CN112459262B - Novel Hafen groove and construction method thereof - Google Patents

Novel Hafen groove and construction method thereof Download PDF

Info

Publication number
CN112459262B
CN112459262B CN202011370746.3A CN202011370746A CN112459262B CN 112459262 B CN112459262 B CN 112459262B CN 202011370746 A CN202011370746 A CN 202011370746A CN 112459262 B CN112459262 B CN 112459262B
Authority
CN
China
Prior art keywords
groove
hafen
steel sheet
triangular
buckle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011370746.3A
Other languages
Chinese (zh)
Other versions
CN112459262A (en
Inventor
周义旺
吕乾
李昌华
张猛
项文胜
张博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN202011370746.3A priority Critical patent/CN112459262B/en
Publication of CN112459262A publication Critical patent/CN112459262A/en
Application granted granted Critical
Publication of CN112459262B publication Critical patent/CN112459262B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4114Elements with sockets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a novel Halfen groove and a construction method thereof, wherein a large-head bolt is arranged behind the Halfen groove and is inserted into a wall through the large-head bolt; the Hafen groove is a concave cuboid, a steel sheet is arranged on the inner side of the Hafen groove, and triangular supports are arranged at four corners of the outer side of the Hafen groove; the triangular bracket is provided with a buckle with adjustable position and is connected with the steel bar with the corresponding position on the wall body through the buckle on the triangular bracket; the connection position of the Hafen groove and the reinforcing steel bar is adjusted by adjusting the position of the buckle on the triangular bracket, so that the Hafen groove is tightly connected with the template; the steel sheet adopts a rotatable structure, the steel sheet is used for installing the pipeline supporting arm, the pipeline supporting arm penetrates through the rotatable steel sheet from the lower end of the Hafen groove, and when the pipeline supporting arm reaches a preset position, the pipeline supporting arm can be fixed on the Hafen groove. The invention can avoid the falling of the Hafen groove when pouring concrete, and is convenient for construction; the movable steel sheet is convenient for fixing the bracket, and the water stop sheet prevents the water from permeating on the inner wall of the cabin.

Description

Novel Hafen groove and construction method thereof
Technical Field
The invention relates to the technical field of steel structures, in particular to a novel Hafen groove and a construction method thereof.
Background
The utility tunnel is one of the important signs of modern novel city municipal infrastructure construction of present generation, possesses the requirement of overlength life. Various pipelines are used in the later stage of the underground comprehensive pipe gallery, and facilities for reserving mounting brackets need to be reserved on the wall body by using the Hafen grooves. The Hufen groove is an embedded part for buildings, and an embedded device is embedded, and the existing Hufen groove structure is formed by C-shaped channel steel and a long bolt arranged behind the C-shaped channel steel; the installation is that the C-shaped groove is pre-buried in the concrete, the big end of the big end bolt is buckled into the C-shaped groove, and the component to be installed is fixed by the big end bolt (as shown in figure 1). Therefore, after the large-head bolt is inserted into a wall body, the possibility of water seepage along the bolt is caused, and the large-head bolt is influenced when concrete is poured, so that the position of the Halfen groove is possibly deviated. Therefore, when the hausen groove is installed, the large-head bolt is welded on the main reinforcing steel bar in the prior art, but the strength of the reinforcing steel bar is affected. Therefore, the vertical and stable installation of the hafen groove is a difficult problem in construction, and the installation is not beautiful after the installation is finished, and the installation of the bracket is unstable, thereby influencing the stability of the pipeline in the use process.
Disclosure of Invention
The invention aims to solve the technical problem of providing a novel Hafen groove and a construction method thereof aiming at the defects in the prior art.
The technical scheme adopted by the invention for solving the technical problems is as follows:
the invention provides a novel Halfen groove, which comprises a Halfen groove, wherein a large-head bolt is arranged behind the Halfen groove and is inserted into a wall through the large-head bolt; the Hafen groove is a concave cuboid, a steel sheet is arranged on the inner side of the Hafen groove, and triangular supports are arranged at four corners of the outer side of the Hafen groove; the triangular bracket is provided with a buckle with adjustable position and is connected with the steel bar with the corresponding position on the wall body through the buckle on the triangular bracket; the connection position of the Hafen groove and the reinforcing steel bar is adjusted by adjusting the position of the buckle on the triangular bracket, so that the Hafen groove is tightly connected with the template; the steel sheet adopts a rotatable structure, the steel sheet is used for installing the pipeline supporting arm, the pipeline supporting arm penetrates through the rotatable steel sheet from the lower end of the Hafen groove, and when the pipeline supporting arm reaches a preset position, the pipeline supporting arm can be fixed on the Hafen groove.
Furthermore, each large-head bolt is also provided with a water stop sheet.
Furthermore, the large-head bolts are not less than 4.
Further, the steel sheet of the invention comprises a rotatable blocking steel sheet and sawteeth, wherein a rotating shaft is arranged on the rotatable blocking steel sheet, and the sawteeth are arranged at the lower part of the rotatable blocking steel sheet.
Furthermore, the triangular support is a right-angled triangle.
Furthermore, a slideway is arranged on one bottom edge of the triangular bracket; the buckle comprises a connecting block and a fastening bolt, and the connecting block is arranged on the slideway and can slide in the slideway; fastening bolt sets up in the connecting block below, and the buckle is fixed on the wall body reinforcing bar, and buckle and reinforcing bar buckle.
Furthermore, the triangular support and the Hafen groove form a certain angle for installation.
Furthermore, C-shaped channel steel is arranged on two sides of the Halfen groove.
The invention provides a construction method of a novel Hafen groove, which comprises the following steps:
step 1, selecting a Hufen groove installation position;
after the binding of the reinforcing steel bars of the pipe gallery wall is finished, selecting a Hufen groove installation position according to the early-stage design requirement;
step 2, fixing the hafen groove at an installation position;
inserting the big end bolt behind the Hafen slot into the reinforced wall body, and determining whether the installation is bilateral or not according to the requirement:
if the installation is unilateral, the large-head bolt with the water stop sheet is directly bound with the main body steel bar, and the four triangular supports are inserted into the wall body steel bar;
if the installation is bilateral, the C-shaped channel steels on two sides of the Hafen channel are installed by using a level gauge after the large-head bolt is ensured to be vertical to the wall body, and the triangular supports at four corners are installed in the same step as the single-side installation;
step 3, adjusting the position of the triangular support;
after the triangular support is inserted into a steel bar wall body, the buckles can move on the triangular support, when a proper steel bar is selected for fixing, the connecting blocks of the buckles are moved to enable the buckles to be tightly buckled with the steel bar, after the buckles at the four corners are completely fixed, whether the hafen grooves are vertical or not is observed, and the next step can be carried out after the hafen grooves are vertical;
step 4, installing a template;
installing a template, tightly attaching the halamine groove and the template together, and filling fillers in the halamine groove to ensure that no gap exists above and below the halamine groove and concrete cannot be poured into the halamine groove in the later period;
step 5, pouring concrete;
and finally, after the Hafen groove is closely contacted with the template and is vertical to the ground, concrete pouring is carried out.
The invention has the following beneficial effects: according to the novel Hafen groove and the construction method thereof, the triangular supports are arranged behind the groove, and the buckles are arranged on the supports and can be fixed with the main ribs, so that the Hafen groove can be prevented from falling off when concrete is poured, and the construction is convenient. The sawtooth is arranged in the groove, the movable steel sheet is arranged on the sawtooth, when the support is installed at the later stage, the steel sheet can be opened upwards, the support can pass through the sawtooth conveniently, and when the sawtooth reaches an expected position, the sawtooth can prevent the steel sheet from opening downwards, so that the position of the support can be fixed conveniently, and the support is prevented from falling. The large-head bolt is provided with a water stop sheet to prevent the large-head bolt from penetrating through the wall to cause water seepage in the cabin inner wall structure.
Drawings
The invention will be further described with reference to the accompanying drawings and examples, in which:
FIG. 1 is a schematic diagram of a conventional Halofen cell of an embodiment of the present invention;
FIG. 2 is a front view of a hausen cell of an embodiment of the invention;
FIG. 3 is a cross-sectional view of a single cartridge configuration of an embodiment of the present invention;
FIG. 4 is a cross-sectional view of a multi-compartment interior wall structure of an embodiment of the present invention;
FIG. 5 is a top view of an embodiment of the present invention;
FIG. 6 is a schematic view of the embodiment of the present invention showing the connection between the clip and the reinforcement bar;
FIG. 7 is a schematic view of a mounting bracket according to an embodiment of the present invention;
in the figure: 1-Hafengro, 2-steel sheet, 3-buckle, 4-template, 5-water stop sheet, 6-wall, 7-steel bar, 8-triangular bracket, 9-rotatable blocking steel sheet, 10-sawtooth, 11-slideway, 12-connecting block, 13-fastening bolt and 14-big head bolt.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The novel Halfen groove comprises a Halfen groove 1, wherein a large-head bolt 14 is arranged behind the Halfen groove 1 and is inserted into a wall 6 through the large-head bolt 14; the Hafen groove 1 is a concave cuboid, a steel sheet 2 is arranged on the inner side of the Hafen groove, and triangular supports 8 are arranged at four corners of the outer side of the Hafen groove; the triangular bracket 8 is provided with a buckle 3 with adjustable position, and is connected with the reinforcing steel bar 7 with the corresponding position on the wall body through the buckle 3 on the triangular bracket 8; the connecting position of the Hafen groove 1 and the reinforcing steel bar 7 is adjusted by adjusting the position of the buckle 3 on the triangular bracket 8, so that the Hafen groove 1 is tightly connected with the template 4; the steel sheet 2 is of a rotatable structure, the steel sheet 2 is used for installing a pipeline supporting arm, the pipeline supporting arm penetrates through the rotatable steel sheet 2 from the lower end of the Hafen groove 1, and when the pipeline supporting arm reaches a preset position, the pipeline supporting arm can be fixed on the Hafen groove 1.
Each big head bolt 14 is also provided with a water stop 5. The large-head bolts 14 are provided with not less than 4. The steel sheet 2 comprises a rotatable blocking steel sheet 9 and saw teeth 10, wherein a rotating shaft is arranged on the rotatable blocking steel sheet 9, and the saw teeth 10 are arranged on the lower portion of the rotatable blocking steel sheet 9. The triangular support 8 is a right triangle. A slideway 11 is arranged on one bottom edge of the triangular bracket 8; the buckle 3 comprises a connecting block 12 and a fastening bolt 13, wherein the connecting block 12 is arranged on the slideway 11 and can slide in the slideway 11; the fastening bolt 13 is arranged below the connecting block 12, and the reinforcing steel bar 7 is installed on the connecting block 12. The triangular support 8 and the Hafen groove 1 are arranged at a certain angle. C-shaped channel steel is further arranged on two sides of the Halfen groove 1.
The construction method of the novel Hafen groove provided by the embodiment of the invention comprises the following steps:
step 1, selecting a Hufen groove installation position;
after the binding of the reinforcing steel bars of the pipe gallery wall is finished, selecting a Hufen groove installation position according to the early-stage design requirement;
step 2, fixing the hafen groove at an installation position;
inserting the big end bolt behind the Hafen slot into the reinforced wall body, and determining whether the installation is bilateral or not according to the requirement:
if the installation is unilateral, the large-head bolt with the water stop sheet is directly bound with the main body steel bar, and the four triangular supports are inserted into the wall body steel bar;
if the installation is bilateral, the C-shaped channel steels on two sides of the Hafen channel are installed by using a level gauge after the large-head bolt is ensured to be vertical to the wall body, and the triangular supports at four corners are installed in the same step as the single-side installation;
step 3, adjusting the position of the triangular support;
after the triangular support is inserted into a steel bar wall body, the buckles can move on the triangular support, when a proper steel bar is selected for fixing, the connecting blocks of the buckles are moved to enable the buckles to be tightly buckled with the steel bar, after the buckles at the four corners are completely fixed, whether the hafen grooves are vertical or not is observed, and the next step can be carried out after the hafen grooves are vertical;
step 4, installing a template;
installing a template, tightly attaching the Halfen groove and the template together, filling the Halfen groove with a filler, and ensuring that no concrete is poured into the Halfen groove in the later period;
step 5, pouring concrete;
and finally, after the Hafen groove is closely contacted with the template and is vertical to the ground, concrete pouring is carried out.
The current installation procedure is to use spikes to fix the holes on the template through holes reserved on the surface of the embedded parts while supporting the template of the side wall before the haufen slot. A long nail and template should be used for each cavity in which a part is embedded. During the embedding of the embedded part, the surface of the embedded part and the surface of the template should be tightly connected. After fixing the embedded parts with the formworks, it is checked whether the embedded parts are perpendicular to the ground before casting concrete. The concrete adhering to the outer surface of the embedded component is cleaned to expose the surface. The contents of the can were removed. After the embedded part is fixed by the formwork, it is checked whether the embedded part is perpendicular to the ground before concrete is poured. After the embedded part is installed by the Hafen slot inspection, the embedded part is subjected to self-inspection and hidden record. After passing the self-test, it should be reported to the supervisor to accept the embedded part. Only after passing the acceptance can the next step be performed. During the embedding of the toothed hayfen slot, the surface of the embedded part and the surface of the template should be tightly connected.
The hafen groove is fixed on the reinforcing steel bars through bolts and is connected with the wall reinforcing steel bars corresponding to the positions of the clamping buckles on the triangular supports, and the clamping openings can be adjusted in position through the connecting blocks through the slide ways to ensure that the clamping buckles are connected with the wall reinforcing steel bars at the most proper positions, so that the hafen groove is finally connected with the template tightly. When the pipeline bracket is erected at the later stage, the bracket can penetrate through the rotatable blocking steel sheet from the lower end of the Hafen groove, and can be fixed on the Hafen groove when reaching a preset position. In order to prevent the water seepage of the bolt after the wall pouring is finished, the bolt is provided with a water stop sheet. The water stopping function is added to the hafen groove.
The invention aims to improve the stability of the halan tank and facilitate later use. According to the design, triangular supports are additionally arranged at four corners of the Hafen groove, and the triangular supports are provided with slide fasteners (shown in figure 2), so that bayonets are fixed on wall body reinforcing steel bars during installation, and the stability is improved; secondly, a water-stopping steel sheet (as shown in figure 3) is arranged on the long bolt at the back of the Hafen groove, so that the water seepage of the through-wall bolt is prevented. And a rotatable blocking steel sheet (as shown in figure 7) is arranged in the hafen groove, so that the bracket arm support is more convenient and stable to mount at the later stage.
It will be understood that modifications and variations can be made by persons skilled in the art in light of the above teachings and all such modifications and variations are intended to be included within the scope of the invention as defined in the appended claims.

Claims (5)

1. A novel Halfen groove is characterized by comprising a Halfen groove (1), wherein a large-head bolt (14) is arranged behind the Halfen groove (1) and is inserted into a wall (6) through the large-head bolt (14); the Hafen groove (1) is a concave cuboid, the inner side of the Hafen groove is provided with a steel sheet (2), and the four corners of the outer side of the Hafen groove are provided with triangular supports (8); the triangular bracket (8) is provided with a buckle (3) with adjustable position, and the buckle (3) on the triangular bracket (8) is connected with a reinforcing steel bar (7) with corresponding position on the wall body; the connecting position of the Hafen groove (1) and the reinforcing steel bar (7) is adjusted by adjusting the position of the buckle (3) on the triangular bracket (8), so that the Hafen groove (1) is tightly connected with the template (4); the steel sheet (2) adopts a rotatable structure, the steel sheet (2) is used for installing a pipeline supporting arm, the pipeline supporting arm penetrates through the rotatable steel sheet (2) from the lower end of the Hafen groove (1), and when the pipeline supporting arm reaches a preset position, the pipeline supporting arm can be fixed on the Hafen groove (1);
the steel sheet (2) comprises a rotatable blocking steel sheet (9) and sawteeth (10), a rotating shaft is arranged on the rotatable blocking steel sheet (9), and the sawteeth (10) are arranged on the lower part of the rotatable blocking steel sheet (9);
the triangular support (8) is a right-angled triangle;
a slideway (11) is arranged on one bottom edge of the triangular bracket (8); the buckle (3) comprises a connecting block (12) and a fastening bolt (13), wherein the connecting block (12) is arranged on the slideway (11) and can slide in the slideway (11); the fastening bolt (13) is arranged below the connecting block (12), the buckle (3) is fixed on the wall body steel bar, and the buckle (3) is fastened with the steel bar (7);
each big-end bolt (14) is also provided with a water stop sheet (5).
2. A new type hausen cell according to claim 1, characterised in that there are no less than 4 studs (14) provided.
3. A new type hausen cell according to claim 1, characterised in that the triangular support (8) is mounted at an angle to the hausen cell (1).
4. A novel Hafen slot as claimed in claim 1, characterized in that C-shaped channel steel is arranged on both sides of the Hafen slot (1).
5. The novel hafen groove as claimed in claim 1, wherein the construction method using the novel hafen groove comprises the following steps:
step 1, selecting a Hufen groove installation position;
after the binding of the reinforcing steel bars of the pipe gallery wall is finished, selecting a Hufen groove installation position according to the early-stage design requirement;
step 2, fixing the hafen groove at an installation position;
inserting the big end bolt behind the Hafen slot into the reinforced wall body, and determining whether the installation is bilateral or not according to the requirement:
if the installation is unilateral, the large-head bolt with the water stop sheet is directly bound with the main body steel bar, and the four triangular supports are inserted into the wall body steel bar;
if the installation is bilateral, the C-shaped channel steels on two sides of the Hafen channel are installed by using a level gauge after the large-head bolt is ensured to be vertical to the wall body, and the triangular supports at four corners are installed in the same step as the single-side installation;
step 3, adjusting the position of the triangular support;
after the triangular support is inserted into a steel bar wall body, the buckles can move on the triangular support, when a proper steel bar is selected for fixing, the connecting blocks of the buckles are moved to enable the buckles to be tightly buckled with the steel bar, after the buckles at the four corners are completely fixed, whether the hafen grooves are vertical or not is observed, and the next step can be carried out after the hafen grooves are vertical;
step 4, installing a template;
installing a template, tightly attaching the Halfen groove and the template together, filling the Halfen groove with a filler, and ensuring that no concrete is poured into the Halfen groove in the later period;
step 5, pouring concrete;
and finally, after the Hafen groove is checked to be in close contact with the template and is vertical to the ground, concrete pouring is carried out.
CN202011370746.3A 2020-11-30 2020-11-30 Novel Hafen groove and construction method thereof Active CN112459262B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011370746.3A CN112459262B (en) 2020-11-30 2020-11-30 Novel Hafen groove and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011370746.3A CN112459262B (en) 2020-11-30 2020-11-30 Novel Hafen groove and construction method thereof

Publications (2)

Publication Number Publication Date
CN112459262A CN112459262A (en) 2021-03-09
CN112459262B true CN112459262B (en) 2022-05-10

Family

ID=74804932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011370746.3A Active CN112459262B (en) 2020-11-30 2020-11-30 Novel Hafen groove and construction method thereof

Country Status (1)

Country Link
CN (1) CN112459262B (en)

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0518954D0 (en) * 2005-09-16 2005-10-26 Laing O Rourke Plc Fixing embedments in reinforced concrete
KR20090088106A (en) * 2008-02-14 2009-08-19 김향순 The fixation means which is bought in the concrete structure
CN104769194A (en) * 2012-10-11 2015-07-08 株式会社世宗研究井发 Cast-in anchor channel having sub-anchor
CN205171550U (en) * 2015-11-28 2016-04-20 贵州安凯达实业股份有限公司 Piping lane fixed bolster chute structure
CN206052977U (en) * 2016-09-14 2017-03-29 中国建筑第八工程局有限公司 The ruggedized construction of built-in groove
CN208203773U (en) * 2018-04-20 2018-12-07 包头市神润高新材料股份有限公司 A kind of self-locking T-bolt that the fragrant slot in cooperation Kazakhstan uses
CN208280174U (en) * 2018-06-08 2018-12-25 中国十七冶集团有限公司 A kind of new-type built-in groove for underground pipe gallery
CN208533566U (en) * 2018-05-28 2019-02-22 德阳瑞方智能交通设备科技有限公司 A kind of rail traffic assembled integrates the fastener inserts of prefabricated piping lane
CN109826441A (en) * 2018-12-29 2019-05-31 济南城建集团有限公司 One kind breathing out fragrant slot laterally pre-buried installation method for concrete structure c-type
CN110359485A (en) * 2019-07-05 2019-10-22 中国十七冶集团有限公司 A kind of pre-buried trough fixation device of steel form and its construction method
CN110752572A (en) * 2019-11-01 2020-02-04 河北帕克轨道交通设备有限公司 Bracket with bracket arm easy to install
CN210182252U (en) * 2019-05-06 2020-03-24 上海良信电器股份有限公司 Sliding block clamping structure of moving contact system of translational isolating switch
CN111501825A (en) * 2020-04-20 2020-08-07 中国一冶集团有限公司 Installation method of Hafen groove and cantilever support in cast-in-situ comprehensive pipe gallery
CN111691458A (en) * 2020-06-22 2020-09-22 福建省华策建设集团有限公司 Construction method of comprehensive pipe rack support
CN211736023U (en) * 2019-10-18 2020-10-23 绿材实业有限责任公司 Cement surface fly ash fiber sandwich wallboard

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8209925B2 (en) * 2009-11-12 2012-07-03 The Foley Group, LLC Connector system for securing an end portion of a steel structural member to a vertical cast concrete member
CN108005377B (en) * 2017-12-08 2020-05-01 中国一冶集团有限公司 Hafen groove embedded part installation method matched with composite template for construction
CN111501826A (en) * 2020-04-20 2020-08-07 中国一冶集团有限公司 Installation method of cast-in-situ comprehensive pipe gallery pre-buried hafen channel

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0518954D0 (en) * 2005-09-16 2005-10-26 Laing O Rourke Plc Fixing embedments in reinforced concrete
KR20090088106A (en) * 2008-02-14 2009-08-19 김향순 The fixation means which is bought in the concrete structure
CN104769194A (en) * 2012-10-11 2015-07-08 株式会社世宗研究井发 Cast-in anchor channel having sub-anchor
CN205171550U (en) * 2015-11-28 2016-04-20 贵州安凯达实业股份有限公司 Piping lane fixed bolster chute structure
CN206052977U (en) * 2016-09-14 2017-03-29 中国建筑第八工程局有限公司 The ruggedized construction of built-in groove
CN208203773U (en) * 2018-04-20 2018-12-07 包头市神润高新材料股份有限公司 A kind of self-locking T-bolt that the fragrant slot in cooperation Kazakhstan uses
CN208533566U (en) * 2018-05-28 2019-02-22 德阳瑞方智能交通设备科技有限公司 A kind of rail traffic assembled integrates the fastener inserts of prefabricated piping lane
CN208280174U (en) * 2018-06-08 2018-12-25 中国十七冶集团有限公司 A kind of new-type built-in groove for underground pipe gallery
CN109826441A (en) * 2018-12-29 2019-05-31 济南城建集团有限公司 One kind breathing out fragrant slot laterally pre-buried installation method for concrete structure c-type
CN210182252U (en) * 2019-05-06 2020-03-24 上海良信电器股份有限公司 Sliding block clamping structure of moving contact system of translational isolating switch
CN110359485A (en) * 2019-07-05 2019-10-22 中国十七冶集团有限公司 A kind of pre-buried trough fixation device of steel form and its construction method
CN211736023U (en) * 2019-10-18 2020-10-23 绿材实业有限责任公司 Cement surface fly ash fiber sandwich wallboard
CN110752572A (en) * 2019-11-01 2020-02-04 河北帕克轨道交通设备有限公司 Bracket with bracket arm easy to install
CN111501825A (en) * 2020-04-20 2020-08-07 中国一冶集团有限公司 Installation method of Hafen groove and cantilever support in cast-in-situ comprehensive pipe gallery
CN111691458A (en) * 2020-06-22 2020-09-22 福建省华策建设集团有限公司 Construction method of comprehensive pipe rack support

Also Published As

Publication number Publication date
CN112459262A (en) 2021-03-09

Similar Documents

Publication Publication Date Title
CN207048069U (en) A kind of pipe gallery segmental timbering
CN112459262B (en) Novel Hafen groove and construction method thereof
CN211473453U (en) Reinforced structure of pre-buried channel
CN218405565U (en) Integral pouring structure for advanced water stop of post-cast strip
CN109826441B (en) Lateral pre-embedding installation method for C-shaped hafen groove of concrete structure
CN219344030U (en) Pre-buried opposite-pulling screw device for lining wall
CN111155553A (en) Back-pasting type rubber water stop structure and construction method of pipe gallery deformation joint
CN220747651U (en) Column template mounting structure
CN214424061U (en) Anchoring device for temporarily fixing floor steel beam
CN215408692U (en) Tunnel longitudinal water stop belt mounting device
CN214785955U (en) Post-cast strip template
CN216108608U (en) Embedded part fixing and combining device
CN114837231B (en) Integral pouring structure for advanced water stop of post-pouring belt and construction method
CN211973587U (en) Pre-buried supporting member with water stop steel plate
JP3898595B2 (en) Installation structure and construction method of precast lining members
CN220768458U (en) Post-pouring belt structure connected with existing concrete structure
CN220814887U (en) Contain waterstop side wall end wall structure template
CN215330689U (en) Prefabricated wall panel for underground structure
JP3359145B2 (en) How to install the water stop plate
CN221073065U (en) Waterproof integrated advanced plugging assembly for outer wall post-pouring belt
CN219605252U (en) Rail top air duct post-pouring construction blanking hole plugging system
CN220379030U (en) Suspension bracket device for ceiling pipeline bridge
CN214786223U (en) Reinforcing structure of high big back beam of aluminum alloy template balcony
CN214832928U (en) Side wall post-cast strip precast concrete template simple and convenient to install
CN220789632U (en) Ship backing member water-blocking structure combined with underwater pile cap steel hanging box of high-pile wharf

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant