CN112555645B - Fatigue test and debugging test bed for forklift portal - Google Patents
Fatigue test and debugging test bed for forklift portal Download PDFInfo
- Publication number
- CN112555645B CN112555645B CN202011597259.0A CN202011597259A CN112555645B CN 112555645 B CN112555645 B CN 112555645B CN 202011597259 A CN202011597259 A CN 202011597259A CN 112555645 B CN112555645 B CN 112555645B
- Authority
- CN
- China
- Prior art keywords
- slide
- forklift
- hydraulic oil
- fixedly installed
- screw rods
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 46
- 238000009661 fatigue test Methods 0.000 title claims abstract description 24
- 210000005069 ears Anatomy 0.000 claims abstract description 25
- 239000003921 oil Substances 0.000 claims description 56
- 239000010720 hydraulic oil Substances 0.000 claims description 48
- 238000005096 rolling process Methods 0.000 claims description 3
- 230000002441 reversible effect Effects 0.000 description 10
- 230000009471 action Effects 0.000 description 9
- 230000005540 biological transmission Effects 0.000 description 8
- 238000000034 method Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 238000001514 detection method Methods 0.000 description 4
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 101001121408 Homo sapiens L-amino-acid oxidase Proteins 0.000 description 1
- 101000827703 Homo sapiens Polyphosphoinositide phosphatase Proteins 0.000 description 1
- 102100026388 L-amino-acid oxidase Human genes 0.000 description 1
- 102100023591 Polyphosphoinositide phosphatase Human genes 0.000 description 1
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16M—FRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
- F16M11/00—Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
- F16M11/42—Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters with arrangement for propelling the support stands on wheels
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16M—FRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
- F16M11/00—Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
- F16M11/20—Undercarriages with or without wheels
- F16M11/24—Undercarriages with or without wheels changeable in height or length of legs, also for transport only, e.g. by means of tubes screwed into each other
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M13/00—Testing of machine parts
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/02—Details
Landscapes
- General Engineering & Computer Science (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- General Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Biochemistry (AREA)
- Analytical Chemistry (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Forklifts And Lifting Vehicles (AREA)
Abstract
本发明公开了一种叉车门架疲劳性测试及调试试验台,包括底座,所述底座的顶部固定安装有配重座和两个立柱,两个立柱相互靠近的一侧均开设有第一滑槽,两个第一滑槽内均设有第一丝杆,两个第一丝杆上均螺纹套设有第一滑座,两个第一滑座相互靠近的一侧分别延伸至相对应的第一滑槽外。本发明设计合理,实用性好,便于把叉车门架安装固定在安装板上,方便对叉车门架的稳定性和疲劳强度进行检测试验和调试,而且便于对升降座和安装板的高度位置进行调节,并且便于对两个油缸连接耳之间的间距进行调节,适用对不同尺寸的叉车门架安装固定,方便对不同尺寸、不同型号的叉车门架进行检测试验工作,能够满足检测需求。
The present invention discloses a forklift mast fatigue test and debugging test bench, including a base, a counterweight seat and two columns are fixedly installed on the top of the base, a first slide groove is opened on the side of the two columns close to each other, a first screw rod is arranged in the two first slide grooves, a first slide seat is threadedly sleeved on the two first screw rods, and the sides of the two first slide seats close to each other extend to the outside of the corresponding first slide grooves respectively. The present invention has reasonable design and good practicality, and is convenient for installing and fixing the forklift mast on the mounting plate, and is convenient for testing and debugging the stability and fatigue strength of the forklift mast, and is convenient for adjusting the height position of the lifting seat and the mounting plate, and is convenient for adjusting the spacing between the two oil cylinder connecting ears, and is suitable for installing and fixing forklift masts of different sizes, and is convenient for testing and testing for forklift masts of different sizes and models, and can meet the testing needs.
Description
技术领域Technical Field
本发明涉及叉车门架试验技术领域,具体为一种叉车门架疲劳性测试及调试试验台。The invention relates to the technical field of forklift mast testing, in particular to a forklift mast fatigue testing and debugging test bench.
背景技术Background Art
叉车门架是叉车取物装置的主要承重结构,提升货物的机构,又称为门架,由内门架、外门架、货叉架、货叉、链轮、链条、起升油缸和倾斜油缸等组,根据叉取货物起升高度的要求,叉车门架可做成两级或多级,常见的普通叉车多采用两级门架,常见的有三节全自由门架、两节全自由门架、两节标准门架,传统的叉车门架生产完成后在进行检验时,需要将叉车门架安装到叉车上进行检测调试,如果发现叉车门架有问题时还必需要将叉车门架拆下进行修理,十分繁琐,现今,通常会使用叉车门架疲劳性测试及调试试验台对生产完成的叉车门架进行测试试验,以便于对叉车门架的性能进行检测。The forklift mast is the main load-bearing structure of the forklift's picking device, a mechanism for lifting goods, also known as a gantry. It is composed of an inner mast, an outer mast, a fork frame, forks, sprockets, chains, lifting cylinders and tilting cylinders. According to the requirements of the lifting height of the forked goods, the forklift mast can be made into two or more stages. Common ordinary forklifts mostly use a two-stage mast. Common ones are three-section full-free masts, two-section full-free masts, and two-section standard masts. When the traditional forklift mast is inspected after production, it is necessary to install the forklift mast on the forklift for testing and debugging. If a problem is found in the forklift mast, the forklift mast must be removed for repair, which is very cumbersome. Nowadays, a forklift mast fatigue test and debugging test bench is usually used to test the completed forklift mast in order to test the performance of the forklift mast.
但是,现有技术中,常用的叉车门架疲劳性测试及调试试验台在使用时,不便于把待检测的叉车门架进行安装固定,操作过程繁琐,对叉车门架的稳定性和疲劳强度的检测试验和调试操作不便,而且不适用于对不同尺寸的叉车门架安装固定,不适用于对不同尺寸、不同型号的叉车门架进行检测试验工作,不能够满足检测需求,为此,我们提出一种叉车门架疲劳性测试及调试试验台用于解决上述问题。However, in the prior art, the commonly used forklift mast fatigue test and debugging test bench is not convenient for installing and fixing the forklift mast to be tested during use, the operation process is cumbersome, and the detection and debugging operations of the stability and fatigue strength of the forklift mast are inconvenient. Moreover, it is not suitable for installing and fixing forklift masts of different sizes, and is not suitable for testing forklift masts of different sizes and models, and cannot meet the testing requirements. Therefore, we propose a forklift mast fatigue test and debugging test bench to solve the above problems.
发明内容Summary of the invention
(一)解决的技术问题1. Technical issues to be solved
针对现有技术的不足,本发明提供了一种叉车门架疲劳性测试及调试试验台,解决了现有的叉车门架疲劳性测试及调试试验台在使用时,不便于把待检测的叉车门架进行安装固定,操作过程繁琐,对叉车门架的稳定性和疲劳强度的检测试验和调试操作不便,而且不适用于对不同尺寸的叉车门架安装固定,不适用于对不同尺寸、不同型号的叉车门架进行检测试验工作,不能够满足检测需求的问题。In view of the deficiencies in the prior art, the present invention provides a forklift mast fatigue test and debugging test bench, which solves the problems that the existing forklift mast fatigue test and debugging test bench is not convenient for installing and fixing the forklift mast to be tested during use, the operation process is cumbersome, the detection and debugging operations of the stability and fatigue strength of the forklift mast are inconvenient, and it is not suitable for installing and fixing forklift masts of different sizes, and is not suitable for testing forklift masts of different sizes and models, and cannot meet the detection needs.
(二)技术方案(II) Technical solution
为实现上述目的,本发明提供如下技术方案:一种叉车门架疲劳性测试及调试试验台,包括底座,所述底座的顶部固定安装有配重座和两个立柱,两个立柱相互靠近的一侧均开设有第一滑槽,两个第一滑槽内均设有第一丝杆,两个第一丝杆上均螺纹套设有第一滑座,两个第一滑座相互靠近的一侧分别延伸至相对应的第一滑槽外,两个立柱的顶部固定安装有同一个横板,两个第一滑槽的顶部内壁上均开设有第一通孔,两个第一丝杆的顶端分别贯穿相对应的第一通孔,横板的顶部固定安装有第一电机,第一电机的输出轴端固定安装有竖轴,竖轴上和两个第一丝杆中的一个第一丝杆的顶端均固定套设有第一链轮,竖轴上和两个第一丝杆中的另一个第一丝杆的顶端均固定套设有第二链轮,两个第一链轮上绕设有同一个第一链条,两个第二链轮上绕设有同一个第二链条,两个第一滑座相互靠近的一侧固定安装有同一个升降座,升降座的顶部开设有两个第二滑槽,两个第二滑槽内均设有第二丝杆,两个第二丝杆的螺纹旋向相反设置,两个第二丝杆上均螺纹套设有第二滑座,两个第二滑座的顶部分别延伸至相对应的第二滑槽外,两个第二滑座的顶部均固定安装有支撑柱,两个支撑柱的顶端均固定安装有油缸连接耳,两个油缸连接耳内均活动安装有第一连接销,两个第一连接销上均螺纹套设有第一螺母,两个第二滑槽相互靠近的一侧内壁上开设有同一个连接孔,连接孔内转动安装有连接轴,连接轴的两端均延伸至连接孔外,两个第二丝杆相互靠近的一端分别与连接轴的两端固定连接,连接轴上固定套设有第一齿轮,连接孔的底部内壁上开设有凹槽,凹槽的底部内壁上固定安装有第二电机,第二电机的输出轴端固定安装有第二齿轮,第二齿轮的顶部延伸至连接孔内并与第一齿轮相啮合,升降座的底部固定安装有安装板,升降座远离安装板的一侧固定安装有液压油箱,液压油箱远离升降座的一侧固定安装有液压油泵,液压油泵的吸入端固定安装有吸油管,吸油管远离液压油泵的一端延伸至液压油箱内,液压油泵的排出端固定安装有出油管,出油管远离液压油泵的一端固定连接有四通阀,四通阀的另三端均固定连接有输油软管,三个输油软管远离四通阀的一端均固定连接有油管接头,安装板的顶部开设有多个定位孔,多个定位孔呈等间距两两对称设置。To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a forklift gantry fatigue test and debugging test bench, comprising a base, a counterweight seat and two columns are fixedly installed on the top of the base, a first slide groove is provided on the side of the two columns close to each other, a first screw rod is provided in the two first slide grooves, a first slide seat is threadedly sleeved on the two first screw rods, and the sides of the two first slide seats close to each other extend to the outside of the corresponding first slide grooves respectively, a same cross plate is fixedly installed on the top of the two columns, a first through hole is provided on the top inner wall of the two first slide grooves, the top ends of the two first screw rods pass through the corresponding first through holes respectively, a first motor is fixedly installed on the top of the cross plate, and the output of the first motor A vertical shaft is fixedly installed at the output shaft end, and a first sprocket is fixedly sleeved on the vertical shaft and the top end of one of the two first screw rods, and a second sprocket is fixedly sleeved on the vertical shaft and the top end of the other of the two first screw rods. The same first chain is wound around the two first sprockets, and the same second chain is wound around the two second sprockets. The same lifting seat is fixedly installed on the side where the two first slides are close to each other, and two second sliding grooves are opened on the top of the lifting seat, and second screw rods are arranged in the two second sliding grooves. The threads of the two second screw rods are arranged in opposite directions, and second slides are threadedly sleeved on the two second screw rods. The tops of the two second slides extend to the outside of the corresponding second sliding grooves, and the two The top of the second slide is fixedly installed with a support column, the top of the two support columns is fixedly installed with a cylinder connecting ear, the first connecting pins are movably installed in the two cylinder connecting ears, the two first connecting pins are threaded with a first nut, the same connecting hole is opened on the inner wall of the side where the two second slides are close to each other, a connecting shaft is rotatably installed in the connecting hole, both ends of the connecting shaft extend out of the connecting hole, the ends of the two second screw rods close to each other are respectively fixedly connected to the two ends of the connecting shaft, a first gear is fixedly sleeved on the connecting shaft, a groove is opened on the bottom inner wall of the connecting hole, a second motor is fixedly installed on the bottom inner wall of the groove, a second gear is fixedly installed on the output shaft end of the second motor, and the second gear The top of the gear extends into the connecting hole and meshes with the first gear, and a mounting plate is fixedly installed at the bottom of the lifting seat, and a hydraulic oil tank is fixedly installed on the side of the lifting seat away from the mounting plate, and a hydraulic oil pump is fixedly installed on the side of the hydraulic oil tank away from the lifting seat, and an oil suction pipe is fixedly installed on the suction end of the hydraulic oil pump, and an end of the oil suction pipe away from the hydraulic oil pump extends into the hydraulic oil tank, and an oil outlet pipe is fixedly installed on the discharge end of the hydraulic oil pump, and an end of the oil outlet pipe away from the hydraulic oil pump is fixedly connected to a four-way valve, and the other three ends of the four-way valve are fixedly connected to oil delivery hoses, and the ends of the three oil delivery hoses away from the four-way valve are fixedly connected to oil pipe joints, and a plurality of positioning holes are opened on the top of the mounting plate, and the plurality of positioning holes are symmetrically arranged in pairs at equal intervals.
优选的,多个定位孔中的其中四个定位孔内均活动安装有第二连接销,四个第二连接销上均螺纹套设有第二螺母。Preferably, second connecting pins are movably installed in four of the multiple positioning holes, and second nuts are threadedly sleeved on the four second connecting pins.
优选的,两个立柱的顶部固定安装有同一个外罩,第一电机、两个第一链轮、两个第二链轮、第一链条和第二链条均位于外罩内。Preferably, a same outer cover is fixedly mounted on the tops of the two columns, and the first motor, the two first sprockets, the two second sprockets, the first chain and the second chain are all located inside the outer cover.
优选的,两个第一滑槽的底部内壁上均固定安装有第一轴承座,两个第一丝杆的底端分别转动安装在相对应的第一轴承座上。Preferably, first bearing seats are fixedly mounted on the bottom inner walls of the two first slide grooves, and the bottom ends of the two first screw rods are rotatably mounted on the corresponding first bearing seats.
优选的,两个第一滑座相互远离的一侧均嵌套有滚珠,两个滚珠分别与相对应第一滑槽的一侧内壁滚动接触。Preferably, balls are embedded in the two first sliding seats on the sides away from each other, and the two balls are in rolling contact with the inner wall of one side of the corresponding first sliding groove respectively.
优选的,两个第二滑槽相互远离的一侧内壁上均固定安装有第二轴承座,两个第二丝杆相互远离的一端分别转动安装在相对应的第二轴承座上。Preferably, a second bearing seat is fixedly mounted on the inner wall of the two second sliding grooves at a side away from each other, and the ends of the two second screw rods away from each other are rotatably mounted on the corresponding second bearing seats.
优选的,两个第二滑槽的底部内壁上均开设有限位槽,两个第二滑座的底部均固定安装有限位柱,两个限位柱分别滑动安装在相对应的限位槽内。Preferably, limiting grooves are provided on the inner walls at the bottom of the two second slide grooves, limiting columns are fixedly installed at the bottom of the two second slide seats, and the two limiting columns are slidably installed in the corresponding limiting grooves respectively.
优选的,所述连接轴上固定套设有两个轴承,两个轴承的外圈均与连接孔的内壁固定连接。Preferably, the connecting shaft is provided with two bearings on the fixed sleeve, and the outer rings of the two bearings are fixedly connected to the inner wall of the connecting hole.
(三)有益效果(III) Beneficial effects
本发明提供了一种叉车门架疲劳性测试及调试试验台。具备以下有益效果:The present invention provides a forklift mast fatigue test and debugging test bench, which has the following beneficial effects:
(1)、该一种叉车门架疲劳性测试及调试试验台,通过启动第一电机正转,在两个第一链轮和第一链条的传动作用下,在两个第二链轮和第二链条的传动作用下,使得两个第一丝杆进行同步同向转动,使得两个第一滑座带动升降座、安装板和液压油箱竖直升高,通过启动第一电机反转,第一电机带动竖轴、相对应的第一链轮和相对应的第二链轮反方向转动,使得两个第一滑座带动升降座、安装板和液压油箱竖直下降,从而通过控制第一电机的正反转工作,可对升降座和安装板的高度位置进行调节。(1) The forklift gantry fatigue test and debugging test bench starts the first motor to rotate forward. Under the transmission action of the two first sprockets and the first chain, under the transmission action of the two second sprockets and the second chain, the two first screw rods rotate synchronously in the same direction, so that the two first slides drive the lifting seat, the mounting plate and the hydraulic oil tank to rise vertically. By starting the first motor to rotate backward, the first motor drives the vertical axis, the corresponding first sprocket and the corresponding second sprocket to rotate in the opposite direction, so that the two first slides drive the lifting seat, the mounting plate and the hydraulic oil tank to descend vertically, so that the height position of the lifting seat and the mounting plate can be adjusted by controlling the forward and reverse rotation of the first motor.
(2)、该一种叉车门架疲劳性测试及调试试验台,通过启动第二电机正转,第二电机带动第二齿轮转动,第二齿轮带动第一齿轮、连接轴和两个第二丝杆转动,使得两个第二滑座带动相对应的支撑柱和相对应的油缸连接耳向相互靠近的方向移动,通过启动第二电机反转,第二电机带动第二齿轮反方向转动,第二齿轮带动第一齿轮、连接轴和两个第二丝杆反方向转动,使得两个第二滑座带动相对应的支撑柱和相对应的油缸连接耳向相互远离的方向移动,从而通过控制第二电机的正反转,便于对两个油缸连接耳之间的间距进行调节。(2) This forklift gantry fatigue test and debugging test bench starts the second motor to rotate forward, the second motor drives the second gear to rotate, the second gear drives the first gear, the connecting shaft and the two second screws to rotate, so that the two second slides drive the corresponding support columns and the corresponding cylinder connecting ears to move toward each other. By starting the second motor to rotate backward, the second motor drives the second gear to rotate in the opposite direction, the second gear drives the first gear, the connecting shaft and the two second screws to rotate in the opposite direction, so that the two second slides drive the corresponding support columns and the corresponding cylinder connecting ears to move away from each other, thereby controlling the forward and reverse rotation of the second motor to facilitate the adjustment of the distance between the two cylinder connecting ears.
(3)、该一种叉车门架疲劳性测试及调试试验台,通过把升降座和安装板的高度位置调节合适后,并把两个油缸连接耳之间的间距调节合适后,把叉车门架放在安装板的顶部,利用四个第二连接销和四个第二螺母的锁紧配合,把叉车门架安装固定在安装板上,然后利用两个第一连接销与两个第一螺母的锁紧配合,把两个倾斜油缸分别与相对应的油缸连接耳进行连接固定,再把三个输油软管上的油管接头分别与叉车门架上的起升油缸和两个倾斜油缸的进油端固定连接,即完成了把叉车门架安装固定在安装板上,从而便于对升降座和安装板的高度位置进行调节,并且便于对两个油缸连接耳之间的间距进行调节,适用对不同尺寸的叉车门架安装固定,方便对不同尺寸、不同型号的叉车门架进行检测试验工作,提高了适用范围,实用性好。(3) The fatigue test and debugging test bench for a forklift mast is configured to place the forklift mast on the top of the mounting plate after the height position of the lifting seat and the mounting plate is adjusted appropriately and the spacing between the two cylinder connecting ears is adjusted appropriately. The forklift mast is then fixed on the mounting plate by means of the locking cooperation of four second connecting pins and four second nuts. The two tilting cylinders are then respectively connected and fixed to the corresponding cylinder connecting ears by means of the locking cooperation of two first connecting pins and two first nuts. The oil pipe joints on the three oil delivery hoses are then respectively fixedly connected to the lifting cylinder on the forklift mast and the oil inlet ends of the two tilting cylinders. Thus, the forklift mast is fixed on the mounting plate, thereby facilitating the adjustment of the height position of the lifting seat and the mounting plate and the spacing between the two cylinder connecting ears. The forklift mast is suitable for installation and fixation of forklift masts of different sizes and convenient for testing and inspecting forklift masts of different sizes and models, thereby improving the scope of application and having good practicality.
(4)、该一种叉车门架疲劳性测试及调试试验台,通过启动液压油泵工作,使得液压油箱内的液压油从三个输油软管分别进入起升油缸和两个倾斜油缸内,便可分别控制叉车门架上的起升油缸和两个倾斜油缸动作,便可对叉车门架的疲劳性能进行测试试验,可根据需要在叉车门架上放置相应配重的货物,并控制叉车门架连续升降运动,便可对叉车门架的稳定性和疲劳强度进行检测试验,而且通过分别控制起升油缸和两个倾斜油缸动作,能够检测并调节叉车门架两侧升降的同步性,从而方便对叉车门架进行疲劳性测试及调试,测试方便,提高了工作效率。(4) The forklift mast fatigue test and debugging test bench can start the hydraulic oil pump to allow the hydraulic oil in the hydraulic oil tank to enter the lifting cylinder and two tilting cylinders from three oil hoses respectively, so as to control the movements of the lifting cylinder and two tilting cylinders on the forklift mast respectively, so as to test the fatigue performance of the forklift mast. According to needs, corresponding counterweights can be placed on the forklift mast, and the forklift mast can be controlled to continuously lift and lower, so as to test the stability and fatigue strength of the forklift mast. Moreover, by controlling the movements of the lifting cylinder and the two tilting cylinders respectively, the synchronism of the lifting and lowering of the two sides of the forklift mast can be detected and adjusted, thereby facilitating fatigue testing and debugging of the forklift mast, making testing convenient and improving work efficiency.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本发明主视结构示意图;FIG1 is a schematic diagram of the main structure of the present invention;
图2为本发明主视的剖视结构示意图;FIG2 is a schematic diagram of a cross-sectional structure of the present invention in a front view;
图3为图2中A部分的放大示意图;FIG3 is an enlarged schematic diagram of part A in FIG2 ;
图4为本发明侧视的剖视结构示意图;FIG4 is a schematic diagram of a cross-sectional structure of the present invention from a side view;
图5为图4中B部分的放大示意图。FIG. 5 is an enlarged schematic diagram of portion B in FIG. 4 .
图中:1、底座;2、配重座;3、立柱;4、第一滑槽;5、第一丝杆;6、第一滑座;7、横板;8、第一电机;9、竖轴;10、第一链轮;11、第二链轮;12、第一链条;13、第二链条;14、升降座;15、第二滑槽;16、第二丝杆; 17、第二滑座;18、支撑柱;19、油缸连接耳;20、第一连接销;21、第一螺母;22、连接孔;23、连接轴;24、第一齿轮;25、凹槽;26、第二电机;27、第二齿轮;28、安装板;29、液压油箱;30、液压油泵;31、吸油管;32、出油管;33、四通阀;34、输油软管;35、油管接头;36、定位孔;37、第二连接销;38、第二螺母;39、外罩。In the figure: 1, base; 2, counterweight seat; 3, column; 4, first slide; 5, first screw; 6, first slide; 7, horizontal plate; 8, first motor; 9, vertical axis; 10, first sprocket; 11, second sprocket; 12, first chain; 13, second chain; 14, lifting seat; 15, second slide; 16, second screw; 17. Second slide seat; 18. Support column; 19. Cylinder connecting ear; 20. First connecting pin; 21. First nut; 22. Connecting hole; 23. Connecting shaft; 24. First gear; 25. Groove; 26. Second motor; 27. Second gear; 28. Mounting plate; 29. Hydraulic oil tank; 30. Hydraulic oil pump; 31. Suction pipe; 32. Oil outlet pipe; 33. Four-way valve; 34. Oil delivery hose; 35. Oil pipe joint; 36. Positioning hole; 37. Second connecting pin; 38. Second nut; 39. Outer cover.
具体实施方式DETAILED DESCRIPTION
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
如图1-5所示,本发明提供一种技术方案:一种叉车门架疲劳性测试及调试试验台,包括底座1,底座1的顶部固定安装有配重座2和两个立柱3,两个立柱3相互靠近的一侧均开设有第一滑槽4,两个第一滑槽4内均设有第一丝杆5,两个第一丝杆5上均螺纹套设有第一滑座6,两个第一滑座6相互靠近的一侧分别延伸至相对应的第一滑槽4外,两个立柱3的顶部固定安装有同一个横板7,两个第一滑槽4的顶部内壁上均开设有第一通孔,两个第一丝杆5的顶端分别贯穿相对应的第一通孔,横板7的顶部固定安装有第一电机8,第一电机8 的输出轴端固定安装有竖轴9,竖轴9上和两个第一丝杆5中的一个第一丝杆5 的顶端均固定套设有第一链轮10,竖轴9上和两个第一丝杆5中的另一个第一丝杆5的顶端均固定套设有第二链轮11,两个第一链轮10上绕设有同一个第一链条12,两个第二链轮11上绕设有同一个第二链条13,两个第一滑座6相互靠近的一侧固定安装有同一个升降座14,升降座14的顶部开设有两个第二滑槽 15,两个第二滑槽15内均设有第二丝杆16,两个第二丝杆16的螺纹旋向相反设置,两个第二丝杆16上均螺纹套设有第二滑座17,两个第二滑座17的顶部分别延伸至相对应的第二滑槽15外,两个第二滑座17的顶部均固定安装有支撑柱18,两个支撑柱18的顶端均固定安装有油缸连接耳19,两个油缸连接耳 19内均活动安装有第一连接销20,两个第一连接销20上均螺纹套设有第一螺母21,两个第二滑槽15相互靠近的一侧内壁上开设有同一个连接孔22,连接孔22内转动安装有连接轴23,连接轴23的两端均延伸至连接孔22外,两个第二丝杆16相互靠近的一端分别与连接轴23的两端固定连接,连接轴23上固定套设有第一齿轮24,连接孔22的底部内壁上开设有凹槽25,凹槽25的底部内壁上固定安装有第二电机26,第二电机26的输出轴端固定安装有第二齿轮27,第二齿轮27的顶部延伸至连接孔22内并与第一齿轮24相啮合,升降座14的底部固定安装有安装板28,升降座14远离安装板28的一侧固定安装有液压油箱29,液压油箱29远离升降座14的一侧固定安装有液压油泵30,液压油泵30 的吸入端固定安装有吸油管31,吸油管31远离液压油泵30的一端延伸至液压油箱29内,液压油泵30的排出端固定安装有出油管32,出油管32远离液压油泵30的一端固定连接有四通阀33,四通阀33的另三端均固定连接有输油软管34,三个输油软管34远离四通阀33的一端均固定连接有油管接头35,安装板 28的顶部开设有多个定位孔36,多个定位孔36呈等间距两两对称设置。As shown in FIGS. 1-5 , the present invention provides a technical solution: a forklift gantry fatigue test and debugging test bench, comprising a base 1, a counterweight seat 2 and two columns 3 are fixedly installed on the top of the base 1, a first slide groove 4 is provided on the side of the two columns 3 close to each other, a first screw rod 5 is provided in the two first slide grooves 4, a first slide seat 6 is threadedly sleeved on the two first screw rods 5, and the sides of the two first slide seats 6 close to each other extend to the outside of the corresponding first slide grooves 4 respectively, a same horizontal plate 7 is fixedly installed on the top of the two columns 3, a first through hole is provided on the top inner wall of the two first slide grooves 4, the top ends of the two first screw rods 5 pass through the corresponding first through holes respectively, a first motor 8 is fixedly installed on the top of the horizontal plate 7, a vertical shaft 9 is fixedly installed on the output shaft end of the first motor 8, and the vertical shaft 9 and one of the two first screw rods 5 are connected to the first screw rod 5 The top of each of the two first screw rods 5 is fixedly sleeved with a first sprocket 10, the top of each of the two first screw rods 5 is fixedly sleeved with a second sprocket 11, the two first sprockets 10 are wound with the same first chain 12, the two second sprockets 11 are wound with the same second chain 13, the two first slides 6 are fixedly installed with the same lifting seat 14 on the side close to each other, the top of the lifting seat 14 is provided with two second slide grooves 15, the two second slide grooves 15 are provided with a second screw rod 16, the threads of the two second screw rods 16 are arranged in opposite directions, the two second screw rods 16 are threadedly sleeved with a second slide seat 17, the tops of the two second slide seats 17 extend to the outside of the corresponding second slide grooves 15 respectively, the tops of the two second slide seats 17 are fixedly installed with support columns 18, the tops of the two support columns 18 are fixedly installed with cylinder connecting ears 19, the two cylinder connecting ears A first connecting pin 20 is movably installed in each of the two connecting pins 19, and a first nut 21 is threadedly sleeved on each of the two first connecting pins 20. A same connecting hole 22 is provided on the inner wall of the side where the two second slide grooves 15 are close to each other, and a connecting shaft 23 is rotatably installed in the connecting hole 22. Both ends of the connecting shaft 23 extend to the outside of the connecting hole 22, and the ends of the two second screw rods 16 close to each other are fixedly connected to the two ends of the connecting shaft 23 respectively. A first gear 24 is fixedly sleeved on the connecting shaft 23, and a groove 25 is provided on the bottom inner wall of the connecting hole 22. A second motor 26 is fixedly installed on the bottom inner wall of the groove 25, and a second gear 27 is fixedly installed on the output shaft end of the second motor 26. The top of the second gear 27 extends into the connecting hole 22 and meshes with the first gear 24. A mounting plate 28 is fixedly installed at the bottom of the lifting seat 14, and a hydraulic oil tank 29 is fixedly installed on the side of the lifting seat 14 away from the mounting plate 28. A hydraulic oil pump 30 is fixedly installed on the side of the hydraulic oil tank 29 away from the lifting seat 14. The hydraulic oil pump 30 An oil suction pipe 31 is fixedly installed at the suction end of the hydraulic oil pump 30, and the end of the oil suction pipe 31 away from the hydraulic oil pump 30 extends into the hydraulic oil tank 29. An oil outlet pipe 32 is fixedly installed at the discharge end of the hydraulic oil pump 30. The end of the oil outlet pipe 32 away from the hydraulic oil pump 30 is fixedly connected to a four-way valve 33, and the other three ends of the four-way valve 33 are fixedly connected to oil delivery hoses 34. The ends of the three oil delivery hoses 34 away from the four-way valve 33 are fixedly connected to oil pipe joints 35. A plurality of positioning holes 36 are opened on the top of the mounting plate 28, and the plurality of positioning holes 36 are symmetrically arranged in pairs at equal intervals.
本实施例中,多个定位孔36中的其中四个定位孔36内均活动安装有第二连接销37,四个第二连接销37上均螺纹套设有第二螺母38。In this embodiment, second connecting pins 37 are movably installed in four of the plurality of positioning holes 36 , and second nuts 38 are threadedly sleeved on the four second connecting pins 37 .
本实施例中,两个立柱3的顶部固定安装有同一个外罩39,第一电机8、两个第一链轮10、两个第二链轮11、第一链条12和第二链条13均位于外罩39 内。In this embodiment, a same outer cover 39 is fixedly mounted on the top of the two columns 3 , and the first motor 8 , two first sprocket wheels 10 , two second sprocket wheels 11 , the first chain 12 and the second chain 13 are all located inside the outer cover 39 .
本实施例中,两个第一滑槽4的底部内壁上均固定安装有第一轴承座,两个第一丝杆5的底端分别转动安装在相对应的第一轴承座上。In this embodiment, first bearing seats are fixedly mounted on the bottom inner walls of the two first slide grooves 4, and the bottom ends of the two first screw rods 5 are rotatably mounted on the corresponding first bearing seats.
本实施例中,两个第一滑座6相互远离的一侧均嵌套有滚珠,两个滚珠分别与相对应第一滑槽4的一侧内壁滚动接触。In this embodiment, balls are embedded in the two first sliding seats 6 at the sides away from each other, and the two balls are in rolling contact with the inner wall of one side of the corresponding first sliding groove 4 respectively.
本实施例中,两个第二滑槽15相互远离的一侧内壁上均固定安装有第二轴承座,两个第二丝杆16相互远离的一端分别转动安装在相对应的第二轴承座上。In this embodiment, second bearing seats are fixedly mounted on the inner walls of the two second slide grooves 15 at a side away from each other, and ends of the two second screw rods 16 away from each other are rotatably mounted on the corresponding second bearing seats.
本实施例中,两个第二滑槽15的底部内壁上均开设有限位槽,两个第二滑座17的底部均固定安装有限位柱,两个限位柱分别滑动安装在相对应的限位槽内。In this embodiment, the bottom inner walls of the two second slide grooves 15 are provided with limiting grooves, the bottoms of the two second slide seats 17 are fixedly installed with limiting columns, and the two limiting columns are slidably installed in the corresponding limiting grooves respectively.
本实施例中,所述连接轴23上固定套设有两个轴承,两个轴承的外圈均与连接孔22的内壁固定连接。In this embodiment, two bearings are fixedly sleeved on the connecting shaft 23 , and the outer rings of the two bearings are fixedly connected to the inner wall of the connecting hole 22 .
本实施例中,使用时,两个立柱3中的一个立柱3的一侧固定安装有多控开关和外接电源线,第一电机8和第二电机26均为可正反转电机,第一电机8、第二电机26、液压油泵30、多控开关和外接电源线依次通过导线电性连接构成回路,控制开关可分开控制第一电机8和第二电机26的启停和正反转工作,还可控制液压油泵30的启停工作,液压油箱29内存储有适量的液压油,通过启动第一电机8正转,第一电机8带动竖轴9、相对应的第一链轮10和相对应的第二链轮11转动,在两个第一链轮10和第一链条12的传动作用下,在两个第二链轮11和第二链条13的传动作用下,使得两个第一丝杆5进行同步同向转动,由于两个第一滑座6分别与相对应的第一丝杆5螺纹连接配合,使得两个第一滑座6带动升降座14、安装板28和液压油箱29竖直升高,两个第一滑座 6带动相对应的滚珠分别在相对应的第一滑槽4的一侧内壁上滚动,同理,通过启动第一电机8反转,第一电机8带动竖轴9、相对应的第一链轮10和相对应的第二链轮11反方向转动,在两个第一链轮10和第一链条12的传动作用下,在两个第二链轮11和第二链条13的传动作用下,使得两个第一丝杆5进行同步同向转动,使得两个第一滑座6带动升降座14、安装板28和液压油箱29竖直下降,从而通过控制第一电机8的正反转工作,可对升降座14和安装板28 的高度位置进行调节,通过启动第二电机26正转,第二电机26带动第二齿轮 27转动,第二齿轮27带动第一齿轮24、连接轴23和两个第二丝杆16转动,由于两个第二丝杆16的螺纹旋向相反设置,使得两个第二滑座17带动相对应的支撑柱18和相对应的油缸连接耳19向相互靠近的方向移动,两个第二滑座 17带动相对应的限位柱分别在相对应的限位槽内滑动,同理,通过启动第二电机26反转,第二电机26带动第二齿轮27反方向转动,第二齿轮27带动第一齿轮24、连接轴23和两个第二丝杆16反方向转动,使得两个第二滑座17带动相对应的支撑柱18和相对应的油缸连接耳19向相互远离的方向移动,从而通过控制第二电机26的正反转,便于对两个油缸连接耳19之间的间距进行调节,根据叉车门架的高度和宽度大小,把升降座14和安装板28的高度位置调节合适后,并把两个油缸连接耳19之间的间距调节合适后,然后把叉车门架放在安装板28的顶部,使得四个第二连接销37和四个第二螺母38的锁紧配合,可把叉车门架安装固定在安装板28上,然后把叉车门架上的两个倾斜油缸分别与相对应的油缸连接耳19相连接,并利用两个第一连接销20与两个第一螺母21的锁紧配合,把两个倾斜油缸分别与相对应的油缸连接耳19进行连接固定,然后把三个输油软管34上的油管接头35分别与叉车门架上的起升油缸和两个倾斜油缸的进油端固定连接,从而即完成了把叉车门架安装固定在安装板28上,从而便于对升降座14和安装板28的高度位置进行调节,并且便于对两个油缸连接耳19之间的间距进行调节,适用对不同尺寸的叉车门架安装固定,从而方便对不同尺寸、不同型号的叉车门架进行检测试验工作,提高了适用范围,实用性好,通过启动液压油泵30工作,使得液压油箱29内的液压油依次经过吸油管31、液压油泵30、出油管32、四通阀33和三个输油软管34分别进入起升油缸和两个倾斜油缸内,便可分别控制叉车门架上的起升油缸和两个倾斜油缸动作,便可对叉车门架的疲劳性能进行测试试验,在检测试验过程中,可根据需要在叉车门架上放置相应配重的货物,并控制叉车门架连续升降运动,便可对叉车门架的稳定性和疲劳强度进行检测试验,而且通过分别控制起升油缸和两个倾斜油缸动作,能够检测并调节叉车门架两侧升降的同步性,从而方便对叉车门架进行疲劳性测试及调试,测试方便,提高了工作效率,同时本说明书中未作详细描述的内容均属于本领域专业技术人员公知的现有技术。In this embodiment, when in use, a multi-control switch and an external power line are fixedly installed on one side of one of the two columns 3. The first motor 8 and the second motor 26 are both reversible motors. The first motor 8, the second motor 26, the hydraulic oil pump 30, the multi-control switch and the external power line are electrically connected in sequence through wires to form a circuit. The control switch can separately control the start and stop and the forward and reverse operation of the first motor 8 and the second motor 26, and can also control the start and stop of the hydraulic oil pump 30. An appropriate amount of hydraulic oil is stored in the hydraulic oil tank 29. By starting the first motor 8 to rotate forward, the first motor 8 drives the vertical shaft 9, the corresponding first sprocket 10 and the corresponding second sprocket 11 to rotate. Under the transmission action of the two first sprockets 10 and the first chain 12, under the transmission action of the two second sprockets 11 and the second chain 13, the two first screw rods 5 rotate synchronously in the same direction. Since the two first slides 6 are respectively threadedly connected and cooperated with the corresponding first screw rods 5, the two first slides 6 drive the lifting seat 14, the mounting plate 28 and the hydraulic oil tank 29 to rise vertically, and the two first slides 6 drives the corresponding balls to roll on the inner wall of one side of the corresponding first slide groove 4. Similarly, by starting the first motor 8 to rotate in reverse, the first motor 8 drives the vertical shaft 9, the corresponding first sprocket 10 and the corresponding second sprocket 11 to rotate in the opposite direction. Under the transmission action of the two first sprockets 10 and the first chain 12, under the transmission action of the two second sprockets 11 and the second chain 13, the two first screw rods 5 rotate synchronously in the same direction, so that the two first slide seats 6 drive the lifting seat 14, the mounting plate 28 and the hydraulic oil tank 29 to vertically descend, so that by controlling the forward and reverse rotation of the first motor 8, the height position of the lifting seat 14 and the mounting plate 28 can be adjusted. By starting the second motor 26 to rotate in the forward direction, the second motor 26 drives the second gear 27 to rotate, and the second gear 27 drives the first gear 24, the connecting shaft 23 and the two second screw rods 16 to rotate. Since the thread rotation directions of the two second screw rods 16 are set in opposite directions, the two second slide seats 17 drive the corresponding support columns 18 and the corresponding cylinder connecting ears 19 to move in the direction of approaching each other, and the two second slide seats 17 drives the corresponding limiting columns to slide in the corresponding limiting grooves respectively. Similarly, by starting the second motor 26 to reverse, the second motor 26 drives the second gear 27 to rotate in the opposite direction. The second gear 27 drives the first gear 24, the connecting shaft 23 and the two second screw rods 16 to rotate in the opposite direction, so that the two second slide seats 17 drive the corresponding supporting columns 18 and the corresponding cylinder connecting ears 19 to move away from each other. Therefore, by controlling the forward and reverse rotation of the second motor 26, it is convenient to adjust the distance between the two cylinder connecting ears 19. According to the height and width of the forklift mast, after the height position of the lifting seat 14 and the mounting plate 28 is adjusted appropriately, After the spacing between the two oil cylinder connecting ears 19 is adjusted appropriately, the forklift mast is placed on the top of the mounting plate 28, so that the four second connecting pins 37 and the four second nuts 38 are locked together, and the forklift mast can be installed and fixed on the mounting plate 28, and then the two tilting oil cylinders on the forklift mast are respectively connected to the corresponding oil cylinder connecting ears 19, and the two first connecting pins 20 and the two first nuts 21 are locked together to connect and fix the two tilting oil cylinders to the corresponding oil cylinder connecting ears 19, and then the oil pipe joints 35 on the three oil delivery hoses 34 are respectively fixedly connected to the lifting oil cylinder on the forklift mast and the oil inlet ends of the two tilting oil cylinders. The forklift mast is connected, thereby completing the installation and fixing of the forklift mast on the mounting plate 28, so that it is convenient to adjust the height position of the lifting seat 14 and the mounting plate 28, and it is convenient to adjust the distance between the two cylinder connecting ears 19, which is suitable for installing and fixing forklift masts of different sizes, so as to facilitate the detection and testing of forklift masts of different sizes and models, thereby improving the scope of application and having good practicality. By starting the hydraulic oil pump 30, the hydraulic oil in the hydraulic oil tank 29 passes through the oil suction pipe 31, the hydraulic oil pump 30, the oil outlet pipe 32, the four-way valve 33 and the three oil delivery hoses 34 in sequence and enters the lifting cylinder and the two tilting cylinders respectively, so that the lifting cylinder and the two tilting cylinders can be controlled respectively. By controlling the movement of the lifting cylinder and the two tilting cylinders on the forklift mast, the fatigue performance of the forklift mast can be tested. During the test, corresponding counterweights can be placed on the forklift mast as needed, and the forklift mast can be controlled to continuously move up and down, so as to test the stability and fatigue strength of the forklift mast. Moreover, by separately controlling the movement of the lifting cylinder and the two tilting cylinders, the synchronization of the lifting and lowering of both sides of the forklift mast can be detected and adjusted, thereby facilitating fatigue testing and debugging of the forklift mast, facilitating testing and improving work efficiency. At the same time, the contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
综上可得,该一种叉车门架疲劳性测试及调试试验台,通过启动第一电机8 正转,在两个第一链轮10和第一链条12的传动作用下,在两个第二链轮11和第二链条13的传动作用下,使得两个第一丝杆5进行同步同向转动,使得两个第一滑座6带动升降座14、安装板28和液压油箱29竖直升高,通过启动第一电机8反转,第一电机8带动竖轴9、相对应的第一链轮10和相对应的第二链轮11反方向转动,使得两个第一滑座6带动升降座14、安装板28和液压油箱 29竖直下降,从而通过控制第一电机8的正反转工作,可对升降座14和安装板 28的高度位置进行调节,通过启动第二电机26正转,第二电机26带动第二齿轮27转动,第二齿轮27带动第一齿轮24、连接轴23和两个第二丝杆16转动,使得两个第二滑座17带动相对应的支撑柱18和相对应的油缸连接耳19向相互靠近的方向移动,通过启动第二电机26反转,第二电机26带动第二齿轮27反方向转动,第二齿轮27带动第一齿轮24、连接轴23和两个第二丝杆16反方向转动,使得两个第二滑座17带动相对应的支撑柱18和相对应的油缸连接耳19向相互远离的方向移动,从而通过控制第二电机26的正反转,便于对两个油缸连接耳19之间的间距进行调节,通过把升降座14和安装板28的高度位置调节合适后,并把两个油缸连接耳19之间的间距调节合适后,把叉车门架放在安装板28的顶部,利用四个第二连接销37和四个第二螺母38的锁紧配合,把叉车门架安装固定在安装板28上,然后利用两个第一连接销20与两个第一螺母21 的锁紧配合,把两个倾斜油缸分别与相对应的油缸连接耳19进行连接固定,再把三个输油软管34上的油管接头35分别与叉车门架上的起升油缸和两个倾斜油缸的进油端固定连接,即完成了把叉车门架安装固定在安装板28上,从而便于对升降座14和安装板28的高度位置进行调节,并且便于对两个油缸连接耳 19之间的间距进行调节,适用对不同尺寸的叉车门架安装固定,方便对不同尺寸、不同型号的叉车门架进行检测试验工作,提高了适用范围,实用性好,通过启动液压油泵30工作,使得液压油箱29内的液压油从三个输油软管34分别进入起升油缸和两个倾斜油缸内,便可分别控制叉车门架上的起升油缸和两个倾斜油缸动作,便可对叉车门架的疲劳性能进行测试试验,可根据需要在叉车门架上放置相应配重的货物,并控制叉车门架连续升降运动,便可对叉车门架的稳定性和疲劳强度进行检测试验,而且通过分别控制起升油缸和两个倾斜油缸动作,能够检测并调节叉车门架两侧升降的同步性,从而方便对叉车门架进行疲劳性测试及调试,测试方便,提高了工作效率,本发明设计合理,实用性好,便于把叉车门架安装固定在安装板28上,方便对叉车门架的稳定性和疲劳强度进行检测试验和调试,而且便于对升降座14和安装板28的高度位置进行调节,并且便于对两个油缸连接耳19之间的间距进行调节,适用对不同尺寸的叉车门架安装固定,方便对不同尺寸、不同型号的叉车门架进行检测试验工作,能够满足检测需求。In summary, the fatigue test and debugging test bench for the forklift gantry starts the first motor 8 to rotate forward, and under the transmission action of the two first sprockets 10 and the first chain 12, under the transmission action of the two second sprockets 11 and the second chain 13, the two first screw rods 5 are synchronously rotated in the same direction, so that the two first slides 6 drive the lifting seat 14, the mounting plate 28 and the hydraulic oil tank 29 to rise vertically, and the first motor 8 is started to rotate reversely, and the first motor 8 drives the vertical shaft 9, the corresponding first sprocket 10 and the corresponding second sprocket 11 to rotate in the opposite direction, so that the two first slides 6 drive the lifting seat 14, the mounting plate 28 and the hydraulic oil tank 29 to descend vertically, so that the lifting seat 14 and the mounting plate 28 can be adjusted by controlling the forward and reverse rotation of the first motor 8. The height position of 28 is adjusted by starting the second motor 26 to rotate forward, the second motor 26 drives the second gear 27 to rotate, the second gear 27 drives the first gear 24, the connecting shaft 23 and the two second screw rods 16 to rotate, so that the two second slides 17 drive the corresponding support column 18 and the corresponding oil cylinder connecting ear 19 to move in a direction close to each other, and by starting the second motor 26 to rotate reversely, the second motor 26 drives the second gear 27 to rotate in the opposite direction, the second gear 27 drives the first gear 24, the connecting shaft 23 and the two second screw rods 16 to rotate in the opposite direction, so that the two second slides 17 drive The corresponding support columns 18 and the corresponding oil cylinder connecting ears 19 move in the direction away from each other, so that the spacing between the two oil cylinder connecting ears 19 can be adjusted by controlling the forward and reverse rotation of the second motor 26. After the height position of the lifting seat 14 and the mounting plate 28 is adjusted appropriately, and the spacing between the two oil cylinder connecting ears 19 is adjusted appropriately, the forklift mast is placed on the top of the mounting plate 28, and the forklift mast is fixed on the mounting plate 28 by the locking cooperation of the four second connecting pins 37 and the four second nuts 38, and then the two tilting oil cylinders are respectively connected and fixed to the corresponding oil cylinder connecting ears 19 by the locking cooperation of the two first connecting pins 20 and the two first nuts 21, and then the oil pipe joints 35 on the three oil delivery hoses 34 are respectively fixedly connected to the lifting oil cylinder on the forklift mast and the oil inlet ends of the two tilting oil cylinders, that is, the forklift mast is installed and fixed on the mounting plate 28, so that the height position of the lifting seat 14 and the mounting plate 28 can be adjusted, and the two oil cylinder connecting ears can be adjusted appropriately. The spacing between 19 can be adjusted, which is suitable for installing and fixing forklift masts of different sizes, and is convenient for testing forklift masts of different sizes and models, thereby improving the scope of application and having good practicality. By starting the hydraulic oil pump 30, the hydraulic oil in the hydraulic oil tank 29 enters the lifting cylinder and the two tilting cylinders from the three oil delivery hoses 34 respectively, so that the lifting cylinder and the two tilting cylinders on the forklift mast can be controlled respectively, so that the fatigue performance of the forklift mast can be tested, and corresponding counterweights can be placed on the forklift mast as needed, and the continuous lifting movement of the forklift mast can be controlled, so that the stability and fatigue strength of the forklift mast can be tested, and by respectively By controlling the actions of the lifting cylinder and the two tilting cylinders, the synchronization of the lifting and lowering of the two sides of the forklift mast can be detected and adjusted, thereby facilitating fatigue testing and debugging of the forklift mast, facilitating testing, and improving work efficiency. The present invention has reasonable design and good practicality, and is convenient for installing and fixing the forklift mast on the mounting plate 28, so as to facilitate testing and debugging of the stability and fatigue strength of the forklift mast, and is convenient for adjusting the height position of the lifting seat 14 and the mounting plate 28, and is convenient for adjusting the distance between the two cylinder connecting ears 19. It is suitable for installing and fixing forklift masts of different sizes, and is convenient for testing and testing for forklift masts of different sizes and models, and can meet testing needs.
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011597259.0A CN112555645B (en) | 2020-12-29 | 2020-12-29 | Fatigue test and debugging test bed for forklift portal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011597259.0A CN112555645B (en) | 2020-12-29 | 2020-12-29 | Fatigue test and debugging test bed for forklift portal |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112555645A CN112555645A (en) | 2021-03-26 |
CN112555645B true CN112555645B (en) | 2024-10-29 |
Family
ID=75032974
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011597259.0A Active CN112555645B (en) | 2020-12-29 | 2020-12-29 | Fatigue test and debugging test bed for forklift portal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112555645B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113021246B (en) * | 2021-04-07 | 2022-12-23 | 国网湖北省电力有限公司黄冈供电公司 | A wall hole water pipe connection device suitable for narrow areas |
CN113092094A (en) * | 2021-04-13 | 2021-07-09 | 安徽安凯金达机械制造有限公司 | Bus inner swing door fatigue test bench |
CN113281056B (en) * | 2021-04-28 | 2024-02-27 | 安徽长景机电科技有限公司 | Intelligent monitoring device for forklift |
CN113281028B (en) * | 2021-06-03 | 2025-03-28 | 杭叉集团股份有限公司 | A universal forklift mast test bench |
CN115031822A (en) * | 2022-07-06 | 2022-09-09 | 青岛市计量技术研究院 | Multi-station weighing apparatus fatigue testing machine |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN215111815U (en) * | 2020-12-29 | 2021-12-10 | 唐山盛航环保机车制造有限公司 | Fatigue test and debugging test bed for forklift gantry |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR980009247U (en) * | 1996-07-27 | 1998-04-30 | 추호석 | Light source device for visibility test of forklift mast |
CN210567267U (en) * | 2019-06-13 | 2020-05-19 | 山东昌泽联泰智能科技有限公司 | Bank queuing display screen convenient to maintain |
CN210528383U (en) * | 2019-10-14 | 2020-05-15 | 江苏康达顺精密汽车附件制造有限公司 | Power fork truck hydraulic part pressure testing equipment |
CN211206713U (en) * | 2019-12-02 | 2020-08-07 | 深圳市正科宏达科技有限公司 | Multifunctional PCB test jig |
-
2020
- 2020-12-29 CN CN202011597259.0A patent/CN112555645B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN215111815U (en) * | 2020-12-29 | 2021-12-10 | 唐山盛航环保机车制造有限公司 | Fatigue test and debugging test bed for forklift gantry |
Also Published As
Publication number | Publication date |
---|---|
CN112555645A (en) | 2021-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112555645B (en) | Fatigue test and debugging test bed for forklift portal | |
CN211841699U (en) | Fixing device for automobile part detection | |
CN108046162A (en) | A kind of equipment elevator platform | |
CN115070273A (en) | Radiator welding workstation system for transformer | |
CN207645715U (en) | A kind of double shear formula electric lifting device of heavy workpiece | |
CN202046840U (en) | Special-purpose lifting mobile vehicle for transformer testing | |
CN208656720U (en) | A kind of wet earth detector of photovoltaic module | |
CN211444875U (en) | Lifting mechanism for automatic lifting workbench | |
CN108928782A (en) | A kind of Mobile distribution line maintenance device | |
CN219899879U (en) | Steel construction processing punching equipment | |
CN211662007U (en) | Maintenance device for repairing engineering machine | |
CN207401938U (en) | A kind of school circle device of major-diameter thick-wall aluminum barrel | |
CN204454422U (en) | A kind of load transfer device for large-scale cylindrical workpiece rotation and lifting | |
CN210795646U (en) | Large-load movable lifting platform | |
CN103163022A (en) | Tensile test fixture | |
CN220979418U (en) | Lifting platform for movable drill floor calandria robot | |
CN221976050U (en) | A sliding mechanism for a lower trim panel inspection fixture for an automobile | |
CN209868507U (en) | Automatic change maintenance platform device | |
CN208008387U (en) | A kind of equipment elevator platform | |
WO2016112607A1 (en) | Combined type light lifting apparatus and method for using same | |
CN215828296U (en) | Lifting device | |
CN111660045A (en) | Water wall assembling and adjusting rack and method | |
CN222537096U (en) | A drilling device for steel structure production | |
CN203903938U (en) | Hanging bracket special for power transformation equipment | |
CN219469643U (en) | An easy-to-adjust electrical engineering maintenance stand |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |