吊钩座4、吊装封闭组件5、晃动锁紧组件6和挂钩7,工作台1的顶端与吊臂2的底端固定安装,吊臂2的顶端与吊绳3的顶端固定安装,吊绳3的底端与吊钩座4的顶端固定安装,吊钩座4的底端与挂钩7的顶端固定安装,挂钩7的正面与转轮606的背面固定安装,限位轴607的正面与背面均与转轮606的内壁固定安装,为了实现挂钩7在进行摆动的时候带动着转轮606移动,同时带动着对位卡勾601移动,实现挂绳的包裹性固定,挂钩7的内壁与吊装封闭组件5的外壁活动连接,晃动锁紧组件6的外壁与挂钩7的内壁活动连接,为了实现挂钩7在通过挂绳移动物体时,鉴于物体本身的质量,使得吊装封闭组件5开始工作形成挂钩7整体封闭,同时避免挂绳在牵引的过程中发生偏移。Please refer to Figure 1-2, according to Figure 1 combined with Figure 2, it can be concluded that a vertically lifting construction equipment hoisting device includes a
请参阅图2-3,由图3可以初步得出,吊装封闭组件5包括置物板501,置物板501的底端固定安装有移动板502,置物板501的左侧与右侧均固定安装有导向杆503,导向杆503的外壁与挂钩7的内壁活动连接,半齿505的背面与挂钩7的内壁活动连接,移动板502的外壁与挂钩7的内壁活动连接,为了保证置物板501在移动过程中的稳定,同时避免挂绳在进行悬挂阶段出现位置偏移的效果,移动板502的正面铰接有节杆504,节杆504及节杆504的所属结构数量为两组,两组节杆504及节杆504的所属结构以移动板502的垂直中心线为中心对称均匀分布,为了保证置物板501在移动过程中的稳定性,同时当挂绳脱离置物板501时,能够自动复位的效果,节杆504的底端固定安装有半齿505,半齿505的外壁活动连接有齿板506,齿板506的底端固定安装有弹簧伸缩杆507,弹簧伸缩杆507的底端与挂钩7的内壁固定安装,限位座508的背面与挂钩7的内壁固定安装,为了保证弹簧伸缩杆507在移动过程中的稳定性,避免出现晃荡造成置物板501运动不稳定的效果,齿板506的顶端固定安装有卡头509,齿板506的外壁活动连接有限位座508,为了实现设备在对物料进行吊装时,随着物料的移动挂钩7整体封闭,避免挂绳脱钩的现象。Please refer to Fig. 2-3, it can be preliminarily concluded from Fig. 3 that the
请参阅图6,从图6中可以了解到,晃动锁紧组件6包括对位卡勾601,对位卡勾601的顶端固定安装有套筒602,套筒602的内壁活动连接有活塞板603,活塞板603的正面铰接有摆杆604,摆杆604的顶端铰接有铰接座605,铰接座605的背面固定安装有转轮606,转轮606的左侧与对位杆5025的右侧固定安装,套板5022的外壁与挂钩7的内壁活动连接,连接板5023的外壁与置物槽5026的内壁活动连接,为了实现挂钩7的移动带动着对位杆5025对位移动,避免套板5022在对位阶段发生位置偏移的效果,转轮606的内壁活动连接有限位轴607,为了实现吊绳在进行物料吊取时,当物料发生抖动时,对位卡勾601与置物板501配合实现对挂绳的锁死。Please refer to FIG. 6 . From FIG. 6 , it can be understood that the shaking and
请参阅图4-5,根据图4结合图5可以得出,移动板502由凸板5021、套板5022、连接板5023、气压杆5024、对位杆5025和置物槽5026组成,移动板502的底端与凸板5021的顶端固定安装,凸板5021的外壁与套板5022的外壁活动连接,套板5022的外壁与连接板5023的内壁固定安装,连接板5023的顶端与气压杆5024的底端固定安装,气压杆5024的顶端与置物槽5026的内壁固定安装,套板5022的外壁与对位杆5025的外壁活动连接,为了实现设备在对物料进行吊取时,鉴于物料自身重量使得凸板5021移动,最终造成套板5022移动与对位杆5025的配合实现封闭。Please refer to Figures 4-5. According to Figure 4 and Figure 5, it can be concluded that the moving
在使用时,请参阅图1-6,使用者将拴紧后的挂绳放置在挂钩7的内壁,随着吊臂2的伸长鉴于物料本身质量使得置物板501移动,置物板501的移动带动着导向杆503沿着挂钩7的内壁移动,同时置物板501的移动带动着移动板502的移动,随着移动板502的移动使得节杆504在转动的过程伴随着锁紧,由于节杆504的转动带动着半齿505转动,半齿505的转动带动着齿板506移动,齿板506的移动逐渐拉扯弹簧伸缩杆507,鉴于齿板506的移动受到限位座508以及卡头509的同步限制使得齿板506稳定移动,移动板502的移动带动着凸板5021移动逐渐挤压套板5022的右侧使得套板5022步进移动,套板5022的移动配合着连接板5023沿着置物槽5026的内壁挤压气压杆5024,随后套板5022的外壁进入对位杆5025的内壁形成挂钩7的闭合,当挂绳在调取物料阶段随着高度提升造成晃动,挂绳的晃动带动着挂钩7的晃动,挂钩7在进行晃荡时带动着晃动锁紧组件6开始工作,挂钩7的摆动带动着转轮606转动,转轮606的转动配合着铰接座605带动着摆杆604摆动,摆杆604的摆动带动着活塞板603沿着套筒602的内壁移动,活塞板603的移动使得套筒602内壁气压发生变化使得对位卡勾601移动,最终对位卡勾601移动与置物板501配合使得挂绳锁紧,从而实现了在对物料进行调取阶段,挂绳无法脱钩以及挂绳晃荡自动锁紧的功能。When in use, please refer to Figures 1-6, the user places the fastened lanyard on the inner wall of the
综上所述,该一种垂直升降的建筑设备吊装装置,通过使用者将拴紧后的挂绳放置在挂钩7的内壁,随着吊臂2的伸长鉴于物料本身质量使得置物板501移动,置物板501的移动带动着移动板502移动使得节杆504摆动缩进,节杆504的摆动配合着半齿505带动着齿板506在限位座508的限制下移动,齿板506的移动逐渐拉扯弹簧伸缩杆507,当挂绳在调取物料阶段随着高度提升造成晃动,挂绳的晃动带动着挂钩7的晃动,挂钩7在进行晃荡时带动着晃动锁紧组件6开始工作,最终对位卡勾601移动与置物板501配合使得挂绳锁紧,从而实现了在对物料进行调取阶段,挂绳无法脱钩以及挂绳晃荡自动锁紧的功能。To sum up, in this vertical lifting construction equipment hoisting device, the user places the fastened lanyard on the inner wall of the
以上,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。The above is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Anyone familiar with the technical field within the technical scope disclosed in the present invention, according to the technical solutions of the present invention and its Any equivalent replacement or change of the inventive concept shall fall within the protection scope of the present invention.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110087182.0A CN112758839B (en) | 2021-01-22 | 2021-01-22 | A vertical lifting construction equipment hoisting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110087182.0A CN112758839B (en) | 2021-01-22 | 2021-01-22 | A vertical lifting construction equipment hoisting device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN112758839A CN112758839A (en) | 2021-05-07 |
| CN112758839B true CN112758839B (en) | 2023-02-17 |
Family
ID=75705635
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202110087182.0A Expired - Fee Related CN112758839B (en) | 2021-01-22 | 2021-01-22 | A vertical lifting construction equipment hoisting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN112758839B (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007001754A (en) * | 2005-06-27 | 2007-01-11 | Ryoei Koki Kk | Crane hook rotation restricting device |
| CN207090815U (en) * | 2017-07-27 | 2018-03-13 | 上海建筑防水材料(集团)防水工程有限公司 | A kind of crane |
| CN211141281U (en) * | 2019-12-09 | 2020-07-31 | 山西捷成数控机械设备有限公司 | Hook mechanism for lorry-mounted crane |
-
2021
- 2021-01-22 CN CN202110087182.0A patent/CN112758839B/en not_active Expired - Fee Related
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007001754A (en) * | 2005-06-27 | 2007-01-11 | Ryoei Koki Kk | Crane hook rotation restricting device |
| CN207090815U (en) * | 2017-07-27 | 2018-03-13 | 上海建筑防水材料(集团)防水工程有限公司 | A kind of crane |
| CN211141281U (en) * | 2019-12-09 | 2020-07-31 | 山西捷成数控机械设备有限公司 | Hook mechanism for lorry-mounted crane |
Also Published As
| Publication number | Publication date |
|---|---|
| CN112758839A (en) | 2021-05-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN208120566U (en) | A kind of slack tank special hanger for hoisting | |
| CN201971567U (en) | Small-sized indoor sand hoister | |
| CN112173955A (en) | Anti-hook-off mechanism for hoisting tower crane | |
| CN206927461U (en) | New-energy automobile power battery bag hoisting device | |
| CN103863972A (en) | Forklift hoisting tool and hoisting method thereof | |
| CN112758839B (en) | A vertical lifting construction equipment hoisting device | |
| CN211444776U (en) | Grab Lifting Device | |
| CN217732434U (en) | a spreader | |
| CN203284055U (en) | H-section steel lifting tool | |
| CN209603078U (en) | A kind of mousing-hook machine automatization grasping beam | |
| CN214989738U (en) | Crane boom hoisting device, crane boom and crane | |
| CN211292107U (en) | A streamlined combined box sampler | |
| CN212639861U (en) | Suspension arm capable of automatically unhooking | |
| CN211644332U (en) | Novel lifter lifting appliance for automobile coating line | |
| CN221796726U (en) | Caisson lifting appliance capable of automatically correcting and positioning | |
| CN209872130U (en) | Blind plate hoisting auxiliary frame | |
| CN204702444U (en) | The aerial self-locking of tower crane hoist rope and system for unlocking | |
| CN208120610U (en) | A kind of pitching elevating mechanism | |
| CN222743940U (en) | A crane hook structure for lifting equipment | |
| CN223213665U (en) | Cement pipe hoisting device capable of being horizontally turned | |
| CN218290216U (en) | Special lifting appliance for replacing high-speed wire CW roller | |
| CN216235637U (en) | Automatic grabbing device of storage bucket | |
| CN221739737U (en) | A multifunctional lifting device | |
| CN220376140U (en) | Hoisting clamp | |
| CN222877453U (en) | Be applied to pipeline hoist device of hydraulic and hydroelectric engineering |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB03 | Change of inventor or designer information | ||
| CB03 | Change of inventor or designer information |
Inventor after: Ma Cuixiang Inventor after: Fang Haiting Inventor after: Huang Zongjie Inventor after: Shou Wangjie Inventor before: Shou Wangjie |
|
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20230119 Address after: No. 20, Group 4, Shangmaao Village, Sizhoutou Town, Xiangshan County, Ningbo City, Zhejiang Province, 315724 Applicant after: Huang Zongjie Address before: No. 312, Wenhua Road, Dangwan Town, Xiaoshan District, Hangzhou City, Zhejiang Province, 310000 Applicant before: Shou Wangjie |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230217 |