Disclosure of Invention
The invention aims to overcome the defects of the prior art and provide the environment-friendly and efficient smokeless furnace which has the advantages of simple structure, full fuel combustion, high fuel utilization rate, rapid heating of a heating medium, no smoke and no smoke dust.
In order to achieve the above purpose, the invention adopts the following technical scheme:
The environment-friendly efficient smokeless furnace comprises a base 1, a combustion chamber 2 and an absorption chamber 3, wherein the base 1 comprises a first water tank 1-1, a second water tank 1-2, a bottom wall 1-3 and a plurality of hollow calandria 1-4, and the first water tank 1-1 and the second water tank 1-2 are respectively arranged on two sides of the bottom wall 1-3 to form a base side wall; a calandria 1-4 is transversely arranged between the water tank I1-1 and the water tank II 1-2, one end of the calandria 1-4 is communicated with the water tank I1-1, and the other end is communicated with the water tank II 1-2;
The upper part of the first water tank 1-1 is provided with a base water tank water inlet 1-5, and the lower part of the second water tank 1-2 is provided with a base water tank water outlet 1-6;
The top of the base 1 is opened, and an ash removal port 1-7 is arranged on one surface between the first water tank 1-1 and the second water tank 1-2; an absorption chamber 3 is arranged on the surface opposite to the surface provided with the ash removal port; one surface of the base 1 connected with the absorption chamber 3 is not closed;
The combustion chamber 2 is arranged above the base 1, is a cylinder with four closed sides, and is opened at the top and not closed at the bottom; a combustion chamber coil pipe 2-1 is arranged in the combustion chamber 2 along the inner wall of the combustion chamber, and a combustion chamber flue is formed in the middle of the combustion chamber coil pipe 2-1; one side of the combustion chamber 2 is provided with a combustion chamber water inlet 2-2 and a combustion chamber water outlet 2-3 positioned at the lower part of the combustion chamber water inlet 2-2; one end of the combustion chamber coil pipe 2-1 is connected with the combustion chamber water inlet 2-2, and the other end is connected with the base water tank water inlet 1-5 through the combustion chamber water outlet 2-3; a charging port 4 is formed in the top of the base 1;
The absorption chamber 3 is of a box structure, an absorption chamber coil pipe 3-1 is arranged in the absorption chamber 3 along the inner wall of the absorption chamber, an absorption chamber flue is formed in the middle of the absorption chamber coil pipe 3-1, and an absorption chamber water inlet 3-2 and an absorption chamber water outlet 3-3 are respectively formed in the lower part of the absorption chamber 3; one end of the absorption chamber coil pipe 3-1 is connected with the water outlet 1-6 of the base water tank through the absorption chamber water inlet 3-2, the other end of the absorption chamber coil pipe is connected with the absorption chamber water outlet 3-3, and the other end of the absorption chamber water outlet 3-3 is connected with the pump;
the lower part of the absorption chamber 3 is communicated with one surface connected with the base 1 to form a flue, a main smoke exhaust port 5 is formed in the top of the absorption chamber 3, the tail end of the flue of the absorption chamber is connected with the main smoke exhaust port 5, and the other end of the main smoke exhaust port 5 is connected with a fan.
Further, the water inlet 1-5 of the base water tank is arranged higher than the calandria 1-4, and the water outlet 1-6 of the base water tank is arranged lower than the calandria 1-4.
Further, an air inlet 6 is arranged on the side wall of the combustion chamber 2 opposite to the absorption chamber 3.
Further, the smokeless furnace further comprises a second smoke extraction port, and the second smoke extraction port is arranged on the furnace body outside the combustion chamber; and a flue through hole is formed in one side wall of the combustion chamber, the flue through hole leads to a second smoke suction port, and the other end of the second smoke suction port is connected with a fan.
Further, the support legs are arranged below the base.
The smokeless furnace provided by the invention consists of a combustion chamber, a base and an absorption chamber, wherein the combustion chamber and the absorption chamber are internally provided with coils, a cavity formed by the coils is used as a flue, the coils determine the flow direction of water, and the flue determines the direction of flame.
In the smokeless furnace, one surface of the lower part of the absorption chamber connected with the base is communicated to form a flue, and when fuel is combusted, flame enters the base from the combustion chamber under the action of the fan and enters the absorption chamber through a channel between the base and the absorption chamber, so that the smoke-free furnace is in a counter-combustion mode; at this time, water enters the combustion chamber through the water inlet of the combustion chamber, circulates to the base water tank through the coil pipe, is communicated with the absorption chamber through the water outlet of the base water tank, enters through the water inlet of the absorption chamber below the absorption chamber, flows from bottom to top along the coil pipe, then flows from top to bottom through the coil pipe and is discharged to the water outlet of the absorption chamber, and the heat utilization rate is further improved.
The high-efficiency energy-saving smokeless furnace provided by the invention has the advantages that heat flows along with flue gas in the flue, and heat medium flows reversely in the side furnace wall water tank, the front and rear furnace wall cavities, the calandria and the flue water tank, so that the heat utilization rate is high.
An air inlet is arranged on the side wall of the combustion chamber, and the air inlet can support combustion;
when the calandria on the base below the combustion chamber is used as the furnace drawer, flame of fuel combustion heats the heating medium in the calandria through the calandria below the furnace drawer, so that the heat utilization rate can be further improved.
In order to ensure the effective operation of the exhaust fan (pumping the air in the furnace body), the ash removal port is arranged to be a closed ash removal port, a plug-in type baffle plate can be used for sealing, a hinge type sealing door can also be used, and sealing materials such as fire-resistant cotton are arranged on the sealing side.
The high-efficiency energy-saving smokeless furnace provided by the invention can use most common fuels such as coal, charcoal, firewood and the like because the fuel can be fully combusted. The fuel can be fully combusted, so that the household gas (CO) poisoning risk is avoided, and the safety is realized.
Compared with the prior art, the environment-friendly high-efficiency smokeless furnace has the advantages that: (1) The fuel is fully combusted, so that smoke and smoke dust are not generated, and the environment is protected; (2) The fuel is fully combusted, the heat utilization rate is high, and the use cost is low; (3) The furnace is dual-purpose, has wide application range, is safe and has no risk of gas poisoning.
Detailed Description
The following examples are given for the purpose of illustration only and are not intended to limit the scope of the invention in order to provide a better understanding of the technical solution of the present invention to those skilled in the art.
The environment-friendly efficient smokeless furnace comprises a base 1, a combustion chamber 2 and an absorption chamber 3, wherein the base 1 comprises a first water tank 1-1, a second water tank 1-2, a bottom wall 1-3 and a plurality of hollow calandria 1-4, and the first water tank 1-1 and the second water tank 1-2 are respectively arranged on two sides of the bottom wall 1-3 to form a base side wall; a calandria 1-4 is transversely arranged between the water tank I1-1 and the water tank II 1-2, one end of the calandria 1-4 is communicated with the water tank I1-1, and the other end is communicated with the water tank II 1-2;
The upper part of the first water tank 1-1 is provided with a base water tank water inlet 1-5, and the lower part of the second water tank 1-2 is provided with a base water tank water outlet 1-6;
The top of the base 1 is opened, and an ash removal port 1-7 is arranged on one surface between the first water tank 1-1 and the second water tank 1-2; an absorption chamber 3 is arranged on the surface opposite to the surface provided with the ash removal port; one surface of the base 1 connected with the absorption chamber 3 is not closed;
The combustion chamber 2 is arranged above the base 1, is a cylinder with four closed sides, and is opened at the top and not closed at the bottom; a combustion chamber coil pipe 2-1 is arranged in the combustion chamber 2 along the inner wall of the combustion chamber, and a combustion chamber flue is formed in the middle of the combustion chamber coil pipe 2-1; one side of the combustion chamber 2 is provided with a combustion chamber water inlet 2-2 and a combustion chamber water outlet 2-3 positioned at the lower part of the combustion chamber water inlet 2-2; one end of the combustion chamber coil pipe 2-1 is connected with the combustion chamber water inlet 2-2, and the other end is connected with the base water tank water inlet 1-5 through the combustion chamber water outlet 2-3; a charging port 4 is formed in the top of the base 1;
The absorption chamber 3 is of a box structure, an absorption chamber coil pipe 3-1 is arranged in the absorption chamber 3 along the inner wall of the absorption chamber, an absorption chamber flue is formed in the middle of the absorption chamber coil pipe 3-1, and an absorption chamber water inlet 3-2 and an absorption chamber water outlet 3-3 are respectively formed in the lower part of the absorption chamber 3; one end of the absorption chamber coil pipe 3-1 is connected with the water outlet 1-6 of the base water tank through the absorption chamber water inlet 3-2, the other end of the absorption chamber coil pipe is connected with the absorption chamber water outlet 3-3, and the other end of the absorption chamber water outlet 3-3 is connected with the pump;
the lower part of the absorption chamber 3 is communicated with one surface connected with the base 1 to form a flue, a main smoke exhaust port 5 is formed in the top of the absorption chamber 3, the tail end of the flue of the absorption chamber is connected with the main smoke exhaust port 5, and the other end of the main smoke exhaust port 5 is connected with a fan.
Further, the water inlet 1-5 of the base water tank is arranged higher than the calandria 1-4, and the water outlet 1-6 of the base water tank is arranged lower than the calandria 1-4.
Further, an air inlet 6 is arranged on the side wall of the combustion chamber 2 opposite to the absorption chamber 3.
Further, the smokeless furnace further comprises a second smoke extraction port, and the second smoke extraction port is arranged on the furnace body outside the combustion chamber; and a flue through hole is formed in one side wall of the combustion chamber, the flue through hole leads to a second smoke suction port, and the other end of the second smoke suction port is connected with a fan.
Further, the support legs are arranged below the base.
Example 1
As shown in fig. 1-3, the embodiment provides an environment-friendly efficient smokeless furnace, which comprises a base 1, a combustion chamber 2 and an absorption chamber 3, wherein the base 1 comprises a first water tank 1-1, a second water tank 1-2, a bottom wall 1-3 and a plurality of hollow calandria 1-4, and the first water tank 1-1 and the second water tank 1-2 are respectively arranged on two sides of the bottom wall 1-3 to form a side wall of the base; a calandria 1-4 is transversely arranged between the water tank I1-1 and the water tank II 1-2, one end of the calandria 1-4 is communicated with the water tank I1-1, and the other end is communicated with the water tank II 1-2;
The upper part of the first water tank 1-1 is provided with a base water tank water inlet 1-5, and the lower part of the second water tank 1-2 is provided with a base water tank water outlet 1-6;
The top of the base 1 is opened, and an ash removal port 1-7 is arranged on one surface between the first water tank 1-1 and the second water tank 1-2; an absorption chamber 3 is arranged on the surface opposite to the surface provided with the ash removal port; one surface of the base 1 connected with the absorption chamber 3 is not closed;
As shown in fig. 1 to 4, the combustion chamber 2 is arranged above the base 1, is a cylinder with closed periphery, and has an open top and an unsealed bottom; a combustion chamber coil pipe 2-1 is arranged in the combustion chamber 2 along the inner wall of the combustion chamber, and a combustion chamber flue is formed in the middle of the combustion chamber coil pipe 2-1; one side of the combustion chamber 2 is provided with a combustion chamber water inlet 2-2 and a combustion chamber water outlet 2-3 positioned at the lower part of the combustion chamber water inlet 2-2; one end of the combustion chamber coil pipe 2-1 is connected with the combustion chamber water inlet 2-2, and the other end is connected with the base water tank water inlet 1-5 through the combustion chamber water outlet 2-3; a charging port 4 is formed in the top of the base 1;
As shown in figures 5-6, the absorption chamber 3 is of a box structure, an absorption chamber coil pipe 3-1 is arranged in the absorption chamber 3 along the inner wall of the absorption chamber, an absorption chamber flue is formed in the middle of the absorption chamber coil pipe 3-1, and an absorption chamber water inlet 3-2 and an absorption chamber water outlet 3-3 are respectively arranged at the lower part of the absorption chamber 3; one end of the absorption chamber coil pipe 3-1 is connected with the water outlet 1-6 of the base water tank through the absorption chamber water inlet 3-2, the other end of the absorption chamber coil pipe is connected with the absorption chamber water outlet 3-3, and the other end of the absorption chamber water outlet 3-3 is connected with the pump;
the lower part of the absorption chamber 3 is communicated with one surface connected with the base 1 to form a flue, a main smoke exhaust port 5 is formed in the top of the absorption chamber 3, the tail end of the flue of the absorption chamber is connected with the main smoke exhaust port 5, and the other end of the main smoke exhaust port 5 is connected with a fan.
Further, the water inlet 1-5 of the base water tank is arranged higher than the calandria 1-4, and the water outlet 1-6 of the base water tank is arranged lower than the calandria 1-4.
Example 2
As shown in fig. 1-3, the embodiment provides an environment-friendly efficient smokeless furnace, which comprises a base 1, a combustion chamber 2 and an absorption chamber 3, wherein the base 1 comprises a first water tank 1-1, a second water tank 1-2, a bottom wall 1-3 and a plurality of hollow calandria 1-4, and the first water tank 1-1 and the second water tank 1-2 are respectively arranged on two sides of the bottom wall 1-3 to form a side wall of the base; a calandria 1-4 is transversely arranged between the first water tank 1-1 and the second water tank 1-2, one end of the calandria 1-4 is communicated with the first water tank 1-1, the other end of the calandria is communicated with the second water tank 1-2, a water inlet 1-5 of the base water tank is higher than the calandria 1-4, and a water outlet 1-6 of the base water tank is lower than the calandria 1-4.
The upper part of the first water tank 1-1 is provided with a base water tank water inlet 1-5, and the lower part of the second water tank 1-2 is provided with a base water tank water outlet 1-6;
The top of the base 1 is opened, and an ash removal port 1-7 is arranged on one surface between the first water tank 1-1 and the second water tank 1-2; an absorption chamber 3 is arranged on the surface opposite to the surface provided with the ash removal port; one surface of the base 1 connected with the absorption chamber 3 is not closed;
As shown in fig. 1 to 4, the combustion chamber 2 is arranged above the base 1, is a cylinder with closed periphery, and has an open top and an unsealed bottom; a combustion chamber coil pipe 2-1 is arranged in the combustion chamber 2 along the inner wall of the combustion chamber, and a combustion chamber flue is formed in the middle of the combustion chamber coil pipe 2-1; one side of the combustion chamber 2 is provided with a combustion chamber water inlet 2-2 and a combustion chamber water outlet 2-3 positioned at the lower part of the combustion chamber water inlet 2-2; one end of the combustion chamber coil pipe 2-1 is connected with the combustion chamber water inlet 2-2, and the other end is connected with the base water tank water inlet 1-5 through the combustion chamber water outlet 2-3; a charging port 4 is formed in the top of the base 1;
As shown in figures 5-6, the absorption chamber 3 is of a box structure, an absorption chamber coil pipe 3-1 is arranged in the absorption chamber 3 along the inner wall of the absorption chamber, an absorption chamber flue is formed in the middle of the absorption chamber coil pipe 3-1, and an absorption chamber water inlet 3-2 and an absorption chamber water outlet 3-3 are respectively arranged at the lower part of the absorption chamber 3; one end of the absorption chamber coil pipe 3-1 is connected with the water outlet 1-6 of the base water tank through the absorption chamber water inlet 3-2, the other end of the absorption chamber coil pipe is connected with the absorption chamber water outlet 3-3, and the other end of the absorption chamber water outlet 3-3 is connected with the pump;
the lower part of the absorption chamber 3 is communicated with one surface connected with the base 1 to form a flue, a main smoke exhaust port 5 is formed in the top of the absorption chamber 3, the tail end of the flue of the absorption chamber is connected with the main smoke exhaust port 5, and the other end of the main smoke exhaust port 5 is connected with a fan.
In this embodiment, the side wall of the combustion chamber 2 opposite to the absorption chamber 3 is provided with an air inlet 6, and if necessary, the air inlet 6 can be opened to achieve the effect of supporting combustion for the fuel in the combustion chamber.
Example 3
As shown in fig. 1-3, the embodiment provides an environment-friendly efficient smokeless furnace, which comprises a base 1, a combustion chamber 2 and an absorption chamber 3, wherein the base 1 comprises a first water tank 1-1, a second water tank 1-2, a bottom wall 1-3 and a plurality of hollow calandria 1-4, and the first water tank 1-1 and the second water tank 1-2 are respectively arranged on two sides of the bottom wall 1-3 to form a side wall of the base; a calandria 1-4 is transversely arranged between the first water tank 1-1 and the second water tank 1-2, one end of the calandria 1-4 is communicated with the first water tank 1-1, the other end of the calandria is communicated with the second water tank 1-2, a water inlet 1-5 of the base water tank is higher than the calandria 1-4, and a water outlet 1-6 of the base water tank is lower than the calandria 1-4.
The upper part of the first water tank 1-1 is provided with a base water tank water inlet 1-5, and the lower part of the second water tank 1-2 is provided with a base water tank water outlet 1-6;
The top of the base 1 is opened, and an ash removal port 1-7 is arranged on one surface between the first water tank 1-1 and the second water tank 1-2; an absorption chamber 3 is arranged on the surface opposite to the surface provided with the ash removal port; one surface of the base 1 connected with the absorption chamber 3 is not closed;
As shown in fig. 1 to 4, the combustion chamber 2 is arranged above the base 1, is a cylinder with closed periphery, and has an open top and an unsealed bottom; a combustion chamber coil pipe 2-1 is arranged in the combustion chamber 2 along the inner wall of the combustion chamber, and a combustion chamber flue is formed in the middle of the combustion chamber coil pipe 2-1; one side of the combustion chamber 2 is provided with a combustion chamber water inlet 2-2 and a combustion chamber water outlet 2-3 positioned at the lower part of the combustion chamber water inlet 2-2; one end of the combustion chamber coil pipe 2-1 is connected with the combustion chamber water inlet 2-2, and the other end is connected with the base water tank water inlet 1-5 through the combustion chamber water outlet 2-3; a charging port 4 is formed in the top of the base 1; wherein, be provided with air intake 6 on the lateral wall of combustion chamber 2 on the opposite side with absorption chamber 3, if necessary, can open air intake 6, reach the effect of combustion-supporting to the fuel in the combustion chamber.
As shown in figures 5-6, the absorption chamber 3 is of a box structure, an absorption chamber coil pipe 3-1 is arranged in the absorption chamber 3 along the inner wall of the absorption chamber, an absorption chamber flue is formed in the middle of the absorption chamber coil pipe 3-1, and an absorption chamber water inlet 3-2 and an absorption chamber water outlet 3-3 are respectively arranged at the lower part of the absorption chamber 3; one end of the absorption chamber coil pipe 3-1 is connected with the water outlet 1-6 of the base water tank through the absorption chamber water inlet 3-2, the other end of the absorption chamber coil pipe is connected with the absorption chamber water outlet 3-3, and the other end of the absorption chamber water outlet 3-3 is connected with the pump;
the lower part of the absorption chamber 3 is communicated with one surface connected with the base 1 to form a flue, a main smoke exhaust port 5 is formed in the top of the absorption chamber 3, the tail end of the flue of the absorption chamber is connected with the main smoke exhaust port 5, and the other end of the main smoke exhaust port 5 is connected with a fan.
The smokeless furnace also comprises a second smoke extraction port, wherein the second smoke extraction port is arranged on the furnace body outside the combustion chamber; and a flue through hole is formed in one side wall of the combustion chamber, the flue through hole leads to a second smoke suction port, and the other end of the second smoke suction port is connected with a fan. The smokeless furnace can be used as an industrial furnace or a household furnace, and can be used for heating and the like when the first smoke extraction port works; if necessary, the first smoke exhausting port is closed, the second smoke exhausting port is opened, and the furnace body outside the combustion chamber can be used as a small-sized stove for water heating, cooking and the like.
The preferred embodiments of the present invention have been described in detail above, but the present invention is not limited to the specific details of the above embodiments, and various modifications can be made to the technical solutions of the present invention within the scope of the technical concept of the present invention, and these simple modifications all fall within the scope of the present invention.
In addition, the specific features and steps described in the foregoing embodiments may be combined in any suitable manner, and in order to avoid unnecessary repetition, various possible combinations are not described in detail.
Moreover, any combination of the various embodiments of the invention can be made without departing from the spirit of the invention, which should also be considered as disclosed herein.