CN112252465A - Construction method of formwork - Google Patents

Construction method of formwork Download PDF

Info

Publication number
CN112252465A
CN112252465A CN202011053845.9A CN202011053845A CN112252465A CN 112252465 A CN112252465 A CN 112252465A CN 202011053845 A CN202011053845 A CN 202011053845A CN 112252465 A CN112252465 A CN 112252465A
Authority
CN
China
Prior art keywords
template
construction method
positioning strip
end part
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011053845.9A
Other languages
Chinese (zh)
Inventor
袁旺鲜
陈炼
李坚
胡岳根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suntown Technology Group Co Ltd
Original Assignee
Suntown Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suntown Technology Group Co Ltd filed Critical Suntown Technology Group Co Ltd
Priority to CN202011053845.9A priority Critical patent/CN112252465A/en
Publication of CN112252465A publication Critical patent/CN112252465A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84—Walls made by casting, pouring, or tamping in situ
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/02—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08—Forms, which are completely dismantled after setting of the concrete and re-built for next pouring

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A construction method of a formwork includes the steps: the concrete body comprises a main body part and a plurality of vertical steel bars, wherein the main body part comprises two vertical side surfaces which are oppositely arranged and a transverse end surface which is connected between the two vertical side surfaces, each vertical steel bar comprises a first end part and a second end part which is opposite to the first end part, the first end part is inserted into the main body part, and the second end part is exposed out of the transverse end surface. And determining a preset position on the second end part, and arranging the positioning strip on the preset position, wherein at least one end of the positioning strip is exposed out of the vertical side surface. Set up the template in at least one side of the concrete body, the template includes a template main part and a plurality of side rib, and the template main part includes a working face and a holding surface relative with the working face, and the side rib sets up in the periphery of holding surface and deviates from the working face, working face and perpendicular side parallel and level, and the side rib holds to lean on the location strip. And filling gaps between the side ribs and the transverse end faces to finish the installation of the template.

Description

Construction method of formwork
Technical Field
The invention relates to a construction method of a template.
Background
When the aluminium mould board connects the stubble with the concrete platform, need confirm the mounted position of wall outside template, adopt the fixed flitch of wall screw rod at present stage, highly fix a position through adjusting the flitch, but this mode is comparatively rough, the condition that causes local inhomogeneous settlement because of the nut consolidates rotatory not in place exists in practical application, it is big easily to cause whole elevation difference, and because the construction difference of different projects, probably there is not available wall screw rod of wearing, or former screw rod mounted position height is unsuitable to need trompil again and destroys original structure at the concrete bench.
Disclosure of Invention
The invention aims to provide a construction method of a formwork, which does not need to use a screw and does not damage a concrete platform.
A construction method of a formwork includes the steps:
providing a concrete body, wherein the concrete body comprises a main body part and a plurality of vertical steel bars, the main body part comprises two vertical side surfaces which are oppositely arranged and a transverse end surface which is connected between the two vertical side surfaces, each vertical steel bar comprises a first end part and a second end part which is opposite to the first end part, the first end part is inserted into the main body part, and the second end part is exposed out of the transverse end surface.
And determining a preset position on the second end part, and arranging a positioning strip on the preset position, wherein at least one end of the positioning strip is exposed out of the vertical side surface.
In at least one side of the concrete body sets up the template, the template includes a template main part and a plurality of side rib, the template main part include a working face and with a holding surface that the working face is relative, the side rib set up in the periphery of holding surface just deviates from the working face, the working face with erect the side parallel and level, the side rib bear lean on the location strip.
And filling gaps between the side ribs and the transverse end surfaces to finish the installation of the template.
Further, the concrete body comprises a thickness direction and an extension direction, the thickness direction is perpendicular to the extension direction, and the plurality of vertical steel bars are arranged on the main body part at intervals along the thickness direction and the extension direction.
Further, the concrete body still includes many horizontal reinforcing bars, the horizontal reinforcing bar is followed thickness direction set up in the concrete body, and each horizontal reinforcing bar connects at least one the vertical reinforcement.
Further, the positioning strip is perpendicular to the second end, and the part of the positioning strip exposed out of the vertical side surface is perpendicular to the vertical side surface.
Further, the step of "determining the predetermined location on the second end" includes:
and setting a datum line higher than the preset position, wherein the datum line is parallel to the transverse end surface, and the datum line and the second end part are intersected at a datum point.
And measuring the predetermined distance along the central axis direction of the second end part by taking the reference point as an origin, thereby determining the predetermined position on the second end part.
Further, the step of "disposing the lock bar at the predetermined position" includes the steps of:
pre-fixing the positioning strip near the preset position, and confirming the distance between the positioning strip and the datum point.
And when the positioning strip deviates from the preset position, moving the positioning strip to the preset position, and fixing the positioning strip at the preset position.
When the positioning strip is not deviated from the preset position, the positioning strip is directly fixed at the preset position.
Further, still include:
and measuring whether the distance between the side rib on the positioning strip and the datum line is the preset distance.
And when the distance between the side rib and the datum line is not equal to the preset distance, raising or sinking the template.
Further, the step of "filling the gap between the side rib and the lateral end face" includes:
and arranging a batten on one side of the positioning strip, which is deviated from the side rib, wherein the batten is connected with the side rib, a gap is formed between the batten and the side rib, and the gap is opposite to the gap.
And filling fillers into the gap and the clearance, so that the fillers are clamped between the side rib and the batten.
Further, the positioning bar is a steel bar, and the positioning bar is fixed to the second end portion in a welding mode.
Further, the templates are arranged on one side of the concrete body side by side, and the working surface of each template is flush with the working surfaces of the other templates.
The formwork construction method provided by the invention has the following advantages:
the first positioning strip is directly fixed at the second end part, and extra drilling on a concrete body is not needed, so that the operation is simple and convenient, and the construction efficiency is improved;
(II) performing joint filling treatment between the side ribs and the transverse end faces to prevent slurry from leaking during pouring, and easily adjusting the types and the amount of fillers;
and thirdly, the mounting position of the template is rechecked for many times, so that the positioning precision of the template is improved, and the occurrence of wrong platforms is prevented.
Drawings
Fig. 1 is a flowchart of a construction method of a formwork according to an embodiment of the present invention.
Fig. 2 is a schematic diagram of determining a predetermined position in the formwork construction method provided by the present invention.
Fig. 3 is a schematic diagram of the formwork in the formwork construction method according to the present invention after the formwork is installed.
Fig. 4 is a schematic view of the formwork construction method according to the present invention after the formwork is removed.
Description of the main elements
Concrete body 100
Main body part 10
Vertical side 11
Transverse end face 12
Vertical reinforcing bar 20
Transverse reinforcement bar 30
Positioning strip 40
Form body 50
Edge rib 51
Working surface 501
Support surface 502
Wood block 60
K plate 70
K plate body 71
Fixing member 72
Template 200
Pouring space 300
Wall 400
Thickness direction T
Predetermined position P
Reference point B
Reference line L
Center axis O
Predetermined distance F
Gap S
Void R
Distance D
The following detailed description of the invention will be further described in conjunction with the above description of the drawings.
Detailed Description
The technical scheme of the invention is clearly and completely described in the following by combining the drawings of the specific embodiment. It is to be understood that the described embodiments are merely exemplary of the invention, and not restrictive of the full scope of the invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention.
Referring to fig. 1 to 4, an embodiment of the present invention provides a formwork construction method for installing formworks 200 on two sides of a concrete body 100, including:
s1, please refer to fig. 1 and 2, providing a concrete body 100, where the concrete body 100 includes a main body 10 and a plurality of vertical reinforcing bars 20, the main body 10 includes two vertical side surfaces 11 disposed oppositely and a transverse end surface 12 connected between the two vertical side surfaces 11, each vertical reinforcing bar 20 includes a first end portion 21 and a second end portion 22 opposite to the first end portion 21, the first end portion 21 is inserted into the main body 10, and the second end portion 22 is exposed out of the transverse end surface 12.
In this embodiment, in step S1, the concrete body 100 includes a thickness direction T and an extending direction, the thickness direction T is perpendicular to the extending direction, the plurality of vertical reinforcing bars 20 are disposed on the main body 10 at intervals along the thickness direction T and the extending direction, and a distance D between every two adjacent vertical reinforcing bars 20 is less than 800 mm. The vertical reinforcing bars 20 are mainly used to reinforce the strength of the concrete body 100.
In this embodiment, in step S1, the concrete body 100 further includes a plurality of transverse bars 30, the transverse bars 30 are disposed on the concrete body 100 along the thickness direction T, each of the transverse bars 30 is connected to at least one of the vertical bars 20, and the transverse bars 30 are mainly used for connecting the vertical bars 20 to form a whole.
S2, determining a predetermined position P on the second end 22, and disposing the positioning bar 40 at the predetermined position P, wherein at least one end of the positioning bar 40 is exposed out of the vertical side 11.
In this embodiment, the step S2 of determining the predetermined position P on the second end portion 22 includes the steps of:
and S20, setting a reference line L slightly higher than the preset position P, wherein the reference line L is parallel to the transverse end surface 12 and intersects with the second end part 22 at a reference point B.
And S21, measuring a predetermined distance F downwards along the central axis O direction of the second end part 22 by taking the reference point B as an origin (the predetermined distance F can be adjusted according to the applicability of construction drawings), and determining the predetermined position P on the second end part 22.
In this embodiment, the distance between the reference line L and the transverse end surface 12 is 1000mm, the predetermined distance F is 950 mm, a K plate 70 is installed at a height of 50 mm, and the K plate 70 is used for supporting a wall surface formwork on a previous layer.
In this embodiment, the step S2 of disposing the positioning bar 40 at the predetermined position P includes the steps of:
s22, pre-fixing the positioning bar 40 near the preset position P, then confirming the distance between the positioning bar 40 and the datum point B again, if the positioning bar 40 deviates from the preset position P (the deviation between the positioning bar 40 and the preset position P is more than 2 mm), moving the positioning bar 40 to the preset position P, and finally fixing; if the positioning strip 40 does not deviate from the predetermined position P (the deviation between the positioning strip 40 and the predetermined position P is less than 2 mm), the final fixation is directly performed, wherein the fixation is realized by a welding mode, and whether the welding is firm or not needs to be checked after the welding fixation is completed.
In this embodiment, in step S2, the positioning bar 40 is perpendicular to the second end 22, and the portion of the positioning bar 40 exposed on the vertical side 11 is perpendicular to the vertical side 11.
In this embodiment, in step S2, the positioning bars 40 are distributed on the transverse end surface 12 at intervals, the positioning bars 40 are steel bars, the diameter of each steel bar is 14 mm, and the distance between every two adjacent positioning bars 40 is less than 800 mm.
S3, please refer to fig. 3, a formwork 200 is disposed on at least one side of the concrete body 100, the formwork 200 includes a formwork main body 50 and a plurality of side ribs 51, the formwork main body 50 includes a working surface 501 and a supporting surface 502 opposite to the working surface 501, the side ribs 51 are disposed on the periphery of the supporting surface 502 and face away from the working surface 501, the working surface 501 is flush with the vertical side 11, and the side ribs 51 are supported on the positioning bars 40.
In this embodiment, in step S3, a plurality of the templates 200 are arranged side by side on one side of the concrete body 100, and the working surface 501 of each template 200 is flush with the working surfaces of the other templates 200.
In the present embodiment, step S3 includes: the formwork 200 is arranged on the outer sides of the two vertical side surfaces 11 of the concrete body 100, the formwork 200 arranged on the vertical side surfaces 11 oppositely encloses to form a pouring space 300, and the pouring space 300 is used for pouring concrete slurry.
In the present embodiment, step S3 includes: a K plate 70 is disposed on a side of the formwork 200 outside the wall, which is away from the positioning strip 40, the K plate 70 includes a K plate main body 71 and a fixing member 72 protruding from the K plate main body 71, and the fixing member 72 is inserted into the concrete slurry to fix the K plate 70.
In this embodiment, referring to fig. 4, after step S3, the method further includes: and after the concrete slurry is cured, removing the template 200 to form a wall 400.
In this embodiment, step S3 further includes the steps of:
s30, a first rechecking, which includes measuring whether the distance between the side rib 51 on the positioning bar 40 and the reference line L is the predetermined distance F. If the distance between the side rib 51 and the reference line L is not equal to the predetermined distance F, raising or lowering the template 200 is required, and a first recheck is completed; if the distance between the side rib 51 and the reference line L is equal to the predetermined distance, the position of the template 200 does not need to be adjusted, and the first recheck is completed.
And S4, filling the gap S between the side rib 51 and the transverse end face 12 to complete the installation of the template 200.
In the present embodiment, the step S4 of filling the gap between the side rib 51 and the lateral end face 12 includes the steps of:
s40, arranging a batten 60 on the side of the positioning strip 40 departing from the side rib 51, wherein the batten 60 is connected with the side rib 51 through a hinge, and a gap R is formed between the batten 60 and the side rib 51 and is opposite to the gap S.
S41, filling the gap R and the space S with a filler (e.g., wood block, concrete block, etc.), and adjusting the hinge to clamp the filler between the side rib 51 and the batten 60.
In this embodiment, step S4 is followed by: and pouring concrete slurry in the pouring space 300, and removing the template 200 after the concrete slurry is solidified.
In this embodiment, step S4 is followed by a second review, which includes reviewing the distance between the side rib 51 and the reference point B with a laser level and a tower ruler, and performing local adjustment and error control if necessary.
Compared with the prior art, the formwork construction method provided by the invention has the following advantages:
the first positioning strip is directly fixed at the second end part, and extra drilling on a concrete body is not needed, so that the operation is simple and convenient, and the construction efficiency is improved;
(II) performing joint filling treatment between the side ribs and the transverse end faces to prevent slurry from leaking during pouring, and easily adjusting the types and the amount of fillers;
and thirdly, the mounting position of the template is rechecked for many times, so that the positioning precision of the template is improved, and the occurrence of wrong platforms is prevented.
The following will exemplify the construction method of the formwork of the present invention.
Firstly, prepare the tower/steel tape (5M), laser level, appropriate amount of phi 12 x 300mm reinforcing bar head (200 mm wall thickness is taken as an example) (the length of the reinforcing bar head is determined according to the wall thickness, usually 100mm wall thickness), iron wire, batten, step fastening, hand saw, and clean the template or sundries of the wall outside the outer wall.
Then, the laser level switch is turned on, and the laser level emits light to form a reference line L, which intersects the second end 22 at a reference point B, which is 1000mmm in height from the bottom surface.
And then, aligning the original point of the tower ruler/steel tape with the reference point B, slowly moving the tower ruler/steel tape up and down, directly aligning a positioning strip 40 (phi 14 mm and 300mm) prepared in advance with a 950 mm position of the tower ruler/steel tape by a welder, welding the tower ruler/steel tape on a vertical stressed steel bar of the shear wall, checking whether the welding is firm before installing an outer wall template after welding, and performing repair welding on the tower ruler/steel tape in a direction vertical to the elevation positioning steel bar when loosening and settlement possibly occur to ensure the reliability of the tower ruler/steel tape.
And then welding positioning strips 40 on each outer wall according to the vertical stressed steel bar position of the shear wall, wherein the distance between the positioning strips is not more than 800mm, and the distance between the two positioning strips 40 on the outer side and the edge of the concrete body 100 is less than 200 mm.
The template 200 is then mounted on the locator bar 40.
Then, the distance between the side rib 51 and the reference point B is checked for the first time by using the laser level and the tower ruler, and local adjustment is performed if necessary to control an error.
And then, caulking, namely, filling the gap between the template and the wall body by using battens, and reinforcing by using iron wires, iron nails, step tightening and the like.
Then, the distance between the side rib 51 and the reference point B is checked with a laser level and a slide rule for the second time, and if necessary, local adjustment is performed to control an error.
In addition, those skilled in the art should recognize that the foregoing embodiments are illustrative only, and not limiting, and that appropriate changes and modifications can be made without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (10)

1. A construction method of a formwork is characterized by comprising the following steps:
providing a concrete body, wherein the concrete body comprises a main body part and a plurality of vertical steel bars, the main body part comprises two vertical side surfaces which are arranged oppositely and a transverse end surface which is connected between the two vertical side surfaces, each vertical steel bar comprises a first end part and a second end part which is opposite to the first end part, the first end part is inserted into the main body part, and the second end part is exposed out of the transverse end surface;
determining a preset position on the second end part, and arranging a positioning strip on the preset position, wherein at least one end of the positioning strip is exposed out of the vertical side surface;
arranging the template on at least one side of the concrete body, wherein the template comprises a template main body and a plurality of side ribs, the template main body comprises a working surface and a supporting surface opposite to the working surface, the side ribs are arranged on the periphery of the supporting surface and deviate from the working surface, the working surface is flush with the vertical side surface, and the side ribs are supported on the positioning strips;
and filling gaps between the side ribs and the transverse end surfaces to finish the installation of the template.
2. The construction method according to claim 1, wherein the concrete body includes a thickness direction and an extension direction, the thickness direction is perpendicular to the extension direction, and a plurality of the vertical bars are provided at intervals in the thickness direction and the extension direction in the main body.
3. The construction method according to claim 2, wherein the concrete body further comprises a plurality of transverse reinforcing bars disposed in the concrete body along the thickness direction, and each transverse reinforcing bar is connected to at least one of the vertical reinforcing bars.
4. The construction method according to claim 1, wherein the positioning bar is perpendicular to the second end portion, and a portion of the positioning bar exposed to the vertical side surface is perpendicular to the vertical side surface.
5. The construction method of claim 1, wherein the step of "determining the predetermined location on the second end" comprises:
setting a datum line higher than the preset position, wherein the datum line is parallel to the transverse end surface and intersects with the second end part at a datum point;
and measuring the predetermined distance along the central axis direction of the second end part by taking the reference point as an origin, thereby determining the predetermined position on the second end part.
6. The construction method according to claim 5, wherein the step of "disposing the positioning bar at the predetermined position" comprises the steps of:
pre-fixing the positioning strip near the preset position, and confirming the distance between the positioning strip and the datum point;
when the positioning strip deviates from the preset position, moving the positioning strip to the preset position, and fixing the positioning strip at the preset position;
when the positioning strip is not deviated from the preset position, the positioning strip is directly fixed at the preset position.
7. The construction method according to claim 5, further comprising:
measuring whether the distance between the side rib on the positioning strip and the datum line is the preset distance;
and when the distance between the side rib and the datum line is not equal to the preset distance, raising or sinking the template.
8. The construction method according to claim 1, wherein the step of "filling the gap between the side rib and the lateral end surface" includes:
arranging a batten on one side of the positioning strip, which is far away from the side rib, wherein the batten is connected with the side rib, a gap is formed between the batten and the side rib, and the gap is opposite to the gap;
and filling fillers into the gap and the clearance, so that the fillers are clamped between the side rib and the batten.
9. The construction method according to claim 1, wherein the positioning bar is a steel bar, and the positioning bar is fixed to the second end portion by welding.
10. The construction method according to claim 1, wherein a plurality of said forms are arranged side by side on one side of said concrete body, and said working surface of each said form is flush with said working surfaces of the other said forms.
CN202011053845.9A 2020-09-30 2020-09-30 Construction method of formwork Pending CN112252465A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011053845.9A CN112252465A (en) 2020-09-30 2020-09-30 Construction method of formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011053845.9A CN112252465A (en) 2020-09-30 2020-09-30 Construction method of formwork

Publications (1)

Publication Number Publication Date
CN112252465A true CN112252465A (en) 2021-01-22

Family

ID=74235070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011053845.9A Pending CN112252465A (en) 2020-09-30 2020-09-30 Construction method of formwork

Country Status (1)

Country Link
CN (1) CN112252465A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695703A (en) * 2015-02-11 2015-06-10 茂名市建筑集团有限公司 Non-drilled shear wall construction template system and shear wall construction method
CN205153527U (en) * 2015-10-27 2016-04-13 中建一局集团第三建筑有限公司 End part plugging plate for shaped steel formwork
CN205935641U (en) * 2016-08-24 2017-02-08 天津市兴业龙祥建设工程有限公司 Template formwork system of aluminum alloy shear force wall
CN107461027A (en) * 2017-09-21 2017-12-12 付志红 A kind of wall form reinforcement system
CN207228614U (en) * 2017-06-21 2018-04-13 中民筑友建设有限公司 A kind of formwork fastener and its installation node
CN108661307A (en) * 2018-06-22 2018-10-16 中国五冶集团有限公司 A kind of concrete wall template location structure and method
CN211313369U (en) * 2019-10-10 2020-08-21 中建三局第三建设工程有限责任公司 Drilling-free reinforcing system for shear wall large template

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695703A (en) * 2015-02-11 2015-06-10 茂名市建筑集团有限公司 Non-drilled shear wall construction template system and shear wall construction method
CN205153527U (en) * 2015-10-27 2016-04-13 中建一局集团第三建筑有限公司 End part plugging plate for shaped steel formwork
CN205935641U (en) * 2016-08-24 2017-02-08 天津市兴业龙祥建设工程有限公司 Template formwork system of aluminum alloy shear force wall
CN207228614U (en) * 2017-06-21 2018-04-13 中民筑友建设有限公司 A kind of formwork fastener and its installation node
CN107461027A (en) * 2017-09-21 2017-12-12 付志红 A kind of wall form reinforcement system
CN108661307A (en) * 2018-06-22 2018-10-16 中国五冶集团有限公司 A kind of concrete wall template location structure and method
CN211313369U (en) * 2019-10-10 2020-08-21 中建三局第三建设工程有限责任公司 Drilling-free reinforcing system for shear wall large template

Similar Documents

Publication Publication Date Title
JP4732915B2 (en) Foundation construction method and device, and anchor bolt support device for construction
JP2016160690A (en) Road bridge guard fence and its installation method
CN112942812A (en) Positioning device for shear wall template and method for mounting template by using same
JP5235700B2 (en) Construction method of building foundation and joint board for building foundation construction
CA2576780C (en) Slab edge casing and method therefor
JP3959517B2 (en) Steel frame mounting hardware and mounting method
JP2019155659A (en) Drilling machine
JP2023001964A (en) Measurement jig, template jig, and bridge repair/reinforcement method using them
JP7704224B2 (en) Anchor bolt installation tool and anchor bolt installation method
CN116696072B (en) A construction method for a large-span steel channel frame
CN215055521U (en) Stable installation structure of anchor bolt embedded parts
CN116623948A (en) A kind of aluminum alloy formwork construction technology
CN114525847B (en) Construction method suitable for steel reinforced concrete beam column and prefabricated laminated slab system
CN214940096U (en) Column shoe bolt assembling and positioning device
CN117738228A (en) Method for installing foundation embedded part of structural equipment
JP3734571B2 (en) Wall panel mounting structure
JPH07180360A (en) Standing formwork fixture
JP2002348883A (en) Foundation structure and foundation construction method
CN114000428A (en) Method for constructing cushion stone and stop block
CN114033191A (en) Anchor plate type foundation bolt positioning method
JPH06316939A (en) Positioning jig for construction work, and construction of building therewith
JPH08284180A (en) Foundation bolt embedding method
JPH0532536B2 (en)
CN217897070U (en) Prefabricated stairs for civil and industrial buildings
CN223805726U (en) A fastening structure for adjacent wall panels

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210122