CN112709287A - Rainwater recycling method and system in high-rise building construction process - Google Patents
Rainwater recycling method and system in high-rise building construction process Download PDFInfo
- Publication number
- CN112709287A CN112709287A CN202011546030.4A CN202011546030A CN112709287A CN 112709287 A CN112709287 A CN 112709287A CN 202011546030 A CN202011546030 A CN 202011546030A CN 112709287 A CN112709287 A CN 112709287A
- Authority
- CN
- China
- Prior art keywords
- rainwater
- concrete
- data
- message
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B3/00—Methods or installations for obtaining or collecting drinking water or tap water
- E03B3/02—Methods or installations for obtaining or collecting drinking water or tap water from rain-water
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B11/00—Arrangements or adaptations of tanks for water supply
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B7/00—Water main or service pipe systems
- E03B7/07—Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons or valves, in the pipe systems
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01F—MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01F23/00—Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N33/00—Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
- G01N33/18—Water
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/108—Rainwater harvesting
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Hydrology & Water Resources (AREA)
- General Physics & Mathematics (AREA)
- Chemical & Material Sciences (AREA)
- Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Biochemistry (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Structural Engineering (AREA)
- Medicinal Chemistry (AREA)
- Food Science & Technology (AREA)
- Analytical Chemistry (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to the technical field of building energy conservation, in particular to a rainwater recycling method and a rainwater recycling system in the building process of a high-rise building, wherein the method comprises the following steps: acquiring the rainwater content in each preset rainwater storage tank, and triggering a rainwater quality inspection message when the rainwater content reaches a first threshold value; when a quality qualified message corresponding to the rainwater quality inspection message is obtained, obtaining a corresponding reservoir identifier and rainwater content corresponding to the reservoir identifier from the quality qualified message; when a concrete preparation request is obtained, obtaining formula data of concrete to be prepared and quantity data of the concrete to be prepared, and calculating water demand information of the concrete preparation request according to the formula data of the concrete to be prepared and the quantity data of the concrete to be prepared; and generating a corresponding rainwater recycling message according to the water demand information and the reservoir identification. The concrete distribution system has the effect of improving the efficiency of on-site concrete distribution in the building process of high-rise buildings.
Description
Technical Field
The invention relates to the technical field of building energy conservation, in particular to a rainwater recycling method and system in a high-rise building construction process.
Background
At present, concrete is artificial stone which is prepared by taking cement as a main cementing material, adding water, sand, stones, chemical additives and mineral admixtures if necessary, mixing the materials according to a proper proportion, uniformly stirring, densely molding, curing and hardening.
In the existing civil engineering, concrete is the most widely applied material, and in the actual building engineering, constructors can also configure concrete which is consistent with the actual application scene on the construction site according to the actual engineering situation, so that the construction is convenient.
In view of the above-described related art, the inventors of the present invention have considered that there is a drawback that the efficiency of placing concrete is affected due to difficulty in transporting raw materials when placing concrete on site during construction of high-rise buildings.
Disclosure of Invention
In order to improve the efficiency of on-site concrete allocation in the building process of a high-rise building, the application provides a rainwater recycling method and system in the building process of the high-rise building.
The above object of the present invention is achieved by the following technical solutions:
a rainwater recycling method in the process of high-rise building construction comprises the following steps:
acquiring the rainwater content in each preset rainwater storage tank, and triggering a rainwater quality inspection message when the rainwater content reaches a first threshold value;
when a quality qualified message corresponding to the rainwater quality inspection message is obtained, obtaining a corresponding reservoir identifier and the rainwater content corresponding to the reservoir identifier from the quality qualified message;
when a concrete preparation request is obtained, obtaining formula data of concrete to be prepared and quantity data of the concrete to be prepared, and calculating water demand information of the concrete preparation request according to the formula data of the concrete to be prepared and the quantity data of the concrete to be prepared;
and generating a corresponding rainwater recycling message according to the reservoir identification according to the water demand information.
By adopting the technical scheme, when a high-rise building is built, the rainwater reservoir is arranged in advance, so that rainwater can be collected, the rainwater can be recycled when the building is built, and water resources are saved; when the rainwater content reaches the first threshold value, triggering a rainwater quality inspection message, and checking the rainwater quality when the rainwater content in the rainwater storage tank reaches the usable amount, wherein the rainwater quality can be directly used after the checking is passed, so that the rainwater recycling efficiency is improved, the checking times are reduced, and the time cost and the money cost for rainwater quality inspection are saved; when the ready-made concrete needs to be configured when the high-rise building is constructed, rainwater can be used as one of raw materials for configuring the concrete by using water in the rainwater storage tank which passes quality verification, so that time and water resources are saved, the concrete is prepared by using the rainwater which is qualified in quality verification, and the quality of the concrete preparation cannot be influenced by impurities of the rainwater; by obtaining the concrete formula, the corresponding amount of the required rainwater can be obtained, and the distribution and inspection of qualified rainwater are facilitated.
The present application may be further configured in a preferred example to: when the quality qualified message corresponding to the rainwater quality inspection message is acquired, the method specifically includes:
detecting the pH value of rainwater in each rainwater storage tank in real time, and comparing the pH value of the rainwater with a preset pH value threshold range;
if the comparison result shows that the pH value of the rainwater exceeds or is lower than the pH value threshold range, triggering a rainwater pH value adjusting message;
and if the comparison result shows that the pH value of the rainwater is within the pH value threshold range, triggering a quality qualified message.
By adopting the technical scheme, when the concrete is prepared, the high requirement is provided for the acidity of water, and if the acidity of the rainwater is higher than the standard for preparing the concrete according to the PH value of the rainwater, the rainwater pH value adjusting message is triggered, so that the acidity and alkalinity of the rainwater can meet the requirement for preparing the concrete.
The present application may be further configured in a preferred example to: when the concrete preparation request is obtained, obtaining formula data of concrete to be prepared and quantity data of the concrete to be prepared, and calculating water demand information of the concrete preparation request according to the formula data of the concrete to be prepared and the quantity data of the concrete to be prepared, specifically comprising:
acquiring building site data, and acquiring position selection information to be built from the building site data;
and acquiring corresponding concrete formula data to be prepared from a preset concrete formula table according to the selection information of the position of the concrete to be constructed.
By adopting the technical scheme, because the concrete adopted in the position of each building is different, the selection information of the position of the building to be built is obtained according to the data of the building site, so that the worker can select the corresponding building position, and the corresponding concrete formula is automatically matched from the preset concrete formula table, so that the worker can quickly obtain the corresponding concrete formula, and the efficiency of preparing the concrete on site is improved.
The present application may be further configured in a preferred example to: before the corresponding concrete formula data to be prepared is obtained from a preset concrete formula table according to the position selection information of the to-be-constructed building, the rainwater recycling method in the high-rise building construction process further comprises the following steps:
building space classification data corresponding to the to-be-built position selection information is obtained, and building space attribute information corresponding to each type of building space is obtained from the building space classification data;
and setting corresponding concrete preparation scheme data according to each piece of building space attribute information, and forming the concrete formula table by each piece of concrete preparation scheme data.
By adopting the technical scheme, the building space classification data corresponding to the to-be-built position selection message is obtained in advance, the corresponding concrete preparation scheme data is set according to the building space attribute information of the building space classification data, and the concrete formula table is further obtained, so that a constructor can quickly select the corresponding concrete formula according to the actual condition.
The present application may be further configured in a preferred example to: generating a corresponding rainwater recycling message according to the water demand information and the reservoir identification, specifically comprising:
sorting the rainwater content corresponding to each reservoir identification from large to small to obtain a corresponding sorting result;
triggering the rainwater recycling message to the corresponding reservoir identification one by one according to a preset second threshold value of the rainwater content and the water demand information and the sequencing result, wherein the numerical value of the second threshold value is smaller than the numerical value of the first threshold value.
By adopting the technical scheme, the water storage pool identifications are sequenced according to the rainwater content, so that convenience in water taking can be facilitated; because probably there is impurity in the rainwater, through stewing the rainwater or handling the back correspondingly, impurity can subside to rainwater cistern bottom, consequently through setting up the second threshold value, can reduce the impurity entering of rainwater and treat during the concrete of preparation to the quality of concrete has been improved.
The second objective of the present invention is achieved by the following technical solutions:
a rainwater recycling system in the process of high-rise building construction comprises:
the rainwater inspection module is used for acquiring the rainwater content in each preset rainwater storage tank and triggering a rainwater quality inspection message when the rainwater content reaches a first threshold value;
the water tank marking module is used for acquiring a corresponding water tank identifier and the rainwater content corresponding to the water tank identifier from the quality qualified message when the quality qualified message corresponding to the rainwater quality inspection message is acquired;
the water demand calculation module is used for acquiring formula data of concrete to be prepared and volume data of the concrete to be prepared when a concrete preparation request is acquired, and calculating water demand information of the concrete preparation request according to the formula data of the concrete to be prepared and the volume data of the concrete to be prepared;
and the rainwater recycling module is used for generating a corresponding rainwater recycling message according to the reservoir identification according to the water demand information.
By adopting the technical scheme, when a high-rise building is built, the rainwater reservoir is arranged in advance, so that rainwater can be collected, the rainwater can be recycled when the building is built, and water resources are saved; when the rainwater content reaches the first threshold value, triggering a rainwater quality inspection message, and checking the rainwater quality when the rainwater content in the rainwater storage tank reaches the usable amount, wherein the rainwater quality can be directly used after the checking is passed, so that the rainwater recycling efficiency is improved, the checking times are reduced, and the time cost and the money cost for rainwater quality inspection are saved; when the ready-made concrete needs to be configured when the high-rise building is constructed, rainwater can be used as one of raw materials for configuring the concrete by using water in the rainwater storage tank which passes quality verification, so that time and water resources are saved, the concrete is prepared by using the rainwater which is qualified in quality verification, and the quality of the concrete preparation cannot be influenced by impurities of the rainwater; by obtaining the concrete formula, the corresponding amount of the required rainwater can be obtained, and the distribution and inspection of qualified rainwater are facilitated.
The third purpose of the present application is achieved by the following technical solutions:
a computer apparatus comprising a memory, a processor and a computer program stored in said memory and executable on said processor, said processor implementing the steps of the method for rainwater reuse in high-rise building construction processes described above when executing said computer program.
The fourth purpose of the present application is achieved by the following technical solutions:
a computer-readable storage medium storing a computer program which, when executed by a processor, implements the steps of the above-described method for recycling rainwater in a high-rise building construction process.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when the building is in a high-rise building, the rainwater storage tank is arranged in advance, so that rainwater can be collected, the building can be recycled conveniently, and water resources can be saved; when the rainwater content reaches the first threshold value, triggering a rainwater quality inspection message, and checking the rainwater quality when the rainwater content in the rainwater storage tank reaches the usable amount, wherein the rainwater quality can be directly used after the checking is passed, so that the rainwater recycling efficiency is improved, the checking times are reduced, and the time cost and the money cost for rainwater quality inspection are saved;
2. when the ready-made concrete needs to be configured when the high-rise building is constructed, rainwater can be used as one of raw materials for configuring the concrete by using water in the rainwater storage tank which passes quality verification, so that time and water resources are saved, the concrete is prepared by using the rainwater which is qualified in quality verification, and the quality of the concrete preparation cannot be influenced by impurities of the rainwater; by obtaining the concrete formula, the corresponding rainwater demand amount can be obtained, and distribution and inspection of qualified rainwater are facilitated;
3. the method comprises the steps of obtaining selection information of the position to be built, enabling workers to select the corresponding building position, automatically matching the corresponding concrete formula from a preset concrete formula table, enabling the workers to obtain the corresponding concrete formula quickly, and improving the efficiency of on-site concrete preparation;
4. the water storage tank marks are sequenced according to the rainwater content, so that convenience in water taking can be facilitated; because probably there is impurity in the rainwater, through stewing the rainwater or handling the back correspondingly, impurity can subside to rainwater cistern bottom, consequently through setting up the second threshold value, can reduce the impurity entering of rainwater and treat during the concrete of preparation to the quality of concrete has been improved.
Drawings
FIG. 1 is a flow chart of a method for recycling rainwater in a high-rise building construction process according to an embodiment of the present invention;
FIG. 2 is a flowchart illustrating a step S20 of the method for recycling rainwater in the process of building high-rise buildings according to an embodiment of the present invention;
FIG. 3 is a flowchart illustrating a step S30 of the method for recycling rainwater in the process of building high-rise buildings according to an embodiment of the present invention;
FIG. 4 is a flow chart of another implementation of the method for recycling rainwater during the construction of a high-rise building according to an embodiment of the present application;
FIG. 5 is a flowchart illustrating a step S40 of the method for recycling rainwater in the process of building high-rise buildings according to an embodiment of the present invention;
FIG. 6 is a schematic block diagram of a rainwater reuse system in the process of high-rise building construction according to an embodiment of the present application;
fig. 7 is a schematic diagram of an apparatus in an embodiment of the present application.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
In one embodiment, as shown in fig. 1, the present application discloses a rainwater recycling method in a high-rise building construction process, which specifically includes the following steps:
s10: and acquiring the rainwater content in each preset rainwater storage tank, and triggering a rainwater quality inspection message when the rainwater content reaches a first threshold value.
In this embodiment, the rainwater storage tank refers to a container which is pre-installed in a construction site and is used for receiving rainwater. The rainwater content refers to the content of rainwater collected in each rainwater storage tank. The first threshold value is preset to determine whether the rainwater content reaches a reusable amount. The rainwater quality inspection message is a message that the quality of rainwater in the rainwater storage tank needs to be inspected.
Specifically, when a high-rise building is constructed, concrete is often required to be temporarily prepared on site, water is one of ingredients commonly used for preparing concrete when the concrete is prepared on site, a constructor adds a proper amount of water after preparing other raw materials according to a corresponding formula and a proper amount of the water, and stirs the mixture to obtain the concrete required to be used, and when the high-rise building is constructed, a water supply system has the possibility of incomplete installation, and if the water storage amount is insufficient when the concrete is prepared, the water needs to be conveyed from other places again, so that the construction progress is delayed while manpower is consumed. Therefore, on a high-rise construction site, the rainwater collecting device can be set up in advance and communicated to a plurality of rainwater storage tanks preset on the construction site.
Furthermore, a liquid level sensor is installed in each rainwater storage tank, and the rainwater content in each rainwater storage tank is obtained in real time through the liquid level sensor. When the rainwater content of a rainwater reservoir reaches a first threshold value, triggering a rainwater quality inspection message, informing a constructor or starting a corresponding instrument, inspecting the rainwater quality in the rainwater reservoir, wherein if the quality of rainwater in the rainwater reservoir is inspected through the instrument, the instrument for specific use is adopted, and technical personnel in the field can set the corresponding instrument capable of inspecting the index according to the index of specific need inspection.
S20: and when the quality qualified message corresponding to the rainwater quality inspection message is obtained, obtaining the corresponding reservoir identification and the rainwater content corresponding to the reservoir identification from the quality qualified message.
In this embodiment, the quality-qualified message is a message reflecting that the quality of the stored rainwater in the rainwater storage tank satisfies the requirement for preparing concrete. The reservoir identification means a character or a character string for distinguishing each rainwater reservoir.
Specifically, if the quality of the rainwater obtained from the inspection result meets the requirement for preparing concrete after the rainwater in the rainwater storage tank is inspected by constructors or corresponding instruments, the quality qualified message is triggered.
Further, a reservoir identification corresponding to the quality qualified message is obtained to indicate that the rainwater in the rainwater reservoir can be used for preparing concrete, and the rainwater content in the rainwater reservoir corresponding to the reservoir identification is obtained.
S30: when the concrete preparation request is obtained, the formula data of the concrete to be prepared and the quantity data of the concrete to be prepared are obtained, and the water demand information of the concrete preparation request is calculated according to the formula data of the concrete to be prepared and the quantity data of the concrete to be prepared.
In the present embodiment, the concrete preparation request means a message requesting preparation of concrete at a construction site. The formula data of the concrete to be prepared refers to the concrete formula which needs to be prepared actually. The data of the amount of concrete to be prepared refers to the amount of concrete which is actually required to be prepared or used, corresponding to the data of the formula of the concrete to be prepared. The water demand information refers to the amount of water required to prepare the concrete.
Specifically, after a constructor triggers a concrete preparation request, formula data of concrete to be prepared and quantity data of the concrete to be prepared are obtained from the concrete preparation request. The obtaining mode can be that when the constructor needs to prepare the concrete on the construction site in the process of high-rise building construction, the constructor selects a corresponding prepared formula in the mobile terminal according to the type of the concrete which is actually needed, and triggers the concrete preparation request after inputting the amount of the concrete which needs to be used in the mobile terminal. Further, the formula of the corresponding concrete and the amount of the concrete required to be used are obtained from the concrete preparation request and are respectively used as the formula of the concrete to be prepared and the amount data of the concrete to be prepared.
Further, the proportion of water in unit dosage is obtained from the formula of the concrete to be prepared, the data of the concrete quantity to be prepared is divided by the unit dosage, and the obtained numerical value is multiplied by the proportion to obtain the water demand information.
S40: and generating a corresponding rainwater recycling message according to the water demand information and the reservoir identification.
In the present embodiment, the rainwater reuse message refers to a message that rainwater that is qualified for quality inspection is applied to concrete preparation.
Specifically, according to the water demand information, a corresponding amount of rainwater is extracted from the rainwater reservoir corresponding to the reservoir identification as water for preparing concrete corresponding to the concrete formula to be prepared.
In the embodiment, when a high-rise building is in use, the rainwater storage tank is arranged in advance, so that rainwater can be collected, the rainwater can be recycled when the building is in use, and water resources can be saved; when the rainwater content reaches the first threshold value, triggering a rainwater quality inspection message, and checking the rainwater quality when the rainwater content in the rainwater storage tank reaches the usable amount, wherein the rainwater quality can be directly used after the checking is passed, so that the rainwater recycling efficiency is improved, the checking times are reduced, and the time cost and the money cost for rainwater quality inspection are saved; when the ready-made concrete needs to be configured when the high-rise building is constructed, rainwater can be used as one of raw materials for configuring the concrete by using water in the rainwater storage tank which passes quality verification, so that time and water resources are saved, the concrete is prepared by using the rainwater which is qualified in quality verification, and the quality of the concrete preparation cannot be influenced by impurities of the rainwater; by obtaining the concrete formula, the corresponding amount of the required rainwater can be obtained, and the distribution and inspection of qualified rainwater are facilitated.
In an embodiment, as shown in fig. 2, in step S20, that is, when the quality qualified message corresponding to the rainwater quality inspection message is acquired, the method specifically includes:
s21: and detecting the pH value of the rainwater in each rainwater storage tank in real time, and comparing the pH value of the rainwater with a preset pH value threshold range.
In the present embodiment, the ph threshold range refers to a range for determining whether or not the ph of rainwater meets the standard for preparing concrete.
Specifically, the ph threshold range is set according to the standard of general concrete preparation, wherein the ph threshold range can be adjusted according to the requirements of specific concrete performance when concrete is actually prepared.
Furthermore, the pH value of the rainwater in the rainwater storage tank with the rainwater content reaching the first threshold value can be recorded and detected in real time by an instrument for detecting the pH value of the liquid, so that the corresponding pH value of the rainwater is obtained.
And further, comparing each detected rainwater pH value with a rainwater pH value threshold range to obtain a corresponding comparison result.
S22: and if the comparison result shows that the pH value of the rainwater exceeds or is lower than the pH value threshold range, triggering a rainwater pH value adjusting message.
In this embodiment, the rainwater ph adjustment message refers to a message for adjusting the ph of rainwater in the rainwater storage tank.
Specifically, if the corresponding comparison result in the rainwater reservoir indicates that the ph value of the rainwater in the rainwater reservoir exceeds or is lower than the ph value threshold range, it indicates that the ph value of the rainwater in the rainwater reservoir is slightly acidic or slightly alkaline compared with the standard for preparing concrete, and then a corresponding rainwater ph value adjustment message is triggered, so that a constructor or related workers are notified to adjust the ph value of the rainwater in the rainwater reservoir, and after adjustment, the ph value of the rainwater in the rainwater reservoir is compared with the ph value threshold range of the rainwater again.
S23: and if the comparison result shows that the pH value of the rainwater is within the pH value threshold range, triggering a quality qualified message.
Specifically, if the comparison result indicates that the rainwater ph is within the ph threshold range, the quality qualified message is triggered. Wherein, including rainwater pH valve itself in rainwater cistern is in this pH valve threshold value scope and make rainwater pH valve be in this pH valve threshold value scope after step S22 adjusts the pH valve.
In one embodiment, as shown in fig. 3, in step S30, when the concrete preparation request is obtained, the method includes obtaining concrete formula data to be prepared and concrete amount data to be prepared, and calculating water demand information of the concrete preparation request according to the concrete formula data to be prepared and the concrete amount data to be prepared, and specifically includes:
s31: and acquiring building site data, and acquiring to-be-built position selection information from the building site data.
In this embodiment, the building site data refers to data of a position of a building to be specifically constructed and environmental data of the building. The to-be-built location selection message refers to a specific location of the building on the floor where the concrete with the temporary configuration is required to be specifically used.
Specifically, by acquiring the geographical position of a specific building of the building, and acquiring corresponding environmental data, such as temperature and humidity changes, wind direction changes and the like, according to the geographical position, so that concrete with corresponding performance is used, and the structural strength of the building is improved.
Further, the constructor may select a corresponding specific construction location, such as a toilet, a kitchen, or a living room, etc., in the mobile terminal as the to-be-constructed location selection information.
S32: and acquiring corresponding concrete formula data to be prepared from a preset concrete formula table according to the selection information of the position of the concrete to be constructed.
In this embodiment, the concrete formula table refers to a formula which is preset and records concrete to be used at different positions of the building in the environment position.
Specifically, according to the to-be-built location selection information, matching a corresponding concrete formula from a concrete formula table as the to-be-prepared concrete formula data.
Optionally, after the data of the concrete formula to be prepared is obtained, the contents of other impurities in the rainwater in the reservoir identifier can be further checked according to the specific formula, and the rainwater with the other impurities exceeding the standard can be further purified or subjected to sedimentation treatment.
In one embodiment, as shown in fig. 4, before step S32, the method for recycling rainwater in the process of building high-rise buildings further comprises:
s321: and acquiring building space classification data corresponding to the to-be-built position selection information, and acquiring building space attribute information corresponding to each type of building space from the building space classification data.
In this embodiment, the building space classification data refers to classification data of a space divided by functions in each floor of a building. The building space attribute information refers to information of a function corresponding to each type of building space.
Specifically, building space classification data corresponding to the selectively acquired to-be-built location selection information is obtained by division according to the function of the space of the building, such as a toilet, a kitchen, or a living room.
Further, the building function corresponding to each type of building space classification data is obtained as the building space attribute information.
S322: and setting corresponding concrete preparation scheme data according to the building space attribute information, and forming a concrete formula table by using the concrete preparation scheme data.
Specifically, according to the requirement of the building space attribute information on the performance of the concrete, such as for a toilet, the requirement on waterproofness is high, or for a bearing wall, a shear wall and the like, the requirement on the structural strength of the concrete is high, concrete preparation scheme data corresponding to each building space attribute information in different environments are preset, so that the prepared concrete can meet different environments, such as for an area with a high latitude, the requirement on the frost resistance of the concrete is high, or for an area with a high humidity, the requirement on the moisture resistance of the concrete is high.
In an embodiment, as shown in fig. 5, in step S40, generating a corresponding rainwater reuse message according to the reservoir identifier according to the water demand information specifically includes:
s41: and sorting the rainwater content corresponding to each reservoir identification from large to small to obtain a corresponding sorting result.
Specifically, a value of the rainwater content corresponding to each reservoir identifier is obtained, that is, a value of the rainwater content of the rainwater reservoir corresponding to the qualified-quality message is obtained, and the reservoir identifiers are sorted according to the magnitude sequence of the values to obtain a corresponding sorting result.
S42: and triggering rainwater recycling messages to corresponding reservoir identifications one by one according to a preset second threshold value of the rainwater content and the water demand information and the sorting result, wherein the numerical value of the second threshold value is smaller than that of the first threshold value.
In this embodiment, the second threshold value is a value that is set in advance and used for determining whether or not to stop the preparation of concrete by extracting the stored rainwater from the rainwater storage tank.
Specifically, according to the sequence of the sequencing results, corresponding rainwater reuse messages are sent to the reservoir identifications one by one, namely when the rainwater content in the rainwater reservoir corresponding to the first reservoir identification is reduced to a second threshold value, the rainwater reuse messages are triggered to the rainwater reservoir corresponding to the next reservoir identification until the amount of the extracted rainwater reaches the water demand information.
It should be understood that, the sequence numbers of the steps in the foregoing embodiments do not imply an execution sequence, and the execution sequence of each process should be determined by its function and inherent logic, and should not constitute any limitation to the implementation process of the embodiments of the present application.
In one embodiment, a rainwater recycling system in a high-rise building construction process is provided, and the rainwater recycling system in the high-rise building construction process corresponds to the rainwater recycling method in the high-rise building construction process in the embodiment one to one. As shown in fig. 6, the rainwater recycling system in the high-rise building construction process includes a rainwater inspection module, a pool marking module, a water demand calculation module, and a rainwater recycling module. The functional modules are explained in detail as follows:
the rainwater inspection module is used for acquiring the rainwater content in each preset rainwater storage tank and triggering a rainwater quality inspection message when the rainwater content reaches a first threshold value;
the water tank marking module is used for acquiring a corresponding water storage tank identifier and rainwater content corresponding to the water storage tank identifier from the quality qualified message when the quality qualified message corresponding to the rainwater quality inspection message is acquired;
the water demand calculation module is used for acquiring formula data of the concrete to be prepared and volume data of the concrete to be prepared when a concrete preparation request is acquired, and calculating water demand information of the concrete preparation request according to the formula data of the concrete to be prepared and the volume data of the concrete to be prepared;
and the rainwater recycling module is used for generating a corresponding rainwater recycling message according to the water demand information and the reservoir identification.
Optionally, the pool marking module comprises:
the detection and comparison submodule is used for detecting the pH value of the rainwater in each rainwater storage tank in real time and comparing the pH value of the rainwater with a preset pH value threshold range;
the first execution submodule is used for triggering a rainwater pH value adjusting message if the comparison result shows that the rainwater pH value exceeds or is lower than the pH value threshold range;
and the second execution submodule is used for triggering the qualified quality message if the comparison result shows that the pH value of the rainwater is within the pH value threshold range.
Optionally, the water demand calculation module includes:
the position selection submodule is used for acquiring building site data and acquiring position selection information to be built from the building site data;
and the formula acquisition submodule is used for acquiring corresponding concrete formula data to be prepared from a preset concrete formula table according to the selection information of the position to be built.
Optionally, the rainwater recycling system in the high-rise building process further includes:
the attribute information acquisition module is used for acquiring building space classification data corresponding to the to-be-built position selection information and acquiring building space attribute information corresponding to each type of building space from the building space classification data;
and the formula setting module is used for setting corresponding concrete preparation scheme data according to the building space attribute information and forming a concrete formula table by using the concrete preparation scheme data.
Optionally, the rainwater reuse module includes:
the sorting submodule is used for sorting the rainwater content corresponding to each reservoir identification from large to small to obtain a corresponding sorting result;
and the message sending submodule is used for triggering rainwater recycling messages to the corresponding reservoir identifications one by one according to a preset second threshold value of the rainwater content and the water demand information and the sequencing result, wherein the numerical value of the second threshold value is smaller than the numerical value of the first threshold value.
For the specific definition of the rainwater recycling system in the process of building the high-rise building, the above definition of the rainwater recycling method in the process of building the high-rise building can be referred to, and the details are not repeated herein. All modules in the rainwater recycling system in the process of the high-rise building can be completely or partially realized through software, hardware and a combination thereof. The modules can be embedded in a hardware form or independent from a processor in the computer device, and can also be stored in a memory in the computer device in a software form, so that the processor can call and execute operations corresponding to the modules.
In one embodiment, a computer device is provided, which may be a server, the internal structure of which may be as shown in fig. 7. The computer device includes a processor, a memory, a network interface, and a database connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device comprises a nonvolatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The database of the computer device is used for storing a concrete formula table. The network interface of the computer device is used for communicating with an external terminal through a network connection. The computer program is executed by a processor to implement a method for reusing rainwater in a high-rise building construction process.
In one embodiment, a computer device is provided, comprising a memory, a processor, and a computer program stored on the memory and executable on the processor, the processor implementing the following steps when executing the computer program:
acquiring the rainwater content in each preset rainwater storage tank, and triggering a rainwater quality inspection message when the rainwater content reaches a first threshold value;
when a quality qualified message corresponding to the rainwater quality inspection message is obtained, obtaining a corresponding reservoir identifier and rainwater content corresponding to the reservoir identifier from the quality qualified message;
when a concrete preparation request is obtained, obtaining formula data of concrete to be prepared and quantity data of the concrete to be prepared, and calculating water demand information of the concrete preparation request according to the formula data of the concrete to be prepared and the quantity data of the concrete to be prepared;
and generating a corresponding rainwater recycling message according to the water demand information and the reservoir identification.
In one embodiment, a computer-readable storage medium is provided, having a computer program stored thereon, which when executed by a processor, performs the steps of:
acquiring the rainwater content in each preset rainwater storage tank, and triggering a rainwater quality inspection message when the rainwater content reaches a first threshold value;
when a quality qualified message corresponding to the rainwater quality inspection message is obtained, obtaining a corresponding reservoir identifier and rainwater content corresponding to the reservoir identifier from the quality qualified message;
when a concrete preparation request is obtained, obtaining formula data of concrete to be prepared and quantity data of the concrete to be prepared, and calculating water demand information of the concrete preparation request according to the formula data of the concrete to be prepared and the quantity data of the concrete to be prepared;
and generating a corresponding rainwater recycling message according to the water demand information and the reservoir identification.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware instructions of a computer program, which can be stored in a non-volatile computer-readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. Any reference to memory, storage, database, or other medium used in the embodiments provided herein may include non-volatile and/or volatile memory, among others. Non-volatile memory can include read-only memory (ROM), Programmable ROM (PROM), Electrically Programmable ROM (EPROM), Electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), Dynamic RAM (DRAM), Synchronous DRAM (SDRAM), Double Data Rate SDRAM (DDRSDRAM), Enhanced SDRAM (ESDRAM), Synchronous Link DRAM (SLDRAM), Rambus Direct RAM (RDRAM), direct bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
It will be apparent to those skilled in the art that, for convenience and brevity of description, only the above-mentioned division of the functional units and modules is illustrated, and in practical applications, the above-mentioned function distribution may be performed by different functional units and modules according to needs, that is, the internal structure of the system is divided into different functional units or modules to perform all or part of the above-mentioned functions.
The above-mentioned embodiments are only used for illustrating the technical solutions of the present application, and not for limiting the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not substantially depart from the spirit and scope of the embodiments of the present application and are intended to be included within the scope of the present application.
Claims (10)
1. A rainwater recycling method in the process of high-rise building construction is characterized by comprising the following steps:
acquiring the rainwater content in each preset rainwater storage tank, and triggering a rainwater quality inspection message when the rainwater content reaches a first threshold value;
when a quality qualified message corresponding to the rainwater quality inspection message is obtained, obtaining a corresponding reservoir identifier and the rainwater content corresponding to the reservoir identifier from the quality qualified message;
when a concrete preparation request is obtained, obtaining formula data of concrete to be prepared and quantity data of the concrete to be prepared, and calculating water demand information of the concrete preparation request according to the formula data of the concrete to be prepared and the quantity data of the concrete to be prepared;
and generating a corresponding rainwater recycling message according to the reservoir identification according to the water demand information.
2. The method for recycling rainwater in the process of building the high-rise building according to claim 1, wherein when the quality-qualified message corresponding to the rainwater quality inspection message is acquired, the method specifically comprises the following steps:
detecting the pH value of rainwater in each rainwater storage tank in real time, and comparing the pH value of the rainwater with a preset pH value threshold range;
if the comparison result shows that the pH value of the rainwater exceeds or is lower than the pH value threshold range, triggering a rainwater pH value adjusting message;
and if the comparison result shows that the pH value of the rainwater is within the pH value threshold range, triggering the quality qualified message.
3. The method for recycling rainwater in the process of building a high-rise building according to claim 1, wherein when the concrete preparation request is obtained, the formula data of the concrete to be prepared and the amount data of the concrete to be prepared are obtained, and the water demand information of the concrete preparation request is calculated according to the formula data of the concrete to be prepared and the amount data of the concrete to be prepared, and specifically comprises the following steps:
acquiring building site data, and acquiring position selection information to be built from the building site data;
and acquiring corresponding concrete formula data to be prepared from a preset concrete formula table according to the selection information of the position of the concrete to be constructed.
4. The method for recycling rainwater in the process of building high-rise buildings according to claim 3, wherein before the corresponding concrete formula data to be prepared is obtained from a preset concrete formula table according to the selection information of the position to be built, the method for recycling rainwater in the process of building high-rise buildings further comprises:
building space classification data corresponding to the to-be-built position selection information is obtained, and building space attribute information corresponding to each type of building space is obtained from the building space classification data;
and setting corresponding concrete preparation scheme data according to each piece of building space attribute information, and forming the concrete formula table by each piece of concrete preparation scheme data.
5. The method according to claim 1, wherein the generating a corresponding rainwater reuse message according to the reservoir identifier and the water demand information specifically comprises:
sorting the rainwater content corresponding to each reservoir identification from large to small to obtain a corresponding sorting result;
triggering the rainwater recycling message to the corresponding reservoir identification one by one according to a preset second threshold value of the rainwater content and the water demand information and the sequencing result, wherein the numerical value of the second threshold value is smaller than the numerical value of the first threshold value.
6. A rainwater recycling system in the process of high-rise building construction is characterized by comprising:
the rainwater inspection module is used for acquiring the rainwater content in each preset rainwater storage tank and triggering a rainwater quality inspection message when the rainwater content reaches a first threshold value;
the water tank marking module is used for acquiring a corresponding water tank identifier and the rainwater content corresponding to the water tank identifier from the quality qualified message when the quality qualified message corresponding to the rainwater quality inspection message is acquired;
the water demand calculation module is used for acquiring formula data of concrete to be prepared and volume data of the concrete to be prepared when a concrete preparation request is acquired, and calculating water demand information of the concrete preparation request according to the formula data of the concrete to be prepared and the volume data of the concrete to be prepared;
and the rainwater recycling module is used for generating a corresponding rainwater recycling message according to the reservoir identification according to the water demand information.
7. The system of claim 6, wherein the pool marking module comprises:
the detection and comparison submodule is used for detecting the pH value of the rainwater in each rainwater storage tank in real time and comparing the pH value of the rainwater with a preset pH value threshold range;
the first execution submodule is used for triggering a rainwater pH value adjusting message if the comparison result shows that the rainwater pH value exceeds or is lower than the pH value threshold range;
and the second execution submodule is used for triggering the qualified quality message if the comparison result shows that the pH value of the rainwater is within the pH value threshold range.
8. The rainwater recycling system in the process of building high-rise buildings according to claim 6, characterized in that the water demand calculation module comprises:
the position selection submodule is used for acquiring building site data and acquiring position selection information to be built from the building site data;
and the formula acquisition submodule is used for acquiring corresponding concrete formula data to be prepared from a preset concrete formula table according to the position selection information of the concrete to be constructed.
9. The rainwater recycling system in high-rise building construction process according to claim 8, further comprising:
the attribute information acquisition module is used for acquiring building space classification data corresponding to the to-be-built position selection information and acquiring building space attribute information corresponding to each type of building space from the building space classification data;
and the formula setting module is used for setting corresponding concrete preparation scheme data according to each piece of building space attribute information and forming the concrete formula table by each piece of concrete preparation scheme data.
10. The rainwater recycling system in the process of building a high-rise building according to claim 6, wherein the rainwater recycling module comprises:
the sorting submodule is used for sorting the rainwater content corresponding to each reservoir identifier from large to small to obtain a corresponding sorting result;
and the message sending submodule is used for triggering the rainwater recycling messages to the corresponding reservoir identifications one by one according to a preset second threshold value of rainwater content and the water demand information and the sequencing result, wherein the numerical value of the second threshold value is smaller than that of the first threshold value.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011546030.4A CN112709287A (en) | 2020-12-24 | 2020-12-24 | Rainwater recycling method and system in high-rise building construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011546030.4A CN112709287A (en) | 2020-12-24 | 2020-12-24 | Rainwater recycling method and system in high-rise building construction process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112709287A true CN112709287A (en) | 2021-04-27 |
Family
ID=75543980
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011546030.4A Pending CN112709287A (en) | 2020-12-24 | 2020-12-24 | Rainwater recycling method and system in high-rise building construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112709287A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101519885A (en) * | 2009-02-20 | 2009-09-02 | 深圳市建设(集团)有限公司 | Method for synthetically utilizing concrete curing water and rain water in constructional engineering |
CN205604329U (en) * | 2016-04-08 | 2016-09-28 | 苏州百联建筑工程有限公司 | Environmental protection water - saving device for building |
CN205935175U (en) * | 2016-08-26 | 2017-02-08 | 海绵城市雨水收集利用技术有限公司 | Rainwater recycling system |
CN107152053A (en) * | 2017-06-14 | 2017-09-12 | 杭州耐立电气有限公司 | A kind of rainwater-collecting process control method |
CN207998907U (en) * | 2018-01-15 | 2018-10-23 | 水利部交通运输部国家能源局南京水利科学研究院 | A kind of region rainwater catchment system engineering system |
CN108803392A (en) * | 2018-08-03 | 2018-11-13 | 深圳文科园林股份有限公司 | A kind of sponge urban rainwater collection with utilize wisdom system |
CN110185088A (en) * | 2019-06-03 | 2019-08-30 | 吉林建筑大学 | A kind of rain recycling system and method for energy saving building |
CN110593390A (en) * | 2019-08-30 | 2019-12-20 | 南京艾数信息科技有限公司 | Intelligent rainwater collection system based on Internet of things technology |
CN111270743A (en) * | 2020-02-10 | 2020-06-12 | 湖北工业大学 | Rainwater collection and utilization construction method for ecological restoration of mine wasteland |
-
2020
- 2020-12-24 CN CN202011546030.4A patent/CN112709287A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101519885A (en) * | 2009-02-20 | 2009-09-02 | 深圳市建设(集团)有限公司 | Method for synthetically utilizing concrete curing water and rain water in constructional engineering |
CN205604329U (en) * | 2016-04-08 | 2016-09-28 | 苏州百联建筑工程有限公司 | Environmental protection water - saving device for building |
CN205935175U (en) * | 2016-08-26 | 2017-02-08 | 海绵城市雨水收集利用技术有限公司 | Rainwater recycling system |
CN107152053A (en) * | 2017-06-14 | 2017-09-12 | 杭州耐立电气有限公司 | A kind of rainwater-collecting process control method |
CN207998907U (en) * | 2018-01-15 | 2018-10-23 | 水利部交通运输部国家能源局南京水利科学研究院 | A kind of region rainwater catchment system engineering system |
CN108803392A (en) * | 2018-08-03 | 2018-11-13 | 深圳文科园林股份有限公司 | A kind of sponge urban rainwater collection with utilize wisdom system |
CN110185088A (en) * | 2019-06-03 | 2019-08-30 | 吉林建筑大学 | A kind of rain recycling system and method for energy saving building |
CN110593390A (en) * | 2019-08-30 | 2019-12-20 | 南京艾数信息科技有限公司 | Intelligent rainwater collection system based on Internet of things technology |
CN111270743A (en) * | 2020-02-10 | 2020-06-12 | 湖北工业大学 | Rainwater collection and utilization construction method for ecological restoration of mine wasteland |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Andersson et al. | Carbonation as a method to improve climate performance for cement based material | |
Marques et al. | Service life of RC structures: Carbonation induced corrosion. Prescriptive vs. performance-based methodologies | |
US11313848B2 (en) | Sensing device, and systems and methods for obtaining data relating to concrete mixtures and concrete structures | |
Alexander | Service life design and modelling of concrete structures-background, developments, and implementation | |
Pacheco et al. | Uncertainty models of reinforced concrete beams in bending: Code comparison and recycled aggregate incorporation | |
Muigai et al. | Durability design of reinforced concrete structures: a comparison of the use of durability indexes in the deemed-to-satisfy approach and the full-probabilistic approach | |
Talib et al. | Investigating effective waterproofing materials in preventing roof leaking; initial comparative study: Malaysia, UK | |
CN115144571A (en) | Construction site concrete strength detection model establishing method, device, equipment and medium | |
Carević et al. | Evaluation of concrete cover depth for green concretes exposed to carbonation | |
CN106116317B (en) | A kind of high-ductility concrete and the method for controlling its mix performance | |
CN110855781A (en) | Engineering monitoring method and device, computer equipment and storage medium | |
CN112709287A (en) | Rainwater recycling method and system in high-rise building construction process | |
Beushausen et al. | Principles of the performance-based approach for concrete durability | |
Thiery et al. | Application of the reliability theory to the assessment of carbonation-induced corrosion risk of rebars | |
Silva et al. | Case study of permeability-reducing admixture use in anti-flotation slabs: building in Brasilia, Brazil | |
CN112711681B (en) | House wall high crack measuring and identifying method and system | |
Albuquerque et al. | Reliability‐based recommendations for EN1992 carbonation cover design of concrete with coarse recycled concrete aggregates | |
Dervishaj et al. | A digital workflow for assessing lifespan, carbonation, and embodied carbon of reusing concrete in buildings | |
CN205238296U (en) | Concrete trolley GPS detection device | |
CN105844016A (en) | Planned building engineering quantity acquisition method based on building model cutting | |
Revert et al. | State-of-the-art report: Service life modelling, carbonation of concrete and corrosion in carbonated concrete. | |
Agarwalla et al. | Automation of Curing Using Prefabricated Sensors | |
CN118428587A (en) | Checking method, checking device, processing equipment and checking system for construction project | |
Wilde | Development of a concrete maturity test protocol | |
Milford | Load factors for limit states codes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210427 |